1094 Castle Park — 1094 20210812 - Site Visit No.04 Created: 08-16-2021 Creator: Gavin McCormack (@GMC) Status: Dates: 08-11-2021 - 08-13-2021 Recipients [email protected] Description Purpose of Report: Site Walk undertaken Thursday 12/08/2021 @ 9.45am by DOB & GMcC of MDO to review general progress. Weather: Dry Location: Site & Basement General Comments: 1) Majority of rock breaking is now complete bar Zone 3. 2) Basement slab is cast in Zone 1 & partially in Zone 2 with re-bar for rising elements in place. 3) Rising elements in Zone 1 Block A such as the basement ramp flanking walls and basement stair 01 enclosure are cast with RWP ope's visible. 4) Lean mix and re-bar installation to Zone 2 is on-going. 5) It was noted that a safety net will need to be installed to the rock face at Block C to mitigate any risk of rock falls. 20210812 - Site Visit No.04 pg. 1 Created with Fieldwire on 08-16-2021

20210812 - Site Visit No

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

1094 Castle Park — 1094

20210812 - Site Visit No.04Created: 08-16-2021Creator: Gavin McCormack (@GMC)Status:Dates: 08-11-2021 - 08-13-2021

Recipients

[email protected]

Description

Purpose of Report: Site Walk undertaken Thursday 12/08/2021 @ 9.45am by DOB & GMcC of MDO to review general progress.

Weather: Dry

Location: Site & Basement

General Comments:1) Majority of rock breaking is now complete bar Zone 3.2) Basement slab is cast in Zone 1 & partially in Zone 2 with re-bar for rising elements in place.3) Rising elements in Zone 1 Block A such as the basement ramp flanking walls and basement stair 01 enclosure are cast with RWP ope'svisible. 4) Lean mix and re-bar installation to Zone 2 is on-going.5) It was noted that a safety net will need to be installed to the rock face at Block C to mitigate any risk of rock falls.

20210812 - Site Visit No.04 pg. 1 Created with Fieldwire on 08-16-2021

#57 - Exposed Cliff Face - Safety netting to be installed on rock face tomitigate the risk on rock falls, as discussed at last site visit 29/07.Priority 2 | David O'brien | Rectify & ProgressPlan: 1094-MDO-XX-RF-DR-A-01001 PROPOSED SITE LAYOUT PLANCreated 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:06 AMDavid O'brien Photo 2 12 Aug 10:06 AMDavid O'brien Protection? 12 Aug 10:06 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 2 Created with Fieldwire on 08-16-2021

#55 - Core C - No starter bars evident for bin store lobby wall orseparating wall between bin store and telecoms room, TWL to advisehow this wall will be constructed.Priority 2 | David O'brien | Rectify & ProgressPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:02 AMDavid O'brien Wall missing? 12 Aug 10:02 AM

Photos

1

20210812 - Site Visit No.04 pg. 3 Created with Fieldwire on 08-16-2021

#56 - Plant Room - No drainage gully visible, discussion held with JKwho confirmed that a gully is in place but may have been covered atthe time of the site visit, MDO to carry out a follow up inspectionduring the next site visit.Priority 2 | David O'brien | Rectify & ProgressPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:05 AMDavid O'brien Photo 2 12 Aug 10:05 AMDavid O'brien Drainage? 12 Aug 10:05 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 4 Created with Fieldwire on 08-16-2021

#44 - Tower Crane 02 has been erected on site.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-XX-RF-DR-A-01001 PROPOSED SITE LAYOUT PLANCreated 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 09:51 AMDavid O'brien Photo 2 12 Aug 09:51 AMDavid O'brien TC02 up 12 Aug 09:51 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 5 Created with Fieldwire on 08-16-2021

#49 - Opes for slung drainage to underside of Ground floor slab arevisible in ramp flanking walls.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 09:58 AM

Photos

1

20210812 - Site Visit No.04 pg. 6 Created with Fieldwire on 08-16-2021

#45 - Zone 3 earth clearance and rock breaking ongoing.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-XX-RF-DR-A-01001 PROPOSED SITE LAYOUT PLANCreated 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 09:52 AMDavid O'brien Zone 3 strip out ongoing 12 Aug 09:52 AMDavid O'brien Photo 2 12 Aug 09:53 AMDavid O'brien Photo 3 12 Aug 09:53 AMDavid O'brien Photo 4 12 Aug 09:53 AMDavid O'brien Photo 5 12 Aug 09:53 AM

Photos

1 2 3

4 5

20210812 - Site Visit No.04 pg. 7 Created with Fieldwire on 08-16-2021

#48 - Basement car park ramp walls cast on site, RWP opes are visible.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 09:56 AMDavid O'brien Photo 2 12 Aug 09:56 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 8 Created with Fieldwire on 08-16-2021

#59 - Core B - Upstands are cast in place and starter bars are in placefore rising elements.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:08 AMDavid O'brien Photo 2 12 Aug 10:08 AMDavid O'brien Photo 3 12 Aug 10:08 AMDavid O'brien Photo 4 12 Aug 10:08 AMDavid O'brien All looks good 12 Aug 10:08 AM

Photos

1 2 3

4

20210812 - Site Visit No.04 pg. 9 Created with Fieldwire on 08-16-2021

#50 - Rising elements for basement stair 01 are now cast, starter barsare in place for core walls.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 09:59 AMDavid O'brien Photo 2 12 Aug 09:59 AMDavid O'brien Photo 3 12 Aug 09:59 AMDavid O'brien Progress 12 Aug 09:59 AM

Photos

1 2 3

20210812 - Site Visit No.04 pg. 10 Created with Fieldwire on 08-16-2021

#64 - Residents Club - Rock breaking to residents club, MurphySheanon to review landscaping levels at a later date.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-XX-RF-DR-A-01001 PROPOSED SITE LAYOUT PLANCreated 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:12 AMDavid O'brien Photo 2 12 Aug 10:12 AMDavid O'brien Photo 3 12 Aug 10:12 AMDavid O'brien Photo 4 12 Aug 10:12 AMDavid O'brien Excavation removed 12 Aug 10:12 AM

Photos

1 2 3

4

20210812 - Site Visit No.04 pg. 11 Created with Fieldwire on 08-16-2021

#54 - Core C wall change captured following DAC update.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:01 AMDavid O'brien Change captured 12 Aug 10:01 AM

Photos

1

20210812 - Site Visit No.04 pg. 12 Created with Fieldwire on 08-16-2021

#52 - Upstands to Core A in place, re-bar in place fore core walls.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:00 AMDavid O'brien Photo 2 12 Aug 10:00 AMDavid O'brien Review location of wall 12 Aug 10:00 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 13 Created with Fieldwire on 08-16-2021

#61 - Core A - Upstands are cat in place and re-bar is in place for risingelements.Priority 3 | David O'brien | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)David O'brien Photo 1 12 Aug 10:09 AMDavid O'brien Photo 2 12 Aug 10:09 AMDavid O'brien All looks good 12 Aug 10:09 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 14 Created with Fieldwire on 08-16-2021

#60 - Basement Stair 02 - Starter bars in place fore core risingelements, drainage gully viable.Priority 3 | Gavin McCormack | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)Gavin McCormack Photo 1 12 Aug 10:09 AMGavin McCormack Photo 2 12 Aug 10:09 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 15 Created with Fieldwire on 08-16-2021

#47 - East flanking wall to car park ramp cast, opes for RWP's visible.Priority 3 | Gavin McCormack | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)Gavin McCormack Photo 1 12 Aug 09:56 AMGavin McCormack Photo 2 12 Aug 09:56 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 16 Created with Fieldwire on 08-16-2021

#51 - Concrete rising elements to basement stair 1 cast, RWP opes andgully locations visible.Priority 3 | Gavin McCormack | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)Gavin McCormack Photo 1 12 Aug 09:59 AMGavin McCormack Photo 2 12 Aug 09:59 AMGavin McCormack Photo 3 12 Aug 09:59 AM

Photos

1 2 3

20210812 - Site Visit No.04 pg. 17 Created with Fieldwire on 08-16-2021

#58 - Core B - Starter bars in place for rising elements to be cast,drainage locations are visible.Priority 3 | Gavin McCormack | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)Gavin McCormack Photo 1 12 Aug 10:06 AMGavin McCormack Photo 2 12 Aug 10:06 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 18 Created with Fieldwire on 08-16-2021

#53 - Core A rising elements - re-bar in place for core wall to be cast.Priority 3 | Gavin McCormack | ObservationPlan: 1094-MDO-ZZ-B1-DR-A-02000Created 08-12-2021

Task messages (time in IST)Gavin McCormack Photo 1 12 Aug 10:00 AMGavin McCormack Photo 2 12 Aug 10:00 AM

Photos

1 2

20210812 - Site Visit No.04 pg. 19 Created with Fieldwire on 08-16-2021

#63 - Residents Club - Rock breaking to residents club, MurphySheanon to review landscaping levels at a later date.Priority 3 | Gavin McCormack | ObservationPlan: 1094-MDO-ZZ-00-DR-A-02001Created 08-12-2021

Task messages (time in IST)Gavin McCormack Photo 1 12 Aug 10:11 AMGavin McCormack Photo 2 12 Aug 10:11 AMGavin McCormack Photo 3 12 Aug 10:11 AM

Photos

1 2 3

20210812 - Site Visit No.04 pg. 20 Created with Fieldwire on 08-16-2021

57

44

45

64

63

5556

49

48

59

50

54

52

61

60

47

51

58

53