4
24” x 92” x 84” Garage Shelving Installation Instructions 1-877-655-3443 (English, Español) 7:00 am - 5:00 pm [email protected] www.saferacks.com Weight Capacity 500 Lbs Per Shelf Rubber Mallet Required

24” x 92” x 84” Garage Shelving Installation Instructions · 5/24/2020  · 24” x 92” x 84” Garage Shelving Installation Instructions 1-877-655-3443 (English, Español)

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 24” x 92” x 84” Garage Shelving Installation Instructions · 5/24/2020  · 24” x 92” x 84” Garage Shelving Installation Instructions 1-877-655-3443 (English, Español)

24” x 92” x 84” Garage Shelving Installation Instructions

1-877-655-3443 (English, Español)7:00 am - 5:00 pm

[email protected]

Weight Capacity500 Lbs Per Shelf

Rubber Mallet Required

Page 2: 24” x 92” x 84” Garage Shelving Installation Instructions · 5/24/2020  · 24” x 92” x 84” Garage Shelving Installation Instructions 1-877-655-3443 (English, Español)

Components List

Vertical Posts (x4)Short Side Rail (x8)

Center Support (x8)

Long Side Rail (x8)

Screw (x32) Bolt (x64)

Wingnut (x32) Nut (x64)Allen Key (x1)

Wire Decking (x8)

Wire Decking Brackets (x8)

Page 3: 24” x 92” x 84” Garage Shelving Installation Instructions · 5/24/2020  · 24” x 92” x 84” Garage Shelving Installation Instructions 1-877-655-3443 (English, Español)

1. Apply shoulder bolts to each end of the 92” beams. 2. Place shoulder bolts into rivets of the vertical beams. Gently tap with rubber mallet to secure.

3. Ensure shoulder bolts are locked into rivets. 4. Repeat process for the 24” beams, ensuring the lips of the beam are facing inward.

5. Repeat steps until all four sides of the shelf frame are in place. 6. Place the center support between the two 92” beams and align the holes. Secure with 4 screws and 4 wingnuts.

Page 4: 24” x 92” x 84” Garage Shelving Installation Instructions · 5/24/2020  · 24” x 92” x 84” Garage Shelving Installation Instructions 1-877-655-3443 (English, Español)

7. Repeat steps 1-6 until the whole frame of the rack is assembled.

8. Lay the wire decking onto the lips of the beams.

9. Use wire decking bracket to secure decks to the 92” beams. 10. Using the allen key, tighten all shoulder bolts so that the rack is secure.