    EU Financed ProjectsOverview

    Hseyin Cahit EkizMay 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    2/65

    BACKGROUND - EU

    STRUCTURAL AND COHESION

    FUNDS (1)

    Various funding regulations and mechanismsover the past 30 years

    Two main aims, to promote economic and social cohesion among

    the Member States to support the economic and social development

    of non-EU Member States

    Priorities for economic and socialdevelopment were defined inline with therequirements of beneficiary countries and

    Member StatesHseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    3/65

    BACKGROUND - EU

    STRUCTURAL AND COHESION

    FUNDS (2) Structural Funds are generally committed

    to regions under each Objective by meansof;

    Community Support Framework and

    Operational Programmes

    Single Programming Documents developed in

    partnership with Member States

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    4/65

    BACKGROUND - EU

    STRUCTURAL AND COHESION

    FUNDS (3) The Cohesion Fund was established in

    1993 through a provision of the MaastrichtTreaty on European Union, and was

    designed to assist the least prosperous

    Member States in their preparation for

    Economic and Monetary Union

    Hseyin Cahit Ekiz May 26, 2010

    BACKGROUND EU

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    5/65

    BACKGROUND - EU

    STRUCTURAL AND COHESION

    FUNDS (4) In order to improve the efficiency of the

    Community's External Aid, a new framework forprogramming and delivery of assistance, TheInstrument for Pre-Accession [IPA], has beenenvisaged (1085/2006 of 17 July 2006

    establishing an Instrument for Pre-AccessionAssistance (IPA) )

    The IPA Regulation was released as the set of

    new regulations for Structural / Cohesion Fundswhich profoundly modifies the rules of the EC indirect relation with systems of control of the

    related funds.Hseyin Cahit Ekiz May 26, 2010

    BACKGROUND EU

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    6/65

    BACKGROUND - EU

    STRUCTURAL AND COHESION

    FUNDS (5) In comparison with the former pre-

    accession instruments, a major changeintroduced in the institutional backdrop by

    the IPA regulation is the need for setting

    up an institutional framework similar to

    the one required for Structural / Cohesion

    Funds

    Hseyin Cahit Ekiz May 26, 2010

    BACKGROUND Hi t f

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    7/65

    BACKGROUND History of

    TURKEY related with EU FUNDS

    (1) Application for membership to the

    European Union was accepted by theEuropean Council in Helsinki in 1999.

    Pre-accession assistance has been madeavailable since 2002

    The candidate countries received EU

    assistance through various instruments,

    PHARE, ISPA, SAPARD and CARDS and

    MEDA.Hseyin Cahit Ekiz May 26, 2010

    BACKGROUND Hi t f

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    8/65

    BACKGROUND - History of

    TURKEY related with EU FUNDS

    (2) Turkey was allocated specific funds under

    the heading Turkey Pre-Accessioninstrument in addition to MEDA funds.

    EU financial assistance to Turkey isplanned, and implemented as year based

    Financial Agreements (FA).

    2002 2006 FAs were financed under

    Turkey Pre-Accession instrument

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    9/65

    IPA (1)

    IPA constitutes one of the general

    instruments directly supporting EuropeanExternal Aid policies

    The main objective of pre-accessionfinancial assistance to be provided to

    Turkey under the IPA Regulation is to

    prepare and facilitate its integration intothe EU

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    10/65

    IPA (2)

    Assistance under IPA programmed and

    implemented according to fivecomponents to ensure coherence,coordination and efficiency

    In the context of the action plan of the EUtowards an Integrated Internal ControlFramework, common rules for theimplementation of assistance under theIPA Regulation are required for all five

    components of IPA.Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    11/65

    IPA components

    I. Transition Assistance and Institution

    Building (TAIB) II. Cross-Border Cooperation (CBC)

    III. Regional Development (RD) IV. Human Resources Development

    (HRD) V. Rural Development (IPARD)

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    12/65

    Component-I : TAIB (1)

    The Transition Assistance and Institution Building[TAIB] component is designed to support the

    administrative and judicial capacity building of thepublic institutions in order to: Address the Copenhagen Political Criteria [Accession

    Criteria: political, economic and Acquis-related criteria for

    membership]; Transpose and implement the Acquis Communautaire

    [including participation in Community Programmes andCommunity Agencies]

    Promote the dialogue with the civil society tostrengthen relations, contacts and mutual exchange ofexperience between civil society in the EU and Turkeyand ensure a better knowledge and understanding ofTurkey within the European Union and conversely a betterknowledge and understanding of the European Unionwithin Turkey

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    13/65

    Component-I : TAIB (2)

    In this component, the CFCU is the

    Contracting Authority and Head of theCFCU is the Program Authorising Officer

    (PAO)

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    14/65

    Component-II : CBC (1)

    Designed to promote good neighborly

    relations and strengthen cooperation inborder areas between countries through

    joint local and regional initiatives

    combining both external aid and economic

    and social cohesion objectives

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    15/65

    Component-II : CBC (2)

    Actions funded under this component are

    generally implemented through grantschemes

    For Turkey this component isimplementable with two Member States,

    i.e. Greece and Bulgaria, since has no

    border with any other candidate orpotential candidate country

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    16/65

    Component-III: Regional

    Development (1) Based on 3 sub-components:

    Environment Transport

    Regional Competitiveness

    All aim at developing the internaleconomic and social cohesion and

    convergence with the EU and shall serveto prepare candidate countries to themanagement of EU funds post-accession

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    17/65

    Component-III: Reg. Dev. (2)

    Sub-component Environment Serves to support the transposition,

    implementation and enforcement of theEU environmental legislation

    Projects and measures funded under thissub-component relate to:

    water supply and urban waste water

    treatment;

    waste management, including the

    rehabilitation of contaminated sites and land

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    18/65

    Component-III: Reg. Dev. (3)

    Sub-component Transport Serves to support;

    provision of efficient, flexible and safetransport infrastructure vital for economic

    development as good transport networks

    boost opportunities for trade, while increasingefficiency

    interconnection and interoperability betweennational networks, and between national and

    trans-European networks

    Hseyin Cahit Ekiz May 26, 2010

    Component-III: Reg Dev (4)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    19/65

    Component-III: Reg. Dev. (4)

    Sub-component Regional

    Competitiveness Serves to support the internal development

    which provides for a higher level of social andeconomic cohesion between regions, throughhigh employment and productivity growth

    Measures funded under this sub-componentinclude operations which enhance regional

    competitiveness and a productiveenvironment, and encourage creation andsafeguarding of sustainable employment

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    20/65

    Component-III: Regional

    Development (5) For a transition period (2007-2010) CFCU

    is identified as the Contracting Authority inall sub-components of the Regional

    Development through the Cooperation

    Agreements between the CFCU and the

    Operating Structures (OSs) under the line

    ministries

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    21/65

    Component IV: Human Resources

    Development (1) The Human Resources Development

    [HRD] component is designed tocontribute to strengthening economic and

    social cohesion as well as to the priorities

    of the European Employment Strategy in

    the field of employment, education and

    training, and social inclusion

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    22/65

    Component IV: Human Resources

    Development (2) For a transition period (2007-2010) CFCU

    is identified as the Contracting Authority inthis component through the Cooperation

    Agreement between the CFCU and the

    OS under the Ministry of Labour and

    Social Security

    Hseyin Cahit Ekiz May 26, 2010

    C t V R l D l t

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    23/65

    Component- V: Rural Development

    [IPARD] (1) It is controlled by DG AGRI completely

    independent from DG Enlargement IPARD Measures include;

    Investments in farms to restructure andupgrade to the EU standards

    Investments in processing and marketing of

    agriculture and fishery products to restructureand upgrade to the EU standards

    Hseyin Cahit Ekiz May 26, 2010

    C t V R l D l t

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    24/65

    Component- V: Rural Development

    [IPARD] (2) IPARD Measures include;

    Improving and developing rural infrastructure;

    Development and diversification of ruraleconomic activities; Producer groups;

    Agri-environment and animal welfare schemes (at

    pilot level); Preparation of rural communities to conceive and

    implement local rural development strategies andintegrated rural development strategies throughlocal partnerships (at pilot level);

    Training;

    Technical assistance

    Hseyin Cahit Ekiz May 26, 2010

    C t V R l D l t

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    25/65

    Component- V: Rural Development

    [IPARD] (3) In order to make use of the IPA funds to be

    provided in the field of rural development, Turkey

    presents a Rural Development Plan (IPARD Plan)for the years from 2007 to 2013 to form the basisfor financing the rural development measuresunder the IPA and establishes animplementing/paying agency which is the OSunder EDIS, namely IPARD Agency under theMinistry of Agriculture and Rural Affairs

    IPARD is a step in preparing the country to theEuropean Agricultural Fund for Rural Development(EAFRD) and the European Agricultural Fund forGuarantee (EAFG)

    Hseyin Cahit Ekiz May 26, 2010

    INSTITUTIONAL FRAMEWORK

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    26/65

    INSTITUTIONAL FRAMEWORK

    (1) In order to manage IPA Components I to

    IV, Turkey has established the followinginstitutions and key positions in such a

    way to comply with the IPA Regulations;

    Competent Accrediting Officer [CAO] -

    State Minister with oversight of the

    Treasury National Authorising Officer [NAO] &

    National Fund [NF] - Undersecretary of theTreasury Hseyin Cahit Ekiz May 26, 2010

    INSTITUTIONAL FRAMEWORK

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    27/65

    INSTITUTIONAL FRAMEWORK

    (2) National IPA Coordinator [NIPAC] -

    Secretariat General for EU Affairs [EUSG]

    Strategic Coordinator for the RegionalDevelopment component and the Human

    Resources Development Component - StatePlanning Organisation [DPT]

    Audit Authority - Board of Treasury

    Controllers Operating Structure - A body or a collection

    of bodies within the administration of thebeneficiary country

    Hseyin Cahit Ekiz May 26, 2010

    INSTITUTIONAL FRAMEWORK

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    28/65

    INSTITUTIONAL FRAMEWORK

    (3) Contracting Authority - Central Finance and

    Contracts Unit (CFCU) (relevant only forComponent I of IPA and applicable toComponents III & IV for transitional period

    [2007 2010]) Program Autorising Officer (PAO) - Head ofthe CFCU [being PAO is relevant only for

    Component I of IPA] Senior Programme Officers (relevant only for

    Component I of IPA) Responsible officers

    of the Line Ministries for projects underComponent I Hseyin Cahit Ekiz May 26, 2010

    Competent Accrediting Officer

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    29/65

    p g(CAO)

    Issuing, monitoring and suspending or

    withdrawing the accreditation of theNational Authorising Officer and the

    National Fund

    Hseyin Cahit Ekiz May 26, 2010

    National Authorising Officer

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    30/65

    National Authorising Officer

    (NAO) Is the head of the National Fund and bear

    overall responsibility for the financialmanagement of EU funds in the

    beneficiary country

    Responsible for

    the legality and regularity of the underlying

    transactions the effective functioning of management and

    control systems under the IPA Regulation

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    31/65

    National Fund (NF)

    The national fund act as a central treasuryand be in charge of tasks of financial

    management of assistance under the IPARegulation, under the responsibility of theNational Authorising Officer

    Responsible for organising the bank accounts, requesting funds

    from the Commission

    authorising the transfer of funds received from theCommission to the Operating Structures or to thefinal beneficiaries

    the financial reporting to the Commission

    Hseyin Cahit Ekiz May 26, 2010

    National IPA Coordinator (NIPAC)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    32/65

    National IPA Coordinator (NIPAC)

    (1) Ensure partnership between EU and the

    beneficiary country, and a close link betweenthe general accession process and the use of

    assistance under the IPA Regulation

    Responsible for

    the coherence and co-ordination of the

    programmes provided under the IPARegulation

    the annual programming for Component-I at

    national levelHseyin Cahit Ekiz May 26, 2010

    National IPA Coordinator (NIPAC)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    33/65

    National IPA Coordinator (NIPAC)

    (2) the co-ordination of the participation of the

    beneficiary country in the relevantComponent-II programmes. The National IPA

    Coordinator may delegate the tasks relating

    to this coordination to a cross-border co-operation co-ordinator;

    drawing up and submission of the IPA annualand final reports on implementation to the

    Commission with a copy to the national

    authorising officerHseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    34/65

    Strategic Coordinator (SC)

    Ensure the coordination of the RegionalDevelopment component and Human

    Resources Development component Responsibilities

    co-ordinate assistance granted under theregional development component and thehuman resources development component

    draft the Strategic Coherence Framework

    ensure co-ordination between sectoralstrategies and programmes

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    35/65

    Audit Authority (1)

    Verify the effective and sound functioning of themanagement and controls system.

    Responsible for

    establish and fulfil an annual audit work plan,during the course of each year and submit it to theNAO and the Commission before the start of theyear

    submit to the Commission, to the NAO and theCAO by 31 December of each year the annualaudit activity report, as per the model of theFramework Agreement, setting out the resources

    used, summary of weaknesses foundHseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    36/65

    Audit Authority (2)

    submit to the Commission, NAO and the

    competent accrediting officer an annualopinion

    submit an opinion on any final statement of

    expenditure submitted to the Commission bythe NAO, for the closure of any programme

    or any part of thereof, as per the model of theFramework Agreement; the opinion shall be

    sent to the Commission and the competent

    accrediting officerHseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    37/65

    CFCU (PAO)

    Multisectoral implementing body

    In charge of tendering, contracting,payments, accounting, financial reporting,

    contract administration

    Responsible for the sound financial and

    administrative management of projects to

    be implemented

    Hseyin Cahit Ekiz May 26, 2010

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    38/65

    Line Ministeries (SPOs)

    Technical preparation & implementation of

    projects Assist the PAO in the good and timely

    preparation and implementation of

    operations at technical level

    Hseyin Cahit Ekiz May 26, 2010

    O S (1)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    39/65

    Operating Structures (1)

    Entities, dealing with the management and

    implementation of assistance, to theexclusion of the tasks undertaken by the

    NIPAC, SC, NAO and the NF

    The wording Operating Structures

    basically refers to management

    authorities, implementing agencies, lineministries, etc. managing and

    implementing projects

    Hseyin Cahit Ekiz May 26, 2010

    Operating Structures -

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    40/65

    Operating Structures

    responsibilities (2) Drafting the annual or multi-annual

    programmes programme monitoring and guiding the work

    of the sectoral monitoring committee, notably

    by providing the documents

    drawing up the sectoral annual and final

    implementation reports, submitting them tothe Commission, to the National IPA

    Coordinator and to the National Authorising

    OfficerHseyin Cahit Ekiz May 26, 2010

    Operating Structures -

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    41/65

    Operating Structures

    responsibilities (3) ensuring that operations are selected for funding and

    approved in accordance with the criteria and

    mechanisms applicable to the programmes, and thatthey comply with the relevant Community and nationalrules

    setting up procedures to ensure the retention of all

    documents required to ensure an adequate audit trail arranging for tendering procedures, grant award

    procedures, the ensuing contracting, and makingpayments to, and recovery from, the final beneficiary;

    ensuring that all bodies involved in the implementationof operations maintain a separate accounting systemor a separate accounting codification

    Hseyin Cahit Ekiz May 26, 2010

    Operating Structures -

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    42/65

    Operating Structures

    responsibilities (4) ensuring that the national fund and the national

    authorising officer receive all necessary information on

    the procedures and verifications carried out in relationto expenditure

    setting up, maintaining and updating the reporting andinformation system

    carrying out verifications to ensure that theexpenditure declared has actually been incurred inaccordance with applicable rules, the products orservices have been delivered in accordance with the

    approval decision, and the payment requests by thefinal beneficiary are correct. These verifications shallcover administrative, financial, technical and physicalaspects of operations, as appropriate

    Hseyin Cahit Ekiz May 26, 2010

    Operating Structures -

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    43/65

    Operating Structures

    responsibilities (5) ensuring internal audit of its different

    constituting bodies ensuring irregularity reporting

    ensuring compliance with the informationand publicity requirements

    Hseyin Cahit Ekiz May 26, 2010

    O ti St t (6)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    44/65

    Operating Structures (6)

    In Components III and IV, the TurkishGovernment has decided to develop thefollowing Operating Structures

    Component III - IPA Regional Development

    Component : Ministry of Trade and Industry Ministry of Environment and Forestry

    Ministry of Transport Component IV - IPAHRD component:

    Ministry of Labour and Social Security

    Hseyin Cahit Ekiz May 26, 2010

    O ti St t (7)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    45/65

    Operating Structures (7)

    Two phases for development of OperatingStructures

    A transitional period [2007 2010] during which: the CFCU is the Contracting Authority for

    Components III & IV and shares a certain number of

    responsibilities and tasks which are defined in theagreements with the Oss

    the Operating Structures and the CFCU will reinforce

    each other through the practice of exchangingexperience where there is a lack of appropriatelyskilled and/or experienced people in a particular body.

    ultimate responsibility remains at the side of the OSs

    with regard to implementation of the programmesHseyin Cahit Ekiz May 26, 2010

    Operating Structures (8)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    46/65

    Operating Structures (8)

    A second period [2010 2013] during

    which the various bodies involved in theOperating Structures are expected to be

    able to take on board additional

    responsibilities in relation to procurementand financial management

    Hseyin Cahit Ekiz May 26, 2010

    MONITORING COMMITTEES

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    47/65

    MONITORING COMMITTEES

    The overall implementation of IPA assistance inTurkey must be subject to monitoring in

    accordance with the IPA IR. This implies settingspecific monitoring committees which mandatesmust be formally defined and agreed upon with the

    EC; IPA Monitoring Committee

    Sectoral Monitoring Committees [SMC]

    TAIB Committee CBC Joint Monitoring Committee

    Sectoral Monitoring Committees - Environment,

    Transport, Competitiveness and Human ResourcesHseyin Cahit Ekiz May 26, 2010

    IPA Monitoring Committee (1)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    48/65

    IPA Monitoring Committee (1)

    Participation of EC + NIPAC + NAO + SCO +

    Oss Co-chaired by EC + NIPAC

    Adopts its internal rules of procedure in

    compliance with a monitoring committee

    mandate established by the EC

    Meetings: minimum once a year +intermediate meetings on a thematic basis

    and/or as established in the monitoring

    committee mandate / internal rules ofHseyin Cahit Ekiz May 26, 2010

    IPA Monitoring Committee (2)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    49/65

    IPA Monitoring Committee (2)

    Make proposals to the Commission, the NIPACand the NAO for any actions to ensure the

    coherence and co-ordination between theprogrammes and operations implemented underthe different components, as well as for any cross-component corrective measures needed to ensure

    the achievement of the global objectives of theassistance provided, and to enhance its overallefficiency

    May make proposals to relevant sectoralmonitoring committee(s) for decisions on anycorrective measures to ensure the achievementsof programme objectives and enhance the

    efficiency of assistance provided under theprogrammes or IPA component(s) concernedHseyin Cahit Ekiz May 26, 2010

    Sectoral Monitoring Committees

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    50/65

    [SMC] Participation of EC + NIPAC + NAO + SCO + Oss

    Shall report to the IPA Monitoring Committee

    Shall satisfy itself as to the effectiveness and quality ofthe implementation of the programmes and operationsconcerned, in accordance with the specific provisionslaid down for each component;

    May make proposals to the EC and the NIPAC, with acopy to the NAO, for decisions on any correctivemeasures to ensure the achievements of programmeobjectives and enhance the efficiency of theassistance provided

    Shall provide the IPA monitoring committee withinformation in accordance with the IPA IR

    Hseyin Cahit Ekiz May 26, 2010

    TAIB Committee

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    51/65

    TAIB Committee

    Participation of NIPAC + NAO + PAO +

    OSs + EC chaired by the NIPAC

    meet at least twice a year rules of procedure, in compliance with a

    sectoral monitoring committee mandate

    set out by the Commission adopted in

    agreement with the NIPAC, NAO and the

    IPA monitoring committeeHseyin Cahit Ekiz May 26, 2010

    CBC Joint Monitoring

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    52/65

    Committee Participation of Managing authority +Participating countries + EC [advisory role]

    One joint monitoring committee for each CBCprogramme

    Chaired by a representative of one of the

    participating countries or the managingauthority

    Meets at least twice a year

    Draws up its rules of procedure in compliancewith a joint monitoring committee mandateset out by EC

    Hseyin Cahit Ekiz May 26, 2010

    Sectoral Monitoring Committees -Environment Transport

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    53/65

    Environment, Transport,

    Competitiveness and HRD (1) The composition of the Sectoral Committees

    is decided by the Operating Structure, in

    agreement with the Commission Co-chaired by Head of OS + representative

    of EC

    Secretariat provided by IPA Unit of relevantMinistry

    Meet at least twice a year

    Each sectoral monitoring committee has itsrules of procedure in compliance with aSectoral Monitoring Committee mandate set

    out by the ECHseyin Cahit Ekiz May 26, 2010

    Sectoral Monitoring Committees -Environment Transport

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    54/65

    Environment, Transport,

    Competitiveness and HR (2) Consider and approve the general criteria for

    selecting the operations, and approve any

    revision of those criteria in accordance withprogramming needs

    Review at each meeting progress made

    towards achieving the specific targets of theOP on the basis of documents submitted bythe OS;

    Examine at each meeting the results ofimplementation, particularly the achievementof the targets set for each priority axis and

    measures and interim evaluationsHseyin Cahit Ekiz May 26, 2010

    INTER INSTITUTIONAL

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    55/65

    RELATIONS It is important for the staff involved in a

    way or another in the management of IPAto understand:

    At which level of the project management

    cycle they intervene

    How their respective activities impact on the

    whole system How their respective functions are subject to

    internal controls and audits

    Hseyin Cahit Ekiz May 26, 2010

    FLOW OF INFORMATION (1)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    56/65

    FLOW OF INFORMATION (1)

    EU Headquarters Brussels + EU

    DELEGATION ANKARA to/from CAO CAO to/from NAO + NF

    NAO + NF to/from NIPAC + EUSC, PAO+CFCU, OSs

    NIPAC + EUSG to/from Strategic

    Coordinator for Reg. Dev. & HrD (StatePlanning Organisation)

    Hseyin Cahit Ekiz May 26, 2010

    FLOW OF INFORMATION (2)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    57/65

    FLOW OF INFORMATION (2)

    PAO+ CFCU to/from OSs, Delegated

    bodies at local / regional level,Contractors, Beneficiaries

    All of the actors to/from Monitoring

    Committees

    Hseyin Cahit Ekiz May 26, 2010

    FLOW OF FUNDS

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    58/65

    FLOW OF FUNDS

    EU to/from NF

    NF to/from Contracting Authority Contracting Authority to/from Contractors,

    Grant Beneficiaries

    Hseyin Cahit Ekiz May 26, 2010

    AUDIT (1)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    59/65

    AUDIT (1)

    SAYITAY - Turkish Court of Accounts

    [TCA] Supreme audit institution of Turkey EU Court of Accounts - Supreme audit

    institution of EU

    AUDIT AUTHORITY - Board of Treasury

    Controllers

    Hseyin Cahit Ekiz May 26, 2010

    AUDIT (2)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    60/65

    AUDIT (2)

    Internal Auditors

    Audit counsil of Turkish Prime Ministry Audit counsil of relevant Ministery

    EC Auditors Third party organisations assigned by EC

    OLAF

    Hseyin Cahit Ekiz May 26, 2010

    AUDIT (3)

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    61/65

    AUDIT (3)

    Internal Audits

    Audit of the systems Compliance audits

    Periodical audits Project/event based case audits

    Hseyin Cahit Ekiz May 26, 2010

    Segregation of duties among the

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    62/65

    key players A clear division of tasks has been established amongthe IPA key players in order to comply with Article 21.2of the IPA Implementing Regulation

    NAO and NIPAC the two positions, although separate,hold equal authority in their respective scope

    The National Fund is established under the authority

    of the Undersecretary of Treasury and reports to theNAO. It is fully independent from any of the OperatingStructure

    The CAO is independent from the NAO

    The Operating Structures and the ContractingAuthority do not report to the NIPAC nor to the CAO orthe SCO

    Hseyin Cahit Ekiz May 26, 2010

    Segregation of duties within the

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    63/65

    Operating Structure (1) Adequate separation of functions has

    been ensured within the designatedOperating Structure

    Sufficient segregation of duties is

    guaranteed among Tendering, Contract

    implementation / monitoring and financial

    / payment responsibilities

    Hseyin Cahit Ekiz May 26, 2010

    Segregation of duties within the

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    64/65

    Operating Structure (2) During the implementation of the projects

    through the tendering, contracting and

    implementation of each contract: the staff assigned to manage and / or control

    tendering process

    shall be different from the staff which will beassigned after signature to:

    implement / monitor the contract, execute financial aspects of the contractsincluding payments

    Hseyin Cahit Ekiz May 26, 2010

    Segregation of duties within the

  • 7/27/2019 2045-EU-Financed-Projects-Overview.pdf

    65/65

    Operating Structure (3) The staff providing approval for payment of

    invoices / requests for payment during the

    operational monitoring should not have

    access to the funds in a way or another [e.g.

    signature on bank accounts, accounting, andreconciliation]

    As a rule, the initiation, the ex-ante and the

    ex-post controls are separate functions, to be

    carried out by different persons, functionally

    independent form each otherHseyin Cahit Ekiz May 26, 2010