SPECIFICATION AMENDMENT
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
INTERNATIONAL BECHTEL CO. LTD.
THE DESIGN OR PART THEREOF CONTAINED IN THIS DOCUMENT WAS DEVELOPED FOR TAKREER FOR THE PROJECT AND REMAINS THE PROPERTY OF TAKREER. ALL
INTERNATIONAL BECHTEL CO. LTD. PROPRIETARY INFORMATION OR UNDERLYING INTELLECTUAL PROPERTY UTILIZED IN THE CREATION OF THE DESIGN OR INFORMATION
CONTAINED HEREIN SHALL REMAIN THE PROPERTY OF INTERNATIONAL BECHTEL CO. LTD.
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED Page 1 of 17
CARBON BLACK & DELAYED COKER PROJECT
FRONT END ENGINEERING DESIGN
AMENDMENT TO
DESIGN GENERAL SPECIFICATION
DGS-CU-002
STRUCTURAL ENGINEERING DESIGN CRITERIA
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 2/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 2 of 17
This page records the revision status of this documentAll previous issues are hereby superseded and are to be destroyed.
NOTES:
1) Revisions after Rev. 0 are denoted as follows:
By a vertical line in the right-hand margin adjacent to the revised text. The revision numberis displayed adjacent to the right hand side of the revision line.
OR
By a triangle symbol for graphics, the revision number being denoted within the symbol
positioned adjacent to the revision.
2) BY = Originator of Document
CHKD = Project Discipline Lead, Functional Manager, or nominee
DISC = Corporate Functional Manager, or designee
PD = ENGINEER's Project Director, or designee
PMC = Project Management Contractor, or designee
COMPANY = Representative of Company Team (PMC/PMT)
APPROVEDREV DATE REASON FOR ISSUE BY CHKD
DISC PD PMC COMPANY
2 12 Aug 11 Re-issued for FEED KHJ MCS TF PP
1 09 May 11 Issued for FEED MCS KHJ TF PP
0 16 Mar 11 Issued for Approval MCS TF TF PP
Signed (Initials)
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 3/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 3 of 17
PARAGRAPHS REVISED THIS ISSUE
Para. No. Para. No. Para. No. Para. No.
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 4/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 4 of 17
CONTENTS
1. SCOPE ...................................................................................................................................5
2. AMENDMENTS ...................................................................................................................... 5
2.1 Amendments to Section 2.0 - CODES AND STANDARDS............. ........... ............. ............. ............ ............. ........... .... 5
2.2 Amendments to Section 6.0 – QUALITY ASSURANCE/QUALITY CONTROL ............. ............ ............. ........... .... 6
2.3 Amendments to Section 7.0 – DESIGN. ......................................................................................................................... 6
2.4 Amendments to Section 9.0 – DEFLECTION............................................................................................................. 11
2.5 Amendments to Section 10.0 – STRUCTURAL STEEL ............................................................................................ 12
2.6 Amendments to Section 11.0 – CONCRETE. ............. ........... ............. ............ ............. ........... ............. ............ ............ 12
2.7 Amendments to Section 14.0 – FOUNDATIONS........................................................................................................ 12
14.6 Amendments to Section 16.0 – STABILITY CHECKS........... ............ ............. ........... ............. ............ ............. ......... 14
14.7 Add New Section 17.0 - SURVEYS & REPORTS. ..................................................................................................... 14
14.8 Add New Section 18.0 – Structural Analysis and Design Computer Programs: ........... ............. ............. ........... ...... 15
3. ATTACHMENTS...................................................................................................................16
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 5/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 5 of 17
1. SCOPE
This Specification and its attachments cover the requirements for the Structural Engineering Design
Criteria for the Carbon Black & Delayed Coker Project.
This Specification Amendment shall be read in conjunction with the attached Takreer Design
General Specification (DGS) for Structural Engineering Design Criteria No DGS-CU-002
Revision 2 and the specific requirements of the requisition(s) in which it is incorporated.
2. AMENDMENTS
The following amendments shall apply to the DGS, Structural Engineering Design Criteria, No.
DGS-CU-002 Revision 2.
All references to DGS shall be replaced with 5636-AMD- .
All references to STD-CU- shall be replaced with 5636-STD-CU-D-.
All references to “contract drawings” shall be replaced by “CONTRACT DOCUMENTS”.
2.1 Amendments to Section 2.0 - CODES AND STANDARDS
Delete: Last paragraph ‘Where this specification ……………… shall govern.’
With: “Where this specification provisions contradict other referenced Project
Specifications, Standard Drawings or Codes, the Order of Precedence in
Section 4.0 below shall prevail.”
Section 2.1 – CODES
ASCE (American Petroleum Institute):
Replace: ASCE 7
With: ASCE/SEI 7-05
Replace: ICBO (International Conference of Building Officials)
UBC Uniform Building Code, Structural Engineering Design Provisions
With: ICC (International Code Council) - IBC (International Building Code)
2009
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 6/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 6 of 17
Section 2.2 – STANDARDS
Replace: BS 5950 Structural use of Steel work in Building
With:
BS EN 1990 Eurocode Basis of Structural Design
BS EN 1993 Eurocode 3 Design of Steel Structures
BS EN 1994 Eurocode 4 Design of Composite Steel and
Concrete Structures
Replace: BS 8004 Foundations
With: BS EN 1997-1 Eurocode 7 Geotechnical design
Replace: BS 8007 Design of Concrete Structures for Retaining
aqueous Liquids
With: BS EN 1992 Eurocode 2 Design of Concrete Structures
Delete: BS 8110
Add: API 653 Tank Inspections, Repair, Alteration and
Reconstruction
2.2 Amendments to Section 6.0 – QUALITY ASSURANCE/QUALITY CONTROL
Replace: CONTRACTOR’S proposed quality system shall fully satisfy all the
elements of ISO 9001 - 2000 and ISO 9004 – 2000
With: CONTRACTOR’S proposed quality system shall fully satisfy all the
elements of ISO 9001 - 2000 and ISO 9004 - 2000, with due regard to ISO
19011.
2.3 Amendments to Section 7.0 – DESIGN.
Add: Where applicable, all design shall be in accordance with the
recommendations contained in the PROJECT Onshore Geotechnical
Report.
7.4 LIVE LOAD
Add:
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 7/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 7 of 17
Category Uniform Load Concentrated
Load
Trench Cover (Non Vehicular) 5.0 kN/m²
Sand load on roof (Minimum) 0.75 kN/m² ***
***Sand load shall be additive to live loads only when the area under consideration is usedas a work area. A uniform load of 0.75kN/m² shall be used in the design of flat roofs.
The effect of sand accumulating behind walls and up stands shall be considered in the
design of the walls and roof (treat as similar to snow loading)
7.7 EARTHQUAKE LOAD
Delete Section 7.7.2 and replace with:
All plant equipment and structures shall be designed for earthquake loads in
accordance with IBC 2009/ASCE-7-05. Seismic forces calculated in
accordance with IBC 2009 represent ultimate limit force loading. The
seismic design parameters given below are supplied by COMPANY based on
M/S Fugro study report carried out for RRE project.
Seismic Design parameters:
a) Site Class Definitions Site Class C Ref Table 1613.5.2 & provided by
COMPANY
b) Mapped spectral acceleration for short periods
Ss = 0.355 Ref. Provided by COMPANY
Fa = 1.2 Ref. Table 1613.5.3(1)
SDS = 2/3 x Ss x Fa Equation 16-39
= 0.284
c) Mapped spectral acceleration for a 1 second period
S1 = 0.066 Ref. Provided by COMPANY
Fv = 1.7 Ref. Table 1613.5.3(2)
SD1 = 2/3 x S1 x Fv Equation 16-40
= 0.075
d) Occupancy Category: II - for Ordinary Structures.
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 8/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 8 of 17
III - for Substations, Satellite Instrument Shelters, Control
Buildings, Fire Station Buildings and Firewater Pump
Shelters.
e) Importance Factors ASCE 07-05, Ref Table 11.5-1
I = 1.0 for Ordinary structures
I = 1.25 for structures containing toxic or explosive
materials, including Marine Structures, Substations,
Satellite Instrument Shelters, Control Buildings, Fire
Station Buildings and Firewater Pump Shelters.
f) Response Modification Factors:
For building structures, the R factors shall be obtained from
Table 12.2-1 of ASCE 7-05.
For non-building structures that are not similar to buildings
(such as vessels, heat exchangers, etc), the R factors shall be
obtained from Table 15.4-2 of ASCE 7-05.
g) For ASD design combinations a load factor of 0.7 should be applied to the ultimate
seismic load. The seismic factors and site class are as defined above Section 7.7, a),b) and
c).
Section 7.7.3Delete: and the following factors:
Delete: Seismic Zone 1 factor, Z 0.075
Importance Factor, I 1.0
Lateral force coefficient, C1 0.60
Lateral force coefficient, C2 (to be calculated)
Site Coefficient, S Per API 650 classification (based on the soil
investigation report)
Add new paragraph
Section 7.7.5 Earthquake loading shall be applied to the piping where the base shear factoris less than the friction coefficient between pipe and structure (e.g. Actual
base shear factor compared to 0.3 of steel to steel). This would make the pipe
mass undetached from the structure during an earthquake and its mass would
attract a base shear component.
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 9/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 9 of 17
Add new paragraph
Section 7.7.6 Concrete framed buildings shall if no more stringent requirement exists be
designed and detailed to satisfy the requirements of “intermediate moment
frames” as per ACI-318M Ch 21.
7.10 THERMAL FORCES
Section 7.10.3
Replace: 5o C to a maximum of 50o C.
With: 5° C to a maximum of 50° C.
Section 7.10.4, Table, 3rd
row
Replace: 3rd row
With: Teflon-to-Teflon 0.17
Add new sub-section 7.10.8
All Thermal Loads shall be considered as Dead Load.
7.15 BLAST LOAD
Section 7.15.2
Replace: Negligible Blast
With: Negligible Blast and No Blast Load
Delete: Section 7.15.3.3 to Section 7.15.3.7
Delete: Section 7.15.4.5 to Section 7.15.4.6
Delete: Section 7.15.4.6.1 to Section 7.15.4.6.2
Delete: Section 7.15.5 to Section 7.15.12Add:
7.15.5 Minimum Design Requirements
The following minimum requirements are to be applied for design of buildings subject to
blast loading unless the relevant design or detailing provisions in referenced codes have a
more stringent requirement.
7.15.5.1.0 For Blast Resilient Buildings
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 10/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 10 of 17
7.15.5.1.1 The building frame shall be either reinforced concrete or structural steel.
7.15.5.1.2 The building walls shall be constructed as precast or cast in-situ reinforced
concrete modules, fully grouted reinforced masonry, or a properly designed
structural steel cladding system. Walls for these buildings shall be structurally
isolated from the main moment resisting framing and shall not be used as main
frame members or to provide structural stability and/or structural strength.
7.15.5.1.3 Materials with a brittle behavior, such as masonry, shall not be used in such a
way that they have a strength function.
7.15.5.1.4 The building roofs shall be constructed of monolithic reinforced concrete or a
properly designed structural steel roofing system. Loose light-weight concrete
roof slabs or asbestos cement sheeting shall not be used. Gravel as a protection
of roof finish, or loose tiles for walkways on top of the roof finish, shall not be
used.
7.15.5.1.5 For steel structures, structural steel bracing in the roof and walls shall be
provided.
7.15.5.1.6 For additional design requirements also refer to s7.7.6 of this document.
7.15.5.2.0 For Blast Resistant Buildings
7.15.5.2.1 Pre-stressed concrete shall not be used. In general, special attention shall be
paid to ensure continuity and a minimum of local stress concentration.Adequate lapping of reinforcement is required.
7.15.5.2.2 Blast resistant concrete structures framing shall be detailed in accordance to
ACI 318M, “Special Provisions for Seismic Design" to satisfy Special Moment
Resisting Frames provisions except for the following:
a) Concrete walls and slabs shall be reinforced each side in the main
direction with a minimum percentage of steel bars equivalent to 1.7/fy,
where fy is the yield strength of the steel bars.
In the other direction on both sides, a distribution reinforcement of at
least 20% of that in the main direction shall be applied. Maximum
spacing of bars shall be 150 mm center to center. It is preferable for the
wall and roof thickness to be between the limits of 250 and 400 mm inorder to facilitate the placing of the required reinforcing bars.
b) Shear reinforcement shall be applied in beams only and shall be a
combination of stirrups and horizontal side bars web reinforcement.
When the actual shear stress (V) is less than 1.3 N/mm² (Vc1): no web
reinforcement is required.
When the actual shear stress (V) is more than 1.3 N/mm² (Vc 1), but less
than 4.5 N/mm2
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 11/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 11 of 17
(Vc2): web reinforcement shall be required for (V-Vc1) N/mm².
Where:
V = Actual shear stress
Vc1 = Concrete shear stress lower limit
Vc2 = Concrete shear stress upper limit
At least 50 percent of the bottom main reinforcement shall extend
over the face of the support providing a good anchorage between the
supports.
7.15.5.2.3 Wind or earthquake loads shall not be combined with blast loads.
7.15.5.2.4 A load factor of 1.0 shall be used for all loads when combined with blast load.
7.15.5.2.5 Blast loads need not be taken into account for walls or foundations below
ground level.
7.15.5.2.6 Under blast conditions a maximum allowable soil bearing pressure equal to
75% of the ultimate static bearing capacity may be used.
7.15.5.2.7 The foundation shall be designed so that the safety factor against overturning
due to the unbalanced lateral reactions in not less than 1.2 under the load
combination of dead plus blast loads.
7.15.5.2.8 Passive resistance of the foundation, where required in addition to the friction
to resist sliding, shall be at least 1.5 times the unbalanced lateral load under theload combination of dead plus blast loads. The unbalanced lateral load is
defined as the total horizontal reaction force less the frictional resistance.
7.15.5.2.9 Individual foundations shall be tied together by tie beams to preserve the
foundation system integrity
7.15.5.2.10 The structure shall be firmly embedded in the ground by having the foundations
at least 1.5m below grade, and having the same strength walls and columns
below and above grade.
7.15.5.2.11 Blast resistant structures shall be designed using “ASCE—Blast Resistant
Buildings- Petrochemical facilities”.
2.4 Amendments to Section 9.0 – DEFLECTION
Add:
9.4 The shelter roofing and sidings deflections shall be limited to L/180 under
gravity loadings and to L/120 under wind loading.
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 12/17
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 13/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 13 of 17
14.5 Concrete ring beams for storage tank shall be designed in addition to hoop
tension loading, for combined actions of flexure and shear from the
maximum allowable differential settlement along the circumference (to the
limits specified in API-650, 11th
edition section 7.3.6.6 and as described in
API 653 Annex B which will result in additional stresses resulting from
vertical curvature of 13mm over a 20m length measured along the
circumference of the ring beam).
If ring beam soil bearing pressure is not balanced for condition being
checked then ring torsion and induced overall ring moments resulting from
tank shell and liquid loading eccentricity from beam center line must also be
included in the ring beam design (ref. PIP and Roark’s Formulas for Stress
and Strain).
CONTRACTOR shall include local slip surface failure check (similar to
slope instability) in the design calculations and the related safety factors shall
be satisfied in test, operation and seismic load conditions. In addition
settlement shall not exceed (without COMPANY approval) the limitations
specified below:
Overall uniform settlement including long term:
- 50mm max for tank dia < 50m
-(Dia (mm) / 1000)mm for tank dia ≥ 50m but not more than 100mm
Peripheral Differential Settlement: shall satisfy the guidance and limits
listed under API 653 Annexure B and “Criteria for Settlement of
Tanks,” W. Allen Marr, M. ASCE, Jose A. Ramos, and T. WilliamLambe, F. ASCE, Journal of Geotechnical Engineering Division,
Proceedings of the American Society of Civil Engineers, Vol. 108,
August, 1982.
Edge to Center: Shall not exceed 1 / 150 along a radial line from tank
periphery to tank center but not more than 300mm overall. The
minimum design fall to draw-off sump(s) after settlement shall be
maintained in the case of cone-up bottoms
Tilt : Shall not exceed a 1 / 500 gradient along tank height or diameter
but not more than the maximum permissible differential settlement
specified above
14.5.1 CONTRACTOR at the EPC tendering stage shall submit along with his bid acomprehensive preliminary estimate of tank settlements based on his
interpretation of the site geotechnical conditions. CONTRACTOR shall
include any necessary soil improvement or deep foundation system in his bid
to satisfy the above settlement limits. Any geotechnical design parameter
requiring further confirmation shall be reasonably determined with sufficient
contingency by CONTRACTOR with no liability whatsoever on
COMPANY.
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 14/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 14 of 17
14.5.2 CONTRACTOR during detailed engineering shall perform a comprehensive
FEM analysis of the combined tank foundation / subsoil system considering
final geotechnical and tanks design parameters to validate the proposed
foundation design. Any additional site preparation, soil improvement or deep
foundation identified as mandatory to satisfy the settlement limits shall be
considered as part of the normal detailed engineering development and shall
be deemed as already included in the Contract price.
14.5.3 CONTRACTOR shall include immediate and long term settlement
calculations in all shallow foundation and pile foundation design reports for
foundations with plan dimensions sufficiently large to induce stress
increments in soil weak layers at depth.14.5.4 CONTRACTOR shall compensate for the computed tank uniform settlement
in the ring beam top level, so that the final bottom level of the tank annular
plate after short and long term settlements is not less than 600mm above
High Point of Finished bund floor (this will unify the design of all tanks
foundation and elevation criteria).
14.5.5 Large tank concrete ring beams shall be designed for thermal and shrinkage
actions related to ring beam construction sequence. CONTRACTOR shall
implement every necessary precaution to prevent excessive thermal or
shrinkage cracking by reducing the volume of concrete pours, following
intermittent pouring successions, introducing explicit control joints or a
combination thereof. CONTRACTOR shall reflect the impact of the
proposed construction sequence in the structural design of the ring beams.
14.6 Amendments to Section 16.0 – STABILITY CHECKS
Add to end of section the following paragraph:
When computing the in-ground concrete to soil friction in respect of sliding
resistance, due allowance shall be made for the lower friction factors of any
protective coating membrane.
14.7 Add New Section 17.0 - SURVEYS & REPORTS.
Add new section as follows:
The COMPANY accepts no liability for the information shown within the
Onshore and Offshore Site Surveys and Geotechnical Reports.
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 15/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 15 of 17
CONTRACTOR shall engage the services of an approved Geotechnical
Consultant to substantiate/supplement the Geotechnical Investigation Report
before proceeding with the detailed design.
17.1 Onshore Report - Geotechnical Investigation.
The CONTRACTOR shall review the Onshore Geotechnical Report and
shall satisfy himself regarding the accuracy and validity of the contents and
recommendations contained therein.
The CONTRACTOR shall submit any alternative proposals to the
recommendations given in the Onshore Geotechnical Investigation Report
for approval by the COMPANY prior to commencement of work.
The CONTRACTOR shall review the Onshore Geotechnical Report and
satisfy himself of the contents and recommendations.
The CONTRACTOR shall submit any alternative proposals to the
recommendations given in the Onshore Geotechnical Report for approval
by the COMPANY.
17.3 Offshore Reports - Bathymetric Survey & Geotechnical Investigation.
The CONTRACTOR shall review the Offshore Reports and satisfy himself
regarding the accuracy and validity of the contents and recommendations
contained therein.
The CONTRACTOR shall submit any alternative proposals to the
recommendations given in the Offshore Reports for approval by the
COMPANY prior to commencement of work.
14.8 Add New Section 18.0 – Structural Analysis and Design Computer Programs:
CONTRACTOR shall submit along with his technical bid a list of the
Computer Programs he intends to utilize during detailed engineering. Anyin-house developed software shall be accompanied by a comprehensive
validation and quality manual, listing the theories and design codes forming
the software computer code.
All computation steps for such proprietary programs shall be structured with
sufficient clarity to allow direct review and design concurrence by
COMPANY.
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 16/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKER
PROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
ELECTRONIC DOCUMENTS ARE CONTROLLED. ANY PRINTED COPY WILL BE UNCONTROLLED AND MAY BECOME OUTDATED
Page 16 of 17
The following listed computer programs are minimum requirements by
COMPANY for structural analysis and design of structures, buildings and
foundations. CONTRACTOR may propose other computer programs
subject to validation, proof of quality control and COMPANY approval. All
commercial software listed below shall be compatible with the design codes
revision specified in the Contract:
1. STAAD PRO by Research Engineers, Inc.
2. SAP / ETABS / SAFE series by Computers and Structures, Inc.
3. AFES by GS E&C for foundation element design
4. Foundation 3D, Mat 3D by Dimensional Solutions, Inc. for foundation
element design
5. Plaxis, FEM program for integrated foundation and soil interaction
modelling
3. ATTACHMENTS
8/13/2019 25652-2000-3PS-S000-C0001r002v3_0
http://slidepdf.com/reader/full/25652-2000-3ps-s000-c0001r002v30 17/17
TAKREER SPECIFICATION AMENDMENT
STRUCTURAL ENGINEERING
DESIGN CRITERIA
TAKREER
PROJECT No 5636
Agreement No 10-5636-F-1
CARBON BLACK &
DELAYED COKERPROJECT
COMPANY Doc. No. 5636-AMD-CU-002
ENG Doc. No. 25652-2000-3PS-S000-C0001Rev. 2
Attachment 1 – DGS-CU-002 Rev-2
STRUCTURAL ENGINEER ING DESIGN CRITERIA