Bill of Material Definition
Bill of material is therelation between the Productand its components.
The Product is called the Parent item and its components are called the
child items.
Bill of material defines whatarethe different child items and in what
quantities forone unit of Parent item.
We mayhave fewexamples as below
- For1 meterof Knitted fabric of some style (Parent)werequire 200 Grams of 40s
Blueyarn and 250 Grams of 30s Yellowyarn (Childs).
- For1 piece ofa particularGarment product (Parent),werequire 1.2 meters of
Finished Fabric, 8 pieces of buttons of particulartype, 1 piece of size label, 1
piece ofwash care label etc (Childs).
- For1 Kg of Grey Yarn (Parent),werequire 1.3 Kg of Cotton (Childs)
8/8/2019 2.Creation of BOM
3/13
InfiniteDatatexInfiniteDatatex
Bill of Material
The structure ofa Typical Bill of material is given below
Parent item
Child 1 (Typeand Quantity) Child 2 (Typeand Quantity) Child 3 (Typeand Quantity)
8/8/2019 2.Creation of BOM
4/13
InfiniteDatatexInfiniteDatatex
BOM Component Entries
Index
8/8/2019 2.Creation of BOM
5/13
InfiniteDatatexInfiniteDatatex
Product Show image
PROCESS: Product Show Image
Click on BOM Component fromFunctions drop Down .
Wrkng BOM Screen will Appear.
Click on the Same.
Click on Functions drop down
8/8/2019 2.Creation of BOM
6/13
InfiniteDatatexInfiniteDatatex
Working BOM
PROCESS: Trims Item type (AGT) and Component
Item Types (ASG, AYF) Will Appear on the
functions Drop Down. BOM Component button is
linked to ACP
We select ASG, Since For Finished Garment,
stitched Garment is a BOM Component.
Now we select BOM Component which is for ACP
so we change the Father Item code to ASG
Now if component is dependent on size of father
item type then check the checkbox Dep. On Size
Now if component is dependent on color of fatheritem type then check the checkbox Dep. On Color
8/8/2019 2.Creation of BOM
7/13
InfiniteDatatexInfiniteDatatex
WORKING BOM
PROCESS: Similarly if component is
dependent on both then check both
the check box.
To add more components press add button
Now if dependency is one to many i.e.
if 2 colors of father item have same color
of component or 2 size of father havesame component size the go on open
detail button
Open Detail Button
8/8/2019 2.Creation of BOM
8/13
InfiniteDatatexInfiniteDatatex
PROCESS: Here is an example of size
Go on size button and then mapping can
be done
After mapping is done we need to validate it
by pressing Validate button
WORKING BOM
8/8/2019 2.Creation of BOM
9/13
InfiniteDatatexInfiniteDatatex
WORKING BOM
PROCESS:
User creates all the Trims Required
for finished Garment, Sewing,
Cutting.
Then users validate the BOM and
click parent.
8/8/2019 2.Creation of BOM
10/13
InfiniteDatatexInfiniteDatatex
BOM CREATION
PROCESS: BOM
As soon as it reaches to parent
screen, click create BOM
8/8/2019 2.Creation of BOM
11/13
InfiniteDatatexInfiniteDatatex
BOM
PROCESS: BOM will be Created
at different Levels of product
as shown like AFG, ASG and ACP
8/8/2019 2.Creation of BOM
12/13
InfiniteDatatexInfiniteDatatex
Exercise
Create Bill of Material Finished Garment Productas perthe specification
provided.
- Packing Material (Sizeand colorindependent)
- Fabric (Colordependent)
- 1 sewing trim (size label) (size dependent)
- 1 pricetag (colorsize dependent)