26
2.20 WELDING PROCEDURE MANUAL PROCESS PIPING Page 1 of 26 GENERAL POLICY QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS) 04/25/11 PIPE SIZE LESS THAN OR EQUAL TO 2.375 O.D. WELDING PROCESS FITTING/PIPE MATERIAL PIPE SIZE (INCH) WALL THICKNESS RANGE (INCH) PROCEDURE NO. POSITION/ DIRECTIONSMAW (Stick) Butt P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 2” 0.109 to 0.436 200 Fixed/VDH SMAW (Stick) (6010 Root – 7018 fill and cap) Butt P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 2” 0.109 to 0.436 220 Fixed/VDH (root) Fixed/VUH (fill and cap) GMAW (Wire) 100% CO2 or 75% Ar / 25% CO2 Butt P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 2” 0.109 to 0.240 230 Fixed/VDH GTAW 100% Argon Butt P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 2” 0.109 to 0.436 240 Fixed/VUH GTAW 100% Argon (root) and SMAW (7018 fill and cap) Butt P1 Group 1 to P1 Group 2 API 5L Gr B to API 5LX-65 2” 0.109 to 0.436 250 Fixed/VUH For Position/Direction… Fixed/VUH = Fixed Position, Vertical Uphill Rolled/VUH = Rolled Position, Vertical Uphill Fixed/VDH = Fixed Position, Vertical Downhill

2.20.General_Policy.Qualified_Welding_Procedure_Specifications_(QWPS)PROCESSPIPING.pdf

  • Upload
    carlos

  • View
    15

  • Download
    2

Embed Size (px)

Citation preview

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 1 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

PIPE SIZE LESS THAN OR EQUAL TO 2.375 O.D.

WELDING PROCESS FITTING/PIPE

MATERIAL PIPE SIZE

(INCH)

WALL THICKNESS

RANGE (INCH)

PROCEDURE NO.

POSITION/ DIRECTION†

SMAW (Stick) Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

≤ 2” 0.109 to 0.436 200 Fixed/VDH

SMAW (Stick) (6010 Root – 7018 fill and

cap)

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

≤ 2” 0.109 to 0.436 220

Fixed/VDH (root)

Fixed/VUH (fill and cap)

GMAW (Wire) 100% CO2 or 75% Ar / 25%

CO2

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

≤ 2” 0.109 to 0.240 230 Fixed/VDH

GTAW 100% Argon

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

≤ 2” 0.109 to 0.436 240 Fixed/VUH

GTAW 100% Argon (root) and SMAW

(7018 fill and cap)

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

≤ 2” 0.109 to 0.436 250 Fixed/VUH

† For Position/Direction…

Fixed/VUH = Fixed Position, Vertical Uphill Rolled/VUH = Rolled Position, Vertical Uphill Fixed/VDH = Fixed Position, Vertical Downhill

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 2 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

PIPE SIZE GREATER THAN 2.375 THROUGH UNLIMITED O.D.

WELDING PROCESS FITTING/PIPE

MATERIAL PIPE SIZE

(INCH)

WALL THICKNESS

RANGE (INCH)

(QW-403)

PROCEDURE NO.

POSITION/ DIRECTION†

SMAW (Stick) Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

> 2 0.154 – 0.864 600 Fixed/VDH

SMAW (Stick) (6010 Root – 7018 fill and

cap)

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

> 2 0.154 – 0.864 620 Fixed/VDH

GTAW 100% Argon (root) and SMAW

(7018 fill and cap)

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

> 2 0.154 – 0.864 640

Fixed/VUH (root)

Fixed/VDH (fill and cap)

GMAW (Wire) 100% CO2 or 75% Ar / 25%

CO2

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

> 2 0.154 – 0.475 650 Fixed/VDH

GMAW (Wire) 100% CO2 or 75% Ar / 25% CO2 (root) and FCAW (Flux Core)

100% CO2 (fill and cap)

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

> 2 0.154 – 0.864 660 Fixed/VUH

GTAW 100% Argon (root) and FCAW (Flux Core)

100% CO2 (fill and cap)

Butt

P1 Group 1 to P1 Group 2

API 5L Gr B to API 5LX-65

2-1/2 -12 0.154 – 0.864 680 Fixed/VUH

† For Position/Direction… Fixed/VUH = Fixed Position, Vertical Uphill Rolled/VUH = Rolled Position, Vertical Uphill Fixed/VDH = Fixed Position, Vertical Downhill

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 3 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 4 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 5 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 6 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 7 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 8 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 9 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 10 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 11 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 12 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 13 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 14 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 15 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 16 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 17 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 18 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 19 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 20 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 21 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 22 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 23 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 24 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 25 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11

2.20 WELDING PROCEDURE MANUAL

PROCESS PIPING Page 26 of 26

GENERAL POLICY

QUALIFIED WELDING PROCEDURE SPECIFICATIONS (QWPS)

04/25/11