28 08 2015 BOQ for Lasanod (School and Hospital)

Embed Size (px)

DESCRIPTION

28 08 2015 BOQ for Lasanod (School and Hospital)

Citation preview

School Consumption Year20162036Population Current and Future(Geometric method)200530Average Daily Consumption(lit/day) /person8080School Average Daily Demand (Lit/day)1600042400Maximum Daily Demand (lit/day)2080055120Maximum Daily Demand (M3/day)20.855.12Peak Hour Demand (lit/hr)1733.33333333334593.3333333333Peak Hour Demand (M3/hr)1.73333333334.6Peak Hour Demand (M3/sec)0.00048148150.00128Capacity of Storage Tank (lit)1248033072Capacity of Storage Tank (M3)12.4833.072Cubic Meter30

Method20162036Arithemtic Mean Method200400Geometric Increase Method200530.7

BOQ SchoolBILL OF QUANTITYPackage: Supply,Installation,Testing and Commissioning of Water supply and Rain Water Harvesting systemProject : SOMALILAND DEVELOPMENT FUNDWATER ENGINEER: MOHAMOUD ABDILAHICONSULTANT: HAIDMAN ENGINEERING CONSULTANT

Location: Lasanod School, Sool, Somaliland Date: 20-Sep-2015S.NoDESCRIPTION UNIT QTYRATE (USD)Total (USD)A. HDPE PIPES AND FITTINGS FOR TRANSMISSION LINE AND EXPANSION WORKSSupply pipes and fittings with coupling units and all accessories for complete installation of the lines and fittingsSupply of HDPE materials-All Polyethylene material include for supply and delivery to the work site of all pipes, fittings & specials including all other associated accessories required for complete installation.1.1Pressure pipes of standard 6m length for pure and brackish water1.1.1DN50mmm48209601.1.2DN40mmm48125761.1.3DN32mmm35134551.1.4DN15mmm329288Sub total (1) 2279

1.2FittingsBends1.2.1DN50mm 90 degree bendsNo123361.2.2DN50mm 45degree bendsNo63181.2.3DN40mm 90 degree bendsNo121121.2.4DN40mm 45 degree bendsNo6161.2.7DN15mm 90 degree bendsNo320.5161.2.8DN15mm 45 degree bendsNo180.59Sub total (2) 97

UnionsSupply, deliver, installation and testing Unions1.2.9DN50mm unionsNo7053501.2.10DN40mm unionsNo7032101.2.11DN32mm unionsNo3261.2.12DN15mm unionsNo150.57.5Sub total (3) 573.5

Tee's Supply, deliver, installation and testing Tee's1.2.13DN50/50/50mm 90 degree TeeNo85401.2.14DN50/50/25mm 90 degree TeeNo82161.2.15DN40/50/20mm 90 degree TeeNo2121.2.16DN15/50/15mm 90 degree TeeNo200.510Sub total (4) 68

Reducers1.2.17DN50/60.3mmNo47281.2.18DN25/60.3mmNo122241.2.19DN20/33.4mmNo12112DN15/33.4mmNo100.55Sub total (5) 69

Externally threaded nipples Supply, deliver, installation and testing Externally threaded nipples1.2.21DN50mmNo47281.2.22DN40mmNo301.5451.2.23DN32mmNo301301.2.24DN15mmNo330.516.5Sub total (6)119.5

Pumps1.2.25 Supply, deliver, installation and testing Ceterafugal pump,Cast iron, complete with threaded ports in compliance with ISO 228/1 Model: HFm 50BNO1200200Sub total (7) 200

Reverse Osmosis1.2.26Supply, deliver, installation and testing WMH Series Wall Mount High TDS River Osmosis SystemsNO140004000Sub total (8) 4000

Float valve1.2.27 Supply, deliver, installation, testing Storage tank float switch arrangement with two way float switchNO42080Sub total (9) Supply, deliver, installation, testing elevated Water Storage Tank (30 cubic meter capacity) having necessary connection for Inlets, Out lets & Drain Pipe line, etc. NO180008000Sub total (10) 8000

1.2.28 Supply, deliver, installation, testing Rainwater Harvest material, fitting and pipes with first flushGutter:150*130*120mm, 1.7mm in thicknessM1803540Downspout:100*80mm, 1.9mm in thicknessM28384Collection Pipe DN114,141,161 mmM42031260Sub total (11) 1884

Construction & Installations1.2.29Earth Works & Pipe Laying - Earth work rate shall include for back filling, shoring,compaction as per the specifications and disposal of surplus excavated material elsewhere as directed by the Engineer. Pipe laying rate shall include for local transportation within the site, handling, welding, and all other associated works required for complete installation Excavation for pipe trenches in any materialLaying and Jointing or Fixing in Open Trench HDPE pipes Installation of HDPE Fittings, 1.2.30The rate shall include excavation, shoring, dewatering,etc. necessary for the complete installationTotal17,370

Summery ItemsNoPrice(USD) Total (USD)1.7*sub-Total122793874.31.7* sub total297164.91.7* sub total3573.5974.951.7* sub total468115.61.7* sub total569117.31.7* sub total6119.5203.151.7* sub total72003401.2* sub total8400048001.7* sub total9801361.2* sub total10800096001.1* sub total1118843202.8Grand Total23,529

BOQ HospitalBILL OF QUANTITYPackage: Supply,Installation,Testing and Commissioning of Water supply and Rain Water Harvesting system

Project : SOMALILAND DEVELOPMENT FUNDCONSULTANT: HAIDAMAN ENGINEERING CONSULTANTLocation: Lasanod Hospital, Sanaag, Somaliland Date: 28-Aug-2015S.NoDESCRIPTION UNIT QTYRATE (USD)Total (USD)1Supply of Pipes and FittingsSupply of HDPE materials-l include for supply and delivery to the work site of all pipes, fittings & specials including all other associated accessories required for complete installation.Pressure pipes of standard 6m length for pure and brackish water, Standard: GB/T13663-2000, Length: 6m, Thickness: 2.0mm-82.4mm, Pressure: PN6,PN8,PN10,PN12.5,PN16, 6Kg/cm21.1.1DN50mmm1402028001.1.3DN40mmm1401216801.1.3DN32mmm40135201.1.4DN15mmm809720Sub total (1) 57201.2FittingsPE Class:PE100, D15*90 -D50*45, Norminal Pressure: PN6, PN8, PN10 PN16, Model Number: DN15 MM~DN400MM, SDR:SDR33,SDR21,SDR17,SDR13.6, Elbow,Tee,Unions, Reducers, Nipple Coupling ect.Bends1.2.1DN50mm 90 degree bendsNo73211.2.2DN50mm 45degree bendsNo73211.2.3DN25mm 90 degree bendsNo261261.2.4DN25mm 45 degree bendsNo261261.2.5DN20mm 90 degree bendsNo390.7529.251.2.6DN20mm 45degree bendsNo390.7529.251.2.7DN15mm 90 degree bendsNo390.519.51.2.8DN15mm 45 degree bendsNo390.519.5Sub total (2) 191.5Unions1.2.9DN50mmNo45201.2.10DN40mmNo4031201.2.11DN32mmNo5021001.2.12DN15mmNo500.525Sub total (3) 265

Tee's1.2.13DN50/50/50mm 90 degree TeeNo45201.2.14DN50/50/25mm 90 degree TeeNo152301.2.15DN50/50/20mm 90 degree TeeNo151151.2.16DN50/50/15mm 90 degree TeeNo200.510Sub total (4) 75

Reducers1.2.17DN50/60.3mmNo47281.2.18DN25/60.3mmNo82161.2.19DN20/33.4mmNo301301.2.20DN15/33.4mmNo130.56.5Sub total (5) 80.5

Externally threaded nipples1.2.21DN50mmNo47281.2.22DN25mmNo401.5601.2.23DN20mmNo401401.2.24DN15mmNo130.56.5Sub total (6) 134.5Pumps1.2.25 Ceterafugal pump,Cast iron, complete with threaded ports in compliance with ISO 228/1 Model: HFm 50BNO1200200Sub total (7) 200Reverse Osmosis1.2.261000BW Brackish Water Reverse Osmosis 3,000 gallons per day (gpd) Model: 3000BW, TFC Brackish Water RO Membrane,316SS High-Pressure Piping, Fittings, and Valves, Safety Pressure Relief Valve, 5-Micron Sediment Prefilter,316SS Pump, Painted Steel or Powder-coated Aluminum Frame, Fiberglass Pressure Vessels, Automatic Feed Water Shut-off ValveNO160006000Sub total (8) 6000.00

Float valve1.2.27Water Level Liquid Sensor Float Switch for Storage tank and float switch arrangement with two way float switch; Model Number: GLT606,Material:SUS304\316,

Sub Total (9)NO420120

Construction & Installations1.2.28Earth Works & Pipe Laying - Earth work rate shall include for back filling, shoring,compaction as per the specifications and disposal of surplus excavated material elsewhere as directed by the Engineer. Pipe laying rate shall include for local transportation within the site, handling, welding, and all other associated works required for complete installation Excavation for pipe trenches in any materialLaying and Jointing or Fixing in Open Trench HDPE pipes M3Installation of HDPE Fittings, 1.2.29The rate shall include excavation, shoring, dewatering,etc. necessary for the complete installationM3Installation of Valves including supply and installation of HDPEpipe works 1.2.29Installation of 250 mm dia control Sluice Valve on the branch line as depicted in drawings or directed by the Engineer. 1.2.30PVC Rainwater Harvest material, fitting and pipes .Ethylene polymer material, leed-free, good UV performance, Rain gutters, First Flush: ,material :PVC High temperature resistance, anti-aging, anti-oxidant, acid-base mold erosion resistance, oxidation resistance.Gutter:150*130*120mm, 1.7mm in thicknessM3103930Downspout:100*80mm, 1.9mm in thicknessM603180Collection Pipe DN114,141,161 mmM122033660Sub total (10) 4770

1.2.31Storage tank 15 cubic meters 60 Cubic metersM313,0003,000Sub total (11) Total20,557BOQ Summery for HospitalItemsNoPrice(USD) Total (USD)1.7*sub-Total1572097241.7* sub total2191.5325.551.7* sub total3265450.51.7* sub total475127.51.7* sub total580.5136.851.7* sub total6134.5228.651.7* sub total72003401.2* sub total86000.0072001.7* sub total91202041.7* sub total10477081091.1* sub total113,0003300Grand Total30,146.1

Hospital consumptionYear20162036Population Current and Future(Geometric method)338676Average Daily Consumption(lit/day) /person27.3668627.36Hospital Average Daily Demand Lit/day9249.9986818495.36Maximum Daily Demand (lit/day)12024.99828424043.968Maximum Daily Demand (lM3/day)12.02499828424.043968Peak Hour Demand (lit/hr)1002.08319033332003.664Peak Hour Demand (M3/hr)1.00208319032.0Peak Hour Demand (M3/sec)0.00027835640.00056Capacity of Storage Tank (lit)7214.998970414426.3808Capacity of Storage Tank (M3)7.214998970414.4263808Cubic meter15DescriptionNoAverage Consumptionper lit/dayProductIn patient75806000Out Patient200102000 Delivers5100500Operations4100400Staff505250Health directorate425100Total3383209250Lit/day9250Average daily consumption per person27.36686Method20162036Arithemtic Mean Method338676Geometric Increase Method338896.8

SummeryBOQ summery for School and HospitalNoItemGrand Total (USD)1Hospital30,146.052School23,5293Total53,675.05