FUGRO TECHNICAL SERVICES LIMITED Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company. A Fugro Group Company Contract NE/2017/02 : Tseung Kwan O – Lam Tin Tunnel – Road P2/D4 and Associated Works Noise Mitigation Plan Revision Chronology No. NMP Report No. a. Activities No.1 to 4 remain unchanged while Activities No.5 and 6 have been re-organized into new Activities No.5, 6. 7 and 8. b. The new Activities No.5, 6, 7 and 8 are confined within the current site boundary demarcation in Figures 1b to 1d (with legend updated) while Figure 1e is no longer applicable and removed. c. Tables 2, 3, 4, 5 and 6 have been revised accordingly. d. Plots 1 and 2 have been re-organized and expanded into Plots 1a, 1b, 1c, 2a, 2b, 2c. 2 3 4 5 6 7 8 9 10 04/12/2018 Revision Background / Reason for Revision Revised by Revision Date Revision Highlight To go in line with the latest site progress and the construction plant inventory variation 0005/18/ED/0004k 1 Fugro Technical Services Ltd.

3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected]

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 0 of 1

Contract NE/2017/02 : Tseung Kwan O – Lam Tin Tunnel – Road P2/D4 and Associated Works

Noise Mitigation Plan

Revision Chronology

No. NMP Report No.

a. Activities No.1 to 4 remain unchanged while Activities No.5 and 6

have been re-organized into new Activities No.5, 6. 7 and 8.

b. The new Activities No.5, 6, 7 and 8 are confined within the current site

boundary demarcation in Figures 1b to 1d (with legend updated) while

Figure 1e is no longer applicable and removed.

c. Tables 2, 3, 4, 5 and 6 have been revised accordingly.

d. Plots 1 and 2 have been re-organized and expanded into Plots 1a, 1b,

1c, 2a, 2b, 2c.

2

3

4

5

6

7

8

9

10

04/12/2018

Revision Background / Reason

for RevisionRevised by

Revision

DateRevision Highlight

To go in line with the

latest site progress

and the construction

plant inventory

variation

0005/18/ED/0004k1 Fugro

Technical

Services

Ltd.

Page 2: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 1 of 36

Noise Mitigation Plan for Contract NE/2017/02 Tseung Kwan O – Lam Tin Tunnel – Road P2/D4 and Associated Works

Client : Zhen Hua Engineering Company

Limited

Project : Noise Mitigation Plan for

NE/2017/02 Tseung Kwan O – Lam Tin

Tunnel – Road P2/D4 and Associated

Works

Prepared by:

__________________________

Mr. K. W. CHENG (AMIOA, MHKIOA)

Reviewed by:

__________________________

Calvin M.P. LEUNG (M239 of HKIOA)

Certified by:

__________________________

Colin K. L. YUNG Project Manager Fugro Technical Services Limited

Page 3: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 2 of 36

TABLE OF CONTENTS TABLE

1. Introduction 1

2. Noise Mitigation Plan 1

2.1 Noise Sensitive Receivers & Statutory Noise Limits 1

2.2 Construction Plant Inventory 2

2.3 Construction Noise Calculations 4

2.4 Noise Mitigation Measures (Construction Noise) 14

2.5 Noise Mitigation Measures (Road Traffic Noise) 14

2.6 Construction Noise Levels & Compliance Status 15

3. Conclusion 19

4. References 19

TABLE

Table 1 Critical Noise Sensitive Receivers & Statutory Noise Limits

Table 2 Construction Plant Inventory

Table 3 Construction Noise Calculations (Mitigated)

Table 4 Predicted Monthly Construction Noise Levels (Mitigated)

Table 5 Summary of Proposed Noise Mitigation Measures

Table 6 Summary of Predicted Construction Noise Levels

FIGURE

FIGURE 1a Location Plan of the Construction Site

FIGURE 1b Location Plan of Noise Sensitive Receivers & Activity Locations (Activity No.1, 2, 4, 5 and 7)

FIGURE 1c Location Plan of Noise Sensitive Receivers & Activity Locations (Activity No.3, 6 and 8 ; NSR-1, NSR-3, NSR-5)

FIGURE 1d Location Plan of Noise Sensitive Receivers & Activity Locations (Activity No.3, 6 and 8 ; NSR-2, NSR-4, NSR-6)

FIGURE 2 Location Plan of the Noise Sensitive Receivers within the 300m Noise Study Boundary

APPENDIX

APPENDIX A Proposed Mitigation Measures

Page 4: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 3 of 36

1. Introduction

1.1 Contract Requirements

This project refers to Contract No. NE/2017/02 Tseung Kwan O – Lam Tin Tunnel – Road P2/D4 and Associated Works. Fugro Technical Services Limited (FTS) has been appointed as the Environmental Consultant by Zhen Hua Engineering Company Limited to prepare a Noise Mitigation Plan (NMP) for this contract which is to be completed in fulfilment of the associated Environmental Permit No. EP-458/2013/C, Part C, Condition 2.5 as well as the Particular Specification, Section 25.13A of the Contract.

1.2 Scope

The NMP under this report applies to all the critical construction activities which are involved in a number of stages including the road construction, drainage works, footbridge construction as well as the subsequent landscaping works throughout the whole construction period. Particular attention shall be paid to the concurrent school activities during the school examination time during which the contract is to be executed.

2. Noise Mitigation Plan

2.1 Noise Sensitive Receivers & Statutory Noise Limits

A total of 6 critical noise sensitive receivers (NSRs) have been identified as shown in Figures 1b to 1d and Table 1 below. They are particularly within the 300 m distance from the site boundary as delineated in Figure 2 under the current Contract. Only NSR-5 is common with the corresponding NSR No. N7603 (as designated under the associated EIA report) which has been covered under the Noise Mitigation Plans of the other 2 neighbouring Contracts: NE/2015/02 (Revision 7, updated on 04-04-2018) and NE/2015/03. Table 1 Critical Noise Sensitive Receivers & Statutory Noise Limits

Designation PremisesNoise Limit in

Leq (30 min), dB(A)Remarks

NSR-1 Metrotown, Tower 1 75

NSR-2 Hong Kong Design Institute

Served by mechanical ventilation with curtain wall façades

instead of natural ventilation via openable windows ; offering -

10 dB(A) noise reduction

NSR-3 Hong Kong IVE (Lee Wai Lee)

NSR-4 Tiu Keng Leng Public Library 70

Served by mechanical ventilation with 'fixed window + curtain

wall' façades instead of natural ventilation via openable

windows ; offering -10 dB(A) noise reduction

NSR-5 Park Central, Tower 6 75

NSR-6 Park Central, Central Heights 75

Notes : Only NSR-5 has been covered in the Noise Mitigation Plans under the other 2 Contract : NE/2015/02 and NE/2015/03

70 or 65 (during

examination)

Page 5: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 4 of 36

2.2 Construction Plant Inventory

Table 2 below gives the construction plant inventory over the whole construction period to be adopted for the 8 activities corresponding to the latest site progress. Table 2 Construction Plant Inventory

Group Item ClassificationIdentification

CodeSource Description Quantity

SWL,

dB(A)

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105

2 PME CNP 082 Excavator (mini-robot mounted) 2 94

3 PME CNP 143 Light Good Vehicle (G.V.W. ≤ 5.5 tonnes) 1 101

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

5 PME CNP 185 Road Roller 2 108

1 PME CNP 072 Drilling rig (Pre-drilling) 1 110

2 PME CNP 105 Grout mixer 1 90

3 PME CNP 106 Grout pump 1 105

5 PME CNP 281 Water pump (electric) 1 88

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 8 102

2 PME CNP 164 Bored Piling - Grab & Chisel 2 115

3 PME CNP 165 Bored Piling - Oscillator 2 115

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 2 100

5 SPME BS D6/33 b Concrete lorry mixer 8 96

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105

7 PME CNP 082 Excavator (mini-robot mounted) 2 94

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100

9 PME CNP 048 Mobile / crawler crane 2 112

10 PME CNP 281 Water pump (electric) 2 88

1 PME CNP 003 a Air compressor (air flow > 30 m3/min) 8 104

2 SPME BS D6/33 b Concrete lorry mixer 8 96

3 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110

4 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105

5 PME CNP 082 Excavator (mini-robot mounted) 2 94

6 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100

7 PME CNP 048 Mobile / crawler crane 2 112

8 PME CNP 281 Water pump (electric) 2 88

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115

3 PME CNP 165 Bored Piling - Oscillator 1 115

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100

5 SPME BS D6/33 b Concrete lorry mixer 4 96

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

7 PME CNP 082 Excavator (mini-robot mounted) 1 94

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100

9 PME CNP 048 Mobile / crawler crane 1 112

10 PME CNP 281 Water pump (electric) 1 88

11 PME CNP 003 a Air compressor (air flow > 30 m3/min) 4 104

12 SPME BS D6/33 b Concrete lorry mixer 4 96

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

15 PME CNP 082 Excavator (mini-robot mounted) 1 94

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100

17 PME CNP 048 Mobile / crawler crane 1 112

18 PME CNP 281 Water pump (electric) 1 88

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115

3 PME CNP 165 Bored Piling - Oscillator 1 115

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100

5 SPME BS D6/33 b Concrete lorry mixer 4 96

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

7 PME CNP 082 Excavator (mini-robot mounted) 1 94

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100

9 PME CNP 048 Mobile / crawler crane 1 112

10 PME CNP 281 Water pump (electric) 1 88

11 PME CNP 003 a Air compressor (air flow > 30 m3/min) 8 104

12 SPME BS D6/33 b Concrete lorry mixer 8 96

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105

15 PME CNP 082 Excavator (mini-robot mounted) 2 94

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100

17 PME CNP 048 Mobile / crawler crane 2 112

18 PME CNP 281 Water pump (electric) 2 88

Activity Period

Powered Mechanical Equipment (PME)

4

5

1Utilities

Diversion3/2018-6/2019 1

a

a

a

a

a

2

Bored Piling /

Pre-bored

Socketed H

Pile / Pre-

drilling

a

a

a

a

a

a

8/2018-12/2019

1

2

3

Page 6: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 5 of 36

Table 2 Cont'd.

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105

2 PME CNP 081 Excavator 1 112

3 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

5 PME CNP 186 Roller (vibratory) 1 108

6 PME CNP 283 Water pump (submersible, electric) 4 85

1 SPME CNP 025 a Breaker (hand-held, 20 kg ≤ mass ≤ 35 kg) 1 111

2 SPME BS D6/33 b Concrete lorry mixer 1 96

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

4 PME CNP 081 Excavator 1 112

5 PME CNP 107 Generator (portable) - Welding set 1 100

6 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102

7 PME CNP 186 Roller (vibratory) 1 108

8 PME CNP 283 Water pump (submersible, electric) 4 85

1 PME CNP 021 a Bar Bender and Cutter (electric) 1 90

2 SPME BS D6/33 b Concrete lorry mixer 3 96

3 PME CNP 048 Crawler Crane 1 112

4 PME CNP 056 Cutter (circular, steel, electric) 1 112

5 PME CNP 081 Excavator 1 112

6 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

7 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102

8 PME CNP 168 Power Pack for Hand-held Items 1 100

2 1 PME CNP 068 a Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105

Activities 5 to 6 being mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110

3 PME CNP 081 Excavator 1 112

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100

5 PME CNP 048 Mobile / crawler crane 1 112

1 PME CNP 003 a Air compressor (air flow > 30 m3/min) 2 104

2 SPME BS D6/33 b Concrete lorry mixer 2 96

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

4 PME CNP 081 Excavator 1 112

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100

6 PME CNP 048 Mobile / crawler crane 1 112

6Concrete

Breaking8/2018-11/2020 1 1 PME CNP 028 a Breaker (excavator mounted, hydraulic) 1 122

Activities 7 to 8 being mutually exclusive (not occurring concurrently with) from Activities 1 to 6

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110

3 PME CNP 081 Excavator 1 112

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100

5 PME CNP 048 Mobile / crawler crane 1 112

1 PME CNP 003 a Air compressor (air flow > 30 m3/min) 2 104

2 SPME BS D6/33 b Concrete lorry mixer 2 96

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

4 PME CNP 081 Excavator 1 112

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100

6 PME CNP 048 Mobile / crawler crane 1 112

1 PME CNP 004 Asphalt Paver 1 109

2 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105

3 PME CNP 168 Power Pack for Hand-held Items 1 100

4 PME CNP 184 Road Planer 1 111

5 PME CNP 185 Road Roller (Pneumatic Tyred Roller) 1 108

6 PME CNP 186 Roller (vibratory) 1 108

Notes : 1. SPME = Specified Powered Mechanical Equipment ; SWL = Sound Power Level

2. Source from 'a' EPD's Technical Memorandum GW-TM [1] or DA-TM [2] ; 'b' British Standard BS 5229-1 (2009) [3]

8Flexible

Pavement8/2018-11/2020 1

a

a

a

a

a

7

Bored Piling /

Pre-bored

Socketed H

Pile / Pre-

drilling

8/2018-12/2019 1

Bored Piling /

Pre-bored

Socketed H

Pile / Pre-

drilling

8/2018-12/2019 2

5

Bored Piling /

Pre-bored

Socketed H

Pile / Pre-

drilling

8/2018-12/2019 1

Bored Piling /

Pre-bored

Socketed H

Pile / Pre-

drilling

8/2018-12/2019 2

1

3

Drainage,

Sewerage and

Water Mains

8/2018-11/2020

4

Footbridge

Segment

Installation /

Staircase and

Lift Shaft

Construction

7/2019-11/2020

1

2

a

a

a

Page 7: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 6 of 36

2.3 Construction Noise Calculations

Construction noise calculations based on the latest proposed plant inventory have been carried out to give the Corrected Noise Levels (CNLs) for the 6 most critical NSRs as tabulated in Table 3 below. All CNLs are derived from the selected Sound Power Levels (SWLs) of the respective Powered Mechanical Equipments (PMEs) as well as corrections including those for PME % On-time (both the plant inventory and PME % On-time have been reviewed and confirmed to be appropriate estimates by the Resident Engineer of the project team), noise screening (e.g. noise barrier), distance attenuation (source-to-receiver slant distance ‘R’ where the source is taken as the notional source position) and façade reflection. Details of the combined CNL time variation over the whole construction period from 2018 to 2020 (with relevant noise mitigation measures) and the noise compliance status are summarized in Table 4. In particular the cumulative CNLs at the common NSR-5 from all the noise contribution under the current Contract NE/2017/02 as well as the other Contract NE/2015/02 + NE/2015/03 are given in Table 4 (NSR-5 only) as well.

Page 8: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 7 of 36

Table 3 Construction Noise Calculations (Mitigated)

NSR-1 : Metrotown, Tower 1 (Mitigated) Updated : 27-11-2018

Group Item ClassificationIdentification

CodeDescription Quantity

SWL,

dB(A)

Combined

SWL, dB(A)Individual Overall

Non-restricted Hours

(07:00-19:00)

Compliance

(CNL ≤ Noise Limit)

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 247 52

2 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 50 0 247 41

3 PME CNP 143 Light Good Vehicle (G.V.W. ≤ 5.5 tonnes) 1 101 101 50 0 247 45

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 247 47

5 PME CNP 185 Road Roller 2 108 111 50 0 247 55

1 PME CNP 072 Drilling rig (Pre-drilling) 1 110 110 60 0 271 54

2 PME CNP 105 Grout mixer 1 90 90 40 0 271 32

3 PME CNP 106 Grout pump 1 105 105 40 0 271 47

5 PME CNP 281 Water pump (electric) 1 88 88 60 0 271 32

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 8 102 111 35 0 271 53

2 PME CNP 164 Bored Piling - Grab & Chisel 2 115 118 60 0 271 62

3 PME CNP 165 Bored Piling - Oscillator 2 115 118 60 0 271 62

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 2 100 103 60 0 271 47

5 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 271 49

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 271 47

7 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 271 39

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 271 49

9 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 271 57

10 PME CNP 281 Water pump (electric) 2 88 91 60 0 271 35

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 271 55

2 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 271 49

3 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 271 57

4 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 271 47

5 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 271 39

6 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 271 49

7 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 271 57

8 PME CNP 281 Water pump (electric) 2 88 91 60 0 271 35

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 271 50

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 271 59

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 271 59

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 271 44

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 271 46

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 271 44

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 271 36

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 271 46

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 271 54

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 271 32

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 4 104 110 35 0 271 52

12 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 271 46

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 60 0 271 54

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 271 44

15 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 271 36

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 271 46

17 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 271 54

18 PME CNP 281 Water pump (electric) 1 88 88 60 0 271 32

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 271 50

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 271 59

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 271 59

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 271 44

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 271 46

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 271 44

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 271 36

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 271 46

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 271 54

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 271 32

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 271 55

12 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 271 49

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 271 57

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 271 47

15 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 271 39

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 271 49

17 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 271 57

18 PME CNP 281 Water pump (electric) 2 88 91 60 0 271 35

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 25 0 122 55

2 PME CNP 081 Excavator 1 112 112 30 0 122 60

3 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 122 56

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 25 0 122 52

5 PME CNP 186 Roller (vibratory) 1 108 108 25 0 122 55

6 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 122 44

1 SPME CNP 025 Breaker (hand-held, 20 kg ≤ mass ≤ 35 kg) 1 111 111 25 0 122 58

2 SPME BS D6/33 Concrete lorry mixer 1 96 96 70 0 122 48

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 122 53

4 PME CNP 081 Excavator 1 112 112 25 0 122 59

5 PME CNP 107 Generator (portable) - Welding set 1 100 100 50 0 122 50

6 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 35 0 122 51

7 PME CNP 186 Roller (vibratory) 1 108 108 25 0 122 55

8 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 122 44

1 PME CNP 021 Bar Bender and Cutter (electric) 1 90 90 100 0 271 36

2 SPME BS D6/33 Concrete lorry mixer 3 96 101 50 0 271 44

3 PME CNP 048 Crawler Crane 1 112 112 80 0 271 57

4 PME CNP 056 Cutter (circular, steel, electric) 1 112 112 60 0 271 56

5 PME CNP 081 Excavator 1 112 112 80 0 271 57

6 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 271 48

7 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 50 0 271 45

8 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 271 43

2 1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 271 51 51 75 Complied

Activities 5 to 6 being mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 271 53

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 271 56

3 PME CNP 081 Excavator 1 112 112 40 0 271 54

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 271 46

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 271 54

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 271 53

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 271 42

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 271 46

4 PME CNP 081 Excavator 1 112 112 40 0 271 54

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 271 46

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 271 55

6 Concrete Breaking 8/2018-11/2020 1 1 PME CNP 028 Breaker (excavator mounted, hydraulic) 1 122 122 39 0 122 71 71 75 Complied

Activities 7 to 8 being mutually exclusive (not occurring concurrently with) from Activities 1 to 6

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 271 53

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 271 56

3 PME CNP 081 Excavator 1 112 112 40 0 271 54

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 271 46

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 271 54

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 271 53

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 271 42

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 271 46

4 PME CNP 081 Excavator 1 112 112 40 0 271 54

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 271 46

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 271 55

1 PME CNP 004 Asphalt Paver 1 109 109 50 0 122 59

2 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 122 55

3 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 122 50

4 PME CNP 184 Road Planer 1 111 111 50 0 122 61

5 PME CNP 185 Road Roller (Pneumatic Tyred Roller) 1 108 108 50 0 122 58

6 PME CNP 186 Roller (vibratory) 1 108 108 50 0 122 58

Notes : 1. SPME = Specified Powered Mechanical Equipment ; SWL = Sound Power Level ; CNL = Corrected Noise Level 3. * Noise Mitigation Measures = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction]

2. Combined SWL = SWL + 10 log (Quantity) ; Predicted CNL (Individual) = Combined SWL + 10 log (PME % On-time) + Correction (Measures) - 20 log (R) - 8 + Facade Reflection [where Facade Reflection = 3] ; Predicted CNL (Overall) = 10 log [∑10(Predicted CNL (Individual) /10)

]

75 Complied8 Flexible Pavement 8/2018-11/2020 1 66

75 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 60 75 Complied

7

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 61

75 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 60 75 Complied

5

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 61

75 Complied4

Footbridge

Segment

Installation /

Staircase and Lift

Shaft Construction

7/2019-11/20201 62

Complied

3

Drainage,

Sewerage and

Water Mains

8/2018-11/2020

1 64 75 Complied

2 64 75 Complied

Predicted CNL, dB(A) Statutory Noise Limit, dB(A)

Complied75

2

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019

1 55

5 66 75

4 65 75 Complied

1 Utilities Diversion 3/2018-6/2019 1 58

3 62

75 Complied

2 66 75 Complied

75 Complied

Activity Period

Powered Mechanical Equipment (PME)PME %

On-time

Distance 'R'

(Source to Critical

NSR), m

Correction

(Noise Mitigation

Measures)

Page 9: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 8 of 36

NSR-2 : Hong Kong Design Institute (Mitigated) Updated : 27-11-2018

Group Item ClassificationIdentification

CodeDescription Quantity

SWL,

dB(A)

Combined

SWL, dB(A)Individual Overall

Non-restricted Hours

(07:00-19:00)

Compliance

(CNL ≤ Noise Limit)

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 118 49

2 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 50 0 118 38

3 PME CNP 143 Light Good Vehicle (G.V.W. ≤ 5.5 tonnes) 1 101 101 50 0 118 42

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 118 43

5 PME CNP 185 Road Roller 2 108 111 50 0 118 52

1 PME CNP 072 Drilling rig (Pre-drilling) 1 110 110 60 0 143 50

2 PME CNP 105 Grout mixer 1 90 90 40 0 143 28

3 PME CNP 106 Grout pump 1 105 105 40 0 143 43

5 PME CNP 281 Water pump (electric) 1 88 88 60 0 143 28

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 8 102 111 35 0 143 48

2 PME CNP 164 Bored Piling - Grab & Chisel 2 115 118 60 0 143 58

3 PME CNP 165 Bored Piling - Oscillator 2 115 118 60 0 143 58

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 2 100 103 60 0 143 43

5 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 143 45

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 143 43

7 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 143 35

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 143 45

9 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 143 52

10 PME CNP 281 Water pump (electric) 2 88 91 60 0 143 31

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 143 50

2 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 143 45

3 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 143 53

4 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 143 43

5 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 143 35

6 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 143 45

7 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 143 52

8 PME CNP 281 Water pump (electric) 2 88 91 60 0 143 31

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 143 45

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 143 55

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 143 55

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 143 40

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 143 42

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 143 40

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 143 32

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 143 42

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 143 49

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 143 28

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 4 104 110 35 0 143 47

12 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 143 42

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 60 0 143 50

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 143 40

15 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 143 32

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 143 42

17 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 143 49

18 PME CNP 281 Water pump (electric) 1 88 88 60 0 143 28

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 143 45

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 143 55

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 143 55

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 143 40

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 143 42

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 143 40

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 143 32

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 143 42

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 143 49

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 143 28

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 143 50

12 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 143 45

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 143 53

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 143 43

15 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 143 35

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 143 45

17 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 143 52

18 PME CNP 281 Water pump (electric) 2 88 91 60 0 143 31

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 25 0 57 52

2 PME CNP 081 Excavator 1 112 112 30 0 57 57

3 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 57 53

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 25 0 57 49

5 PME CNP 186 Roller (vibratory) 1 108 108 25 0 57 52

6 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 57 41

1 SPME CNP 025 Breaker (hand-held, 20 kg ≤ mass ≤ 35 kg) 1 111 111 25 0 57 55

2 SPME BS D6/33 Concrete lorry mixer 1 96 96 70 0 57 44

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 57 50

4 PME CNP 081 Excavator 1 112 112 25 0 57 56

5 PME CNP 107 Generator (portable) - Welding set 1 100 100 50 0 57 47

6 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 35 0 57 47

7 PME CNP 186 Roller (vibratory) 1 108 108 25 0 57 52

8 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 57 41

1 PME CNP 021 Bar Bender and Cutter (electric) 1 90 90 100 0 143 32

2 SPME BS D6/33 Concrete lorry mixer 3 96 101 50 0 143 40

3 PME CNP 048 Crawler Crane 1 112 112 80 0 143 53

4 PME CNP 056 Cutter (circular, steel, electric) 1 112 112 60 0 143 52

5 PME CNP 081 Excavator 1 112 112 80 0 143 53

6 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 143 44

7 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 50 0 143 41

8 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 143 39

2 1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 143 47 47 70 Complied

Activities 5 to 6 being mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 143 49

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 143 52

3 PME CNP 081 Excavator 1 112 112 40 0 143 50

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 143 42

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 143 50

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 143 49

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 143 38

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 143 42

4 PME CNP 081 Excavator 1 112 112 40 0 143 50

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 143 42

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 143 51

6 Concrete Breaking 8/2018-11/2020 1 1 PME CNP 028 Breaker (excavator mounted, hydraulic) 1 122 122 39 0 57 68 68 70 Complied

Activities 7 to 8 being mutually exclusive (not occurring concurrently with) from Activities 1 to 6

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 143 49

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 143 52

3 PME CNP 081 Excavator 1 112 112 40 0 143 50

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 143 42

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 143 50

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 143 49

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 143 38

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 143 42

4 PME CNP 081 Excavator 1 112 112 40 0 143 50

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 143 42

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 143 51

1 PME CNP 004 Asphalt Paver 1 109 109 50 0 57 56

2 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 57 52

3 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 57 47

4 PME CNP 184 Road Planer 1 111 111 50 0 57 58

5 PME CNP 185 Road Roller (Pneumatic Tyred Roller) 1 108 108 50 0 57 55

6 PME CNP 186 Roller (vibratory) 1 108 108 50 0 57 55

Notes : 1. SPME = Specified Powered Mechanical Equipment ; SWL = Sound Power Level ; CNL = Corrected Noise Level 3. * Noise Mitigation Measures = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction]

2. Combined SWL = SWL + 10 log (Quantity) ; Predicted CNL (Individual) = Combined SWL + 10 log (PME % On-time) + Correction (Measures) - 20 log (R) - 8 + Facade Reflection - 10 [where Facade Reflection = 3] ; Predicted CNL (Overall) = 10 log [∑10(Predicted CNL (Individual) /10)

]

70 Complied8 Flexible Pavement 8/2018-11/2020 1 63

70 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 55 70 Complied

7

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 56

70 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 55 70 Complied

5

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 56

70 Complied4

Footbridge

Segment

Installation /

Staircase and Lift

Shaft Construction

7/2019-11/20201 58

Complied

3

Drainage,

Sewerage and

Water Mains

8/2018-11/2020

1 60 70 Complied

2 60 70 Complied

Predicted CNL, dB(A) Statutory Noise Limit, dB(A)

Complied70

2

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019

1 51

5 61 70

4 60 70 Complied

1 Utilities Diversion 3/2018-6/2019 1 54

3 57

70 Complied

2 62 70 Complied

70 Complied

Activity Period

Powered Mechanical Equipment (PME)PME %

On-time

Distance 'R'

(Source to Critical

NSR), m

Correction

(Noise Mitigation

Measures)

Page 10: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 9 of 36

NSR-3 : Hong Kong IVE (Lee Wai Lee) (Mitigated) Updated : 27-11-2018

Group Item ClassificationIdentification

CodeDescription Quantity

SWL,

dB(A)

Combined

SWL, dB(A)Individual Overall

Non-restricted Hours

(07:00-19:00)

Compliance

(CNL ≤ Noise Limit)

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 117 59

2 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 50 0 117 48

3 PME CNP 143 Light Good Vehicle (G.V.W. ≤ 5.5 tonnes) 1 101 101 50 0 117 52

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 117 53

5 PME CNP 185 Road Roller 2 108 111 50 0 117 62

1 PME CNP 072 Drilling rig (Pre-drilling) 1 110 110 60 0 141 60

2 PME CNP 105 Grout mixer 1 90 90 40 0 141 38

3 PME CNP 106 Grout pump 1 105 105 40 0 141 53

5 PME CNP 281 Water pump (electric) 1 88 88 60 0 141 38

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 8 102 111 35 -5 141 53

2 PME CNP 164 Bored Piling - Grab & Chisel 2 115 118 60 -5 141 63

3 PME CNP 165 Bored Piling - Oscillator 2 115 118 60 -5 141 63

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 2 100 103 60 0 141 53

5 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 141 55

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 141 53

7 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 141 45

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 -5 141 50

9 PME CNP 048 Mobile / crawler crane 2 112 115 35 -5 141 57

10 PME CNP 281 Water pump (electric) 2 88 91 60 0 141 41

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 141 60

2 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 141 55

3 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 141 63

4 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 141 53

5 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 141 45

6 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 -5 141 50

7 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 141 62

8 PME CNP 281 Water pump (electric) 2 88 91 60 0 141 41

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 141 55

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 -5 141 60

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 -5 141 60

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 141 50

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 141 52

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 141 50

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 141 42

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 141 52

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 141 59

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 141 38

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 4 104 110 35 -5 141 52

12 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 141 52

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 60 -5 141 55

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 141 50

15 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 141 42

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 141 52

17 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 141 59

18 PME CNP 281 Water pump (electric) 1 88 88 60 0 141 38

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 141 55

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 -5 141 60

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 -5 141 60

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 141 50

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 141 52

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 141 50

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 141 42

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 141 52

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 -5 141 54

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 141 38

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 -5 141 55

12 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 141 55

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 -5 141 58

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 141 53

15 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 141 45

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 141 55

17 PME CNP 048 Mobile / crawler crane 2 112 115 35 -5 141 57

18 PME CNP 281 Water pump (electric) 2 88 91 60 0 141 41

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 25 0 84 59

2 PME CNP 081 Excavator 1 112 112 30 -5 84 58

3 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 -5 84 55

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 25 0 84 55

5 PME CNP 186 Roller (vibratory) 1 108 108 25 0 84 58

6 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 84 48

1 SPME CNP 025 Breaker (hand-held, 20 kg ≤ mass ≤ 35 kg) 1 111 111 25 -5 84 56

2 SPME BS D6/33 Concrete lorry mixer 1 96 96 70 0 84 51

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 84 56

4 PME CNP 081 Excavator 1 112 112 25 -5 84 57

5 PME CNP 107 Generator (portable) - Welding set 1 100 100 50 0 84 54

6 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 35 0 84 54

7 PME CNP 186 Roller (vibratory) 1 108 108 25 0 84 58

8 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 84 48

1 PME CNP 021 Bar Bender and Cutter (electric) 1 90 90 100 0 141 42

2 SPME BS D6/33 Concrete lorry mixer 3 96 101 50 0 141 50

3 PME CNP 048 Crawler Crane 1 112 112 80 -5 141 58

4 PME CNP 056 Cutter (circular, steel, electric) 1 112 112 60 -5 141 57

5 PME CNP 081 Excavator 1 112 112 80 -5 141 58

6 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 141 54

7 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 50 0 141 51

8 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 141 49

2 1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 141 57 57 70 Complied

Activities 5 to 6 being mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 141 59

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 -5 141 57

3 PME CNP 081 Excavator 1 112 112 40 0 141 60

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 141 52

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 141 60

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 141 59

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 141 48

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 141 52

4 PME CNP 081 Excavator 1 112 112 40 0 141 60

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 141 52

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 141 61

6 Concrete Breaking 8/2018-11/2020 1 1 PME CNP 028 Breaker (excavator mounted, hydraulic) 1 122 122 39 -5 84 69 69 70 Complied

Activities 7 to 8 being mutually exclusive (not occurring concurrently with) from Activities 1 to 6

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 141 59

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 -5 141 57

3 PME CNP 081 Excavator 1 112 112 40 0 141 60

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 141 52

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 141 60

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 141 59

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 141 48

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 141 52

4 PME CNP 081 Excavator 1 112 112 40 0 141 60

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 141 52

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 141 61

1 PME CNP 004 Asphalt Paver 1 109 109 50 0 84 63

2 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 84 59

3 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 84 54

4 PME CNP 184 Road Planer 1 111 111 50 0 84 65

5 PME CNP 185 Road Roller (Pneumatic Tyred Roller) 1 108 108 50 0 84 62

6 PME CNP 186 Roller (vibratory) 1 108 108 50 0 84 62

Notes : 1. SPME = Specified Powered Mechanical Equipment ; SWL = Sound Power Level ; CNL = Corrected Noise Level 3. * Noise Mitigation Measures = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction]

2. Combined SWL = SWL + 10 log (Quantity) ; Predicted CNL (Individual) = Combined SWL + 10 log (PME % On-time) + Correction (Measures) - 20 log (R) - 8 + Facade Reflection [where Facade Reflection = 3] ; Predicted CNL (Overall) = 10 log [∑10(Predicted CNL (Individual) /10)

]

70 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 65 70 Complied

7

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 65

70 Complied

5

28/2018-12/2019

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 65 70 Complied

70 Complied

8 Flexible Pavement 8/2018-11/2020 1 69 70 Complied

4

Footbridge

Segment

Installation /

Staircase and Lift

Shaft Construction

7/2019-11/20201 64

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

65

Complied

3

Drainage,

Sewerage and

Water Mains

8/2018-11/2020

1 64 70 Complied

2 64 70 Complied

Predicted CNL, dB(A) Statutory Noise Limit, dB(A)

Complied70

2

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019

1 61

5 67 70

4 67 70 Complied

1 Utilities Diversion 3/2018-6/2019 1 64

3 67

70 Complied

2 67 70 Complied

70 Complied

Activity Period

Powered Mechanical Equipment (PME)PME %

On-time

Distance 'R'

(Source to Critical

NSR), m

Correction

(Noise Mitigation

Measures)

Page 11: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 10 of 36

NSR-4 : Tiu Keng Leng Public Library (Mitigated) Updated : 27-11-2018

Group Item ClassificationIdentification

CodeDescription Quantity

SWL,

dB(A)

Combined

SWL, dB(A)Individual Overall

Non-restricted Hours

(07:00-19:00)

Compliance

(CNL ≤ Noise Limit)

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 99 50

2 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 50 0 99 39

3 PME CNP 143 Light Good Vehicle (G.V.W. ≤ 5.5 tonnes) 1 101 101 50 0 99 43

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 99 45

5 PME CNP 185 Road Roller 2 108 111 50 0 99 53

1 PME CNP 072 Drilling rig (Pre-drilling) 1 110 110 60 0 121 51

2 PME CNP 105 Grout mixer 1 90 90 40 0 121 29

3 PME CNP 106 Grout pump 1 105 105 40 0 121 44

5 PME CNP 281 Water pump (electric) 1 88 88 60 0 121 29

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 8 102 111 35 0 121 50

2 PME CNP 164 Bored Piling - Grab & Chisel 2 115 118 60 0 121 59

3 PME CNP 165 Bored Piling - Oscillator 2 115 118 60 0 121 59

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 2 100 103 60 0 121 44

5 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 121 46

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 121 44

7 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 121 36

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 121 46

9 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 121 54

10 PME CNP 281 Water pump (electric) 2 88 91 60 0 121 32

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 121 52

2 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 121 46

3 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 121 54

4 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 121 44

5 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 121 36

6 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 121 46

7 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 121 54

8 PME CNP 281 Water pump (electric) 2 88 91 60 0 121 32

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 121 47

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 121 56

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 121 56

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 121 41

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 121 43

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 121 41

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 121 33

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 121 43

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 121 51

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 121 29

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 4 104 110 35 0 121 49

12 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 121 43

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 60 0 121 51

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 121 41

15 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 121 33

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 121 43

17 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 121 51

18 PME CNP 281 Water pump (electric) 1 88 88 60 0 121 29

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 121 47

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 121 56

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 121 56

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 121 41

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 121 43

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 121 41

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 121 33

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 121 43

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 121 51

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 121 29

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 121 52

12 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 121 46

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 121 54

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 121 44

15 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 121 36

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 121 46

17 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 121 54

18 PME CNP 281 Water pump (electric) 2 88 91 60 0 121 32

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 25 0 88 48

2 PME CNP 081 Excavator 1 112 112 30 0 88 53

3 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 88 49

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 25 0 88 45

5 PME CNP 186 Roller (vibratory) 1 108 108 25 0 88 48

6 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 88 37

1 SPME CNP 025 Breaker (hand-held, 20 kg ≤ mass ≤ 35 kg) 1 111 111 25 0 88 51

2 SPME BS D6/33 Concrete lorry mixer 1 96 96 70 0 88 41

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 88 46

4 PME CNP 081 Excavator 1 112 112 25 0 88 52

5 PME CNP 107 Generator (portable) - Welding set 1 100 100 50 0 88 43

6 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 35 0 88 44

7 PME CNP 186 Roller (vibratory) 1 108 108 25 0 88 48

8 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 88 37

1 PME CNP 021 Bar Bender and Cutter (electric) 1 90 90 100 0 121 33

2 SPME BS D6/33 Concrete lorry mixer 3 96 101 50 0 121 41

3 PME CNP 048 Crawler Crane 1 112 112 80 0 121 54

4 PME CNP 056 Cutter (circular, steel, electric) 1 112 112 60 0 121 53

5 PME CNP 081 Excavator 1 112 112 80 0 121 54

6 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 121 45

7 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 50 0 121 42

8 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 121 40

2 1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 121 48 48 70 Complied

Activities 5 to 6 being mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 121 50

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 121 53

3 PME CNP 081 Excavator 1 112 112 40 0 121 51

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 121 43

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 121 51

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 121 50

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 121 39

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 121 43

4 PME CNP 081 Excavator 1 112 112 40 0 121 51

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 121 43

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 121 52

6 Concrete Breaking 8/2018-11/2020 1 1 PME CNP 028 Breaker (excavator mounted, hydraulic) 1 122 122 39 0 88 64 64 70 Complied

Activities 7 to 8 being mutually exclusive (not occurring concurrently with) from Activities 1 to 6

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 121 50

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 121 53

3 PME CNP 081 Excavator 1 112 112 40 0 121 51

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 121 43

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 121 51

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 121 50

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 121 39

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 121 43

4 PME CNP 081 Excavator 1 112 112 40 0 121 51

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 121 43

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 121 52

1 PME CNP 004 Asphalt Paver 1 109 109 50 0 88 52

2 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 88 48

3 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 88 43

4 PME CNP 184 Road Planer 1 111 111 50 0 88 54

5 PME CNP 185 Road Roller (Pneumatic Tyred Roller) 1 108 108 50 0 88 51

6 PME CNP 186 Roller (vibratory) 1 108 108 50 0 88 51

Notes : 1. SPME = Specified Powered Mechanical Equipment ; SWL = Sound Power Level ; CNL = Corrected Noise Level 3. * Noise Mitigation Measures = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction]

2. Combined SWL = SWL + 10 log (Quantity) ; Predicted CNL (Individual) = Combined SWL + 10 log (PME % On-time) + Correction (Measures) - 20 log (R) - 8 + Facade Reflection - 10 [where Facade Reflection = 3] ; Predicted CNL (Overall) = 10 log [∑10(Predicted CNL (Individual) /10)

]

70 Complied8 Flexible Pavement 8/2018-11/2020 1 59

70 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 57 70 Complied

7

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 58

70 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 57 70 Complied

5

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 58

2

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

70 Complied4

Footbridge

Segment

Installation /

Staircase and Lift

Shaft Construction

7/2019-11/20201 59

70 Complied

2 57 70 Complied

3

Drainage,

Sewerage and

Water Mains

8/2018-11/2020

1 56

Predicted CNL, dB(A)

8/2018-12/2019

1

2

3

5

4 62

63

52

Statutory Noise Limit, dB(A)

1

Distance 'R'

(Source to Critical

NSR), m

PME %

On-time

Correction

(Noise Mitigation

Measures)

Complied56 70

Activity Period

Powered Mechanical Equipment (PME)

Utilities Diversion 3/2018-6/2019 1

70 Complied

70 Complied

59 70 Complied

70 Complied

63 70 Complied

Page 12: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 11 of 36

NSR-5 (i.e. N7603 under the associated EIA Report & CM8 under the Noise Mitigation Plan by Contract : NE/2015/02) : Park Central, Tower 6 (Mitigated) Updated : 27-11-2018

Group Item ClassificationIdentification

CodeDescription Quantity

SWL,

dB(A)

Combined

SWL, dB(A)Individual Overall

Non-restricted Hours

(07:00-19:00)

Compliance

(CNL ≤ Noise Limit)

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 110 59

2 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 50 0 110 48

3 PME CNP 143 Light Good Vehicle (G.V.W. ≤ 5.5 tonnes) 1 101 101 50 0 110 52

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 110 54

5 PME CNP 185 Road Roller 2 108 111 50 0 110 62

1 PME CNP 072 Drilling rig (Pre-drilling) 1 110 110 60 0 109 62

2 PME CNP 105 Grout mixer 1 90 90 40 0 109 40

3 PME CNP 106 Grout pump 1 105 105 40 0 109 55

5 PME CNP 281 Water pump (electric) 1 88 88 60 0 109 40

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 8 102 111 35 0 109 61

2 PME CNP 164 Bored Piling - Grab & Chisel 2 115 118 60 -5 109 65

3 PME CNP 165 Bored Piling - Oscillator 2 115 118 60 -5 109 65

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 2 100 103 60 0 109 55

5 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 109 57

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 109 55

7 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 109 47

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 109 57

9 PME CNP 048 Mobile / crawler crane 2 112 115 35 -5 109 60

10 PME CNP 281 Water pump (electric) 2 88 91 60 0 109 43

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 109 63

2 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 109 57

3 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 109 65

4 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 109 55

5 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 109 47

6 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 109 57

7 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 109 65

8 PME CNP 281 Water pump (electric) 2 88 91 60 0 109 43

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 109 58

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 -5 109 62

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 -5 109 62

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 109 52

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 109 54

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 109 52

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 109 44

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 109 54

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 109 62

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 109 40

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 4 104 110 35 0 109 60

12 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 109 54

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 60 0 109 62

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 109 52

15 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 109 44

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 109 54

17 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 109 62

18 PME CNP 281 Water pump (electric) 1 88 88 60 0 109 40

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 109 58

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 -5 109 62

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 -5 109 62

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 109 52

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 109 54

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 109 52

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 109 44

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 109 54

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 109 62

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 109 40

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 109 63

12 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 109 57

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 -5 109 60

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 109 55

15 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 109 47

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 -5 109 52

17 PME CNP 048 Mobile / crawler crane 2 112 115 35 -5 109 60

18 PME CNP 281 Water pump (electric) 2 88 91 60 0 109 43

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 25 0 61 61

2 PME CNP 081 Excavator 1 112 112 30 0 61 66

3 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 -5 61 57

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 25 0 61 58

5 PME CNP 186 Roller (vibratory) 1 108 108 25 0 61 61

6 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 61 50

1 SPME CNP 025 Breaker (hand-held, 20 kg ≤ mass ≤ 35 kg) 1 111 111 25 -5 61 59

2 SPME BS D6/33 Concrete lorry mixer 1 96 96 70 0 61 54

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 61 59

4 PME CNP 081 Excavator 1 112 112 25 0 61 65

5 PME CNP 107 Generator (portable) - Welding set 1 100 100 50 0 61 56

6 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 35 0 61 57

7 PME CNP 186 Roller (vibratory) 1 108 108 25 0 61 61

8 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 61 50

1 PME CNP 021 Bar Bender and Cutter (electric) 1 90 90 100 0 109 44

2 SPME BS D6/33 Concrete lorry mixer 3 96 101 50 0 109 52

3 PME CNP 048 Crawler Crane 1 112 112 80 0 109 65

4 PME CNP 056 Cutter (circular, steel, electric) 1 112 112 60 0 109 64

5 PME CNP 081 Excavator 1 112 112 80 0 109 65

6 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 109 56

7 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 50 0 109 53

8 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 109 51

2 1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 109 59 59 75 Complied

Activities 5 to 6 being mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 109 61

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 109 64

3 PME CNP 081 Excavator 1 112 112 40 0 109 62

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 109 54

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 109 62

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 109 61

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 109 50

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 109 54

4 PME CNP 081 Excavator 1 112 112 40 0 109 62

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 109 54

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 109 63

6 Concrete Breaking 8/2018-11/2020 1 1 PME CNP 028 Breaker (excavator mounted, hydraulic) 1 122 122 39 -5 61 72 72 75 Complied

Activities 7 to 8 being mutually exclusive (not occurring concurrently with) from Activities 1 to 6

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 109 61

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 109 64

3 PME CNP 081 Excavator 1 112 112 40 0 109 62

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 109 54

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 109 62

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 109 61

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 109 50

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 109 54

4 PME CNP 081 Excavator 1 112 112 40 0 109 62

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 109 54

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 109 63

1 PME CNP 004 Asphalt Paver 1 109 109 50 0 61 65

2 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 61 61

3 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 61 56

4 PME CNP 184 Road Planer 1 111 111 50 0 61 67

5 PME CNP 185 Road Roller (Pneumatic Tyred Roller) 1 108 108 50 0 61 64

6 PME CNP 186 Roller (vibratory) 1 108 108 50 0 61 64

Notes : 1. SPME = Specified Powered Mechanical Equipment ; SWL = Sound Power Level ; CNL = Corrected Noise Level 3. * Noise Mitigation Measures = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction]

2. Combined SWL = SWL + 10 log (Quantity) ; Predicted CNL (Individual) = Combined SWL + 10 log (PME % On-time) + Correction (Measures) - 20 log (R) - 8 + Facade Reflection [where Facade Reflection = 3] ; Predicted CNL (Overall) = 10 log [∑10(Predicted CNL (Individual) /10)

]

75 Complied8 Flexible Pavement 8/2018-11/2020 1 72

75 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 68 75 Complied

7

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 69

75 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 68 75 Complied

5

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 69

Complied5

Complied

7570

75

8/2018-12/2019

70

1 69

2 75 Complied

75

Predicted CNL, dB(A) Statutory Noise Limit, dB(A)

Complied

Complied

Complied

75

75

Complied

Complied7570

63 75

75 Complied4

Footbridge

Segment

Installation /

Staircase and Lift

Shaft Construction

7/2019-11/20201 70

65

2 70

2

69

1

4

3

3

1 Utilities Diversion 3/2018-6/2019 1

Drainage,

Sewerage and

Water Mains

8/2018-11/2020

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

Activity Period

Powered Mechanical Equipment (PME)PME %

On-time

Distance 'R'

(Source to Critical

NSR), m

Correction

(Noise Mitigation

Measures)

Page 13: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 12 of 36

NSR-6 (i.e. N7001 under the associated EIA Report) : Park Central, Central Heights (Mitigated) Updated : 27-11-2018

Group Item ClassificationIdentification

CodeDescription Quantity

SWL,

dB(A)

Combined

SWL, dB(A)Individual Overall

Non-restricted Hours

(07:00-19:00)

Compliance

(CNL ≤ Noise Limit)

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 300 50

2 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 50 0 300 39

3 PME CNP 143 Light Good Vehicle (G.V.W. ≤ 5.5 tonnes) 1 101 101 50 0 300 43

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 300 45

5 PME CNP 185 Road Roller 2 108 111 50 0 300 53

1 PME CNP 072 Drilling rig (Pre-drilling) 1 110 110 60 0 294 53

2 PME CNP 105 Grout mixer 1 90 90 40 0 294 32

3 PME CNP 106 Grout pump 1 105 105 40 0 294 47

5 PME CNP 281 Water pump (electric) 1 88 88 60 0 294 31

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 8 102 111 35 0 294 52

2 PME CNP 164 Bored Piling - Grab & Chisel 2 115 118 60 0 294 61

3 PME CNP 165 Bored Piling - Oscillator 2 115 118 60 0 294 61

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 2 100 103 60 0 294 46

5 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 294 48

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 294 47

7 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 294 39

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 294 49

9 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 294 56

10 PME CNP 281 Water pump (electric) 2 88 91 60 0 294 34

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 294 54

2 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 294 48

3 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 294 56

4 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 294 47

5 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 294 39

6 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 294 49

7 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 294 56

8 PME CNP 281 Water pump (electric) 2 88 91 60 0 294 34

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 294 49

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 294 58

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 294 58

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 294 43

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 294 45

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 294 44

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 294 36

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 294 46

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 294 53

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 294 31

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 4 104 110 35 0 294 51

12 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 294 45

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 60 0 294 53

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 294 44

15 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 294 36

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 294 46

17 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 294 53

18 PME CNP 281 Water pump (electric) 1 88 88 60 0 294 31

1 PME CNP 002 Air compressor (10m3/min < air flow ≤ 30m

3/min) 4 102 108 35 0 294 49

2 PME CNP 164 Bored Piling - Grab & Chisel 1 115 115 60 0 294 58

3 PME CNP 165 Bored Piling - Oscillator 1 115 115 60 0 294 58

4 PME CNP 166 Bored Piling - Reverse Circulation Drill 1 100 100 60 0 294 43

5 SPME BS D6/33 Concrete lorry mixer 4 96 102 60 0 294 45

6 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 20 0 294 44

7 PME CNP 082 Excavator (mini-robot mounted) 1 94 94 40 0 294 36

8 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 294 46

9 PME CNP 048 Mobile / crawler crane 1 112 112 35 0 294 53

10 PME CNP 281 Water pump (electric) 1 88 88 60 0 294 31

11 PME CNP 003 Air compressor (air flow > 30 m3/min) 8 104 113 35 0 294 54

12 SPME BS D6/33 Concrete lorry mixer 8 96 105 60 0 294 48

13 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 2 110 113 60 0 294 56

14 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 20 0 294 47

15 PME CNP 082 Excavator (mini-robot mounted) 2 94 97 40 0 294 39

16 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 294 49

17 PME CNP 048 Mobile / crawler crane 2 112 115 35 0 294 56

18 PME CNP 281 Water pump (electric) 2 88 91 60 0 294 34

1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 25 0 80 59

2 PME CNP 081 Excavator 1 112 112 30 0 80 64

3 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 2 100 103 100 0 80 60

4 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 25 0 80 56

5 PME CNP 186 Roller (vibratory) 1 108 108 25 0 80 59

6 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 80 48

1 SPME CNP 025 Breaker (hand-held, 20 kg ≤ mass ≤ 35 kg) 1 111 111 25 0 80 62

2 SPME BS D6/33 Concrete lorry mixer 1 96 96 70 0 80 51

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 80 57

4 PME CNP 081 Excavator 1 112 112 25 0 80 63

5 PME CNP 107 Generator (portable) - Welding set 1 100 100 50 0 80 54

6 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 35 0 80 54

7 PME CNP 186 Roller (vibratory) 1 108 108 25 0 80 59

8 PME CNP 283 Water pump (submersible, electric) 4 85 91 100 0 80 48

1 PME CNP 021 Bar Bender and Cutter (electric) 1 90 90 100 0 294 36

2 SPME BS D6/33 Concrete lorry mixer 3 96 101 50 0 294 43

3 PME CNP 048 Crawler Crane 1 112 112 80 0 294 57

4 PME CNP 056 Cutter (circular, steel, electric) 1 112 112 60 0 294 55

5 PME CNP 081 Excavator 1 112 112 80 0 294 57

6 PME CNP 145 Lorry with Crane (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 294 48

7 SPME CNP 173 Poker (vibratory, hand-held, electric) 1 102 102 50 0 294 45

8 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 294 43

2 1 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 2 105 108 50 0 294 51 51 75 Complied

Activities 5 to 6 being mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 294 53

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 294 56

3 PME CNP 081 Excavator 1 112 112 40 0 294 54

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 294 46

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 294 54

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 294 53

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 294 42

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 294 45

4 PME CNP 081 Excavator 1 112 112 40 0 294 54

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 294 46

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 294 55

6 Concrete Breaking 8/2018-11/2020 1 1 PME CNP 028 Breaker (excavator mounted, hydraulic) 1 122 122 39 0 80 75 75 75 Complied

Activities 7 to 8 being mutually exclusive (not occurring concurrently with) from Activities 1 to 6

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 294 53

2 PME CNP 072 Drilling rig (Pre-bored Sockette H Pile) 1 110 110 100 0 294 56

3 PME CNP 081 Excavator 1 112 112 40 0 294 54

4 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 294 46

5 PME CNP 048 Mobile / crawler crane 1 112 112 40 0 294 54

1 PME CNP 003 Air compressor (air flow > 30 m3/min) 2 104 107 100 0 294 53

2 SPME BS D6/33 Concrete lorry mixer 2 96 99 50 0 294 42

3 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 30 0 294 45

4 PME CNP 081 Excavator 1 112 112 40 0 294 54

5 PME CNP 102 Generator (silenced, 75 dB(A) at 7m) 1 100 100 100 0 294 46

6 PME CNP 048 Mobile / crawler crane 1 112 112 50 0 294 55

1 PME CNP 004 Asphalt Paver 1 109 109 50 0 80 63

2 PME CNP 068 Dump Truck (5.5 tonnes < G.V.W. ≤ 38 tonnes) 1 105 105 50 0 80 59

3 PME CNP 168 Power Pack for Hand-held Items 1 100 100 50 0 80 54

4 PME CNP 184 Road Planer 1 111 111 50 0 80 65

5 PME CNP 185 Road Roller (Pneumatic Tyred Roller) 1 108 108 50 0 80 62

6 PME CNP 186 Roller (vibratory) 1 108 108 50 0 80 62

Notes : 1. SPME = Specified Powered Mechanical Equipment ; SWL = Sound Power Level ; CNL = Corrected Noise Level 3. * Noise Mitigation Measures = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction]

2. Combined SWL = SWL + 10 log (Quantity) ; Predicted CNL (Individual) = Combined SWL + 10 log (PME % On-time) + Correction (Measures) - 20 log (R) - 8 + Facade Reflection [where Facade Reflection = 3] ; Predicted CNL (Overall) = 10 log [∑10(Predicted CNL (Individual) /10)

]

75 Complied8 Flexible Pavement 8/2018-11/2020 1 70

75 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 59 75 Complied

7

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 60

75 Complied

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 2 59 75 Complied

5

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019 1 60

75 Complied4

Footbridge

Segment

Installation /

Staircase and Lift

Shaft Construction

7/2019-11/20201 61

75 Complied

2 67 75 Complied

3

Drainage,

Sewerage and

Water Mains

8/2018-11/2020

1 67

Utilities Diversion 3/2018-6/2019 1 56

Predicted CNL, dB(A) Statutory Noise Limit, dB(A)

Activity Period

Powered Mechanical Equipment (PME)PME %

On-time

Distance 'R'

(Source to Critical

NSR), m

Correction

(Noise Mitigation

Measures)

Complied751

2

Bored Piling / Pre-

bored Socketed H

Pile / Pre-drilling

8/2018-12/2019

1 54

2 66

3 61

4 64

75 Complied

5 65 75 Complied

75 Complied

75 Complied

75 Complied

Page 14: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 13 of 36

Table 4 Predicted Monthly Construction Noise Levels (Mitigated)

Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 1 Utilities Diversion 58 - 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

66 - 0 0 0 0 0 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 0 0 0 0 0 0 0 0 0 0 0

3 2Drainage, Sewerage and

Water Mains64 - 0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64

4 1

Footbridge Segment

Installation / Staircase and

Lift Shaft Construction

62 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62

58 58 58 58 58 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 66 66 66 66 66 66 66 66 66 66 66

5 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

61 - 0 0 0 0 0 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0

6 1 Concrete Breaking 71 - 0 0 0 0 0 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71

0 0 0 0 0 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71 71

7 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

61 - 0 0 0 0 0 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 0 0 0 0 0 0 0 0 0 0 0

8 1 Flexible Pavement 66 - 0 0 0 0 0 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66

0 0 0 0 0 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 66 66 66 66 66 66 66 66 66 66 66

75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Notes :1. CNL = Corrected Noise Level ; C = Complied ; E = Exceeded

2. For any multi-group construcction activity (with only 1 group operating at a time), only the group striking the highest Predicted CNL has been included in the calculations above.

3. * NB = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction] ; Activity groups to adopt NB are detailed in Table 3.

4. Activities 5 to 6 are mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8.

Activities 7 to 8 are mutually exclusive (not occurring concurrently with) from Activities 1 to 6.

Statutory Noise Limit (07:00-19:00), dB(A)

Compliance (Combined CNLs for 'Activities 1 to 4 ; 5 to 6 ; 7 to 8' ≤ Statutory Noise Limit)

Construction Activity 2019 2020Noise

Mitigation

MeasuresNo. Group Description

Contract : NE/2017/02 ; Activities 5 to 6

Contract : NE/2017/02 ; Activities 7 to 8

Combined CNL, dB(A)

Combined CNL, dB(A)

Predicted CNL Allocation, dB(A)

2018Predicted CNL

(Mitigated),

dB(A)

Contract : NE/2017/02 ; Activities 1 to 4 Combined CNL, dB(A)

NSR-1 : Metrotown, Tower 1

Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 1 Utilities Diversion 54 - 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 54 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

62 - 0 0 0 0 0 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 0 0 0 0 0 0 0 0 0 0 0

3 2Drainage, Sewerage and

Water Mains60 - 0 0 0 0 0 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

4 1

Footbridge Segment

Installation / Staircase and

Lift Shaft Construction

58 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58

54 54 54 54 54 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 62 62 62 62 62 62 62 62 62 62 62

5 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

56 - 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0

6 1 Concrete Breaking 68 - 0 0 0 0 0 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68

0 0 0 0 0 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68

7 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

56 - 0 0 0 0 0 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0

8 1 Flexible Pavement 63 - 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63

0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 63 63 63 63 63 63 63 63 63 63 63

70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Notes :1. CNL = Corrected Noise Level ; C = Complied ; E = Exceeded

2. For any multi-group construcction activity (with only 1 group operating at a time), only the group striking the highest Predicted CNL has been included in the calculations above.

3. * NB = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction] ; Activity groups to adopt NB are detailed in Table 3.

4. Activities 5 to 6 are mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8.

Activities 7 to 8 are mutually exclusive (not occurring concurrently with) from Activities 1 to 6.

Statutory Noise Limit (07:00-19:00), dB(A)

Compliance (Combined CNLs for 'Activities 1 to 4 ; 5 to 6 ; 7 to 8' ≤ Statutory Noise Limit)

Construction Activity 2019 2020Noise

Mitigation

MeasuresNo. Group Description

Contract : NE/2017/02 ; Activities 5 to 6

Contract : NE/2017/02 ; Activities 7 to 8

Combined CNL, dB(A)

Combined CNL, dB(A)

Predicted CNL Allocation, dB(A)

2018Predicted CNL

(Mitigated),

dB(A)

Contract : NE/2017/02 ; Activities 1 to 4 Combined CNL, dB(A)

NSR-2 : Hong Kong Design Institute

Page 15: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 14 of 36

Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 1 Utilities Diversion 64 - 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

67 NB * 0 0 0 0 0 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 0 0 0 0 0 0 0 0 0 0 0

3 2Drainage, Sewerage and

Water Mains64 NB * 0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64

4 1

Footbridge Segment

Installation / Staircase and

Lift Shaft Construction

64 NB * 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64

64 64 64 64 64 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 67 67 67 67 67 67 67 67 67 67 67

5 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

65 NB * 0 0 0 0 0 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0

6 1 Concrete Breaking 69 NB * 0 0 0 0 0 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69

0 0 0 0 0 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 69 69 69 69 69 69 69 69 69 69 69

7 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

65 NB * 0 0 0 0 0 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0

8 1 Flexible Pavement 69 - 0 0 0 0 0 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69

0 0 0 0 0 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 69 69 69 69 69 69 69 69 69 69 69

70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Notes :1. CNL = Corrected Noise Level ; C = Complied ; E = Exceeded

2. For any multi-group construcction activity (with only 1 group operating at a time), only the group striking the highest Predicted CNL has been included in the calculations above.

3. * NB = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction] ; Activity groups to adopt NB are detailed in Table 3.

4. Activities 5 to 6 are mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8.

Activities 7 to 8 are mutually exclusive (not occurring concurrently with) from Activities 1 to 6.

Predicted CNL Allocation, dB(A)

2018Predicted CNL

(Mitigated),

dB(A)

Contract : NE/2017/02 ; Activities 1 to 4 Combined CNL, dB(A)

NSR-3 : Hong Kong IVE (Lee Wai Lee)

Statutory Noise Limit (07:00-19:00), dB(A)

Compliance (Combined CNLs for 'Activities 1 to 4 ; 5 to 6 ; 7 to 8' ≤ Statutory Noise Limit)

Construction Activity 2019 2020Noise

Mitigation

MeasuresNo. Group Description

Contract : NE/2017/02 ; Activities 5 to 6 Combined CNL, dB(A)

Contract : NE/2017/02 ; Activities 7 to 8 Combined CNL, dB(A)

Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 1 Utilities Diversion 56 - 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

63 - 0 0 0 0 0 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 63 0 0 0 0 0 0 0 0 0 0 0

3 2Drainage, Sewerage and

Water Mains57 - 0 0 0 0 0 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57 57

4 1

Footbridge Segment

Installation / Staircase and

Lift Shaft Construction

59 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59

56 56 56 56 56 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 61 61 61 61 61 61 61 61 61 61 61

5 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

58 - 0 0 0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0

6 1 Concrete Breaking 64 - 0 0 0 0 0 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64 64

0 0 0 0 0 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 64 64 64 64 64 64 64 64 64 64 64

7 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

58 - 0 0 0 0 0 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 58 0 0 0 0 0 0 0 0 0 0 0

8 1 Flexible Pavement 59 - 0 0 0 0 0 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59 59

0 0 0 0 0 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 62 59 59 59 59 59 59 59 59 59 59 59

70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Notes :1. CNL = Corrected Noise Level ; C = Complied ; E = Exceeded

2. For any multi-group construcction activity (with only 1 group operating at a time), only the group striking the highest Predicted CNL has been included in the calculations above.

3. * NB = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction] ; Activity groups to adopt NB are detailed in Table 3.

4. Activities 5 to 6 are mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8.

Activities 7 to 8 are mutually exclusive (not occurring concurrently with) from Activities 1 to 6.

Predicted CNL Allocation, dB(A)

2018Predicted CNL

(Mitigated),

dB(A)

Contract : NE/2017/02 ; Activities 1 to 4 Combined CNL, dB(A)

NSR-4 : Tiu Keng Leng Public Library

Statutory Noise Limit (07:00-19:00), dB(A)

Compliance (Combined CNLs for 'Activities 1 to 4 ; 5 to 6 ; 7 to 8' ≤ Statutory Noise Limit)

Construction Activity 2019 2020Noise

Mitigation

MeasuresNo. Group Description

Contract : NE/2017/02 ; Activities 5 to 6

Contract : NE/2017/02 ; Activities 7 to 8

Combined CNL, dB(A)

Combined CNL, dB(A)

Page 16: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 15 of 36

Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 1 Utilities Diversion 65 - 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 65 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

70 NB * 0 0 0 0 0 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 0 0 0 0 0 0 0 0 0 0 0

3 2Drainage, Sewerage and

Water Mains69 NB * 0 0 0 0 0 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69

4 1

Footbridge Segment

Installation / Staircase and

Lift Shaft Construction

70 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70

65 65 65 65 65 73 73 73 73 73 73 73 73 73 73 73 74 74 74 74 74 74 73 73 73 73 73 73 73 73 73 73 73

5 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

69 - 0 0 0 0 0 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 0 0 0 0 0 0 0 0 0 0 0

6 1 Concrete Breaking 72 NB * 0 0 0 0 0 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72

0 0 0 0 0 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74 72 72 72 72 72 72 72 72 72 72 72

7 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

69 - 0 0 0 0 0 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 69 0 0 0 0 0 0 0 0 0 0 0

8 1 Flexible Pavement 72 - 0 0 0 0 0 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72

0 0 0 0 0 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74 74 72 72 72 72 72 72 72 72 72 72 72

75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

(NE/2015/02 + NE/2015/03) 71 71 71 71 72 70 70 70 70 70 70 70 70 70 61 61 61 61 61 61 - - - - - - - - - - - - -

72 72 72 72 73 75 75 75 75 75 75 75 75 75 74 74 74 74 74 74 74 74 73 73 73 73 73 73 73 73 73 73 73

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Notes :1. CNL = Corrected Noise Level ; C = Complied ; E = Exceeded

2. For any multi-group construcction activity (with only 1 group operating at a time), only the group striking the highest Predicted CNL has been included in the calculations above.

3. * NB = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction] ; Activity groups to adopt NB are detailed in Table 3.

4. Activities 5 to 6 are mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8.

Activities 7 to 8 are mutually exclusive (not occurring concurrently with) from Activities 1 to 6.

5. Cumulative CNL = Logarithmic sum of [The highest Combined CNL among Activities 1 to 4, 5 to 6, 7 to 8 (in Green)] and [Combined CNL (in Pale Blue)]

Contract : NE/2017/02 ; Activities 5 to 6

Contract : NE/2017/02 ; Activities 7 to 8

Combined CNL, dB(A)

Combined CNL, dB(A)

Compliance (Cumulative

CNL ≤ Statutory Noise Limit)

Predicted CNL Allocation, dB(A)

2018Predicted CNL

(Mitigated),

dB(A)

Cumulative CNL, dB(A)

Combined CNL, dB(A)

Combined CNL, dB(A)Contract :

Statutory Noise Limit (07:00-19:00), dB(A)

Compliance (Combined CNLs for 'Activities 1 to 4 ; 5 to 6 ; 7 to 8' ≤ Statutory Noise Limit)

Construction Activity 2019

Contract :NE/2017/02 + (NE/2015/02

+ NE/2015/03)

Contract : NE/2017/02 ; Activities 1 to 4

2020

NSR-5 (i.e. N7603, EIA Report) : Park Central, Tower 6

Noise

Mitigation

MeasuresNo. Group Description

Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov Dec J an Feb Mar Ap r May J u n J u l Au g S ep Oct Nov

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 1 Utilities Diversion 56 - 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 56 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 2

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

66 - 0 0 0 0 0 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 66 0 0 0 0 0 0 0 0 0 0 0

3 2Drainage, Sewerage and

Water Mains67 - 0 0 0 0 0 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67 67

4 1

Footbridge Segment

Installation / Staircase and

Lift Shaft Construction

61 - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61 61

56 56 56 56 56 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 68 68 68 68 68 68 68 68 68 68 68

5 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

60 - 0 0 0 0 0 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0

6 1 Concrete Breaking 75 - 0 0 0 0 0 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

0 0 0 0 0 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

7 1

Bored Piling / Pre-bored

Socketed H Pile / Pre-

drilling

60 - 0 0 0 0 0 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0 0 0 0 0 0 0 0 0 0 0

8 1 Flexible Pavement 70 - 0 0 0 0 0 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70

0 0 0 0 0 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70 70

75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75 75

C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Notes :1. CNL = Corrected Noise Level ; C = Complied ; E = Exceeded

2. For any multi-group construcction activity (with only 1 group operating at a time), only the group striking the highest Predicted CNL has been included in the calculations above.

3. * NB = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction] ; Activity groups to adopt NB are detailed in Table 3.

4. Activities 5 to 6 are mutually exclusive (not occurring concurrently with) from Activities 1 to 4, 7 to 8.

Activities 7 to 8 are mutually exclusive (not occurring concurrently with) from Activities 1 to 6.

Statutory Noise Limit (07:00-19:00), dB(A)

Compliance (Combined CNLs for 'Activities 1 to 4 ; 5 to 6 ; 7 to 8' ≤ Statutory Noise Limit)

2019

Contract : NE/2017/02 ; Activities 1 to 4 Combined CNL, dB(A)

Contract : NE/2017/02 ; Activities 5 to 6

Contract : NE/2017/02 ; Activities 7 to 8

Combined CNL, dB(A)

Combined CNL, dB(A)

2020Noise

Mitigation

Measures

NSR-6 (i.e. N7001, EIA Report) : Park Central, Central Heights

Description

Construction Activity

No. Group

Predicted CNL Allocation, dB(A)

2018Predicted CNL

(Mitigated),

dB(A)

Page 17: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 16 of 36

2.4 Noise Mitigation Measures (Construction Noise)

A summary of the proposed noise mitigation measures for this NMP is shown in Table 5 below. Specific assignment of the noise mitigation measures (noise barriers) to particular PMEs is included in Table 3 above. Table 5 Summary of Proposed Noise Mitigation Measures

Detailed selection and design of the engineering noise mitigation measures (e.g. greater setback distance, screening structures like noise barriers or noise enclosures etc.) are to be reviewed upon further refinement of the plants and site constraints with the project team for future NMP revision(s) and incorporation in the associated EM&A monitoring report(s). Other than these engineering noise mitigation measures, some practicable but administrative means can be like rescheduling the works program to prevent noisy construction activities during the examination periods as well as further restriction on PME % On-time. Alternatives such as installing acoustic mat covers or the like for major engine noise sources can be considered but are subject to other engineering limitations (e.g. engine cooling).

2.5 Noise Mitigation Measures (Road Traffic Noise)

Other than construction noise, specific direct and permanent noise mitigation measures for road traffic noise (operation phase) have been assigned under the associated EIA report in fulfilment of the relevant EIAO requirements. Those applicable for this Contract (within 300 m from the site boundary) are as follows.

NSR-1 NSR-2 NSR-3 NSR-4 NSR-5 NSR-6

Metrotown,

Tower 1

HK Design

Institute

HK IVE (Lee

Wai Lee)

Tiu Keng Leng

Public Library

Park Central,

Tower 6

Park Central,

Central Heights

1 Utilities Diversion - - - - - -

2Bored Piling / Pre-bored Socketed H Pile / Pre-

drilling- - NB * - NB * -

3 Drainage, Sewerage and Water Mains - - NB * - NB * -

4Footbridge Segment Installation / Staircase and

Lift Shaft Construction- - NB * - - -

5Bored Piling / Pre-bored Socketed H Pile / Pre-

drilling- - NB * - - -

6 Concrete Breaking - - NB * - NB * -

7Bored Piling / Pre-bored Socketed H Pile / Pre-

drilling- - NB * - - -

8 Flexible Pavement - - - - - -

75 70 70 70 75 75

Notes : 1. * NB = Noise barrier [with geometrical coverage blocking the line of sight to the subject NSR - offering 5 dB(A) noise reduction]

2. Activity groups to adopt NB are detailed in Table 3.

3. All noisy activities during the examination periods at NSR-2 and NSR-3 shall be suspended so as to meet the more stringent limit of 65 dB(A).

Noise Mitigation Measures

Statutory Noise Limit (07:00-19:00), dB(A)

No. Description

Construction Activity

LNS1 About 190m of Low Noise Surfacing on North and South Bound P2 Road

LNS2 About 240m of Low Noise Surfacing on East and West Bound Po Yap Road

LNS3 About 200m of Low Noise Surfacing on East and West Bound Po Yap Road

Noise Mitigation Measures (Low Noise Surfacing as shown in Figure 4, EP below)

Page 18: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 17 of 36

2.6 Construction Noise Levels & Compliance Status

A summary of the predicted combined CNLs and their noise compliance status is given in Table 6 below. Table 6 Summary of Predicted Construction Noise Levels

58 to 69 54 to 65 64 to 70 56 to 65 65 to 74 56 to 70

71 to 71 68 to 68 69 to 70 64 to 65 72 to 74 75 to 75

66 to 67 63 to 64 69 to 70 59 to 62 72 to 74 70 to 70

Statutory Noise Limit (07:00-19:00), dB(A)

Compliance

(Combined CNLs for 'Activities 1 to 4 ; 5 to 6 ; 7 to 8' ≤

Statutory Noise Limit)

Plot 2b

Plot 2c

Combined CNL Range (Activities 5 to 6), dB(A)

Combined CNL Range (Activities 7 to 8), dB(A)Plot 1c

Plot 1b Plot 1b

Plot 1c

Complied

7575 70 70 70 75

Complied Complied Complied Complied Complied

Park Central,

Central Heights

NSR-1 NSR-2 NSR-3 NSR-4 NSR-5 NSR-6

Metrotown,

Tower 1

HK Design

Institute

HK IVE (Lee

Wai Lee)

Plot 1aPlot 2a

Noise Sensitive Receivers

Combined CNL Range (Activities 1 to 4), dB(A)

Tiu Keng Leng

Public Library

Park Central,

Tower 6

Plot 1a

Page 19: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 18 of 36

Page 20: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 19 of 36

Page 21: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 20 of 36

Page 22: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 21 of 36

3. Conclusion

This Noise Mitigation Plan is prepared with respect to a number of stages involving some critical construction activities throughout the whole construction period such as the road construction, drainage works, footbridge construction as well as the subsequent landscaping works. Some practicable noise mitigation measures, both engineering and administrative, have been proposed and included into the construction noise level estimation. Results indicate that noise compliance (mitigated) with the statutory noise limit(s) has been struck at the selected NSR positions (i.e. The Combined CNLs at NSR-1 to NSR-6 would comply with the respective noise limits in Table 1 above while the Cumulative CNL at NSR-5 complies with the 75 dB(A) noise limit). Any excessive noise, if occurred, can be tackled by program rescheduling (e.g. during examination periods), further limiting the operation time (PME % On-time) and setbacks as well as installing screening covers (e.g. acoustic mats) onto major engine noise sources wherever appropriate.

4. References

1. Technical Memorandum on Noise from Construction Work other than Percussive Piling, 2nd Ed., Environmental Protection Department, 1996.

2. Technical Memorandum on Noise from Construction Work in Designated Areas, 2nd Ed., Environmental Protection Department, 2001.

3. British Standards BS 5229-1 (2009) : Code of Practice for Noise and Vibration Control on Construction and Open Sites – Part 1 : Noise, British Standards Institution.

Page 23: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 22 of 36

Page 24: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 23 of 36

Page 25: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 24 of 36

Page 26: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 25 of 36

Page 27: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 26 of 36

Page 28: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 27 of 36

Appendix A

Proposed Mitigation Measures

Page 29: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 28 of 36

Proposed Mitigation Measures

Noise Barrier Mat Model No. CK2009

Noise Barrier Mat Model No. CK2009

(Laboratory Sound insulation Test Performance Rw = 15 dB)

Page 30: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 29 of 36

Page 31: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 30 of 36

Page 32: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 31 of 36

Page 33: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 32 of 36

Page 34: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 33 of 36

Page 35: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 34 of 36

Page 36: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 35 of 36

Page 37: 3 FUGRO TECHNICAL SERVICES LIMITED€¦ · Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : matlab@fugro.com

FUGRO TECHNICAL SERVICES LIMITED

Fugro Development Centre, Tel : +852 2450 8233 5 Lok Yi Street, Tai Lam, Fax : +852 2450 6138 Tuen Mun, N.T., E-mail : [email protected] Hong Kong. Website : www.fugro.com

Report No.: 0005/18/ED/0004k

The copyright of this document is owned by Fugro Technical Services Limited. It may not be reproduced except with prior written approval from the Company.

A Fugro Group Company

Page 36 of 36