10
www.huawei.com Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. 2 nd Carrier Performance After Implementation RNCLK01 January 09, 2013

2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Embed Size (px)

DESCRIPTION

Performance

Citation preview

Page 1: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

www.huawei.com

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

2nd Carrier Performance After ImplementationRNCLK01 January 09, 2013

Page 2: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

Summary

2nd Carrier already implemented at RNCLK01 for 12 sites

Alarm status for these site is CLEAR

KPI Status is still monitoring

Average Mean RTWP between -107 and -104

Traffic carried PS is increased since today 13:00

SHO is Maintained, but IFHO and IRAT PS and CS still

degraded. Under monitoring and further analysis about

parameter etc.

Page2

Page 3: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

Site List 2nd CarrierSite

Count

Region RNC ID Site ID 2nd Carrier Priority Remarks Batch Batch

_new LONG LAT

1 BALI LOMBOK RNCLK01 LBMT001 P1 capacity 1 BATCH1 116.12513000 -8.59654000

2 BALI LOMBOK RNCLK01 LBMT002 P1 capacity 1 BATCH1 116.09228000 -8.56957000

3 BALI LOMBOK RNCLK01 LBMT005 P1 capacity 1 BATCH1 116.11448000 -8.57617000

4 BALI LOMBOK RNCLK01 LBMT006 P1 capacity 1 BATCH1 116.09955000 -8.59738000

5 BALI LOMBOK RNCLK01 LBMT008 P1 capacity 1 BATCH1 116.11343000 -8.58744000

6 BALI LOMBOK RNCLK01 LBMT010 P1 capacity 1 BATCH1 116.12822000 -8.58419000

7 BALI LOMBOK RNCLK01 LBMT011 P1 capacity 1 BATCH1 116.08827000 -8.58817000

8 BALI LOMBOK RNCLK01 LBMT012 P1 capacity 1 BATCH1 116.11315000 -8.61187000

9 BALI LOMBOK RNCLK01 LBMT049 P1 capacity 1 BATCH1 116.08800000 -8.59380000

10 BALI LOMBOK RNCLK01 LBMT007 P2 capacity 2 BATCH1 116.07634000 -8.59511000

11 BALI LOMBOK RNCLK01 LBMT025 P2 capacity 2 BATCH1 116.09980000 -8.61194000

12 BALI LOMBOK RNCLK01 LBMT039 P2 capacity 2 BATCH1 116.09400000 -8.58131000

Page3

Page 4: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

RTWP

Page4

Page 5: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

CSSR

Page5

Page 6: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved. Page6

CDR

Page 7: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

Handover

Page7

Page 8: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

Traffic

Page8

Page 9: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Copyright © 2006 Huawei Technologies Co., Ltd. All rights reserved.

Utilitization

Page9

Page 10: 2nd Carrier Performance RNCLK 09 Jan 2013.Ppt

Thank youwww.huawei.com