    Contract No. SS P318 Programme No. 063KA

    Design & Construction

    of

    Tamar Development Project, Hong Kong

    for

    The Government of the Hong Kong Special Administrative Region

    2nd AIP Submission Broadcast Reception Installation for CGC Low Block

    Revision No. Issue on

    a 6 March 2008

    b 5 June 2008

    c 12 Dec 2008

    c1 04Jun2009

    Endorsed by

    Company GHHJV

    for and on behalf of

    Signature

    Name Edward Yeung

    Position Project Director

    Distribution List:

    ArchSD - SO GHHJV MVAArchSD SOR/PTL RDL WMArchSD SOR/A MCS (RSE) ERMArchSD SOR/SE LAM (RGE) KAA

    ArchSD SOR/BSE JRP (BSE) LDP

    ArchSD SOR/QS HOK APLArchSD SOR/EME GMB TPSArchSD SOR/LA GTR RWDIArchSD SOR/IT ALT CWArchSD SOR/COW SMW VVArchSD SOR/BSI EDAW

    ArchSD SOR/EM Date

    Independent Design Checker (IDC)

    2nd AIP Drawing

    ( ) in compliance with Contract No.SS P318

    ( ) in compliance with Contract No.SS P318 with conditions

    ( ) NOT in compliance with Contract No.SS P318

    For and on behalf of Scott Wilson Limited

    Building Services Design Checker

    Date:

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    2/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) - 1 - Building Services Installation

    CONTENT

    1.0 Introduction

    2.0 Design Criteria

    3.0 System Description

    4.0 Resilience Design and Expansion Flexibility

    5.0 MVAC Provision

    6.0 T&C Procedures

    7.0 Statutory Submission

    APPENDIX

    A Drawing Schedule, Legend and Schematic Diagram

    B Schedule of Major Materials and Equipment

    C Estimate of Maintenance Cost

    D Proposed BRI System Channel List

    E Satellite Channel List

    F Running Cost Estimation

    G Signal Loss Calculation of BRI system

    H Corresponding Letters

    I Diagram for BRI interfacing with IT system

    J Reply to ASD Comments on 1st Submission of 2nd AIP

    K Reply to IDC Comments on 1st Submission of 2nd AIP

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    3/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    4/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    5/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    6/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    7/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) - 6 - Building Services Installation

    4.3 In case of both BRI system of CGC Office Block and LegCo Complex failure, SMATV and LegCo Meeting

    Broadcast service will both suspended. The local BRI system of CGC Low Block with UHF and VHF

    antenna can still provide local TV and FM channels for CGC Low Block. When BRI systems is failure at

    CGC Office block or LegCo complex, their BRI system are able to support each other by operating two

    manual switch connection between them.

    4.4 Spare space and slot in the head-end equipment for future addition of channel amplifiers will be allowed.The

    broadcast reception installation shall allow and incorporate provisions for future connection to at least three

    other public broadcasting systems. The provision shall include preamplifiers, filters, amplifiers, frequency

    converters, coaxial cable distribution system, associated trunkings and conduits and power cables

    Quantity to be determined in DDA stage.

    4.5 Spare outlets at the receiver on each floor will be allowed for future addition of additional TV/FM outlets.

    Quantity to be determined in DDA stage.

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    8/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    9/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-A Building Services Installation

    APPENDIX A

    DRAWING SCHEDULE, LEGEND ANDSCHEMATIC DIAGRAM

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    10/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-B Building Services Installation

    APPENDIX B

    SCHEDULE OF MAJOR MATERIALS AND EQUIPMENT

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    11/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-B Building Services Installation

    Appendix B Schedule of Major Materials and Equipment

    1.0 Schedule of Major Equipment for Broadcast Reception Installation

    Offered

    Item Equipment/Material

    Brand Model Origin

    1st 2nd 3rd

    1 UHF Aerial Fagor Di@na Plus Spain - - -

    2 FM Aerial Fagor AN02 Spain - - -

    3 Pre-amplifier Fagor AMB 800 Spain - - -

    4 Channel amplifier Fagor Micro MATV

    plus N

    Spain - - -

    5 Fibre transmitter unit Cabletech - H.K. - - -

    6 Fibre receiver unit Cabletech - H.K - - -

    7 Distribution amplifier Fagor DA 353 Spain - - -

    8 Splitter & Tee unit Antek SFS Series H.K

    9 Trunk coaxial cable Cabletech A-1160-LSZH H.K

    10 Branch coaxial cable Cabletech A-660-LSZH H.K - - -

    11 TV/FM outlet Antek SKK 04 H.K - - -

    12 LNB C-Band Chaparral 11-5205-1 USA - - -

    13 Digital receiver

    modulator

    Fagor SDM 6000+ Spain - - -

    14 LNB Ku-Band Chaparral 11-5205-1 USA - - -

    15 Feedhorn C-Band Chaparral 11-1427-1 USA

    16 Rack Delta 42U PRC - - -

    17 Satellite solid antenna

    6.2m

    JJ - P.R.C - - -

    Remarks: Satellite dish is to be provided by others in future installation

    NOTE : Some specified model number of equipment / material will be provided in DDA submission

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    12/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-C Building Services Installation

    APPENDIX C

    ESTIMATE OF MAINTENANCE COST

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    13/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-C

    Appendix C Estimation of Maintenance Cost

    1.0 Estimation of Maintenance Cost for Broadcast Reception Installation

    Item Equipment / System Monthly cost

    1BRI System

    (comprehensive)

    - Monthly Inspection 1,800.00

    Total Amount (12 months) : 21,600.00

    2.0 Description of the Maintenance Service Work for Broadcast Reception Installations

    Broadcast Reception Installation

    Monthly Inspection

    (a) General cleaning of headend equipment

    (b) To carry out function test for the BRI system at equipment room

    - Connecting a TV at the test point in headend equipment room for channel reception inspection.

    - Check reception and make fine-tuning, if necessary

    (c) To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution AMP)

    at the equipment room

    (d) To check the record of complaints of the corresponding equipments with follow-up action.

    Detail of it will be provided in DDA submission

    3.0 Detail Cost breakdown For monthly inspection of BRI system in CGC Low Block

    Items Description Qty Unite rate (HK$) Sub-total (HK$)

    1) General cleaning of headend equipment 1 lot 300 300

    2) To carry to function test for the BRI system at

    equipment room as follows :

    1 lot 900 900

    i) Connecting a TV at the test point in headend

    equipment room for channel reception

    inspection

    ii) Check reception and make fine-tuning, if

    necessary

    c) To check the condition of the equipment, if

    necessary, the BRI system (e.g. Pre-amp,

    Distribution AMP)

    1 lot 600 600

    d) To check the record of complaints of thecorresponding equipments with follow-up action.

    Detail of it will be provided in DDA submission

    1 lot (included) 0

    Total (HK$) : 1800

    Remarks : The maintenance works listed above are offered as a single package of a

    comprehensive maintenance contract

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    14/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    15/33

    Design and Construction of Tamar Development Project Hong Kong Building Services J Roger Preston Limited

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    16/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-D

    UHF Frequency Channels list in IBCCDS (470-862 MHz)

    Channel Number Frequncy Range Allocation to be avoided Remark OFTA specified

    E44 654 - 662MHz SMATV 17 ER requirement

    E45 662 - 670MHz SMATV 18 ER requirement

    E46 670 - 678MHz SMATV 19 ER requirement

    E47 678 - 686MHz Public broadcasting system ER requirement Y

    E48 686 - 694MHz SMATV 20 ER requirement

    E49 694 - 702MHz Vacant Frequency Band availableE50 702 - 710MHz Vacant Frequency Band available

    E51 710 - 718MHz IT network ER requirement

    E52 718 - 726MHz Vacant Frequency Band available

    E53 726 - 734MHz Vacant Frequency Band available

    E54 734 - 742MHz Vacant Frequency Band available

    E55 742 - 750MHz Vacant Frequency Band available

    E56 750 - 758MHz Vacant Frequency Band availableE57 758 - 766MHz Vacant Frequency Band available

    E58 766 - 774MHz Vacant Frequency Band available

    E59 774 - 782MHz Vacant Frequency Band available

    E60 782 - 790MHz Vacant Frequency Band available

    E61 790 - 798MHz Vacant Frequency Band available

    E62 798 - 806MHz Public broadcasting system ER requirement Y

    E63 806 - 814MHz Public broadcasting system ER requirement

    E64 814 - 822MHz Vacant Frequency Band available

    E65 822 - 830MHz Vacant Frequency Band available

    E66 830 - 838MHz Vacant Frequency Band available

    E67 838 - 846MHz Vacant Frequency Band available

    E68 846 - 854MHz Vacant Frequency Band available

    E69 854 - 862MHz Building CCTV ER requirement

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    17/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston Limited

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    18/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-E

    APPENDIX E

    SATELLITE CHANNEL LIST

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    19/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    20/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    21/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-E

    Satellite Programme Video Standard

    Maharishi

    BTV World

    * Fashion TV HK & Asia

    * Aaj TV

    Arirang

    Pacific Century Matrix

    Alijazeera

    Bloomberg

    NOW

    * MTA Internat ional 1

    * MTA Internat ional 2

    DW-TV

    Russia Today

    Supreme Master

    * Star Utsav

    Wik Kid

    * Phoenix Info News

    * Phoenix Chinese

    Sahara Samay

    Alami Saharar

    AsiaSat 3S

    Orbital position: 105.5E

    Azimuth: 204.5

    Elevation: 62.6

    * Sahara Samay Bihar

    MPEG-2

    * Sahara Samay NCR

    *Sahara Samay National

    * Sahara Samay Mumbai

    * Sahara Samay Madhya Pradesh

    * Sahara Samay Uttar Predesh

    VOA

    PTV

    * PTV 1

    PTV World

    ATV

    * ATV Khyber

    Global

    i -

    Pakistani mux

    National

    Global

    Z Music

    Z Smile

    NOTE :

    *Programme channel names from Internet / magazines are used.

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    22/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    23/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    24/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-F

    Estimation of Running Cost

    Running Cost of BRI System for CGCL

    ITEM Description Estimated Loading (kW)Assumed Operation Hour

    per day

    Sub-Total Energy Consumption

    per day (kWh)

    1 Lighting (10.3 sq m) 0.206 1 0.206

    2 BRI Equipment in Head-end room 0.59 24 14.16

    3 BRI from G/F to 3/F 0.05 24 1.2

    4 Air-conditioning for BRI Room 0.25 24 6

    Total 21.57

    Notes:

    Electricity charge rate of Year 2008 is used for the estimation of electricity cost.The life cycle of BRI system equipment is around ten Years.

    2. Total Running Cost for BRI system

    Total power consumption for BRI system per month: 647 kWh

    (Assumed 30 days for each month)

    Block Rate Tariff

    Unit charge for the first 1,500 units (Basic Charge) $ 1.177 / kW h

    Unit charge from 1,501 units and above (Basic Charge) $ 1.270 / kW h

    Unit charge for the first 1,500 units (Fuel Clause Adjustment) $ 0.105 / kWh

    Unit charge for the f irst 1,501 units and above (Fuel Clause Adjustment) $ 0.105 / kWh

    Running cost for each month : $ 829.46

    Annual running cost : $ 9,953.52

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    25/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    26/33

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    27/33

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No SS P318 Programme No 063KA 04 Jun 2009

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    28/33

    Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-H

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    29/33

    Contract No. SS P318 Programme No. 063KA 04 Jun 2009

    BRI System (CGC Low Block) APP-H

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    30/33

    g

    BRI System (CGC Low Block) APP-I

    APPENDIX I

    Diagram for BRI interfacing with IT system

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    31/33

    BRI System (CGC Low Block) APP-I

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    32/33

    BRI System (CGC Low Block) APP-J

    APPENDIX J

    Reply to ASD Comments on 1st Submission of 2nd AIP

    Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009

  • 7/27/2019 2nd AIP_BS_BRI_CGCL_010609

    33/33

    BRI System (CGC Low Block) APP-K

    APPENDIX K

    Reply to IDC Comments on 1st Submission 2nd AIP