15
2/5/2010 1 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

Embed Size (px)

Citation preview

Page 1: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20101

R-DCR ARB Preparation

A Winsor Brown

CS 577B Spring 2010

Page 2: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20102

Outline

IICM-Sw Review

Original RDCR ARB Presentation Guidelines

Revised, depending on situation RDCR ARB Presentation Guidelines

Page 3: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20103July 2008 ©USC-CSSE 3©USC-CSSE

The Incremental Commitment Life Cycle Process: OverviewStage I: Definition Stage II: Development and Operations

Anchor Point Milestones

Anchor Point Milestones

Synchronize, stabilize concurrency via FEDsSynchronize, stabilize concurrency via FEDs

Risk patterns determine life cycle process

Risk patterns determine life cycle process

Page 4: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20104

RUP/ICM Activity/SDLC Model

Page 5: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20105

Adjust Scope, priorities, or discontinue Adjust Scope, priorities, or discontinue

Too High, unaddressable

Too High, unaddressable

ExplorationExploration ValuationValuation FoundationsFoundations DevelopmentDevelopment

Team formed, project assigned

Start of Fall Semester

Negligible

Acceptable

Risk?

High, butaddressable

Negligible

Acceptable

Risk?

High, butaddressable

Risk? Risk?

Semester Break

Risk?

Team reformed, project assigned

Risk? Risk?

Client Evaluation

Client Evaluation, Close Out

Report

End of Spring Semester

Project Release

Incremental Commitment Model (Instructional ICM-Sw)

CCD-Core Capability Drivethrough; DCR- Development Commitment Review; ECR-Evaluation Commitment Review; FCR-Foundations Commitment Review;OCR- Operational Commitment Review; RDCR-Rebaselined Development Commitment Review; TRR-Transition Readiness Review; VCR-Valuation Commitment Review

OperationOperation

ConstructionConstruction TransitionTransition

Risk?

Page 6: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20106

ExplorationExploration ValuationValuation

Start of Fall Semester

Incremental Commitment Model (Instructional ICM-Sw)Project Artifacts (Exploration – Valuation phase)

Team formed, project assigned

Client Interaction Report

Individual Project Effort Reports, Weekly Project Plans, Weekly Progress Reports, Weekly Risk Analyses Individual Project Effort Reports, Weekly Project Plans, Weekly Progress Reports, Weekly Risk Analyses

VC Package(Top Level of

OCD, LCP, FED)

Initial Prototype

Wiki WinWin Report

Core FC Package(OCD, SSRD, LCP,FED, SID)

Draft FC Package(OCD, SSRD, SSAD, UML, FED, SID)

FC PackageEvaluation of VC Package

Evaluation of Initial Prototype

Evaluation of Core FC Package

Evaluation of Draft FC Package

Evaluation of Draft FC Package

Respond to Evaluation of Core FC Package

Respond to Evaluation of FC Package

QMP-I

Corrective Action

Item List

Page 7: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20107

FoundationsFoundations

End of Fall Semester

Incremental Commitment Model (Instructional ICM-Sw)Project Artifacts (Foundations phase)

Individual Project Effort Reports, Weekly Project Plans, Weekly Progress Reports, Weekly Risk Analyses Individual Project Effort Reports, Weekly Project Plans, Weekly Progress Reports, Weekly Risk Analyses

QMP-IIWiki WinWin

Report

Draft DC PackageDC Package

Evaluation of Draft DC Package Evaluation of

DC Package

Respond to Evaluation of Draft DC Package

Annotated Outlines of the

extended FC Package

(AO FC Package)

Follow up of AO FC Package & Corrective Action

Item List

Page 8: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20108

FoundationsFoundations

Start of Spring

Semester

Incremental Commitment Model (Instructional ICM-Sw)Project Artifacts (CSCI577B)

(Rebaselined Foundations – Development – Operations phase)

Individual Project Effort Reports, Weekly Project Plans, Weekly Progress Reports, Weekly Risk Analyses Individual Project Effort Reports, Weekly Project Plans, Weekly Progress Reports, Weekly Risk Analyses

Updated Wiki WinWin Report

CCD Report

Draft Transition Package, IOC

working set , OC Package

Evaluation of Draft Transition

Package

DevelopmentDevelopment OperationOperation

ConstructionConstruction Transition Transition

Team formed, project assigned

Respond to Evaluation of Draft RDC Package

Draft RDC Package, IOC Working Set

Eval of Draft RDC Package

RDC Package, IOC Working Set

Evaluation of IOC Working Set

Transition Package, IOC working set , OC Package

Evaluation of Transition Package

All project Deliverables

Executable Components

End of Spring

Semester

T1 T1 T2 T2

Page 9: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/20109

Incremental Commitment Model (Instructional ICM-Sw)One semester project

CCD-Core Capability Drivethrough; DCR- Development Commitment Review; ECR-Evaluation Commitment Review; FCR-Foundations Commitment Review;OCR- Operational Commitment Review; RDCR-Rebaselined Development Commitment Review; TRR-Transition Readiness Review; VCR-Valuation Commitment Review

Adjust Scope, priorities, or discontinue Adjust Scope, priorities, or discontinue

Too High, unaddressable

Too High, unaddressable

ExplorationExploration ValuationValuation FoundationsFoundations DevelopmentDevelopment

Team formed, project assigned

Start of Fall Semester

Negligible

Acceptable

Risk?

High, butaddressable

Negligible

Acceptable

Risk?

High, butaddressable

Risk? Risk? Risk?

Client Evaluation, Close Out Report

End of Fall Semester

Project Release

Risk?

OperationOperation

ConstructionConstruction TransitionTransition

Risk?

Typical ProjectMilestones

Core FCPackage

11/21 12/0111/1410/2010/0609/22

Draft DCPackage

08/22

ARB

ARB

ARB

ARB

Negligible

Page 10: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/201010

CS577 Projects' Paths and OptionsFull two semester

– Completed software for a "system"– Inception, Elaboration, Construction, mini-Transition

Single Semester– System "Feasibility" demonstration– COTS assessment and recommendation– Inception and Elaboration (for later "implementation”

Second Semester (possibly delayed)– Completed software for a "system"– Re-baselined Elaboration, Construction, mini-Transition

Third Semester– Enhancement (more functionality) IECT– Full Transition

Page 11: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/201011

Incremental Commitment Model (Instructional ICM-Sw)

Too High, unaddressable

CCD-Core Capability Drivethrough; DCR- Development Commitment Review; ECR-Evaluation Commitment Review; FCR-Foundations Commitment Review;OCR- Operational Commitment Review; RDCR-Rebaselined Development Commitment Review; TRR-Transition Readiness Review; VCR-Valuation Commitment Review

Adjust Scope, priorities, or discontinue Adjust Scope, priorities, or discontinue

Too High, unaddressable

ExplorationExploration ValuationValuation FoundationsFoundations DevelopmentDevelopment

Team formed, project assigned

Start of Fall

Semester

Negligible

Acceptable

Risk?

High, butaddressable

Negligible

Acceptable

Risk?

High, butaddressable

Risk? Risk?

Semester Break

Risk?

Team reformed, project assigned

Risk? Risk?

Client Evaluation

Client Evaluation,

Close Out Report

End of Spring

Semester

Project Release

OperationOperation

ConstructionConstruction TransitionTransition

Risk?

OCD, LCP, FED

OCD, LCP, FED

FCP-Level OCD,

SSRD, SSAD,

LCP, FED, SID, QMP*Prototype

FCP-Level OCD,

SSRD, SSAD,

LCP, FED, SID, QMP*Prototype

DCP-LevelOCD, SSRD, SSAD, LCP,

FED, SID, QMP**, ATPC^,

IP†, TP‡, Exec. Prototype

DCP-LevelOCD, SSRD, SSAD, LCP,

FED, SID, QMP**, ATPC^,

IP†, TP‡, Exec. Prototype

DCP-LevelOCD, SSRD, SSAD, LCP,

FED, SID, QMP, ATPC, IP, TP, Exec.

Prototype

DCP-LevelOCD, SSRD, SSAD, LCP,

FED, SID, QMP, ATPC, IP, TP, Exec.

Prototype

* Peer Review Strategy for Foundations; ** Peer Review and Test Strategy For Development; ^ at least one test case; † Skeletal for up through CCD; ‡ Team/Client tasks and dates identified

* Peer Review Strategy for Foundations; ** Peer Review and Test Strategy For Development; ^ at least one test case; † Skeletal for up through CCD; ‡ Team/Client tasks and dates identified

Page 12: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/201012

Completion progress of project artifacts in each phase

Page 13: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/201013

RDCR ARB Presentation GuidelinesDates: February 11-12Location: SAL 322Arrange with client; sign up ASAP!Topics to cover in your presentation & recommended

time allocations10 min: Summary of Change Sources & Resulting Changes10 min: Highlights of any Prototype Changes

» Highlights as appropriate» Be prepared to do a FULL (functional) demo

25 min: Description of Major (Foundation) Changes20 min: Construction Plans; Transition Plan Draft 15 min: General Discussions

Page 14: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/201014

RDCR ARB in Projects with Big ChangesRDCR ARB Session Outline

(x,y): (presentation time, total time)

(2, 2) What ARB outline are you following and why

(5, 5) OCD. System purpose; changes in current system and deficiencies, proposed new system, system boundary, and desired capabilities and goals; top-level scenarios

(5,10) Prototype Update. Changes in significant capabilities (especially those with high risk if gotten wrong)

(5, 10) SSRD. ALL high priority or changes in requirements; rating for all others

(10, 15) Architecture. Overall and detailed architecture; design if critical; COTS/reuse selections (NOT JUST CHOICES)

(10, 15) Life Cycle Plan. Focus on 577b (no history) or ? as appropriate; Include QMP and plans for CTS initial cycle “Plans” during 2nd Elab. Iter.

Team members’ roles & responsibilities in 577b.

(5, 10) Feasibility Rationale. Refined business case; major risks; general discussion

(5, 10) Things done right; issues to address (IV&V)

(5, 5) Feedback from Instructors

• Plan on 2 minutes per briefing chart, except title

• Focus on changes (particularly new things) since LCO

• You may vary from the above: please notify ARB board members IN ADVANCE

Page 15: 2/5/20101 R-DCR ARB Preparation A Winsor Brown CS 577B Spring 2010

2/5/201015

Propose Your Own Outline

Mix and Match from last years and RDCR for projects with big changes