24458915 Organisational Change and Development

Embed Size (px)

Citation preview

  • 8/8/2019 24458915 Organisational Change and Development

    1/280

  • 8/8/2019 24458915 Organisational Change and Development

    2/280

    Change is inevitableChange offers

    New Opportunities

    & Poses Formidable Challenges

    Change is Making Things Different

    Change can bePlanned (Deliberate)- Internal or Goal-Oriented

    Unplanned (accidental)

    Fast or slowFirst Order (Incremental)

    Second Order (Fundamental or Radical)

  • 8/8/2019 24458915 Organisational Change and Development

    3/280

    Acts as a catalyst and assumes responsibilityfor Managing change Process/Activities inarea:Changing structure

    Changing technology

    Changing physical setting

    Changing people

  • 8/8/2019 24458915 Organisational Change and Development

    4/280

    Individual level

    Group level

    Organisation level

  • 8/8/2019 24458915 Organisational Change and Development

    5/280

    External causes Government policies Changes in the economy Competition

    Increase in raw materials cost Technology push

    Internal change Change in leadership Implementation of new technology Decline in profitability Union actions Low morale & motivation

  • 8/8/2019 24458915 Organisational Change and Development

    6/280

    Change basically results from stimuli from both outside &inside the enterprise. Organisational change refers toalteration of structural relationship and roles of people inthe organisation.

    Change takes place in all organisations but at varying ratesof speed and degree of significance.

    Change takes place in all parts of the organisation but atvarying rates of speed & degree of significance

    Finally, the enterprise can be changed in several ways i.e.its technology can be changed, its people, its structure &other elements can be changed.

  • 8/8/2019 24458915 Organisational Change and Development

    7/280

    To improve ability of the organisation toadapt to changes in its environment

    It seeks to change employee behaviour

    (Individual & Groups)

  • 8/8/2019 24458915 Organisational Change and Development

    8/280

    First order changeLinear & continuous

    No fundamental shift in assumptions

    Second order changeMulti-dimensional, multi-level, discontinuous,

    radical change

    Reframing of assumptions about the organisationand the world in which it operates

    e.g. Boeing company in view of slump andaggressive competition from airbus

  • 8/8/2019 24458915 Organisational Change and Development

    9/280

  • 8/8/2019 24458915 Organisational Change and Development

    10/280

    What can a change agent can change?Changing structureWork specifications Span of control

    Organisational redesign Centralization/De-centralization Simple structure to team-based structure Flexible work hours Introducing performance bonuses or profit sharing

    Changing Technology Introduction of new equipment/tools, methods,(improve quality/cut costs)

    Automation Computerization

  • 8/8/2019 24458915 Organisational Change and Development

    11/280

    Changing the physical settingConsidering work demands, interaction

    requirements, interior design, equipment

    placement, etc.

    Changing peopleChanging attitudes & behaviours of

    organisational members through process of

    communication, decision-making & problem-

    solving. Various types of interventions areneeded to change people & quality of their work

    relationships known as Organisational

    Development (O.D.)

  • 8/8/2019 24458915 Organisational Change and Development

    12/280

    Overt/ implicit Immediate/ Deferred

    Overt/ implicit: Easiest to Deal

    Threaten to strike Slow Down

    Immediate/ Deferred Loss of loyalty to organisation

    Loss of motivation to work

    Increased errors/ mistakes (deliberate) Increased absenteeism due to Sickness

    Increased Turn-over of labour

  • 8/8/2019 24458915 Organisational Change and Development

    13/280

    Individual resistance

    Organisational resistance

    Resistance in a sense is positiveProvides degree of stability and predictability

    Avoids chaotic randomness

    Stimulates healthy debate

  • 8/8/2019 24458915 Organisational Change and Development

    14/280

  • 8/8/2019 24458915 Organisational Change and Development

    15/280

    Organisations by their very nature, are conservative

    and actively resist change.

  • 8/8/2019 24458915 Organisational Change and Development

    16/280

    HabitAs human beings, we are creatures of habit. Life

    is complex enough and we do not need toconsider the full range of options for the

    hundreds of decisions we have to makeeveryday. To cope with this complexity, we allrely on habits or Programmed Responses butwhen confronted with change, this tendency torespond in our accustomed ways becomes asource of resistance. e.g. Shifting of office tonew location.

  • 8/8/2019 24458915 Organisational Change and Development

    17/280

    SecurityPeople with a high need for security are likely to

    resist change because it threatens their feeling ofsafety. e.g. when a company introduces a new roboticequipment, many employees may fear that their jobsare in danger.

    Economic factorsAnother source of individual resistance is concern that

    changes will lower ones income. Changes in job tasksor established work routines if people are concernedthat they would not be able to perform the new tasksor routines to their previous standards, especiallywhen pay is closely tied to productivity.

  • 8/8/2019 24458915 Organisational Change and Development

    18/280

    Fear of the unknownThe rate at which knowledge is exploding is

    incredible. As a result, knowledge in anyparticular field quickly becomes obsolete. e.g.

    introduction of word processors.Selective Information Processing Individuals shape their world through their

    perceptions. Once, they have created this world,it resists change. So individuals are guilty of

    selectively processing information in order tokeep what they want to hear. They ignoreinformation that challenges the world they havecreated.

  • 8/8/2019 24458915 Organisational Change and Development

    19/280

    Organisations by their very nature areconservative. They actively resist change.Government agencies want to continue doingwhat they have been doing for years.Whether the need for their services changesor remain the same.

  • 8/8/2019 24458915 Organisational Change and Development

    20/280

    Structural inertia Organisations have built-in mechanisms to produce stability.

    The people who are hired into an organisation are chosenfor fit, they are then shaped and directed to behave incertain ways. When an organisation is confronted with

    change, this structural inertia acts as a counter balance tosustain stability.

    Limited focus of change Organisations are made up of a number of independent sub

    systems . You cannot change one without affecting the

    others. For example, if management changes thetechnological process without simultaneously modifying theorganisations structure to match, the change in technologyis not likely to be accepted. So limited change in subsystemstend to get nullified by larger system.

  • 8/8/2019 24458915 Organisational Change and Development

    21/280

    Group inertia Even if individuals want to change their behaviour,

    group norms may act as a constraint. An individual union

    member may be willing to accept changes in the job

    suggested by management but since he has to follow therules of the union, he is likely to resist such a change

    brought in by the management.

    Threat to Expertise Changes in organisational patterns may threaten the

    expertise of specialized groups. The introduction ofdecentralised PCs which allow managers to gain access

    directly from companys mainframe is strongly resisted

    by information specialists (IT Specialists)

  • 8/8/2019 24458915 Organisational Change and Development

    22/280

    Threat to established power relationships Any re-distribution of decision-making authority can

    threaten long-established power relationships within the

    organisation. The introduction of participative decision-

    making or self-managed work-teams is the kind ofchange that is often seen as threatening by supervisors

    & middle managers.

    Threat to established resources allocations Those in the organisation that control sizable resources

    often see change as a threat. Those that most benefitfrom the current allocation of resources often feel

    threatened by chances that may affect future

    allocations.

  • 8/8/2019 24458915 Organisational Change and Development

    23/280

    Disturbance in existing equilibrium

    Imbalance in need satisfaction

    Change affects emotions & Sentiments

    Disturbance of social relationshipOpposition only for sake of opposition

  • 8/8/2019 24458915 Organisational Change and Development

    24/280

    Increase in responsibility

    Change proposed by government & labourunion

    Change on experimental basis

  • 8/8/2019 24458915 Organisational Change and Development

    25/280

  • 8/8/2019 24458915 Organisational Change and Development

    26/280

    Imbalance in need satisfaction It is assumed that prior to change, people

    existed in an environment where their need

    satisfaction was at a higher degree of stability.

    Change may prevent or decrease needsatisfaction

    Change affects emotions & sentimentsApart from fears & apprehensions - real or

    imaginary about what will happen after thechange, people are emotionally & sentimentally

    disturbed.

  • 8/8/2019 24458915 Organisational Change and Development

    27/280

    Disturbance of social relationship Some people are very loyal to the group. Changes may affect

    groups norms, customs etc. or even the composition itself. In

    case of transferable job due to changes, family life, etc. is

    disturbed & he is to start in a new environment.

    Lack of clarification Resistance can be expected if the nature of change is not

    made clear to persons who are going to be affected by the

    change. Different people will see different meaning and

    interpretations in the proposed change. Some people may

    interpret that the change as an indication of their poorperformance in the job while some others may assume that

    their office would be soon abolished. Thus, lack of

    clarification regarding the nature of change invites resistance

    from the workers.

  • 8/8/2019 24458915 Organisational Change and Development

    28/280

    Opposition only for the sake of opposition Sometimes, resistance to change is illogical and

    is only for the sake of opposition. Some people

    will oppose it only for the sake of opposition

    without having any reason or withoutunderstanding its pros & cons.

  • 8/8/2019 24458915 Organisational Change and Development

    29/280

    Employers and management resist the change onthe following grounds

    Increase in responsibility Management has to retrain the workers according to

    proposed changes and this in turn increases theresponsibility of management.

    Changes proposed by government & labour union Sometimes changes are proposed by labour union and

    because the management takes it as an insulting matter to

    implement the change proposed by union, they oppose anyproposal of change. Some changes are forced by governmentfor the industries to implement such changes, though mgt./employers have to implement it, are resisted by thembecause they are not mentally prepared to implement.

  • 8/8/2019 24458915 Organisational Change and Development

    30/280

    Change on experimental basis In few cases, changes are introduced on

    experimental basis viz. if it is proved beneficial,

    it will be extended further and be made

    permanent otherwise it will be abolished. Somemen in the mgt. do not favour such temporary

    phase and oppose it if change does not suit

    them.

  • 8/8/2019 24458915 Organisational Change and Development

    31/280

    Six tactics have been suggested for use bychange agents in dealing with resistance tochange.

    Education & communicationResistance can be reduced through communicating

    with employees to help them see the logic of change.This tactic basically assumes that the source ofresistance lies in misinformation and poorcommunication. If employees receive the full facts

    and get misunderstandings cleared up, resistance willsubside. Communication can be achieved throughone-to-one discussions, memos, group presentationsor reports etc.

  • 8/8/2019 24458915 Organisational Change and Development

    32/280

    Participation It is difficult for individuals to resist a change

    decision in which they participated. Prior to

    making a change, those opposed can be brought

    into decision process. Assuming that theparticipants have the expertise to make a

    meaningful contribution, their involvement can

    reduce resistance, obtain commitment and

    increase the quality of the change decision.

  • 8/8/2019 24458915 Organisational Change and Development

    33/280

    Facilitation and SupportChange agents can offer a range of supportive

    efforts to reduce resistance. When employees

    fear & anxiety are high, employee counseling

    and therapy, new skills training or a short periodleave of absence may facilitate adjustment. The

    drawback of this tactic is that, as with the

    others, it is time consuming. Additionally it is

    expensive and its implementation offers noassurance of success.

  • 8/8/2019 24458915 Organisational Change and Development

    34/280

    NegotiationsOffering incentive to resistors is another fruitful

    way of overcoming resistance to change where

    some people in a group clearly lose out in a

    change and where groups have considerablepower to resist, negotiations and agreements are

    helpful. It becomes relatively easy to avoid

    major resistance through negotiations but it can

    be too expensive or costly.

  • 8/8/2019 24458915 Organisational Change and Development

    35/280

    Manipulation & co-optation Manipulation refers to twisting & distorting facts to make

    them appear more attractive, withholding undesirable

    information and creating fake rumours to get employees to

    accept a change.

    Co-operation, on the other hand, is a form of both

    manipulation and participation. It seeks to Buy off the

    leaders of a resistance group by giving them a key role in

    the change decision. The leaders advice is sought not to

    seek a better decision, but to get their endorsement. Both

    manipulation & co-operation are relatively inexpensive andeasy ways to win the support of adversaries, but the tactics

    can backfire if the targets become aware that they are

    being tricked or used once discovered, the change agents

    credibility may drop to zero.

  • 8/8/2019 24458915 Organisational Change and Development

    36/280

    CoercionCoercion is application of direct threats or force

    upon the people who resist change. Examples of

    coercion are: Threat of transfer, loss of

    promotion, negative performance evaluation anda poor letter of recommendation. The

    advantages & disadvantages of coercion are

    approximately the same as mentioned for

    manipulation and co-optation.

  • 8/8/2019 24458915 Organisational Change and Development

    37/280

    Effects of change on the organisation &individual can be positive or negative

  • 8/8/2019 24458915 Organisational Change and Development

    38/280

    Social scientists have pointed out that thereis no direct connection between change onone hand and response on the other. Theyhave successfully introduced an intervening

    variable called Employee Attitude.

    X-Chart

  • 8/8/2019 24458915 Organisational Change and Development

    39/280

    A persons attitude depends onPsychological factors

    Personal factors

    Social factors

  • 8/8/2019 24458915 Organisational Change and Development

    40/280

  • 8/8/2019 24458915 Organisational Change and Development

    41/280

  • 8/8/2019 24458915 Organisational Change and Development

    42/280

    Change almost always produces responses.

    These responses may be positive or negative

    but are largely conditioned by the attitudes

    of the employees. If we think of changes a

    stimulus, numerous responses can be made

    by personnel, with varied outcomes & effect

    on the organisation.

  • 8/8/2019 24458915 Organisational Change and Development

    43/280

    Kurt Lewin: Two TheoriesStatus QUO/ Equilibrium Point Resultant of

    opposing forces

    Three step model:

    Unfreezing (The status Quo)

    Movement (To new status/ Changing)

    Refreezing (The new change)

  • 8/8/2019 24458915 Organisational Change and Development

    44/280

    Time

    Desired

    State

    Status

    Quo

    (Resistance to Change)

    Restraining Forces

    Driving Forces (Forces for change)

  • 8/8/2019 24458915 Organisational Change and Development

    45/280

    Time

    Phase I Phase II Phase III

    Low

    HighOld Social

    SystemUnfreeze

    Change

    Agent

    Changing

    Social

    System

    Transition Management

    Change

    Agent

    Refreeze New Social

    System

    Change

  • 8/8/2019 24458915 Organisational Change and Development

    46/280

    Make aware that present behaviour is Inappropriate

    Irrelevant

    Inadequate

    Unsuitable

    Steps TakenPhysical removal from routines, sources of

    information & social relationships

    Demeaning & Humiliating Experience

    Consistent linking to reward/ punishment forwillingness to change

  • 8/8/2019 24458915 Organisational Change and Development

    47/280

    New learning/ways Individuals providedwith alternatives

    Steps takenCompliance Forced to change by

    rewards/punishment

    Internalisation situation calling for newbehaviour

    Identification Role models most suitable to

    their personality

  • 8/8/2019 24458915 Organisational Change and Development

    48/280

    Individuals Stabilize new beliefs/ feelings/behaviour learned in movement stage

    Accepts new behaviour as a permanent partof his personality

    Continue to practice & experiment newmethod of behaviour to blend with his otherbehavioural attitudes

  • 8/8/2019 24458915 Organisational Change and Development

    49/280

    Throughout the change process, transitionmanagement keeps the organisation functioning.Transition management is the process of systematicallyplanning, organising and implementing change, fromthe disassembly of current state to the realisation of a

    fully functional future state in the organisation. Oncethe change begins the organisation is neither in the oldstate nor in the new state. Transition mgt. shouldbegin before change occurs. In interim managementstructure or interim position may be created to ensure

    continuity & control of the business during transition.Communication of changes to all involved fromemployees to customers & suppliers play a key role intransition management.

  • 8/8/2019 24458915 Organisational Change and Development

    50/280

    Following steps are required to make the changestick otherwise there is the danger of peoplereverting to pre-change position

    Use of group forces -

    The behaviour, attitude, beliefs and values of theindividual are all firmly grounded in the groups towhich he belongs. How aggressive or co-operative aperson is, what he believes to be true or good, whatbeliefs & prejudices he holds- all these

    characteristics are highly determined by theindividuals group membership. Whether they resistor accept change largely depends on the groups. Thechange agent must make use of the groups to bringabout change.

  • 8/8/2019 24458915 Organisational Change and Development

    51/280

    Change of change agentThe change agent must himself change. It is only then

    that he will be able to reinforce a psychological climate

    of support for change. Unwillingness of mangers to give

    up traditional managerial practices and theirunpreparedness to accept new methods are the most

    serious barriers to the introduction of change and to

    make it permanent in organisations.

    Shared rewards

    Another way to build support for change is to ensurethat the people affected derive benefit out of the

    change. Benefits include increased pay, promotion,

    training, recognition and the like

  • 8/8/2019 24458915 Organisational Change and Development

    52/280

    Co-operation of the unionsTaken into confidence, unions themselves can

    act as change agents, though they are generally

    considered to be anti-change. Many union

    leaders are accepting computerisation though itmay result in some displacement of work force.

    This has been possible because of their

    participation before, during and after the change

    has been introduced. A change introducedwithout support of unions may not last for long.

  • 8/8/2019 24458915 Organisational Change and Development

    53/280

    Concern for employeesA change should not be introduced for the sake

    of it. Change need to be introduced only when

    necessary and it must be by evolution and not by

    revolution. Any change must ultimately benefitemployees. In the short run, the needs &

    requirements of employees should not be

    affected. Any problem that has taken place

    because of change needs to be looked into and

    corrected immediately.

  • 8/8/2019 24458915 Organisational Change and Development

    54/280

    Most often, the planned organisationalchange involves more than one of thefollowing targets.

    Targets Possible Change Methods

    Purpose &Objective

    Clarify overall mission, modify existing objectives, use MBO

    Strategy Modify strategic plans, modify operational plans, modifypolicies & procedures

    Tasks Modify job designs, use job enrichment

    Technology Improve equipment & facilities, improve methods & workflows

    People Modify selection criteria, training, development activitiesetc.

    Structure Modify job description, modify organisational design, adjustco-ordination mechanisms, modify distribution of authority,

    span of control, etc.

  • 8/8/2019 24458915 Organisational Change and Development

    55/280

    Planning is the most crucial phase in themanagement of change. It involves three vitalquestions what, how & when to change

    Steps in planning change

    A change agent must consider following:1. Make clear the need for change or provide a

    climate in which group members feel free toidentify such needs.

    2. Permit & encourage relevant group participation inclarifying the need changes

    3. State the objectives to be achieved by proposedchanges.

  • 8/8/2019 24458915 Organisational Change and Development

    56/280

    4. Establish broad guidelines for achieving the

    objectives.

    5. Leave details of implementation of proposed

    changes to the group affected by change

    6. Indicate benefits or rewards to individuals thataccrue from change

    7. Benefits / rewards must be passed on to those

    who made the change - keep the promises.

  • 8/8/2019 24458915 Organisational Change and Development

    57/280

    Growth is a narrow concept that isapplicable to short term whereas,

    Development is a much broader termreferring long run.

  • 8/8/2019 24458915 Organisational Change and Development

    58/280

    Organisations develop only when it can grow.Development creates potential for new growth & new

    innovations.According to Larry E. Greiner, a growing organisation

    passes through five phases of evolution, each of which

    ends with a period of crisis & revolution. In his model,

    Greiner makes use of five key dimensions.

    Age of organisation

    size of organisation

    Stages of evolution

    Stages of revolution

    Growth rate of the industryEach stage of evolution breeds its own revolution.

  • 8/8/2019 24458915 Organisational Change and Development

    59/280

  • 8/8/2019 24458915 Organisational Change and Development

    60/280

    Griener model makes use of five key

    dimensions viz.Age of the organisation This is represented by

    the horizontal axis in the Grieners model of

    organisational growth.Size of the organisation With the increasing

    size, the problems of an organisation tend to

    multiply. The problems of communication and

    coordination magnify, jobs become moreinterrelated and levels of management hierarchy

    get multiplied.

  • 8/8/2019 24458915 Organisational Change and Development

    61/280

    Stages of evolution the organisation thatsurvives a crises usually enjoy four to eight years

    of continuous growth without setback or severe

    internal disruption.

    Stages of revolution Periods of substantialturbulence space between the smooth periods of

    evolution

    Growth rate of industry The speed at which an

    organisation experiences the above phases ofevolution and revolution also depends on the

    market environment of industry.

  • 8/8/2019 24458915 Organisational Change and Development

    62/280

    Phases of growth

    Phase I: CreativityPhase II: Direction

    Phase III: DelegationPhase IV: Co-ordination

    Phase V: Collaboration

    Crises of ? = Psychological saturation ofemployees

    (Emotionally & Physically exhausted dueinnovations)

  • 8/8/2019 24458915 Organisational Change and Development

    63/280

    It is important to remember that each stageof evolution breeds its own revolution

    Phase I: CreativityDuring the first phase, the emphasis is on the

    creation of both product and market: Thecompany founders are usually technically orentreneurially-oriented and they disdainmanagement activities; the physical and mental

    energies are absorbed entirely in making andselling a new product. The communicationamong the employees is informal.

  • 8/8/2019 24458915 Organisational Change and Development

    64/280

    Phase II: DirectionDuring this evolutionary phase, a functional

    structure of organisation is introduced, a

    systematic accounting procedures and incentives

    are followed, budgets and work standards areadopted. Formal communication is another

    notable characteristic of this phase. The lower-

    level managers demand more autonomy and as a

    result a crisis of autonomy develops during this

    phase.

  • 8/8/2019 24458915 Organisational Change and Development

    65/280

    Phase III: DelegationThe crisis of autonomy is resolved through the

    delegation of authority. The delegation stage

    helps in gaining expansion through heightened

    motivation at lower rungs. But one seriousproblem that eventually evolves is the crisis of

    control. Thus a greater delegation no doubt

    recognizes the importance of lower-level

    managers but results in a greater problem called

    control.

  • 8/8/2019 24458915 Organisational Change and Development

    66/280

    Phase IV: Co-ordinationThe problem of control is effectively solved

    through coordination. The coordination system

    aim at achieving more efficient allocation of

    organisations limited resources. Thus to achievecoordination, a more formal system is used and

    rules and regulations are imposed by the top

    management. But when the organisation

    becomes large, the formal authority and rigid

    systems eventually result in the crisis of red

    tape.

  • 8/8/2019 24458915 Organisational Change and Development

    67/280

    Phase V: Collaboration The crises of red tape and the conflicts between line and staff

    are overcome by strong interpersonal collaboration. One

    notable feature of this phase is that social control and self-

    discipline take over from formal control. This phase is,

    therefore built around a more flexible and behaviouralapproach to management.

    But surprisingly Griener expressed his inability to define the

    next period of crisis in concrete terms. He, however,

    anticipates a psychological saturation of employees.

    The above model is typical for the companies in industrieswith moderate growth over a long period of time. Companies

    in fastly growing industries tend to experience all five phases

    more rapidly; while those in slowly growing industry

    encounter only two or at the most three phases over many

    years.

  • 8/8/2019 24458915 Organisational Change and Development

    68/280

    Planned effort

    Long range/long term

    Organisation wide

    Managed from top

    To achieve

    Increased organisation effectiveness & health

    Through

    Planned interventions in organisationsprocesses using behavioural sciences

  • 8/8/2019 24458915 Organisational Change and Development

    69/280

    Organisation development is a long term

    effort, led & supported by top management,

    to improve organisations visioning,

    empowerment, learning and problem solving

    processes, through an ongoing, collaborativemanagement of organisation culture with

    special emphasis on the culture of intact

    work teams & other team configuration

    utilising the consultant facilitator role andthe theory and technology of applied

    behavioural science, including action

    research.

  • 8/8/2019 24458915 Organisational Change and Development

    70/280

    Beyond the Quick fiximprovement as a never ending journey of

    continuous change

    Higher to higher plateau

    Led & supported by top management

    Org change is hard & serious business

    O.D. programmes fail because top mgt. lostcommitment

  • 8/8/2019 24458915 Organisational Change and Development

    71/280

    Members develop viable, coherent & sharedpicture of nature of products/ Services(Desired Picture)

    How these products would be produced &

    delivered to customers

    Empowerment Processes

    Org. members to develop & utilize theirtalents as fully as possible towards the goalsof individual growth & organisational success

  • 8/8/2019 24458915 Organisational Change and Development

    72/280

    People continually expand their capacity to createthe results

    New patterns of thinking are nurtured

    Avoid defensive routines that prevent

    embarrassment but also prevent learningProblem Solving processes

    Take actions in relation toProblems

    OpportunitiesChallenges

    In relation to organisation environment & its internalfunctioning

  • 8/8/2019 24458915 Organisational Change and Development

    73/280

    Culture: Prevailing pattern of basics:Values

    Attitudes

    Believes

    AssumptionsExpectations

    Norms

    Sentiments.etc.

    Collaborative: Widespread ParticipationProcesses are relatively easy to change but change

    becomes permanent only when culture changes & thenew ways are accepted as Right ways

  • 8/8/2019 24458915 Organisational Change and Development

    74/280

    Teams are building blocks of organisations Intact work teams consist of superior & subordinates with

    specific job

    Intact work teams do not have a boss in traditional sense teams manage themselves

    These self directed teams assume complete responsibilityfor planning & execution

    Ad-hoc teams

    Cross functional teams for complex tasks

    Old method in serial/sequential fashion results in wastageof time, rework, loss of synergy etc.

    Work of tomorrow (Brain Work) will be done by ad-hocteams, rigid hierarchies wrong in fast-paced marketplace.

  • 8/8/2019 24458915 Organisational Change and Development

    75/280

    Third party Role: Professional helpPowerful

    Brings objectivity, neutrality

    Expertise

    Not captive to the culture

    Third party can be member of theorganisation but not of the particular unit to be encouraged.

  • 8/8/2019 24458915 Organisational Change and Development

    76/280

    Psychological, social psychology, sociology,anthropology, political science & applieddiscipline

    Study of complex change dynamics

    Action ResearchParticipative model in which leader, org.

    members & O.D. parctioner work together todefine and resolve problems and avail

    opportunities.Org. improvement through participant action

    research.

  • 8/8/2019 24458915 Organisational Change and Development

    77/280

    Is the process of systematically collecting researchdata about an on-going system relative to someobjective, goal or need of that system, feedingthese data back into the system, taking actions by

    altering selected variables within the system basedboth on the data and on hypothesis and evaluatingthe results of actions by collecting more data.

    Steps Static Picture of what exists

    Actions manipulating variables

    Second static picture to examine effects of actiontaken

  • 8/8/2019 24458915 Organisational Change and Development

    78/280

    Key aspectsDiagnosis

    Data gathering

    Feed back to client group

    Data discussions

    Action planning

    Action

    Evaluation

    Action Research is a process in two different ways

    Sequence of events/ activities

    Cycle of iterations - same problem/different problems

  • 8/8/2019 24458915 Organisational Change and Development

    79/280

    Action Research model

  • 8/8/2019 24458915 Organisational Change and Development

    80/280

    Action research was the conceptual modelfor an early organisation improvement

    programme in a group of oil refineries

    It is problem focused.

    Heavily involves employees, hence resistance

    to change is minimized.

  • 8/8/2019 24458915 Organisational Change and Development

    81/280

    Action Research model

  • 8/8/2019 24458915 Organisational Change and Development

    82/280

    O. D. process is complicated and it takes longtime to complete the process. Following stepsare involved.

    I. Initial diagnosis If inadequacies are observed in the organisation which

    can be corrected through O. D. activities,competent/professional people within the org. can beasked to plan & execute O. D. activities. Alternativelyoutside consultants can be hired to diagnose the problem

    & develop O. D. activities. The consultants adopt various methods including

    interviews, questionnaires, direct observation, analysisof documents/reports for diagnosing the problem.

    II. Data collection

  • 8/8/2019 24458915 Organisational Change and Development

    83/280

    Survey method is used to collect data &information for determining org. Climate &

    identifying behavioural problem.III. Data feed-back & confrontation

    Data collected is analysed and reviewed by

    various work groups formed for this propose in

    order to mediate in the areas of disagreementor confrontation of ideas/opinions & to

    establish priorities.

    IV. Selection & design of interventions

    The interventions are planned activities thatare introduced into the system to accomplish

    desired changes/improvements. Suitable

    interventions are selected & designed.

    V. Implementation of intervention

  • 8/8/2019 24458915 Organisational Change and Development

    84/280

    The selected intervention should be Implemented which may take the form of

    workshops, feed-back of data toparticipants, group discussions, written

    exercises, on the job activities, re-design of

    control system etc.

    Interventions are to be implemented steadilyas the process is not a one-shot, quick cure

    for organisational malady. But it achieves

    real & lasting change in the attitudes &

    behaviour of employees.

    VI. Action planning & problem solving

  • 8/8/2019 24458915 Organisational Change and Development

    85/280

    p g p g

    Groups prepare recommendations & specific

    action planning to solve the specific and

    identified problems by using data collected.VII. Team building

    The consultants encourage the employees

    throughout the process to form into groups &

    teams by explaining the advantages of teams

    In O. D. process, by arranging joint meetings

    with the managers, subordinates, etc.

    VIII. Inter-group developmentThe consultants encourage intergroup

    meetings, interaction, etc. after the

    formation of groups/ teams.

  • 8/8/2019 24458915 Organisational Change and Development

    86/280

    IX. Evaluation & follow-up

    The organisation evaluates the O. D.

    programmes, find out their utility, developsthe programmes further for correcting the

    deviations and/or improved results. The

    consultants help the organisation in this

    respect.All the steps in the O. D. processes should be

    followed by the organisation in order to

    derive full range of O. D. benefits.

  • 8/8/2019 24458915 Organisational Change and Development

    87/280

    1. Long Range Effort

    O. D. is not designed to solve short term, temporary orisolated problems. It is a long-term approach meant toelevate the org. to a higher level of functioning byimproving the performance and satisfaction of org.members. O.D. programmes generally cover a period of

    three to five years.2. Broad-basedO.D. is used to describe a variety of change programmes.

    It essentially deals with a big picture- An organisation. Itis a sophisticated attempt to bring about acomprehensive change in the entire org. in other words,it is concerned not only with changes in org.philosophies, skills of individuals & groups.

    3. Dynamic process

    O D i l d th ff t t id d di t h

  • 8/8/2019 24458915 Organisational Change and Development

    88/280

    O.D. includes the effort to guide and direct change aswell as to cope with or adapt to imposed change. O.D.

    recognises the fact that goals of the org. change &

    hence methods of attaining them should also change.O.D. is thus a dynamic process involving considerable

    investment of time & money. It is not a one-shot deal

    but an on-going, interactive & cyclic process.

    4. System viewO.D. is based on open, adaptive systems concept. It

    recognises that org. structure and managerial

    performance are mutually inter-dependent. The org. is

    treated as an inter-related whole & no part of the org.

    can be changed without affecting other parts.

    5. Research based

  • 8/8/2019 24458915 Organisational Change and Development

    89/280

    Most O.D. interventions are research based changeagents conduct surveys, collect data & then take

    decisions. O.D. programmes are generallyconducted by special task force & utilize outside

    consultants behavioural faculties.

    6. Goal setting & planning

    Since O.D. is concerned with entire org. changeagent defines goals of the groups & ensures they all

    work to achieve them. Beckhard contends that

    healthy org. tend to have goal setting at all levels.

    7. Normative re-educative strategy

  • 8/8/2019 24458915 Organisational Change and Development

    90/280

    O.D. is based on principle that norms form thebasis for behaviour and change is a re-educative

    process of replacing old by new once. O.D.programmes signify major departures from

    bureaucratic structure & call for changes in

    leadership styles based on well-established

    principles.

    8. Feed-back & learning by experienceParticipants learn by experience & O.D. provides

    feed-back data/information to participants

  • 8/8/2019 24458915 Organisational Change and Development

    91/280

    O.D. interventions are sets of structuredactivities in which selected organisational units(target groups or individuals) engage in a taskwhere the task goals are related directly or

    indirectly to organisation improvement. Interventions constitute the action thrust of O.D.

    and are designed to improve the organisationsfunctioning by helping organisation membersbetter manage their team & organisationcultures & processes. Interventions are vehiclesfor causing change.

  • 8/8/2019 24458915 Organisational Change and Development

    92/280

    1. Maximize diagnostic data Interventions that provide data to make subsequent

    interventions should come first.

    2. Maximize effectiveness

    Early interventions should enhance the effectivenessof subsequent interventions. For example,interventions that develop readiness, motivation,knowledge or skills required by other interventionsshould come first.

    3. Maximize efficiency

    Interventions should be sequenced to conserveorganisational resources such as time, energy &money.

    4. Maximize speed

  • 8/8/2019 24458915 Organisational Change and Development

    93/280

    Interventions should be sequenced to maximize the

    speed with which ultimate organisational

    improvement is attained.

    5. Maximize relevance Interventions that are most relevant to immediate

    problems should come first. Interventions that

    have impact on organisations performance or task

    should come before those having impact on

    individuals or culture.

    6. Minimize psychological & organisationalstrain

    Sequence chosen should minimize anxiety,

    insecurity, distrust, unwanted effect on org.

    performance, psychological damage to people,

    etc.

  • 8/8/2019 24458915 Organisational Change and Development

    94/280

    These interventions are techniques & methodsdesigned to change the culture of theorganization, move it from where it is towhere organization members want it to be and

    generally enable them to improve their practicesso that they may better accomplish individual,team and organisational goals.

    Much of organizations work is accomplished

    directly or indirectly through teams and theassumption is that work team culture exerts asignificant influence on individual behaviour

    A work group is a number of persons usually

  • 8/8/2019 24458915 Organisational Change and Development

    95/280

    A work group is a number of persons, usuallyreporting to a common superior and having face

    to face interaction, who have some degree ofinter-dependence in carrying out tasks for thepurpose of achieving organization goals.

    A team is a form of group, but has some

    characteristics in greater degree than ordinarygroups including a higher commitment tocommon goals and a higher degree ofinterdependency and interaction, Rensis Likert

    suggested that organizations are bestconcentualised by systems of interlocking groupsconnected by linking pins.

    Individuals in organizations function not so muchas individuals alone but as members of groups or

  • 8/8/2019 24458915 Organisational Change and Development

    96/280

    g pteams. For an individual to function effectively,frequently a pre requisite is that the team must

    function effectively.Characteristics of effective teams

    Clear purpose

    Informality

    Listening

    Civilised disagreement

    Consensus decision making

    Open communications. Clear roles & work assignments.

    Shared leadership

    External relations Style diversity (broad spectrum of task skills &

  • 8/8/2019 24458915 Organisational Change and Development

    97/280

    Style diversity (broad spectrum of task skills &process)

    Self assessment

    High performance teams have the samecharacteristics but to a higher degree

    Extra sense of commitment

    High performance with a deeper sense of purpose More ambitious performance goals

    More complete approaches

    Fuller mutual accountability

    Interchangeable as well as complementary skills

    Strong personal commitment to each other.

    Team building interventionsTeam building interventions are directed towards four

  • 8/8/2019 24458915 Organisational Change and Development

    98/280

    gmajor areas

    Diagnosis

    Task accomplishments

    Team relationships

    Team & organisation processes

    Team building activities

    Formal groups special groups

    (intact work teams) (start up teams, special

    Project teams , functional teams, parallel learning

    Teams) structures, etc.

    Formal groups:A. Diagnostic meeting

  • 8/8/2019 24458915 Organisational Change and Development

    99/280

    A. Diagnostic meeting

    B. Team building focused on

    Task accomplishment including problem solving,decision making, role clarification, goal setting,etc.

    Building & maintaining effective inter-personal

    relationships and peer relationships. Understanding & managing group processes &

    culture

    Role analysis technique for role clarification &

    definition Role negotiation techniques.

    Formal groups diagnostic meeting:The purpose of meeting is to identify problem

  • 8/8/2019 24458915 Organisational Change and Development

    100/280

    p p g y pand not solving problems

    Several ways:

    i. A total group discussion involving every onemaking individual contributions.

    ii. Sub-grouping for more intense discussions &then sub-groups reporting back to totalgroup.

    iii. Pairing of two individuals each who discusstheir ideas and each pair reporting back tothe total group.

    When data is shared throughout the group, issues

  • 8/8/2019 24458915 Organisational Change and Development

    101/280

    When data is shared throughout the group, issuesare grouped into themes. The next would beaction steps calling a team building meeting& assigning different persons as task groupsto work on the problems.

    Diagnostic meetings for newly constituted groupsresulting from mergers/acquisitions are to beheld more frequently to stay ahead of theproblems

    Role analysis technique (RAT)

  • 8/8/2019 24458915 Organisational Change and Development

    102/280

    The role analysis technique intervention is designed toclarify role expectations and obligations of team

    members to improve team effectiveness.- Division of labour to discharge functions

    - role clarity not understood.

    - Determination of role requirements of team membersconsisting of joint building leading to more mutually

    satisfactory and productive behaviour.- Role incumbents in conjunction with team members

    define role requirements. The role defined is focalrole.

    - In a new organization, desirable to conductrole analysis for each of major roles.

  • 8/8/2019 24458915 Organisational Change and Development

    103/280

    1. Analysis of focal role initiated by focal roleindividual, discussions with entire team,

    behaviours added or deleted until group androle incumbent satisfied.

    2. Examination of focal role incumbentsexpectations of others.

    3. Others expectations and desired behavioursof focal role

    In conclusion, the focal role person assumesresponsibility & makes a written summary of

    role profile, which is briefly reviewed at nextmeeting before another focal role isanalyzed.

    - Collaborative role analysis and definition bythe entire work group not only clarifies whoi d h b i h

  • 8/8/2019 24458915 Organisational Change and Development

    104/280

    is to do what but ensures commitment to therole once it has been clarified.

    - Example of a meeting of board, presidentand senior management team if board orpresident were operating in an optimallyeffective way, what would they or he be

    doingAttempts at consensus in team building sessions.

    - Helps to clarify role expectations andobligations & leads to shifts in network of

    activities.

    A Role Negotiation Technique- When the causes of team ineffectiveness are based

  • 8/8/2019 24458915 Organisational Change and Development

    105/280

    on peoples behaviours that they are unwilling tochange because it would mean a loss of power or

    influence to the individual, a technique developedby Roger Harrison called role negotiation canoften be used to great advantage.

    - The technique is basically an imposed structure forparties in which each party agrees in writing tochange certain behaviours in return for changes inbehaviour by the other. Behaviour relate to the job(quid pro quo) most people prefer a fair negotiated settlement to unresolved conflict.

    Steps1. Contract setting

  • 8/8/2019 24458915 Organisational Change and Development

    106/280

    g

    2. Issue diagnosis

    3. Influence trade (negotiation)4. Follow up meeting.

    1. Contract setting

    Consultant sets climate & ground rules It is to change work behaviours & not feelings

    with quid pro-quo

    Session consists of individuals negotiate witheach other to arrive at Written contract ofwhat behaviours each one will change.

    2. Issue diagnosisEach person fills out an issue diagnosis form

  • 8/8/2019 24458915 Organisational Change and Development

    107/280

    p gfor every other person in the group statingwhat other should do more/ less/unchanged. These messages are exchanged.

    3. Influence trade (negotiation period)

    Each person must give something to get

    something. This step once demonstrated bytwo individuals with rest of the groupwatching, the group breaks into negotiatingpairs. All agreements are written with each

    Party having a copy.

    4. Follow up meetingIt is best to have a follow up meeting to

  • 8/8/2019 24458915 Organisational Change and Development

    108/280

    determine whether the contracts have beenhonoured and to assess the effects of the

    contracts on effectiveness.

    Role negotiation technique is an effective way ofbringing about positive improvement in a

    situation where power and influence issues areworking to maintain an unsatisfactory statusquo. This intervention leads to improved teamfunctioning with individuals changing their work

    behaviours.

    Inter group and third party peace makinginterventions

  • 8/8/2019 24458915 Organisational Change and Development

    109/280

    When there is tension, conflict or competition

    among groups:-

    -Each group sees other as enemy

    -Each group describes others in negatives-Interaction & communication decreases

    -Feed back & data input cut off

    -Communication is distorted & inaccurate

    -Each group prizes itself positively and denigratesothers & their products

    -Other groups can do nothing right & we can do nowrong.

    There is considerable inter group conflict inorganizations and known patterns of

  • 8/8/2019 24458915 Organisational Change and Development

    110/280

    behaviour of groups in conflict

    How to resolve conflict?

    Common enemy

    Increased interaction & communication

    Finding a superordinate goal Rotating the members of the group &

    instituting some forms of training

    Inter group team building interventions Increase communications & inter-actions

    between work related groups

    Reduce amount of dysfunctional competition Replace a parochial independent point of

  • 8/8/2019 24458915 Organisational Change and Development

    111/280

    p p p pview with best efforts of both groups.

    Activities developed by Blake, Shepard &Mounton six steps.

    i. Discussions by group leaders (or whole group)with consultant - willingness & take steps toimprove is established.

    ii. Two groups meet separately & draw up two lists

    A. What the other group is like?

    B. What the other group thinks about them?

    iii. Two groups meet and read out lists. Nodiscussions & only clarification on any point

    d l

  • 8/8/2019 24458915 Organisational Change and Development

    112/280

    contained in list.

    iv. Two groups return to separate meetingplaces. Differences may not be as great asimagined. They make a list of priority issuesto be resolved.

    v. Two groups share their lists and togethermake one list of problems & issues thatshould be resolved. Generate action steps who will do what when

    vi. Follow - up to determine whether actionsteps have in fact occurred. This ensuresmomentum is not lost.

    Slightly modified version of above procedurepresented by Fordyce & Weil in this

    d h li d b h

  • 8/8/2019 24458915 Organisational Change and Development

    113/280

    procedure, three lists drawn by each group.

    1. A positive feed back list containing thingsthe group values and likes about the othergroup.

    2. A bug list containing things the group does not

    like about the other group.3. An empathy list containing a prediction of

    what the other group is saying in its list.

    Third party peace making interventionsR.E. Walton third party interventions into

  • 8/8/2019 24458915 Organisational Change and Development

    114/280

    conflict situations have the potential tocontrol (contain) the conflict or resolve it.

    Basic feature

    - Two principals must be willing to confront

    the fact that conflict exists and it hasconsequences for effectiveness of twoparties.

    - Third party must be able to diagnose conflictsituations (conflict is a cyclic process findsource of conflict)

    Diagnostic model of inter personal conflict hasfour basic elements.

  • 8/8/2019 24458915 Organisational Change and Development

    115/280

    A.

    Conflict issuesB.Precipitating circumstances

    C.Conflict relevant acts of principals

    D.Consequences of the conflict

    Substantive (policies, practice, etc.)

    Issues

    Emotional (negative feelings

    between parties)

    Third party will intervene directly or indirectlyin facilitating dialogue between principals.

  • 8/8/2019 24458915 Organisational Change and Development

    116/280

    Direct interventions- Interviewing principals before the confrontation

    meeting

    - Helping to set agenda.

    - Attending to pace of the dialogue

    - Refereeing the interaction

    More subtle interventions

    - Setting the meeting on neutral turf.

    -

    Setting time boundaries on the interventionsetc.

    - Third party intervention requires a highly skilledprofessional who understands the dynamics of

    conflict.

    Organization mirror interventions(Organization mirroring)

  • 8/8/2019 24458915 Organisational Change and Development

    117/280

    - It is a set of activities in which a particulars

    organization group, the host group, gets feedback from several other groups about how itis perceived & regarded

    - intervention between three or more groups;

    work related groups & not with all groups (orfull membership) i.e. only with grouprepresentatives)

    Focus is to assist host group that requested themeeting

  • 8/8/2019 24458915 Organisational Change and Development

    118/280

    - Host group experiencing difficulties withother work related units, calls for a meetingto get a feed back as to how they see thehost unit.

    - Consultant often interviews the people

    attending the meeting in order to get a senseof problems & their magnitude, prepareparticipants & answer any questions

    - Manager of host group states the purpose &

    consultant gives feed back to the total groupfrom interviews.

    - The outsider fish bowl to discuss andexplore the data presented by the

    lt t

  • 8/8/2019 24458915 Organisational Change and Development

    119/280

    consultant.

    - The fish bowl allows the invitedparticipants to talk about the host unit in anatural, uninterrupted way while host groupmembers listen & learn.

    -

    Host group fish bowls clarification,general discussions

    - For working on problems, sub- groups,consisting of host group members & invited

    participants, formed- Total group meets to identify key problems

    based on feed back from sub-groups

    - Action plans firmed up. People assigned tasks& target dates for completion agreed upon.

  • 8/8/2019 24458915 Organisational Change and Development

    120/280

    - A follow up meeting to assess progress &review action steps.

    - Thus in a short period , an organizational unitgets the feed back it needs to improve itsrelationship with significant work related

    groups. However, the host group mustimplement the action plans that weredeveloped during the meeting.

    PartneringAn intervention called partnering can be

    d i f b h i i i i i

  • 8/8/2019 24458915 Organisational Change and Development

    121/280

    productive for both parties in situations inwhich two or more organizations are likely toincur unnecessary conflict & cost over runs.

    e.g. Owner- contractor relationship in a largeconstruction project

    Partnering is an effective problem finding/problem solving technique. Managementteam composed of personnel from bothparties, are formed thus creating a single

    culture with one set of goals & objectives forthe project.

    Partnering involves all the functions in theconstruction project including engineering &design site management home office

  • 8/8/2019 24458915 Organisational Change and Development

    122/280

    design, site management, home officesupport.

    Steps:

    - Selection of consultants

    - Prior to beginning of construction, meeting

    of key managers of organization, contractor& the consultants at neutral site.

    - Several exercises for group decision making.Listing strengths & problems of

    organization & contractor. Mixed groupsformed to diagnose & evaluate courses ofaction & make recommendations.

    - At Workshop, mutual commitment to teamwork, equitable problem - solving & opencommunication was made

  • 8/8/2019 24458915 Organisational Change and Development

    123/280

    communication was made.

    - Follow up workshop - three months afterconstruction began.

    - Further follow up, after say six months afteron site data gathering visits, involving all

    key players.- While partnering did not solve all problems

    but high success rates have been reported.

    Better results than on previous non-

    partnered projects

    The Appreciations & Concerns exerciseIt may be appropriate if interview data suggest

  • 8/8/2019 24458915 Organisational Change and Development

    124/280

    that one of the deficiencies in theinteractions of members of a group is lack ofexpression of appreciation and anotherdeficiency is the avoidance of confrontingconcerns & irritations.

    - In instances in which lack of appreciation is amuch more serious deficiency than concerns,focusing solely on appreciations can be apowerful and positive intervention in the life

    of the group.- When the concerns segment is used, a Mini

    lecture from facilitator on the nature ofconstructive feed back is desirable.

    - If there is substantial conflict in the group, amore structured exercise such as the rolenegotiation technique is likely to be more

  • 8/8/2019 24458915 Organisational Change and Development

    125/280

    negotiation technique, is likely to be moreappropriate.

    Steps in appreciations & concerns exercise

    1. Facilitator asks each member of group to jot

    down one to three appreciations for eachmember of group.

    2. Each member to jot down one or two minorirritations/ concerns relative to each person

    interfering with communications, gettingwork done effectively, etc.

    3. Some one is asked to volunteer to be the firstperson to listen to members of the group

    Each group member mentions both theappreciations & concerns about the volunteerwho hears from all the group members

  • 8/8/2019 24458915 Organisational Change and Development

    126/280

    who hears from all the group membersbefore responding.

    5. Each group member listens in turn, eitherthrough volunteering to be the next orthrough the simple procedure of rotatingclock wise or counter clockwise from thefirst person.

  • 8/8/2019 24458915 Organisational Change and Development

    127/280

    Usefulness of getting all of the key actors of a complexorganization or system together in a team building,future planning session.

    Examples of whole system

    -Managers of all functional areas in a business.

    -Representatives of top management, a Cross sectionof employees from all levels, and supplier & customerrepresentatives.

    -The directors of all social services agencies in a

    community.-All of the librarians in a state or region plus theDirector and staff of state library system.

    Future Search ConferencesWeisbords future search conference model

    i t f f ll i g t

  • 8/8/2019 24458915 Organisational Change and Development

    128/280

    consists of following steps.

    1. The consultants (or conference managers) meet witha voluntary committee of four to six potentialparticipants.

    2. Upton 50 to 60 persons invited depending uponnature of focus, people from

    a. All functional areasb. Levels of the organization

    c. All racial, sex & age

    d. Customers & suppliers

    e. Union Leaders.

    People asked to bring newspaper & magazine

    clippings that can have influence on organizationsfuture.

    3. Six to eight people sit at one table. Conference isnot to solve problems but to generate awareness,understanding. All ideas are valid and recorded.

  • 8/8/2019 24458915 Organisational Change and Development

    129/280

    g

    4. The conference has four or five segments each

    lasting half a day. Each one requires that peoplea. Build a data base

    b. Look at it together

    c. Interpret what they find

    d. Draw conclusions for action5. The first major activity focuses on the past.

    Each person asked to make notes on significantevents, milestones during past three decades from

    three perspectives Self Company (or town or industry) Society

    The group at each table then analyzes onetheme (self, company or society) and extractpatterns and meanings

  • 8/8/2019 24458915 Organisational Change and Development

    130/280

    patterns and meanings.

    6. Sub- groups report to total group & total

    conference interprets good & bad trendsand the direction of movement of each

    7. The second major activity focuses on present

    factors internal & external that are shapingthe future of the organization

    - Newspapers & magazine cuttings discussed

    - priorities finalized

    - lists of Prouds & Sorries Currentgoings on.

    Conference managers note & summarize keystatements.

    8 The third major activity focuses on the future

  • 8/8/2019 24458915 Organisational Change and Development

    131/280

    8. The third major activity focuses on the future.

    - New groups formed to prepare a preferred future

    scenario the most desirable & attainable futurefive years hence.

    - The groups then report to the total conference.

    9. The fourth major activity focuses on next actionsteps.

    - Groups are asked to make three lists ofsuggested action steps for

    a. Themselves

    b. Their functionc. Total organization

    Action proposals for functional areas are shared by

  • 8/8/2019 24458915 Organisational Change and Development

    132/280

    Action proposals for functional areas are shared bymembers of the same department.

    10. Members of top management or the steeringcommittee discuss proposals for the totalorganization, prioritize themes and developaction plans. They then present action plans to

    total conference.

    11. Before the conference ends, entire proceedingsare drawn up and volunteers carry forward thenext actions steps.

    Such conferences offer a unique spring boardfor planning & goal setting.

    Beckhards Confrontation Meeting- A one day meeting of entire management in

    which they take stock of own organizational

  • 8/8/2019 24458915 Organisational Change and Development

    133/280

    which they take stock of own organizationalhealth, in a series of activities. The

    management group generates informationabout

    a. Its major problems

    b. Analyze underlying causesc. Develop action plans to correct problems

    d. Set a schedule for completion of remedialwork.

    - It is a quick, simple & reliable way togenerate data about an organization & to setaction plans for organizational improvement.

    a. It is appropriate where there is need for totalmgt. team to examine its own working.

    b Limited time available

  • 8/8/2019 24458915 Organisational Change and Development

    134/280

    b. Limited time available

    c. Top mgt. wants to improve conditions quickly

    d. Enough cohesion in top team to ensure followup.

    e. Real commitment on part of top mgt. to

    resolve issues.f. Org. is experiencing or recently experienced

    some major change.

    Steps involved in confrontation meeting

    Step 1. Climate setting (45 to 60 minutes)

    - Top mgt. states the goals for the meeting,free & open discussions of issues & problems

    - Consultant stresses the importance ofcommunication, desirability of organizationsproblem solving

  • 8/8/2019 24458915 Organisational Change and Development

    135/280

    problem solving

    Step 2. Information collecting (1 hour)

    - Small groups of seven or eight members fromvarious disciplines & work situations.

    - Boss & subordinates not to be together

    - Top mgt. group meets separately- All groups to discuss

    What are obstacles, de-motivators, poorprocedures or policies, unclear goals orattitudes

    - What conditions would make organizationmore effective?

    - The reporters record results of discussions.Step 3. Information sharing (1hour)

    R t f h t t t t l

  • 8/8/2019 24458915 Organisational Change and Development

    136/280

    - Reporters from each group report to totalgroup.

    - Total list categorized into few majorcategories based on type of problem

    - Communication problem

    - Relationship Problem (with top mgt.)- Functional Problem (With accounts Dept. etc)

    Step 4. Priority setting & group action planning

    ( 1 hour 15 minutes)- Each one is given a list of categorized items

    - Next participants form into functional, naturalwork teams reflecting the way they

    are organized in the organization- Each group is headed by top manager in the

    group

  • 8/8/2019 24458915 Organisational Change and Development

    137/280

    group.

    - Each group asked to do three tasks

    a. Identify & discuss problems related to theirarea, decide on prioties and determine earlyaction steps for remedy which they are ready

    to take themselves.b. Asked to identify problems which should be

    priority issues for top mgt.

    c. Determine how will they communicate

    results of confrontation meeting to theirsubordinates.

    Step 5 Immediate follow up by top team- Top mgt team meets to decide first follow up

    action steps and also to determine what actions

  • 8/8/2019 24458915 Organisational Change and Development

    138/280

    action steps and also to determine what actionsshould be taken on the basis of what they learnt

    during the days conference.- Follow up action plans are communicated to rest

    of mgt. group within next few days.

    Step 6 Progress Review (2 hours)

    A follow up meeting with the total mgt. groupis held after 4-6 weeks to report progress & toreview actions.

    - A quick & accurate means for diagnosingorganizational health.

    - Enhances upward communication within theorganization.

    - Increases involvement & commitment toaction on the part of entire managerialgroup.

  • 8/8/2019 24458915 Organisational Change and Development

    139/280

    group.

    Systems 1 4 TRensis Likert using a 105- item questionnaire called

    survey of organizations found that survey

  • 8/8/2019 24458915 Organisational Change and Development

    140/280

    survey of organizations found that surveybased on following measures could be used to

    track changes over time.- Leadership

    - Organizational Climate

    -

    Job satisfactionIn Likert model, each type of organization(systems 1-4) as having internally consistentcharacteristics of which org. climate is a major

    part.In Systems 1 type of organization

    - Control, Goal setting & Decision making areconcentrated at the top.

    - No seeking of subordinates ideas- Subordinates not involved in decisions

    related to their work

  • 8/8/2019 24458915 Organisational Change and Development

    141/280

    related to their work

    - Extensive use is made of threats, punishment& fear.

    - Cost & productivity data are used for policing& punishment

    - Communication is largely downward- Lateral & upward communication is minimal

    & distorted.

    - Teamwork is essentially non- existent

    Systems 2 type of organization- There is some delegation of decision-making

    to implement policies

  • 8/8/2019 24458915 Organisational Change and Development

    142/280

    to implement policies.

    - Subordinates are sometimes consulted beforedecisions are made about their work.

    - There is some lateral communication &upward communication (filtered).

    - Extensive use of monetary award.- Threats and punishment less than system 1.

    - Motivation low but higher than system 1

    -

    Little team work

    Systems 3 type of organization

    - More participative than systems 1 & 2

  • 8/8/2019 24458915 Organisational Change and Development

    143/280

    More participative than systems 1 & 2

    - Substantial delegation of decision making

    - Goals by top mgt. after consultation

    - Moderate delegation

    - Subordinates generally consulted about their

    work- Substantial confidence shown in subordinates

    - Communication downward & upward without

    much distortion- Cost & productivity data for rewards

    - Most individuals feel responsible.

    Systems 4 type of organization- Most participative & highly group process oriented.

    - Goals established through participation

  • 8/8/2019 24458915 Organisational Change and Development

    144/280

    Goals established through participation

    - Decisions made by consensus.

    - Subordinates fully involved in decisions related totheir work.

    - High level of confidence shown in subordinates

    - Communication flow is upward, downward & lateral

    without distortion- No Coercion

    - High Motivation

    - Cost, productivity data for problem solving

    - Team work evident throughout org.

    Systems 4 T- When variables such as The levels of performance

    goals & The level of Technical Competence are

  • 8/8/2019 24458915 Organisational Change and Development

    145/280

    g padded the system becomes 4 T (T stands for total

    model)System 1 Orgs usually have employee resistance ofall kinds & low morale & Commitment, Orgs shouldshift to systems 3 or 4 (or 4T)

    Survey Feed-BackIt is a well-organized & Systematic approach to assist

    organisation in diagnosing problems & developingl f bl l l

  • 8/8/2019 24458915 Organisational Change and Development

    146/280

    action plans for problem solving. It also assistsgroup members to improve the relationships throughdiscussions of common problems.

    The survey feed-back starts by obtaining commitment andendorsement of top management. The survey may beconducted with or without the help of outside

    consultant. Four distinct steps are involved:

    1. Collection of Data

    Information gathered through comprehensivequestionnaire to focus on issues:

    a. Employee satisfaction (Individual attitudes)

    b. Quality and styles of leadership

    a. Organisational climate (like decision making, co-ordination , etc)

    b General health of the enterprise

  • 8/8/2019 24458915 Organisational Change and Development

    147/280

    b. General health of the enterprise.

    2.

    Feed Back the Information- Survey results fed directly to participants

    rather than to top mgt. Group discussions &

    problem solving sessions.

    3. Develop an action plan

    Mgt. to develop an action plan which is

    workable based on recommendations of

    participants for solving problems discoveredin the survey.

    ii Follow-upAfter few months, a check is made to determinewhether the action plans are implemented or not

  • 8/8/2019 24458915 Organisational Change and Development

    148/280

    Necessary Conditions for successi. Questionnaire should be valid & reliable

    ii. Employees willing to report honestly

    iii. Top mgt. willing to use information

    iv. Sessions conducted are Task-oriented

    v. Each group has enough discretion to consider & actupon its findings/analysis

    vi. Org. members trust each other

    vii. Participants do not feel manipulated.

    EvaluationIt is more effective change technique than many other

    types.

  • 8/8/2019 24458915 Organisational Change and Development

    149/280

    i. It can yield a great amount of information

    ii. Decision making & problem solving ability of org.improved since competence & knowledge of entireorg. used.

    iii. Emphasizes two way communication

    iv. Can increase influence of lower level managersv. Broad coverage including all members of the org.

    vi. Information provided can help to work out concreteplan for org. effectiveness.

    vii. Flexible and can be applied to many different orgs.& different problems.

    Six Phase programme lasting about 3 5 years bywhich organisation can move systematically from the

  • 8/8/2019 24458915 Organisational Change and Development

    150/280

    which organisation can move systematically from thestage of examining managerial behavior & style to the

    development & implementation of an Ideal StrategicCorporate Model.

    The Programme utilizes a Considerable number ofinstruments enabling individuals & groups to assess

    their own strengths and weaknesses. It focuses onskills, knowledge & processes necessary foreffectiveness at the individual, group, inter- group andtotal organization levels.

    As used in managerial grid diagnostic questionnaire,

    grid O.D. process becomes one vehicle for individuals &groups to examine & explore their styles & modifyprevailing practices

    Phase I The managerial grid seminar conducted byIn company managers (who are pre - trained) isgiven to all managers Focus of trg Is on individuals

  • 8/8/2019 24458915 Organisational Change and Development

    151/280

    given to all managers. Focus of trg. Is on individual smanagerial styles, problem solving &

    communication skills. Managers learn to become 9 -9managers

  • 8/8/2019 24458915 Organisational Change and Development

    152/280

    Concern for production

    Concern

    for

    people

    (Low) 1 2 3 4 5 6 7 8 9

    1

    2

    3

    4

    5

    6

    7

    8

    9

    (High)

    (High)

    (1,1) Impoverished Mgt. (9,1) Task Mgt.

    (5,5 Middle of Road Mgt.

    (1,9) Country Club Mgt. (9,9) Team Mgt.

    Phase 2 Team work developmentGoal is perfecting team work culture,

    traditions & developing skills in planning,

  • 8/8/2019 24458915 Organisational Change and Development

    153/280

    traditions & developing skills in planning,

    setting objectives & problem - solving. The

    problems & issues dealt are real ones.

    Phase 3 Inter-Group Development

    The focus of this phase is inter-group

    relations and the goal is to move groups fromtheir in-effective often win-lose actual ways

    to ideal model of inter-group relations. It

    includes building operational plans for

    moving to ideal state

    Only teams which have important inter- facerelationships do so (meeting in twos)

    Phase 4 Developing an ideal corporatestrategic model

  • 8/8/2019 24458915 Organisational Change and Development

    154/280

    strategic model

    Top management engages in strategy planningactivities of this phase and corporate members test& evaluate the plans / ideas. Fact finding, technicalinputs & so on are contributed from all persons ofthe org.

    The top executives build ideal strategic corporatemodel for their particular org. may take upto oneyear.

    Phase 5 Implementing the ideal strategic modelTo execute the conversion to ideal strategic model,the org. must be re-organized - profit centers,geographical locations product lines etc ) A

  • 8/8/2019 24458915 Organisational Change and Development

    155/280

    geographical locations, product lines, etc.) Aplanning team for each component to examine howthe business be moved more in line with idealmodel . A phase 5 Co-ordinator is appointed as aresource to the planning teams.

    After planning & assessment steps completed, orgs

    movement to ideal condition implemented.Phase 6 Systematic critique

    Systematic critiquing, measuring & evaluating isdone to find progress made. Taking stock of how far

    the org. has moved to current position whichbecomes a New beginning from which to continuestriving towards corp. excellence.

    Blake & Mouton studied results on a large multi-plant

    Co. (800 mgrs & 4000 staff) Given grid conceptsSignificant org. improvement showed up on Bottom-line greater profits, lower costs, less waste.Managers also reported that changes for the better

  • 8/8/2019 24458915 Organisational Change and Development

    156/280

    Managers also reported that changes for the betterhad resulted.

  • 8/8/2019 24458915 Organisational Change and Development

    157/280

    T Groups (sensitivity training)

    Behaviour modeling

    Life & career planning including use of careeranchors.

    Behaviour modeling

    A training technique designed to improve inter-personal competence.

    An excellent way to make first line supervisorsmore effective & to improve organisationaleffectiveness.

    It is a social learning theory which emphasizes that

    person

    1 Must perceive a link between the behaviour & certain

  • 8/8/2019 24458915 Organisational Change and Development

    158/280

    1. Must perceive a link between the behaviour & certain

    outcomes

    2. Must desire those outcomes

    3. Must believe they can do it

    For example, many first line supervisors find it

    difficult to discipline employees. To learn this

    behaviour, they must1. See a link between discipline and desired outcomes

    2. Believe they can do it

    The methodology of behaviour modeling is

    1. Select a model similar to them being successful bydiscovering special behavioural skills that led to

    success.

    2. Practicing skills until proficient

  • 8/8/2019 24458915 Organisational Change and Development

    159/280

    1. Determine most pressing problems facing atarget group say first line supervisors.

    Counseling poor performer

    Correcting absenteeism

    Encouraging average performer Correcting unsafe work behaviour

    1. Training modules for about 10 problemsdeveloped through video tapes showing a

    model correctly handling each situation.2. Specific behaviours exhibited by model

    highlighted as learning points.

    4. Trainees discuss behavioural skills & role play

    the situation receiving feed back from the

    ( 10) d th t i th i

  • 8/8/2019 24458915 Organisational Change and Development

    160/280

    group (say 10) and the trainer on their

    performances.5. Role playing continues until each participant

    successfully masters all specific skills.

    6. Participants practice new skills on the job.

    7. In next session, participants report how their

    new skills worked on the job.

    8. New problem is addressed on video tape, role

    playing and feed back till participants learn.

    Behaviour modeling works to teach the skills &behaviours needed to deal with inter-personal

    problems.

  • 8/8/2019 24458915 Organisational Change and Development

    161/280

    Change behaviour of people through unstructured &agendlaless group interaction ( 10-12 people assisted bya behavioural scientist (catalyst)).

    Focus of discussion: Individual personalities

    Group interaction

    Processes Relationships

    Specific results aimed: Increased ability to understand others

    Improved listening skills

    Greater openness

    Increased tolerance of individual differences

    Improved conflict resolution skills

    Critics feel that all positive effects are felt onlyduring training.

    Controversial technique & research reveals both

  • 8/8/2019 24458915 Organisational Change and Development

    162/280

    Controversial technique & research reveals both

    positive & negative sides

    Criticism of T-group training

    Lays heavy concentration on individuals & its

    utility to total org. is limitedCan cause behaviuoral change (+ve or ve) but

    changes may not be related to org. performance.

    It may result in psychological damage to some

    employees who do not take well to criticism.

    Impractical since not consistent with the

    business 7 economic world.

  • 8/8/2019 24458915 Organisational Change and Development

    163/280

    It is a continuous quality improvementthrough a combination of organisationimprovement techniques and approachesincluding use of:

    Quality circles Statistical quality control

    Statistical process control

    Self managed teams

    Task forcesExtensive employee participation

    Need to compete is the compulsion

    Primary emphasis on customers

  • 8/8/2019 24458915 Organisational Change and Development

    164/280

    Daily operational use of the concept of internal customers

    Emphasis on measurement using both statistical qualitycontrol and statistical process control techniques

    Competitive bench marking

    Continuous search for sources of defects with a goal of

    eliminating these entirely.Participative management

    An emphasis on teams & team work

    A major emphasis on continuous training.

    Top management support on an on-going basis.Some version of TQM is being used in virtually all

    organisations.

    General accounting office, USA report

  • 8/8/2019 24458915 Organisational Change and Development

    165/280

    1. Companies that adopted quality managementpractices experienced an overall improvement

    in corporate performance. In nearly all cases,

    companies achieved

    Better employee relations Higher productivity

    Greater customer satisfaction

    Increased market share

    Greater profitability

    1. TQM is relevant to small as well as large

    companies.

    3. Sufficient time needed for gains to appear

    say two and a half years.

  • 8/8/2019 24458915 Organisational Change and Development

    166/280

    say two a d a al yea s.

    Other authors said

    Greatest success was achieved when

    organisations pursued simultaneously both

    TQM & employee involvement programmes.

    Team & work groups

  • 8/8/2019 24458915 Organisational Change and Development

    167/280

    Team & work groups

    Characteristics of effective team

    Broad team building interventions

    Process consultation interventions

    Techniques used in team building

    Role analysis technique

    Interdependency exercise

    A role negotiation technique

    The appreciations & concerns exercise

    Appreciative inquiry

    Responsibility chartingVisioning

    Force-field analysis.

  • 8/8/2019 24458915 Organisational Change and Development

    168/280

    Inter-group team building interventionsThird-party peace-making interventions

    Organisation mirror interventions

    Partnering

  • 8/8/2019 24458915 Organisational Change and Development

    169/280

    Getting the whole system in the roomFuture search conferences

    Beckhards confrontation meeting.

    Survey feed-back

    Strategic mgt. activities.

    System 1-4T

    Grid organisation development

    Scheins cultural analysisTransorganisational development

  • 8/8/2019 24458915 Organisational Change and Development

    170/280

    Socio-technical systems (STS)Self-managed teams

    Work re-design

    MBO & appraisal

    Quality circles

    Parallel learning structuresPhysical setting & O.D.

    Total quality management (TQM)

    Re-engineering

    Large-scale systems change & organisational transformation

  • 8/8/2019 24458915 Organisational Change and Development

    171/280

    T-groupBehaviour modeling

    Life & career planning

    Career anchors

    Life goals exercise

  • 8/8/2019 24458915 Organisational Change and Development

    172/280

    Although O.D. is a source of inspiration forthose who feel the need for human-basedapproach to organisational change yet it(O.D.) suffers from lack of research &

    documentation. O.D. programmes have beensubject to criticism by managers &researchers. People are of the view thatdiagnostic interventions are stirring updiscontent in the organisations.

    Most frequently observed criticism arefollowing:

    1. Discrepancy between ideal & real

    O.D. programmes should begin at the top of

  • 8/8/2019 24458915