20
© Intergraph 2015 2816 - Generating Your Plant Deliverables Efficiently Matt Worland

2816 - Generating your Plant Deliverables Efficiently - mworland

Embed Size (px)

Citation preview

Page 1: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

2816 - Generating Your Plant Deliverables Efficiently

Matt Worland

Page 2: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Learning Objectives

Meet the Experts Around You Intelligent modeling equals intelligent results – No Touch Isos Check as you model Troubleshooting Share your Tips and Tricks Questions

Page 3: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Line View Palette – Line Isolate

Isolate each line number for continuity

Page 4: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

User Shapes

All components need to be CADWorx Plant components. CADWorx Spec Editor is very robust, but if you need something a bit

more detailed you can create a User Shape

Page 5: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Start Signs

Start Signs help ISOGEN create drawings that follow the flow of the line.

Page 6: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Ancillary Data - Instruments

Adding a Tag and using the following SKEY will draw a component as an instrument on the iso.

Page 7: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Ancillary Data – Flow Arrows

Use the IsogenSupl command to insert Flow Arrows

Page 8: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Ancillary Data - Notes

You can use either the Tag or the Message Text to leave notes in the model.

Note the $ to provide a carriage return in ISOGEN

Page 9: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Discontinuity View

The Discontinuity View allows you to see several types of disconnects that could cause issues with ISOGEN and CAESAR II

There are three types; Disconnected, Not On Line, and Overlaps

Page 10: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Bill Of Materials

You should check the long descriptions before running isos. A quick way to do this is using BOMTOTAL in the model.

Page 11: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Line View Palette - Find

Lets use the Line View Palette Find tab to find those erroneous long descriptions.

Page 12: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

IsogenBatch

Running IsogenBatch allows us to check multiple lines numbers in our model at one time by providing a report of which lines were successful or failed.

Page 13: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Stop Signs

For consistent isos, it is important to place stop signs in the model. Even if we are simply matching the split points ISOGEN used.

Page 14: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

More Ancillary Data – Support Data

You can add a Direction, custom SKEY, Message and even a Detailed Sketch to your supports

Page 15: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

More Ancillary Data – Penetrations

Just like flow arrows the IsogenSupl command includes wall and grade penetrations.

Page 16: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

More Ancillary Data – Reference Dimensions

Reference Dimensions can be added to the model so they come out in the iso.

Page 17: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

IsogenOut for Testing

Typically IsogenOut is used for testing purposes only. If you have an iso that is having difficulties running, you can use IsogenOut on several components at a time to determine if those components are the problem components

IsogenBatch is used for production ready isos. These isos will include all connecting equipment and other line numbers.

Page 18: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Results

Page 19: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Wrap Up

No Touch Isos are possible, but they require intelligent models. Accurate models = Consistent and informative isos. Don’t forget to fill out your eval forms

Page 20: 2816 - Generating your Plant Deliverables Efficiently - mworland

© Intergraph 2015

Thank You!

Tips Tricks

SuggestionsQuestionsComments