2
MND Drilling & Services has a long, time-honored tradition of providing workover services. During last 5 years, there have been over 580 workover jobs completed. The aforementioned jobs were executed for our parent company MND a.s. as well as many other customers, including the following: RWE Transgas a.s. RWE Transgas Net, s.r.o. RWE Gas Storage s.r.o. POZAGAS a.s. (Slovakia) Engas a.s. UNIGEO a.s Česká naftařská společnost, s.r.o. Hodonín Spa Palivový kombinát Ústí s.p. The Ministry of the Environment of the Czech Republic Type of workover operations Standard workover operations – changing beam pumps, sucker rods and tubing, P&A, sand plug removal, special well completion (ESP, downhole pressure gauges, bridge plug setting), cement plug isolation, TCP perforation, dewaxing. Special workover operations – long interval casing section milling, isolation of down-hole leaks, wellhead total reconstruction, remedial cementing, acidizing, hydraulic fracturing. Completion of UGS wells – section-milling of casings, underreaming, gravel packing and final well completion with sub surface safety valve and premium connection tubing. Member of KKCG Group www.mnd-drilling.eu Workover operations MD 80 80 32 MAX STREICHER 2016 - DIR-5505/2 85 32.4 SBS Austria 1975 2012 DIR-5505/4 85 32.4 SBS Austria 1977 2011 DIR-3007 70 30.7 SBS Austria 1979 2014 DIR-308 70 30.7 SBS Austria 1972 2017 DIR-110 50 28.3 SBS Austria 1996 2012 MND Drilling & Services a.s. MND Drilling & Services a.s. | Velkomoravská 900/405 | 696 18 Lužice | Czech Republic | T: +420 518 315 555 | F: +420 518 315 577 MND DS Green Line: +420 800 100 630 | E: [email protected] Type of the rig Hookload capacity (t) Mast height incl. substructure (m) Manufacturer Year of last overhaul Year of manufacture  

210x297 Workover operations - MND Drilling · MND Drilling & Services has a long, time-honored tradition of providing workover services. During last 5 years, there have been over

Embed Size (px)

Citation preview

Page 1: 210x297 Workover operations - MND Drilling · MND Drilling & Services has a long, time-honored tradition of providing workover services. During last 5 years, there have been over

MND Drilling & Services has a long, time-honored tradition

of providing workover services. During last 5 years, there

have been over 580 workover jobs completed.

The aforementioned jobs were executed for our parent

company MND a.s. as well as many other customers,

including the following:

RWE Transgas a.s.

RWE Transgas Net, s.r.o.

RWE Gas Storage s.r.o.

POZAGAS a.s. (Slovakia)

Engas a.s.

UNIGEO a.s

Česká naftařská společnost, s.r.o.

Hodonín Spa

Palivový kombinát Ústí s.p.

The Ministry of the Environment of the Czech Republic

Type of workover operations

Standard workover operations – changing beam pumps,

sucker rods and tubing, P&A, sand plug removal, special

well completion (ESP, downhole pressure gauges, bridge

plug setting), cement plug isolation, TCP perforation,

dewaxing.

Special workover operations – long interval casing

section milling, isolation of down-hole leaks, wellhead

total reconstruction, remedial cementing, acidizing,

hydraulic fracturing.

Completion of UGS wells – section-milling of casings,

underreaming, gravel packing and final well completion

with sub surface safety valve and premium connection

tubing.

Member of KKCG Group www.mnd-dril l ing.eu

Workover operations

MD 80 80 32 MAX STREICHER 2016 −

DIR-5505/2 85 32.4 SBS Austria 1975 2012

DIR-5505/4 85 32.4 SBS Austria 1977 2011

DIR-3007 70 30.7 SBS Austria 1979 2014

DIR-308 70 30.7 SBS Austria 1972 2017

DIR-110 50 28.3 SBS Austria 1996 2012

MND Drilling & Services a.s.

MND Drilling & Services a.s. | Velkomoravská 900/405 | 696 18 Lužice | Czech Republic | T: +420 518 315 555 | F: +420 518 315 577

MND DS Green Line: +420 800 100 630 | E: [email protected]

Type of the rig Hookload capacity (t)Mast height incl. substructure (m)

Manufacturer Year of last overhaulYear

of manufacture  

Page 2: 210x297 Workover operations - MND Drilling · MND Drilling & Services has a long, time-honored tradition of providing workover services. During last 5 years, there have been over

Workover Rigs

MND Drilling & Services a.s.

MD 80

Manufacturer MAX STREICHER

Hook load capacity (t) 80

DIR 308

Manufacturer SBS, Austria

Hook load capacity (t) 70

DIR 5505/2

Manufacturer SBS, Austria

Hook load capacity (t) 85

DIR 5505/4

Manufacturer SBS, Austria

Hook load capacity (t) 85

DIR 110

Manufacturer SBS, Austria

Hook load capacity (t) 50

DIR 3007

Manufacturer SBS, Austria

Hook load capacity (t) 70

Member of KKCG Group www.mnd-dril l ing.eu

MND Drilling & Services a.s. | Velkomoravská 900/405 | 696 18 Lužice | Czech Republic | T: +420 518 315 555 | F: +420 518 315 577

MND DS Green Line: +420 800 100 630 | E: [email protected]