Upload
jaime-manalili-landingin
View
24
Download
8
Embed Size (px)
DESCRIPTION
Long Lead Items for Client Presentation.
Citation preview
Sheet1ITEM NO.DESCRIPTIONSTATUS OF SUBMITTALSREMARKS1LONG LEAD ITEMSRequired order date1.1Plumbing and Drainage1.1.1Booster Pump1.1.2Hot Water Circulating Pump1.1.3Electric Water Heater1.1.4Water Filter1.1.5Sump Pumps1.1.6Sanitary Fixtures1.1.7Water Meter Cabinet
1.2HVAC1.2.1Fresh Air Handling Unit (FAHU)1.2.2Fan Coil Unit (FCU)1.2.3Kitchen Exhaust Fan1.2.4Kitchen Fresh Air Supply Fan1.2.5Toilet Exhaust Fan
2ClLIENT PRESENTATION2.1Plumbing and Drainage2.1.1Sanitary Fixtures2.1.2Floor Drain
2.2HVAC2.2.1Return Air Diffuser2.2.2Return Air Grille 2.2.3Return Linear Diffuser2.2.4Exhaust Air Diffuser2.2.5Exhaust Linear Diffuser2.2.6Supply Air Diffuser2.2.7Supply Air Grille2.2.8Supply Linear Diffuser
ELECTRICAL
1Sub main distribution board2Distribution boards3Fire alarm panel and devices4Structured cabling components6Wiring devices (socket outlets, switches)7Light fixtures (By Client)8CCTV9Intercom10Earthing & lightning protection
Sheet2
Sheet3