36
1/15

2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

1/15

Page 2: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

2/15

Profile

Gulf Group Co.Maintenance Division

Page 3: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

3/15

WHO IS GULF GROUP?We initiated our journey in 1982 by establishing this company that is

specialized and highly professional in maintaining and installing

electromechanical systems. Our business ideology is mainly based on

the four pillars of: trust, reliability, superior quality and optimum

prices.

Gulf Group owns a number of specialist companies strategically

located throughout the GCC countries, each independently managed

as an independent profit center but falling under the umbrella of Gulf

Group. Today Gulf Group has grown into a dynamic force in the

fields of electromechanical equipment installation and maintenance,

trading and industrial supplies and services throughout the Gulf.

Page 4: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

4/15

FOUNDERS

Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

vision, governance and the overall strategy of the Group, and reinforcing

the morale, loyalty and dedication amongst its human resources.

Previously, he served as one of the founders and team board member with

Gulf Investment House, Osoul Investment Company and Refrigeration

Industries & Storage Company (Kuwait).

Mr. Farid Alfozan, Vice-Chairman of Gulf Group, is co-responsible for

setting the vision, governance and strategic planning of the Group, and

overseeing the utilization of its resources and the execution of its business

plans. He is a board member on a number of investment, real estate and

financial companies, namely: Boubyan Bank (Kuwait) and Invest

(Bahrain), Gulf Real Estate (Saudi Arabia), Amlak Real Estate Co.

(Kuwait) and a member of the supervisory council of SAFCORP

(Kuwait).

Page 5: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

5/15

BOARD MEMBERS (Kuwait)

Eng. Fuad S. Alfozan

Chairman

Mr. Farid S.Alfozan

Vice Chairman

Mr. Meshari Fuad Alfozan

Board Member

Mr. Ali Fuad Alfozan

Board Member & CEO

Page 6: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

6/15

Executive Management (Kuwait)

Eng. Ashraf Kamal Nassar

Maintenance Executive Manager

Page 7: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

7/15

MAINTENANCEState of Kuwait

We are the pioneer inmaintenance HVAC (DX units andchillers) in Kuwait and KSA.

Our experience of cumulative inthis area more than 30 years andour staff have expertise puts us atthe top of maintenance companiesin Kuwait, using more than 100movable maintenance workshopcontain the last modernizedtechnology of tools and equipmentand that has enabled us to carryout all types of maintenancecontracts, whether governmentalor private towers and complexes.

Page 8: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

8/15

State of Kuwait

We have arround100 technicians

and assistants have the

experience, skills and

competence to serve the

customer to complete the

necessary maintenance. We also

have a fleet of vehicles available

throughout the day

Page 9: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

9/15

Maintenance of all types of air conditioners

Page 10: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

10/15

Maintenance of chilled water system

Page 11: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

11/15

Maintenance Division

Page 12: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

12/15

Work shop

Page 13: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

13/15

Work shop

Page 14: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

14/15

Safety tools

Page 15: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

15/15

COMPANY REGISTRATION

DOCUMENTS

Page 16: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

16/15

Page 17: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

17/15

Page 18: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

18/15

Page 19: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

19/15

Page 20: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

20/15

Page 21: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

21/15

Page 22: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

22/15

Page 23: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

23/15

MEP PROJECTS

Page 24: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

24/15

S. No. Project Client

1

Maintenance and Replacement of Air Conditioning

Equipment using Refrigerant Gas R12 at Al-Zour South

Power Station

Ministry Of

Electricity & water

2Construction, Completion & Maintenance of the Blood

bank Building At Adan hospitalMinistry Of Health

3 Sultan Center Salmiya park Sultan Center

4 Agility Office Building At Sulibiya Agility Company

5 Students Center Building at American University KuwaitAmerican

University

Sample list of running projects (M.E.P.) Kuwait (2016)

Page 25: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

25/15

No. Project Client Location Scope of Work

1 Al Udied Air base ECC / US Army Qatar

TAB , 800 tons Chillers

maintenance& repairs , installing 800

door louvers for return air

2 DPW Camp Arifjan US Army Camp Arifjan - KuwaitSupply and commissioning of 2

Nos.SKM Chiller 200 tons each

3Building# 505 - Server

RoomUS Army Camp Arifjan - Kuwait

Installation of Two Number SKM

Units

4 Building No. 505, 506 & 507 Burgan One/ US Army Camp Arifjan - Kuwait DX-Units Installation

5 Building No. 505, 506 & 507 Burgan One/ US Army Camp Arifjan - Kuwait 85 UNITS Duct Cleaning

6 Building No. T780 Burgan One/ US Army Camp Arifjan - Kuwait 5 Nos. DX-Units Installation

7 Building 209 E2M / US army Camp Arifjan - Kuwait Chillers Operation &Maintenance

8 Earth Terminal Complex ECC / US Army Camp Arifjan - Kuwait

Replacement of 300 Tons Chillers +

30 AHU + BMS + electrical main

supply cable and panels

Sample list of projects (US ARMY)

Page 26: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

26/15

No. Project Client Scope of Work

1Construction & Maintenance of the

Administration building for KFD at Mushrif

Public Directorate Of Fire

Fighting

HVAC Works (2nd Degree), Electrical

Works (2nd degree), plumping and Fire

Fighting works (2nd degree) with total

2

Supply & Installation of Centrifugal Chillers at

Doha West Station with see water

(2,417 ton × 6 chillers)

Ministry of Electricity &

Water

Supply & Installation of Centrifugal

Chillers

3Construction & Maintenance of Chilled Water

System at Kazema Club

Pubic Authority for Youth

& Sports

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

4Construction, Completion and Maintenance of

Al Nasr Club

Pubic Authority for Youth

& SportsElectromechanical Works

5Construction & Maintenance Class Room

Building At Kefan - Kuwait UniversityKuwait University Maintenance

6Supply , install of electro mechanical System at

Mina AbdullaKuwait Oil Company

Supply , install of electro mechanical

System

7Supply and install of 2 Nos.SKM Chiller at

Arifjan CampUS Army (DPW) Supply and install of 2 Nos.SKM Chiller

Sample list of projects (M.E.P) Kuwait

Page 27: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

27/15

No. Project Client Scope of Work

8Construction & Maintenance Olympic Swimming

Pool Kuwait Sea club

Pubic Authority for Youth

& SportsMaintenance

9Construction & Maintenance Olympic Swimming

Pool Kheitan club

Pubic Authority for Youth &

SportsHVAC, Electrical and Fire Fitting

10Supply & Installation of Trane Chillers in

SalmiyaSultan Center Supply & Installation of Trane Chillers

11Supply, Install & Maintenance of Chilled Water

System at Dasma

National Council for Culture,

Arts and Letters

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

12Supply, Install & Maintenance of Chilled Water

System at Arifjan CampBurgan One/ US Army ( I )

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

13 Dx-Units Installation at Mina Abdullah HEISCO Kharafi National DX-Units Installation

14Supply, Install & Maintenance of Chilled Water

System at Sabhan

Kuwait Saudi

Pharmaceutical Industry

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

15 HVAC-& Electrical at ShuwaikhMinistry of Electricity &

WaterHVAC-& Electrical

16Supply, Install & Maintenance of Chilled Water

at Mina AbdullahNational Industries Company

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

Page 28: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

28/15

No. Project Client Scope of Work

17Supply, Install & Maintenance of Chilled Water

System at ShabaIRAQ Embassy - Kuwait

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

18Supply, Install & Maintenance of Chilled Water at

Arifjan CampBurgan One / US Army ( II )

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

19 DX-Units Installation at Doha Agility DX-Units Installation

20Supply, Install & Maintenance of Chilled Water

System at AmgharaFirst Kuwait Co.

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

21Supply, Install & Maintenance of Chilled Water

System at Sulaibiya

Industrial Building

Company (IBC)

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

22Supply, Install & Maintenance of Chilled Water

System at Jaleeb

Al Qanah Commercial

Complex

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU &

CHWP)

23 Replacement of Centrifugal Chillers at kheitan Ministry of Finance Replacement of Centrifugal Chillers

24Supply, Install & Maintenance of Chilled Water

System at Salmiya

Al Kharafi Construction Co.

W.L.L

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU & CHWP)

25Supply, Install & Maintenance of Chilled Water

System at SulaibiyaPublic Warehouse Company

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU & CHWP)

26Supply, Install & Maintenance of Chilled Water

System at Sharq

Kuwait Reconstruction

House

Supply, Install & Maintenance of Chilled

Water System with (FCU, AHU & CHWP)

Page 29: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

29/15

األعمال المالك اسم المشروع م

أعمال التكييف وزارة الصحة مشروع مستشفى الملك خالد التخصصي للعيون 1

أعمال التكييف وزارة الصحة إحالل التكييف بمستشفى الملك فهد بجازان 2

أعمال التكييف وزارة الصحة إعادة تأهيل نظام التكييف المركزي لمستشفى المجاردة العام

بمنطقة عسير 3

ار تصميم وتوريد وتركيب واختب

نظام تكييف كامل

–رئاسة الحرس الوطني

الشئون الصحية

لمرضى السرطان 11جناح )تصميم وتوريد تكييف كامل لمنطقة

لمرضى زراعة النخاع أطفال12أطفال،وجناح 4

تحسين وتطوير نظام التكييفوزارة الصحة

مستشفى الملك فهد المركزي بجازان 5

توريد وتركيب مبردات متكاملةوزارة الصحة

مستشفى الملك فهد المركزي بجازان 6

توريد وتركيب غرفة التبريد

والتجميد

الهيئة العامة للغذاء

والدواء

جدة فىمباني مركز الفسح المباشر للهيئة العامة للغذاء والدواء

والدمام7

تحسين وتطوير نظام التكييف وزارة الصحة مستشفى فرسان العام بجازان 8

توريد وتركيب ألنظمة التكييف

المركزية وزارة الصحة بمستشفى فرسانشيلراتأنظمة التكييف المركزية 9

وحدات ( 6)توريد وتركيب عدد

مناولة هواءوزارة الصحة توريد وتركيب وحدات مناولة هواء بمستشفى فرسان 10

جدول المشروعات التي تم تنفيذها داخل مناطق المملكة العربية السعودية

Page 30: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

30/15

اإلعمال المالك اسم المشروع م

توريد وتركيب المعدات واألجهزة

الالزمة إليصال التيار الكهربائي

للمستودعات الخارجية

وزارة الصحة مستشفى الملك فهد المركزي بجازان 11

كهرباء أعمال وزارة الصحة

تطوير محطة كهرباء مستشفى فرسان العام 12

أعمال كهرباء وزارة الصحة مولدات كهربائية لمستودعات التموين الطبي المركزي تطوير

بجازان13

أعمال التكييف وزارة الصحة مشروع إحالل وحدات مناولة الهواء لمستشفى فرسان العام 14

ي الملحاستبدال أنابيب مسخن المحلول المؤسسة العامة

لتحليه المعالجة3محطات تحليه الشقيق وحدة التحلية رقم 15

تنفيذ األعمال الكهروميكانيكية لي وزارة التعليم العا جامعة أم القرى –محطة التكييف المركزية 16

تشيلرات 6توريد وتركيب عدد وزارة الدفاع ياض توريد وتركيب تشلرات لمدارس غسكان القوات البحرية بالر 17

أعمال كهروميكانيكية وزارة الدفاع بجدةMSIمشروع استبدال محطة 18

كهرباء أعمال وزارة الدفاع ريالشبكة الكهربائية بميناء رأس مشعاب العسكمشروع تطوير 19

أعمال كهروميكانيكية وزارة الدفاع بمعهد قوات الدفاع الجوى بجدةMS-4استبدال المحطة مشروع 20

أعمال التكييف الحرس الوطني تحديث وحدات التكييف بمبنى وكالة الحرس الوطني بالدمام 21

أعمال التكييف وزارة الدفاعحفر خالد العسكرية بتوريد وتركيب وحدات تبريد بمدينة الملك

الباطن 22

Page 31: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

31/15

APPROVALS & ACCEPTANCE

CERTIFICATES (KWT – KSA)

Page 32: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

32/15

Page 33: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

33/15

Page 34: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

34/15

Page 35: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

35/15

Page 36: 2/15 - Gulf Groupgulfgroupco.com/wp-content/uploads/2017/02/Gulf-Group... · 2017-03-13 · 4/15 FOUNDERS Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the

36/15