BACKGROUND - EU
STRUCTURAL AND COHESION
FUNDS (1)
Various funding regulations and mechanismsover the past 30 years
Two main aims, to promote economic and social cohesion among
the Member States to support the economic and social development
of non-EU Member States
Priorities for economic and socialdevelopment were defined inline with therequirements of beneficiary countries and
Member StatesHseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
3/65
BACKGROUND - EU
STRUCTURAL AND COHESION
FUNDS (2) Structural Funds are generally committed
to regions under each Objective by meansof;
Community Support Framework and
Operational Programmes
Single Programming Documents developed in
partnership with Member States
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
4/65
BACKGROUND - EU
STRUCTURAL AND COHESION
FUNDS (3) The Cohesion Fund was established in
1993 through a provision of the MaastrichtTreaty on European Union, and was
designed to assist the least prosperous
Member States in their preparation for
Economic and Monetary Union
Hseyin Cahit Ekiz May 26, 2010
BACKGROUND EU
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
5/65
BACKGROUND - EU
STRUCTURAL AND COHESION
FUNDS (4) In order to improve the efficiency of the
Community's External Aid, a new framework forprogramming and delivery of assistance, TheInstrument for Pre-Accession [IPA], has beenenvisaged (1085/2006 of 17 July 2006
establishing an Instrument for Pre-AccessionAssistance (IPA) )
The IPA Regulation was released as the set of
new regulations for Structural / Cohesion Fundswhich profoundly modifies the rules of the EC indirect relation with systems of control of the
related funds.Hseyin Cahit Ekiz May 26, 2010
BACKGROUND EU
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
6/65
BACKGROUND - EU
STRUCTURAL AND COHESION
FUNDS (5) In comparison with the former pre-
accession instruments, a major changeintroduced in the institutional backdrop by
the IPA regulation is the need for setting
up an institutional framework similar to
the one required for Structural / Cohesion
Funds
Hseyin Cahit Ekiz May 26, 2010
BACKGROUND Hi t f
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
7/65
BACKGROUND History of
TURKEY related with EU FUNDS
(1) Application for membership to the
European Union was accepted by theEuropean Council in Helsinki in 1999.
Pre-accession assistance has been madeavailable since 2002
The candidate countries received EU
assistance through various instruments,
PHARE, ISPA, SAPARD and CARDS and
MEDA.Hseyin Cahit Ekiz May 26, 2010
BACKGROUND Hi t f
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
8/65
BACKGROUND - History of
TURKEY related with EU FUNDS
(2) Turkey was allocated specific funds under
the heading Turkey Pre-Accessioninstrument in addition to MEDA funds.
EU financial assistance to Turkey isplanned, and implemented as year based
Financial Agreements (FA).
2002 2006 FAs were financed under
Turkey Pre-Accession instrument
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
9/65
IPA (1)
IPA constitutes one of the general
instruments directly supporting EuropeanExternal Aid policies
The main objective of pre-accessionfinancial assistance to be provided to
Turkey under the IPA Regulation is to
prepare and facilitate its integration intothe EU
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
10/65
IPA (2)
Assistance under IPA programmed and
implemented according to fivecomponents to ensure coherence,coordination and efficiency
In the context of the action plan of the EUtowards an Integrated Internal ControlFramework, common rules for theimplementation of assistance under theIPA Regulation are required for all five
components of IPA.Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
11/65
IPA components
I. Transition Assistance and Institution
Building (TAIB) II. Cross-Border Cooperation (CBC)
III. Regional Development (RD) IV. Human Resources Development
(HRD) V. Rural Development (IPARD)
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
12/65
Component-I : TAIB (1)
The Transition Assistance and Institution Building[TAIB] component is designed to support the
administrative and judicial capacity building of thepublic institutions in order to: Address the Copenhagen Political Criteria [Accession
Criteria: political, economic and Acquis-related criteria for
membership]; Transpose and implement the Acquis Communautaire
[including participation in Community Programmes andCommunity Agencies]
Promote the dialogue with the civil society tostrengthen relations, contacts and mutual exchange ofexperience between civil society in the EU and Turkeyand ensure a better knowledge and understanding ofTurkey within the European Union and conversely a betterknowledge and understanding of the European Unionwithin Turkey
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
13/65
Component-I : TAIB (2)
In this component, the CFCU is the
Contracting Authority and Head of theCFCU is the Program Authorising Officer
(PAO)
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
14/65
Component-II : CBC (1)
Designed to promote good neighborly
relations and strengthen cooperation inborder areas between countries through
joint local and regional initiatives
combining both external aid and economic
and social cohesion objectives
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
15/65
Component-II : CBC (2)
Actions funded under this component are
generally implemented through grantschemes
For Turkey this component isimplementable with two Member States,
i.e. Greece and Bulgaria, since has no
border with any other candidate orpotential candidate country
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
16/65
Component-III: Regional
Development (1) Based on 3 sub-components:
Environment Transport
Regional Competitiveness
All aim at developing the internaleconomic and social cohesion and
convergence with the EU and shall serveto prepare candidate countries to themanagement of EU funds post-accession
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
17/65
Component-III: Reg. Dev. (2)
Sub-component Environment Serves to support the transposition,
implementation and enforcement of theEU environmental legislation
Projects and measures funded under thissub-component relate to:
water supply and urban waste water
treatment;
waste management, including the
rehabilitation of contaminated sites and land
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
18/65
Component-III: Reg. Dev. (3)
Sub-component Transport Serves to support;
provision of efficient, flexible and safetransport infrastructure vital for economic
development as good transport networks
boost opportunities for trade, while increasingefficiency
interconnection and interoperability betweennational networks, and between national and
trans-European networks
Hseyin Cahit Ekiz May 26, 2010
Component-III: Reg Dev (4)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
19/65
Component-III: Reg. Dev. (4)
Sub-component Regional
Competitiveness Serves to support the internal development
which provides for a higher level of social andeconomic cohesion between regions, throughhigh employment and productivity growth
Measures funded under this sub-componentinclude operations which enhance regional
competitiveness and a productiveenvironment, and encourage creation andsafeguarding of sustainable employment
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
20/65
Component-III: Regional
Development (5) For a transition period (2007-2010) CFCU
is identified as the Contracting Authority inall sub-components of the Regional
Development through the Cooperation
Agreements between the CFCU and the
Operating Structures (OSs) under the line
ministries
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
21/65
Component IV: Human Resources
Development (1) The Human Resources Development
[HRD] component is designed tocontribute to strengthening economic and
social cohesion as well as to the priorities
of the European Employment Strategy in
the field of employment, education and
training, and social inclusion
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
22/65
Component IV: Human Resources
Development (2) For a transition period (2007-2010) CFCU
is identified as the Contracting Authority inthis component through the Cooperation
Agreement between the CFCU and the
OS under the Ministry of Labour and
Social Security
Hseyin Cahit Ekiz May 26, 2010
C t V R l D l t
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
23/65
Component- V: Rural Development
[IPARD] (1) It is controlled by DG AGRI completely
independent from DG Enlargement IPARD Measures include;
Investments in farms to restructure andupgrade to the EU standards
Investments in processing and marketing of
agriculture and fishery products to restructureand upgrade to the EU standards
Hseyin Cahit Ekiz May 26, 2010
C t V R l D l t
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
24/65
Component- V: Rural Development
[IPARD] (2) IPARD Measures include;
Improving and developing rural infrastructure;
Development and diversification of ruraleconomic activities; Producer groups;
Agri-environment and animal welfare schemes (at
pilot level); Preparation of rural communities to conceive and
implement local rural development strategies andintegrated rural development strategies throughlocal partnerships (at pilot level);
Training;
Technical assistance
Hseyin Cahit Ekiz May 26, 2010
C t V R l D l t
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
25/65
Component- V: Rural Development
[IPARD] (3) In order to make use of the IPA funds to be
provided in the field of rural development, Turkey
presents a Rural Development Plan (IPARD Plan)for the years from 2007 to 2013 to form the basisfor financing the rural development measuresunder the IPA and establishes animplementing/paying agency which is the OSunder EDIS, namely IPARD Agency under theMinistry of Agriculture and Rural Affairs
IPARD is a step in preparing the country to theEuropean Agricultural Fund for Rural Development(EAFRD) and the European Agricultural Fund forGuarantee (EAFG)
Hseyin Cahit Ekiz May 26, 2010
INSTITUTIONAL FRAMEWORK
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
26/65
INSTITUTIONAL FRAMEWORK
(1) In order to manage IPA Components I to
IV, Turkey has established the followinginstitutions and key positions in such a
way to comply with the IPA Regulations;
Competent Accrediting Officer [CAO] -
State Minister with oversight of the
Treasury National Authorising Officer [NAO] &
National Fund [NF] - Undersecretary of theTreasury Hseyin Cahit Ekiz May 26, 2010
INSTITUTIONAL FRAMEWORK
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
27/65
INSTITUTIONAL FRAMEWORK
(2) National IPA Coordinator [NIPAC] -
Secretariat General for EU Affairs [EUSG]
Strategic Coordinator for the RegionalDevelopment component and the Human
Resources Development Component - StatePlanning Organisation [DPT]
Audit Authority - Board of Treasury
Controllers Operating Structure - A body or a collection
of bodies within the administration of thebeneficiary country
Hseyin Cahit Ekiz May 26, 2010
INSTITUTIONAL FRAMEWORK
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
28/65
INSTITUTIONAL FRAMEWORK
(3) Contracting Authority - Central Finance and
Contracts Unit (CFCU) (relevant only forComponent I of IPA and applicable toComponents III & IV for transitional period
[2007 2010]) Program Autorising Officer (PAO) - Head ofthe CFCU [being PAO is relevant only for
Component I of IPA] Senior Programme Officers (relevant only for
Component I of IPA) Responsible officers
of the Line Ministries for projects underComponent I Hseyin Cahit Ekiz May 26, 2010
Competent Accrediting Officer
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
29/65
p g(CAO)
Issuing, monitoring and suspending or
withdrawing the accreditation of theNational Authorising Officer and the
National Fund
Hseyin Cahit Ekiz May 26, 2010
National Authorising Officer
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
30/65
National Authorising Officer
(NAO) Is the head of the National Fund and bear
overall responsibility for the financialmanagement of EU funds in the
beneficiary country
Responsible for
the legality and regularity of the underlying
transactions the effective functioning of management and
control systems under the IPA Regulation
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
31/65
National Fund (NF)
The national fund act as a central treasuryand be in charge of tasks of financial
management of assistance under the IPARegulation, under the responsibility of theNational Authorising Officer
Responsible for organising the bank accounts, requesting funds
from the Commission
authorising the transfer of funds received from theCommission to the Operating Structures or to thefinal beneficiaries
the financial reporting to the Commission
Hseyin Cahit Ekiz May 26, 2010
National IPA Coordinator (NIPAC)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
32/65
National IPA Coordinator (NIPAC)
(1) Ensure partnership between EU and the
beneficiary country, and a close link betweenthe general accession process and the use of
assistance under the IPA Regulation
Responsible for
the coherence and co-ordination of the
programmes provided under the IPARegulation
the annual programming for Component-I at
national levelHseyin Cahit Ekiz May 26, 2010
National IPA Coordinator (NIPAC)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
33/65
National IPA Coordinator (NIPAC)
(2) the co-ordination of the participation of the
beneficiary country in the relevantComponent-II programmes. The National IPA
Coordinator may delegate the tasks relating
to this coordination to a cross-border co-operation co-ordinator;
drawing up and submission of the IPA annualand final reports on implementation to the
Commission with a copy to the national
authorising officerHseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
34/65
Strategic Coordinator (SC)
Ensure the coordination of the RegionalDevelopment component and Human
Resources Development component Responsibilities
co-ordinate assistance granted under theregional development component and thehuman resources development component
draft the Strategic Coherence Framework
ensure co-ordination between sectoralstrategies and programmes
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
35/65
Audit Authority (1)
Verify the effective and sound functioning of themanagement and controls system.
Responsible for
establish and fulfil an annual audit work plan,during the course of each year and submit it to theNAO and the Commission before the start of theyear
submit to the Commission, to the NAO and theCAO by 31 December of each year the annualaudit activity report, as per the model of theFramework Agreement, setting out the resources
used, summary of weaknesses foundHseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
36/65
Audit Authority (2)
submit to the Commission, NAO and the
competent accrediting officer an annualopinion
submit an opinion on any final statement of
expenditure submitted to the Commission bythe NAO, for the closure of any programme
or any part of thereof, as per the model of theFramework Agreement; the opinion shall be
sent to the Commission and the competent
accrediting officerHseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
37/65
CFCU (PAO)
Multisectoral implementing body
In charge of tendering, contracting,payments, accounting, financial reporting,
contract administration
Responsible for the sound financial and
administrative management of projects to
be implemented
Hseyin Cahit Ekiz May 26, 2010
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
38/65
Line Ministeries (SPOs)
Technical preparation & implementation of
projects Assist the PAO in the good and timely
preparation and implementation of
operations at technical level
Hseyin Cahit Ekiz May 26, 2010
O S (1)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
39/65
Operating Structures (1)
Entities, dealing with the management and
implementation of assistance, to theexclusion of the tasks undertaken by the
NIPAC, SC, NAO and the NF
The wording Operating Structures
basically refers to management
authorities, implementing agencies, lineministries, etc. managing and
implementing projects
Hseyin Cahit Ekiz May 26, 2010
Operating Structures -
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
40/65
Operating Structures
responsibilities (2) Drafting the annual or multi-annual
programmes programme monitoring and guiding the work
of the sectoral monitoring committee, notably
by providing the documents
drawing up the sectoral annual and final
implementation reports, submitting them tothe Commission, to the National IPA
Coordinator and to the National Authorising
OfficerHseyin Cahit Ekiz May 26, 2010
Operating Structures -
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
41/65
Operating Structures
responsibilities (3) ensuring that operations are selected for funding and
approved in accordance with the criteria and
mechanisms applicable to the programmes, and thatthey comply with the relevant Community and nationalrules
setting up procedures to ensure the retention of all
documents required to ensure an adequate audit trail arranging for tendering procedures, grant award
procedures, the ensuing contracting, and makingpayments to, and recovery from, the final beneficiary;
ensuring that all bodies involved in the implementationof operations maintain a separate accounting systemor a separate accounting codification
Hseyin Cahit Ekiz May 26, 2010
Operating Structures -
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
42/65
Operating Structures
responsibilities (4) ensuring that the national fund and the national
authorising officer receive all necessary information on
the procedures and verifications carried out in relationto expenditure
setting up, maintaining and updating the reporting andinformation system
carrying out verifications to ensure that theexpenditure declared has actually been incurred inaccordance with applicable rules, the products orservices have been delivered in accordance with the
approval decision, and the payment requests by thefinal beneficiary are correct. These verifications shallcover administrative, financial, technical and physicalaspects of operations, as appropriate
Hseyin Cahit Ekiz May 26, 2010
Operating Structures -
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
43/65
Operating Structures
responsibilities (5) ensuring internal audit of its different
constituting bodies ensuring irregularity reporting
ensuring compliance with the informationand publicity requirements
Hseyin Cahit Ekiz May 26, 2010
O ti St t (6)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
44/65
Operating Structures (6)
In Components III and IV, the TurkishGovernment has decided to develop thefollowing Operating Structures
Component III - IPA Regional Development
Component : Ministry of Trade and Industry Ministry of Environment and Forestry
Ministry of Transport Component IV - IPAHRD component:
Ministry of Labour and Social Security
Hseyin Cahit Ekiz May 26, 2010
O ti St t (7)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
45/65
Operating Structures (7)
Two phases for development of OperatingStructures
A transitional period [2007 2010] during which: the CFCU is the Contracting Authority for
Components III & IV and shares a certain number of
responsibilities and tasks which are defined in theagreements with the Oss
the Operating Structures and the CFCU will reinforce
each other through the practice of exchangingexperience where there is a lack of appropriatelyskilled and/or experienced people in a particular body.
ultimate responsibility remains at the side of the OSs
with regard to implementation of the programmesHseyin Cahit Ekiz May 26, 2010
Operating Structures (8)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
46/65
Operating Structures (8)
A second period [2010 2013] during
which the various bodies involved in theOperating Structures are expected to be
able to take on board additional
responsibilities in relation to procurementand financial management
Hseyin Cahit Ekiz May 26, 2010
MONITORING COMMITTEES
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
47/65
MONITORING COMMITTEES
The overall implementation of IPA assistance inTurkey must be subject to monitoring in
accordance with the IPA IR. This implies settingspecific monitoring committees which mandatesmust be formally defined and agreed upon with the
EC; IPA Monitoring Committee
Sectoral Monitoring Committees [SMC]
TAIB Committee CBC Joint Monitoring Committee
Sectoral Monitoring Committees - Environment,
Transport, Competitiveness and Human ResourcesHseyin Cahit Ekiz May 26, 2010
IPA Monitoring Committee (1)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
48/65
IPA Monitoring Committee (1)
Participation of EC + NIPAC + NAO + SCO +
Oss Co-chaired by EC + NIPAC
Adopts its internal rules of procedure in
compliance with a monitoring committee
mandate established by the EC
Meetings: minimum once a year +intermediate meetings on a thematic basis
and/or as established in the monitoring
committee mandate / internal rules ofHseyin Cahit Ekiz May 26, 2010
IPA Monitoring Committee (2)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
49/65
IPA Monitoring Committee (2)
Make proposals to the Commission, the NIPACand the NAO for any actions to ensure the
coherence and co-ordination between theprogrammes and operations implemented underthe different components, as well as for any cross-component corrective measures needed to ensure
the achievement of the global objectives of theassistance provided, and to enhance its overallefficiency
May make proposals to relevant sectoralmonitoring committee(s) for decisions on anycorrective measures to ensure the achievementsof programme objectives and enhance the
efficiency of assistance provided under theprogrammes or IPA component(s) concernedHseyin Cahit Ekiz May 26, 2010
Sectoral Monitoring Committees
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
50/65
[SMC] Participation of EC + NIPAC + NAO + SCO + Oss
Shall report to the IPA Monitoring Committee
Shall satisfy itself as to the effectiveness and quality ofthe implementation of the programmes and operationsconcerned, in accordance with the specific provisionslaid down for each component;
May make proposals to the EC and the NIPAC, with acopy to the NAO, for decisions on any correctivemeasures to ensure the achievements of programmeobjectives and enhance the efficiency of theassistance provided
Shall provide the IPA monitoring committee withinformation in accordance with the IPA IR
Hseyin Cahit Ekiz May 26, 2010
TAIB Committee
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
51/65
TAIB Committee
Participation of NIPAC + NAO + PAO +
OSs + EC chaired by the NIPAC
meet at least twice a year rules of procedure, in compliance with a
sectoral monitoring committee mandate
set out by the Commission adopted in
agreement with the NIPAC, NAO and the
IPA monitoring committeeHseyin Cahit Ekiz May 26, 2010
CBC Joint Monitoring
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
52/65
Committee Participation of Managing authority +Participating countries + EC [advisory role]
One joint monitoring committee for each CBCprogramme
Chaired by a representative of one of the
participating countries or the managingauthority
Meets at least twice a year
Draws up its rules of procedure in compliancewith a joint monitoring committee mandateset out by EC
Hseyin Cahit Ekiz May 26, 2010
Sectoral Monitoring Committees -Environment Transport
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
53/65
Environment, Transport,
Competitiveness and HRD (1) The composition of the Sectoral Committees
is decided by the Operating Structure, in
agreement with the Commission Co-chaired by Head of OS + representative
of EC
Secretariat provided by IPA Unit of relevantMinistry
Meet at least twice a year
Each sectoral monitoring committee has itsrules of procedure in compliance with aSectoral Monitoring Committee mandate set
out by the ECHseyin Cahit Ekiz May 26, 2010
Sectoral Monitoring Committees -Environment Transport
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
54/65
Environment, Transport,
Competitiveness and HR (2) Consider and approve the general criteria for
selecting the operations, and approve any
revision of those criteria in accordance withprogramming needs
Review at each meeting progress made
towards achieving the specific targets of theOP on the basis of documents submitted bythe OS;
Examine at each meeting the results ofimplementation, particularly the achievementof the targets set for each priority axis and
measures and interim evaluationsHseyin Cahit Ekiz May 26, 2010
INTER INSTITUTIONAL
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
55/65
RELATIONS It is important for the staff involved in a
way or another in the management of IPAto understand:
At which level of the project management
cycle they intervene
How their respective activities impact on the
whole system How their respective functions are subject to
internal controls and audits
Hseyin Cahit Ekiz May 26, 2010
FLOW OF INFORMATION (1)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
56/65
FLOW OF INFORMATION (1)
EU Headquarters Brussels + EU
DELEGATION ANKARA to/from CAO CAO to/from NAO + NF
NAO + NF to/from NIPAC + EUSC, PAO+CFCU, OSs
NIPAC + EUSG to/from Strategic
Coordinator for Reg. Dev. & HrD (StatePlanning Organisation)
Hseyin Cahit Ekiz May 26, 2010
FLOW OF INFORMATION (2)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
57/65
FLOW OF INFORMATION (2)
PAO+ CFCU to/from OSs, Delegated
bodies at local / regional level,Contractors, Beneficiaries
All of the actors to/from Monitoring
Committees
Hseyin Cahit Ekiz May 26, 2010
FLOW OF FUNDS
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
58/65
FLOW OF FUNDS
EU to/from NF
NF to/from Contracting Authority Contracting Authority to/from Contractors,
Grant Beneficiaries
Hseyin Cahit Ekiz May 26, 2010
AUDIT (1)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
59/65
AUDIT (1)
SAYITAY - Turkish Court of Accounts
[TCA] Supreme audit institution of Turkey EU Court of Accounts - Supreme audit
institution of EU
AUDIT AUTHORITY - Board of Treasury
Controllers
Hseyin Cahit Ekiz May 26, 2010
AUDIT (2)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
60/65
AUDIT (2)
Internal Auditors
Audit counsil of Turkish Prime Ministry Audit counsil of relevant Ministery
EC Auditors Third party organisations assigned by EC
OLAF
Hseyin Cahit Ekiz May 26, 2010
AUDIT (3)
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
61/65
AUDIT (3)
Internal Audits
Audit of the systems Compliance audits
Periodical audits Project/event based case audits
Hseyin Cahit Ekiz May 26, 2010
Segregation of duties among the
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
62/65
key players A clear division of tasks has been established amongthe IPA key players in order to comply with Article 21.2of the IPA Implementing Regulation
NAO and NIPAC the two positions, although separate,hold equal authority in their respective scope
The National Fund is established under the authority
of the Undersecretary of Treasury and reports to theNAO. It is fully independent from any of the OperatingStructure
The CAO is independent from the NAO
The Operating Structures and the ContractingAuthority do not report to the NIPAC nor to the CAO orthe SCO
Hseyin Cahit Ekiz May 26, 2010
Segregation of duties within the
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
63/65
Operating Structure (1) Adequate separation of functions has
been ensured within the designatedOperating Structure
Sufficient segregation of duties is
guaranteed among Tendering, Contract
implementation / monitoring and financial
/ payment responsibilities
Hseyin Cahit Ekiz May 26, 2010
Segregation of duties within the
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
64/65
Operating Structure (2) During the implementation of the projects
through the tendering, contracting and
implementation of each contract: the staff assigned to manage and / or control
tendering process
shall be different from the staff which will beassigned after signature to:
implement / monitor the contract, execute financial aspects of the contractsincluding payments
Hseyin Cahit Ekiz May 26, 2010
Segregation of duties within the
7/27/2019 2045-EU-Financed-Projects-Overview.pdf
65/65
Operating Structure (3) The staff providing approval for payment of
invoices / requests for payment during the
operational monitoring should not have
access to the funds in a way or another [e.g.
signature on bank accounts, accounting, andreconciliation]
As a rule, the initiation, the ex-ante and the
ex-post controls are separate functions, to be
carried out by different persons, functionally
independent form each otherHseyin Cahit Ekiz May 26, 2010