SPECIFICATION AMENDMENTTAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &DELAYED COKER PROJECT

COMPANY Doc. No. 5636-AMD-MW-007

ENG Doc. 25652-2000-3PS-NW00-N0007 Rev. 1

INTERNATIONAL BECHTEL CO. LTD.

THE DESIGN OR PART THEREOF CONTAINED IN THIS DOCUMENT WAS DEVELOPED FOR TAKREER FOR THE PROJECT AND REMAINS THE PROPERTY OF TAKREER. ALL

INTERNATIONAL BECHTEL CO. LTD. PROPRIETARY INFORMATION OR UNDERLYING INTELLECTUAL PROPERTY UTILIZED IN THE CREATION OF THE DESIGN OR INFORMATIONCONTAINED HEREIN SHALL REMAIN THE PROPERTY OF INTERNATIONAL BECHTEL CO. LTD..

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

25652-2000-3PS-NW00-N0007.doc Page 1 of 7 

AMENDMENT TO

DESIGN GENERAL SPECIFICATION

DGS-MW-007

WELDING AND INSPECTION REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY RECOGNIZED

STANDARDS AND/OR CODES

CARBON BLACK & DELAYED COKER PROJECT

FRONT END ENGINEERING DESIGN

Page 2: 25652-2000-3PS-NW00-N0007r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 2/7

TAKREER  

SPECIFICATION AMENDMENT

WELDING AND INSPECTION

REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY

RECOGNIZED

STANDARDS AND/OR CODES

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007

ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1

25652-2000-3PS-NW00-N0007.doc Page 2 of 7 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

This page is a record of all revisions of this document. All previous issues are hereby

superseded and are to be destroyed.

NOTES:

Revisions after IFD are denoted as follows:

(a)  By a vertical line in the right-hand margin against the revised text.

(b)  By a triangle symbol for graphics, the revision number being denoted within the symbol.

Revision symbols are positioned adjacent to the revision.

(c)  CHKD = Checked by, DISC = Discipline Lead, PEM = Project Engineer Manager,

PMC = Project Management Consultant.

APPROVEDREV DATE

REASON

FOR ISSUEBY CHKD

DISC PEM PMC COMPANY

1 15-Mar-11 IFF

0 28 Feb-11 IFA DS EBF DS / PW PC

Signed (Initials)

Page 3: 25652-2000-3PS-NW00-N0007r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 3/7

TAKREER  

SPECIFICATION AMENDMENT

WELDING AND INSPECTION

REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY

RECOGNIZED

STANDARDS AND/OR CODES

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007

ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1

25652-2000-3PS-NW00-N0007.doc Page 3 of 7 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

PARAGRAPHS REVISED THIS ISSUE

Para. No. Para. No. Para. No. Para. No.

Old 2.2 deleted

Page 4: 25652-2000-3PS-NW00-N0007r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 4/7

TAKREER  

SPECIFICATION AMENDMENT

WELDING AND INSPECTION

REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY

RECOGNIZED

STANDARDS AND/OR CODES

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007

ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1

25652-2000-3PS-NW00-N0007.doc Page 4 of 7 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

TABLE OF CONTENTS

1. SCOPE .......................................................................................................................................5

2. AMENDMENTS ........................................................................................................................5

2.1. Amendments to Section 1 – Introduction..............................................................................5

2.2. Amendments to Section 3 – Reference Documents ........... ...................................................5

2.3. Amendments to Section 4 - Document Precedence...............................................................6

2.4. Amendments to Section 9.1.6...............................................................................................6APPENDIX 1 -DGS-MW-007 REV 1.........................................................................................7

Page 5: 25652-2000-3PS-NW00-N0007r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 5/7

TAKREER  

SPECIFICATION AMENDMENT

WELDING AND INSPECTION

REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY

RECOGNIZED

STANDARDS AND/OR CODES

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007

ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1

25652-2000-3PS-NW00-N0007.doc Page 5 of 7 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

1.  SCOPE

This addendum specification and its attachments cover the requirements for Welding and

Inspection Requirements for Equipment not Covered by Recognised Standards (e.g. packaged

equipment).

This specification should be read in conjunction with the attached Design General Specification

Welding and Inspection Requirements for Equipment Not Covered by Recognized Standards or

Codes, No. DGS-MW-007 and the specific requirements of the requisition(s) in which it isincorporated.

2.  AMENDMENTS

The following amendments and additions shall apply to Design General Specification,

DGS-MW-007 Revision 1.

2.1.  Amendments to Section 1 – Introduction

1.3 Definitions

The following definitions shall be added under “General Definitions”

COMPANY – shall be defined as ABU DHABI OIL REFINING COMPANY (TAKREER)

CONTRACTOR – shall be defined as the organisation to which TAKREER award the

Engineering, Procurement and Construction (EPC) phase.

MANUFACTURER/VENDOR – shall be defined as the supplier of equipment and support

services for a particular piece of equipment/package

2.2.  Amendments to Section 3 – Reference Documents

Replace listed Reference Documents with the following:

Page 6: 25652-2000-3PS-NW00-N0007r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 6/7

TAKREER  

SPECIFICATION AMENDMENT

WELDING AND INSPECTION

REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY

RECOGNIZED

STANDARDS AND/OR CODES

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007

ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1

25652-2000-3PS-NW00-N0007.doc Page 6 of 7 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

Bechtel Document No.

Takreer Document

No. Title

25652-2000-3PS-NW00-N0001 5636-AMD-MW-001 Welding, NDE and Prevention of

Brittle Fracture of Pressure Vesselsand Heat Exchangers

25652-2000-3PS-NWP0-N0001  5636-AMD-MW-002 Welding, NDE and Prevention ofBrittle Fracture of Piping

25652-2000-3PS-NW00-N0004 5636-AMD-MW-004Materials and FabricationRequirements for Piping and

Equipment in Severe Service

25652-2000-3PS-NX00-N0001 5636-AMD-MX-001 Painting

2.3.  Amendments to Section 4 - Document Precedence

Replace: “In case of conflict the order or precedence shall be stated in the AGREEMENT

or other PROJECT documents as applicable”

With: “In case of conflict, the documentation order of precedence is:

A. Datasheets

B. Specification

C. Codes and Standards

D. Standard drawings

2.4.  Amendments to Section 9.1.6

Replace-

“Open-root welds, made with low hydrogen electrodes or GMAW (Spray or Globular Transfer)require back gouging and rewelding.”

With-

“Open roots of root welds made by the following processes shall be back-gouged and back-welded:

•  SMAW with low hydrogen consumables

•  GMAW using spray transfer

Page 7: 25652-2000-3PS-NW00-N0007r001v2_0

8/13/2019 25652-2000-3PS-NW00-N0007r001v2_0

http://slidepdf.com/reader/full/25652-2000-3ps-nw00-n0007r001v20 7/7

TAKREER  

SPECIFICATION AMENDMENT

WELDING AND INSPECTION

REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY

RECOGNIZED

STANDARDS AND/OR CODES

TAKREER

PROJECT No 5636

Agreement no 10-5636-F-1 

CARBON BLACK &

DELAYED COKER PROJECTCOMPANY Doc. No. 5636-AMD-MW-007

ENG Doc. 25652-2000-3PS-NW00-N0007Rev.1

25652-2000-3PS-NW00-N0007.doc Page 7 of 7 

ELECTRONIC DOCUMENTS, ONCE PRINTED, ARE NON-CONTROLLED AND MAY BECOME OUTDATED

APPENDIX 1 -DGS-MW-007 REV 1

DESIGN GENERAL SPECIFICATION

WELDING AND INSPECTION REQUIREMENTS FOR

EQUIPMENT NOT COVERED BY RECOGNIZED

STANDARDS AND/OR CODES