7/27/2019 2nd AIP_BS_BRI_CGCL_010609
1/33
Contract No. SS P318 Programme No. 063KA
Design & Construction
of
Tamar Development Project, Hong Kong
for
The Government of the Hong Kong Special Administrative Region
2nd AIP Submission Broadcast Reception Installation for CGC Low Block
Revision No. Issue on
a 6 March 2008
b 5 June 2008
c 12 Dec 2008
c1 04Jun2009
Endorsed by
Company GHHJV
for and on behalf of
Signature
Name Edward Yeung
Position Project Director
Distribution List:
ArchSD - SO GHHJV MVAArchSD SOR/PTL RDL WMArchSD SOR/A MCS (RSE) ERMArchSD SOR/SE LAM (RGE) KAA
ArchSD SOR/BSE JRP (BSE) LDP
ArchSD SOR/QS HOK APLArchSD SOR/EME GMB TPSArchSD SOR/LA GTR RWDIArchSD SOR/IT ALT CWArchSD SOR/COW SMW VVArchSD SOR/BSI EDAW
ArchSD SOR/EM Date
Independent Design Checker (IDC)
2nd AIP Drawing
( ) in compliance with Contract No.SS P318
( ) in compliance with Contract No.SS P318 with conditions
( ) NOT in compliance with Contract No.SS P318
For and on behalf of Scott Wilson Limited
Building Services Design Checker
Date:
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
2/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) - 1 - Building Services Installation
CONTENT
1.0 Introduction
2.0 Design Criteria
3.0 System Description
4.0 Resilience Design and Expansion Flexibility
5.0 MVAC Provision
6.0 T&C Procedures
7.0 Statutory Submission
APPENDIX
A Drawing Schedule, Legend and Schematic Diagram
B Schedule of Major Materials and Equipment
C Estimate of Maintenance Cost
D Proposed BRI System Channel List
E Satellite Channel List
F Running Cost Estimation
G Signal Loss Calculation of BRI system
H Corresponding Letters
I Diagram for BRI interfacing with IT system
J Reply to ASD Comments on 1st Submission of 2nd AIP
K Reply to IDC Comments on 1st Submission of 2nd AIP
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
3/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
4/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
5/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
6/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
7/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) - 6 - Building Services Installation
4.3 In case of both BRI system of CGC Office Block and LegCo Complex failure, SMATV and LegCo Meeting
Broadcast service will both suspended. The local BRI system of CGC Low Block with UHF and VHF
antenna can still provide local TV and FM channels for CGC Low Block. When BRI systems is failure at
CGC Office block or LegCo complex, their BRI system are able to support each other by operating two
manual switch connection between them.
4.4 Spare space and slot in the head-end equipment for future addition of channel amplifiers will be allowed.The
broadcast reception installation shall allow and incorporate provisions for future connection to at least three
other public broadcasting systems. The provision shall include preamplifiers, filters, amplifiers, frequency
converters, coaxial cable distribution system, associated trunkings and conduits and power cables
Quantity to be determined in DDA stage.
4.5 Spare outlets at the receiver on each floor will be allowed for future addition of additional TV/FM outlets.
Quantity to be determined in DDA stage.
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
8/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
9/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-A Building Services Installation
APPENDIX A
DRAWING SCHEDULE, LEGEND ANDSCHEMATIC DIAGRAM
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
10/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-B Building Services Installation
APPENDIX B
SCHEDULE OF MAJOR MATERIALS AND EQUIPMENT
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
11/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-B Building Services Installation
Appendix B Schedule of Major Materials and Equipment
1.0 Schedule of Major Equipment for Broadcast Reception Installation
Offered
Item Equipment/Material
Brand Model Origin
1st 2nd 3rd
1 UHF Aerial Fagor Di@na Plus Spain - - -
2 FM Aerial Fagor AN02 Spain - - -
3 Pre-amplifier Fagor AMB 800 Spain - - -
4 Channel amplifier Fagor Micro MATV
plus N
Spain - - -
5 Fibre transmitter unit Cabletech - H.K. - - -
6 Fibre receiver unit Cabletech - H.K - - -
7 Distribution amplifier Fagor DA 353 Spain - - -
8 Splitter & Tee unit Antek SFS Series H.K
9 Trunk coaxial cable Cabletech A-1160-LSZH H.K
10 Branch coaxial cable Cabletech A-660-LSZH H.K - - -
11 TV/FM outlet Antek SKK 04 H.K - - -
12 LNB C-Band Chaparral 11-5205-1 USA - - -
13 Digital receiver
modulator
Fagor SDM 6000+ Spain - - -
14 LNB Ku-Band Chaparral 11-5205-1 USA - - -
15 Feedhorn C-Band Chaparral 11-1427-1 USA
16 Rack Delta 42U PRC - - -
17 Satellite solid antenna
6.2m
JJ - P.R.C - - -
Remarks: Satellite dish is to be provided by others in future installation
NOTE : Some specified model number of equipment / material will be provided in DDA submission
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
12/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-C Building Services Installation
APPENDIX C
ESTIMATE OF MAINTENANCE COST
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
13/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-C
Appendix C Estimation of Maintenance Cost
1.0 Estimation of Maintenance Cost for Broadcast Reception Installation
Item Equipment / System Monthly cost
1BRI System
(comprehensive)
- Monthly Inspection 1,800.00
Total Amount (12 months) : 21,600.00
2.0 Description of the Maintenance Service Work for Broadcast Reception Installations
Broadcast Reception Installation
Monthly Inspection
(a) General cleaning of headend equipment
(b) To carry out function test for the BRI system at equipment room
- Connecting a TV at the test point in headend equipment room for channel reception inspection.
- Check reception and make fine-tuning, if necessary
(c) To check the condition of the equipment, if necessary, the BRI system (e.g. Pre-amp, Distribution AMP)
at the equipment room
(d) To check the record of complaints of the corresponding equipments with follow-up action.
Detail of it will be provided in DDA submission
3.0 Detail Cost breakdown For monthly inspection of BRI system in CGC Low Block
Items Description Qty Unite rate (HK$) Sub-total (HK$)
1) General cleaning of headend equipment 1 lot 300 300
2) To carry to function test for the BRI system at
equipment room as follows :
1 lot 900 900
i) Connecting a TV at the test point in headend
equipment room for channel reception
inspection
ii) Check reception and make fine-tuning, if
necessary
c) To check the condition of the equipment, if
necessary, the BRI system (e.g. Pre-amp,
Distribution AMP)
1 lot 600 600
d) To check the record of complaints of thecorresponding equipments with follow-up action.
Detail of it will be provided in DDA submission
1 lot (included) 0
Total (HK$) : 1800
Remarks : The maintenance works listed above are offered as a single package of a
comprehensive maintenance contract
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
14/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
15/33
Design and Construction of Tamar Development Project Hong Kong Building Services J Roger Preston Limited
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
16/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-D
UHF Frequency Channels list in IBCCDS (470-862 MHz)
Channel Number Frequncy Range Allocation to be avoided Remark OFTA specified
E44 654 - 662MHz SMATV 17 ER requirement
E45 662 - 670MHz SMATV 18 ER requirement
E46 670 - 678MHz SMATV 19 ER requirement
E47 678 - 686MHz Public broadcasting system ER requirement Y
E48 686 - 694MHz SMATV 20 ER requirement
E49 694 - 702MHz Vacant Frequency Band availableE50 702 - 710MHz Vacant Frequency Band available
E51 710 - 718MHz IT network ER requirement
E52 718 - 726MHz Vacant Frequency Band available
E53 726 - 734MHz Vacant Frequency Band available
E54 734 - 742MHz Vacant Frequency Band available
E55 742 - 750MHz Vacant Frequency Band available
E56 750 - 758MHz Vacant Frequency Band availableE57 758 - 766MHz Vacant Frequency Band available
E58 766 - 774MHz Vacant Frequency Band available
E59 774 - 782MHz Vacant Frequency Band available
E60 782 - 790MHz Vacant Frequency Band available
E61 790 - 798MHz Vacant Frequency Band available
E62 798 - 806MHz Public broadcasting system ER requirement Y
E63 806 - 814MHz Public broadcasting system ER requirement
E64 814 - 822MHz Vacant Frequency Band available
E65 822 - 830MHz Vacant Frequency Band available
E66 830 - 838MHz Vacant Frequency Band available
E67 838 - 846MHz Vacant Frequency Band available
E68 846 - 854MHz Vacant Frequency Band available
E69 854 - 862MHz Building CCTV ER requirement
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
17/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston Limited
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
18/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-E
APPENDIX E
SATELLITE CHANNEL LIST
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
19/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
20/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
21/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-E
Satellite Programme Video Standard
Maharishi
BTV World
* Fashion TV HK & Asia
* Aaj TV
Arirang
Pacific Century Matrix
Alijazeera
Bloomberg
NOW
* MTA Internat ional 1
* MTA Internat ional 2
DW-TV
Russia Today
Supreme Master
* Star Utsav
Wik Kid
* Phoenix Info News
* Phoenix Chinese
Sahara Samay
Alami Saharar
AsiaSat 3S
Orbital position: 105.5E
Azimuth: 204.5
Elevation: 62.6
* Sahara Samay Bihar
MPEG-2
* Sahara Samay NCR
*Sahara Samay National
* Sahara Samay Mumbai
* Sahara Samay Madhya Pradesh
* Sahara Samay Uttar Predesh
VOA
PTV
* PTV 1
PTV World
ATV
* ATV Khyber
Global
i -
Pakistani mux
National
Global
Z Music
Z Smile
NOTE :
*Programme channel names from Internet / magazines are used.
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
22/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
23/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
24/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-F
Estimation of Running Cost
Running Cost of BRI System for CGCL
ITEM Description Estimated Loading (kW)Assumed Operation Hour
per day
Sub-Total Energy Consumption
per day (kWh)
1 Lighting (10.3 sq m) 0.206 1 0.206
2 BRI Equipment in Head-end room 0.59 24 14.16
3 BRI from G/F to 3/F 0.05 24 1.2
4 Air-conditioning for BRI Room 0.25 24 6
Total 21.57
Notes:
Electricity charge rate of Year 2008 is used for the estimation of electricity cost.The life cycle of BRI system equipment is around ten Years.
2. Total Running Cost for BRI system
Total power consumption for BRI system per month: 647 kWh
(Assumed 30 days for each month)
Block Rate Tariff
Unit charge for the first 1,500 units (Basic Charge) $ 1.177 / kW h
Unit charge from 1,501 units and above (Basic Charge) $ 1.270 / kW h
Unit charge for the first 1,500 units (Fuel Clause Adjustment) $ 0.105 / kWh
Unit charge for the f irst 1,501 units and above (Fuel Clause Adjustment) $ 0.105 / kWh
Running cost for each month : $ 829.46
Annual running cost : $ 9,953.52
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
25/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
26/33
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
27/33
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No SS P318 Programme No 063KA 04 Jun 2009
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
28/33
Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-H
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
29/33
Contract No. SS P318 Programme No. 063KA 04 Jun 2009
BRI System (CGC Low Block) APP-H
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
30/33
g
BRI System (CGC Low Block) APP-I
APPENDIX I
Diagram for BRI interfacing with IT system
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
31/33
BRI System (CGC Low Block) APP-I
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
32/33
BRI System (CGC Low Block) APP-J
APPENDIX J
Reply to ASD Comments on 1st Submission of 2nd AIP
Design and Construction of Tamar Development Project, Hong Kong Building Services, J. Roger Preston LimitedFor The Government of the Hong Kong Special Administrative Region 2nd AIP Submission rev. c1Contract No. SS P318 Programme No. 063KA 04 Jun 2009
7/27/2019 2nd AIP_BS_BRI_CGCL_010609
33/33
BRI System (CGC Low Block) APP-K
APPENDIX K
Reply to IDC Comments on 1st Submission 2nd AIP