BUTANE BLENDING Osum Oil Sands Corp. | Cold Lake, AB ENGINEERING | PROCUREMENT | CONSTRUCTION • Engineering & procurement • Project management • Civil works • Mechanical installation • Structural fabrication • Process pipe fabrication • Electrical & instrumentation • Insulation & heat trace Federation was selected to design and build a sales oil butane blending system at Osum's Orion SAGD facility. Injection of butane in the sales oil process stream decreases the volume of diluent required to meet sales product specifications and therefore reduces operating costs. As EPC contractor Federation performed engineering & design, procurement & expediting, construction and commissioning support. The integrated Federation Engineering & Construction team efficiently executed the project from concept to production in 8 months - all during a global pandemic. Schedule: April to November, 2020 Contract Type: Time & Materials Contract Value: $2 Million FEDERATION ENGINEERING & CONSTRUCTION FEDERATION ENGINEERING & CONSTRUCTION P: 780-201-8697 • federationengineering.com P: 780-573-9028 • federationconstruction.com

20375 Fed Const Project Profile Osum Butane Blending

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 20375 Fed Const Project Profile Osum Butane Blending

BUTANE BLENDINGOsum Oil Sands Corp. | Cold Lake, AB

E N G I N E E R I N G | P R O C U R E M E N T | C O N S T R U C T I O N

• Engineering & procurement

• Project management

• Civil works

• Mechanical installation

• Structural fabrication

• Process pipe fabrication

• Electrical & instrumentation

• Insulation & heat trace

Federation was selected to design and

build a sales oil butane blending system at

Osum's Orion SAGD facility. Injection of

butane in the sales oil process stream

decreases the volume of diluent required

to meet sales product specifications and

therefore reduces operating costs.

As EPC contractor Federation performed

engineering & design, procurement &

expediting, construction and

commissioning support. The integrated

Federation Engineering & Construction

team efficiently executed the project from

concept to production in 8 months - all

during a global pandemic.

Schedule: April to November, 2020

Contract Type: Time & Materials

Contract Value: $2 Million