April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 2

Page 3: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

¡Buenas Tardes!

• WELCOME and thank you for joining us!

• Andrés Felipe Archila

– President, Colombian Association of MIT

[email protected]

• We are delighted to receive emails!

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 3

Page 4: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 4

Page 5: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

The Future of Transportation Infrastructure in

Colombia: Envisioning a National

Transportation System

• Ralph Gakenheimer, MIT

• 1st session

– Lina María Castaño, National Planning Department of Colombia (DNP)

– Richard de Neufville, MIT

• Intermission – Coffee Break

• 2nd session

– Néstor Roa, Inter-American Development Bank (IADB)

– Juan Pablo Bocarejo, Universidad de los Andes

– Christopher Zegras, MIT

• Discussion Q&A session with all panelists

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 5

PANEL 2:

Page 6: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

RALPH GAKENHEIMER

(MODERATOR)

Professor of Urban Planning, Emeritus, MIT

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 6

Page 7: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Session 1

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 7

Page 8: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

LINA MARÍA CASTAÑO

Deputy Director, Social Sector, National Planning Department of

Colombia (DNP)

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 8

Page 9: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

NATIONAL PROGRAM OF

URBAN TRANSPORT IN

COLOMBIA

Page 10: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Contents

- National Framework

– Financial Structure

– Opportunities

– Challenges

Page 11: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

National Framework

Page 12: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Access to modern infrastructure and

equal opportunities remain as a

challenge for Colombia

1 = extremely underdeveloped; 7 = extensive and efficient by international standards

2.6

0 2 4 6

Venezuela

Colombia

Brasil

Argentina

Peru

Uruguay

Ecuador

Mexico

Chile

1.6

0 1 2 3

Uruguay

Venezuela

Colombia

Argentina

Brasil

Peru

Ecuador

Chile

Mexico

3.2

0 2 4 6

Venezuela

Brasil

Colombia

Peru

Argentina

Ecuador

Mexico

Uruguay

Chile

Quiality of overall infrastructure Quality of roads

Quality of railroad infrastructure Quality of port infrastructure

Source: World Economic Forum. Global Competitiveness Report 2011 - 2012

3.4

0 2 4 6

Venezuela

Peru

Argentina

Colombia

Brasil

Ecuador

Uruguay

Mexico

Chile

Page 13: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

National Framework for Urban Transport

National Development Plan 2010 - 2014

Transport Infrastructure Housing and Kindly Cities

Guidelines and Strategic Actions

Policy and

regulation of the

Transport Services

Competitive

Infrastructure and

Regional Integration

Improvement of Accessibility

and intermodal conditions

Promotion of alternative

mechanisms of

infrastructure funding

Urban Transport and

Mobility

Articulation and Enchainment with other sectors

Page 14: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Urban Transport and Mobility

Policy

Integrated Mass

Transport System

Strategic Public

Transport Systems

Strategy in Small

Sizes Cities

Mobility

Master Plan

SABT

National Framework for Urban Transport

National Development Plan 2010 - 2014

•Population Over

600.000 Inhabitants

•Population between

250.000 y 600.000

Inhabitants

•Population under

250.000 Inhabitants

SITP

SITR

•Strategy to improve

transport service

bring in efficiency

and high quality

service

• Multimodal

Regional Strategy • Territorial Planning • Territorial Planning

Page 15: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

EIGHT(8)

Mobility Master Plan In preparation: (3) Cartagena, Montería y Fusagasugá

EIGHT (8) SITM Population Over 600.000 Inhabitants

•In preparation: (1) Cúcuta

TWELVE (12) SETP Population between 250.000 y 600.000 Inhabitants

•In preparation : (5) Buenaventura, Neiva, Villavicencio,

Ibagué y Manizales

EIGHT (8)

Strategy in small sizes cities Population under 250.000 Inhabitants

(Tunja, Barrancabermeja, Quibdó, Ocaña, Riohacha,

Florencia, Yopal y Fusagasugá)

SEVEN (7) SATB (Leticia, Arauca, Saravena, Maicao, Ipiales,

San Miguel y Puerto Carreño)

FOUR (4) SITP (Bogotá, Pereira, Barranquilla y Bucaramanga)

FOUR(4) SITR (Caribe, Eje Cafetero, Cundinamarca y Antioquia)

Urban Mobility Projects Summary

Page 16: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

New Roads Concessions Contracts

VILLAVICENCIO

CALI

BUGA

PEREIRA

SOGAMOSO

PALO DE LETRAS CAUCASIA

MONTERIA

SINCELEJO

CARMEN DE

BOLIVAR

VALLEDUPAR

BARRANQUILLA

CARTAGENA

SANTA MARTA

RIOHACHA

PARAGUACHON

SAN ROQUE

NECOCLÍ

PASTO

ZIPAQUIRA

Pamplona

Simití

Achí

San Marcos

SAN PELAYO

GIRARDOT

CUCUTA

RUMICHACA

NEIVA

VILLAVICENCIO

PUERTO GAITAN

POPAYAN

CALI

SOGAMOSO

B/MANGA

CHACHAGÛÍ

ESPINAL

ARMENIA

IBAGUE

PTO. SALGAR

Cáqueza

CALERA

Sopó

LA

PAILA

BUENAVENTURA

STDER. QUILICHAO

PTO CARRENO

YOPAL

TAME

ARAUCA

Sisga

EL SECRETO

MOCOA

CARTAGO

Planeta Rica

La Yé

Toluviejo

Cruz del Viso Carreto

Ponedera

La Paz

San Juan Buenavista

Cuestecitas

Barbosa

Aguaclara Ocaña

MANIZALES VILLET

A

MEDELLIN

BOGOTA

BARRANCAB. REMEDIOS

Pto. Arimena

El Tigre

Pto. Berrío Santa fé de Ant.

Bolombolo

La Manuela

Camilo C

Tunel de

Occidente

TUNJA

Aguachica

Granada

CENTER- SOUTH

FONADE

SOUTH WEST-

FONADE

CENTER WEST

FONADE

CARIBBEAN

FONADE

EAST RANGEFONDO ADAPTACION

ROADS TO PROSPERITY

SMALL

CONCESSIONS

Estimated Kilometers 8.170

Total Estimated Investment

(billions of dollars / Dec 2011)

24,4

Current Concessions

New Concessions

Page 17: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Ports concessions

BUENAVENTURA

CARTAGENA

GUAJIRA

SANTA MARTA

BARRANQUILLA

TOLU COVEÑAS

TURBO

TUMACO

SAN ANDRES

Dredging of second

access canal 19 meters.

Cartagena

2013- I

Dredging 16 meters. Buenaventura

2013-I

Source: Infrastructure National Agency - Structuring Vice-presidency

Page 18: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

BARRANQUILLA

BARRANQUILLA´s AIRPORT

2013-II

ARMENIA

CARTAGO

NEIVA

POPAYÁN

ARMENIA, CARTAGO, NEIVA

AND POPAYÁN AIRPORTS

2013-II

Airports Concessions

Source: Infrastructure National Agency - Structuring Vice-presidency

Page 19: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Railroad Concessions

BOGOTÁ

Belencito

Zipaquirá La Dorada

Cabañas

La Vizcaína

Chiriguaná

Dibulla

Sta Sofía

La Tebaida

Zarzal

La Felisa

Buenaventura

Pto Berrio

Santa Marta

Buga Buenos

Aires

Granada

Ciénaga

Potosí

La Mata

Cúcuta

ESTIMATED KILOMETERS 3.450

ESTIMATED INVESTMENT

(BILLIONS US$ / DEC 2011) 6.48

Actual Concessions

Infraestructure Improvements

New Projects

Source: Infrastructure National Agency - Structuring Vice-presidency

Page 20: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Fluvial Projects

Magdalena´s River navigation

recovery Object

Description

Current State

Forecasted date for opening of bid process:

II Trimester of 2013

To recover Magdalena´s River navigation using PPP

schemes

•Between Puerto Salgar / La Dorada - Bocas de Ceniza.

• Term: 10 years

•Works for river canalization

• OyM activities to guarantee : 4,5 foots on Puerto

Salgar/Puerto Berrío stage; 6,0 foots on Puerto

Berrío/Barrancabermeja stage; 7 foots on

Barrancabermeja/Puente Laureano Gómez stage; and

37,5 foots until Bocas de Ceniza.

• Project will demand a total investment of 2.09 billions of

pesos (US$1,15 millions).

On Pre-qualification

Source: Cormagdalena

Page 21: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

On feasibility studies

Estimated Investment: US$2.500 Millions

Estimated length: 20,3 km

First line prioritization

Infrastructure and implementation system design

Estimated investment: US$2.100 Millions

Estimated length: 31,1 km

Bogota and their surroundings are planning to develop a

commuting train system, integrating the city with near

towns.

On feasibility studies, preliminary information:

Length: 81.2 Km.

Phase I y II: Technical structuring by ConCol. “Empresa

Férrea Regional” Studies have been in actualization

process 2011-2012. Process opening: To be defined

Commuting Train

Bogotá Subway System

Urban mobility projects for the Bogota

– Cundinamarca´s region

CONPES document approved – 3677 (19/07/2010)

Page 22: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Financial Structure

Page 23: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Legal and Regulatory Framework -

Public Initiative PPP project -

Flowchart

+

Conceptual Idea of the Project

Feasibility Studies

Technical, Financial and Legal Structuring

Request of fiscal endorsement and approval of annual budget commitments

Opening of the PPP bidding process

Public Contract

Assessment of social and economic issues

Risk analysis – MHCP Assessment of PPP option

- NPD

Requires Public $

Does not require Public $

Priorization

Opening of the bidding process

Financial reviewed by Public development

Banks – Art 27 / 1508 First review MHCP -

then NPD

Central government investment First is reviewed by

MHCP – then respective planning department Without Central

Government Investment

PPP

Page 24: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Opportunities

Page 25: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Opportunities

Rehabilitation and Renewal of Historic Centers

Generation of New Centralities

Improve the Articulation between Mobility Master Plans and Local Master

Plans

Integration of Populations needs and land uses

Page 26: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Challenges

Page 27: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Technical Institutional Strengthening

Urban and Regional Integration through the implementation of the

mobility strategies

Challenges

Implementation of Intelligent Transportation Systems

Transportation Demand Management

Implementation of strategies of mobility in border cities

Page 28: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Gracias

www.dnp.gov.co

PBX: 3815000

Page 29: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

RICHARD DE NEUFVILLE

Professor of Civil and Environmental Engineering and of

Engineering Systems, MIT

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 29

Page 30: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Using Flexibility to Increase Value

in Transportation Systems Planning

MIT Professor Richard de Neufville

Engineering Systems + Civil and Environmental Engineering

Author: Flexibility in Engineering Design MIT Press, 2011

with Prof. Stefan Scholtes, University of Cambridge UK

(about $30; ebook also available)

Page 31: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

This is the

book

MIT Press

2011

Available

Online

Page 32: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Theme for Flexibility

Paradigm change in project evaluation, choice • From: standard Net Present Values (VPN),

ignoring risks (as done by World Bank) • To: recognizing actual uncertainties and

planning for adaptation to real situations!

Flexibility => significant increase in value

• Using a win-win approach

• Mitigates risk (downside) -- a win

• Opens opportunities (upside) – more win

Page 33: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Outline of Presentation

1. Discussion of Standard Evaluation

Procedure for Transportation projects,

Engineering Systems in general

2. Flaw of Averages

3. Concept of Alternative Paradigm

4. Example Application in Bogota

Page 34: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Standard Evaluation Procedure

for Transportation projects,

Engineering Systems in general

Page 35: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Standard Evaluation Procedure

1. Make a forecast

2. Evaluate alternatives using forecast,

finding a unique cash flow

3. Calculate Net Present Value (VPN)

or equivalent such as IRR

HOWEVER:

• Future is Uncertain, as are outcomes

THEREFORE:

• Above calculations are misleading!

Page 36: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

The Flaw of Averages

Page 37: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Flaw of Averages

Named by Sam Savage (“Flaw of Averages,

Wiley, New York, 2009)

It is a pun. It integrates two concepts:

• A mistake => a “flaw”

• The concept of the “law of averages”, that

that things balance out “on average”

• Flaw consists of assuming that evaluation

based on “average” or “most likely”

conditions give correct answers NOT SO!

Page 38: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

In Words

• Average of all the possible outcomes

associated with uncertain parameters,

• does not equal (except if system linear)

• the value obtained from using the

average value of the parameters

Page 39: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Page 40: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Practical Consequences

• Unless you work with distribution, your

evaluation gives wrong result –

• and wrong results lead to wrong ranking

and choice of design

• design from a realistic description differs – often

greatly – from design from average description

• This is because gains when things do well, do

not balance losses when things do not

(sometimes they’re more, sometimes less)

Page 41: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Concept

of

Alternative Paradigm

Page 42: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

New, Flexible Approach to Design

• Recognizes Uncertainty

• Analyses Possible Outcomes of Designs

• Chooses Flexible Designs to

– Reduce, eliminate downside risks (in general,

less ambitious initial projects – less to lose)

– Maximize Upside opportunities (that can

expand or change function, when, if, and how

seems desirable given future circumstances)

Great Increases in Expected Value Routine!

Page 43: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Great increase in Expected Value

• systems with flexibility to adapt to new conditions can greatly increase expected value.

• With flexibility we can

– avoid future downside risks (by building smaller with confidence that can expand as needed)

– profit from new opportunities by appropriate actions

• Reduce initial capital expenditure (CAPEX). – Lower initial CAPEX because less complex at start

– Lower Present Values, because costs deferred many years (and maybe even avoided)

Higher returns, lower cost = A Great Formula

Page 44: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

HCSC Building in Chicago

• In 2007-2009, 3000 people were coming to work

in the 30-story HCSC building in Chicago,

• … and a 27-story addition was being built right

on top of them!

• The structure was designed in 1990s with extra

steel, utilities, elevator shafts, etc. to permit

doubling of height.

• This flexibility was exploited a decade later

Page 45: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Here’s the Picture

Vertical Expansion of Health Care Service Corporation Building, Chicago.

Phase 1 (left) and Phase 2 (right) in center of image.

Source: Goettsch Partners, 2008 and Pearson and Wittels, 2008.

Page 46: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

The Paradox

• 30-story building with capacity to expand – costs more than one without expansion capacity

– Yet saves money!

• Why is this?

• The fair comparison is between – 30-story expandable building and

– what HCSC would build otherwise to meet its long-term needs – such as a 40-story building

• Flexible design saves money 2 ways: – Lower initial Capital Expenditures (CAPEX)

– Deferral, possible avoidance, of expansion costs

Page 47: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Example Application:

Public Transport in Bogota

Page 48: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

To BRT or HRT in Bogotá?

That is the Question

Application of Flexibility in Engineering Design

MIT Course ESD.71, December 2012

Andrés Felipe Archila, M.S.T. 2013

[email protected]

Page 49: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Description, Background, and Motivation

• New transit corridor in Bogota, Colombia

• BRT or HRT for 35-km-long Avenida Boyacá

• Analysis of fixed and flexible alternatives

Andrés Archila - MIT

Page 50: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Technical Choice

Andrés Archila - MIT

¿El bus?

¿O el tren?

Page 51: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Usual Financial Analysis (as for World Bank)

Calculate NPV (=VPN) with no uncertainty

Andrés Archila - MIT

One design

Dominates

All others

[in this case,

Big buses]

Page 52: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Evaluation Recognizing Uncertainty

Andrés Archila - MIT

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1C

um

ula

tive

Pro

bab

ility

NPV (million $USD)

Evaluation Recognizing Uncertainty

HRT-6

BRT-2

Alternative

Choices now

Ambiguous

[Rail better when

traffic is high,

worse when

traffic is low.]

Page 53: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Evaluation including flexible alternative

Andrés Archila - MIT

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

Cu

mu

lati

ve P

rob

abili

ty

NPV (million $USD)

Valuation including Flexible Design (start with 4 car trains, with stations for 6 cars)

HRT-6

HRT-FFlexible Alternative

provides Insurance

against downside

Risks

Page 54: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

© 2013 Richard de Neufville

Summary

1. Standard Evaluation Procedure for

Transportation projects, Engineering

Systems in general, is FLAWED

2. It fails to recognize, deal with risks

3. Flexibility is New Alternative Paradigm

4. Helps planners deal proactively with risk:

Reduces exposure to downside;

Allows for dealing with upside

Page 55: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Discussion - Q&A

Coffee Break 15-20 min

Session 2 follows

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 55

Page 56: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

NÉSTOR ROA

Chief, Transport Division, Inter-American Development Bank

(IADB)

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 56

Page 57: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

The Transport Sector

and the IDB in

Latin America

Nestor Roa

Chief of the Transport Division

April 26th, 2013

Page 58: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Content

1. Latin America’s infrastructure needs

2. The Inter-American Development Bank (IDB)

3. IDB areas of intervention and support modalities

4. Infrastructure and Transport Sector in the IDB 4.1. Transport Sector priorities 4.2. Strategic Areas

4.3. Flagship Projects

5. Conclusions and Challenges

Page 59: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Content

1. Latin America’s infrastructure needs

2. The Inter-American Development Bank (IDB)

3. IDB areas of intervention and support modalities

4. Infrastructure and Transport Sector in the IDB 4.1. Transport Sector priorities 4.2. Strategic Areas

4.3. Flagship Projects

5. Conclusions and Challenges

Page 60: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Quality

Latin America

and the

Caribbean

Emerging Asia

Developed

economies

Index (1 – 7 scale)

1. Latin America’s infrastructure needs

Average

Ports

Transport

Railways

Electricity

Roads Air

transport

Index (1-7 scale)

Latin America and

the Caribbean

Emerging Asia

Developed

economies

Page 61: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Coverage

1. Latin America’s infrastructure needs

0 20 40 60 80 100

BarbadosUruguayJamaica

BahamasTrinidad y TobagoRep. Dominicana

VenezuelaMéxico

PanamáArgentina

GuatemalaSuriname

HaitíHonduras

El SalvadorCosta Rica

BeliceChile

EcuadorColombia

PerúNicaragua

BrasilParaguay

GuyanaBolivia

2000

2005

Percentage (%) of Paved Roads

0 1 2 3 4 5 6 7

ChileEl Salvador

PanamaTrinidad and Tobago

JamaicaGuatemala

UruguayHonduras

Dominican RepublicMexico

ColombiaArgentina

BrazilCosta Rica

EcuadorVenezuela

PeruNicaragua

BoliviaParaguay

Roads quality (1=underdeveloped, 7=extensive and efficient)

Road Quality

Source: Porter and Schwab (2008).

Source: IDB and WB

Page 62: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Coverage

1. Latin America’s infrastructure needs

Source: WB, 2013

Page 63: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Investment

1. Latin America’s infrastructure needs

Total Public Private

Page 64: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Private investments need to grow from about 1 percent of GDP to between 2.5 and 3 percent to close the infrastructure gap, which represents some 100,000 million dollars a year.

1. Latin America’s infrastructure needs

Page 65: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

The “new” problem: Urbanization

• The “road bias” is changing… by demand

• LAC: the most urbanized region in the world (77% of pop.) -> 85% by 2030

Urban population (2000) Urban population

1. Latin America’s infrastructure needs

Page 66: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Content

1. Latin America’s infrastructure needs

2. The Inter-American Development Bank (IDB)

3. IDB areas of intervention and support modalities

4. Infrastructure and Transport Sector in the IDB 4.1. Transport sector Priorities 4.2. Strategic Areas

4.3. Flagship Projects

5. Conclusions and Challenges

Page 67: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

2. The Inter-American Development Bank

Founded in 1959, the IDB is the oldest and largest regional development bank.

48 members: 26 borrowing members and 22 non-borrowing members.

From 1961 to the end of 2011, the IDB has approved US$207 billion in loans and guarantees.

The IDB obtains its own financial resources from its 48 member countries, borrowings on the financial markets, and trust funds that it administers, and through cofinancing ventures.

The IDB’s debt rating is AAA.

Page 68: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Content

1. Latin America’s infrastructure needs

2. The Inter-American Development Bank (IDB)

3. IDB areas of intervention and support modalities

4. Infrastructure and Transport Sector in the IDB 4.1. Transport Sector priorities 4.2. Strategic Areas

4.3. Flagship Projects

5. Conclusions and Challenges

Page 69: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

3. IDB Areas of Intervention

Page 70: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

3. IDB Support modalities

• Investment Loans

• Policy Based Loans

• Emergency Loans

Public Sector Loans and Guarantees (with Sovereign Guarantee)

• Private Sector Loans

• Public sub-national entities qualified for NSG

Non-Sovereign Guaranteed Loans and Guarantees

Inter-American Investment Corporation

Multilateral Investment Fund

Technical Cooperation: technical studies & project preparation

KCPs (Knowledge & Capacity Building Products)

Page 71: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Content

1. Latin America’s infrastructure needs

2. The Inter-American Development Bank (IDB)

3. IDB areas of intervention and support modalities

4. Infrastructure and Transport Sector in the IDB 4.1. Transport Sector priorities 4.2. Strategic Areas

4.3. Flagship Projects

5. Conclusions and Challenges

Page 72: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

4. 2012: IDB US$11.6 billion in approved loans

and guarantees.

Loans by topic. 1961-2012

1,215.50 1,342.90

2193.6

1,543.60

2009 2010 2011 2012

Transport operation approvals 2009-2012 (USD$ millions)

Page 73: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Typical Projects

4. Transport Sector

Road expansion /rehabilitation

Public transportation (BRTs, Subways)

Ports, airports

Typical Procurement Aspects Civil works (infrastructure construction, rehabilitation, tunneling, bridges ) Buses,

rolling stock, equipment Technical consulting services

Page 74: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

4.1. Transport Sector -Priorities 2013

Increase road safety in the region

Promote sustainable transport

Develop Freight logistic operations

Promote the integration of regional transportation

Page 75: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Road Safety

Freight Logistics and Trade Facilitation

Regional Environment Sustainable Transport

4.2. Strategic areas in the Transport Sector

Page 76: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Flagship Projects

Page 77: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Support to the implementation of the National Road Safety Policy – Colombia (CO-L1111)

IDB Financing: US$ 10 million

Intervention:

Supporting the implementation of the Road Safety National Policy

Supporting the creation of the Road Safety National Observatory

Page 78: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Norte Grande Roads Infrastructure Program – Argentina

(AR-L1133)

IDB Financing: US$300 million

Intervention:

National Road Network (RVN) and access roads of the Provincial Road Network (RVP) in the Norte Grande region (RNG).

Engineering Works (1030km)

Road Safety

Institutional Strengthening

RN 16

RP. 1

Page 79: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Strategic Public Transportation Systems (SPTS) –

Colombia (CO-L1091)

Estimated Cost: US$380,7 million

IDB Financing: US$300 million

CTF Financing: US$20 million

Intervention:

Development of Strategic Public Transportation Systems in four towns (Pasto, Popayan, Armenia and Santa Marta)

Page 80: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Quito´s Metropolitan Urban Transport System– Ecuador

(EC-L1111)

Estimated Cost: US$1.400 million

IDB Financing: US$300 million

Intervention:

Financing the construction of 22 km of track, 15 stations, rolling stock and equipment for the Metro de Quito.

Page 81: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

San Francisco-Mocoa Alternate Road Construction Project

- Phase I – Colombia (CO-L1019)

Estimated Cost: US$150 million

IDB Financing: US$53 million

Intervention:

Improvement and construction of a 47 km by-pass

Page 82: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Mario Covas Rodoanel Project - Northern Section– Brasil

(BR-L1296 )

Estimated Cost: US$3.015,23 million

IDB Financing: US$1.148,63 million

Intervention:

North Section of the Mario Covas Beltway of the City of Sao Paulo

Page 83: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Programs to Support the National Logistics Policy –

Colombia (CO-L1090, CO-L1109)

IDB Financing: US$300 million (CO-L1090)

US$15 million (CO-L1109)

Intervention:

- Support the development and implementation of the National Logistics Policy

Page 84: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Panama Canal Expansion Program – Panama (PN-L1032)

Estimated Cost: US$5.250 million

IDB Financing: US$400 million

Intervention:

Construction of a third set of locks including lock complexes

Deepening of the entrances

Deepening and widening of the navigational channels

Raising Gatun Lake to its maximum operational level

Page 85: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Content

1. Latin America’s infrastructure needs

2. The Inter-American Development Bank (IDB)

3. IDB areas of intervention and support modalities

4. Infrastructure and Transport Sector in the IDB 4.1. Transport Sector priorities 4.2. Strategic Areas

4.3. Flagship Projects

5. Conclusions and Challenges

Page 86: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

5. Conclusions & Challenges

Latin America needs to improve its transport infrastructure and direct its efforts towards integration

Improving the region’s infrastructure needs a stronger participation from both the public and private sector

Parallel and collaborative efforts from the public and private sectors are necessary in the following areas: Extension and maintenance

of road network

Performance of freight transport by road

Ports

Freight railways

Trade facilitation and border controls

Support for better logistics’ management in small and medium-size businesses

Page 87: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

5. Conclusions & Challenges

Consistence and continuity in national policy formulation is key to enhance effective interventions

Multilaterals play an important role in adding value with knowledge sharing and project specific learned lessons

Page 88: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450
Page 89: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

JUAN PABLO BOCAREJO

Associate Professor, Department of Civil and Environmental

Engineering, Universidad de los Andes

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 89

Page 90: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

The Future of Transportation Infrastructure in Colombia

SUR Grupo de Estudios En Sostenibilidad Urbana y Regional

90

Juan Pablo Bocarejo, PhD Associate Professor

Department of Civil and Environmental Engineering

Page 91: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Infrastructure: The next generation

The infrastructure we need?

Environmental aspects

A good investment

Legal aspects

91

Engineering?

Page 92: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Key Aspects for Improvement (I)

• A network analysis

– Isolated projects

– Uncertain demand

– Functional vulnerability analysis

92

Page 93: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

93

Key Aspects for Improvement (II)

Desconexión Total Ig = ∞

Desconexión Parcial

Scenario Impact ($COP / day) Link

1 Inf VILLAVICENCIO GRANADA

2 Inf VILLAVICENCIO PUERTO LOPEZ

3 Inf PUERTO GAITAN PUERTO LOPEZ

4 Inf PASTO IPIALES

5 Inf BUENAVENTURA BUGA

6 Inf ARAUCA TAME

7 $ 6,604,719,910 TULUA ZARZAL

8 $ 5,982,311,917 BUGA TULUA

9 $ 1,638,775,950 MEDELLIN RIOSUCIO

10 $ 1,338,384,332 MEDELLIN SANTA ROSA DE OSOS

11 $ 1,204,313,657 PUERTO BOYACÁ LA DORADA

12 $ 1,183,006,963 BOGOTA TUNJA

13 $ 999,101,987 BOGOTA IBAGUE

14 $ 978,678,816 CAUCASIA PLANETA RICA

15 $ 956,727,491 ARMENIA IBAGUE

16 $ 937,656,385 MEDELLIN PUERTO BOYACÁ

17 $ 823,159,379 BOGOTA LA DORADA

18 $ 791,224,728 NEIVA GARZON

19 $ 730,867,806 TUNJA DUITAMA

20 $ 730,335,411 CAUCASIA SANTA ROSA DE OSOS

21 $ 669,797,430 BUCARAMANGA BARRANCABERMEJA

22 $ 658,860,229 CUCUTA BUCARAMANGA

23 $ 575,830,125 ANSERMA RIOSUCIO

24 $ 528,623,427 ANSERMA CARTAGO

… … … …

Page 94: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Key Aspects for Improvement (III)

• Adequate design standards

– Level of service

– Design speeds

– Slopes and curves

94

Vía Bucaramanga- P. Chicamocha

Page 95: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Key Aspects for Improvement (IV)

• Road safety (3 E´s)

– Indicators and performance

– Incentives

– Standards

– Enforcement

95

Page 96: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Institutional challenges

• An homogeneous network?

• Who manages the network?

• Who enforces the network?

• Who provides maintenance?

• Information availability

• Available capacity to implement

investment 20 times higher than previous

plans

96

Page 97: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Closing remarks

• Need to have a network approach

• Need to develop standards and performance objectives

• Need to introduce vulnerability and redundancy analysis

• Need to prioritize road safety

• Need to strengthen institutions that will lead a long term management over the network

97

Page 98: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

CHRISTOPHER ZEGRAS

(COMMENTS)

Ford Career Development Associate Professor of Transportation &

Urban Planning and Engineering Systems, MIT

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 98

Page 99: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Discussion + Q&A

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 99

Page 100: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

Thank you for joining us!

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 100

Page 101: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 101

Page 102: 2nd Colombian Conference at · 26/04/2013  · La Felisa Buenaventura Pto Berrio Santa Marta Buga Buenos Aires Granada Ciénaga Potosí La Mata Cúcuta ESTIMATED KILOMETERS 3.450

April 26, 2013 2nd Colombian Conference at

Harvard/MIT – Panel 2 102

Tomorrow…