Sl.No . DESCRIPTION OF WORK RATE PER Service tax in % Service tax in words WCT Unit Total Price Total Amount 1 1.00 No. Design of GIS control room building including all structural elements and analysis as per specification and submission of drawings (10 nos) with soft copy in Autocad format for execution as per specification and as directed by the Engineer. No. 2 Dismantling the RCC, PCC and Brick Masonry in CM, if any met with during excavation for foundation trenches, and clearing the debris from site including all labour charges, T & Ps etc., complete. a 10.00 m3 Dismantling RCC. m3 b 860.00 m3 Dismantling PCC. m3 c 20.00 m3 Dismantling Brick Masonry in CM m3 3a. 1.00 Opera tion Mobilization of piling equipments and all other accessories for bored cast in situ pile work. Oper ation 3b. 338.00 Nos. Shifting of piling equipments and all other accessories in the site to various locations of pile. No. 4 Installation of 500mm dia., vertical bored cast in situ piles of length 21m from cut off level using M30 concrete with 400Kg/m3 minimum cement content using 20mm HBG as per ISS including providing temporary casing pipes, using drilling mud circulation ( bentonite slurry of suitable consistent ) for stabilizing the sides of bores and concreting the piles shall be done through tremie pipe including water arrangements etc., complete. (excluding reinforcement) a 7150.00 m Bored cast-in-situ piles upto 21m depth m b 300.00 m For further depth of over 21m m c 260.00 m For depth under 21m (Retaining wall and Compound wall) m d 410.00 m Empty boring in earth from GL to cut off level m 5 1.00 Opera tion Demobilization of piling equipments and all other accessories after completion of work. Oper ation QTY Name of work:- Establishment of 400 / 230 kV GIS Sub-station including Control room, Office building, Transformer plinths, Fire protection wall, Cable ducts and Approach roads at Pulianthope in Chennai North region Schedule - I

278 t 1869 Civil Uploading

Embed Size (px)

DESCRIPTION

www

Citation preview

Page 1: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

1 1.00

No.

Design of GIS control room building including all structural elements and analysis as per specification and submission of drawings (10 nos) with soft copy in Autocad format for execution as per specification and as directed by the Engineer.

No.

2

Dismantling the RCC, PCC and Brick Masonry in CM, if any met with during excavation for foundation trenches, and clearing the debris from site including all labour charges, T & Ps etc., complete.

a 10.00 m3 Dismantling RCC. m3b 860.00 m3 Dismantling PCC. m3

c 20.00 m3 Dismantling Brick Masonry in CM m3

3a. 1.00

Operation

Mobilization of piling equipments and all other accessories for bored cast in situ pile work.

Operation

3b. 338.00

Nos.

Shifting of piling equipments and all other accessories in the site to various locations of pile.

No.

4

Installation of 500mm dia., vertical bored cast in situ piles of length 21m from cut off level using M30 concrete with 400Kg/m3 minimum cement content using 20mm HBG as per ISS including providing temporary casing pipes, using drilling mud circulation ( bentonite slurry of suitable consistent ) for stabilizing the sides of bores and concreting the piles shall be done through tremie pipe including water arrangements etc., complete. (excluding reinforcement)

a 7150.00 m Bored cast-in-situ piles upto 21m depth

m

b 300.00 m For further depth of over 21m m

c 260.00m

For depth under 21m (Retaining wall and Compound wall) m

d 410.00 m Empty boring in earth from GL to cut off level

m

5 1.00

Operation

Demobilization of piling equipments and all other accessories after completion of work.

Operation

QTY

Name of work:- Establishment of 400 / 230 kV GIS Sub-station including Control room, Office building, Transformer plinths, Fire protection wall, Cable ducts and Approach roads at Pulianthope in Chennai North region

Schedule - I

Page 2: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

6a 1.00

Test

Conducting initial load test of a single pile under initial load of 175 MT (2.5 X 70 = 175 tonne) factor of safety 2.5 as per ISS 2911, Part-IV and other relevant codes inclusive of all charges for extension or cutting of piles that may be necessary, erecting loading platform, loading and unloading the loads hire & transportation charges as directed by Engineer at site for conducting the test, retaining the test load load for 24 hours at 100% capacity, Testing equipments and test certificates and calibration chart for pressure gauge produced to the Executive Engineer before commencing day of the test, calibration of pressure gauge must be done before taking the load test. Testing equipments shall be got tested at contractor's cost and test gauge must be done taking up the 1st load including the cost

Test

6b 1.00

Test

Conducting routine load test of a single pile under routine design load (factor 1.5) as per ISS 2911, Part IV and other relevant codes inclusive of all charges for extension or cutting of piles that may be necessary, erecting loading platform, loading and unloading the loads, hire & transportation charges as directed by engineer at site for conducting the test, retaining the test load for 24 hours at 100% capacity [Testing equipments shall be got tested at contractor's cost and test certificate calibration chart for pressure gauge must be done taking up the 1st load test] includig the cost of all matreials lead, lift, labour,

Test

7 4500.00

m3

Supply and filling with gravel, watering and consolidating, rolling with hand roller in every layer including cost of all materials, hire charges for roller, labour for hard packing the surface etc., complete as per std. specification.

m3

Page 3: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

8 8100.00

m3

Earth work excavation for foundation in soil with initial lead of 10m and initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including all materials labour, T&Ps etc., complete.

m3

9 6340.00

m3

Supplying and filling in foundation and basement with filling Sand in layers of not more than 15 cm thick well rammed, watered and compacted complete, as per standard specification

m3

10 2025.00

m3

Back filling with excavated earth wherever required including labour for filling, watering and consolidating with all lead, lift, etc, complete.

m3

11 6075.00

m3

Transporting the excavated earth and debris away from site to a lead of 10Kms including cost of conveyance, loading and unloading etc., complete,

m3

12 2700.00

m2

Applying antitermite treatment to the foundation and basement of the building as per standard specification at different stages including cost of chemicals, lead, lift and labour etc., complete as per direction of Engineer.

m2

13 730.00

m3

Laying plain cement concrete 1:4:8. using 40mm HBG (machine broken) for foundation leveling course including cost of all materials, lead, lift and labour complete as per std.specification

m3

14 80.00

m3

Laying plain cement concrete 1:3:6. using 12 to 20mm HBG (MB) for TRANSFORMER PLINTH including cost of all materials, lead, lift and labour complete as per std.specification.

m3

15 235.00

m3

Laying plain cement concrete 1:2:4. using 12 to 20mm HBG (machine broken) for foundation leveling course including cost of all materials, lead, lift and labour complete as per std.specification

m3

Page 4: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

16 Laying RCC in M30 design mix using 20mm to 12mm down graded metal and 400Kg/m3 minimum cement content for various types of work for pile cap and grade beam. Etc., including chipping the piles up to cut off level, shuttering, strutting, cost of all materials, complete. (excluding reinforcement)

a 530.00 m3 PILE CAP m3b 255.00 m3 GRADE BEAM m3c 614.00 m3 BASE CONCRETE / RAFT m3d 13.00 m3 COLUMN FOOTING &

FOUNDATIONm3

e 400.00 m3 SIDE WALL m3f 180.00 m3 COVER SLAB (DUCT) CAST-IN-

SITUm3

g 2.00 m3 STAIRCASE WAIST AND LANDING SLAB

m3

17 Laying RCC in M30 design mix using 20mm to 12mm down graded metal and 400Kg/m3 minimum cement content for various types of work for GROUND TO FIRST FLOOR level,s etc., including shuttering, strutting, cost of all materials, complete. (excluding reinforcement & insert plate)I GROUND FLOOR (UPTO +3.90m)

a 290.00 m3 COLUMN m3b 10.00 m3 STAIRCASE WAIST AND

LANDING SLABm3

c 250.00 m3 ROOF BEAM m3d 540.00 m3 ROOF SLAB 200mm thick m3II FIRST FLOOR (Upto

+14.40m)a 275.00 m3 COLUMN m3b 12.00 m3 STAIRCASE WAIST AND

LANDING SLABm3

c 300.00 m3 BEAM m3d 10.00 m3 LINTEL & SILL BEAM m3e 5.00 m3 LOFT & SUNSHADE m3f 165.00 m3 TIE BEAM m3c 405.00 m3 ROOF SLAB 150 mm tk m3

III SECOND FLOOR (Upto +15.40m)

a 3.75 m3 ROOF BEAM m3b 4.00 m3 ROOF SLAB 150 mm tk m3

18 7.00

m3

Providing precast RCC cover slabs in M20 grade mix of various sizes and thickness using 12 to 20mm down graded HBG (MB) including cost of all materials, formbox, casting, curing, stocking, transporting in position with all lead, lift, neat finish, etc., as per standard specification (excluding cost of reinforcement).

m3

Page 5: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

19 821.00

MT

Supply, fabrication and placing in position of MS / RTS / TMT grills for reinforced cement concrete works including cost of steel, binding wire, labour, lead, lift, etc., complete.

MT

20 Brick Masonry in cm 1:6. using Fly Ash bricks 230x110x70mm at all levels including cost of all required materials, labour, lead, lift, etc., complete as per std specification and direction.

a 160.00 m3 FOUNDATION AND BASEMENT m3

b 470.00 m3 GROUND FLOOR m3c 1040.00 m3 FIRST FLOOR m3d 100.00 m3 SECOND FLOOR m3

21 Brick Masonry for partition walls 115mm width in cm 1:4. using Fly Ash bricks 230x110x70mm at all levels in Ground Floor including cost of all required materials, labour, lead, lift, etc., complete as per std specification and direction.a 2.00 m3 Ground floor m3

b 2.00 m3 First floor m3c 2.00 m3 Second floor m3

22 385.00

m2

Laying PCC 1:2:4 using 3 to 6mm HBG chips 50mm (average) thickness for wearing coat of plinth protection including cost of all materials, labour, lead, lift, etc., and thread lined as per standard specification and direction.

m2

23 210.00

m

Brick Cornice work over parapet wall using Fly Ash bricks 230x110x70mm in cm 1:4, and plastering with cm 1:4, 12mm thick including cost of all materials, scaffolding, labour, lead lift etc., complete as per drawing and specification

m

24 4350.00

m2

Laying Granolithic flooring 50mm thick in CC1:2:4, using 3 to 6mm HBG chips and mixing with ironite powder in the ratio of 2kg / Sq. m including cost of all materials, labour, lead, etc., and finish the top surface with extra cement and thread line as per direction and specification

m2

25 650.00

m3

Filling with quarry rubbish having quarry dust 25% to a consolidated thickness of 0.30m for stabilisation of approach road including cost of all materials, lead, lift, labour etc., as directed.

m3

Page 6: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

26 1850.00

m2

Paving the road surface with hydraulic pressed inter locking paver blocks of 80 mm thick of any colour finish and of approved design to withstand a load of 10 tonnes, to set in sand cushion including cost of all materials, machine compression, paving charges to uniform level and slope, transporting, stacking, etc., complete as per direction.

m2

27 140.00

m2

Flooring with Industrial tiles of approved quality (Johnson-Endura) and colour, scratch resistant set in cement mortar 1:3 for flooring in control room including cost of industrial tiles, all leads, lifts labour for laying fixing and finishing neatly as per standard specification and as directed by the Engineer-in-charge ( Industrial tiles colour and shade to be got approved by the Executive Engineer before use )

m2

28 290.00

m2

Supplying and fixing of prepolished hydraulic pressed non-skid, vibrated concrete tiles of approved design and colour 18mm thick set in cm 1:3, 10mm thick for steps etc., complete as per direction.

m2

29 Floor Finish with Vitrified tiles johnson, kajaria, nitco of virtified tiles mat finish at required size and Anti-Skid tiles for Toilet in all floors over a base layer of C.M. 1:3. 20mm thick laid in-situ and pointed with same coloured cement for Toilet etc., including cost of tiles and other materials, labour, lead, lift etc, complete, and as directed by the Engineer

a 785.00 m2 Virtified Tiles 600x600mm m2b 50.00 m2 Anti-Skid tiles for Bath & FOL m2

30 125.00

m2

Floor Finish with acid resistance tiles in battery room kajaria, nitco of virtified tiles mat finish at required size to set C.M. 1:3. 20mm thick including cost of tiles and other materials, labour, lead, lift etc, complete, and as directed by the Engineer

m2

Page 7: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

31 130.00

m2

Wall finish with glazed tiles of approved make (johnson) colour set in CM 1:3, 20mm thick in Toilet etc, including cost of all materials and labour charges complete as per specification and direction.

m2

32 140.00

m

Supply and fixing in position of copper sheet 18 G thick and 0.20 m width as per drawing in expansion joint in all floors for end column and slab including cost of all materials such as asphalt pad, all fillets, etc. complete as per standard specification.

m

33 Plastering with cement mortar over the concrete/BM surfaces at all levels both outside and inside of the building including cost of all materials, hacking the surfaces, scaffolding, lead, lift, curing, etc., complete as per the std. specification and direction.

a 5900.00 m2 Ceiling plastering with cm1: 3, 10mm thick

m2

b 1170.00 m2 Floor finishes with cm 1:3, 20mm thick and thread lined.

m2

c 4450.00 m2 plastering in C.M. 1: 4, 12mm thick for concrete surfaces

m2

d 14800.00 m2 plastering in C.M. 1: 5, 12mm thick Inside/outside.

m2

34 215.00

m

Providing projected border 20 Cm width in CM 1 : 3. 20 mm thick including cost of all materials, labour, lead, lift, etc., complete.

m

35 215.00

m

Providing projected border 7.5 Cm width in CM 1 : 3. 20 mm thick including cost of all materials, labour, lead, lift, etc., complete.

m

36 2655.00

m2

Laying weathering course with one course of Pressed Tiles of size 230x230x20mm confirmed to ISI and approved quality to set in cm 1:3, 10mm thick mixed with 200gm pidilite ready mix water proof compound per bag of cement and pointed with same mortar over the brick jelly concrete, 80mm thick using 20mm brick jelly in the ratio 32:12.5 and well beaten with wooden hammers, spraying lime water, kadukkai and jaggery solutions as per std, specification, including cost of all materials, labour, lead, lift, etc., complete as directed.

m2

Page 8: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

37 Supplying and fixing of CW door of size 1180x2100/915x2100mm single leaf flush door in Kongu wood outer frame size 100x75mm and the shutter frame size 100x40mm for top rails, 150x40mm for lock rails and 200x40mm for bottom rails and fixed with 18mm thick water proof plywood and 1mm thick lamination on both sides and giving necessary beeding 20mm size alround the joints of plywood bothsides, fittings and furniture of best quality, 150mm Ano, Alu.hinges (HD) 3Nos, 1No- 250mm Alu.Aldrop, 2Nos-250mm Alu. tower bolts, 1No- stopper, 2Nos- handles and 1No-Godrej 4lever Mirtice lock including cost of all materials wood wrought and put up, labour charges and painting with one coat wood primer etc, complete as per direction.

a 13.00 m2 DOOR 1180X2100MM m2b 16.00 m2 DOOR 915X2100MM m2

38 Supply and fixing of P V C Door frame with shutter of size 750x2100mm of approved quality and fibre make of single leaf by single mould sintex make with furniture fittings 3nos.75mm Ano. Alu. - Hinges,1no.150mm aldrop, 2nos tower bolt and 2nos handle including cost of all materials, labour charges etc.,complete as per directed by Engineer.

21.00 m2 DOOR SIZE 750X2100MM m2

Page 9: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

39 65.00

m2

Supplying Fabricating and fixing in position of anodized aluminium natural color matt finish glazed Sliding window including ventilator head of size 1.18x1.48m in two tracks in all floors with the following sizes. All the two shutters with sliding arrangements, with gutter arrangements so as to drain the water entry and made with extruded aluminum section of bottom track of size 62x37mm with gutter arrangements @ 1.218kg/m sice and top track of size 62x31.5mm @ 0.788kg/m for shutter plain top and bottom section of size 40x18mm @ 0.38kg/m plain side vertical section of 40x18mm @ 0.493kg/mm inter locking vertical section of size 40x18mm @ 0.63kg/mm ventilator box frame 63x37mm @ 0.85kg/m switch lock, special rubber, L angle, alu. Clip 17.15x17.27, 1.5mm thick @

m2

40 25.00

m2

Supplying and fabricating and fixing in position of anodized aluminium natural color matt finish fixed type ventilator of size 1.18x0.58m N type Ventilator in anodized aluminium rectangular tube of size 63x37mm of 0.850kg/m with 4mm thick frosted glass ,aluminium mesh with alu. beading clip of size 17.15x17.27mm @ 0.178kg/m fixing rubber lining etc, including cost of all materials, lead,lift,labour for fabricating,fixing in position etc; including drilling holes in RCC etc., In accordance with ISI 1868, 1962 specification for an average anodic film thickness not less than 5 microns and all the materials should be got approved from the Executive Engineer before use.

m2

Page 10: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

41 11.00

m2

Supplying and fabricating and fixing in position of anodized aluminium natural color matt finish Louvered type ventilator of size 1.18 x 0.58m The outer frame will be 62x38x2mm @ 1.17kg/m and louvers with moving arrangements will be made with alu. channels of size 62x38x2mm @ 1.27kg/m with pairs of louvers 4mm thick alu. clips including cost of all materials, lead,lift,labour for fabricating,fixing in position etc; including drilling holes in RCC etc., In accordance with ISI 1868, 1962 specification for an average anodic film thickness not less than 5 microns and all the materials should be got approved from the Executive Engineer before use.

m2

42 65.00

m2

Supplying Fabricating and fixing natural color matt finish Aluminium partition glazed and 5.5mm thick Plain glass using aluminum section 63x37mm Top and Vertical and for bottom section 95x45mm including cost of all materials, labour, lead, lift, T & Ps etc complete.

m2

43 72.00

m2

Supplying, Fabricating and fixing natural color matt finish Aluminium partition partly glazed & partly paneled (600x600mm) with 12mm thick MDF Board both side melamine finish and 5.5mm thick glass ( Saint Gobin or equivalent ) using aluminum box section 63x37mm @ 0.85kg/m and for bottom section 95x45mm and 2mm thick including cost of all materials, labour, lead, lift, T & Ps etc complete. In accordance with ISI 1868, 1962 specification for an average anodic film thickness not less than 5 microns and all the materials should be got approved from the Executive Engineer before use.

m2

Page 11: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

44a 9.00

m2

Supplying fabricating and fixing in position natural color matt finish Aluminium door half glazed & half MDF Board using aluminum box section 45x50x2mm for top, middle, vertical section 45x45x2mm sides, 95x45x2mm for bottom, top 900mm fixed with 5.5mm thick Machine Frosted float glass ( Mode, Saint Gobin or equivalent ) and bottom two section with 12mm thick MDF boards two sides laminated approved quality Mortice lock, designed aluminum handles at front and back, pivot at top and bottom, door closer etc including the cost of all materials, labour, lead, lift, T & Ps etc complete. In accordance with ISI 1868, 1962 specification for an average anodic film thickness not less than 5 microns and all the materials should be got approved from the Executive Engineer

m2

44b 9.00 m2 - do - (Single leaf) m245 240.00

m2

Aluminium composite panel works:Designing the system for cladding the external wall with approved make of aluminum composite panels --- 4mm thick(0.5 mm thick aluminum sheet on top and bottom sandwiched with 3 mm thick core material of anti toxic low density polyethylene) in combinaton with solid and metallic colour panels, by using pre-assemble extruded aluminum sections/brackets and aluminium composite panel to withstand design wind pressure of 150 kg/sqm (Testing pressure shall be 1.5 times of the design wind pressure of 150 kg/sqm) conforming to IS 875-Part III. The system shall be designed to accomodate thermal movement of the aluminium framing system including supporting arrangements.Fastening devices and composite panel resulting from the exterior skin

m2

46 100.00

m2

Work top - fabricated out of 25 mm thick particle board duly post formed edges using 0.6 mm flex laminates

m2

47 100.00

m2

Work top - fabricated out of 25 mm thick pre laminated particle board duly edge banded with 2 mm thick PVC beeding

m2

Page 12: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

48 100.00

No

End Panel : Size : 725 mm x 400 mm - fabricated out of 25 mm thick Pre-laminated particle board duly edge banded with 2 mm thick PVC beeding

No

49 30.00 No

CPU Trolley -M.S. Powder coated No

50 30.00

No

Mobile Pedestal of Size : 400 mm x 450 mm x 640 mm [H] - Having Two Drawers + One filing drawer - fabricated out of 18 mm & 9 mm thick Pre-laminated particle board duly edge banded with 2 mm thick PVC beeding and provided with handle & lock.

No

51 600.00

sqm

Providing false ceiling by using 12 mm thick perforated gypsum board in panels using 6mmGI rod suspender ,16 gauge aluminium "T" and "L" including all materials, labour, lead and lift etc., complete.

m2

52 50.00

m2

Supplying and fixing of Rolling shutters opening using 18 gauge M.S. Sheet TATA STEEL with Gear System operation providing with locking arrangements on both sides, tophood, guides, gear arrangements, operation rod, handles and painting with one coat red oxide metal primer to the clear opening, including cost of all materials, fabrication, transportation, and fixing in position Godrej 7 levers locks 2Nos, for each shutter and labour charges complete., as directed. (Clear opening)

m2

53 Supplying, fabricating and fixing in position of MS grills gates, name boards, handrails and ladder, etc., at various levels as per approved design of the Engineer, including cost of steel and other required materials, labour charges, transportation and fixing, taking grooves in BM/RCC, packing the pockets with CC and painting with one coat metal primer complete.

a 5000.00 kg Window grills, gates, staircase handrails and ladder

kg

b 50.00 m 50mm M S medium Class pipe for handrail

m

c 8000.00 kg M.S Channel and Angle kgd 4500.00 kg M.S.Flats 50mmx10mm thick for

earth matkg

e 5500.00 kg G.I. Angles of sizes for structure supports

kg

Page 13: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

f 2500.00 kg G.I. racks for control cables kg54 10350.00

m2

White washing two coats with best quality of white Cement over one coat of primer to the newly cement plastered surface, ceiling, sunshade,loft bottom, Duct inside and other surface, including cost of all materials, watering, curing, lead, lift, etc., complete, as per std specification and as directed by the Engineer.

m2

55 9700.00

m2

Wall paint two coats with approved Oil bound distemper over one priming coat to the cement plastered wall inner surface, necessary curing including cost of all materials, labour lead, lift, etc., complete, as per std. specification and as directed by the Engineer.

m2

56 9700.00

m2

Wall paint two coats with approved exterior emulsion paint over one priming coat to the cement plastered wall outer surface,necessary curing including cost of all materials, labour lead, lift, etc., complete, as per std. specification and as directed by the Engineer.

m2

57 400.00

m2

Painting the new steel work with two coats best quality and approved colour Synthetic Enamel paint over the Red Oxide primer including cost of all materials, labour, etc., complete as per std. specification and as directed by the Engineer.

m2

58 110.00

m2

Painting the new wood work with two coats best quality and approved colour Synthetic Enamel paint over one coat of primer including cost of all materials, labour, etc., complete as per std. specification and as directed by the Engineer.

m2

59 Supplying, laying and jointing of PVC pipes of approved brand and ISI quality for waterline, sewerline, and rain water downfall pipe etc., including cost of all materials and GI specials, fixing the pipes over BM/CC surfaces by taking grooves and fixing wooden plugs, screws firmly with special clamps as directed.

a 200.00 m 160mm dia 6kg/cm2 mb 300.00 m 110MMdia 6kg/cm2 mc 200.00 m 63MM dia 6kgf / cm2 m

Page 14: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

d 100.00 m 32MM dia 15kgf / cm2 me 200.00 m 25MM dia 15kgf / cm2 mf 200.00 m 20MM dia 15kgf / cm2 m

60 Supplying and fixing of GM wheelvalve / gate valve of approved brand and ISI quality wherever required including cost of all materials, lead, lift and labour charges, complete as directed

a 6.00 Nos 32MM dia GM wheel valve No.b 8.00 Nos 25mm dia GM wheel valve No.c 10.00 Nos 20mm dia GM wheel valve No.d 3.00 Nos 100mm dia GM gate / wheel

valve No.

61 Supplying and fixing of CP/PVC Bibcock of best quality of approved brand wherever required including cost of all materials, lead, lift and labour charges, complete as directed.

a 20.00Nos

20MM Brass Chromimum plated screw down Bibcock ( Heavy Type )

No.

b 10.00 Nos 15mm dia CP tap long body- LMR No.

c 10.00 Nos CP towel Rail 600mm (Metro)- LMR

No.

d 20.00 Nos 20MM PVC (HD) Bibcock No.62 Supplying and fixing in of

position P V C Nahini Trap / C I. Gully of approved make & quality fixed over a bed with C. M. 1:3, and fixing stainless steel Grating including the cost of all materials, labour, lead, lift, T & Ps etc., complete.

a 20.00 Sets P V C Nahini Trap Setb 20.00 Sets C I. Gully Set

63 Supplying and fixing of heavy duty C. I. Manhole cover with pedastal square 600x600mm (HD) or RCC cover slab with pedastal square for the sewer manholes including cost of all materials, labour charges, etc., complete as per std. specification and as directed by the Engineer.

a 10.00Sets

Heavy duty C. I. Manhole cover with pedastal square 600x600mm

Set

b 20.00 Sets H D RCC Cover slab with pedastal square

Set

Page 15: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

64 10.00

Nos

Supplying and fixing in position wash basin of size 550x400mm of approved quality and make[Parryware of equivalent]Hi-lite colour/white with 12/15mm dia brass CP pillar tap, 32mm CP waste coupling 32mm PVC waste pipe, 12/15mm CP angle cock, 15mm brass nipple, 15mm nylon connection 1No Soap container, 500x400mm size best quality Ano. Alu.framed mirror, etc., fixing the washbasin in the wall with GI/Alu. brackets, giving necessary water connection including the cost of all materials, labour, lead, lift T & Ps etc complete.

No.

65 5.00

Set

Supply and fixing in position of the best belgium glass mirror of size 1.52 X 0.75 m to the wall necessary screws etc. complete in all respects.

Set

66 4.00

Nos

Supplying and fixing in position glazed EWC - white colour of approved make & quality with 'P' or 'S' trap [Parry ware-ELITE- or equivalent With double flapped PVC Anti Microbral Solid Seat cover PVC low level Slim Line Cistern with all necessary fittings (viz) Brass nipple, CP angle cock, Nylon connection, CP brass fittings etc& connecting to water main complying with standard specifications including the cost of all materials, labour, lead, lift, T & Ps etc complete.

No.

67 4.00

Nos

Supplying and fixing of water closet 580x440mm ORIYA pan suitable colour of approved make including cost of all materials, traps etc., and labour for fixing etc., complete as directed.

No.

68 8.00

Sets

Lipped Mouth Porcelin Flat Back Urinal with all accessories such as 32mm dia Bell mouth PVC connection, 15mm dia G.M. wheel value, 15mm dia 'B' Class G.I. waste pipe, 15mm dia nylon connection, 15mm dia brass nipple etc., including cost of all materials, traps etc., and labour for fixing etc., complete. ( Make ,Model to be approved by Dept.Engineer at site )

Set

Page 16: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

69 30.00

m

Drain line connecting to main sewer line near by the main gate of TNEB complex, Guindy with 200mm PVC pipe to the requied depth. ( Minimum 1 m)

m

70 12.00

Nos

Supplying and fixing of white marble stones for partition in urinals of size 600x1200x20mm thick including cost of all materials and labour for fixing etc., complete as directed.

No.

71 2.00

Nos

Supplying and fixing of PVC water tank of approved brand (sintex) 5000 litre capacity in terrace floor as directed by engineer including cost of sintex water tank, labour for fixing in position, construction of BM for alround of tank, filling with filling sand and plastered the top and side surface all leads,lifts etc complete

No.

72 Supply and Erection of single phase Mono block / Double stage Jet Motor & Pump of ISI quality and approved make for dewatering, borewell supply, sump to over head water tank etc., with all accessories such as starter, main switch, teakwood board for fixing of main switch, starter, fuse carrier, indicator holder, switch, lamp, etc., earthing arrangements, internal wiring from switch to motor, transportation, concrete bed / steel brackets, labour charges etc., compete.

a 2.00 Set Double stage 1.5 HP Jet Setb 1.00 Set 1.0 HP MONO BLOCK Set

73 2.00

Nos

Supplying and fixing of white marble stones of size 450x600x20mm thick engravying the foundation details of the substation with necessary borders and painting the letters including cost of all materials, labour charges, etc., complete as directed.

No.

Page 17: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

74 Supply and erection of RCC pre cast well rings of dia 1200mm, 300mm height and 50mm thick for construction of Rainwater Harvesting tank, Septic tank and Soak pit including cost of well rings, brick jelly, stone jelly 40,20,12,10mm and sand, etc., lead, lift, erection charges, labours etc., complete, as per direction and specification.

a 30.00

Nos

Supply and erection of well rings for Rain water harvesting, Septic tank,and Soak pit

No.

b 3.00 Nos Supply and fixing of top cover No.c 4.00 Nos Exhaust fan rings No.

75 3.00

Nos

Supplying and fixing of Cudappah slab Sink of size 0.6x.45x.45m and slab thickness 20mm with 32mm dia 'B' Class G.I. waste water pipe and 32mm dia C.P. waste coupling including cost of all materials and labour for fixing etc., complete as directed.

No.

76 90.00

m2

Supplying and fixing of Cadappah slab for cupboard of varies size, and minimum slab thickness should be maintain 20mm, including cost of all materials and labour for fixing etc., complete as directed.

m2

77 40.00

m

Supplying and fixing of Ornamental handrail 1m height for front ramp & stair case in stainless steel using 50mm dia pipe at top and edge, 25mm dia two rows at middle and 25mm dia pipe for verticals at every 1.00m C/C including cost of all materials, transportation and fixing in position, labour charges, complete as directed.

m

78 270.00

m

Providing Barbed wire fencing 10 Gauge - Two ply four pronged (Galvanised) over the compound wall in three rows with Y angles at regular intervals including cost of barbed wire, labour, lead, lift, etc., complete but excluding the cost of M.S.Angles.

m

79 12.00

m2

Supplying and fixing of Name board using 18mm thick MS board and 45x6mm angles and letter painting etc., including cost of all materials, labour,etc.,complete.

m2

Page 18: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

80 5300.00

kg

Supplying and fixing of M. S. Rails 90 lbs for transformer plinth including cutting to size and fixing to position, transportation, cost of materials, labour, lead, lift etc., complete.

kg

81a. 1.00

Set

Supply and erection, testing and commissioning of 5T capacity Electrically operated travelling (E O T) Crane with 14m span and 60m longitudinal run double girder including cost of all materials, transport, labour etc., complete as per relevent IS

Set

81b. 1.00

Set

Supply and erection, testing and commissioning of 5T capacity Electrically operated travelling (E O T) Crane with 10m span and 40m longitudinal run double girder including cost of all materials, transport, labour etc., complete as per relevent IS

Set

82 2.00

Set

Supply and erection of 3 tonne capacity mono rail 2nos approximate run 15m each pully, chain block fixing arrangements, lifting arrangements all materials , transport, labour etc., complete including testing and commissioning as per IS.

Set

83 Storage Unit of following sizes.

10.00 No. i). 900mmx450x750mm No. 10.00 No. ii). 900mmx450x1200mm No. 10.00 No. iii). 900mmx450x1800mm No.

84 20.00

No

Key Board Tray of Size : 600 mm x 300 mm - fabricated out of 18 mm thick pre-laminated particle board duly edge banded with 2 mm thick. PVC beeding

No

85 20.00

No

COMPUTER OPERATOR CHAIR (Low-Back)-With Arms. The chairs are height adjustable and revolving. The seat and back portion of the chair will be of cane knitted.. Five legged fibre base mounted on twin castor wheels. With Hydraulic gas lift for height adjustment.

No

Page 19: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

86 20.00

No

COMPUTER OPERATOR CHAIR (High-Back)-With Arms. The chairs are height adjustable and revolving. The seat and back portion of the chair will be of cane knitted.. Five legged fibre base mounted on twin castor wheels. With Hydraulic gas lift for height adjustment.

No

87 40.00

Nos.

Supplying and sticking the name / designation stickers in doors identifying the rooms including cost of material, labour etc. complete.

No.

88 Supply of Plastic buckets, dustbin, Toilet refresheners,etc., complete

a 20.00 Nos 10 liters Plastic buckets No.b 20.00 Nos 5 litres Plastic bucket with mug No.

c 20.00 Nos Plastic Dustbin (5 litres ) No.d 5.00 No Notice board laminated (White)

1.00x0.75mNo.

e 5.00 No Display board with Cloth cushion 1.00x0.75m

No.

89 Supplying and fixing of Alu. Dyecasting letters to the required sizes with necessary powder coating colouring with emblem as per board's norms including cost of materials, scaffolding and labour charges complete as directed.a 1.00 No TNEB emblem 1.20m Dia No

b 75.00 Nos 45cm size letters No.c 75.00 Nos 30cm size letters No.d 75.00 Nos 23cm size letters No.

90 40.00

Nos

Supplying and providing of 300mm dia, flower pots containing green plants as directed by the Engineer at site.

No.

91 8.00

Sets

Supplying of Godrej Navtal lock Seven Lever with three keys for locking office portion and Pump rooms as directed.

Sets

92 825.00

m2

Design of architectural rendering and providing architectural finish including cost of all materials, lead, lift , etc complete including scaffolding and plat form etc. with all safety meaures.

m2

93 500.00

m2

Turfing in slope including cost of sand, gravel mix in 1:1 for a depth of 0.15 m and red earth, sand and cow dung mix in 1:1:1 for a depth of 0.15 m and pitching of Korean grass including cost of all materials, watering, lead, lift, labour and T & P, etc., complete.

m2

Page 20: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

94 300.00

m

Drilling 12" (300mm) dia augar holes to the required depth as directed by the Engineer at site including the cost of all materials, labour, T&P, lead, lift, etc., complete for rain water harvesting.

m

95 2.00

No.

Conducting Geophysical survey to assess the availability of sufficient ground water and to locate the place of Borewell including cost of all materials, labour, hire charges for tools and plants, leads, lifts, labour, etc., complete.

No.

96 Drilling of borewell alluvial soil or sedimentary strata of clay and sand or sand stone, shale, pebbles, boulders etc., first by taking a pilot bore of 140mm/150mm dia and then enlarging to required dia by direct or reverse rotatry mud and circulation method using rotary rig fuel, drilling at the site. Site will be shown by theTNEB Engineers at site including construction of mud pit.

a 80.00m

Drilling 140/150mm dia pilot bore upto 60m depth ending below ground level. ( 60.00 )

m

97 Reaming from 140/150 mm dia pilot bore to 300 mm dia bore as directed by the TNEB Engineers at site

a 80.00 m Upto 60m Depth ending from ground level (60.00)

m

98 Supply and delivery of 150mm dia PVC Casing pipe as per ISI Standard Specifications and as directed by TNEB Engineers at Site.

a 40.00 m 150mm dia PVC Casing pipe Plain (CM)

m

b 40.00 m 150mm dia PVC Casing pipe Plain Slotted

m

c 2.00 No. 150mm dia PVC End Cap No.99 80.00

m

Labour charges for inserting 150mm dia PVC casing pipe assembly (with slotted and W/O. slotted) in the drilled bore holes including jointing the PVC pipe with the PVC Coupler with cement paste etc., complete and supply packing with annular space with pebbles of size and quality as approved by the TNEB Engineers.

m

Page 21: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

100 12.00

Hrs.

Charges for developing the bore well with air compressor of 600 cfm capacity (mins. 8 hrs ) including transportation, labour and fuel charges for compressor as directed by the TNEB Engineers and conducting yield test by 'V' notch method.

Hr.

101 40.00

m

Supplying and filling with Pebbles for annular spacing in between strainer pipe and earth surface including cost of all materials, leads, lifts, labour, etc., complete.

m

102 1.00

Set

Supplying and erection of 3HP air compresser 3 phase electrical motor of approved brand with all related accessories as per IsI in all respect including oil level indicator switch board with 3 Nos. test lamp, 3 Nos. fuse carrier, 1 No. 15AMPS DPIC swithch with L&T make starter with guard and providing earthing to main with no. 8 tinned copper rod and 6' long 40mm dia GI pipe for earting and earth pit filled with charcoal and salt as per standard spectification and laying motor bed by concrete and placing motor over bed, labour charge for placing motor over bed including cost of all materilas lead and lift etc, complete as driected by the department engineer at site.

Set

103 1.00

Set

Supplying and erection of 2HP mono block 3 phase electrical motor of approved brand with all related accessories as per IsI in all respect including oil level indicator switch board with 3 Nos. test lamp, 3 Nos. fuse carrier, 1 No. 15AMPS DPIC swithch with L&T make starter with guard and providing earthing to main with no. 8 tinned copper wire rod and 6' long 40mm dia GI pipe for earthing and earth pit filled with charcoal and salt as per standard spectification and laying motor bed by concrete with placing motor over bed, labour charge for placing motor over bed including cost of all materilas lead and lift etc, complete as driected by the department engineer at site.

Set

Page 22: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

104 80.00

m

Supplying &Inserting 40mm dia HDPE hose pipe of make FLOWTEC or equivalent ISI make for suction inside the borewell with supporting clamp including cost of all materials, labour, lead & lift etc., complete as driected by the department engineer at site.

m

105 80.00

m

Supplying & Inserting 20mm dia HDPE hose pipe of FLOWTEC or equivalent ISI make for air pipe inside the borwell with supporting clamp including all materials, labour, lead & lift etc., complete as directed by the department engineer at site.

m

106 Supplying and laying GI B class pipe wherever necessary as directed by Engineer at site including earthwork excavation, refilling necessary fittings, all materials, labour, lead and lift etc., complete as directed by the department engineer at site.

a 100.00 m 100mm dia mb 100.00 m 40mm dia m

107 100.00

m

Supplying and laying 20mm dia B Class GI pipe for air pipe connecting borewell to motor including earthwork excavation, refilling necessary fittings, all materials, labour, lead and lift etc., complete as directed by the department engineer at site.

m

108 100.00

m

Supplying, laying of 50mm dia10 kg/cm2 PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site.

m

109 16.00

m3

Laying reinforced cement concrete in 1:4:8, mix using 12 to 20mm down graded metal for DUMMY COLUMN with necessary centering, strutting, form box vibrating, water arrangements etc., with all materials and labour complete as per standard specification [excluding cost of reinforcement].

m3

Page 23: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

110 270.00

m

Supplying, laying and jointing 100 mm dia M.S. pipes with welded / flange joints for oil drainage lines including cost of M.S. pipes, flanges, neoprene gaskets, welding, transporting, etc., complete.

m

111 2925.00

m2

Providing concrete road with RCC 1:2:4, 150 mm thick over M 10 grade concrete 100 mm thick using 12 to 20 mm metal including cost of all materials, lead & lift, etc., complete.

m2

112 300.00

m2

Supply and installing under deck insulation 50 mm thick of fiber glass crown 150 mm or its approved equivalent thermal conductivity and fire resistant under concrete roof and roof beams including all connected works but not limited to slotted angle pieces with raw plugs and coach screws for fixing the insulation to roof 146 tie wire, wire mesh netting 246 with mesh size of 25 mm x 36 mm gauge aluminium protective covering etc., complete as per specification.

m2

113 600.00

m2

Supply of all materials as per design and drawing and installing cavity flooring of the control room consisting pedestals with level adjust device, located at 610 mm centers in both direction, with die cast in head to receive string. String connection to the pedestal being of removable type but without screwing or bolding floor boards with metal stoppers at bottom to fix the same on the stingers of panel size 610 x 610 mm made up of 35 mm thick phenol bonded particle board / latest approved board, Novoteak super equivalent faced with 2 mm thick PVC tiles as per IS 34562 on top and edges including providing cable outlet opening steps, ramps, etc.,. to be carried out as per specification and as directed by the Engineer.

m2

Page 24: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

114 5.00

m3

casting precast cable gutter of RCC M25 using minimum cement content of 365 Kg/m3 and with 20 mm down graded aggregate including the cost of all materials, labour, formwork, curing, lead, lift, etc., complete and including placing in position but excluding cost of reinforcement.

m3

115 100.00

m2

Supplying and providing water proofing for basement including cost of all materials with 3 mm thick asphalt water proffing material and 20 cm 1:3 plastering over the asphalt sheet to protect the sheet from any damage including cost of all lead, lift, etc., complete.

m2

116 265.00

m2

Supplying and providing water proofing for side walls including cost of all materials with 3 mm thick asphalt water proofing material pasted with concrete surface and protect the water proofing mateial from any damages using 12 mm thick asphalt particle boad or 25 mm thick thermocool sheet including cost of all lead, lift, etc., complete.

m2

117 3.00

no

Rain water harvesting including providing 4 no of 600 mm dia empty boring to a depth of 10 m and filled with 40 mm HBG metal and connect all rain water down fall pipe to the rain water harvesting pit with 225 mm PVC pipe.

no

118 10.00

m3

Filling with 40 mm HBG metal in recharge trenches, percolation pits, Filteration chambers, yard & whereever necessary as directed by the engineer at site including cost of all materials, labour, lead, lift, etc., complete.

m3

119 6.00

no

Supplying and fixing of heavy duty hydraulic door closure with ISI mark of approved brand and good quality including cost of all lead, lift, labour for fixing in position, etc., complete.

no

120 25.00

m2

Supplying and fixing of 6 mm thick AC sheet to cover the lean to roof for staircase head room including cost of sheet, J bolts, cup-washer, bitumen washer etc., complete.

m2

Page 25: 278 t 1869 Civil Uploading

Sl.No. DESCRIPTION OF WORK RATE PER

Service tax in %

Service tax in words

WCTUnit Total Price

Total Amount

QTY

121 50.00

m

Supplying and laying of spun pipe 230 mm dia in between cable duct for cable crossing portion including cost of pipe joint collar and all lead, lifts, labour for fixing including earth work and refillimg the earth after laying the pipe etc., complete.

m

122 330.00

m

Labour charges for fixing of foundation bolts or base plates to the plinth foundation inclusive of cost of pocket hole, alligning, levelling, etc., as per instruction of Engineer at site.

m

Total amount