26 October2005Reston, VA, USA
1
MOIMS AREA:STATUS REPORT,
End of Spring 2005 Meeting
N. Peccia ESAR. Thompson BNSC
26 October 2005
2
26 October2005Reston, VA, USA
2
B. SUMMARY TECHNICAL STATUS
MOIMS AREA REPORT
Working Group Summary progress:• New draft SIP White Book, due 15 November 2005.
• OAIS RM will have its CCSDS 5-year review • Work plan to solicit input from the digital community on the need for
updates has been generated.
• Responses have been required by 30 October, for initial consideration at Fall 2005 workshop, to begin scoping degree of effort.
Problems and Issues:
• None
• No meeting at Atlanta. Next meeting 1st week Dec 2005 in CNES
status: OK CAUTION PROBLEM
comment: X
Data Archive Ingest (DAI) WG
26 October2005Reston, VA, USA
3
B. SUMMARY TECHNICAL STATUS
MOIMS AREA REPORT
Working Group Summary progress:• XFDU Schedule:
1. 15-11-2005 XFDU Draft RB for WG review2. 15-01-2006 XFDU RB to CESG for Agency Review
Problems and Issues:• None• No meeting at Atlanta. Next meeting 1st week Dec 2005 in CNES.
Information Packaging and Registries (IPR) Working Group
status: OK CAUTION PROBLEM
comment: X
26 October2005Reston, VA, USA
4
B. SUMMARY TECHNICAL STATUS Spacecraft Monitoring & Control WG
Goal: See Ops Plan
Working Group Status: Active _X__ Idle ____
Working Group Summary Situation:
Working Group Summary progress:
• Next chart
Problems and Issues:
• Next charts
status: OK CAUTION PROBLEM
comment: X
MOIMS AREA REPORT
26 October2005Reston, VA, USA
5
Mario Merri (ESA) – chairman Roger Thompson (BNSC) - deputy chairman Martin Symonds (BNSC) Brendan Harnett (BNSC) Brigitte Béhal (CNES) Erwann Poupart (CNES) Philip Melanson (CSA) Harald Hofmann (DLR) Alessandro Ercolani (ESA, PoC) Michael Schmidt (ESA, PoC) Ivan Dankiewicz (ESA/SciSys) Sam Cooper (ESA/SciSys) Ana Maria Ambrosio (INPE) NEW Paulo Giacomo Milani (INPE) Takahiro Yamada (Jaxa) Amalaye Oyake (NASA/JPL) Ashton Vaughs (NASA/JPL) Martha Demore (NASA/JPL) NEW Peter Shames (NASA/JPL) Donald C. Lokerson (NASA/GSFC) Freemon Johnson (NASA/GSFC) Gerry Simon (OMG/Lockheed Martin) NEW Brad Kizzot (OMG/Harris) NEW
SM&C WG Statistics
10 Active Organisations
17 Active members ()
17 Teleconferences
12 Members attended the Atlanta CCSDS workshop
MOIMS AREA REPORT
26 October2005Reston, VA, USA
6
SM&C Summary Progress: Green Book• Rework strategy after comments received from NASA
– Limit GB size to 30-40 pages• Move Use Cases to RBs• Remove technical details• Address relevant technical issues
– Scope• Explicitly address interoperability and cross-support• More emphasis on approach (e.g. derivation of services)• Clarify philosophy (e.g. handling of legacy systems, service / layering approach,
modularity)• Rework Plan:
– Respond to comments received:• Internal draft 3rd Oct 05• Teleconf: 12th Oct 05• Back to CESG: End Oct 05
– Rework GB:• Draft 2.1: 28th Nov 05 (distributed for wide internal review)• Comments due 12th Dec 05• Teleconf 20th Dec 05 to discuss comments• GB to CESG: 30 Jan 06
MOIMS AREA REPORT
26 October2005Reston, VA, USA
7
SM&C Summary Progress : Prototype & 3 HP RBs Schedule
• Prototype– JPL / BNSC to secure funding
– Produce global SoW identifying the individual components. Draft 1 due 31 Oct 05.
– End of 2005: Kick off
– June 06: Some co-working component of prototype by next CCSDS workshop in Rome
• Schedule for 3 High Priority RBs– Oct 2005: Internal Agency review of 3 HP RBs (informal)
– June 06: Internal Agency review of 3 updated HP RBs
– Fall 2006: Submission of 3 HP RBs for public Agency review.
MOIMS AREA REPORT
26 October2005Reston, VA, USA
8
SM&C Summary Progress: OMG XTCE Status
• Green Book production started– JPL + ESA + Goddard
• XTCE Schedule– The original baseline (re-issue of XTCE by 30 Aug) not met by OMG– XTCE issue 1.1 draft will be published 1st Dec 05
• RIDs from 1st CCSDS Review.• All OMG Issues up to 1st Nov 05
– XTCE issue 1.1 draft to be used for 2nd CCSDS Agency Review starting on 1st Dec 05 for 3 months up to 28 Feb 06
– Issue 1.1 final available 30th Apr 06– GS (OMG) will take care of adapting the OMG process to the dates
above
MOIMS AREA REPORT
26 October2005Reston, VA, USA
9
B. SUMMARY TECHNICAL STATUSNavigation WG
Goal: Development of standard protocols for the interagency exchange of data required for spacecraft tracking and attitude/orbit determination.
Working Group Status: Active _X__ Idle ____
Working Group Summary Situation:
Working Group Summary progress:
• Next chart
Problems and Issues:
• Next chart
status: OK CAUTION PROBLEM
comment: X
MOIMS AREA REPORT
26 October2005Reston, VA, USA
10
NAV WG Summary Progress
• Conducted extensive and detailed discussions and review of the ADM, the TDM, and the XML specification white books (XML covers all navigation data messages); including all related material in the Navigation GB.
• 4 Resolutions sent to CESG for approval.
• TDM RB complies with IOAG highest priority of CCSDS work.
• The Nav WG is interested in supporting the proposed new work pertaining to DDOR: Difference Differential One-way Range (delta-DOR).
• The Nav WG is interested in supporting the ISO SC14 collision avoidance work, subject to feedback from ISO SC14 personnel.
MOIMS AREA REPORT
26 October2005Reston, VA, USA
11
C. CROSS-AREA TECHNICAL ISSUES
MOIMS AREA REPORT
• Issue 1
XML Guidelines SIG fully supported by MOIMS
• Issue 2
Delta DOR SIG fully supported by MOIMS
26 October2005Reston, VA, USA
12
D. OTHER ISSUES AND CONCERNSIssue 3 – NAV WG
Priority for real-time radiometric data transfer is not firmly established; needs endorsement by CESG, CMC, IOAG or the Agencies.
Issue 4 – NAV WGCollision Avoidance. How to go ahead ? SC14 NWI !!
Issue 5 - OMGNASA LOI to Operational Procedure Meta language RFP: Need coordination within CCSDS?
Issue 6 – SM&C WG Prototype (High Priority Services)JPL / BNSC to confirm funding / resourcesNeed guidance on IPR / security issues
Issue 7 – SecretariatLong Time to publish
Publication Procedure not clear Web Site Improvement (statistics on books, naming conversion) Information to everybody via CCSDS-ALL
MOIMS AREA REPORT