- Home
Documents
- 275/132 kV substation, to the east, and a second 132kV line from Para substation, to the south....
24
275/132 kV substation, to the east, and a second 132kV line from Para substation, to the south. Playford 132 kV switchyard, to the north,
Embed Size (px)
Citation preview