6

Click here to load reader

25652-2000-3PS-NW00-N0008r001v2_0

Embed Size (px)

Citation preview

Page 1: 25652-2000-3PS-NW00-N0008r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0008r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0008r001v20 1/6

 

SPECIFICATION AMENDMENTTAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &DELAYED COKER PROJECT

COMPANY Doc. No. 5636-AMD-MW-008

ENG Doc. 25652-2000-3PS-NW00-N0008 Rev. 1

INTERNATIONAL BECHTEL CO. LTD.

THE DESIGN OR PART THEREOF CONTAINED IN THIS DOCUMENT WAS DEVELOPED FOR TAKREER FOR THE PROJECT AND REMAINS THE PROPERTY OF TAKREER. ALL

INTERNATIONAL BECHTEL CO. LTD. PROPRIETARY INFORMATION OR UNDERLYING INTELLECTUAL PROPERTY UTILIZED IN THE CREATION OF THE DESIGN OR INFORMATIONCONTAINED HEREIN SHALL REMAIN THE PROPERTY OF INTERNATIONAL BECHTEL CO. LTD..

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

25652-2000-3PS-NW00-N0008.doc Page 1 of 6 

AMENDMENT TO

DESIGN GENERAL SPECIFICATION

DGS-MW-008

METALLIC MATERIALS

CARBON BLACK & DELAYED COKER PROJECTFRONT END ENGINEERING DESIGN

Page 2: 25652-2000-3PS-NW00-N0008r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0008r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0008r001v20 2/6

TAKREER  SPECIFICATION AMENDMENT

METALLIC MATERIALS

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECT

COMPANY Doc. No. 5636-AMD-MW-008

ENG Doc. 25652-2000-3PS-NW00-N0008Rev. 1

25652-2000-3PS-NW00-N0008.doc 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

Page 2 of 6

This page is a record of all revisions of this document. All previous issues are hereby

superseded and are to be destroyed.

NOTES:

Revisions after IFD are denoted as follows:

(a)  By a vertical line in the right-hand margin against the revised text.

(b)  By a triangle symbol for graphics, the revision number being denoted within the symbol.

Revision symbols are positioned adjacent to the revision.

(c)  CHKD = Checked by, DISC = Discipline Lead, PEM = Project Engineer Manager,

PMC = Project Management Consultant.

APPROVEDREV DATE

REASON

FOR ISSUEBY CHKD

DISC PEM PMC COMPANY

1 15-Mar-11 IFF

0 28-Feb-11 IFA DS EBF DS / PW PC

Signed (Initials)

Page 3: 25652-2000-3PS-NW00-N0008r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0008r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0008r001v20 3/6

TAKREER  SPECIFICATION AMENDMENT

METALLIC MATERIALS

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECT

COMPANY Doc. No. 5636-AMD-MW-008

ENG Doc. 25652-2000-3PS-NW00-N0008Rev. 1

25652-2000-3PS-NW00-N0008.doc 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

Page 3 of 6

PARAGRAPHS REVISED THIS ISSUE

Para. No. Para. No. Para. No. Para. No.

Old 2.2 deleted

Page 4: 25652-2000-3PS-NW00-N0008r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0008r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0008r001v20 4/6

TAKREER  SPECIFICATION AMENDMENT

METALLIC MATERIALS

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECT

COMPANY Doc. No. 5636-AMD-MW-008

ENG Doc. 25652-2000-3PS-NW00-N0008Rev. 1

25652-2000-3PS-NW00-N0008.doc 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

Page 4 of 6

TABLE OF CONTENTS

1. SCOPE .......................................................................................................................................5

2. AMENDMENTS ........................................................................................................................5

2.1. Amendments to Section 1 – General ....................................................................................5

2.2. Amendments to Section 1.7 – Material Temperature Limits.................................................5

APPENDIX 1 - DGS-MW-008 REV 1................................... ...................................................6

Page 5: 25652-2000-3PS-NW00-N0008r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0008r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0008r001v20 5/6

TAKREER  SPECIFICATION AMENDMENT

METALLIC MATERIALS

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECT

COMPANY Doc. No. 5636-AMD-MW-008

ENG Doc. 25652-2000-3PS-NW00-N0008Rev. 1

25652-2000-3PS-NW00-N0008.doc 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

Page 5 of 6

1.  SCOPE

This addendum specification and its attachments cover the requirements for Metallic Materials.

This specification should be read in conjunction with the attached Design general Specification

 No DGS-MW-008 and the specific requirements of the requisition(s) in which it is incorporated.

2.  AMENDMENTS

The following amendments and additions shall apply to Design General Specification Internal

Linings, DGS-MW-008 Revision 1.

All references to “DGS-XX-YYY” shall be replaced with “5636-AMD--XX-YYY” in the

following sections-.

All references to PROJECT shall be replaced “CARBON BLACK & DELAYED COKER

Project.”

2.1.  Amendments to Section 1 – General

1.11 Definitions

The following definitions shall be added:

COMPANY – shall be defined as ABU DHABI OIL REFINING COMPANY (TAKREER)

CONTRACTOR – shall be defined as the organisation to which TAKREER award the

Engineering, Procurement and Construction (EPC) phase.

MANUFACTURER/VENDOR – shall be defined as the supplier of equipment and support

services for a particular piece of equipment/package.

2.2.  Amendments to Section 1.7 – Material Temperature Limits

Add final sentence-

“The use of other materials for temperatures between -46ºC and -60ºC may beconsidered, provided the supplier can demonstrate adequate manufacturing

experience in satisfying the specification and the required code impact test

requirements at the specified MDMT. COMPANY approval is required for any

 proposed substitution”.

Page 6: 25652-2000-3PS-NW00-N0008r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0008r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0008r001v20 6/6

TAKREER  SPECIFICATION AMENDMENT

METALLIC MATERIALS

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECT

COMPANY Doc. No. 5636-AMD-MW-008

ENG Doc. 25652-2000-3PS-NW00-N0008Rev. 1

25652-2000-3PS-NW00-N0008.doc 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

Page 6 of 6

APPENDIX 1 - DGS-MW-008 REV 1

DESIGN GENERAL SPECIFICATION

METALLIC MATERIALS – SELECTED STANDARDS