Date:27 March 2009Comments on draft document Reclassification of a Non-credible Contingency Event as a Credible Contingency Eventdue to Lightning
Mark MillerGeneral Manager OperationsNEMMCO
Enquiries:Dr Wallace Vosloo+27 (0)21 918 8942
Dear Mr Miller,
Comments on draft document Reclassification of a Non-credible Contingency Event as a
Credible Contingency Event due to Lightning follows:
1. Proposed changes to Figure 1 in Appendix A.
2. The Cause identified and corrected decision in Figure 1 needs to be explained in thetext. The utility should prove the validity of the correction.
3. The Assets characteristics improved to remove risk decision in Figure 1 needs to beexplained in the text. The utility should validate that the risk is removed or minimised.
For your information extracts from EPRI AC Transmission Line Reference Book - 200 kV andAbove, Third Edition is attached in Appendix B.
Doing a lightning performance study, using a program such as TFLASH, is a handy tool tohelp the utilities to identify and calculate risks (see typical example study done for Powerlinkin Queensland in Appendix C).
Hope the above helps
Always at your service
Dr Wallace L VoslooCorporate Specialist High Voltage EngineeringPr. Eng, NHD, B.Sc(Phy), Ph.D(Eng.Sci), SMSAIEE, SMIEEE
Corporate Services DivisionERIDLower Germiston Road Rosherville PB 40175 Cleveland 2022 SATel +27 11 6295536 Fax +27 11 629 5301 www.eskom.co.za
Directors: RM Godsell (Chairman) PJ Maroga (Chief Executive) LCZ Cele SD Dube LG Josefsson (Swedish)HB Lee (Korean) WE Lucas-Bull PM Makwana J Mirenge (Rwandan) JRD Modise AJ Morgan U NeneCompany Secretary: TN MsomiEskom Holdings Limited Reg No 2002/015527/06
8/3/2019 229-0001
2/18
Appendix A: Proposed changes to Figure 1.
Performance over time
No events
Identifiedin the past five years
One event
Identifiedin the ast five ears
More than one event
Identified and confirmedin the past five years
Classified as
Possible
Classified as
Probable
Classified as
Proven
Y
Y
NAssetscharacteristicsimproved toremove risk
Causeidentified and
corrected N
Vulnerable *
* eligible to bereclassified as acredible contingencyevent during alightning storm
8/3/2019 229-0001
3/18
Appendix B: Extracts from EPRI AC Transmission Line Reference Book - 200 kV andAbove, Third Edition
Approximately 4600 instruments were installed on 400 miles (644 km) of transmission line,giving 138 operations on 89 separate strokes. Of these, 48 were identified as shieldingfailures, and 39 were backflashovers. Figure 6.3-17 provides a summary of operations for theproject.
8/3/2019 229-0001
4/18
8/3/2019 229-0001
5/18
Appendix C:
8/3/2019 229-0001
6/18
8/3/2019 229-0001
7/18
8/3/2019 229-0001
8/18
8/3/2019 229-0001
9/18
8/3/2019 229-0001
10/18
8/3/2019 229-0001
11/18
8/3/2019 229-0001
12/18
8/3/2019 229-0001
13/18
8/3/2019 229-0001
14/18
8/3/2019 229-0001
15/18
8/3/2019 229-0001
16/18
8/3/2019 229-0001
17/18
8/3/2019 229-0001
18/18