ERECTION DISMANTLING CRANE TOWERS
EDITION :3 1
2
29A--0000--128--0--GB10.03.99 1
SUMMARY
CRANE TOWERS AND ANCHORAGES (1,20M) 2. . . . . . . . . . . . . . . . . . . . .
1. CRANE TOWERS 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1. 1. FREE STANDING CRANES 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1. 1. 1. REDUCING THE FREE STANDING HEIGHT DUE TO THE TELESCOPIC CAGE. 2. . . . . . . . . . . . . . . .
2. VERY HIGH CRANES 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. 1. WITH RIGID ANCHORAGES TO THE BUILDING 2. . . . . . . . . . . . . . . . . . . . . . . . . . .
2. 2. WITH ANCHORAGE BY GUY ROPES 2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. A SET OF MAST SECTIONS 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. 1. SECTIONS OF 10,5 M LENGTH 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. 2. SECTIONS OF 3 M LENGTH 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3. 3. TELESCOPING MAST 3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4. MAST COMPOSITION 4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4. 1. COMPOSITION OF CRANE TOWER ZF12A (CAN BE TELESCOPED) 4. . . . . . . .
4. 2. COMPOSITION OF THE CRANE TOWER P12C (CAN BE TELESCOPED) 6. . . .
4. 3. MAST COMPOSITION (VERY HIGH CRANE) 8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4. 4. REACTIONS ON THE ANCHORAGES 9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7/24/2019 29A-0000-128-0-GB
2/11
ERECTION DISMANTLINGCRANE TOWERS
EDITION :3 1
2
10.03.992 29A--0500--066--0
CRANE TOWERS AND ANCHORAGES (1,20m)
1. CRANE TOWERS
1. 1. FREE STANDING CRANES
- The mast compositions on pages 29A--0520--.. are given for free standing heights IN SERVICE andOUT OF SERVICE and for the static and rail--mounted versions indicated in the data sheet.
- There are several types of mast sections of various lengths.
- The assembling order is that given in paragraph (29A--0520 --...) for reasons of strength. These docu-ments deal with the optimum composition of the crane tower which is not allowed to be lower. But itis possible to fit stronger sections (*).
(*) Please consult us
1. 1. 1. REDUCING THE FREE STANDING HEIGHT DUE TO THE TELESCOPICCAGE.
If, for reasons of later increase in height, the telescopic cage is to be left at the top of the masts, it is abso-lutely necessary to reduce the free standing height IN SERVICE and OUT OF SERVICE by removingX mast sections (**).
(**) COMPULSORILY consult us
IMPORTANT:The very high cranes are subjected to a downgrading of the load, seechapter Special characteristics.
2. VERY HIGH CRANES
Beyond the free standing height of rail--mounted or static crane, the crane must be connected either tothe ground by anchorage by guy ropes or to the building by rigid anchorages.
For each utilization of anchorages on cranes with chassis, please consult us.
2. 1. WITH RIGID ANCHORAGES TO THE BUILDING
- The heights indicated in the tables of pages 29A--0530--... are the hook heights and the anchorageheights on fixing angles taken with respect to the joint face of the fixing angles.
VERY IMPORTANT:The anchorage heights and the distances between the frames are
minimum values which must be strictly observed. Each valuelowerthan the indicated one results in a smaller number of sec--tionsabove the anchorage (therefore a downgrading of the hook height).Please consult us.
The mast composition is given for the optimum utilization of theframe.
- The mast compositions and the loads applied on the frames are given on pages 29A--0530--...
- The determination and the execution of the beams connecting the anchorage frame to the buildingare on the users responsibility. They must be able to take up the loads and reactions given in thetables on pages 29A--0530--...
2. 2. WITH ANCHORAGE BY GUY ROPES
- Please consult us.
7/24/2019 29A-0000-128-0-GB
3/11
ERECTION DISMANTLING CRANE TOWERS
EDITION :3 1
2
29A--0500--066--010.03.99 3
3. A SET OF MAST SECTIONS
3. 1. SECTIONS OF 10,5 M LENGTH- SR24B Cross section 1,20 x 1,20 m -- length 10,5 m -- Upright L 150x15 -- Monoblock tower
section -- witht lugs -- allows starting telescoping with mast sections of 3 m length.-- lower-fish joint D50 -- upper fish joint D40.
3. 2. SECTIONS OF 3 M LENGTH
- S24A1 Cross section 1,20 x 1,20 m -- length 3 m -- Upright L 150x15 -- Monoblock mast section-- with lugs -- can be telescoped
- S24A2 Cross section 1,20 x 1,20 m -- length 3 m -- Upright L 150x15 -- Monoblock mast section-- with lugs -- with resting platform -- can be telescoped
3. 3. TELESCOPING MAST
- Cross section 1,20 x 1,20 m -- length 1,50 m -- Monoblock mast section -- with fixing gus-setsfor the telescopiccage. Always placed under the fixed towerhead, it ensures the con-nection with the other crane tower sections.
7/24/2019 29A-0000-128-0-GB
4/11
ERECTION DISMANTLINGCRANE TOWERS
EDITION :3 1
2
10.03.994 29A--0520--131--0
4. MAST COMPOSITION
4. 1. COMPOSITION OF CRANE TOWER ZF12A (CAN BE TELESCOPED)
Hook height
in m (1) Mast composition
Jib trolley Mast sections
2 C SR24B
S24A1
ou
S24A2L
:
35,8 1 8 1
34,3 1 8 0
32,8 1 7 1
31,3 1 7 0
29,8 1 6 1
28,3 1 6 0
26,8 1 5 1
25,3 1 5 023,8 1 4 1
22,3 1 4 0
20,8 1 3 1
19,3 1 3 0
17,8 1 2 1
16,3 1 2 0
14,8 1 1 1
13,3 1 1 0
11,8 1 0 1
Hook height -- indicated in the DATA sheets
(1) The hook height is given for cross--shaped base on screw jacks/concrete blocks.
Hook height for cross--shaped base on travelling gear = (1)
Hook height for cross--shaped base on support plates = (1) -- 0,35 m.
Hook height for cross--shaped base on bed plate = (1) -- 0,65 m.
L Mast section equipped with a resting platform, to be fitted every 12 m
: Telescoping mast (always under the towerhead)
7/24/2019 29A-0000-128-0-GB
5/11
ERECTION DISMANTLING CRANE TOWERS
EDITION :3 1
2
29A--0520--131--010.03.99 5
3m
S24A1
1
2
3
4
5
6
7
1,5m
S
R24B
8
10,5m
:
L
S24A
2
Compulsory and in the position indicated in the sketch
L Mast section equipped with a resting platform, to be fitted every 12 m
: Telescoping mast (always under the towerhead)
7/24/2019 29A-0000-128-0-GB
6/11
ERECTION DISMANTLINGCRANE TOWERS
EDITION :3 1
2
10.03.996 29A--0520--132--0
4. 2. COMPOSITION OF THE CRANE TOWER P12C (CAN BE TELESCOPED)
Hook height
(in m) (1) Mast composition
Jib trolley Mast sections
2 C SR24B
S24A1
ou
S24A2L
:
34,5 1 8 1
33,0 1 8 0
31,5 1 7 1
30 1 7 0
28,5 1 6 1
27,0 1 6 0
25,5 1 5 1
24,0 1 5 0
22,5 1 4 121,0 1 4 0
19,5 1 3 1
18,0 1 3 0
16,5 1 2 1
15,0 1 2 0
13,5 1 1 1
12,0 1 1 0
10,5 1 0 1
Hook height -- indicated in the DATA sheets
: Telescoping mast (always under the towerhead)
L Mast section equipped with a resting platform, to be fitted every 12 m
7/24/2019 29A-0000-128-0-GB
7/11
ERECTION DISMANTLING CRANE TOWERS
EDITION :3 1
2
29A--0520--132--010.03.99 7
3m
S24A1
1
2
3
4
5
6
7
1,5m
SR24B
8
10,5m
:
L
S24A2
Compulsory and in the position indicated in the sketch
L Mast section equipped with a resting platform, to be fitted every 12 m
: Telescoping mast (always under the towerhead)
7/24/2019 29A-0000-128-0-GB
8/11
ERECTION DISMANTLINGCRANE TOWERS
EDITION :3 1
2
10.03.998 29A--0530--060--0
4. 3. MAST COMPOSITION (VERY HIGH CRANE)
HSC : HEIGHT UNDER HOOK
A : Free standing height
B : 1 anchorage
C : 2 anchorages
D : 3 anchorages
E : 4 anchorages
Anchorages tightened.
HSC = 94,50m
73,65m
58,65m
8
12
8S24A
A B C D E
1
HSC = 79,50m
HSC = 64,50m
HSC = 49,50m
HSC = 34,50m
Anchorages released
R2
R2
43,65m
R2
28,65m
R1
1 1 11
: SR24B
13S24A
18S24A
23S24A
28S24A
6
7
11
17
23
7
21
22
28
13
6
28,65m
R1
18
7
6
7
6
28,65m
R1
12
11
16
12 43,65m
R211
17
16
Telescoping mast
7/24/2019 29A-0000-128-0-GB
9/11
ERECTION DISMANTLING CRANE TOWERS
EDITION :3 1
2
29A--0530--060--010.03.99 9
4. 4. REACTIONS ON THE ANCHORAGES
I In service I I Out of service
Rear wind / Jib I I
Maximum torsional moment: 10957 m.daN I I
HSC R1 R2 R1 R2
m daN daN daN daN
Height of the first anchorage: 28,65 m
Height of the second anchorage: 43,65 m
Distance between 2 anchorages: 15 m
7/24/2019 29A-0000-128-0-GB
10/11
ERECTION DISMANTLINGCRANE TOWERS
EDITION :3 1
2
10.03.9910 29A--0530--060--0
Reactions (Contd)
In service I I Out of service
Rear wind / Jib I I
HSC R1 R2 R1 R2
m daN daN daN daN
Height of the 3rd anchorage: 58,65 m
(The second anchorage is slackened)
Height of the fourth anchorage: 73,65 m
(Anchorages 1 and 3 slackened)
Distance between tightened anchorages: 30 m
7/24/2019 29A-0000-128-0-GB
11/11
ERECTION DISMANTLING CRANE TOWERS
EDITION :3 1
29A--0530--060--010.03.99 11
Reactions (Contd)
In service I I Out of service
Rear wind / Jib I I
HSC R1 R2 R1 R2
m daN daN daN daN
Maximum reaction on anchorage: 8020 daN