9
BASEBALL FIELD SOCCER FIELD PE 6 PLANETARIUM S4 E1 A. ROBERT DEHART LEARNING CENTER S2 PE1 PE2 FORUM ADMINISTRATION BUILDING F5 L7 L6 F4 L5 L4 F3 L3 L2 F2 CHC LEARNING CENTER WEST S9 SEM GROUNDS PARKING STRUCTURE C2 S6 CDC PE4 PE5 E2 FLINT CENTER L8 F6 L1 F1 ATC L9 CAMPUS CENTER MECH. BLDG A6 A7 A4 A9 A2 A3 A1 A5 FOODSTORE ATM POOL PARKING STRUCTURE FLINT CENTER (E) PARKING STRUCTURE STUDENT SERVICES PERFORM HALL CHILD DEVELOPMENT CENTER TENNIS COURTS SOFTBALL FIELD KIRSH CENTER CHEESEMAN ENVIRONMENTAL STUDY AREA TRACK AND FIELD FOOTBALL FIELD OUTDOOR EVENTS AREA & CUSTODIAL WAREHOUSE SC 3 SC 2 SC 1 OTI T11 PROFESSIONAL T9 1-3 & WORKFORCE DEVELOPMENT ESA LAB M C C L E L L A N R O A D S T E L L I N G R O A D S T E V E N S C R E E K B L V D . 8 5 F R E E W A Y W E S T V A L L E Y F R E E W A Y G S5 S8 S3 S1 S7 E3 S T O P STO P STOP S T O P S T O P STO P STO P STO P STOP S T O P STOP 35 35 FI R E LANE PE1 PE2 POOL PE6 PE5 PE4 6 12 2 M SITE ACCESS & STAGING AREA POOL DIVE TOWER TO BE DEMOLISHED SEE REFERENCE DRAWINGS architects and planners Berkeley, CA 94710 510.649.8295 fax 510.649.3008 729 Heinz Avenue JOB NO. SCALE CHECKED DRAWN SHEET NUMBER DATE SHEET TITLE REVISIONS As indicated 7/31/2014 12:51:07 PM G0.00 COVER FHDA CCD Checker Author JULY 31, 2014 - - DEMOLITION of POOL DIVING TOWER De Anza College 21250 Stevens Creek Blvd. Cupertino, CA 1 : 32000 G0.00 CAMPUS PLAN 1 PROJECT SITE 21250 STEVENS CREEK BLVD CUPERTINO, CA VICINITY MAP CAMPUS MAP AREA OF WORK CHAPTER 4 PART 1, TITLE 24 C.C.R. ADMINISTRATIVE REQUIREMENTS (PARTIAL LISTING ONLY) 1. A copy of Parts 1 and 2, Title 24, C.C.R. shall be kept on the job site at all times. 2. All construction change documents and addenda to be signed by the Architect and the Owner and approved by DSA. Construction change documents are not valid until approved by DSA Section 4-338, Part 1, title 24. 3. All tests to conform to the requirements of Section 4-335, Part 1, Title 24, and approved T & I sheet. 4. Tests of materials and testing laboratory shall be in accordance with Section 4-335 of Part 1, Title 24 and the District shall employ and pay the laboratory. Costs of re-test may be back charged to the Contractor. 5. DSA shall be notified at the start of construction and prior to the placement of concrete per Section 4-331, Part 1, Title 24. 6. Inspector shall be approved by DSA. Inspector shall be in accordance with Section 4-333 (b). The duty of the Inspector shall be in accordance with Section 4-342, Part 1, Title 24. 7. Supervision of Construction by DSA shall be in accordance with section 4-334, Part 1, Title 24. 8. Contractor, Inspector, Architect, and Engineers shall submit verified reports(Form SSS-6) in accordance with Section 4-336 and 4-343, Part 1, Title 24. 9. The Architect and the Structural Engineer shall perform their duties in accordance with Section 4-33(a) and 4-341, Part 1, Title 24. 10. The Contractor shall perform his duties in accordance with Section 4-343, Part1, Title 24. 11. The intent of the drawings and specifications is to construct the school building in accordance with Title 24. C.C.R. Should any conditions develop not covered by the contract documents wherein the finished work will not comply with Title 24, C.C.R., a Construction Change Directive (CCD) detailing and specifying the required work shall be submitted to and approved by the Division of the State Architect before proceeding with the work. CODE COMPLIANCE PROJECT DESCRIPTION THE WORK TO BE PERFORMED UNDER THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, SERVICES, PERMITS, TEMPORARY CONTROLS AND CONSTRUCTION FACILITIES, AND ALL GENERAL CONDITIONS, SEISMIC REQUIREMENTS, GENERAL REQUIREMENTS AND INCIDENTALS REQUIRED TO COMPLETE THE DEMOLITION OF THE DE ANZA COLLEGE DIVING POOL TOWER, IN ITS ENTIRETY AS DESCRIBED IN THE CONTRACT DOCUMENTS. THE PROJECT WILL INCLUDE, BUT IS NOT NECESSARILY LIMITED TO: TEMPORARY FACILITIES INCLUDING BARRICADES PROTECTION OF EXISTING BUILDINGS AND SITE DEMOLITION, CUTTING AND PATCHING, COMPLIANCE WITH THE CURRENT LIFE SAFETY CODES, AND LEGAL DISPOSAL OF MATERIALS RESULTING FROM THE DEMOLITION WORK SCOPE OF WORK WORK INCLUDES BUT IS NOT LIMITED TO: 1. PROTECTION OF POOL, INCLUDING WATER, POOL DECK, COPING 2. SAFE OFF, DISCONNECT AND PERMANENTLY T ERMINATE ANY ELECTRICAL, WATER, OR OTHER BUILDING SERVICES ATTACHED TO THE DIVE TOWER STRUCTURE. MAINTAIN SERVICES TO ADJOINING BUILDINGS, POOL, AND POOL DECK AT ALL TIMES 3. REMOVAL OF POOL DIVING TOWER IN ITS ENTIRETY 4. REMOVAL OF CONCRETE STRUCTURE FLUSH WITH POOL DECK 5. TREATMENT OF EXPOSED CUT ENDS OF STEEL REINFORCING WITH HIGH PERFORMANCE COATING 6. PATCHING OF CONCRETE SURFACE FLUSH WITH EXISTING. MATCH COLOR AND TEXTURE 7. REPAIR OF ANY AND ALL DAMAGE TO EXISTING STRUCTURES AND SURFACES RESULTING FROM WORK OF THIS CONTRACT PARTIAL LIST OF APPLICABLE CODES 2013 California Administrative Code, Part 1, Title 24 CCR 2013 California Building Code (CBC), Part 2, Title 24 CCR (2012 International Building Code Volumes 1-2 and 2013 California Amendments) 2013 California Electrical Code (CEC), Part 3, Title 24 CCR (2011 National Electrical Code and 2013 California Amendments) 2013 California Mechanical Code (CMC), Part 4 , Title 24 CCR (2012 Uniform Mechanical Code and 2013 California Amendments) 2013 California Plumbing Code (CPC), Part 5, Title 24 CCR (2012 Uniform Plumbing Code and 2013 California Amendments) 2013 California Energy Code (CEC), Part 6, Title 24 CCR 2013 California Fire Code (CFC), Part 9, Title 24 CCR (2012 International Fire Code and 2013 California Amendments) 2013 California Green Building Standards Code (CALGreen), Part 11, Title 24 CCR 2013 California Referenced Standards Code, Part 12, Title 24 CCR Public Safety, State Fire Marshal Regulations, Title 19 CCR 2010 ADA Standards for Accessible Design NFPA 13 Automatic Sprinkler Systems 2013 edition NFPA 14 Standpipe Systems 2013 edition NFPA 17 Dry Chemical Extinguishing systems 2013 edition NFPA 17a Wet Chemical Extinguishing Systems 2013 edition NFPA 20 Stationary Fire Pumps 2013 edition NFPA 22 Water Tanks for Private Fire Protection 2013 edition NFPA 24 Private Fire Mains 2013 edition NFPA 72 National Fire Alarm Code 2013 edition NFPA 80 Fire Doors and Other Opening Protectives 2013 edition NFPA 92 Standards for Smoke Control Systems 2012 edition UL 464 Audible Signal Appliances 2003 edition UL 521 Heat Detectors for Fire Protective Signaling Systems 1999 edition PARTIAL LIST OF APPLICABLE STANDARDS NO. DATE DESCRIPTION 1" = 40'-0" G0.00 PARTIAL SITE PLAN 2 SITE PLAN LIST OF REFERENCED DRAWINGS A1.72 PLANS & SCHEDULES BUILDINGS 45 & 46 A1.74 PLAN - BID ITEM NO 1 - DIVING & SWIMMING POOLS A3.72 BUILDING SECTIONS & SECTIONS BUILDINGS 45 & 46, DIVING & SWIM POOLS A7.51 LARGE SCALE PLANS BUILDINGS 26, 11 & DIVING TOWER S1.72 FOUNDATION & FLOOR PLANS BLDGS 45 & 46 S1.74 SWIMMING POOL S3.74 SECTIONS AND DETAILS - SWIMMING POOL S3.75 DIVING TOWER

21250 STEVENS CREEK BLVD - govbids.com

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 21250 STEVENS CREEK BLVD - govbids.com

BASEBALL FIELDSOCCER FIELD

PE 6

PLANETARIUM

S4

E1

A. ROBERT DEHARTLEARNING CENTER

S2 PE1 PE2

FORUM

ADMINISTRATIONBUILDING

F5

L7

L6 F4

L5L4

F3L3

L2

F2

CHC

LEARNINGCENTER

WEST

S9

SEMGROUNDS

PARKING STRUCTURE

C2

S6

CDC

PE4 PE5E2

FLINT CENTER

L8F6

L1F1

ATC L9

CAMPUS CENTER

MECH.BLDG

A6

A7

A4A9

A2 A3A1

A5

FOODSTORE

ATM

POOL

PARKING STRUCTUREFLINT CENTER

(E) PARKING STRUCTURE

STUDENT SERVICES

PERFORMHALL

CHILDDEVELOPMENT

CENTER

TENNIS COURTS

SOFTBALL FIELD

KIRSH CENTER

CHEESEMAN

ENVIRONMENTAL

STUDY AREA

TRACK AND FIELD

FOOTBALL FIELD

OUTDOOR EVENTS AREA

& CUSTODIALWAREHOUSE

SC 3

SC 2

SC 1

OTI

T11

PROFESSIONAL

T9

1-3

& WORKFORCEDEVELOPMENT

ESALAB

s ite. dwg 2130 4 9 2453

M C C L E L L A N R O A D

S T

E L

L I N

G R

O A

D

S T E V E N S C R E E K B L V D .

85 F

R E

E W

A Y

W E

S T

V A

L L

E Y

F R

E E

W A

Y

G

S5

S8

S3

S1

S7

E3

ST OP

STOP

STOP

STOP

STOP

STOPSTOP

STOP

STOP

STOP

STOP

3535

FIRELANE

PE1 PE2

POOL

PE6

PE5

PE4

6

12

2M

SITE ACCESS &STAGING AREA

POOL DIVETOWER TO BEDEMOLISHEDSEE REFERENCEDRAWINGS

architects and planners

Berkeley, CA 94710

510.649.8295

fax 510.649.3008

729 Heinz Avenue

JOB NO.

SCALE

CHECKED

DRAWN

SHEET NUMBER

DATE

SHEET TITLE

REVISIONS

As indicated

7/31

/201

4 12

:51:

07 P

M

G0.00

COVER

FHDA CCD

Checker

Author

JULY 31, 2014

-

-

DEMOLITION ofPOOL DIVING

TOWERDe Anza College

21250 Stevens Creek Blvd. Cupertino, CA

1 : 32000G0.00

CAMPUS PLAN1

PROJECT SITE

21250 STEVENS CREEK BLVD

CUPERTINO, CAVICINITY MAP

CAMPUS MAP

AREA OF WORK

CHAPTER 4 PART 1, TITLE 24 C.C.R. ADMINISTRATIVE

REQUIREMENTS (PARTIAL LISTING ONLY)

1. A copy of Parts 1 and 2, Title 24, C.C.R. shall be kept on the job site at all times.2. All construction change documents and addenda to be signed by the Architect and the

Owner and approved by DSA. Construction change documents are not valid until approvedby DSA Section 4-338, Part 1, title 24.

3. All tests to conform to the requirements of Section 4-335, Part 1, Title 24, and approved T &

I sheet.4. Tests of materials and testing laboratory shall be in accordance with Section 4-335 of Part 1,

Title 24 and the District shall employ and pay the laboratory. Costs of re-test may be backcharged to the Contractor.

5. DSA shall be notified at the start of construction and prior to the placement of concrete per

Section 4-331, Part 1, Title 24.6. Inspector shall be approved by DSA. Inspector shall be in accordance with Section 4-333

(b). The duty of the Inspector shall be in accordance with Section 4-342, Part 1, Title 24.7. Supervision of Construction by DSA shall be in accordance with section 4-334, Part 1, Title

24.

8. Contractor, Inspector, Architect, and Engineers shall submit verified reports(Form SSS-6) inaccordance with Section 4-336 and 4-343, Part 1, Title 24.

9. The Architect and the Structural Engineer shall perform their duties in accordance withSection 4-33(a) and 4-341, Part 1, Title 24.

10. The Contractor shall perform his duties in accordance with Section 4-343, Part1, Title 24.

11. The intent of the drawings and specifications is to construct the school building inaccordance with Title 24. C.C.R. Should any conditions develop not covered by the contract

documents wherein the finished work will not comply with Title 24, C.C.R., a Construction

Change Directive (CCD) detailing and specifying the required work shall be submitted toand approved by the Division of the State Architect before proceeding with the work.

CODE COMPLIANCE PROJECT DESCRIPTION

THE WORK TO BE PERFORMED UNDER THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS,EQUIPMENT, TRANSPORTATION, SERVICES, PERMITS, TEMPORARY CONTROLS AND CONSTRUCTION FACILITIES,

AND ALL GENERAL CONDITIONS, SEISMIC REQUIREMENTS, GENERAL REQUIREMENTS AND INCIDENTALSREQUIRED TO COMPLETE THE DEMOLITION OF THE DE ANZA COLLEGE DIVING POOL TOWER, IN ITS ENTIRETY AS

DESCRIBED IN THE CONTRACT DOCUMENTS. THE PROJECT WILL INCLUDE, BUT IS NOT NECESSARILY LIMITED

TO:TEMPORARY FACILITIES INCLUDING BARRICADES

PROTECTION OF EXISTING BUILDINGS AND SITEDEMOLITION, CUTTING AND PATCHING, COMPLIANCE WITH THE CURRENT LIFE SAFETY CODES, AND LEGAL

DISPOSAL OF MATERIALS RESULTING FROM THE DEMOLITION WORK

SCOPE OF WORK

WORK INCLUDES BUT IS NOT LIMITED TO:1. PROTECTION OF POOL, INCLUDING WATER, POOL DECK, COPING

2. SAFE OFF, DISCONNECT AND PERMANENTLY T ERMINATE ANY ELECTRICAL, WATER, OR OTHER BUILDINGSERVICES ATTACHED TO THE DIVE TOWER STRUCTURE. MAINTAIN SERVICES TO ADJOINING BUILDINGS,

POOL, AND POOL DECK AT ALL TIMES

3. REMOVAL OF POOL DIVING TOWER IN ITS ENTIRETY4. REMOVAL OF CONCRETE STRUCTURE FLUSH WITH POOL DECK

5. TREATMENT OF EXPOSED CUT ENDS OF STEEL REINFORCING WITH HIGH PERFORMANCE COATING6. PATCHING OF CONCRETE SURFACE FLUSH WITH EXISTING. MATCH COLOR AND TEXTURE

7. REPAIR OF ANY AND ALL DAMAGE TO EXISTING STRUCTURES AND SURFACES RESULTING FROM WORK OF

THIS CONTRACT

PARTIAL LIST OF APPLICABLE CODES

2013 California Administrative Code, Part 1, Title 24 CCR2013 California Building Code (CBC), Part 2, Title 24 CCR

(2012 International Building Code Volumes 1-2 and 2013 California Amendments)2013 California Electrical Code (CEC), Part 3, Title 24 CCR

(2011 National Electrical Code and 2013 California Amendments)

2013 California Mechanical Code (CMC), Part 4 , Title 24 CCR(2012 Uniform Mechanical Code and 2013 California Amendments)

2013 California Plumbing Code (CPC), Part 5, Title 24 CCR(2012 Uniform Plumbing Code and 2013 California Amendments)

2013 California Energy Code (CEC), Part 6, Title 24 CCR

2013 California Fire Code (CFC), Part 9, Title 24 CCR(2012 International Fire Code and 2013 California Amendments)

2013 California Green Building Standards Code (CALGreen), Part 11, Title 24 CCR2013 California Referenced Standards Code, Part 12, Title 24 CCR

Public Safety, State Fire Marshal Regulations, Title 19 CCR

2010 ADA Standards for Accessible Design

NFPA 13 Automatic Sprinkler Systems 2013 editionNFPA 14 Standpipe Systems 2013 edition

NFPA 17 Dry Chemical Extinguishing systems 2013 editionNFPA 17a Wet Chemical Extinguishing Systems 2013 edition

NFPA 20 Stationary Fire Pumps 2013 edition

NFPA 22 Water Tanks for Private Fire Protection 2013 editionNFPA 24 Private Fire Mains 2013 edition

NFPA 72 National Fire Alarm Code 2013 editionNFPA 80 Fire Doors and Other Opening Protectives 2013 edition

NFPA 92 Standards for Smoke Control Systems 2012 edition

UL 464 Audible Signal Appliances 2003 editionUL 521 Heat Detectors for Fire Protective Signaling Systems 1999 edition

PARTIAL LIST OF APPLICABLE STANDARDS

NO. DATE DESCRIPTION

1" = 40'-0"G0.00

PARTIAL SITE PLAN2

SITE PLAN

LIST OF REFERENCED DRAWINGS

A1.72 PLANS & SCHEDULES BUILDINGS 45& 46

A1.74 PLAN - BID ITEM NO 1 - DIVING & SWIMMING POOLS

A3.72 BUILDING SECTIONS & SECTIONS

BUILDINGS 45 & 46, DIVING & SWIMPOOLS

A7.51 LARGE SCALE PLANS BUILDINGS 26,11 & DIVING TOWER

S1.72 FOUNDATION & FLOOR PLANS BLDGS

45 & 46S1.74 SWIMMING POOL

S3.74 SECTIONS AND DETAILS - SWIMMINGPOOL

S3.75 DIVING TOWER

Page 2: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE
Merideth
Rectangle
Merideth
Typewritten Text
POOL DIVE TOWER TO BE DEMOLISHED SEE REF DWG A1.74
Merideth
Arrow
Page 3: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE
Merideth
Rectangle
Merideth
Typewritten Text
POOL DIVE TOWER TO BE DEMOLISHED
Merideth
Arrow
Page 4: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE
Merideth
Rectangle
Merideth
Typewritten Text
POOL DIVE TOWER TO BE DEMOLISHED SEE REFERENCE DWG A7.51
Merideth
Arrow
Page 5: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE
Merideth
Rectangle
Merideth
Typewritten Text
POOL DIVE TOWER TO BE DEMOLISHED
Page 6: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE
Page 7: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE
Page 8: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE
Page 9: 21250 STEVENS CREEK BLVD - govbids.com
Merideth
Typewritten Text
REFERENCE DRAWING NOT TO SCALE