http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 1/7
SPECIFICATION AMENDMENTTAKREER
PROJECT No 5636
Agreement no 10-5636-F-1
CARBON BLACK &DELAYED COKER PROJECT
COMPANY Doc. No. 5636-AMD-MW-007
ENG Doc. 25652-2000-3PS-NW00-N0007 Rev. 1
INTERNATIONAL BECHTEL CO. LTD.
THE DESIGN OR PART THEREOF CONTAINED IN THIS DOCUMENT WAS DEVELOPED FOR TAKREER FOR THE PROJECT AND REMAINS THE PROPERTY OF TAKREER. ALL
INTERNATIONAL BECHTEL CO. LTD. PROPRIETARY INFORMATION OR UNDERLYING INTELLECTUAL PROPERTY UTILIZED IN THE CREATION OF THE DESIGN OR INFORMATIONCONTAINED HEREIN SHALL REMAIN THE PROPERTY OF INTERNATIONAL BECHTEL CO. LTD..
ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED
25652-2000-3PS-NW00-N0007.doc Page 1 of 7
AMENDMENT TO
DESIGN GENERAL SPECIFICATION
DGS-MW-007
WELDING AND INSPECTION REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY RECOGNIZED
STANDARDS AND/OR CODES
CARBON BLACK & DELAYED COKER PROJECT
FRONT END ENGINEERING DESIGN
8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0
http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 2/7
TAKREER
SPECIFICATION AMENDMENT
WELDING AND INSPECTION
REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY
RECOGNIZED
STANDARDS AND/OR CODES
TAKREER
PROJECT No 5636
Agreement no 10-5636-F-1
CARBON BLACK &
DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007
ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1
25652-2000-3PS-NW00-N0007.doc Page 2 of 7
ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED
This page is a record of all revisions of this document. All previous issues are hereby
superseded and are to be destroyed.
NOTES:
Revisions after IFD are denoted as follows:
(a) By a vertical line in the right-hand margin against the revised text.
(b) By a triangle symbol for graphics, the revision number being denoted within the symbol.
Revision symbols are positioned adjacent to the revision.
(c) CHKD = Checked by, DISC = Discipline Lead, PEM = Project Engineer Manager,
PMC = Project Management Consultant.
APPROVEDREV DATE
REASON
FOR ISSUEBY CHKD
DISC PEM PMC COMPANY
1 15-Mar-11 IFF
0 28 Feb-11 IFA DS EBF DS / PW PC
Signed (Initials)
8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0
http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 3/7
TAKREER
SPECIFICATION AMENDMENT
WELDING AND INSPECTION
REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY
RECOGNIZED
STANDARDS AND/OR CODES
TAKREER
PROJECT No 5636
Agreement no 10-5636-F-1
CARBON BLACK &
DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007
ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1
25652-2000-3PS-NW00-N0007.doc Page 3 of 7
ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED
PARAGRAPHS REVISED THIS ISSUE
Para. No. Para. No. Para. No. Para. No.
Old 2.2 deleted
8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0
http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 4/7
TAKREER
SPECIFICATION AMENDMENT
WELDING AND INSPECTION
REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY
RECOGNIZED
STANDARDS AND/OR CODES
TAKREER
PROJECT No 5636
Agreement no 10-5636-F-1
CARBON BLACK &
DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007
ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1
25652-2000-3PS-NW00-N0007.doc Page 4 of 7
ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED
TABLE OF CONTENTS
1. SCOPE .......................................................................................................................................5
2. AMENDMENTS ........................................................................................................................5
2.1. Amendments to Section 1 – Introduction..............................................................................5
2.2. Amendments to Section 3 – Reference Documents ........... ...................................................5
2.3. Amendments to Section 4 - Document Precedence...............................................................6
2.4. Amendments to Section 9.1.6...............................................................................................6APPENDIX 1 -DGS-MW-007 REV 1.........................................................................................7
8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0
http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 5/7
TAKREER
SPECIFICATION AMENDMENT
WELDING AND INSPECTION
REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY
RECOGNIZED
STANDARDS AND/OR CODES
TAKREER
PROJECT No 5636
Agreement no 10-5636-F-1
CARBON BLACK &
DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007
ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1
25652-2000-3PS-NW00-N0007.doc Page 5 of 7
ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED
1. SCOPE
This addendum specification and its attachments cover the requirements for Welding and
Inspection Requirements for Equipment not Covered by Recognised Standards (e.g. packaged
equipment).
This specification should be read in conjunction with the attached Design General Specification
Welding and Inspection Requirements for Equipment Not Covered by Recognized Standards or
Codes, No. DGS-MW-007 and the specific requirements of the requisition(s) in which it isincorporated.
2. AMENDMENTS
The following amendments and additions shall apply to Design General Specification,
DGS-MW-007 Revision 1.
2.1. Amendments to Section 1 – Introduction
1.3 Definitions
The following definitions shall be added under “General Definitions”
COMPANY – shall be defined as ABU DHABI OIL REFINING COMPANY (TAKREER)
CONTRACTOR – shall be defined as the organisation to which TAKREER award the
Engineering, Procurement and Construction (EPC) phase.
MANUFACTURER/VENDOR – shall be defined as the supplier of equipment and support
services for a particular piece of equipment/package
2.2. Amendments to Section 3 – Reference Documents
Replace listed Reference Documents with the following:
8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0
http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 6/7
TAKREER
SPECIFICATION AMENDMENT
WELDING AND INSPECTION
REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY
RECOGNIZED
STANDARDS AND/OR CODES
TAKREER
PROJECT No 5636
Agreement no 10-5636-F-1
CARBON BLACK &
DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007
ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1
25652-2000-3PS-NW00-N0007.doc Page 6 of 7
ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED
Bechtel Document No.
Takreer Document
No. Title
25652-2000-3PS-NW00-N0001 5636-AMD-MW-001 Welding, NDE and Prevention of
Brittle Fracture of Pressure Vesselsand Heat Exchangers
25652-2000-3PS-NWP0-N0001 5636-AMD-MW-002 Welding, NDE and Prevention ofBrittle Fracture of Piping
25652-2000-3PS-NW00-N0004 5636-AMD-MW-004Materials and FabricationRequirements for Piping and
Equipment in Severe Service
25652-2000-3PS-NX00-N0001 5636-AMD-MX-001 Painting
2.3. Amendments to Section 4 - Document Precedence
Replace: “In case of conflict the order or precedence shall be stated in the AGREEMENT
or other PROJECT documents as applicable”
With: “In case of conflict, the documentation order of precedence is:
A. Datasheets
B. Specification
C. Codes and Standards
D. Standard drawings
2.4. Amendments to Section 9.1.6
Replace-
“Open-root welds, made with low hydrogen electrodes or GMAW (Spray or Globular Transfer)require back gouging and rewelding.”
With-
“Open roots of root welds made by the following processes shall be back-gouged and back-welded:
• SMAW with low hydrogen consumables
• GMAW using spray transfer
8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0
http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 7/7
TAKREER
SPECIFICATION AMENDMENT
WELDING AND INSPECTION
REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY
RECOGNIZED
STANDARDS AND/OR CODES
TAKREER
PROJECT No 5636
Agreement no 10-5636-F-1
CARBON BLACK &
DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007
ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1
25652-2000-3PS-NW00-N0007.doc Page 7 of 7
ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED
APPENDIX 1 -DGS-MW-007 REV 1
DESIGN GENERAL SPECIFICATION
WELDING AND INSPECTION REQUIREMENTS FOR
EQUIPMENT NOT COVERED BY RECOGNIZED
STANDARDS AND/OR CODES