Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
1/15
2/15
Profile
Gulf Group Co.Maintenance Division
3/15
WHO IS GULF GROUP?We initiated our journey in 1982 by establishing this company that is
specialized and highly professional in maintaining and installing
electromechanical systems. Our business ideology is mainly based on
the four pillars of: trust, reliability, superior quality and optimum
prices.
Gulf Group owns a number of specialist companies strategically
located throughout the GCC countries, each independently managed
as an independent profit center but falling under the umbrella of Gulf
Group. Today Gulf Group has grown into a dynamic force in the
fields of electromechanical equipment installation and maintenance,
trading and industrial supplies and services throughout the Gulf.
4/15
FOUNDERS
Mr. Fuad Alfozan, Chairman of Gulf Group, is responsible for setting the
vision, governance and the overall strategy of the Group, and reinforcing
the morale, loyalty and dedication amongst its human resources.
Previously, he served as one of the founders and team board member with
Gulf Investment House, Osoul Investment Company and Refrigeration
Industries & Storage Company (Kuwait).
Mr. Farid Alfozan, Vice-Chairman of Gulf Group, is co-responsible for
setting the vision, governance and strategic planning of the Group, and
overseeing the utilization of its resources and the execution of its business
plans. He is a board member on a number of investment, real estate and
financial companies, namely: Boubyan Bank (Kuwait) and Invest
(Bahrain), Gulf Real Estate (Saudi Arabia), Amlak Real Estate Co.
(Kuwait) and a member of the supervisory council of SAFCORP
(Kuwait).
5/15
BOARD MEMBERS (Kuwait)
Eng. Fuad S. Alfozan
Chairman
Mr. Farid S.Alfozan
Vice Chairman
Mr. Meshari Fuad Alfozan
Board Member
Mr. Ali Fuad Alfozan
Board Member & CEO
6/15
Executive Management (Kuwait)
Eng. Ashraf Kamal Nassar
Maintenance Executive Manager
7/15
MAINTENANCEState of Kuwait
We are the pioneer inmaintenance HVAC (DX units andchillers) in Kuwait and KSA.
Our experience of cumulative inthis area more than 30 years andour staff have expertise puts us atthe top of maintenance companiesin Kuwait, using more than 100movable maintenance workshopcontain the last modernizedtechnology of tools and equipmentand that has enabled us to carryout all types of maintenancecontracts, whether governmentalor private towers and complexes.
8/15
State of Kuwait
We have arround100 technicians
and assistants have the
experience, skills and
competence to serve the
customer to complete the
necessary maintenance. We also
have a fleet of vehicles available
throughout the day
9/15
Maintenance of all types of air conditioners
10/15
Maintenance of chilled water system
11/15
Maintenance Division
12/15
Work shop
13/15
Work shop
14/15
Safety tools
15/15
COMPANY REGISTRATION
DOCUMENTS
16/15
17/15
18/15
19/15
20/15
21/15
22/15
23/15
MEP PROJECTS
24/15
S. No. Project Client
1
Maintenance and Replacement of Air Conditioning
Equipment using Refrigerant Gas R12 at Al-Zour South
Power Station
Ministry Of
Electricity & water
2Construction, Completion & Maintenance of the Blood
bank Building At Adan hospitalMinistry Of Health
3 Sultan Center Salmiya park Sultan Center
4 Agility Office Building At Sulibiya Agility Company
5 Students Center Building at American University KuwaitAmerican
University
Sample list of running projects (M.E.P.) Kuwait (2016)
25/15
No. Project Client Location Scope of Work
1 Al Udied Air base ECC / US Army Qatar
TAB , 800 tons Chillers
maintenance& repairs , installing 800
door louvers for return air
2 DPW Camp Arifjan US Army Camp Arifjan - KuwaitSupply and commissioning of 2
Nos.SKM Chiller 200 tons each
3Building# 505 - Server
RoomUS Army Camp Arifjan - Kuwait
Installation of Two Number SKM
Units
4 Building No. 505, 506 & 507 Burgan One/ US Army Camp Arifjan - Kuwait DX-Units Installation
5 Building No. 505, 506 & 507 Burgan One/ US Army Camp Arifjan - Kuwait 85 UNITS Duct Cleaning
6 Building No. T780 Burgan One/ US Army Camp Arifjan - Kuwait 5 Nos. DX-Units Installation
7 Building 209 E2M / US army Camp Arifjan - Kuwait Chillers Operation &Maintenance
8 Earth Terminal Complex ECC / US Army Camp Arifjan - Kuwait
Replacement of 300 Tons Chillers +
30 AHU + BMS + electrical main
supply cable and panels
Sample list of projects (US ARMY)
26/15
No. Project Client Scope of Work
1Construction & Maintenance of the
Administration building for KFD at Mushrif
Public Directorate Of Fire
Fighting
HVAC Works (2nd Degree), Electrical
Works (2nd degree), plumping and Fire
Fighting works (2nd degree) with total
2
Supply & Installation of Centrifugal Chillers at
Doha West Station with see water
(2,417 ton × 6 chillers)
Ministry of Electricity &
Water
Supply & Installation of Centrifugal
Chillers
3Construction & Maintenance of Chilled Water
System at Kazema Club
Pubic Authority for Youth
& Sports
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
4Construction, Completion and Maintenance of
Al Nasr Club
Pubic Authority for Youth
& SportsElectromechanical Works
5Construction & Maintenance Class Room
Building At Kefan - Kuwait UniversityKuwait University Maintenance
6Supply , install of electro mechanical System at
Mina AbdullaKuwait Oil Company
Supply , install of electro mechanical
System
7Supply and install of 2 Nos.SKM Chiller at
Arifjan CampUS Army (DPW) Supply and install of 2 Nos.SKM Chiller
Sample list of projects (M.E.P) Kuwait
27/15
No. Project Client Scope of Work
8Construction & Maintenance Olympic Swimming
Pool Kuwait Sea club
Pubic Authority for Youth
& SportsMaintenance
9Construction & Maintenance Olympic Swimming
Pool Kheitan club
Pubic Authority for Youth &
SportsHVAC, Electrical and Fire Fitting
10Supply & Installation of Trane Chillers in
SalmiyaSultan Center Supply & Installation of Trane Chillers
11Supply, Install & Maintenance of Chilled Water
System at Dasma
National Council for Culture,
Arts and Letters
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
12Supply, Install & Maintenance of Chilled Water
System at Arifjan CampBurgan One/ US Army ( I )
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
13 Dx-Units Installation at Mina Abdullah HEISCO Kharafi National DX-Units Installation
14Supply, Install & Maintenance of Chilled Water
System at Sabhan
Kuwait Saudi
Pharmaceutical Industry
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
15 HVAC-& Electrical at ShuwaikhMinistry of Electricity &
WaterHVAC-& Electrical
16Supply, Install & Maintenance of Chilled Water
at Mina AbdullahNational Industries Company
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
28/15
No. Project Client Scope of Work
17Supply, Install & Maintenance of Chilled Water
System at ShabaIRAQ Embassy - Kuwait
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
18Supply, Install & Maintenance of Chilled Water at
Arifjan CampBurgan One / US Army ( II )
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
19 DX-Units Installation at Doha Agility DX-Units Installation
20Supply, Install & Maintenance of Chilled Water
System at AmgharaFirst Kuwait Co.
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
21Supply, Install & Maintenance of Chilled Water
System at Sulaibiya
Industrial Building
Company (IBC)
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
22Supply, Install & Maintenance of Chilled Water
System at Jaleeb
Al Qanah Commercial
Complex
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU &
CHWP)
23 Replacement of Centrifugal Chillers at kheitan Ministry of Finance Replacement of Centrifugal Chillers
24Supply, Install & Maintenance of Chilled Water
System at Salmiya
Al Kharafi Construction Co.
W.L.L
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU & CHWP)
25Supply, Install & Maintenance of Chilled Water
System at SulaibiyaPublic Warehouse Company
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU & CHWP)
26Supply, Install & Maintenance of Chilled Water
System at Sharq
Kuwait Reconstruction
House
Supply, Install & Maintenance of Chilled
Water System with (FCU, AHU & CHWP)
29/15
األعمال المالك اسم المشروع م
أعمال التكييف وزارة الصحة مشروع مستشفى الملك خالد التخصصي للعيون 1
أعمال التكييف وزارة الصحة إحالل التكييف بمستشفى الملك فهد بجازان 2
أعمال التكييف وزارة الصحة إعادة تأهيل نظام التكييف المركزي لمستشفى المجاردة العام
بمنطقة عسير 3
ار تصميم وتوريد وتركيب واختب
نظام تكييف كامل
–رئاسة الحرس الوطني
الشئون الصحية
لمرضى السرطان 11جناح )تصميم وتوريد تكييف كامل لمنطقة
لمرضى زراعة النخاع أطفال12أطفال،وجناح 4
تحسين وتطوير نظام التكييفوزارة الصحة
مستشفى الملك فهد المركزي بجازان 5
توريد وتركيب مبردات متكاملةوزارة الصحة
مستشفى الملك فهد المركزي بجازان 6
توريد وتركيب غرفة التبريد
والتجميد
الهيئة العامة للغذاء
والدواء
جدة فىمباني مركز الفسح المباشر للهيئة العامة للغذاء والدواء
والدمام7
تحسين وتطوير نظام التكييف وزارة الصحة مستشفى فرسان العام بجازان 8
توريد وتركيب ألنظمة التكييف
المركزية وزارة الصحة بمستشفى فرسانشيلراتأنظمة التكييف المركزية 9
وحدات ( 6)توريد وتركيب عدد
مناولة هواءوزارة الصحة توريد وتركيب وحدات مناولة هواء بمستشفى فرسان 10
جدول المشروعات التي تم تنفيذها داخل مناطق المملكة العربية السعودية
30/15
اإلعمال المالك اسم المشروع م
توريد وتركيب المعدات واألجهزة
الالزمة إليصال التيار الكهربائي
للمستودعات الخارجية
وزارة الصحة مستشفى الملك فهد المركزي بجازان 11
كهرباء أعمال وزارة الصحة
تطوير محطة كهرباء مستشفى فرسان العام 12
أعمال كهرباء وزارة الصحة مولدات كهربائية لمستودعات التموين الطبي المركزي تطوير
بجازان13
أعمال التكييف وزارة الصحة مشروع إحالل وحدات مناولة الهواء لمستشفى فرسان العام 14
ي الملحاستبدال أنابيب مسخن المحلول المؤسسة العامة
لتحليه المعالجة3محطات تحليه الشقيق وحدة التحلية رقم 15
تنفيذ األعمال الكهروميكانيكية لي وزارة التعليم العا جامعة أم القرى –محطة التكييف المركزية 16
تشيلرات 6توريد وتركيب عدد وزارة الدفاع ياض توريد وتركيب تشلرات لمدارس غسكان القوات البحرية بالر 17
أعمال كهروميكانيكية وزارة الدفاع بجدةMSIمشروع استبدال محطة 18
كهرباء أعمال وزارة الدفاع ريالشبكة الكهربائية بميناء رأس مشعاب العسكمشروع تطوير 19
أعمال كهروميكانيكية وزارة الدفاع بمعهد قوات الدفاع الجوى بجدةMS-4استبدال المحطة مشروع 20
أعمال التكييف الحرس الوطني تحديث وحدات التكييف بمبنى وكالة الحرس الوطني بالدمام 21
أعمال التكييف وزارة الدفاعحفر خالد العسكرية بتوريد وتركيب وحدات تبريد بمدينة الملك
الباطن 22
31/15
APPROVALS & ACCEPTANCE
CERTIFICATES (KWT – KSA)
32/15
33/15
34/15
35/15
36/15