To request accommodations for persons with disabilities or to receive information in alternative formats, please call 1-888-889-6368, TTY Relay 711 or e-mail [email protected]
Central Puget Sound Regional Transit Authority • Union Station 401 S. Jackson St., Seattle, WA 98104-2826 • Reception: (206) 398-5000 • FAX: (206) 398-5499 www.soundtransit.org
October 2019 To: Sound Transit Board of Directors From: Peter M. Rogoff, Chief Executive Officer Subject: 2020 Proposed Budget In 2019 Sound Transit continues to transform transit in the Central Puget Sound region. The year 2020 begins an intensive five-year period during which Sound Transit will open 28 new light rail stations and 24 bus rapid transit stations. Much of the work in 2019 has focused on positioning the agency for this intensive period and beyond. 2020 Budget Summary The 2020 budget projects revenue and other funding sources of $2.5 billion and expenditures of $3.1 billion, with the difference coming from unrestricted cash balances. This compares to the 2019 budget, which included $2.4 billion in revenue and $2.9 billion in expenditures, again with the balance coming from unrestricted cash balances.
The budget-to-budget increase in revenue and other funding sources comprises a reduction in anticipated borrowing from $100 million in 2019 to zero in 2020, which is more than offset by increases in tax revenue and passenger fares.
On the expenditure side, the budget for capital and other projects totals $2.5 billion, primarily for preliminary engineering, right-of-way acquisition, and construction for system expansion projects. The 2020 budget also funds numerous projects to enhance and maintain existing facilities and equipment in a state of good repair. The 2020 transit operating budget is $370 million as compared to the 2019 budget of $354 million. The budget reflects cost increases in insurance, public safety, security, maintenance and state of good repair, as well as the rising cost of operating contracts with our partner transit agencies. Sound Transit will hire new employees in preparation for opening the Northgate, Hilltop Tacoma and East Link extensions, and the arrival and testing of new light rail vehicles. The agency has budgeted 65 new positions for 2020, primarily due to these startup efforts for future Link services, along with growth in the capital program. Finally, the budget includes $177 million for debt service, contributions to partner agencies, contingency, tax collection fees, and the sales and use tax offset fee. 2020 Look Ahead Sound Transit is entering its most intensive five-year period of system expansion in 2020.
Construction on Link extensions to Northgate, Lynnwood, Bellevue, Redmond, and Hilltop Tacoma will be underway and construction on the Federal Way Link Extension will begin in 2020. The Operations and Maintenance Facility East (OMFE) in Bellevue’s Spring District is under construction and will be substantially complete by the end of 2020. Between 2021 and 2024, all of these Link extensions plus the OMFE will open and commence passenger service.
CHAIR
John Marchione Redmond Mayor
VICE CHAIRS
Kent Keel University Place Mayor
Paul Roberts
Everett Councilmember
BOARD MEMBERS
Nancy Backus Auburn Mayor
David Baker Kenmore Mayor
Claudia Balducci King County Council Vice Chair
Dow Constantine King County Executive
Bruce Dammeier Pierce County Executive
Jenny Durkan Seattle Mayor
Dave Earling Edmonds Mayor
Debora Juarez Seattle Councilmember
Joe McDermott King County Councilmember
Roger Millar Washington State Secretary
of Transportation
Kim Roscoe Fife Mayor
Dave Somers Snohomish County Executive
Dave Upthegrove King County Councilmember
Peter von Reichbauer King County Councilmember
Victoria Woodards Tacoma Mayor
CHIEF EXECUTIVE OFFICER
Peter M. Rogoff
Central Puget Sound Regional Transit Authority • Union Station 401 S. Jackson St., Seattle, WA 98104-2826 • Reception: (206) 398-5000 • FAX: (206) 398-5499 www.soundtransit.org
Sepcifically in 2020, the Northgate Link guideway and terminus station at Northgate will be substantially complete. Work will continue on post-substantial completion for underground stations at Roosevelt and U-District along with ongoing systems installation and startup activities. On Lynnwood Link, civil construction will ramp up along the entire alignment, systems design will be completed, and property acquisitions and utility relocations will continue. From January to March 2020, East Link tracks will be connected to the existing Link system at the International District/Chinatown Station. This construction will reduce Link service but all stations will remain open. Most segments of East Link will also be substantially complete in 2020, clearing the way for systems installation and testing in advance of its 2023 opening. The Downtown Redmond extension breaks ground in late 2019, while 2020 activities will include design, early construction, and advanced utility relocations late in the year. Construction and startup activities will continue on the Hilltop Tacoma Link Extension, including training new employees to operate and maintain the system in advance of the extension opening in 2022.
The Federal Way Link extension will break ground in 2020, and design work, utility relocations, property acquisitions and seller relocations will continue in support of that project. The Everett Link Extension and the Operations and Maintenance Facility North projects will begin alternatives identification and development in 2020. The OMF North will store and commission vehicles in advance of the Everett Link Extension service start up.
The West Seattle and Ballard Link extensions will continue with environmental review, preliminary engineering and risk and value engineering. The Tacoma Dome Link Extension will include preliminary engineering and potential protective acquisitions.
The North Corridor Maintenance of Way Building includes project planning and early property acquisition. The Board will proceed with clarifying options for the delivery date of Northeast 130th Street Infill Station. Sounder continues expansion projects In 2020, planning and community engagement for future Sounder investments will continue. Throughout 2019, Sound Transit has undertaken a public engagement process to gather input from communities and stakeholders to help determine the right mix of projects for expanding Sounder service, along with parking and access improvements. Early in 2020, the draft expansion plan will be released for public review, followed by planning for the first round of projects. The planning process will include further public outreach. Regarding projects underway, the project baseline for the Sounder Maintenance Base will be prepared in early 2020. Other activities include relocating utilities and acquiring right-of-way. Puyallup Station project work will include design and initial construction by the design-build contractor, as well as non‐motorized improvements and stormwater work to be executed by the City of Puyallup.
Sumner Station project activities will include work by the City of Sumner on the Traffic Avenue/SR 410 Overpass. Sound Transit expects the Board to approve the project baseline in 2020. Kent and Auburn Station Parking and Access Improvements activities include risk and value engineering and property acquisitions. South Tacoma Station Access Improvements will begin with alternatives analysis.
The Edmonds and Mukilteo Stations Parking and Access Improvements project will complete an initial feasibility study.
Stride and ST Express Bus projects ramping up I-405 BRT activities include completing environmental studies and continuing preliminary engineering and project development by WSDOT at NE 85th and Brickyard, and beginning WSDOT construction and property acquisition at N 44th in Renton.
Central Puget Sound Regional Transit Authority • Union Station 401 S. Jackson St., Seattle, WA 98104-2826 • Reception: (206) 398-5000 • FAX: (206) 398-5499 www.soundtransit.org
SR522/NE 145th BRT activities include completing environmental work, continuing preliminary engineering, business access and transit lanes construction by the City of Bothell, and property acquisition. Bus Base North activities include completing environmental work, a quantitative risk assessment, and developing the project baseline for Board adoption. Sound Transit will contribute financially to support BRT initiatives led by the city of Seattle (Madison BRT), King County Metro (Rapid Ride C & D), and Pierce Transit (Pacific Avenue/SR7 BRT). The Bus on Shoulder project continues with a feasibility study to identify potential projects and advance design, estimate costs and conduct environmental review on current candidate projects.
Conceptual engineering and environmental review will begin on the North Sammamish Park & Ride project. Ensuring equitable development at our stations The Transit Oriented Development program evaluates and plans for integrating capital projects with housing development. The program also includes station-area planning support and implementing a revolving loan fund. Expansion of Sound Transit facilities includes more public art The STart program will work with artists to fabricate and install public art at stations and along the routes. In 2020 the STart Program will focus on the Northgate, Hilltop, and East Link extensions, opening in 2021, 2022 and 2023 respectively. Implementing new processes to ensure long-term affordability We have implemented new cost controls to ensure sufficient financial capacity to deliver and operate our regional transit system. In particular, new budget procedures have increased scrutiny of operational spending and staffing. Managing cost effectiveness is an area of continuous improvement for the agency, with more changes planned for 2020. Station improvements We have continued to face challenges with escalator and elevator performance. In 2020, we will begin replacing 11 escalators at the University of Washington station and convert another pair of escalators to stairs, along with other customer access improvements. We will also improve wayfinding signage at existing Link and Sounder stations.
2019 Accomplishments • In February we began the process to develop route and station location alternatives for the West
Seattle and Ballard Link Extensions. After receiving input and feedback from community members, the Board identified preferred and other alternatives to study in a draft environmental impact statement. The project is now in environmental review.
• After a decade of mixed bus and rail operations in Downtown Seattle Transit Tunnel, in March, all bus routes moved to surface streets and the four downtown stations became Link-only. In January 2020 we are assuming sole responsibility for operating, securing, and maintaining these 30-year-old stations. Sound Transit has launched a comprehensive program to upgrade the stations to accommodate additional demand from expanding service to Northgate in 2021 and the Eastside in 2023.
• We deployed additional ST Express buses in March and September to maintain service levels in an environment of worsening regional traffic congestion.
• Also in March we debuted the popular double-decker buses on I-405 ST Express routes 532 and 535, increasing the capacity of each bus by 40 percent over the previous articulated buses.
Central Puget Sound Regional Transit Authority • Union Station 401 S. Jackson St., Seattle, WA 98104-2826 • Reception: (206) 398-5000 • FAX: (206) 398-5499 www.soundtransit.org
• We passed an exciting East Link milestone in April, achieving 50 percent project completion. The project is on schedule to open in 2023.
• In May the Board approved a contract to add up to 900 electronic, on-demand bike lockers at stations throughout our service area, 134 of which will be installed prior to the end of the 2019. Sound Transit will install more on-demand lockers annually, eventually replacing all 451 traditional bike lockers.
• In June crews laid the first 300-foot sections of new rail for the 2.4-mile Hilltop Tacoma Link Extension, which will serve the Stadium and Hilltop districts with six new stations when it opens in 2022.
• Real-time arrival information is now digitally displayed at every Link Red Line station. Previously, this information was only available at the Capitol Hill and University of Washington stations.
• Siemens Mobility delivered the first of our next generation light rail vehicles in June, with a total of 152 vehicles expected over the coming five years, more than doubling our current capacity by 2024.
• We awarded $40 million in System Access Funds to 30 different projects that will make it easier and more convenient to get to transit.
Contents Long-Range Financial Plan .................................................................................................................... 1 Sources and Uses ................................................................................................................................ 2 Revenue Sources ................................................................................................................................. 4 Expenditures ......................................................................................................................................... 8 Financing ............................................................................................................................................. 12 LRFP Analysis .................................................................................................................................... 14
2020 Budget Overview .......................................................................................................................... 17 Business Planning and Performance Management ....................................................................... 17 Department Budgets .......................................................................................................................... 19
Agency Staffing .................................................................................................................................. 19 Transit Modes Summary ....................................................................................................................... 21 Link Light Rail ..................................................................................................................................... 22 Sounder Commuter Rail .................................................................................................................... 23 ST Express .......................................................................................................................................... 24 Tacoma Link Light Rail ...................................................................................................................... 25 Projects Budgets ................................................................................................................................... 27
Project Budget Summary .................................................................................................................. 27 System Expansion ............................................................................................................................. 27 Enhancement ...................................................................................................................................... 32 State of Good Repair .......................................................................................................................... 35 Administrative ..................................................................................................................................... 36
Other Budgets Summary ...................................................................................................................... 37 Transit Improvement Plan ..................................................................................................................... 39 Project Budgeting .............................................................................................................................. 39 Projects Summary .............................................................................................................................. 40 Closed Projects .................................................................................................................................. 41 Transit Modes Summary .................................................................................................................... 42 Reserves Summary ............................................................................................................................ 43
Lo
ng-R
ange
Fi
nanc
ial P
lan
20
20 B
udge
t
Tran
sit
Impr
ovem
ent
Plan
Appendices ............................................................................................................................................ 45 Appendix A – Sound Transit 2 and Sound Transit 3 Cost Estimates .............................................. 45 Appendix B – Sound Move Project Budgets ...................................................................................... 47 Appendix C – Glossary ......................................................................................................................... 48 Appendix D – Transit Improvement Plan Project Detail Pages ........................................................ 57
System Expansion ............................................................................................................................. 59 Link ...................................................................................................................................................... 59 Sounder ............................................................................................................................................... 71 Regional Express ............................................................................................................................... 81 Stride .................................................................................................................................................... 87 Other .................................................................................................................................................... 91
Enhancement .................................................................................................................................... 101 State of Good Repair ........................................................................................................................ 125 Administrative ................................................................................................................................... 139
Ap
pend
ices
Alphabetical Index of Projects by Mode LINK LIGHT RAIL Access Control Card Upgrade 700695 ............................................................................................................... 131 Convention Place Development Systems Retrofit 400046................................................................................. 127 Downtown Redmond Link Extension 4X630 ........................................................................................................ 70 DSTT Capital Improvements 400116 ................................................................................................................. 127 DSTT Single Tracking 400117 .............................................................................................................................. 66 East Link Extension 4X600 ................................................................................................................................... 69 Enhancements to Tacoma Link Extension 400034 .............................................................................................. 63 Escalator Modernization Program 400122 ......................................................................................................... 105 Everett Link Extension 400052 ............................................................................................................................. 63 Federal Way Link Extension 4X445 ...................................................................................................................... 69 First Hill Streetcar 400007 .................................................................................................................................... 61 Hilltop Tacoma Link Extension 400008 ................................................................................................................ 61 Kinkisharyo LRV Systems Upgrade 700655 ...................................................................................................... 129 Light Rail Vehicle Fleet Expansion 400032 .......................................................................................................... 62 Light Rail Vehicle Overhaul 700769 ................................................................................................................... 133 Light Rail Vehicle Wireless Communication Upgrade 700684 ........................................................................... 108 Link Bridge Repairs 700705................................................................................................................................ 132 Link CCTV System Upgrade 600033.................................................................................................................. 128 Link Light Rail Vehicle Overhaul 700677 ............................................................................................................ 130 Link Radio Upgrade 700704 ............................................................................................................................... 131 Link Station Braided Tile Replacement 700728 ................................................................................................. 133 LRV Between Car Barriers 700697 .................................................................................................................... 110 LRV Wash Bay Modifications 700713 ................................................................................................................ 111 Lynnwood Link Extension 4X115 .......................................................................................................................... 67 NE 130th Street Infill Station 400115..................................................................................................................... 65 Noise Abatement 4X340 ..................................................................................................................................... 105 Non-revenue Support Vehicles 700781 .............................................................................................................. 112 North Corridor MOW 4000113 .............................................................................................................................. 65 Northgate Link Extension 4X100 .......................................................................................................................... 66 Northgate Link Extension Project Reserve 4X199 ............................................................................................... 67 OMF Energy Efficiency 700706 .......................................................................................................................... 110 Operations and Maintenance Facility East 400009 .............................................................................................. 62 Operations and Maintenance Facility Light Rail Vehicle Lift 700730 ................................................................. 111 Operations Maintenance Facility (OMF) Expanded Parking 700692 ................................................................. 109 Operations Maintenance Facility (OMF) Link Control Center (LCC) Upgrades 700691 .................................... 108 Operations Maintenance Facility (OMF) Renovations 700693 .......................................................................... 109 OT Virtual System Hardware Upgrade 700652 .................................................................................................. 128 SeaTac Airport Wrong Door Fall Protection 700651 .......................................................................................... 106
SeaTac Airport Second Elevator 700654 ........................................................................................................... 107 Signage Improvements 700793 .......................................................................................................................... 112 South 200th Link Extension 4X420 ....................................................................................................................... 68 Tacoma Dome Link Extension 400053 ................................................................................................................. 64 Tacoma Link Fare Collection 600029 ................................................................................................................. 106 Tacoma Link HVAC and Building Systems Upgrade 700682 ............................................................................ 130 Tacoma Link Light Rail Vehicle Overhaul 700718 ............................................................................................. 132 Tacoma Link Radio Upgrade 700676 ................................................................................................................. 107 University Link Extension 4X200 .......................................................................................................................... 68 West Seattle and Ballard Link Extensions 400066 ............................................................................................... 64 Wheel Truing Machine 700657 ........................................................................................................................... 129
SOUNDER COMMUTER RAIL Auburn Station Parking and Access Improvement 300040 .................................................................................. 77 Customer Emergency Stations 700708 .............................................................................................................. 113 D St – M St Track and Signal 3X135 .................................................................................................................... 78 Edmonds and Mukilteo Stations Parking & Access Improvements 300087 ........................................................ 78 Kent Station Parking Lot Paving 700727 ............................................................................................................ 116 Kent Station Platform Lighting 700726 ............................................................................................................... 116 Kent Station Parking and Access Improvements 300035 .................................................................................... 76 Lakewood Station Improvements 300019 ............................................................................................................ 74 Locomotive Inboard Cameras 700710 ............................................................................................................... 114 Mukilteo Station, S Platform 3X206 ...................................................................................................................... 79 Point Defiance Bypass 300027 ............................................................................................................................. 76 Positive Train Control 300011 ............................................................................................................................ 113 Puyallup Station Parking and Access Improvements 300017 .............................................................................. 73 Puyallup Station LED Lighting 700724 ............................................................................................................... 115 Sounder Maintenance Base 300004 .................................................................................................................... 73 Sounder Passenger Emergency Intercom 700711 ............................................................................................ 114 Sounder South Expanded Service 3X510 ............................................................................................................ 80 Sounder Fleet Expansion 7X755 .......................................................................................................................... 80 Sounder Vehicle Overhaul Program 700770 ...................................................................................................... 134 Sounder Yard Expansion 300026 ......................................................................................................................... 75 South Sounder Capacity Expansion 300056 ........................................................................................................ 77 Sumner Station Parking and Access Improvements 300018 ............................................................................... 74 Sumner Station LED Lighting 700725 ................................................................................................................ 115 Tacoma Trestle Track & Signal 300021 ............................................................................................................... 75 Tukwila Station 3X236 .......................................................................................................................................... 79
REGIONAL EXPRESS Bus Base South 500005 ....................................................................................................................................... 83 Bus Maintenance Facility 5X261 ........................................................................................................................ 117 Bus on Shoulder 500086 ...................................................................................................................................... 83 Community Transit – On-Board Communication Upgrade 700690 .................................................................... 118 I-90 Two-Way Transit and HOV Operations, Stage 3 5X387 ............................................................................... 85 North Sammamish Park-and-Ride 500117 ........................................................................................................... 85 Pacific Ave SR 7 Bus Rapid Transit 500111 ........................................................................................................ 84 Pierce Transit – Global Positioning System Repeater 700689 .......................................................................... 117 RapidRide C and D 500110 .................................................................................................................................. 84 Station Midlife Refurbishment Program 700771 ................................................................................................. 134 ST Express Fleet Expansion 700720 ................................................................................................................... 86 ST Express Fleet Replacement 7X701............................................................................................................... 135
STRIDE Bus Base North 500070 ........................................................................................................................................ 90 I-405 Bus Rapid Transit 500050 ........................................................................................................................... 89 SR 522/NE 145th Street BRT 500051 ................................................................................................................... 89
OTHER Administrative Capital 802000 ............................................................................................................................ 142 Agency Administration Operating 0X002 ............................................................................................................ 141 Bike Parking Program 600080 ............................................................................................................................ 118 Design Criteria Management Update 600145 .................................................................................................... 120 Downtown Seattle and Regional Mobility Improvements 700723 ...................................................................... 123 Efficiency and Sustainability Program 600132 ..................................................................................................... 96 Environmental Remediation 600143..................................................................................................................... 97 Environmental Mitigation, Monitoring and Maintenance 600025 ....................................................................... 141 Everett Station Security Improvements 700685 ................................................................................................. 141 Fare Administration 600016 .................................................................................................................................. 94 Fare Collection 3X212 .......................................................................................................................................... 93 Information Technology (IT) Infrastructure 870100 ............................................................................................ 136 Information Technology Program 803800 .......................................................................................................... 142 Innovation and Technology Program 600076 ....................................................................................................... 96 IT Transit Systems 870101 ................................................................................................................................. 137 LED Lighting Program 700688 ........................................................................................................................... 123 Next Generation ORCA 600038 ........................................................................................................................... 94 Parking Management Program 600133 .............................................................................................................. 120
Passenger Information Management System 600084 ....................................................................................... 119 Research and Business Development Program 600039 ..................................................................................... 95 Research and Technology 5X410 ........................................................................................................................ 93 Security Operations Center – Video-Monitoring Improvements 700687 ............................................................ 122 Security Radio System 700686 .......................................................................................................................... 122 Small Works Program 7X740.............................................................................................................................. 136 SODO/MLK Hazard Mitigation 600085 ............................................................................................................... 119 ST3 Planning 809100 ........................................................................................................................................... 99 STart 6X668 .......................................................................................................................................................... 98 STart Operations and Maintenance 600668 ......................................................................................................... 97 Tacoma Dome Station 7X356 ............................................................................................................................. 135 Transit Oriented Development Planning Program 804302................................................................................... 99 Transit Oriented Development Property Disposition 804100 ............................................................................... 98 Transit System Access Program 600073 ............................................................................................................. 95 Union Station Garden Level Remodel 700736 ................................................................................................... 124 Video Management System Upgrade 700665 .................................................................................................... 121
Long-Range Financial Plan
Sound Transit’s Long-Range Financial Plan (LRFP) reflects the agency’s mission to implement affordable high-capacity transit programs approved by voters in 1996 Sound Move (SM), 2008 Sound Transit 2 (ST2), and 2016 Sound Transit 3 (ST3). The LRFP assumes completion of all voter approved capital projects by 2041 and provides sufficient funding to ensure continued operation and maintenance of the transit system thereafter.
The LRFP is produced in accordance with the Federal Transit Administration’s (FTA) “Guidance for Transit Financial Plans” and is maintained on a cash basis. It states and projects all agency sources and uses of funds for the period 1997-2060 with special focus on 2017-2041 which is the ST3 start to completion time period, including the agency’s operating statements, sources and uses statements, debt amortization, and capital replacement funding schedules for the period 1997-2060. It incorporates the agency’s most current proposed or Board-adopted operating budget and long-term capital and operating financial projections for Regional Express, Sounder commuter rail, Link light rail, Tacoma Link light rail, and Stride Bus Rapid Transit as included in the Sound Move, ST2, and ST3 voter-approved programs.
At the heart of the LRFP is the 2017-2041 financial projections model. This model incorporates all financial policies, assumptions, revenue forecasts, and program cost estimates needed to calculate cash flow, debt financing, and key performance indicators (e.g., cash balances and debt service coverage ratios) over the long-range planning horizon. The diagram below illustrates the concept of this model.
KEY ELEMENTS OF THE LONG-RANGE FINANCIAL PLAN
Financial Projections 2017-2041
Board-Adopted Financial Policies
Program Costs from Engineers’ Estimates
Key Planning Assumptions
Independent Revenue and
Inflation Forecasts
Budget and Audited
Financials
(2017-2020)
The Old Tables are Here:07.0P - Long Range Financial Plan https://sharepoint.soundtransit.org/sites/FIT/bu
dget/_layouts/xlviewer.aspx?id=/sites/FIT/budg
et/2020%20Budget%20%20TIP/Proposed%20Bo
ok%20Oct%202020/07.1P%20-%20Table%20-
%20Sources%20Uses%20Budget%20Sum.xlsx&S
ource=https%3A%2F%2Fsharepoint%2Esoundtra
nsit%2Eorg%2Fsites%2FFIT%2Fbudget%2F2020
%2520Budget%2520%2520TIP%2FForms%2FAllI
tems%2Easpx%3FRootFolder%3D%252Fsites%25
2FFIT%252Fbudget%252F2020%2520Budget%25
20%2520TIP%252FProposed%2520Book%2520O
ct%25202020%26FolderCTID%3D0x012000A02D
8DFBDA5F5E46B37A574E7FE580C3%26View%3
D%7B286191E0%2D77C0%2D4D5F%2D8CFD%2
DF70753BBDA4C%7D&DefaultItemOpen=1&Def
aultItemOpen=1
2020 Financial Plan & Proposed Budget
1 of 144
Sources and Uses
Agency sources and uses (2017—2041) are shown below.
SOURCES OF FUNDS $97.9B USES OF FUNDS $97.9B(YOE$ in millions) (YOE$ in millions)
2020 Financial Plan & Proposed Budget 2 of 144
Financial Plan - Sources & Uses Summary
2019 Fall Financial Plan
2017 through 2041; YOE Dollars in Millions
SnohomishNorth
King
South
King
East
KingPierce
System-
wideTotal
Sources of Funds
Tax Revenues
Sales and Use 6,258 16,084 6,962 12,704 9,054 - 51,062
MVET 1,245 1,852 1,105 2,464 1,773 - 8,439
Property Tax 514 1,737 527 1,442 623 - 4,842
Rental Car Tax 4 10 70 6 5 - 96
Total Tax Revenues 8,021 19,683 8,664 16,615 11,455 - 64,438
Other Revenue
Grant Revenue 1,537 2,081 1,438 1,424 993 557 8,029
Fare Revenue 474 3,740 877 955 670 - 6,717
Other Revenue 14 141 30 73 34 11 302
Interest Earnings - - - - - 473 473
Total Other Revenue 2,025 5,961 2,345 2,452 1,697 1,041 15,521
Bond Proceeds (with DSRF) [ 2,496 6,621 3,449 1,461 564 - 14,589
TIFIA Proceeds 471 1,088 926 836 - - 3,320
Total Sources 13,013 33,353 15,383 21,363 13,716 1,041 97,869
Uses of Funds
Capital Expenditures (Including Service Delivery)
Light Rail Transit 7,814 13,279 4,579 9,642 2,587 4,605 42,506
Tacoma Link - - - - 1,216 - 1,216
Commuter Rail 109 - 1,081 - 2,169 - 3,359
Regional Express Bus 136 90 120 340 324 - 1,009
Bus Rapid Transit 44 443 267 1,304 7 - 2,065
System-wide 18 104 42 70 15 1,078 1,326
Service Delivery 20 17 35 38 39 1 151
Total Capital Expenditures 8,142 13,933 6,123 11,393 6,357 5,685 51,633
O&M Expenditures
Light Rail Transit 998 6,934 2,192 1,695 382 - 12,201
Tacoma Link - - - - 583 - 583
Commuter Rail 343 - 934 - 1,024 - 2,301
Regional Express Bus 622 - 408 1,779 1,214 - 4,022
Bus Rapid Transit 136 252 178 707 - - 1,274
System-wide* 315 456 250 382 232 1,909 3,544
Total O&M Expenditures 2,413 7,642 3,963 4,562 3,436 1,909 23,925
SOGR 368 1,639 973 1,298 891 726 5,896
System-Wide Activities 948.7 2,353.9 1,036.3 1,991.3 1,362.9 (7,693.1) -
Reserve Contributions (O&M, R&R, DSRF) 207 556 294 157 81 0 1,295
Debt Service (Excludes TIFIA) 1,942 5,563.90 3,041 2,060 784 - 13,391
TIFIA Debt Service 311 780 687 449 - - 2,226
Change in Cash (1,318) 885 (733) (548) 804 414 (497)
Total Uses 13,013 33,353 15,383 21,363 13,716 1,041 97,869
*Includes Other O&M and Emergency Reserve
2020 Financial Plan & Proposed Budget
3 of 144
Revenues Sources
Revenue sources for 2017–2041 of $97.9 billion include tax revenue, grant revenue, fare revenue, interest earnings, and other revenue, such as advertising, real estate sales proceeds, rental income, and local contributions. Debt issuances in the form of bonds and Transportation Infrastructure Financing and Innovation Act (TIFIA) loans are used to bridge projected gaps between available revenues and expenditures.
Tax Revenue
Forecasting tax revenues for the Sound Transit district presents unique challenges, as the agency’s jurisdictional boundary does not correspond to any other economic reporting entity. The district includes incorporated and unincorporated areas in three counties: King, Pierce, and Snohomish.
Sound Transit receives tax base forecasts for Retail Sales and Use Tax (sales tax) and Motor Vehicle Excise Tax (MVET) from an independent 3rd party. The sales tax and MVET tax base forecasts are grounded on economic and population projections from the Puget Sound Economic Forecasting Model, a regional econometric model of King, Pierce, Snohomish, and Kitsap counties. The variables used to predict taxable retail sales include Puget Sound personal income, housing permits, and the unemployment rate, among other variables. The MVET tax base is forecast based on predictions of motor vehicles by type, driving-age population and the unemployment rate, as well as the expected average value of motor vehicles. Tax base forecasts are then allocated to each of the five Sound Transit subareas based on actual historical data from the State Department of Revenue and the State Department of Licensing.
For the property tax forecast, an independent 3rd party projects the growth of assessed value (AV) for both existing property and new construction within the Sound Transit district.
Assumptions:
Sales Tax Rate: 0.4 percent 1997–2009; 0.9 percent 2009–2017; 1.4 percent 2017–2041
(subject to potential sales tax rollback after 2041). Average Annual Tax Base Growth: 4.1
percent 2017–2041.
MVET Tax Rate: 0.3 percent 1997–2028 (tax ends in 2028), 0.8 percent 2017–2041 (updated
depreciation schedule 2029–2041). Average Tax Base Growth: 3.6 percent 2017–2041.
Rental Car Tax Rate: 0.8 percent. Average Tax Base Growth: 0.4 percent 2017–2041.
Property Tax Rate: Up to $0.25/$1,000 AV. Average AV growth: 5.0 percent 2017–2041.
Projected tax revenue of $64.4 billion comprises two-thirds of all revenue sources over 2017—2041.
TAX REVENUE 2017—2041
(YOE$ in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
Sales and Use Tax & Rental Car Tax MVET Property Tax
2020 Financial Plan & Proposed Budget
4 of 144
Grant Revenue
Federal funding is generally secured through Federal Transit Administration (FTA), Federal Highway Administration (FHWA), and Federal Railroad Administration programs currently authorized under the Fixing America’s Surface Transportation (FAST) Act and future authorizations. Funding is projected to be secured through both congressional appropriations and regional/national grant competitions. Multi-year funding awards are provisional and subject to annual Congressional budget appropriations.
Assumptions:
Sound Transit is projected to receive $8.0 billion in grant revenues 2017–2041.
Tacoma Hilltop Link Extension was awarded a $75 million Small Starts Grant Agreement.
Lynnwood Link Extension was awarded a FFGA of $1.2 billion.
Federal Way Link Extension projected to receive FFGA of $790 million.
Future ST3 FFGAs projected to receive $3.7 billion in FFGAs.
$2.1 billion in Formula Funds projected to be earned from 2017–2041.
Total projected grant revenue of $8.0 billion by grant type is shown on the following graph.
GRANT REVENUE 2017—2041(YOE$ in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$100
$200
$300
$400
$500
$600
New Starts Grants Formula Grants Other Grants
Ridership and Fare Revenue
Fare revenues are a product of transit ridership and fare prices. Ridership, in turn, is a result of transit service provided, as well as a number of other factors. In the near term, ridership can be estimated based on past trends and the amount of transit service to be provided (e.g., routes, service frequency, parking capacity at park-and-ride facilities, etc.).
2020 Financial Plan & Proposed Budget
5 of 144
Ridership
For long-range ridership forecasts, the Sound Transit travel demand forecasting model is used. In this model, transit ridership forecasts are based on observed origins and destinations of transit riders, observed transit line volumes, and a realistic simulation of observed transit service characteristics. The model is executed in three stages. In Stage 1, regional changes in demographics (households and employment) are taken into account.
In Stage 2, changes in transit and highway travel times, which reflect congestion levels, and cost factors such as parking costs, transit fares, and household income are taken into consideration. In Stage 3, incremental changes to the transit network, such as the addition of light rail services offered, are incorporated and a forecast of zone to zone transit trips, is prepared for the region. Each light rail alternative ridership forecast is paired with a comparable baseline ridership forecast in order to measure the impact of incremental changes in the transit network.
RIDERSHIP BY MODE 2017—2041(in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
0
20
40
60
80
100
120
140
160
180
200
Link Light Rail Boardings Tacoma Link Light Rail BoardingsSounder Commuter Rail Boardings ST Express Bus BoardingsStride Bus Rapid Transit Boardings
Fare Revenue
The LRFP assumes the agency continues to collect fare revenues from Sound Transit operations for ST Express bus, Link light rail, and Sounder commuter rail. Fare collection for Tacoma Link is assumed to begin when the Tacoma Link Expansion opens in 2022, and Stride will collect fares when the two Stride projects open in 2024. One Regional Card for All (ORCA) is a stored value smart card used for payment of public transit fares in the central Puget Sound. Fare revenue forecasts are based on ridership forecasts and assumptions regarding fare levels and price elasticity.
Assumptions:
Sounder and Link light rail fares are structured with a base fare plus a distance based charge
per mile traveled.
ST Express bus fares are projected to be comparable to bus fares of other transit agencies
serving the three counties. Fares paid with ORCA card receive a two-hour transfer credit for
the fare paid.
Senior, ORCA LIFT and youth fares are set lower than the standard Adult fare.
2020 Financial Plan & Proposed Budget
6 of 144
Fare changes will occur as necessary to comply with board approved farebox recovery
requirements.
Allocation of regional fare revenue to Sound Transit from collections through the ORCA card system are based on an inter-local agreement reached between Sound Transit, Community Transit, Everett Transit, King County Metro, Pierce Transit, Everett Transit, Kitsap Transit, and Washington State Ferries.
FARE REVENUE 2017—2041(YOE$ in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$100
$200
$300
$400
$500
$600
Link Light Rail Tacoma Link Light Rail Sounder Commuter Rail
ST Express Bus Stride Bus Rapid Transit
Interest Earnings
In accordance with Sound Transit financial policies, interest earnings are credited, at the agency level, to offset expenditures for system-wide programs.
Assumption:
Sound Transit will earn a 2.0 percent rate of return on General Fund cash balances and reserve fund balances throughout the planning horizon of 2041.
Other Revenue
Other revenue includes advertising, real estate sales proceeds, rental income, permit parking revenues, and local contributions. Local contributions include funds that are either granted directly to Sound Transit or are provided as a credit against taxes or fees that would otherwise be levied on construction activities by other jurisdictions or organizations. The agency has commitments from other jurisdictions and organizations for providing funds for ST Express bus, Link light rail, and Sounder commuter rail projects. Such revenues are included in the LRFP subsequent to executed agreements with the jurisdictions which are contributing the funding.
2020 Financial Plan & Proposed Budget 7 of 144
Expenditures
Expenditures in the LRFP include operations and maintenance, capital, state of good repair (SOGR), contribution to reserves, and financing.
Inflation Forecasting
Sound Transit uses three inflation indices in the LRFP to escalate projected costs over time:
Consumer Price Index (CPI-U Seattle) is applied to Operations and Maintenance expenses,
and “soft” capital costs, excluding construction-related elements and property acquisitions, and
is produced by an independent 3rd party;
Construction Cost Index (CCI) is applied to construction-related elements of the capital
program (including state of good repair), and a Seattle-area forecast of the CCI index is
produced by an independent 3rd party;
Right-Of-Way Index (ROWI) forecast is applied to property acquisition costs using an
assessed valuation forecast for the Sound Transit District produced by an independent 3rd
party.
Assumptions:
CPI Annual Cost Inflation* 2017–2041: 2.3 percent.
CCI Annual Cost Inflation* 2017–2041: 3.6 percent.
ROWI Annual Cost Inflation* 2017–2041: 4.6 percent.*based on compound annual growth rate
SOUND TRANSIT INFLATION INDICES – CONVERSION FROM 2017$ (2017 = 1.0)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
Seattle CPI Construction Cost Index Right-of-Way Index
Conve
rsio
n f
rom
2017$
Operations and Maintenance Sound Transit services currently consist of four transit modes: Link light rail, Sounder commuter rail, ST Express bus, and Tacoma Link light rail. The voter-approved ST3 plan includes a fifth mode: Stride Bus Rapid Transit. These modes are managed by the Sound Transit Operations Department. Each year, Sound Transit's Service Planning Division prepares a Service Implementation Plan (SIP) to guide the delivery of these modes. The total operations and maintenance (O&M) cost comprises forecasts for each mode and system-wide operating costs.
2020 Financial Plan & Proposed Budget
8 of 144
Transit Modes
Operations and maintenance (O&M) costs are projected by each transit mode as part of the annual budget process, taking into account all scheduled service expansions as laid out in the Transit Improvement Plan (TIP).
The O&M cost forecasts for each mode are based on a cost build-up model for each function (such as vehicle operations, vehicle maintenance, and facilities maintenance). The modal forecasts also include the cost of Sound Transit staff and other administrative expenses allocated to transit modes. Each cost category is forecasted using different metrics (such as platform hours, number of vehicles, number of stations, etc.). The relevant metrics are based on historical data, current year budget data, and other available information.
Non-labor operating costs are inflated using the Consumer Price Index (CPI-U Seattle). Labor costs are inflated using CPI-U Seattle increased by ten basis points. Some purchased transportation costs are inflated at a higher rate based on historical experience or known contract increases.
System-wide Operations & Maintenance (O&M) Costs
Other operating costs in the LRFP which are not specific to a transit mode include the following:
Administrative costs related to Sound Transit’s capital program. These are costs from capital
project staff that are not directly charged to the capital project. They include items such as sick
and vacation time that are not considered a direct project capital cost.
Revenue collection fees: The state of Washington charges Sound Transit revenue collection
fees on sales and use tax, rental car tax, and motor vehicle excise tax. The forecast of these
fees is included in the system-wide category.
Emergency Loss Fund: This fund includes reserves for uninsured capital and operating losses.
The Board authorizes the use of the emergency/loss fund on a case by case basis.
Sales and Use Tax Offset Fee: As required by RCW 81.112, Sound Transit must remit to the
Washington Department of Revenue a fee of 3.25% on construction contracts for ST3 projects,
until a total of $518 million is paid.
TRANSIT MODES OPERATIONS AND MAINTENANCE COSTS 2017—2041(YOE$ in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
Link Light Rail Tacoma Link Light Rail Sounder Commuter Rail
ST Express Bus Stride Bus Rapid Transit
2020 Financial Plan & Proposed Budget
9 of 144
Capital
The LRFP capital spending plan consists of seven categories. These include Sound Transit’s five transit modes: Link light rail, Tacoma Link light rail, Sounder commuter rail, Regional Express, and Stride Bus Rapid Transit. Additionally, there are two other categories of capital projects: “system-wide” which includes projects that benefit the agency (such as the Transit Oriented Development Planning Program), and “service delivery” which includes projects that support the delivery and operations of service, such as Signage Improvements.
The capital plan in the LRFP includes capital expenditures adopted in the Sound Move, ST2, and ST3 voter-approved programs. Capital expenditures include funding for projects detailed in the TIP, as well as projected future expenditures. The TIP contains dollars allocated to board-approved projects which have gone through the budget process. Beyond that, future capital expenditures comprise remaining projected spending on projects that do not have baseline budget established by the board. Voter-approved costs in constant dollars for system-expansion projects are published in constant dollars (2019$) in Appendix A.
For system expansion projects that do not have a baseline budget, future expenditures are forecasted by inflating the voter-approved cost using Sound Transit inflation indices and an internal cash flow. This is an estimate of the capital cost for each project until the Board establishes the baseline budget.
As shown the graph below, light rail expenditures make up the vast majority of the capital spending plan from 2017 to 2041. The high points in 2022 and 2028 represent the highest points of capital spending for the ST2 and ST3 programs respectively.
System-wide Activities
Sound Transit’s capital and operating programs include funding for projects that are regional in scope, including but not limited to: high-capacity transit studies; innovation and technology fund; Phase 4 planning; transit-oriented development studies; efficiency and sustainability fund; research and technology; fare integration and administration; and agency administration capital and operating projects.
CAPITAL EXPENDITURES BY MODE 2017— 2041(YOE$ in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
Link Light Rail Tacoma Link Light Rail
Sounder Commuter Rail Regional Express Bus
Stride Bus Rapid Transit System-Wide and Service Delivery
2020 Financial Plan & Proposed Budget
10 of 144
State of Good Repair
The LRFP projects expenses for the repair and replacement of key operating assets through State of Good Repair (SOGR) funding. Annual costs of future asset replacement and mid-life maintenance activity are calculated for each class of asset based on original cost, in-service date, estimated asset life, and other financial factors.
The annual payment calculation assumes that 100 percent of replacement costs will be funded by Sound Transit revenues. A $300 million capital reserve fund has been set aside in the LRFP projections with an annual 2.0% interest rate assumption on any earnings.
The replacement date for assets follows generally-accepted principles for the useful life of transit facilities and equipment. For buses the industry standard is a twelve year replacement cycle, for Sounder and Light Rail vehicles, the cycles are from “Methodology for Projecting Rail Transit Rehabilitation and Replacement Capital Financing Needs,” by Robert L. Peskin, published in the Transportation Research Record 1165. State of Good Repair prior to 2021 is included in the capital section of the LRFP model.
STATE OF GOOD REPAIR BY ASSET CATEGORY (YOE$ in millions)
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$100
$200
$300
$400
$500
$600
$700
$800
Contribution to Reserves
The agency maintains reserves to meet agency-wide revenue shortfalls or cost increases, including an operations & maintenance reserve fund, bond reserve fund, emergency loss fund, and capital replacement reserve fund.
Assumptions:
O&M Reserves equal to two months of O&M costs.
Principal Set-Aside for Bond Reserves: 7.15 percent.
Cash is managed so that a minimum $5 million operating balance is maintained in the General
Fund at all times.
2020 Financial Plan & Proposed Budget
11 of 144
Financing
Financial Policy
The agency uses short-term debt to bridge the gap between the timing of expenditures and the receipt of revenues. The current LRFP forecasts $14.6 billion in bonds will be issued from 2017-2041. Additionally, the plan forecasts $3.3 billion in federal loans under the Transportation Infrastructure Finance and Innovation Act (TIFIA), of which $2.7 billion have been executed and the remaining $600 million of loans are expected to be executed under the Master Credit Agreement (MCA).
Assumptions:
All-in Issuance Costs: 1.25 percent of par value.
Bond Interest Rate: 5.3 percent 2019 – 2060.
Bond Term: 30 years.
Interest Only Payment Period on Bonds: First five years.
Bonds may have a non-level principal amortization structure.
Performance and Ratings
The performance of the agency’s financing to date and in the future is evaluated by the agency’s credit rating and adherence to debt service coverage ratios and other financial policies. The agency’s current bond ratings are as follows: Moody’s, Aaa and Aa1 for Senior and Parity bonds, respectively; and Standard & Poor’s, AAA for all bonds. The executed TIFIA loans and the MCA have been rated AA+ by Fitch and A+ by Standard & Poor’s.
The agency net coverage ratio reaches a minimum of 2.17 in 2037 and rises thereafter.
Adherence to other minimum debt service coverage ratios are detailed in the table below.
Capacity
As described earlier, according to Washington state law, the amount of debt issued by Sound Transit cannot exceed 1.5 percent of the assessed valuation of real property located within the regional transit authority district. An important metric of the agency’s financial health is the remaining amount of debt that can be issued, or debt capacity.
The agency reaches a minimum debt capacity of $3.0 billion in 2032 and rises thereafter.
The agency reaches a maximum principal debt balance of $18.3 billion in 2035 and declines
thereafter.
The agency will utilize a maximum of 84.3 percent of its total debt capacity in 2032.
Debt Service Coverage Ratio
Policy Minimum Debt
Service Coverage
Ratio (DSCR)
Requirement
Minimum DSCR
ForecastedYear of Minimum
Net DSCR 1.5X 2.17x 2037
Senior/Prior ABT 2.00x 24.53x 2019
2nd Junior/TIFIA ABT (1.1x Minimum) 1.10x 2.27x 2035
Subordinate/Parity ABT 1.50x 2.27x 2035
2020 Financial Plan & Proposed Budget
12 of 144
DEBT CAPACITY 2017—2041(YOE$ in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
Principal Balance on Tax-Backed Debt Agency Debt Capacity
The following chart summarizes the agency’s financing needs, which is based on the gap between revenues and expenditures, through 2041. Total projected revenue is insufficient to fund total expenditures and debt service for the period of 2022 to 2040 during which the majority of agency debt will be issued.
Bond proceeds represent 14.9 percent of total revenue during the period of 2017 to 2041 and are the second largest contributor behind tax revenue, which comprises 65.8 percent of total revenue throughout the same period.
SUMMARY OF REVENUES, EXPENDITURES, AND BORROWING 2017 — 2041(YOE$ in millions)
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
$-
$1,000.00
$2,000.00
$3,000.00
$4,000.00
$5,000.00
$6,000.00
Expenditures Debt Service Payments Revenue Bond Proceeds
2020 Financial Plan & Proposed Budget
13 of 144
LRFP Analysis
The LRFP reflects all assumptions and contingencies as detailed throughout this section and at present meets all criteria stated in the Financial Policies and Controls section of Agency Overview.
Financial Risks
Stress tests are regularly conducted on the LRFP in order to assess the extent to which the agency’s plans are susceptible to not being fully met due to external risk factors. Completion of a series of these tests has confirmed that, at the agency level, Sound Transit has sufficient financial flexibility to withstand significant adverse financial shocks. However, on a stand-alone basis, individual subareas are more susceptible to negative financial developments than the agency as a whole.
Key Risk Areas
Federal Funding: The LRFP assumes New Starts Funding including $790 million for Federal Way Link Extension and $3.7 billion for future FFGA projects.
Local Tax Revenue Growth: Sound Transit primarily relies on an independent forecaster for its local tax bases. The tax revenue forecast projects continued improvement through 2019 then stabilizes thereafter. The forecast included in the LRFP does not predict economic cycles. However, long-term economic forecasts are inherently uncertain and actual economic growth in the region could be lower than the current forecast. If revenue growth were to fall below the current forecast, the agency’s revenue collections as well as its long-term bonding capacity would be reduced. A significant reduction in local tax revenues would have a negative impact on the agency’s financial condition.
Interest Rates: The LRFP assumes that the agency can borrow at 5.3 percent interest on its long-term bonds. If borrowing rates were to rise above this level for a prolonged period of time, the cost to borrow and service debt could increase to the point that the agency’s capacity to borrow additional funds would be negatively impacted. Although current interest rates are relatively low, various factors may cause interest rates to rise in the mid-to-long term.
Inflation: The Puget Sound region has experienced relatively mild price increases for general goods and services. The CPI-U is currently low and is projected to remain in the 2.0 percent to 2.7 percent range through 2041. However, the region has experienced high property appreciation and construction prices also appear to be higher than prior periods.
The LRFP incorporates long-term consumer price, construction cost, and real estate cost inflation forecasts provided by independent consultants or developed internally using data from external sources. The current forecast projects long term inflation will reflect historically moderate levels. If inflation were to rise significantly beyond this forecast, or if Sound Transit’s construction schedules were to be delayed, the agency’s capital and operating costs would also rise beyond the current forecast. Historically, retail sales and use tax, the agency’s primary revenue source, has risen with general price levels partially mitigating this risk.
Operations and Maintenance Costs: The LRFP utilizes O&M cost build-up models to project costs for Sounder, Link Light Rail, Tacoma Link and ST Express bus services. These models calculate the annual cost associated with providing projected service levels based on the amount of inputs (e.g., staffing, equipment, and materials) needed to provide service at those projected levels. The parameters for these models are developed from experience of both Sound Transit and other transit agencies operating similar services. It is recognized that O&M costs are affected by many factors, including partnership operating agreements and changes in operating efficiency. The cost of fuel, utilities, spare parts, and supplies are subject to change depending on regional and even international market conditions. Adverse changes in these consumables may lead to higher O&M costs than projected in the LRFP, thus reducing financial capacity and flexibility.
2020 Financial Plan & Proposed Budget
14 of 144
Federal Funding Shortfalls
The LRFP assumes full funding of federal grants with recognition of the potential risk that certain grants may not be fully funded. In the event of cost increases or funding shortfalls, there are several mitigation strategies that could be implemented.
Apply savings from bonding: The LRFP uses conservative assumptions regarding bonding and debt coverage, which are appropriate for long-range planning. However, as the agency implements the capital program, it may be possible to apply savings from debt service costs as the projects begin their construction phases.
Changes to financial policies and financial planning assumptions: The agency’s financial policies and financial planning assumptions, such as debt service coverage and capital replacement, could be altered within prudent financial parameters in order to make additional resources available.
Construction schedule extended: Delaying the construction schedule of future projects could generate additional resources. In most years, tax revenues increase faster than cost inflation. Another benefit in extending the construction schedule is the postponement of operating costs and debt service costs.
Control O&M costs: If growth of O&M costs increase significantly above inflation, Sound Transit could find alternate providers for services, or reduce the level of service on routes/runs that have high costs and/or low ridership efficiencies.
Sensitivity Analysis / Stress Tests
A series of sensitivity analyses or “stress tests” were conducted to assess the extent to which the agency’s ability to fulfill its voter approved mission is at risk due to the impact of external factors on the LRFP.
The impact of several types of potential financial events were tested by examining the impact on the agency debt capacity limit (pursuant to state law) and the net debt service coverage ratio (DSCR). It is agency policy to maintain a minimum agency wide net debt service coverage ratio of 1.5 or greater in any year. Generally, the agency will run out of debt capacity prior to reaching the net debt service coverage ratio of 1.5.
As described earlier, Sound Transit’s debt limit is pursuant to state law based on the assessed valuation of real property located within the regional transit authority district. There are two types of bond limits — one for non-voted debt, and the other for voted debt. Sound Transit may issue total outstanding debt in an amount up to 1.5 percent of assessed valuation within its district without special voter authorization. Upon the approval of 60 percent of the electorate, Sound Transit could issue bonds in amounts up to 5.0 percent of assessed valuation.
The stress tests conducted are as follows:
Sales Tax Revenue: How much could sales tax revenues decline before the agency debt capacity available reaches $0 or the net DSCR drops to 1.5, whichever is first?
Sales tax revenues would need to decline approximately $3 billion or 5.9 percent (2017 – 2041) versus the current LRFP before the available debt capacity reaches $0.
Bond Interest Rates: How much could interest rates paid on all agency bonds issued after 2018 increase before the agency debt capacity limit reaches $0 or the net DSCR drops to 1.5, whichever is first?
Interest rates would need to increase to 7.6 percent, up from 4 percent from 2018 to 2020 and 5.3 percent from 2021 to 2060 before the net debt service coverage ratio equals 1.5.
2020 Financial Plan & Proposed Budget
15 of 144
Capital Cost Inflation: How much additional capital spending could the agency absorb beyond current planning estimates before the agency debt capacity limit reaches $0 or the net DSCR drops to 1.5, whichever is first?
The agency could sustain up to $2.8 billion in additional project costs (spread evenly from 2020-2041) before the available debt capacity reaches $0.
Inflation: How much would the Consumer Price, Construction Cost, and Right-of-Way Indices need to increase before the agency debt capacity limit reaches $0 or the net DSCR drops to 1.5x, whichever is first?
In 2021, all three indices would need to increase by an additional 9.3 percent over the current forecast from 2020 (and then increase at the previously forecasted rate from 2029 to 2041) before the available debt capacity reaches $0.
2020 Financial Plan & Proposed Budget
16 of 144
2020 Budget Overview
Business Planning and Performance Management
Sound Transit’s executive leadership team establishes strategic priorities with guidance from the Board to implement the agency’s mission: Connecting more people to more places to make life better and create equitable opportunities for all. The strategic priorities emphasize the agency’s core values and focus on the agency’s commitment to serving the public, managing finances, cultivating staff, and improving processes.
Departments and project teams set goals and performance measures that align with these priorities to plan, implement, monitor, and continually improve effectiveness and efficiency throughout the agency. This planning is a critical step to ensuring a more strategic and sustainable spending plan.
Budget Summary
The 2020 annual budget includes revenues and financing sources of $2.5 billion and outlays of $3.1 billion.
Sound Transit expects to receive $2.5 billion in revenues and financing sources in 2020, an increase of $52.2 million or 2.2 percent over the 2019 budget, driven by higher taxes, federal grant drawdowns, and state and local contributions. The proposed 2020 annual budget does not currently include any forecasted bond issuance for 2020 or Transportation Infrastructure Finance and Innovation Act (TIFIA) loan proceeds.
The total transit modes budget of $370.0 million is up 4.4 percent compared to the 2019 budget, primarily due to increases in third party costs to operate our modes (purchased transportation), staffing growth, and transit vehicle overhauls. Also, Sound Transit will take full ownership of the Downtown Seattle Transit Tunnel from King County Metro on January 1, 2020, which will increase our costs for insurance and third party costs for public safety and maintenance.
Total project spending is budgeted at $2.5 billion for 2020. Approximately $2.3 billion or 90.8 percent is budgeted to continue with planning, design, and build-out of the capital program. An additional $114.5 million is budgeted to enhance or maintain current operational assets. Administrative projects, which include information technology hardware and applications, administrative costs allocated to projects, and general and administrative expenses, are budgeted at $127.3 million.
Other expenses total $176.8 million for 2020. Of that total, $144.4 million is budgeted for debt service, which includes principle repayments, interest expense, loan amortization, and financing fees. Another $16.7 million is budgeted for fees paid to the Washington Departments of Revenue (DOR) and Licensing (DOL) for the collection and administration of taxes. In addition, a sales and use tax offset fee is paid to the DOR. A $5.0 million cash contribution to the city of Seattle for First Hill Streetcar operating and maintenance expenses is budgeted for 2020. Also, $10.8 million is budgeted for operating contingency.
Lastly, the budget anticipates the use of approximately $0.6 billion of unrestricted cash in 2020 to close the gap between this year’s sources ($2.5 billion) and uses ($3.1 billion). The agency’s unrestricted cash balance is expected to be $1.3 billion at the end of 2019 and is estimated to be $696 million at the end of 2020.
2020 Financial Plan & Proposed Budget 17 of 144
2020 BUDGET SUMMARY(in thousands)
2018
Actual
2019
Budget
2019
Forecast
2020
Budget
$1,337,601 $1,366,029 $1,391,889 $1,446,228
338,537 335,353 340,176 355,220
3,802 3,757 3,757 3,840
146,284 149,070 149,070 155,500
169,970 318,373 318,373 332,921
77,937 920 9,155 19,686
96,018 102,564 97,642 100,087
37,801 33,683 57,294 47,915
13,448 12,234 12,234 12,771
56,606 100,000 100,000 0
$2,278,003 $2,421,983 $2,479,590 $2,474,167
$116,942 $144,420 $138,311 $147,679
51,250 56,552 56,416 65,666
136,065 148,469 144,442 150,849
5,459 4,922 5,379 5,844
309,715 354,362 344,549 370,037
1,242,457 2,286,270 1,986,533 2,284,877
8,258 35,219 23,538 38,387
11,774 26,961 16,914 76,103
84,200 88,573 106,299 127,315
(2,659) (3,899) (3,899) (9,377)
1,344,029 2,433,125 2,129,384 2,517,305
134,272 135,007 134,609 144,387
6,652 9,454 10,348 16,657
5,000 5,000 5,000 5,000
- 2,046 627 10,800
145,924 151,506 150,584 176,844
$1,799,669 $2,936,948 $2,623,889 $3,064,186
$1,302,699
$2,474,167
(3,064,186)
(3,792)
(13,367)
$695,521
12019 project budgets include budget amendments approved by the Board through September 30, 2019.2Operating projects charged to modes through expense transfers.
Projected Unrestricted Cash Balance as of 12/31/2020
Sources
Total Revenues and Other Financing Sources
Uses
Expenses and Outlays
Reverse Non-Cash Expenses
Reserves
Projected Unrestricted Cash Balance as of 1/1/2020
State Of Good Repair
Administrative
Charges to Transit Modes2
Subtotal Projects
Others
Debt Service
Tax Collection & Fees
Cash Donations to Other Governments
Operating Contingency
Subtotal Others
Total Expenses & Outlays
Enhancement
Bond & TIFIA Loan Proceeds
Total Revenues and Other Financing Sources
Expenses & Outlays
Transit Modes
Link
Sounder
ST Express
Tacoma Link
Subtotal Transit Modes
Projects1
System Expansion
Miscellaneous Revenues
Revenues and Other Financing Sources
Retail Sales And Use Tax
Motor Vehicle Excise Tax
Rental Car Tax
Property Tax
Federal Grants
Local & State Contributions
Passenger Fare Revenue
Investment Income
2020 Financial Plan & Proposed Budget 18 of 144
Department Budgets
The proposed 2020 budget for Sound Transit departments totals $554.3 million, an increase of $45.9 million
or 9.0 percent over the 2019 budget. Major drivers of the increase are higher staffing, operating contingency,
and third party rates for purchased transportation services and insurance. Of these, staffing is the largest
change. Salaries and benefits increased by $26.0 million or 17.6 percent over the 2019 budget primarily due
to a full year of costs for 129 positions added in 2019, along with 65 new positions approved for 2020.
Department expenses are allocated to the budgets for Transit Modes, Projects, and Others.
DEPARTMENT OVERVIEW SUMMARY(in thousands)
Department 2019
Budget
2020
Budget
Budget $
Change
Budget %
Change
Communications $12,447 $13,626 $1,179 9.5%
Design, Engineering & Construction Management 55,100 65,867 10,767 19.5
Executive 26,941 31,942 5,001 18.6
Finance 26,375 30,638 4,262 16.2
Information Technology 32,784 36,283 3,499 10.7
Legal 4,845 5,442 598 12.3
Operations 325,995 334,400 8,405 2.6
Planning, Environment & Project Development 14,209 15,816 1,607 11.3
Safety & Quality Management 7,661 9,497 1,836 24.0
Operating Contingency 2,046 10,800 8,754 427.9
Total Department Budgets $508,402 $554,310 $45,909 9.0%
Agency Staffing
Staffing growth in 2020 is driven primarily by increasing capital project activities. Sound Transit tracks and
forecasts long-term staffing needs, balancing the addition of permanent positions with the use of consultants,
to ensure capital and operating programs are adequately supported and affordable. Changes in departmental
staffing levels from 2017 to the 2020 proposed budget are summarized below.
AGENCY STAFFING SUMMARY
Department 2017 2018 Adopted Changes Current New Proposed
Communications 41 69 71 1 72 0 72
Design, Engineering & Construction Management 297 309 327 0 327 7 334
Executive 161 194 156 6 162 9 171
Finance 77 90 102 (3) 99 5 104
Information Technology 94 115 121 6 127 15 142
Legal 21 23 23 0 23 2 25
Operations 162 183 225 1 226 21 247
Planning, Environment & Project Development 74 85 95 0 95 6 101
Safety & Quality Management 0 0 66 0 66 0 66
Total Positions 927 1,068 1,186 11 1,197 65 1,262
2019 2020
Note: Community Outreach division was transferred from DECM to COM in 2018. Safety and Quality Management was
transferred from EXEC to become its own department in 2019.
2020 Financial Plan & Proposed Budget 19 of 144
Transit Modes Summary
The 2020 budget for modal operations totals $370.0 million, which is $15.7 million or 4.4 percent higher than
the 2019 budget. In 2020, Sound Transit expects to exceed 51 million boardings by providing approximately
985 thousand revenue vehicle hours across our four modes of service.
Transit mode costs include operations and vehicle maintenance provided primarily through agreements with our transit agency partners. Sound Transit employees perform operations and maintenance for Tacoma Link only. Our light rail, commuter rail, and express bus services are supported by 34 rail stations, six ST-owned transit centers, and six ST-owned park-and-ride lots. Sound Transit also operates through numerous facilities owned by other agencies.
The transit mode budgets shown in this section represent all operating budget activities associated with the mode, including agency administrative costs. Modal budgets comprises costs managed primarily by the Operations department, plus costs managed by other supporting departments.
2020 TRANSIT MODES BUDGET (in thousands)
2018
Actual
2019
Budget
2019
Forecast
2020
Budget
Budget $
Change
Budget %
Change
$6,953 $7,175 $8,257 $8,953 $1,778 24.8
4,496 4,931 5,672 6,147 1,216 24.7
Subtotal 11,449 12,106 13,929 15,100 2,994 24.7
30 85 95 85 0 .0
1,408 6,217 6,184 4,758 (1,459) (23.5)
(1) 0 0 0 0 .0
30,319 31,718 30,404 32,832 1,114 3.5
23,933 34,012 30,427 33,058 (954) (2.8)
5,351 5,465 5,220 5,936 471 8.6
Subtotal 61,040 77,498 72,329 76,670 (828) (1.1)
8,820 11,186 10,572 11,087 (99) (.9)
5,496 5,714 5,354 5,931 217 3.8
7,176 6,903 5,976 9,454 2,552 37.0
3,182 2,974 2,667 3,079 105 3.5
2,195 2,187 2,350 2,591 404 18.5
174,069 193,999 191,423 200,834 6,835 3.5
Subtotal 176,264 196,186 193,773 203,425 7,239 3.7
3 4 4 2 (2) (58.1)
77 124 103 46 (77) (62.7)
417 400 358 400 0 .0
34 60 48 64 5 8.1
42 73 66 78 5 6.8
Subtotal 573 661 579 591 (70) (10.6)
8,056 7,759 7,390 1,079 (6,680) (86.1)
198 200 511 790 591 295.5
Subtotal 8,253 7,959 7,901 1,869 (6,090) (76.5)
2,659 3,899 3,899 9,377 5,478 140.5
7,232 8,976 8,404 10,621 1,645 18.3
0 (909) (717) (1,731) (822) 90.4
17,571 21,211 19,882 24,564 3,353 15.8
Subtotal 27,462 33,176 31,468 42,831 9,654 29.1
$309,715 $354,362 $344,549 $370,037 $15,675 4.4%
Other Services
Salaries & Benefits
Salaries
Benefits
Services
Marketing Agency
Professional & Technical
Temporary Services
Contract Maintenance
Security & Safety
Training
Materials & Supplies
Utilities
Insurance
Taxes
Purchased Transportation Services
Paratransit
Purchased Transportation
Miscellaneous
Dues & Subscriptions
Travel & Meetings
Advertising & Promotion Media
Operations Department
Transfer to CIP
Administrative Departments
Transit Modes Total
Other Miscellaneous
Leases & Rentals
Transit Way
General Administrative Facilities
Expense Transfers
Capital Maintenance and Other Projects
2020 Financial Plan & Proposed Budget 21 of 144
Summary by Mode
Link Light Rail
The Link Light Rail operates on over 20 miles of alignment between the University of Washington Station in the City of Seattle and Angle Lake Station in the City of SeaTac, serving 16 passenger stations, including four stations in the Downtown Seattle Transit Tunnel (DSTT). Sound Transit will take over the ownership of DSTT from King County Metro (KCM) effective January 1, 2020. Link is operated and maintained via a contract with KCM.
2020 LINK BUDGET(in thousands)
2018
Actual
2019
Budget
2019
Forecast
2020
Budget
Budget $
Change
Budget %
Change
$3,108 $3,223 $3,548 $3,957 $734 22.8
2,009 2,250 2,477 2,717 467 20.7
Subtotal 5,116 5,473 6,025 6,674 1,201 21.9
12 34 31 38 4 12.5
309 4,262 3,863 2,841 (1,421) (33.3)
(1) 0 0 0 0 .0
9,979 12,768 11,766 13,974 1,206 9.4
18,059 26,185 23,454 25,572 (614) (2.3)
2,000 2,234 2,025 2,527 293 13.1
Subtotal 30,358 45,483 41,140 44,952 (531) (1.2)
3,594 4,563 4,563 4,381 (182) (4.0)
3,787 3,915 3,726 4,053 138 3.5
5,014 4,295 3,795 6,100 1,805 42.0
995 1,129 1,024 1,122 (8) (.7)
2,195 2,187 2,350 2,591 404 18.5
44,728 50,969 50,969 54,760 3,791 7.4
Subtotal 46,923 53,156 53,319 57,352 4,196 7.9
2 3 3 1 (2) (67.2)
27 55 50 35 (20) (36.8)
161 160 145 180 20 12.5
21 21 19 20 (1) (5.5)
6 0 0 0 0 .0
Subtotal 217 240 217 236 (4) (1.5)
5,604 6,900 6,236 507 (6,393) (92.7)
17 14 14 17 3 21.2
Subtotal 5,622 6,914 6,250 524 (6,390) (92.4)
2,597 2,479 2,479 2,538 60 2.4
3,680 4,912 4,619 5,771 859 17.5
9,039 11,861 11,154 13,977 2,116 17.8
Subtotal 15,316 19,252 18,252 22,286 3,034 15.8
$116,942 $144,420 $138,311 $147,679 $3,259 2.3%
Other Services
Salaries & Benefits
Salaries
Benefits
Services
Marketing Agency
Professional & Technical
Temporary Services
Contract Maintenance
Security & Safety
Training
Materials & Supplies
Utilities
Insurance
Taxes
Purchased Transportation Services
Paratransit
Purchased Transportation
Miscellaneous
Dues & Subscriptions
Travel & Meetings
Advertising & Promotion Media
Operations Department
Administrative Departments
Mode Total
Other Miscellaneous
Leases & Rentals
Transit Way
General Administrative Facilities
Expense Transfers
Capital Maintenance and other Projects
2020 Financial Plan & Proposed Budget 22 of 144
Sounder Commuter Rail
Sounder commuter rail spans three counties and serves commuters making their way between Lakewood on
the south end and Everett on the north end of Central Puget Sound. Sounder service operates via a contract
with BNSF Railway Company, owner of the railway between Tacoma and Everett. Sound Transit owns the
railway from Lakewood to Tacoma. Amtrak provides maintenance for the Sounder fleet of locomotives and
passenger cars.
2020 SOUNDER BUDGET(in thousands)
2018
Actual
2019
Budget
2019
Forecast
2020
Budget
Budget $
Change
Budget %
Change
$1,393 $1,361 $1,674 $1,560 $198 14.6
897 946 1,163 1,071 125 13.2
Subtotal 2,290 2,308 2,837 2,630 323 14.0
9 26 26 21 (4) (16.7)
1,022 754 774 825 71 9.4
14,880 15,895 16,316 16,281 386 2.4
3,137 4,269 3,825 4,078 (191) (4.5)
2,011 2,045 2,099 2,132 87 4.2
Subtotal 21,059 22,989 23,041 23,338 349 1.5
4,961 6,331 5,805 6,294 (37) (.6)
1,338 1,357 1,231 1,415 58 4.3
2,242 2,274 1,874 2,797 523 23.0
1,432 1,107 1,004 1,235 128 11.6
12,962 13,028 13,373 14,107 1,079 8.3
Subtotal 12,962 13,028 13,373 14,107 1,079 8.3
1 1 1 1 (0) (31.8)
12 17 15 10 (7) (39.5)
121 120 109 100 (20) (16.7)
3 3 3 3 0 .5
36 73 66 78 5 6.8
Subtotal 173 214 194 192 (22) (10.2)
377 380 576 412 32 8.3
154 155 474 750 595 382.7
Subtotal 531 536 1,050 1,162 626 116.9
41 1,420 1,420 6,467 5,047 355.4
1,520 1,751 1,610 2,175 424 24.2
2,703 3,237 2,977 3,853 617 19.1
Subtotal 4,264 6,407 6,007 12,495 6,087 95.0
$51,250 $56,552 $56,416 $65,666 $9,114 16.1%
Materials & Supplies
Salaries & Benefits
Salaries
Benefits
Services
Marketing Agency
Professional & Technical
Contract Maintenance
Security & Safety
Other Services
Leases & Rentals
Utilities
Insurance
Taxes
Purchased Transportation Services
Purchased Transportation
Miscellaneous
Dues & Subscriptions
Travel & Meetings
Advertising & Promotion Media
Training
Other Miscellaneous
Mode Total
Transit Way
General Administrative Facilities
Expense Transfers
Capital Maintenance and other Projects
Operations Department
Administrative Departments
2020 Financial Plan & Proposed Budget 23 of 144
ST Express Bus
ST Express offers fast, frequent, two-way service on 27 routes, connecting Snohomish, King, and Pierce
Counties. Sound Transit provides this bus service via non-competitively procured service agreements with
transit partners, including King County Metro, Pierce Transit, and Community Transit in Snohomish County.
ST Express provides services to over 50 transit centers and park-and-ride lots.
2020 ST EXPRESS BUDGET(in thousands)
2018
Actual
2019
Budget
2019
Forecast
2020
Budget
Budget $
Change
Budget %
Change
$741 $733 $853 $805 $72 9.9
481 506 589 553 47 9.3
Subtotal 1,222 1,238 1,442 1,358 120 9.7
9 26 24 26 0 .0
70 1,186 1,097 1,054 (132) (11.2)
4,748 2,510 2,321 1,844 (665) (26.5)
2,272 2,949 2,602 2,849 (100) (3.4)
1,335 1,176 1,088 1,268 91 7.7
Subtotal 8,435 7,847 7,133 7,041 (807) (10.3)
68 71 61 112 41 58.5
272 333 289 357 24 7.2
(288) 152 132 302 150 99.0
755 738 639 720 (18) (2.4)
116,379 129,997 127,076 131,962 1,964 1.5
Subtotal 116,379 129,997 127,076 131,962 1,964 1.5
0 0 0 0 0 .0
9 15 13 1 (14) (94.5)
135 120 104 120 0 .0
0 10 9 6 (4) (41.1)
Subtotal 145 145 126 127 (18) (12.6)
2,075 479 578 160 (319) (66.6)
2 0 0 0 (0) (15.0)
Subtotal 2,076 480 578 161 (319) (66.5)
22 0 0 372 372 100.0
1,825 2,068 1,930 2,295 227 11.0
5,153 5,400 5,038 6,042 643 11.9
Subtotal 7,000 7,468 6,968 8,710 1,242 16.6
$136,065 $148,469 $144,442 $150,849 $2,380 1.6%
Services
Salaries & Benefits
Salaries
Benefits
Miscellaneous
Marketing Agency
Professional & Technical
Contract Maintenance
Security & Safety
Other Services
Materials & Supplies
Utilities
Insurance
Taxes
Purchased Transportation Services
Purchased Transportation
Mode Total
Dues & Subscriptions
Travel & Meetings
Advertising & Promotion Media
Training
Leases & Rentals
Transit Way
General Administrative Facilities
Expense Transfers
Capital Maintenance and other Projects
Operations Department
Administrative Departments
2020 Financial Plan & Proposed Budget 24 of 144
Tacoma Link Light Rail
Tacoma Link is a 1.6-mile light rail passenger line that connects the heart of downtown Tacoma with the
regional transportation hub at Tacoma Dome Station. It is operated and maintained by Sound Transit. There
are six unique stations complete with artwork that reflects the history and community of Tacoma. Trains run
every 12 minutes during the day on weekdays and Saturdays, and every 24 minutes at all other times.
2020 TACOMA LINK BUDGET(in thousands)
2018
Actual
2019
Budget
2019
Forecast
2020
Budget
Budget $
Change
Budget %
Change
$1,711 $1,858 $2,182 $2,631 $773 41.6
1,110 1,229 1,444 1,806 577 47.0
Subtotal 2,821 3,087 3,626 4,437 1,351 43.8
8 15 14 38 23 156.3
712 546 449 732 186 34.1
464 609 546 560 (49) (8.1)
4 9 6 10 0 3.1
Subtotal 1,188 1,179 1,015 1,340 160 13.6
198 220 143 299 79 35.7
99 108 108 106 (2) (2.2)
208 181 176 255 74 40.8
0 0 0 3 3 735.3
0 5 5 5 0 .0
Subtotal 0 5 5 5 0 .0
0 0 0 0 0 .0
29 36 25 0 (36) (99.6)
9 25 17 35 10 39.4
Subtotal 38 62 42 36 (26) (42.4)
24 30 23 23 (7) (23.3)
Subtotal 24 30 23 23 (7) (23.3)
206 245 245 380 134 54.8
0 (909) (717) (1,731) (822) 90.4
676 713 713 691 (22) (3.1)
Subtotal 882 49 241 (660) (709) (1,455.9)
$5,459 $4,922 $5,379 $5,844 $922 18.7%
Services
Salaries & Benefits
Salaries
Benefits
Dues & Subscriptions
Professional & Technical
Contract Maintenance
Security & Safety
Other Services
Materials & Supplies
Utilities
Insurance
Taxes
Purchased Transportation Services
Purchased Transportation
Miscellaneous
Transfer to CIP
Administrative Departments
Modes Total
Travel & Meetings
Training
Leases & Rentals
General Administrative Facilities
Expense Transfers
Operations Department
2020 Financial Plan & Proposed Budget 25 of 144
Project Budgets
Project Budget Summary
Total project spending is budgeted at $2.5 billion for 2020. Approximately $2.3 billion or 90.8 percent is budgeted to continue with planning, design, and build-out of Sound Transit’s capital program. An additional $114.5 million is budgeted to enhance, replace or maintain current operational assets and capabilities. Administrative projects, which include information technology hardware and applications, administrative costs allocated to construction in progress, and general and administrative expense, are budgeted at $127.3 million.
The Transit improvement Plan (TIP) that appears later in this document, includes history and forecasts for all Board authorized project allocations for active projects. This section provides projects organized first by category: System Expansion, System Enhancement, State of Good Repair, Administrative, and Other, and then by mode: Link, Sounder, Regional Express, Stride and Other (non-mode specific).
System Expansion
System Expansion projects expand the regional transit system, and include planning, design, and construction of light rail, commuter rail, express bus, and bus rapid transit infrastructure.
System Expansion – Link 2020 Budget Highlights
Link light rail projects account for $2.1 billion and include plans to:
Establish and commence preliminary engineering and environmental review for the Everett LinkExtension project, which represents the combination of two ST3 voter-approved projects: Lynnwoodto Everett Link Extension and Operations and Maintenance Facility North.
Continue preliminary engineering and environmental review on Tacoma Dome Link Extension, whichrepresents the combination of two ST3 voter-approved projects: Federal Way to Tacoma Dome LinkExtension and Operations and Maintenance Facility South.
Continue preliminary engineering and environmental review on the West Seattle and Ballard Linkextensions, which represent the combination of three ST3 voter-approved projects: Ballard LinkExtension, the Downtown Seattle Light Rail Tunnel and West Seattle Link Extension.
Begin planning and early right-of-way valuation for North Corridor Maintenance of Way facility. Mobilize construction on Downtown Redmond Link and Federal Way Link extensions. Continue systems design, procurement of systems long lead time procurements, advanced utility
relocation, and ramp up of civil construction for Lynnwood Link Extension.
Reach substantial completion on seven segments and continue systems implementation for East Link
Extension.
Reach substantial completion on Northgate Link terminus station and elevated guideway and post-
substantial completion for underground stations at Roosevelt and U-District, along with ongoing
systems installation.
Continue construction on the main line and Operations and Maintenance Facility and production
oversight of five light rail vehicles for the Hilltop Tacoma Link Extension.
Continue fleet inspection, delivery and commissioning process for 30 Link light rail vehicles.
Continue closeout activities for University Link and South 200th Link extensions.
2020 Financial Plan & Proposed Budget 27 of 144
2020 SYSTEM EXPANSION – LINK BUDGET(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
Downtown Redmond Link Extension $15,004 $158,410 $126,073 $149,607 ($8,803) (5.6)%
DSTT Single Tracking 0 2,500 1,409 0 (2,500) (100.0)
East Link Extension 623,536 743,944 613,938 605,984 (137,960) (18.5)
Enhancements to Tacoma Link
Extension1,117 910 271 0 (910) (100.0)
Everett Link Extension 0 0 145 14,560 14,560 0.0
Federal Way Link Extension 29,834 175,087 256,243 313,935 138,848 79.3
First Hill Streetcar 4 8 6 0 (8) (100.0)
Hilltop Tacoma Link Extension 20,393 61,344 61,278 61,730 386 0.6
Light Rail Vehicle Fleet Expansion 13,131 86,068 86,068 137,235 51,167 59.4
Link Operations & Maintenance Facility:
East53,789 108,417 99,307 68,050 (40,367) (37.2)
Lynnwood Link Extension 99,114 443,593 291,366 504,702 61,109 13.8
NE 130th Street Infill Station 87 5,905 3,211 577 (5,328) (90.2)
North Corridor MOW 38 0 23 439 439 0.0
Northgate Link Extension 286,985 244,800 243,835 126,148 (118,652) (48.5)
South 200th Link Extension 957 221 418 146 (75) (33.9)
Tacoma Dome Link Extension 7,010 13,280 15,902 25,902 12,622 95.0
University Link Extension 4,251 2,921 9,653 1,750 (1,171) (40.1)
West Seattle and Ballard Link
Extensions21,352 31,300 26,974 52,301 21,001 67.1
Total System Expansion - Link $1,176,602 $2,078,708 $1,836,121 $2,063,066 ($15,642) (0.8)%
Project
2020 Financial Plan & Proposed Budget 28 of 144
System Expansion - Sounder 2020 Budget Highlights
Sounder commuter rail projects are budgeted at $56.9 million and include plans to:
Start preliminary engineering, environmental review and alternatives analysis for Lakewood StationImprovements.
Begin request-for-proposal process for Kent and Auburn Station access improvement design-buildcontracts.
Complete the alternatives analysis for Edmonds and Mukilteo stations and parking accessimprovements.
Prepare for easement renewals and additions, as well as considerations stemming from SounderSouth Capacity Expansion project.
Commence utility relocations and right-of-way acquisitions for Sounder Maintenance Base. Continue closeout activities on seven Sounder projects.
2020 SYSTEM EXPANSION – SOUNDER BUDGET(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
Auburn Station Parking and Access
Improvements$1,516 $5,147 $1,848 $5,335 $188 3.7 %
D St-M St Track & Signal 7 50 21 30 (20) (40.0)
Edmonds and Mukilteo Stations
Parking & Access Improvements114 848 573 1,161 313 36.9
Kent Station Parking and Access
Improvements1,597 3,911 1,566 7,304 3,393 86.8
Lakewood Station Improvements 0 0 13 811 811 0.0
Mukilteo Station, S Platform 55 975 595 379 (596) (61.1)
Point Defiance Bypass 122 100 15 50 (50) (50.0)
Puyallup Station Parking and Access
Improvements3,425 9,188 3,674 24,375 15,187 165.3
Sounder Fleet Expansion 1,792 7,513 3,133 5,236 (2,277) (30.3)
Sounder Maintenance Base 2,007 7,087 4,500 2,982 (4,105) (57.9)
Sounder South Expanded Service 3,779 2,314 2,187 75 (2,239) (96.8)
Sounder Yard Expansion 182 100 73 55 (45) (45.0)
South Sounder Capacity Expansion 238 2,228 1,824 1,159 (1,069) (48.0)
Sumner Station Parking and Access
Improvements1,417 5,422 1,892 7,686 2,264 41.8
Tacoma Trestle Track & Signal 7,256 1,080 4,084 258 (822) (76.1)
Tukwila Station 23 1,280 614 50 (1,230) (96.1)
Total System Expansion - Sounder $23,529 $47,243 $26,611 $56,946 $9,703 20.5 %
Project
2020 Financial Plan & Proposed Budget 29 of 144
System Expansion - Regional Express 2020 Budget Highlights
Regional Express bus projects are budgeted at $43.3 million and include plans to:
Take delivery of six additional buses to expand ST Express fleet. Begin fixed contributions to development of Rapid Ride C&D in Seattle and Pacific Ave SR7 Bus
Corridor Improvements in Tacoma. Identify potential locations to implement Bus on Shoulder program. Support closeout process for I-90 Two-way Transit and HOV Operations Stage 3 project.
2020 SYSTEM EXPANSION – REGIONAL EXPRESS BUDGET(in thousands)
System Expansion - Stride 2020 Budget Highlights
Stride bus rapid transit projects are budgeted at $92.6 million and include:
Continue preliminary engineering for Brickyard In-line Freeway Station and 85th Street Interchangeand construction at NE 44th Street Interchange on I-405.
Continue construction of the Business Access and Transit lanes in Bothell. Begin preliminary engineering and right-of-way acquisition for Bus Base North.
2020 SYSTEM EXPANSION – STRIDE BUDGET(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
Bus Base South $5 $587 $46 $600 $13 2.2 %
Bus on Shoulder 431 1,187 361 1,495 308 25.9
I-90 Two-Way Transit & HOV
Operations, Stage 37,853 6,340 7,184 1,570 (4,770) (75.2)
North Sammamish Park-and-Ride 43 455 285 765 310 68.1
Pacific Ave SR 7 Bus Rapid Transit 4 2,535 2,035 10,590 8,055 317.8
RapidRide C and D 11 750 650 5,495 4,745 632.7
ST Express Fleet Expansion 15,384 0 0 22,817 22,817 0.0
CLOSED
Bothell Transit Related Improvements 1 0 0 0 0 0.0
Total System Expansion - Regional
Express$23,733 $11,854 $10,561 $43,332 $31,478 265.5 %
Project
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
I-405 Bus Rapid Transit $6,133 $65,232 $57,285 $63,298 ($1,934) (3.0)%
SR 522/NE 145th St BRT 3,213 16,875 15,140 27,178 10,303 61.1
Bus Base North 277 37,543 24,460 2,090 (35,453) (94.4)
Total System Expansion - Bus Rapid
Transit$9,624 $119,650 $96,885 $92,566 ($27,084) (22.6)%
Project
2020 Financial Plan & Proposed Budget 30 of 144
System Expansion - Other 2020 Budget Highlights
System Expansion – Other projects are budgeted at $29.0 million and include plans to:
Support increased capacity of information system network by developing a scope and cost estimate. Implement fare changes and expand ORCA LIFT program. Support station area planning for transit-oriented development (TOD). Fabricate and install art for Federal Way and Downtown Redmond Link extension projects. Begin funding awards to third parties to invest in non-motorized access improvements around existing
passenger facilities.
2020 SYSTEM EXPANSION – OTHER BUDGET(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
Efficiency & Sustainability $0 $1,502 $7 $896 ($606) (40.3)%
Environmental Remediation 0 0 0 500 500 0.0
Fare Administration 942 500 278 630 130 26.0
Fare Collection 175 776 445 17 (759) (97.8)
Innovation and Technology Program 910 2,330 1,938 2,425 95 4.1
Next Generation ORCA 597 3,793 2,962 2,968 (825) (21.8)
Research & Technology 92 1,226 559 3,100 1,874 152.9
Research and Business Development
Program56 205 1 534 329 160.5
ST3 Planning 1,036 4,550 2,440 3,087 (1,463) (32.2)
STart 2,889 3,849 5,537 6,303 2,454 63.8
STart Operations & Maintenance 154 227 69 321 94 41.5
Transit Oriented Development Planning
Program87 425 64 1,065 640 150.6
Transit Oriented Development Property
Disposition1,528 2,432 811 1,221 (1,211) (49.8)
Transit System Access Program 503 7,000 1,243 5,900 (1,100) (15.7)
Total System Expansion - Other $8,968 $28,815 $16,354 $28,967 $152 0.5 %
Project
2020 Financial Plan & Proposed Budget 31 of 144
Enhancement
Enhancement projects improve operating efficiency and effectiveness, improve rider experience, increase system functionality, or reduce operating costs.
Enhancement 2020 Budget Highlights
Enhancement projects are budgeted at $38.4 million and include plans to:
Design escalator improvements for the University of Washington Station to achieve higher reliability
and safety.
Establish Parking Management program to support paid parking at ST facilities.
Install on-demand bike lockers at selected locations.
Begin design and installation of a second elevator at Airport Station.
Continue renovations at OMF Central to support relocation of Link Control Center and increased staff.
Contribute funding to signal and street improvements to mitigate the impacts of buses moving from
the downtown Seattle Transit Tunnel (DSTT) to surface streets.
Continue preliminary engineering for Passenger Information Management System (PIMS) project.
2020 ENHANCEMENT BUDGET(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
LINK
Escalator Modernization Program $0 $4,963 $1,862 $3,427 ($1,536) (30.9)%
Light Rail Vehicle Wireless
Communication Upgrade0 158 146 0 (158) (100.0)
LRV Between Car Barriers 0 108 39 0 (108) (100.0)
LRV Wash Bay Modifications 31 268 268 0 (268) (100.0)
Noise Abatement 5 442 400 900 458 103.6
Non-revenue Support Vehicles 192 1,620 (34) 3,014 1,394 86.0
OMF Energy Efficiency 98 34 39 0 (34) (100.0)
Operations & Maintenance Facility Light
Rail Vehicle Lift 754 2,374 2,374 1,134 (1,240) (52.2)
Operations Maintenance Facility (OMF) -
Link Control Center (LCC) Upgrades0 400 41 566 166 41.5
Operations Maintenance Facility (OMF) -
Renovations262 2,583 2,583 5,654 3,071 118.9
Operations Maintenance Facility (OMF)
Expanded Parking75 38 356 105 67 173.6
SeaTac Airport Second Elevator 0 0 0 745 745 0.0
SeaTac Airport Wrong Door Fall
Protection0 0 0 561 561 0.0
Signage Improvements 96 162 153 280 118 73.2
Tacoma Link Radio Upgrade 10 739 739 0 (739) (100.0)
Tacoma Link Fare Collection 0 0 0 0 0 0.0
Project
2020 Financial Plan & Proposed Budget 32 of 144
2020 ENHANCEMENT BUDGET (CONTINUED)(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
SOUNDER
Customer Emergency Stations 243 0 0 0 0 0.0
Kent Station Parking Lot Paving 3 0 0 0 0 0.0
Kent Station Platform Lighting 1 5 5 0 (5) (100.0)
Locomotive Inboard Cameras 0 0 0 300 300 0.0
Positive Train Control 2,739 278 451 220 (58) (20.9)
Puyallup Station LED Lighting 1 5 5 0 (5) (100.0)
Sounder Passenger Emergency
Intercom0 0 0 1,500 1,500 0.0
Sumner Station LED Lighting 1 4 4 0 (4) (100.0)
REGIONAL EXPRESS
Bus Maintenance Facility 133 0 0 0 0 0.0
Community Transit - On-Board
Communication Upgrade0 1,046 1,047 1,033 (13) (1.2)
Pierce Transit - Global Positioning
System Repeater0 0 0 0 0 0.0
OTHER
Bike Parking Program 2 1,400 1,400 2,284 884 63.1
Design Criteria Manual Update 0 0 0 200 200 0.0
Downtown Seattle & Regional Mobility
Improvements2,719 5,863 5,863 3,327 (2,536) (43.3)
Everett Station Security Improvements 0 289 289 0 (289) (100.0)
LED Lighting Program 0 387 0 245 (142) (36.7)
Parking Management Program 0 0 0 1,926 1,926 0.0
Passenger Information Management
System412 6,036 3,273 8,958 2,922 48.4
Security Operations Center - Video
Monitoring Improvements7 234 234 0 (234) (100.0)
Security Radio System 155 742 105 1,008 266 35.8
SODO/MLK Hazard Mitigation 106 3,030 943 610 (2,420) (79.9)
Union Station Garden Level Remodel 92 0 6 0 0 0.0
Video Management System Upgrade 0 549 900 390 (159) (29.0)
Project
2020 Financial Plan & Proposed Budget 33 of 144
2020 ENHANCEMENT BUDGET (CONTINUED)(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
CLOSED
Link Operating Segment Systems
Enhancements and Upgrades10 1,385 43 0 (1,385) (100.0)
Opensidewalks Data Development 0 0 0 0 0 0.0
King St Station Platform Improvements 38 0 1 0 0 0.0
Bellevue TC Security System 72 0 0 0 0 0.0
LRV Wheel Flat Software 0 0 0 0 0 0.0
Central Link HVAC - Instrument House
and UPS Room0 0 0 0 0 0.0
Central Link Card Readers 0 0 0 0 0 0.0
Central Link Overhead Catenary System
Tie Switch0 0 0 0 0 0.0
Bike Locker Program 0 0 0 0 0 0.0
Lakewood MOW Renovation 0 75 0 0 (75) (100.0)
Total Enhancement $8,258 $35,219 $23,538 $38,387 $3,168 9.0 %
Project
2020 Financial Plan & Proposed Budget 34 of 144
State of Good Repair
State of Good Repair projects extend the life of existing transit system assets, replace those at the end of their useful life, and invest in maintaining assets in a state of good repair.
State of Good Repair 2020 Budget Highlights
State of Good Repair projects are budgeted at $76.1 million and include plans to:
Begin repairs to the Downtown Seattle Transit Tunnel (DSTT) stations and vertical conveyances
to bring these assets into alignment with Sound Transit standards.
Perform on-train communications technology upgrades and install automatic passenger counters
on all in-service light rail vehicles to ensure compatibility with new light rail vehicles.
Maintain all equipment and facilities in a state of good repair.
Perform lifecycle maintenance for administrative and operational technology infrastructures.
Accept and commission 26 ST Express replacement buses to maintain bus fleet reliability.
2020 STATE OF GOOD REPAIR BUDGET(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
LINK
Access Control Card Upgrade $40 $1,370 $1,182 $768 ($602) (43.9)%
Convention Place Development
Systems Retrofit130 350 203 2,214 1,864 532.6
DSTT Capital Improvements 0 8,500 1,630 24,160 15,660 184.2
Kinkisharyo LRV Systems Upgrade 0 0 0 3,300 3,300 0.0
Light Rail Vehicle Overhaul 122 1,500 200 950 (550) (36.7)
Link Bridge Repairs 0 60 10 200 140 233.3
Link CCTV System Upgrade 41 1,980 2,149 278 (1,702) (86.0)
Link Light Rail Vehicle Overhaul 2,648 2,479 2,479 2,000 (479) (19.3)
Link Radio Upgrade 0 986 0 0 (986) (100.0)
Link Station Tile Replacement 0 399 25 846 447 111.9
OT Virtual System Hardware Upgrade 0 0 0 600 600 0.0
Small Works Program 395 1,671 972 1,798 127 7.6
Tacoma Link HVAC and Building
Systems Upgrade0 400 267 370 (30) (7.5)
Tacoma Link Light Rail Vehicle
Overhaul2 386 193 386 0 0.1
Wheel Truing Machine 0 960 960 1,395 435 45.3
SOUNDER
Sounder Vehicle Overhaul Program 548 2,570 2,570 6,692 4,122 164.4
REGIONAL EXPRESS
ST Express Fleet Replacement 5,821 0 0 26,099 26,099 0.0
Project
2020 Financial Plan & Proposed Budget 35 of 144
2020 STATE OF GOOD REPAIR BUDGET (CONTINUED)(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
OTHER
Information Technology (IT)
Infrastructure1,213 1,864 912 1,730 (134) (7.2)
IT Transit Systems 0 135 11 78 (57) (42.3)
Station Midlife Refurbishment Program 103 1,350 1,350 2,239 889 65.8
Tacoma Dome Station 410 0 1,801 0 0 0.0
CLOSED
Othello Traction Power Sub-station
Parking Lot300 2 0 0 (2) (100.0)
Total State of Good Repair $11,774 $26,961 $16,914 $76,103 $49,142 182.3 %
Project
Administrative
Administrative projects support the general administration of the agency. The majority of these costs are capitalized with the assets of the projects or expensed as transit operating costs. Remaining costs are treated as general and administrative expenses and fare and regional planning.
Administrative 2020 Budget Highlights
Administrative projects are budgeted at $127.3 million and include plans to:
Fund department costs allocated to projects as administrative costs as well as department costs
that are unallocated.
Continue HVAC replacement for Union Station.
Accommodate agency growth with office space development and furnishing and procurement of
23 fleet vehicles.
Continue migration to SharePoint 365 and development and implementation of Operating
Performance Management system.
2020 ADMINISTRATIVE BUDGET(in thousands)
2018 2019 2019 2020 Budget $ Budget %
Actual Budget Forecast Budget Change Change
OTHER
Administrative Capital $2,749 $3,104 $2,492 $6,452 $3,348 107.9 %
Agency Administration Operating 77,387 80,681 100,151 112,520 31,839 39.5
Environmental Mitigation, Monitoring &
Maintenance75 125 22 100 (25) (20.0)
Information Technology Program 3,980 4,548 3,575 8,243 3,695 81.2
CLOSED
Surplus Property Disposition 10 115 59 0 (115) (100.0)
Total Administrative $84,200 $88,573 $106,299 $127,315 $38,742 43.7 %
Project
2020 Financial Plan & Proposed Budget 36 of 144
Other Budgets Summary
Other budgets include debt service, contributions to other governments, and tax collection and fees. In 2020 debt service is budgeted at $144.4 million and includes interest, principal repayments, and financing expenses. Contributions to other governments is budgeted at $5.0 million. Tax collection and fees are budgeted at $16.6 million.
Debt Service
As of December 31, 2019 Sound Transit has $2.3 billion of outstanding long-term bonds and four Transportation Infrastructure Finance and Innovation Act (TIFIA) loan agreements for Operations and Maintenance Facility East, and Northgate Link, East Link, and Lynnwood Link extensions.
Sound Transit has executed TIFIA loan drawdowns of: $81.6 million for the Northgate Link Extension, $50 million for East Link Extension, and $25 million for Operation and Maintenance Facility East, totaling $156.6 million.
2020 debt service is budgeted at $144.4 million including:
$42.9 million of principal repayment.
$100.9 million of interest expense including loan amortization.
$597 thousand for financing expenses.
Contributions to Other Governments
Sound Transit will make a $5.0 million contribution for operating and maintenance expenses of First Hill
Street car based on an agreement with the City of Seattle.
In addition, the following contributions are budgeted in projects. In 2020 $86.2 million is expected to be paid to other governments for planning and construction of transportation assets. The cost to Sound Transit is accounted for in the following projects:
I-405 BRT: WSDOT for the NE 145th Interchange - $41.4 million.
SR 522: City of Bothell for Business Access and Transit lanes - $27.2 million.
Pacific Avenue SR7 Bus Corridor Improvements: Pierce Transit for design and construction - $10.6million.
Rapid Ride C&D and Madison BRT: King County Metro for street improvements to enable rapidride routes - $5.5 million.
Bus on Shoulder: WSDOT to identify and evaluate potential opportunities - $1.5 million.
Tax Collection and Fees
Sound Transit pays the Washington State Department of Revenue (DOR) fees for the collection and
administration of sales and use taxes and rental car taxes and the Washington State Department of Licensing
(DOL) fees for the collection and administration of motor vehicle excise taxes. The DOR and DOL fees are
budgeted at $5.2 million in 2020.
In 2019 Sound Transit began paying the sales and use tax offset fee, which was added to the ST3 enabling
legislation and approved in the ST3 plan. The fee will be paid to the Washington DOR and is based on 3.25
percent of construction contract payments for new ST3 projects, up to a total amount of $518.0 million. The
2020 budget anticipates contributions from four projects: Federal Way Link Extension $6.4 million, I-405 Bus
Rapid Transit $975 thousand, Downtown Redmond Link Extension $3.5 million, and SR 522 Bus Rapid Transit
$480 thousand, totaling $11.4 million.
2020 Financial Plan & Proposed Budget 37 of 144
Transit Improvement Plan
The 2020 Transit Improvement Plan (TIP) provides a six-year cost forecast for active projects, a six-year forecast for operating costs by mode as well as a list of contributions to reserves.
For all active projects cost information is presented by phase, including life-to-date costs, annual spending forecasts for the upcoming six years, summarized costs for years beyond this six-year period, and the total Board-authorized project allocation to date. The scope, budget-year activities, increase to the authorized project allocation, and project risk information is also provided for each project. Details for each project are available in Appendix D.
The Sound Transit Board adopts the TIP and the annual budget to authorize spending for the budget year as well as changes to authorized project allocations to date.
Project Budgeting
Project Prioritization Process
During the development of the annual budget, the agency follows an objective process to evaluate all proposed capital projects. After budgeting for voter-approved system projects, proposed new projects and increases to existing projects that are not part of the voter-approved capital program are considered. Projects are scored using objective criteria including: safety, sustainability, regulatory, financial, security, asset life, resource capacity to deliver projects and impact on ridership. The goal is to identify high-value, high-priority projects and pair them with available resources.
Authorized Project Allocations
The Sound Transit Board approves the initial phases of project budgets at the outset of a capital project. As projects reach key milestones, requests for increases in authorized project allocations to complete the next project phase are presented for Board approval.
Typical budget requests include funding for:
Project development through preliminary engineering and environmental review.
Final design and right-of-way acquisition.
Total expected project budget, or Baseline.
The initial project development budget includes alternatives analysis and selection of a preferred alternative, compliance with environmental requirements, development of operations and maintenance plans, and preliminary engineering for the preferred alternative.
A final design and right-of-way budget includes funding for all design work, including architectural, civil, structural, electrical, and HVAC systems through to construction procurement documentation, as well as purchase or lease of all property needed to build the project.
A baseline budget is established during final design when sufficient information is available to establish the cost of a project through construction. Project spending is benchmarked against the baseline through completion of the project. Projects are fully funded when the Board approves the baseline.
Cost Estimates
Sound Move, ST2, and ST3 are voter-approved segments of the capital project. Each voter-approved project has a cost estimate that originated from one of the three voter-approved plans. Appendix A lists ST2 and ST3 cost estimates and Appendix B provides budget for remaining Sound Move projects.
Cost estimates are maintained on a current-year, constant-dollar basis. In the 2020 TIP, full project cost estimates are presented in constant 2019 dollars. The constant dollar presentation allows for comparison of estimated costs across multiple projects. However, the Board approves budgets in year-of-expenditure dollars to take into account the fact that project spending occurs over several years and so must be adjusted for inflation.
2020 Financial Plan & Proposed Budget 39 of 144
Projects Summary
The majority of Sound Transit’s projects support the planning, design, and construction of light rail, commuter rail, express bus, and bus rapid transit infrastructure as described in the voter-approved capital plans. The Transit Improvement Plan (TIP) uses project categories which align with common industry practice and provide transparency into the agency’s investment in expanding service versus investment in existing assets. Projects are also reported by mode.
PROJECTS SUMMARY BY PROJECT TYPE(in millions)
Life to
Date2020 2021 2022 2023 2024 2025 Future
Total
TIP
Link $7,631 $2,063 $1,790 $1,580 $1,635 $929 $367 $673 $16,669
Sounder 718 57 50 10 4 - 1 65 905
Regional Express 228 43 49 47 21 9 - 17 415
Stride 112 93 67 44 20 3 - - 339
Other 92 29 44 23 24 45 18 337 612
System Expansion Subtotal 8,781 2,285 2,000 1,704 1,704 987 386 1,092 18,939
99 38 49 24 26 15 3 17 272
207 76 65 35 33 7 3 35 462
584 127 138 142 142 143 145 74 1,495
$9,672 $2,527 $2,253 $1,905 $1,905 $1,152 $537 $1,218 $21,167
System Expansion
Enhancement
State of Good Repair
Administrative
Total
2020 Financial Plan & Proposed Budget 40 of 144
2020 Closed Projects
The following projects have been closed and excluded from the 2020 TIP. Projects were completed under budget or were cancelled.
CLOSED PROJECTS(In thousands)
Baseline Budget Final Cost
Savings/ (Over)
Enhancement Projects
Link Operating System Enhancement Upgrade $1,400 $ 65 $1,335
Open-sidewalk Data Development 60 50 10
Bellevue TC Security System 150 72 78
LRV Wheel Flat Software 250 - 250
Central Link HVAC - Instrument House and UPS Room 1,232 823 408
Central Link Overhead Catenary System - Tie Switch 42 7 35
Bike Locker Program 1,243 1,241 2
King St Station Platform Improvement 300 43 257
C Link Card Readers 423 131 292
State of Good Repair Projects
King Street Station Vertical Glazing 767 - 767
Othello TPSS Parking Lot 455 431 24
2020 Financial Plan & Proposed Budget 41 of 144
Transit Modes Summary
The 2020 TIP contains forecasted expenses to operate and maintain the regional transit system from 2020 through 2025. Operating expenses include the costs of third-party operators for light rail, commuter rail, express bus services, and bus rapid transit, that include Sound Transit’s direct costs and administrative costs for providing those services.
As a part of the annual budget, the Sound Transit Board approves spending for each of these modal services for the following fiscal year.
There are no service levels changes planned for any of Sound Transit’s modes in 2020. However, between 2021 and 2024 six new light rail extensions will open along with new bus rapid transit service in 2024.
Buses no longer operate in the Downtown Seattle Transit Tunnel and Link light rail operations are now responsiblef for all costs. In mid-2020 the Link Operations and Maintenance Facility East will open with all costs attributed to Link operations. Vehicle maintenance costs are expected to increase over this six-year time period due to aging of the fleet. In 2021 Northgate Link Extension will begin revenue service with a full year of operations in 2022 and East Link Extension will begin revenue service in 2023.
Sounder costs will increase in 2021 when the new Sounder Maintenance Base is scheduled to open. ST Express costs are expected to rise as more buses are required to maintain current services levels due to traffic congestion. As new Link extensions become operational, express bus service is expected to be retracted.
The expansion of Tacoma Link to the Hilltop area of Tacoma is currently under construction with projected revenue service opening in 2022. Expansion of the Tacoma Link Operations and Maintenance Facility is expected to be complete in 2021. Hiring for startup activities began in 2018 and will continue as training and other startup activities continue in advance of opening the new extension. Staff, maintenance, insurance, and other costs will increase substantially once the expansion opens.
TRANSIT MODES SUMMARY (in millions)
2020 2021 2022 2023 2024 2025
Link Light Rail $148 $174 $200 $235 $320 $370
Sounder Commuter Rail 66 71 75 71 71 73
ST Express Bus 151 171 177 182 173 150
Tacoma Link Light Rail 6 10 13 16 19 19
Stride Bus Rapid Transit - - - - 31 55
Total $370 $426 $464 $505 $583 $613
2020 Financial Plan & Proposed Budget 42 of 144
Reserves Summary
Sound Transit maintains reserves in anticipation of future financial obligations. Amounts budgeted as reserves are not included in our spending authorization request. If reserved funds are to be used, the Board’s approval is required in advance.
Emergency/Loss
While the agency maintains a comprehensive insurance program, the policies do contain retentions(deductibles), which the agency would have to cover in the event of an insurable loss. In suchinstances, Board authorization would be required to use this reserve to cover a deductible. Approvalof the ST3 Plan increased the reserve from $38 million to $88 million.
The reserve balance is projected to be $30.4 million at the end of 2019. A contribution of $5.5 millionis budgeted for 2020.
Operations & Maintenance
Sound Transit’s financial policies require the agency to maintain an operations and maintenancereserve equal to two months of department operating expenses, including costs allocated to transitmodes and projects.
The reserve balance is projected to be $86.7 million at the end of 2019. A contribution of $3.9 millionis budgeted for 2020 to increase the reserve to $90.6 million.
Capital Replacement
The agency maintains a minimum $300 million reserve for unanticipated expenditures necessary tokeep the system in good working condition.
The reserve balance is projected to be as $333.1 million at the end of 2019. No contribution will beneeded in 2020.
Regional Affordable Housing Revolving Loan Fund
The ST3 Plan requires that Sound Transit establish a revolving loan fund to support development ofaffordable housing opportunities related to equitable transit-oriented development (TOD). Beginningin 2019 $4.0 million annual deposits will be made for five years to establish a $20 million fund.
The reserve balance is projected to be $4.1M at the end of 2019. A contribution of $4.0 million isbudgeted for 2020.
2020 Financial Plan & Proposed Budget 43 of 144
Appendix A – Sound Transit 2 and Sound
Transit 3 Cost Estimates
The agency maintains cost estimates for all of its capital projects that are funded in the agency’s financial plan. These estimates are updated as new engineering, right-of-way, public outreach, and other project information are developed. Project cost estimates are updated prior to seeking Board authorization of budgets for preliminary engineering, final design and right-of-way acquisition, and baseline budget, which includes total project costs and construction.
ST2 cost estimates were initially developed and reported in 2007 constant-year dollars. ST3 cost estimates were initially developed and reported in 2015 constant-year dollars. To enable comparisons between cost estimates, the figures in this appendix have been updated to 2019 constant-year dollars based on the agency’s August 2019 inflation forecasts.
The table on the next page includes the following information:
Original cost estimates are from the initial plans approved by voters in November 2008 (ST2) andNovember 2016 (ST3).
2020 cost estimates match the proposed 2020 TIP.
2020 cost estimates include all ST2 and ST3 projects currently funded in the agency’s financial plan.
All voter-approved ST3 projects were added to Appendix A.
The Federal Way Link Extension project is increased to reflect the addition of scope to extend theproject to Federal Way Transit Center.
CAPITAL COST ESTIMATES (in thousands/constant 2019 dollars)
Voter Approved
Estimate
Inc / (Dec) from
Voter Approved 2019 Estimate Inc / (Dec) 2020 Estimate
Link Light Rail
ST2 East Link Extension 4,019,793$ (320,506)$ 3,699,287$ -$ 3,699,287$
ST2 Northgate Link Extension 2,096,368$ 164,012$ 2,260,380$ -$ 2,260,380$
ST2 Lynnwood Link Extension 1,968,722$ (290,982)$ 1,677,740$ -$ 1,677,740$
ST2 First Hill Streetcar 154,859$ (1,377)$ 153,482$ -$ 153,482$
ST2 South 200th Link Extension 485,394$ 10,721$ 496,115$ -$ 496,115$
ST2 South 200th to KDM Rd 594,301$ (594,301)$ -$ -$ -$
ST2 KDM Rd to S 272nd St 644,918$ (644,918)$ -$ -$ -$
ST3 Federal Way Link Extension 1,254,390$ 525,080$ 1,779,470$ -$ 1,779,470$
ST2 S 272nd to Tacoma Dome - ROW 72,822$ (72,822)$ -$ -$ -$
ST2 South Corridor Alternatives Analysis 92,956$ (89,506)$ 3,450$ -$ 3,450$
ST2 Hilltop Tacoma Link Extension 120,542$ 38,381$ 158,923$ -$ 158,923$
sT2 Link Operations & Maintenance Facility - East 367,198$ 98,228$ 465,426$ -$ 465,426$
ST2 Light Rail Vehicle Fleet Expansion 654,203$ 73,677$ 727,880$ -$ 727,880$
ST3 Downtown Seattle Light Rail Tunnel 2,103,944$ -$ 2,103,944$ -$ 2,103,944$
ST3 West Seattle Link Extension 1,882,180$ (9,097)$ 1,873,083$ -$ 1,873,083$
ST3 Ballard Link Extension 3,137,594$ (20,712)$ 3,116,882$ -$ 3,116,882$
ST3 Graham Street Infill Station 89,037$ (353)$ 88,684$ -$ 88,684$
ST3 Boeing Access Road Infill Station 159,632$ (797)$ 158,835$ -$ 158,835$
ST3 Downtown Redmond Link Extension 1,242,278$ 24,538$ 1,266,816$ -$ 1,266,816$
ST3 NE 130th Street Infill Station 79,705$ (446)$ 79,259$ -$ 79,259$
ST3 Everett Link Extension 3,707,680$ (18,240)$ 3,689,440$ -$ 3,689,440$
ST3 Issaquah Link Extension 2,325,152$ (11,130)$ 2,314,022$ -$ 2,314,022$
ST3 Link Operations & Maintenance Facility - North 916,755$ (3,368)$ 913,387$ -$ 913,387$
ST3 Link Operations & Maintenance Facility - South 651,892$ (3,361)$ 648,531$ -$ 648,531$
ST3 Tacoma Dome Link Extension 2,444,061$ (12,999)$ 2,431,062$ -$ 2,431,062$
ST3 Tacoma Community College Extension 581,272$ (2,569)$ 578,703$ -$ 578,703$
ST3 Light Rail Vehicle Fleet Expansion 1,538,653$ (229,918)$ 1,308,735$ -$ 1,308,735$
Total Link Light Rail 33,386,301$ (1,392,764)$ 31,993,537$ -$ 31,993,537$
Sounder Commuter Rail
t2 Sumner Station Impro ement 59,450$ (4,605)$ 54,845$ -$ 54,845$
ST2 Pu allup Station Impro ement 84,810$ (13,121)$ 71,688$ -$ 71,688$
t2 La ewood Station Impro ement 51,917$ (7,718)$ 44,199$ -$ 44,199$
t2 Kent Station A e Impro ement 43,166$ 28,247$ 71,412$ -$ 71,412$
t2 Auburn Station A e Impro ement 45,041$ 20,778$ 65,819$ -$ 65,819$
t2 Ta oma Dome Station A e 19,098$ (3,958)$ 15,140$ -$ 15,140$
t2 South Ta oma Station A e 53,968$ (8,444)$ 45,525$ -$ 45,525$
t2 Mu ilteo Station 15,511$ (2,908)$ 12,602$ -$ 12,602$
t3 Sounder South A e Impro ement Program 1,139,593$ (1,729)$ 1,137,864$ -$ 1,137,864$
t3 Edmond and Mu ilteo Station Par ing and A e Impro ement 48,398$ (205)$ 48,194$ -$ 48,194$
t3 Sounder South E ten ion from La ewood to DuPont 390,413$ (2,106)$ 388,306$ -$ 388,306$
t2 Sounder Maintenan e Ba e 217,193$ (26,317)$ 190,875$ -$ 190,875$
t2 Sounder Yard E pan ion -$ 24,571$ 24,571$ -$ 24,571$
t2 Tu wila Permanent Station 47,435$ 13,281$ 60,716$ -$ 60,716$
t2 Edmond Permanent Station 33,230$ (33,230)$ -$ -$ -$
t2 Sounder South E panded Ser i e 298,229$ 80,935$ 379,163$ -$ 379,163$
t2 Sounder ST2 Fleet E pan ion 41,314$ 10,390$ 51,704$ -$ 51,704$
t2 Ta oma Tre tle Tra & Signal 92,061$ 83,477$ 175,538$ -$ 175,538$
t2 Ta oma Tra & Signal 35,880$ (359)$ 35,521$ -$ 35,521$
t2 Platform E ten ion - South King / Pier e 71,020$ (71,020)$ -$ -$ -$
t2 Ea t ide Rail Partner hip 64,553$ (64,551)$ 2$ -$ 2$
Total Sounder Commuter Rail 2,852,278$ 21,408$ 2,873,686$ -$ 2,873,686$
Bus Rapid Transit
t3 I-405 Bu Rapid Tran it 1,041,671$ (4,884)$ 1,036,788$ -$ 1,036,788$
t3 Bu Rapid Tran it Maintenan e Ba e 194,109$ (677)$ 193,433$ -$ 193,433$
t3 SR 522 Bu Rapid Tran it 482,940$ (1,995)$ 480,945$ -$ 480,945$
Total Bus Rapid Transit 1,718,721$ (7,555)$ 1,711,166$ -$ 1,711,166$
Regional Express -$ -$
ST E pre Bu Ba e 242,876$ (8,219)$ 234,657$ -$ 234,657$
t2 Mid-Da Bu Storage -$ 3,448$ 3,448$ -$ 3,448$
t2 ST E pre ST2 Fleet E pan ion 46,008$ 18,964$ 64,972$ -$ 64,972$
t2 North Sammami h Par -and-Ride 24,254$ (64)$ 24,190$ -$ 24,190$
t3 Pa ifi A e SR 7 Bu Corridor 71,630.252$ (1,814.817)$ 69,815.436$ -$ 69,815.436$
t3 Bu on Shoulder Proje t 123,415$ -$ 123,415$ -$ 123,415$
t3 In e tment SR 162 40,488$ (180)$ 40,308$ -$ 40,308$
t3 STEX Fleet to upport Interim STEX Ser i e 21,801$ -$ 21,801$ -$ 21,801$
t3 RapidRide C and D 78,647$ (870)$ 77,777$ -$ 77,777$
t3 I-90 Contribution 64,584$ -$ 64,584$ -$ 64,584$
t2 Burien Tran it Center/ Par ing Garage 19,196$ (1,582)$ 17,613$ -$ 17,613$
t2 Bothell Tran it Related Impro ement 7,174$ (7,174)$ -$ -$ -$
t2 Total Regional Express 740,074$ 2,508$ 742,582$ -$ 742,582$
Other -$ -$
ST3 Planning 59,689$ (25,082)$ 34,607$ -$ 34,607$
t2 Inno ation and Te hnolog Fund 84,865$ -$ 84,865$ -$ 84,865$
t3 Tran it Oriented De elopment 24,406$ -$ 24,406$ -$ 24,406$
t3 S tem A e Program 113,154$ -$ 113,154$ -$ 113,154$
t3 Sumner to Orting Stud 5,658$ -$ 5,658$ -$ 5,658$
t3 Future S tem Planning (ST4) 74,795$ -$ 74,795$ -$ 74,795$
t3 HCT Planning Studie 51,204$ -$ 51,204$ -$ 51,204$
t3 STArt Program -$ 158,653$ 158,653$ -$ 158,653$
t2 Total Other 413,771$ 133,571$ 547,342$ -$ 547,342$
TOTAL Capital Plan Estimate 39,111,145$ (1,242,833)$ 37,868,312$ -$ 37,868,312$
TOTAL Capital Plan Estimate 39,039,515$ (1,241,018)$ 37,798,497$ -$ 37,798,497$
Note:
The o t e timate in luded in the tab le abo e refle t the amount funded in the Agen ' long-term Finan ial Plan. Proje t
propo ed to pro eed with onl limited engineering a ti it are funded onl to the e tend that a ti ti require . Proje t propo ed to
be u pended or deleted ha e no funding in the urrent Long-term Finan ial Plan.
2020 Financial Plan & Proposed Budget 45 of 144
CAPITAL COST ESTIMATES (in thousands/constant 2019 dollars)
Sounder Commuter Rail
Sumner Station Improvements 59,450$ (4,605)$ 54,845$ -$ 54,845$
Puyallup Station Improvements 84,810$ (13,121)$ 71,688$ -$ 71,688$
Lakewood Station Improvements 51,917$ (7,718)$ 44,199$ -$ 44,199$
Kent Station Access Improvements 43,166$ 28,247$ 71,412$ -$ 71,412$
Auburn Station Access Improvements 45,041$ 20,778$ 65,819$ -$ 65,819$
Tacoma Dome Station Access 19,098$ (3,958)$ 15,140$ -$ 15,140$
South Tacoma Station Access 53,968$ (8,444)$ 45,525$ -$ 45,525$
Mukilteo Station 15,511$ (2,908)$ 12,602$ -$ 12,602$
Sounder South Access Improvement Program 1,139,593$ (1,729)$ 1,137,864$ -$ 1,137,864$
Edmonds and Mukilteo Station Parking and Access Improvements 48,398$ (205)$ 48,194$ -$ 48,194$
Sounder South Extension from Lakewood to DuPont 390,413$ (2,106)$ 388,306$ -$ 388,306$
Sounder Maintenance Base 217,193$ (26,317)$ 190,875$ -$ 190,875$
Sounder Yard Expansion -$ 24,571$ 24,571$ -$ 24,571$
Tukwila Permanent Station 47,435$ 13,281$ 60,716$ -$ 60,716$
Edmonds Permanent Station 33,230$ (33,230)$ -$ -$ -$
Sounder South Expanded Service 298,229$ 80,935$ 379,163$ -$ 379,163$
Sounder ST2 Fleet Expansion 41,314$ 10,390$ 51,704$ -$ 51,704$
Tacoma Trestle Track & Signal 92,061$ 83,477$ 175,538$ -$ 175,538$
Tacoma Track & Signal 35,880$ (359)$ 35,521$ -$ 35,521$
Platform Extensions - South King / Pierce 71,020$ (71,020)$ -$ -$ -$
Eastside Rail Partnership 64,553$ (64,551)$ 2$ -$ 2$
Total Sounder Commuter Rail 2,852,278$ 21,408$ 2,873,686$ -$ 2,873,686$
Bus Rapid Transit
I-405 Bus Rapid Transit 1,041,671$ (4,884)$ 1,036,788$ -$ 1,036,788$
Bus Rapid Transit Maintenance Base 194,109$ (677)$ 193,433$ -$ 193,433$
SR 522 Bus Rapid Transit 482,940$ (1,995)$ 480,945$ -$ 480,945$
Total Bus Rapid Transit 1,718,721$ (7,555)$ 1,711,166$ -$ 1,711,166$
Regional Express -$ -$
ST Express Bus Base 242,876$ (8,219)$ 234,657$ -$ 234,657$
Mid-Day Bus Storage -$ 3,448$ 3,448$ -$ 3,448$
ST Express ST2 Fleet Expansion 46,008$ 18,964$ 64,972$ -$ 64,972$
North Sammamish Park-and-Ride 24,254$ (64)$ 24,190$ -$ 24,190$
Pacific Ave SR 7 Bus Corridor 71,630$ (1,815)$ 69,815$ -$ 69,815$
Bus on Shoulder Project 123,415$ -$ 123,415$ -$ 123,415$
Investments SR 162 40,488$ (180)$ 40,308$ -$ 40,308$
STEX Fleet to support Interim STEX Service 21,801$ -$ 21,801$ -$ 21,801$
RapidRide C and D 78,647$ (870)$ 77,777$ -$ 77,777$
I-90 Contribution 64,584$ -$ 64,584$ -$ 64,584$
Burien Transit Center/ Parking Garage 19,196$ (1,582)$ 17,613$ -$ 17,613$ Bothell Transit Related Improvements 7,174$ (7,174)$ -$ -$ -$
Total Regional Express 740,074$ 2,508$ 742,582$ -$ 742,582$
Other -$ -$
ST3 Planning 59,689$ (25,082)$ 34,607$ -$ 34,607$
Innovation and Technology Fund 84,865$ -$ 84,865$ -$ 84,865$
Transit Oriented Development 24,406$ -$ 24,406$ -$ 24,406$
System Access Program 113,154$ -$ 113,154$ -$ 113,154$
Sumner to Orting Study 5,658$ -$ 5,658$ -$ 5,658$
Future System Planning (ST4) 74,795$ -$ 74,795$ -$ 74,795$
HCT Planning Studies 51,204$ -$ 51,204$ -$ 51,204$
STArt Program -$ 158,653$ 158,653$ -$ 158,653$
Total Other 413,771$ 133,571$ 547,342$ -$ 547,342$
TOTAL Capital Plan Estimate 39,111,145$ (1,242,833)$ 37,868,312$ -$ 37,868,312$
Note:
The cost estimates included in the tab le above reflect the amount funded in the Agency's long-term Financial Plan. Projects
proposed to proceed with only limited engineering activity are funded only to the extend that activtiy requires. Projects proposed to
be suspended or deleted have no funding in the current Long-term Financial Plan.
2020 Financial Plan & Proposed Budget 46 of 144
Appendix B – Sound Move Project Budgets
The agency has three voter-approved system expansion programs: Sound Move approved in 1996; Sound Transit 2 (ST2) approved in 2008; and Sound Transit 3 (ST3) approved in 2016. Appendix A reflects the cost estimates in constant-year dollars for all capital projects. This appendix displays adopted project budgets in year-of-expenditure dollars for active Sound Move system expansion projects.
Project budgets for Sound Move projects were adopted as total project budgets/baseline budgets, since these projects pre-date the agency’s Phase Gate process. As with the ST2 and ST3 projects in Appendix A, Sound Move project budgets are shown for 2008, 2019, and 2020.
There were no changes between 2019 and 2020.
Regional Express
Note: The I-90 Two-Way Transit and HOV Operations, Stage 3 project was baselined in 2014. This project is funded by Sound Move &ST2, Regional Express Reserve, and agency financial capacity.
I-90 TWO-WAY AND HOV OPERATIONS, STAGE 3 TOTAL FUNDING(in thousands)
Sound Move $64,222
I-90 Contribution (ST2) 45,000
REX Program Reserve 27,126
Agency Financial Capacity 89,300
Total Project Cost $225,648
ADOPTED ALLOCATIONS TO DATE FOR ACTIVE SOUND MOVE PROJECTS(YOE$ in thousands)
2008 Inc/(Dec) 2019 Inc/(Dec) 2020
Link Light Rail
University Link 1,614,007$ 142,000$ 1,756,007$ -$ 1,756,007$
Total Link Light Rail 1,614,007 142,000 1,756,007 - 1,756,007
Sounder Commuter Rail
D Street to M Street Track and Signal 76,025 82,237 158,262 - 158,262
Mukilteo Station, South Platform 9,371 8,942 18,313 - 18,313
Tukwila Station (see Notes) - - - - -
Total Sounder Commuter Rail 85,396 91,179 176,575 - 176,575
Regional Express
I-90 2-Way Transit & HOV Op, Stage 3 (see note) 1,722 223,926 225,648 - 225,648
Total Regional Express 1,722 223,926 225,648 - 225,648
Total Active Sound Move Projects 1,701,125$ 457,105$ 2,158,230$ -$ 2,158,230$
Notes: Numbers may not add due to rounding.
Tukwila Station is a project recognized in ST2, but Sound Move did fund the project through Final Design.
I-90 2-Way Transit and HOV Op, Stage 3 is recognized in Sound Move, but ST2 contributed $45 million of planned funding.
The agency used $89.3 million of financial capacity to fully fund the project and the balance of the REX program reserve of $27.2 million.
2020 Financial Plan & Proposed Budget 47 of 144
Appendix C - Glossary
ADA (Americans with Disabilities Act) –
Federal law passed in 1990 that prohibits
discrimination in services, facilities, and
employment against individuals with
disabilities.
Adopted Annual Budget – The proposed
annual budget and associated revisions
adopted by the Board before the beginning of
the fiscal year, plus any one-time actions that
the agency’s Budget Policy authorizes the
CEO to take after the Board adopts the annual
budget and transit improvement plan (TIP) and
before publication of the adopted annual
budget document.
Adopted Transit Improvement Plan (TIP) –
The TIP is the cumulative total of authorized
project allocations to date for all active projects.
The adopted TIP is the proposed TIP and
associated revisions adopted by the Board,
plus any one-time actions that the Budget
Policy authorizes the CEO to take after the
Board adopts the annual budget and TIP
resolution.
Annual Budget – A plan for the agency’s
revenue and expenditures for a fiscal year.
Annual Budget and TIP Resolution – Board-
adopted resolution that establishes annual
spending authority and divides spending totals
into categories such as operating including
transit modes, projects by type, and debt
service, plus an annual revenue forecast. It
also establishes the authorized project
allocation to date for projects included in the
TIP and not approved by separate Board
resolution.
Annual Operating Budget – The board-
authorized agency operating expenditures.
The agency maintains operating budgets at
five levels:
Agency – Total agency operating
expenditures.
Department – All operating expenditures
managed by a department (e.g., DECM,
Operations, Executive). Included in agency
budget document.
Division – All operating expenditures
managed by a division (e.g., Construction
Management, Environmental &
Sustainability, Human Resources, Service
Planning, ). Not included in agency budget
document but maintained and monitored
within agency financial systems.
Business Unit – All operating
expenditures for smallest organization
component. Not included in agency budget
documents but maintained and monitored
within agency financial systems.
Modal – All operating expenditures for a
transit mode: Sounder commuter rail, ST
Express bus, Tacoma Link, and Link light
rail. Included in agency budget document.
Annual Project Budget – The amount of
project costs expected to be incurred during
the budget year.
Authorized Project Allocation to Date – The
current Board-authorized spending ceiling for a
project.
Average Weekday Boardings – Number of
one-way passenger movements (trips)
between two points on a single vehicle on all
routes on an average weekday.
Baseline – The project scope, schedule, and
budget against which actual performance is
measured; used for management control and
reporting purposes.
Baseline Budget – The total budget to
complete all phases of a project approved by
the Board as a benchmark for performance and
reporting purposes in year of expenditure
dollars. A project may set a new baseline if
there is a change in the scope of the project.
However, a project baseline is not adjusted to
account for cost overruns or underruns.
2020 Financial Plan & Proposed Budget
49 of 144
BNSF – Burlington Northern Santa Fe Railway,
the railroad company that contractually
operates Sounder, Sound Transit’s commuter
rail service.
Board – The Sound Transit Board of Directors,
made up of 18 members: 17 elected officials
from local jurisdictions within the Sound Transit
district and the Secretary of the Washington
State Department of Transportation.
Boarding – The number of one-way
passenger trips between two points on a single
vehicle. Also synonymous with unlinked
passenger trip, rider, or passenger.
Budget authority – The authority granted by
the board to spend a given amount of money
for a certain purpose.
Capital Asset – Individual assets costing
$5,000 or more and having useful lives greater
than one year. Also, significant alterations,
renovations, or structural changes that
increase the usefulness of a Sound Transit
owned asset, enhance its efficiency, or prolong
its useful life by more than one year.
Capital Outlay – An expense that results in the
acquisition of or addition to fixed assets.
Capital Project Cost Estimate – The current
estimated project cost from inception to
completion, as maintained and updated at
engineering milestones by agency Project
Controls. Maintained in constant dollars.
Capital Projects – Projects that purchase or
construct capital assets.
Catenary – Suspended overhead wire that
carries high voltage for electrically-powered
transit vehicles (such as light rail) from a central
power source.
CCTV (Closed Circuit Television) – Cameras
installed aboard transit vehicles and at
passenger stations for security purposes.
COM – Communications department.
CEO – Chief Executive Officer of Sound
Transit who reports directly to the Board of
Directors.
COLA (Cost-of-Living Adjustment) – Refers
to the annual percentage increase applied to
an employee’s salary for inflationary factors.
Commuter Rail – Railway for urban passenger
train service consisting of local short distance
travel operating between a central city and
adjacent suburbs.
Complaints per 100,000 Boardings – The
performance metric (calculated for each mode)
that measures the number of service
complaints per 100,000 passenger boardings.
Complaints per 100,000 Boardings –
Calculation = [(Service Complaints
Received/ Modal Passenger Boardings) *
100,000]
Contingency – A budgetary reserve put aside
for emergencies or unforeseen expenses.
COP (Citizen Oversight Panel) – An
independent panel of 15 volunteers appointed
by the Board of Directors representing each of
Sound Transit’s five subareas. Its mission is to
monitor the agency’s commitment to the public,
reviewing projects, budgets, and performance,
and reporting its findings and
recommendations for improvement to the
Board.
Cost per Boarding – Calculated for each
mode, this metric represents the fully allocated
cost of providing service to a passenger.
Cost per Boarding – Calculation = (Modal
Operating Expenses/Modal Passenger
Boardings)
Cost per Platform Hour – Calculated for each
mode, this metric measures the fully allocated
cost of providing one hour of service, inclusive
of revenue and non-revenue time.
Cost per Platform Hour – Calculation =
(Modal Operating Expenses/Modal
Platform Hours)
Cost per Revenue Vehicle Hour – Calculated
for each mode, this metric represents the fully
allocated cost of providing one revenue vehicle
hour of service.
2020 Financial Plan & Proposed Budget
50 of 144
Cost per Revenue Vehicle Hour –
Calculation = (Modal Operating
Expense/Modal Revenue Vehicle Hours)
CPI (Cost Performance Index) – A measure
of the value of the work completed compared
to the actual cost or progress made on the
project.
DB (Design-Build) – A procurement method
used to minimize design and construction risks
while reducing the project delivery schedule by
overlapping the design phase and construction
phase of a project. Using DB, the owner
contracts with a single entity for all engineering,
design, and construction services for a transit
facility/system.
Deadhead – The amount of non-revenue
service time or miles when a bus or train is not
carrying revenue passengers, usually a trip
from, to, or between lines, yards, or garages.
Debt Service – The payment of interest and
the repayment of principal on long-term
borrowed funds according to a predetermined
schedule.
DECM – Design, Engineering & Construction
Management department.
Department – Highest organizational unit of
Sound Transit, consisting of: Communications
& External Affairs; Design, Engineering &
Construction Management; Executive;
Finance; Information Technology; Legal;
Operations; Planning, Environment & Project
Development; and Safety.
Depreciation – A method by which the costs
of property and equipment are systematically
and rationally allocated over their useful life.
Division – Organizational sub-unit within
departments.
DSTT – Downtown Seattle Transit Tunnel.
EIS (Environmental Impact Statement) – A
study of the impacts of a major project on the
environment and surrounding areas, required
for any capital construction project for which
federal funds are used.
Expense – A decrease in net current assets.
Expenses include salaries and benefits,
administrative expenses, debt service, and
those current operating costs that require the
use of current assets.
Farebox Recovery – Calculated for each
mode collecting fares, this metric represents
the percentage of operating cost of each mode
that is paid by transit riders.
Farebox Recovery – Calculation = (Modal
Passenger Fare Revenue/Modal Operating
Expenses).
FCC – Federal Communications Commission.
Financial Plan Project Estimate – The
current estimated project cost from inception to
completion, as maintained and updated
annually in the agency’s financial plan.
Maintained in inflation adjusted year of
expenditure dollars.
Financial Plan Total Capital Project Cost
Estimate – The current estimated project cost
from inception to completion, as maintained
and updated at engineering milestones.
Maintained in constant dollars.
Fiscal Year – A 12-month period for
calculating annual financial statements. Sound
Transit’s fiscal year is January 1 to December
31.
FIT – Finance & Information Technology
department.
FTA (Federal Transit Administration) – The
federal agency responsible for the
administration of federal transit programs,
including the allocation of grant funds. FTA is a
part of the U.S. Department of Transportation.
FTE (Full Time Equivalent) – The fractional
equivalent of one full-time employee working a
40-hour work week for one calendar year.
FY – Fiscal Year.
2020 Financial Plan & Proposed Budget 51 of 144
GCCM (General Contractor/Construction
Manager) – A procurement method used to
reduce construction risk. Using GCCM, the
owner has access to construction expertise
and experience prior to completion of design.
Services offered by a GCCM contractor include
assistance with decision-making,
constructability reviews, value engineering,
budget control, cost estimating, and schedule
control.
GFOA (Government Finance Officers
Association) – An organization whose
purpose is to enhance and promote the
professional management of governments for
the public’s benefit by identifying and
developing financial policies and practices and
promoting them through education, training,
and leadership.
GIS – Geographic Information Services.
HCT (High Capacity Transit) – Public
transportation within an urbanized region
operating principally on exclusive rights of way,
including interim express services and high
occupancy vehicle lanes, which taken as a
whole, provides a substantially higher level of
passenger capacity, speed, and service
frequency than traditional public transportation
systems operating principally in general
purpose roadways.
HOV (High-Occupancy Vehicle) – A vehicle
containing two or more passengers.
Occupancy designations are used on
designated auto traffic lanes to encourage car-
pooling, ride sharing, or the use of public
transportation.
IT – Information Technology.
KCM (King County Metro) – The public transit
division of King County Department of
Transportation, responsible for providing bus,
trolley bus, light rail, water taxi, paratransit, and
vanpool services in a service area of about
2,000 square miles. Sound Transit contracts a
portion of its express bus service as well as all
of its light rail service with KCM.
Light Rail – Service using trains powered with
overhead catenary power, operating on tracks
embedded in city streets or along a separate
right-of-way. Passengers are picked up and
discharged at fixed locations (stations) located
along the tracks.
LRV (Light Rail Vehicle) – A vehicle with
overhead catenary power operating on tracks.
It may be connected to other vehicles and
operated as a train.
MMIS (Maintenance Management
Information System) – The Maintenance
Management Information System is an online
system that helps gather and analyze data
about an organization’s maintenance
operations with the intention of helping
management make informed decisions and
staff do their jobs more effectively.
Mode – A system for carrying transit
passengers described by specific right-of-way,
technology, and operational features. Sound
Transit modes are light rail, commuter rail, and
regional express bus.
MVET (Motor Vehicle Excise Tax) – Also
called the “car tab” tax; this is a tax on vehicles
based on the depreciated value of the vehicle
using the Manufacturer's Suggested Retail
Price (MSRP) as the initial vehicle value. The
tax on commercial trucks and trailers is based
on the depreciated value using the latest
purchase price and year as the initial vehicle
value. Sound Transit currently assesses a 0.3
percent MVET within its taxing district.
NRV (Non-Revenue Vehicles) – Agency fleet
consisting of cars, trucks, vans, SUVs,
specialty vehicles, and equipment used for
administrative purposes.
O&M – Operations and Maintenance.
OMF – Operations Maintenance Facility.
2020 Financial Plan & Proposed Budget
52 of 144
On-Time Performance – A performance ratio
that measures how often a transit service is on
time (i.e., at a designated pick-up spot within a
predetermined timeframe). The timeframe
differs based on mode and frequency of
service.
On-Time Performance – Calculation = ((#
Scheduled Trips – # Trips Early or
Late)/Total # of Scheduled Trips).
Operating expenses – Ongoing costs to
deliver public transportation services and
provide administrative support to the agency.
ORCA (One Regional Card for All) – A
stored-value smart card used for payment of
public transit fares in the Central Puget Sound
region.
Paratransit – The comparable transportation
service required by the ADA for individuals with
disabilities who are unable to use fixed-route
(bus and rail) service. The vehicles used do not
operate over a fixed route or on a fixed
schedule.
PE/ED – Preliminary Engineering and
Environmental Documentation
PEPD – Planning, Environment & Project
Development department
Percentage of Scheduled Trips Operated –
A performance ratio that measures the number
of times a Sound Transit vehicle or mode of
service completes its scheduled route/trip
Phase Gate Process – Project management
oversight and project budget approval process
to ensure projects are ready to advance to a
subsequent phase. Intended to enhance Board
visibility into projects and control over key
project decisions. The Phase Gate process
triggers requests to the Board for Phase Gate
project budget and other actions.
PLA (Project Labor Agreement) – PLAs are
collective bargaining agreements between
building trade unions and contractors. They
govern terms and conditions of employment for
all craft workers – union and nonunion – on a
construction project.
Platform Hours (also called Service Hours)
– For any mode, the total time the operator
operates the vehicle, including revenue service
(scheduled route, special event, and layover
time) and non-revenue service (pullout and
pull-in times from first/last stop to garage).
Platform Miles (also called Service Miles) –
For any mode, the total miles traveled by a
vehicle from pullout of garage/yard to return to
garage/yard at end of revenue service,
including any layover time and time when not
carrying passengers.
Preventable Accidents per 100,000
Revenue Miles – For any mode, the number of
preventable accidents reported per 100,000
miles of actual revenue vehicle mileage. A
preventable accident is one in which the driver
failed to do everything that reasonably could
have been done to avoid the crash.
Preventable Accidents per 100,000
Revenue Miles – Calculation =
(Preventable Accidents / Actual Revenue
Mileage) * 100,000
Project Budgeting
Authorized Project Allocation to Date –
The current board-authorized spending
ceiling for a project. For example, when the
board authorizes a change to the
authorized project allocation to date, this is
not a budget amendment but rather an
increase or a decrease to the authorized
project allocation to date.
2020 Financial Plan & Proposed Budget
53 of 144
Baseline Budget – The total budget to
complete all phases of a project approved
by the board as a benchmark for
performance and reporting purposes in
year of expenditure dollars. A project may
set a new baseline if there is a change in
the scope of the project. However, a project
baseline is not adjusted to account for cost
overruns or underruns.
Capital outlay – An expenditure that
results in the acquisition of, creation of, or
addition to fixed assets.
Project – A discrete body of work that has
a scope, schedule, and budget approved
by the board.
Project Amendment – A change to an
authorized project allocation to date for a
previously established phase budget or
baseline. Generally triggered by a cost
overrun or underrun.
Rebaselined Budget – The Board-
adopted change to a previously adopted
baseline budget. This occurs when new
scope elements have been included in a
project that were not previously part of the
project baseline. In order to maintain clear
cost management accountability, projects
are not rebaselined when project cost
elements are higher than previously
estimated.
Project Cost Phases – A defined set of
categories to budget and track project costs.
These are distinct groupings of project
activities, typically project development,
design, and construction.
01 – Operations + Maintenance
02 – Operations + Maintenance - Agency
09 – Administrative Capital
10 – Agency Administration
20 – Preliminary Engineering &
22 – Environmental Review
26 – Research & Technology
30 – Final Design & Specifications
35 – Third Parties
40 – Right of Way Acquisition
50 – Construction
55 – Construction Services
61 – Art
70 – Vehicles
80 – Startup and Testing
90 – Project Contingency
Project Type – A category name used to
identify projects of a similar nature. Sound
Transit has four project types:
Administrative – Projects that support
administration of the agency. The majority
of these costs are capitalized with the
assets produced by projects or expensed
as transit operating costs. Remaining costs
are treated as general and administrative
expenses.
Enhancement – Projects that improve
operating efficiency and effectiveness,
improve rider experience, increase system
functionality, or reduce operating costs.
State of Good Repair – Projects that
extend the life of existing system assets
and replace those at the end of their useful
life; investment in maintaining assets in a
state of good repair.
System Expansion – Projects that expand
the current regional transit system
including planning, design, and
construction of light rail, commuter rail, and
express bus transit infrastructure.
Proposed Annual Budget – The initial annual
operating and project budget as submitted by
the CEO to the Board for its consideration and
adoption.
Proposed Transit Improvement Plan (TIP) –
The TIP is the cumulative total of authorized
project allocations to date for all active projects.
The proposed TIP is the initial submission to
the Board for their review and adoption.
Purchased Transportation – Transportation
service provided to a public transit agency from
a public or private transportation provider,
based on a written contract.
Reserve – Cash set aside to support
unplanned expenditures, such as an insurance
deductible or a period of operating expenses in
the case of lost revenues.
2020 Financial Plan & Proposed Budget 54 of 144
Revenue Vehicle Hours – The number of
hours that a vehicle is in revenue service and
there is a reasonable expectation of carrying
passengers (includes layover time, but not
deadhead).
Revenue Vehicle Miles – The number of miles
that a vehicle is in revenue service and there is
a reasonable expectation of carrying
passengers (includes layover time, but not
deadhead).
Revenues – Increases in proprietary fund type
net total assets from other than expense
refunds and capital contributions.
ROW (Right-of-Way) – A right-of-way is a right
to make a way over a piece of land, usually to
and from another piece of land. A right of way
is a type of easement granted or reserved over
the land for transportation purposes. Also used
to describe the land on which a railroad line,
road, or utility is built.
Sales Tax – A 0.9 percent tax levied on sales
of eligible items within the boundaries of the
Sound Transit District and collected by the
State for the benefit of Sound Transit.
SCADA (Supervisory Control and Data
Acquisition) – A centralized system to control
signals, systems, and substations on Sound
Transit’s light rail system. The system also
provides real-time location data to a control
center.
Service Hours (also called Platform Hours)
– For any mode, the total time the operator
operates the vehicle, including revenue service
(scheduled route, special event, and layover
time) and non-revenue service (pullout and
pull-in times from first/last stop to garage).
Service Implementation Plan (SIP) – Board-
adopted document that details six-year transit
mode service levels and operating expenses.
SIP is a planning document and does not
constitute authorization for expenditure of
funds.
Service Miles (also called Platform Miles) –
For any mode, the total miles traveled by a
vehicle from pullout of garage/yard to return to
garage/yard at end of revenue service,
including any layover time and time when not
carrying passengers.
Smart Card – A small card, usually plastic, with
an imbedded computer chip good for one or
more trips that is usually altered by a fare
collection machine removing some or all of the
stored value as each trip is taken.
SODO – The general area south of downtown
Seattle; also, the name of one of Sound
Transit’s light rail stations located in that
neighborhood.
Sound Move – Voter-approved plan (1996) to
build a high-capacity public transit system.
Sound Transit – The Central Puget Sound
Regional Transit Authority.
SPI (Schedule Performance Index) – A
measure of schedule efficiency on a project. It
is the ratio of earned value (EV) to planned
value (PV).
SR – State Route.
ST2 (Sound Transit 2) – Voter-approved
(2008) second phase of Sound Transit’s plan
for mass transit expansion.
ST3 (Sound Transit 3) – The third phase of
Sound Transit’s plan for mass transit
expansion.
STart (Sound Transit Art Program) –
Program whose purpose is to incorporate
public art into Sound Transit systems and
facilities that will reflect the communities
served and enhance the customer experience.
Stride – Sound Transit’s future Bus Rapid
Transit service providing limited-stop regional
service connecting riders with major urban and
employment centers in King County. Bus Rapid
Transit service will utilize new park-and-ride
lots, transit centers, and high occupancy
vehicle (HOV) access ramps.
2020 Financial Plan & Proposed Budget 55 of 144
STU (Sound Transit University Program) –
Refers to a range of training courses, both on-
site and off-site, offered for Sound Transit
employees to improve professional and
technical skills.
Subarea – Five subareas of the Sound Transit
District defined for planning and budgeting
purposes consisting of Snohomish County,
North King County, East King County, South
King County, and Pierce County.
System Plan – (see Sound Move).
TCO (Total Cost of Ownership) – A financial
estimate intended to help buyers and owners
determine the direct and indirect costs of a
product or system.
TGT (Technology Governance Team) –
Team of Sound Transit employees who provide
leadership and direction for the Information
Technology (IT) division to ensure reliable,
consistent, cost-effective, and accountable
services.
TIFIA (Transportation Infrastructure
Financing and Innovation Act) – A direct
loan, loan guarantee, and standby line of credit
program allowing the USDOT to provide credit
assistance of up to 33 percent of the
construction costs of a regionally or nationally
significant surface transportation project.
Loans are made at U.S. Treasury rates and
may be repaid over as long as 35 years after
substantial completion of the project.
TIP (Transit Improvement Plan) – This
document provides projected capital and
operating expenditures for the construction and
operation of the Sound Transit regional transit
system in the central Puget Sound. The TIP
contains information on scope and budget as
well as changes in budget and schedule for all
active phases of both capital and operating
programs.
TOD (Transit-Oriented Development) – The
development of residential, commercial, and
retail uses within walking distance of a transit
station or stop.
TPSS (Traction Power Sub Station) – A
wayside unit that converts electric power from
the form provided by the public utility to an
appropriate voltage, current type, and
frequency to supply traction power to the motor
of the light rail vehicle through the overhead
catenary.
Transit Improvement Plan (TIP) – Adopted
TIP – The proposed TIP and associated
revisions adopted by the board, plus any one-
time actions that the Budget Policy authorizes
the CEO to take after the board adopts the
annual TIP.
Transit Improvement Plan (TIP) – Proposed
TIP – The initial submission of the TIP to the
board for review.
Transit Improvement Plan (TIP) – The
cumulative total of authorized project
allocations to date for all active projects, six-
year forecasts of operating expenses for each
transit mode, and contributions to reserves.
Transit mode – A system for carrying transit
passengers described by specific right-of-way,
technology and operational features, such as
light rail, commuter rail, bus or streetcar.
TVM (Ticket Vending Machine) – Automated
equipment located at customer facilities that
enable the purchase of fare media for access
to the Sound Transit transportation system.
UPS – Uninterrupted Power Supply
UW – University of Washington
Variance – The difference between planned
costs and actual costs.
WSDOT – Washington State Department of
Transportation
YOE (Year of Expenditure) – Refers to the
representation of a project’s cost inclusive of
an annual inflationary factor calculation.
2020 Financial Plan & Proposed Budget 56 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Syst
em E
xpan
sion
LIN
K
Proj
ect N
umbe
r and
Nam
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Prel
imin
ary
Engi
neer
ing
4000
34
Enha
ncem
ents
to T
acom
a Li
nk
Exte
nsio
n $1
,500
$0
$0
$0
$5
00
$0
$0
$0
$2,0
00
4000
52
Ever
ett L
ink
Exte
nsio
n 3
14,5
60
27,8
97
32,6
57
41,1
95
34,2
00
34,5
30
0 18
5,04
2 40
0053
Ta
com
a D
ome
Link
Ext
ensi
on
25,3
08
25,9
02
34,2
45
16,8
43
23,3
75
0 0
0 12
5,67
3 40
0066
W
est S
eattl
e an
d Ba
llard
Lin
k Ex
tens
ions
53
,896
52
,301
65
,100
68
,400
46
,199
0
0 0
285,
896
4001
13
Nor
th C
orrid
or M
OW
52
43
9 0
0 0
0 0
0 49
1 40
0115
N
E 13
0th
Stre
et In
fill S
tatio
n 3,
888
577
2,30
4 0
0 0
0 0
6,76
9 40
0117
D
STT
Sing
le T
rack
ing
3,50
0 0
0 0
0 0
0 0
3,50
0 Su
btot
al
88,1
47
93,7
79
129,
546
117,
900
111,
269
34,2
00
34,5
30
0 60
9,37
1 Ba
selin
e40
0008
H
illtop
Tac
oma
Link
Ext
ensi
on
100,
308
61,7
30
49,8
92
5,41
6 0
0 0
0 21
7,34
6 40
0009
O
pera
tions
and
Mai
nten
ance
Fa
cilit
y Ea
st
288,
499
68,0
50
20,0
70
7,23
6 60
,250
5,
116
0 0
449,
220
4000
32
Ligh
t Rai
l Veh
icle
Fle
et E
xpan
sion
17
4,04
1 13
7,23
5 12
9,25
8 10
6,94
5 10
3,62
8 88
,954
37
2 28
6 74
0,71
8 4X
100
Nor
thga
te L
ink
Exte
nsio
n 1,
569,
107
126,
148
78,3
55
22,7
37
103,
408
0 0
0 1,
899,
756
4X11
5 Ly
nnw
ood
Link
Ext
ensi
on
605,
224
504,
702
543,
778
544,
809
438,
434
126,
056
8,61
9 0
2,77
1,62
2 4X
200
Uni
vers
ity L
ink
Exte
nsio
n 1,
514,
981
1,75
0 2,
276
0 0
0 0
237,
000
1,75
6,00
7 4X
420
Sout
h 20
0th
Link
Ext
ensi
on
329,
402
146
0 0
0 0
0 53
,693
38
3,24
1 4X
445
Fede
ral W
ay L
ink
Exte
nsio
n 36
4,40
9 31
3,93
5 33
4,00
8 31
0,80
9 32
9,01
0 40
8,96
6 17
1,24
5 21
9,15
3 2,
451,
535
4X60
0 Ea
st L
ink
Exte
nsio
n 2,
343,
070
605,
984
248,
241
142,
094
131,
020
146,
080
26,4
10
34,2
51
3,67
7,15
0 4X
630
Dow
ntow
n R
edm
ond
Link
Ext
ensi
on
120,
743
149,
607
254,
915
322,
475
307,
764
119,
744
125,
812
128,
939
1,53
0,00
0 Su
btot
al
7,40
9,78
3 1,
969,
287
1,66
0,79
3 1,
462,
521
1,47
3,51
4 89
4,91
6 33
2,45
7 67
3,32
4 15
,876
,595
R
eser
ve
4X19
9 N
orth
gate
Lin
k Ex
tens
ion
Proj
ect
Res
erve
0
0 0
0 50
,000
0
0 0
50,0
00
Subt
otal
0
0 0
0 50
,000
0
0 0
50,0
00
Ope
ratin
g 40
0007
Fi
rst H
ill St
reet
car
132,
735
0 0
0 45
0
0 0
132,
780
Subt
otal
13
2,73
5 0
0 0
45
0 0
0 13
2,78
0
Tota
l $7
,630
,665
$2
,063
,066
$1
,790
,339
$1
,580
,421
$1
,634
,828
$9
29,1
16
$366
,987
$6
73,3
24
$16,
668,
746
2020 Financial Plan & Proposed Budget 59 of 144
2020
Cas
hflo
w b
y Su
bare
a (in
thou
sand
s)
Syst
em E
xpan
sion
LI
NK
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$413
,296
$3
19,8
64
$341
,633
$3
40,8
52
$300
,274
$1
09,5
74
$33,
850
$35
$1,8
59,3
79
2 - N
orth
Kin
g 3,
659,
727
462,
533
433,
648
367,
555
437,
150
85,4
68
4,18
2 23
7,29
1 5,
687,
554
3 - S
outh
Kin
g 78
3,52
5 35
6,82
3 37
0,13
2 33
4,48
7 36
4,67
2 42
1,69
0 17
1,29
4 27
2,88
5 3,
075,
508
4 - E
ast K
ing
2,65
0,53
4 83
9,00
9 56
5,00
2 51
2,37
1 50
7,68
8 30
3,89
1 15
2,21
7 16
3,10
3 5,
693,
814
5 - P
ierc
e 12
3,52
8 82
,495
75
,470
19
,951
18
,519
3,
113
13
10
323,
100
6 - S
yste
mw
ide
54
2,34
2 4,
453
5,20
5 6,
526
5,37
9 5,
431
0 29
,390
To
tal
$7,6
30,6
65
$2,0
63,0
66
$1,7
90,3
39
$1,5
80,4
21
$1,6
34,8
28
$929
,116
$3
66,9
87
$673
,324
$1
6,66
8,74
5
2020
Cas
hflo
w b
y Ph
ase
(in th
ousa
nds)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 02
-Ope
ratio
n+M
aint
enan
ce-A
genc
y$5
2 $3
89
$0
$0
$0
$0
$0
$0
$441
10
-Age
ncy
Adm
inis
tratio
n37
1,35
3 69
,765
89
,133
92
,178
12
7,99
8 58
,691
34
,088
46
,578
88
9,78
4 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w28
0,81
5 73
,583
99
,753
83
,589
57
,903
25
,431
23
,966
4,
246
649,
287
30-F
inal
Des
ign+
Spec
ifica
tions
568,
654
30,9
63
26,2
81
17,9
26
29,2
58
9,14
3 14
,130
8,
576
704,
930
35-T
hird
Par
ty20
5,41
8 15
,616
21
,372
19
,863
22
,406
10
,051
10
,509
13
,870
31
9,10
4 40
-Row
Acq
uisi
tion+
Perm
its1,
006,
107
154,
799
80,7
76
22,1
15
56,6
01
107,
552
5,09
0 10
7,70
6 1,
540,
745
50-C
onst
ruct
ion
4,54
0,14
1 1,
456,
869
1,23
5,94
5 1,
155,
905
1,05
7,74
1 56
6,53
8 24
0,51
4 46
5,36
7 10
,719
,020
55
-Con
stru
ctio
n Se
rvic
es37
8,15
0 10
6,66
6 83
,863
80
,999
78
,793
47
,792
37
,783
20
,768
83
4,81
3 70
-Veh
icle
s26
8,11
9 14
4,60
0 14
4,07
5 10
3,35
0 10
0,00
0 85
,192
0
4,71
6 85
0,05
2 80
-Sys
tem
Tes
ting+
Star
tup
11,8
56
9,81
7 9,
140
4,49
6 31
,929
18
,726
90
7 1,
497
88,3
68
90-C
ontin
genc
y0
0 0
0 72
,200
0
0 0
72,2
00
Tota
l $7
,630
,665
$2
,063
,066
$1
,790
,339
$1
,580
,421
$1
,634
,828
$9
29,1
16
$366
,987
$6
73,3
24
$16,
668,
746
2020 Financial Plan & Proposed Budget 60 of 144
Syst
em E
xpan
sion
LI
NK
4000
07
Firs
t Hill
Str
eetc
a r
Man
aged
by:
PEP
D
Prov
ide
a fix
ed a
mou
nt o
f fun
ding
for t
he p
lann
ing,
des
ign,
and
con
stru
ctio
n of
an
at-g
rade
stre
et c
ar c
onne
ctin
g C
apito
l Hill
with
the
Inte
rnat
iona
l Dis
trict
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$1
32,7
80
Base
line:
20
15
Vote
r-App
rove
d C
ost
Estim
ate:
$1
54,8
59
2019
TIP
: $1
32,7
80
2019
: 20
15
2019
Cos
t Est
imat
e:
$153
,482
20
20 T
IP:
$132
,780
20
20 :
2015
20
20 C
ost E
stim
ate:
$1
53,4
82
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
32,7
35
$0
$0
$0
$45
$0
$0
$0
$132
,780
To
tal
$132
,735
$0
$0
$0
$4
5 $0
$0
$0
$1
32,7
80
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$244
$0
$0
$0
$4
5 $0
$0
$0
$2
89
35-T
hird
Par
ty
132,
491
0 0
0 0
0 0
0 13
2,49
1 To
tal
$132
,735
$0
$0
$0
$4
5 $0
$0
$0
$1
32,7
80
P roj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
LIN
K
4000
08
Hill
top
Taco
ma
Link
Ext
ensi
on
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
2.4
mile
ext
ensi
on o
f lig
ht ra
il fro
m th
e Th
eatre
Dis
trict
in d
ownt
own
Taco
ma
to th
e H
illtop
nei
ghbo
rhoo
d.
This
ext
ensi
on w
ill ad
d 6
new
sta
tions
, 5 n
ew v
ehic
les
and
the
expa
nsio
n of
the
Taco
ma
Link
Ope
ratio
ns a
nd M
aint
enan
ce fa
cilit
y.
The
new
sta
tions
will
be lo
cate
d at
Old
City
Hal
l, So
uth
4th
Stre
et, S
tadi
um D
istri
ct, T
acom
a G
ener
al H
ospi
tal,
6th
Aven
ue H
illtop
D
istri
ct, a
nd S
t Jos
eph
Med
ical
Cen
ter.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
con
stru
ctio
n w
ork
on m
ainl
ine
and
at th
e op
erat
ing
and
mai
nten
ance
faci
lity
(OM
F).
Con
tinue
ov
ersi
ght o
f thi
rd p
arty
and
veh
icle
man
ufac
turin
g w
ork.
Exe
cute
sco
pe w
ith v
endo
r for
veh
icle
insp
ectio
n se
rvic
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$2
17,3
46
Base
line:
20
22
Vote
r-App
rove
d C
ost
Estim
ate:
$1
20,5
42
2019
TIP
: $2
17,3
46
2019
: 20
22
2019
Cos
t Est
imat
e:
$158
,923
20
20 T
IP:
$217
,346
20
20 :
2022
20
20 C
ost E
stim
ate:
$1
58,9
23
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$1
00,3
08
$61,
730
$49,
892
$5,4
16
$0
$0
$0
$0
$217
,346
To
tal
$100
,308
$6
1,73
0 $4
9,89
2 $5
,416
$0
$0
$0
$0
$2
17,3
46
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$10,
620
$2,5
75
$2,3
66
$1,7
87
$0
$0
$0
$0
$17,
348
20-P
relim
Eng
inee
ring/
Env
Rev
iew
5,
559
0 0
0 0
0 0
0 5,
559
30-F
inal
D
esig
n+Sp
ecifi
catio
ns11
,081
1,
395
296
26
0 0
0 0
12,7
98
35-T
hird
Par
ty
1,13
1 50
21
5 70
0
0 0
0 1,
466
40-R
ow A
cqui
sitio
n+Pe
rmits
1,92
0 55
53
24
2 0
0 0
0 2,
270
50-C
onst
ruct
ion
60,9
11
41,1
05
25,2
83
1,89
6 0
0 0
0 12
9,19
6 55
-Con
stru
ctio
n Se
rvic
es
4,65
4 3,
800
1,56
6 27
1 0
0 0
0 10
,291
70
-Veh
icle
s 3,
379
11,2
00
18,5
13
0 0
0 0
0 33
,092
80
-Sys
tem
Tes
ting+
Star
tup
1,05
3 1,
550
1,60
0 1,
123
0 0
0 0
5,32
6 To
tal
$100
,308
$6
1,73
0 $4
9,89
2 $5
,416
$0
$0
$0
$0
$2
17,3
46
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
risk
of u
nide
ntifi
ed u
tility
con
ditio
ns u
nder
the
prop
osed
alig
nmen
t pot
entia
lly c
ausi
ng a
del
ay in
com
plet
ion
of th
ese
relo
catio
ns. T
here
is c
once
rn th
at ro
adw
ay im
prov
emen
ts a
nd m
odifi
catio
ns a
long
Mar
tin L
uthe
r Kin
g W
ay a
re g
reat
er th
an
antic
ipat
ed re
quiri
ng a
dditi
onal
sco
pe.
budg
et a
nd s
ched
ule
unce
rtain
ty re
mai
ns w
ith u
tility
relo
catio
ns a
ssoc
iate
d w
ith th
e pe
dest
rian
pass
agew
ays
unde
r Mar
tin L
uthe
r Kin
g W
ay a
nd u
nkno
wn
subs
urfa
ce c
ondi
tions
und
er th
e pr
opos
ed a
lignm
ent o
r ov
erhe
ad c
aten
ary
syst
em p
ole
loca
tions
.
2020 Financial Plan & Proposed Budget 61 of 144
Syst
em E
xpan
sion
LI
NK
4000
09
Ope
ratio
ns a
nd M
aint
enan
ce F
acili
ty E
ast
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
ligh
t rai
l veh
icle
mai
nten
ance
faci
lity
loca
ted
in th
e C
ity o
f Bel
levu
e th
at w
ill pr
ovid
e st
orag
e an
d m
aint
enan
ce c
apac
ity to
sup
port
the
light
rail
expa
nsio
n w
ithin
the
east
cor
ridor
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
ope
ratio
n an
d m
aint
enan
ce fa
cilit
y de
sign
-bui
ld c
onst
ruct
ion
with
ass
ocia
ted
supp
ort f
rom
des
ign-
build
pro
ject
man
agem
ent.
Rig
ht-o
f-way
act
iviti
es w
ill be
min
imal
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$4
49,2
20
Base
line:
20
20
Vote
r-App
rove
d C
ost
Estim
ate:
$3
67,1
98
2019
TIP
: $4
49,2
20
2019
: 20
20
2019
Cos
t Est
imat
e:
$465
,426
20
20 T
IP:
$449
,220
20
20 :
2020
20
20 C
ost E
stim
ate:
$4
65,4
26
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$60,
585
$14,
291
$4,2
15
$1,5
19
$12,
653
$1,0
74
$0
$0
$94,
336
Nor
th K
ing
48,1
79
11,3
64
3,35
2 1,
208
10,0
62
854
0 0
75,0
20
Sout
h Ki
ng
55,3
92
13,0
66
3,85
3 1,
389
11,5
68
982
0 0
86,2
50
East
Kin
g 12
4,34
3 29
,330
8,
650
3,11
9 25
,968
2,
205
0 0
193,
614
Tota
l $2
88,4
99
$68,
050
$20,
070
$7,2
36
$60,
250
$5,1
16
$0
$0
$449
,220
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$6,6
51
$1,8
50
$1,2
58
$715
$1
,984
$5
,116
$0
$0
$1
7,57
3 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
8,71
2 0
0 0
824
0 0
0 9,
536
30-F
inal
Des
ign+
Spec
ifica
tions
0
50
100
0 23
6 0
0 0
386
35-T
hird
Par
ty
125
0 50
0 0
2,48
2 0
0 0
3,10
7 40
-Row
Acq
uisi
tion+
Perm
its10
1,95
9 50
50
4,
291
28,1
79
0 0
0 13
4,52
9 50
-Con
stru
ctio
n 16
1,30
5 61
,600
17
,162
1,
730
22,9
56
0 0
0 26
4,75
3 55
-Con
stru
ctio
n Se
rvic
es
9,74
7 4,
500
1,00
0 50
0 3,
590
0 0
0 19
,337
To
tal
$288
,499
$6
8,05
0 $2
0,07
0 $7
,236
$6
0,25
0 $5
,116
$0
$0
$4
49,2
20
Proj
ect R
isk
Asse
ssm
ent
Long
lead
pro
cure
men
ts a
re d
elay
ed c
ausi
ng in
terru
ptio
n to
con
stru
ctio
n se
quen
ces
in 2
019.
Int
erfa
ces
with
Eas
t Lin
k an
d di
fferin
g gr
ound
con
ditio
n at
con
stru
ctio
n ra
mp
up c
ould
pos
e ch
alle
nges
.
Sy
stem
Exp
ansi
on
LIN
K
4000
32
Ligh
t Rai
l Veh
icle
Fle
et E
xpan
sion
M
anag
ed b
y: D
ECM
Plan
, des
ign,
pro
cure
, ins
pect
, and
test
152
ligh
t rai
l veh
icle
s.
The
vehi
cles
will
supp
ort r
even
ue s
ervi
ce fo
r Nor
thga
te L
ink,
Eas
t Lin
k,
Lynn
woo
d Li
nk, F
eder
al W
ay L
ink
and
Dow
ntow
n R
edm
ond
Link
ext
ensi
ons.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Maj
or m
ilest
one
paym
ents
, acc
epta
nce
and
com
mis
sion
ing
of in
itial
del
iver
y of
30
new
LR
Vs.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$7
40,7
18
Base
line:
20
24
Vote
r-App
rove
d C
ost
Estim
ate:
$6
54,2
03
2019
TIP
: $7
40,7
18
2019
: 20
24
2019
Cos
t Est
imat
e:
$727
,880
20
20 T
IP:
$740
,718
20
20 :
2024
20
20 C
ost E
stim
ate:
$7
27,8
80
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$21,
233
$16,
743
$15,
769
$13,
047
$12,
643
$10,
852
$45
$35
$90,
368
Nor
th K
ing
51,8
64
40,8
96
38,5
19
31,8
70
30,8
81
26,5
08
111
85
220,
734
Sout
h Ki
ng
22,9
73
18,1
15
17,0
62
14,1
17
13,6
79
11,7
42
49
38
97,7
75
East
Kin
g 71
,879
56
,678
53
,383
44
,168
42
,798
36
,738
15
3 11
8 30
5,91
7 Pi
erce
6,
091
4,80
3 4,
524
3,74
3 3,
627
3,11
3 13
10
25
,925
To
tal
$174
,041
$1
37,2
35
$129
,258
$1
06,9
45
$103
,628
$8
8,95
4 $3
72
$286
$7
40,7
18
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,6
46
$1,3
35
$1,3
60
$1,3
10
$1,3
40
$1,2
68
$82
$286
$9
,627
55
-Con
stru
ctio
n Se
rvic
es
5,84
8 2,
500
2,33
5 2,
285
2,28
8 2,
495
289
0 18
,040
70
-Veh
icle
s 16
5,54
7 13
3,40
0 12
5,56
3 10
3,35
0 10
0,00
0 85
,192
0
0 71
3,05
1 To
tal
$174
,041
$1
37,2
35
$129
,258
$1
06,9
45
$103
,628
$8
8,95
4 $3
72
$286
$7
40,7
18
P roj
ect R
isk
Asse
ssm
ent
Proj
ect r
isk
cent
ers
on th
e tim
ely
com
plet
ion
and
com
mis
sion
ing
of th
e O
pera
tions
and
Mai
nten
ance
Fac
ility:
Eas
t’s (O
MF-
East
) ya
rd to
rece
ive
the
new
LR
Vs.
Coo
rdin
atio
n of
the
retro
fittin
g of
aut
omat
ic tr
ain
prot
ectio
n on
the
exis
ting
LRVs
is c
ritic
al to
m
inim
ize
impa
cts
to L
ink
oper
atio
ns; D
iffic
ulty
in m
eetin
g th
e m
agne
tic fr
eque
ncy
and
vibr
atio
n st
anda
rds
may
lead
to p
rodu
ctio
n an
d de
liver
y de
lays
.
2020 Financial Plan & Proposed Budget 62 of 144
Syst
em E
xpan
sion
LI
NK
4000
34
Enha
ncem
ents
to T
acom
a Li
nk E
xten
sion
M
anag
ed b
y: F
IN
Cre
ate
engi
neer
ing
and
stre
etsc
ape
desi
gn fo
r tra
nsit
acce
ss im
prov
emen
ts a
nd s
tatio
n ar
ea e
nhan
cem
ents
aro
und
the
Taco
ma
Link
Ex
tens
ion
proj
ect.
This
pro
ject
is a
lso
focu
sed
on jo
b ac
cess
nee
ds a
nd id
entif
ying
bar
riers
that
cur
rent
ly li
mit
the
Taco
ma
Hillt
op re
side
nts
from
pa
rtici
patio
n in
exi
stin
g w
orkf
orce
trai
ning
and
app
rent
ices
hip
prog
ram
s. In
201
6 th
e C
ity o
f Tac
oma
and
Soun
d Tr
ansi
t rec
eive
d a
$2
milli
on g
rant
from
the
Fede
ral T
rans
it Ad
min
istra
tion
for t
his
proj
ect.
Soun
d Tr
ansi
t is
the
desi
gnat
ed re
cipi
ent a
nd n
eeds
to a
dmin
iste
r th
e gr
ant w
hile
the
City
of T
acom
a w
ill ex
ecut
e th
e sc
ope
and
prov
ide
$0.5
milli
on in
loca
l mat
chin
g fu
nds.
The
scop
e of
this
pro
ject
is in
depe
nden
t of t
he T
acom
a Li
nk E
xten
sion
pro
ject
.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
clo
se o
ut.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
,000
20
19 :
2019
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $2
,000
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$1
,500
$0
$0
$0
$5
00
$0
$0
$0
$2,0
00
Tota
l $1
,500
$0
$0
$0
$5
00
$0
$0
$0
$2,0
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$220
$0
$0
$0
$0
$0
$0
$0
$2
20
35-T
hird
Par
ty
1,28
0 0
0 0
500
0 0
0 1,
780
Tota
l $1
,500
$0
$0
$0
$5
00
$0
$0
$0
$2,0
00
Proj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
LIN
K
4000
52
Ever
ett L
ink
Exte
nsio
n M
anag
ed b
y: P
EPD
Plan
, des
ign,
and
con
stru
ct a
16.
3 m
ile e
xten
sion
of l
ight
rail
from
Lyn
nwoo
d Tr
ansi
t Cen
ter t
o Ev
eret
t Sta
tion
via
at-g
rade
and
el
evat
ed a
lignm
ent.
The
proj
ect i
nclu
des
six
new
sta
tions
at W
est A
lder
woo
d M
all,
Ash
Way
, 128
th /M
arin
er, S
outh
wes
t Eve
rett
Indu
stria
l Cen
ter,
SR 5
26/E
verg
reen
and
Eve
rett
Stat
ion.
The
pro
ject
als
o in
clud
es o
ne p
rovi
sion
al s
tatio
n, a
t SR
99/
Airp
ort R
oad.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: New
pro
ject
of $
185
milli
on to
beg
in p
roje
ct d
evel
opm
ent.
Budg
et y
ear a
ctiv
ities
: Pro
cure
pro
ject
dev
elop
men
t ser
vice
s co
nsul
tant
con
tract
, com
plet
e Ph
ase
1 al
tern
ativ
es d
evel
opm
ent.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$3,7
07,6
80
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
85,0
42
2020
: 20
36
2020
Cos
t Est
imat
e:
$3,6
89,4
40
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$2
$12,
270
$23,
509
$27,
520
$34,
716
$28,
821
$29,
099
$0
$155
,937
Sy
stem
wid
e 0
2,29
0 4,
388
5,13
6 6,
479
5,37
9 5,
431
0 29
,105
To
tal
$3
$14,
560
$27,
897
$32,
657
$41,
195
$34,
200
$34,
530
$0
$185
,042
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$3
$3,8
99
$5,4
06
$5,6
00
$7,3
97
$5,7
49
$6,1
16
$0
$34,
170
20-P
relim
Eng
inee
ring/
Env
Rev
iew
0
10,4
03
19,6
42
22,6
36
25,6
37
23,6
30
23,6
24
0 12
5,57
2
35-T
hird
Par
ty
0 25
8 1,
508
2,35
4 3,
897
2,45
1 2,
732
0 13
,200
40
-Row
Acq
uisi
tion+
Perm
its0
0 1,
341
2,06
7 4,
264
2,37
0 2,
058
0 12
,100
To
tal
$3
$14,
560
$27,
897
$32,
657
$41,
195
$34,
200
$34,
530
$0
$185
,042
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 63 of 144
Syst
em E
xpan
sion
LI
NK
4000
53
Taco
ma
Dom
e Li
nk E
xten
sion
M
anag
ed b
y: P
EPD
Plan
, des
ign,
and
con
stru
ct a
9.7
mile
ext
ensi
on o
f lig
ht ra
il fro
m F
eder
al W
ay to
Tac
oma
via
at-g
rade
or e
leva
ted
alig
nmen
t. S
tatio
ns
will
be lo
cate
d at
Fed
eral
Way
Tra
nsit
Cen
ter,
Sout
h Fe
dera
l Way
, Fife
, Eas
t Tac
oma,
and
the
Taco
ma
Dom
e.
The
proj
ect i
nclu
des
the
plan
ning
of a
ligh
t rai
l mai
nten
ance
faci
lity
(OM
F-So
uth)
to a
dd s
tora
ge a
nd m
aint
enan
ce c
apac
ity in
sup
port
the
expa
nsio
n of
ligh
t rai
l on
the
Fede
ral W
ay to
Tac
oma
corri
dor.
Upo
n th
e co
mpl
etio
n of
the
envi
ronm
enta
l im
pact
sta
tem
ent (
EIS)
, th
e O
MF-
Sout
h w
ill tra
nsiti
on to
a s
tand
-alo
ne p
roje
ct.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
duct
tech
nica
l ana
lysi
s of
the
pref
erre
d al
tern
ativ
es a
nd o
ther
sta
tion
and
alig
nmen
t opt
ions
in p
repa
ratio
n fo
r fin
al d
rafts
of t
he D
raft
Envi
ronm
enta
l Im
pact
Sta
tem
ent (
DEI
S) b
y th
e en
d of
202
0 fo
r pub
licat
ion
to th
e pu
blic
in e
arly
202
1.
Eval
uate
thre
e O
MF
site
s w
ith a
goa
l of s
eeki
ng a
Boa
rd p
refe
rred
alte
rnat
ive
by Q
4 20
20.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
o jec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$2,4
44,0
61
2019
TIP
: $1
25,6
73
2019
: 20
30
2019
Cos
t Est
imat
e:
$2,4
31,0
62
2020
TIP
: $1
25,6
73
2020
: 20
30
2020
Cos
t Est
imat
e:
$2,4
31,0
62
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$1
0,32
6 $1
0,56
8 $1
3,97
2 $6
,872
$9
,537
$0
$0
$0
$5
1,27
5 Pi
erce
14
,982
15
,334
20
,273
9,
971
13,8
38
0 0
0 74
,398
To
tal
$25,
308
$25,
902
$34,
245
$16,
843
$23,
375
$0
$0
$0
$125
,673
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$6,0
35
$3,8
31
$4,4
75
$5,0
29
$7,4
78
$0
$0
$0
$26,
848
20-P
relim
Eng
inee
ring/
Env
Rev
iew
18
,393
20
,129
28
,106
10
,153
10
,295
0
0 0
87,0
75
35-T
hird
Par
ty
680
1,04
2 1,
014
1,01
1 2,
003
0 0
0 5,
750
40-R
ow A
cqui
sitio
n+Pe
rmits
200
900
650
650
3,60
0 0
0 0
6,00
0 To
tal
$25,
308
$25,
902
$34,
245
$16,
843
$23,
375
$0
$0
$0
$125
,673
Proj
ect R
isk
Asse
ssm
ent
Con
tinue
to re
duce
our
risk
for c
ross
ing
the
Puya
llup
Riv
er b
y fu
rther
des
ign
of a
cle
ar s
pan
that
elim
inat
es a
ny p
iers
in th
e riv
er.
Ref
ine
the
use
of th
e W
SDO
T R
ight
of W
ay to
max
imiz
e th
e R
OW
rem
aini
ng fo
r WSD
OT
whi
le m
inim
izin
g th
e pe
rman
ent i
mpa
ct o
n ad
join
ing
priv
ate
prop
ertie
s. E
valu
ate
thre
e Bo
ard
dire
cted
site
s of
the
OM
FS in
the
DEI
S w
ith e
nviro
nmen
tal c
halle
nges
at a
ll th
ree
site
s.
Sy
stem
Exp
ansi
on
LIN
K
4000
66
Wes
t Sea
ttle
and
Bal
lard
Lin
k Ex
tens
ions
M
anag
ed b
y: P
EPD
Exte
nsio
n of
ligh
t rai
l app
roxi
mat
ely
4.7
mile
s fro
m D
ownt
own
Seat
tle to
the
Alas
ka J
unct
ion
neig
hbor
hood
of W
est S
eattl
e vi
a el
evat
ed a
nd a
t-gra
de a
lignm
ent a
nd a
ppro
xim
atel
y 5.
4 m
iles
from
Dow
ntow
n Se
attle
to B
alla
rd v
ia e
leva
ted
guid
eway
and
tunn
el.
Incl
udes
an
at-g
rade
sta
tion
(Sta
dium
) and
ele
vate
d st
atio
ns in
SO
DO
, Del
ridge
, Ava
lon,
Ala
ska
Junc
tion,
Bal
lard
, Sm
ith C
ove,
and
In
terb
ay a
nd u
nder
grou
nd (t
unne
l) st
atio
ns a
t Sea
ttle
Cen
ter a
nd S
outh
Lak
e U
nion
.
Prel
imin
ary
engi
neer
ing
incl
udes
Wes
t Sea
ttle
Link
and
Bal
lard
Lin
k ex
tens
ions
. U
pon
com
plet
ion
of th
e en
viro
nmen
tal r
evie
w a
nd
the
envi
ronm
enta
l im
pact
sta
tem
ent t
hese
pro
ject
s w
ill be
com
e st
and-
alon
e pr
ojec
ts.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: C
ontin
ue a
ltern
ativ
es d
evel
opm
ent a
nd e
valu
atio
n; c
ondu
ct fe
asib
ility
stud
ies
on k
ey p
roje
ct s
cope
as
sum
ptio
ns in
the
ST3
Plan
, and
beg
in s
take
hold
ers
enga
gem
ent.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$7,1
23,7
18
2019
TIP
: $2
85,8
96
2019
: 20
35
2019
Cos
t Est
imat
e:
$7,0
93,9
09
2020
TIP
: $2
85,8
96
2020
: 20
35
2020
Cos
t Est
imat
e:
$7,0
93,9
09
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$1,0
24
$994
$1
,237
$1
,300
$8
78
$0
$0
$0
$5,4
32
Nor
th K
ing
50,0
70
48,5
88
60,4
78
63,5
44
42,9
19
0 0
0 26
5,59
7 So
uth
King
1,
024
994
1,23
7 1,
300
878
0 0
0 5,
432
East
Kin
g 1,
078
1,04
6 1,
302
1,36
8 92
4 0
0 0
5,71
8 Pi
erce
64
7 62
8 78
1 82
1 55
4 0
0 0
3,43
1 Sy
stem
wid
e 54
52
65
68
46
0
0 0
286
Tota
l $5
3,89
6 $5
2,30
1 $6
5,10
0 $6
8,40
0 $4
6,19
9 $0
$0
$0
$2
85,8
96
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$9,9
55
$7,8
00
$11,
500
$13,
700
$20,
125
$0
$0
$0
$63,
080
20-P
relim
Eng
inee
ring/
Env
Rev
iew
42
,492
42
,301
49
,900
50
,500
20
,223
0
0 0
205,
416
35-T
hird
Par
ty
806
1,45
0 2,
700
2,70
0 3,
744
0 0
0 11
,400
40
-Row
Acq
uisi
tion+
Perm
its64
4 75
0 1,
000
1,50
0 2,
106
0 0
0 6,
000
Tota
l $5
3,89
6 $5
2,30
1 $6
5,10
0 $6
8,40
0 $4
6,19
9 $0
$0
$0
$2
85,8
96
P roj
ect R
isk
Asse
ssm
ent
Ther
e is
risk
to s
cope
, sch
edul
e an
d bu
dget
whe
n try
ing
to re
ach
stak
ehol
der c
onse
nsus
on
a pr
efer
red
alte
rnat
ive,
com
plex
ity o
f al
ignm
ents
in c
onst
rain
ed e
nviro
nmen
t with
cha
lleng
ing
topo
grap
hy a
nd p
roje
ct d
eliv
erab
les
that
incl
ude
two
brid
ge c
ross
ings
, co
nstru
ctin
g a
tunn
el th
roug
h a
mat
ure
urba
n en
viro
nmen
t and
the
effe
cts
in c
onst
rain
ed e
nviro
nmen
t. Po
tent
ial i
mpa
ct o
n C
entra
l Li
nk o
pera
tions
dur
ing
cons
truct
ion;
righ
t of w
ay a
nd p
rope
rty im
pact
s.
2020 Financial Plan & Proposed Budget 64 of 144
Syst
em E
xpan
sion
LI
NK
4001
13
Nor
th C
orrid
or M
OW
M
anag
ed b
y: P
EPD
Des
ign
and
cons
truct
a M
aint
enan
ce o
f Way
faci
lity
in L
ynnw
ood.
Thi
s bu
ildin
g w
ill fa
cilit
ate
as a
repo
rt fa
cilit
y an
d su
ppor
t m
aint
enan
ce n
eeds
to S
ound
Tra
nsit
asse
ts to
incl
ude
faci
litie
s, v
ehic
le m
aint
enan
ce, t
rack
, sig
nals
, com
mun
icat
ions
, tra
ctio
n po
wer
an
d pa
rts in
vent
ory
north
of t
he s
hip
cana
l in
Seat
tle. T
he p
ropo
sed
build
ing
coul
d be
tem
pora
ry o
r per
man
ent.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Est
ablis
hed
proj
ect a
t $49
1 th
ousa
nd to
beg
in P
hase
1 o
f pre
limin
ary
engi
neer
ing.
Budg
et y
ear a
ctiv
ities
: Ana
lysi
s of
inte
rmed
iate
and
long
-term
mai
nten
ance
of w
ay (M
OW
) nee
ds.
Sitin
g an
alys
is fo
r a M
OW
faci
lity
to
supp
ort t
he n
orth
cor
ridor
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $4
91
2020
: 20
20
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $5
2 $4
39
$0
$0
$0
$0
$0
$0
$491
To
tal
$52
$439
$0
$0
$0
$0
$0
$0
$4
91
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
02-O
pera
tion+
Mai
nten
ance
-Ag
ency
$5
2 $3
89
$0
$0
$0
$0
$0
$0
$441
40-R
ow A
cqui
sitio
n+Pe
rmits
0 50
0
0 0
0 0
0 50
To
tal
$52
$439
$0
$0
$0
$0
$0
$0
$4
91
Proj
ect R
isk
Asse
ssm
ent
Not
hav
ing
a Ly
nwoo
d M
OW
faci
lity
wou
ld d
elay
mai
nten
ance
resp
onse
s to
the
Nor
th C
orrid
or s
egm
ent.
Seve
re im
pact
s to
reve
nue
serv
ice
wou
ld b
e re
aliz
ed a
s fa
iled
train
s or
sys
tem
s w
ould
hav
e to
wai
t for
mai
ntai
ners
to re
spon
d fro
m th
e ei
ther
the
OM
F Fo
rest
lo
catio
n or
Bel
levu
e O
MFE
usi
ng In
ters
tate
5 th
roug
h Se
attle
pla
gued
with
hea
vy tr
affic
vol
umes
. Fur
ther
mor
e, If
regu
lar s
ched
uled
m
aint
enan
ce a
ctiv
ities
per
form
ed d
urin
g no
n-re
venu
e ho
urs
coul
d no
t be
supp
orte
d fro
m th
is lo
catio
n, th
e dr
ivin
g tim
e re
quire
d to
re
ach
the
Lynw
ood
alig
nmen
t wou
ld s
ever
ely
limit
the
time
to p
erfo
rm th
em.
Sy
stem
Exp
ansi
on
LIN
K
4001
15
NE
130t
h St
reet
Infil
l Sta
tion
Man
aged
by:
PEP
D
Plan
, des
ign
and
cons
truct
an
elev
ated
ligh
t rai
l sta
tion
at 1
30th
Stre
et a
nd I-
5 in
Sea
ttle.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pen
ding
boa
rd d
irect
ion
rega
rdin
g st
rate
gy to
adv
ance
the
proj
ect.
Boar
d de
cisi
on to
adv
ance
to F
inal
Des
ign
wou
ld re
sult
in a
n as
soci
ated
bud
get a
men
dmen
t.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$76,
094
2019
TIP
: $6
,769
20
19 :
2024
20
19 C
ost E
stim
ate:
$7
6,09
4 20
20 T
IP:
$6,7
69
2020
: 20
36
2020
Cos
t Est
imat
e:
$75,
670
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $3
,888
$5
77
$2,3
04
$0
$0
$0
$0
$0
$6,7
69
Tota
l $3
,888
$5
77
$2,3
04
$0
$0
$0
$0
$0
$6,7
69
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$616
$5
77
$177
$0
$0
$0
$0
$0
$1
,370
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
2,99
8 0
1,19
1 0
0 0
0 0
4,18
9
35-T
hird
Par
ty
264
0 82
4 0
0 0
0 0
1,08
8 40
-Row
Acq
uisi
tion+
Perm
its10
0
12
0 0
0 0
0 22
50
-Con
stru
ctio
n 0
0 10
0 0
0 0
0 0
100
Tota
l $3
,888
$5
77
$2,3
04
$0
$0
$0
$0
$0
$6,7
69
P roj
ect R
isk
Asse
ssm
ent
Tim
ely
com
plet
ion
of d
esig
n w
ork
to a
llow
con
curre
nt c
onst
ruct
ion
with
Lyn
nwoo
d Li
nk, o
r to
elim
inat
e/m
inim
ize
oper
atio
nal i
mpa
cts;
C
onst
ruct
ion
mar
ket c
ondi
tions
.
2020 Financial Plan & Proposed Budget 65 of 144
Syst
em E
xpan
sion
LI
NK
4001
17
DST
T Si
ngle
Tra
ckin
g M
anag
ed b
y: E
XE
Dev
elop
and
con
stru
ct tu
nnel
mod
ifica
tions
sup
porti
ng s
ingl
e tra
ckin
g op
erat
ions
in th
e D
ownt
own
Seat
tle T
rans
it Tu
nnel
allo
win
g th
e Ea
st L
ink
proj
ect t
o es
tabl
ish
a co
nnec
tion
to a
ctiv
e lig
ht ra
il se
rvic
e.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
,500
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $3
,500
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $2
1 $0
$0
$0
$0
$0
$0
$0
$2
1 Ea
st K
ing
3,47
9 0
0 0
0 0
0 0
3,47
9 To
tal
$3,5
00
$0
$0
$0
$0
$0
$0
$0
$3,5
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$300
$0
$0
$0
$0
$0
$0
$0
$3
00
50-C
onst
ruct
ion
3,20
0 0
0 0
0 0
0 0
3,20
0 To
tal
$3,5
00
$0
$0
$0
$0
$0
$0
$0
$3,5
00
Proj
ect R
isk
Asse
ssm
ent
The
risk
exis
ts th
at c
hang
ing
cond
ition
s or
exp
ecta
tions
cou
ld re
sult
in b
udge
t im
pact
s to
mai
ntai
n a
fixed
sch
edul
e.
Sy
stem
Exp
ansi
on
LIN
K
4X10
0 N
orth
gate
Lin
k Ex
tens
ion
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
4.3
mile
ext
ensi
on o
f lig
ht ra
il fro
m th
e U
nive
rsity
of W
ashi
ngto
n to
Nor
thga
te v
ia tu
nnel
and
ele
vate
d al
ignm
ent.
Sta
tions
will
be lo
cate
d at
Uni
vers
ity D
istri
ct, R
oose
velt,
and
Nor
thga
te.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Sub
stan
tial c
ompl
etio
n of
all
stat
ions
and
sys
tem
s co
ntra
ct w
ork.
Per
form
inte
grat
ed te
stin
g in
pre
para
tion
for
pre-
reve
nue
serv
ice
oper
atio
ns.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$1
,899
,756
Ba
selin
e:
2021
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$2,0
96,3
68
2019
TIP
: $1
,899
,756
20
19 :
2021
20
19 C
ost E
stim
ate:
$2
,260
,380
20
20 T
IP:
$1,8
99,7
56
2020
: 20
21
2020
Cos
t Est
imat
e:
$2,2
60,3
80
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,569
,107
$1
26,1
48
$78,
355
$22,
737
$103
,408
$0
$0
$0
$1,
899,
756
Tota
l $1
,569
,107
$1
26,1
48
$78,
355
$22,
737
$103
,408
$0
$0
$0
$1,
899,
756
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$78,
244
$11,
192
$10,
693
$9,2
25
$21,
025
$0
$0
$0
$130
,379
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
15,0
77
0 0
0 0
0 0
0 15
,077
30-F
inal
Des
ign+
Spec
ifica
tions
12
1,76
9 5,
184
2,13
6 72
7 7,
352
0 0
0 13
7,16
7
35-T
hird
Par
ty
7,40
5 1,
442
1,40
2 86
3 68
8 0
0 0
11,8
00
40-R
ow A
cqui
sitio
n+Pe
rmits
101,
040
300
41
200
10,7
20
0 0
0 11
2,30
0 50
-Con
stru
ctio
n 1,
155,
307
90,3
23
48,5
59
7,57
6 32
,827
0
0 0
1,33
4,59
3 55
-Con
stru
ctio
n Se
rvic
es
89,2
65
9,44
0 8,
233
2,77
4 8,
598
0 0
0 11
8,31
0 80
-Sys
tem
Tes
ting+
Star
tup
1,00
0 8,
267
7,29
0 1,
373
0 0
0 0
17,9
30
90-C
ontin
genc
y 0
0 0
0 22
,200
0
0 0
22,2
00
Tota
l $1
,569
,107
$1
26,1
48
$78,
355
$22,
737
$103
,408
$0
$0
$0
$1,
899,
756
Proj
ect R
isk
Asse
ssm
ent
Proj
ect r
isk
is s
till a
con
cern
giv
en m
ultip
le c
ontra
ct in
terfa
ces,
the
pote
ntia
l sho
rtage
of s
kille
d la
bor a
nd o
pera
tions
and
m
aint
enan
ce s
uppo
rt du
ring
star
tup
and
inte
grat
ion
test
ing.
Dur
atio
n un
certa
intie
s fo
r sys
tem
inst
alla
tion,
inte
grat
ion,
and
test
ing.
C
oord
inat
ion
with
third
par
ties
(City
of S
eattl
e, W
SDO
T, U
W e
tc.)
whi
ch m
ay re
sult
in u
nant
icip
ated
miti
gatio
n/re
stor
atio
n re
ques
ts
and/
or d
elay
ed re
view
s. A
ll of
thes
e po
tent
ial i
ssue
s co
uld
have
an
impa
ct o
n sc
hedu
le a
nd b
udge
t.
2020 Financial Plan & Proposed Budget 66 of 144
Syst
em E
xpan
sion
LI
NK
4X11
5 Ly
nnw
ood
Link
Ext
ensi
on
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
8.5
mile
ext
ensi
on o
f lig
ht ra
il fro
m N
orth
gate
to L
ynnw
ood
Tran
sit C
ente
r via
at-g
rade
and
ele
vate
d al
ignm
ent.
Sta
tions
will
be lo
cate
d at
Mou
ntla
ke T
erra
ce, S
hore
line
Sout
h/14
5th
Stre
et, S
hore
line
Nor
th/1
85th
Stre
et, a
nd L
ynnw
ood
City
Cen
ter.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e fin
al d
esig
n, a
nd b
egin
ear
ly c
onst
ruct
ion
activ
ities
with
an
expe
cted
not
ice
to p
roce
ed d
urin
g th
e th
ird q
uarte
r. C
ontin
ue ri
ght-o
f-way
acq
uisi
tion
activ
ities
. Beg
in p
rimar
y ut
ility
wor
k an
d co
mpl
etie
per
mitt
ing
activ
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$2
,771
,622
Ba
selin
e:
2024
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$1,9
68,7
22
2019
TIP
: $2
,771
,622
20
19 :
2024
20
19 C
ost E
stim
ate:
$1
,677
,740
20
20 T
IP:
$2,7
71,6
22
2020
: 20
24
2020
Cos
t Est
imat
e:
$1,6
77,7
40
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$330
,452
$2
75,5
67
$296
,903
$2
97,4
66
$239
,385
$6
8,82
7 $4
,706
$0
$1,
513,
306
Nor
th K
ing
274,
772
229,
135
246,
875
247,
343
199,
049
57,2
29
3,91
3 0
1,25
8,31
6 To
tal
$605
,224
$5
04,7
02
$543
,778
$5
44,8
09
$438
,434
$1
26,0
56
$8,6
19
$0 $
2,77
1,62
2
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$36,
175
$9,3
18
$11,
495
$12,
425
$22,
663
$3,6
35
$2,4
53
$0
$98,
164
20-P
relim
Eng
inee
ring/
Env
Rev
iew
39
,053
0
0 0
0 0
1 0
39,0
54
30-F
inal
Des
ign+
Spec
ifica
tions
11
5,41
6 10
,426
9,
304
8,23
7 14
,085
2,
652
4,04
2 0
164,
162
35-T
hird
Par
ty
8,60
8 1,
877
1,14
0 77
5 52
9 19
6 1,
474
0 14
,600
40
-Row
Acq
uisi
tion+
Perm
its16
9,29
8 33
,584
32
,778
0
0 0
0 0
235,
660
50-C
onst
ruct
ion
205,
976
424,
857
463,
954
496,
342
367,
203
115,
372
649
0 2,
074,
353
55-C
onst
ruct
ion
Serv
ices
30
,697
24
,640
25
,107
26
,030
17
,755
4,
200
0 0
128,
429
80-S
yste
m T
estin
g+St
artu
p 0
0 0
1,00
0 16
,200
0
0 0
17,2
00
Tota
l $6
05,2
24
$504
,702
$5
43,7
78
$544
,809
$4
38,4
34
$126
,056
$8
,619
$0
$2,
771,
622
Proj
ect R
isk
Asse
ssm
ent
Ther
e co
ntin
ues
a pr
ojec
t ris
k of
obt
aini
ng p
erm
its fr
om o
ur lo
cal j
uris
dict
ions
, WSD
OT,
and
oth
er re
sour
ce a
genc
ies.
The
tim
ely
com
plet
ion
of ri
ght-o
f-way
acq
uisi
tion
with
lim
ited
staf
f res
ourc
es, c
onst
ruct
ion
mar
ket c
ondi
tions
, and
diff
erin
g si
te c
ondi
tions
dur
ing
cons
truct
ion
coul
d af
fect
bot
h sc
hedu
le a
nd b
udge
t.
Sy
stem
Exp
ansi
on
LIN
K
4X19
9 N
orth
gate
Lin
k Ex
tens
ion
Proj
ect R
eser
ve
Man
aged
by:
DEC
M
Proj
ect r
eser
ve c
reat
ed fo
r the
Nor
thga
te L
ink
Exte
nsio
n th
at, i
f req
uire
d, c
an b
e di
rect
ed to
miti
gate
bud
get r
isks
ass
ocia
ted
with
pr
ojec
t con
stru
ctio
n. F
undi
ng fo
r the
rese
rve
orig
inat
ed fr
om u
nuse
d fu
nds
in th
e pr
ojec
t res
erve
that
was
set
up
for t
he In
itial
Se
gmen
t. Th
e pr
ojec
t res
erve
can
not b
e us
ed fo
r add
ition
al s
cope
and
its
use
requ
ires
supe
r-maj
ority
app
rova
l by
the
Boar
d.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$5
0,00
0 Ba
selin
e:
2021
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
0,00
0 20
19 :
2021
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $5
0,00
0 20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $0
$0
$0
$0
$5
0,00
0 $0
$0
$0
$5
0,00
0 To
tal
$0
$0
$0
$0
$50,
000
$0
$0
$0
$50,
000
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
90-C
ontin
genc
y $0
$0
$0
$0
$5
0,00
0 $0
$0
$0
$5
0,00
0 To
tal
$0
$0
$0
$0
$50,
000
$0
$0
$0
$50,
000
P roj
ect R
isk
Asse
ssm
ent
This
pro
ject
rese
rve
was
est
ablis
hed
to m
itiga
te p
oten
tial p
roje
ct ri
sks
espe
cial
ly d
urin
g tu
nnel
act
iviti
es.
As th
e tu
nnel
act
ivity
is
subs
tant
ially
com
plet
e th
e ris
k is
low
er.
2020 Financial Plan & Proposed Budget 67 of 144
Syst
em E
xpan
sion
LI
NK
4X20
0 U
nive
rsity
Lin
k Ex
tens
ion
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
3.1
5 m
ile e
xten
sion
of l
ight
rail
from
Wes
tlake
Cen
ter t
o th
e U
nive
rsity
of W
ashi
ngto
n vi
a tu
nnel
. St
atio
ns w
ill be
loca
ted
at C
apito
l Hill
and
the
Uni
vers
ity o
f Was
hing
ton.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
pro
ject
clo
seou
t act
iviti
es. O
ptim
ize
and
fine
tune
Lin
k op
erat
ing
syst
ems.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$1
,756
,007
Ba
selin
e:
2016
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,756
,007
20
19 :
2016
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,756
,007
20
20 :
2016
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,514
,981
$1
,750
$2
,276
$0
$0
$0
$0
$2
37,0
00 $
1,75
6,00
7 To
tal
$1,5
14,9
81
$1,7
50
$2,2
76
$0
$0
$0
$0
$237
,000
$1,
756,
007
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$84,
473
$100
$5
00
$0
$0
$0
$0
$28,
482
$113
,554
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
24,2
61
0 0
0 0
0 0
0 24
,261
30-F
inal
D
esig
n+Sp
ecifi
catio
ns86
,833
15
0 25
0 0
0 0
0 3,
075
90,3
08
35-T
hird
Par
ty
11,4
64
0 0
0 0
0 0
7,18
2 18
,646
40
-Row
Acq
uisi
tion+
Perm
its12
6,42
8 0
0 0
0 0
0 25
,904
15
2,33
2 50
-Con
stru
ctio
n 98
7,23
1 1,
500
1,27
6 0
0 0
0 15
8,77
7 1,
148,
783
55-C
onst
ruct
ion
Serv
ices
86
,659
0
250
0 0
0 0
7,90
5 94
,814
70
-Veh
icle
s 99
,193
0
0 0
0 0
0 4,
716
103,
909
80-S
yste
m T
estin
g+St
artu
p 8,
440
0 0
0 0
0 0
960
9,40
0 To
tal
$1,5
14,9
81
$1,7
50
$2,2
76
$0
$0
$0
$0
$237
,000
$1,
756,
007
P roj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
LIN
K
4X42
0 So
uth
200t
h Li
nk E
xten
sion
M
anag
ed b
y: D
ECM
Plan
, des
ign,
and
con
stru
ct a
1.6
mile
ext
ensi
on o
f lig
ht ra
il fro
m th
e Se
a-Ta
c Ai
rpor
t to
Sout
h 20
0th
Stre
et in
Sea
Tac
via
an e
leva
ted
alig
nmen
t. T
here
will
be o
ne s
tatio
n at
Sou
th 2
00th
Stre
et.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
pro
ject
clo
seou
t act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$3
83,2
41
Base
line:
20
16
Vote
r-App
rove
d C
ost
Estim
ate:
$4
62,3
51
2019
TIP
: $3
83,2
41
2019
: 20
16
2019
Cos
t Est
imat
e:
$471
,560
20
20 T
IP:
$383
,241
20
20 :
2016
20
20 C
ost E
stim
ate:
$4
71,5
60
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$3
29,4
02
$146
$0
$0
$0
$0
$0
$5
3,69
3 $3
83,2
41
Tota
l $3
29,4
02
$146
$0
$0
$0
$0
$0
$5
3,69
3 $3
83,2
41
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$16,
428
$61
$0
$0
$0
$0
$0
$653
$1
7,14
2 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
5,69
8 0
0 0
0 0
0 0
5,69
8
30-F
inal
D
esig
n+Sp
ecifi
catio
ns8,
783
20
0 0
0 0
0 72
1 9,
523
35-T
hird
Par
ty
3,81
2 0
0 0
0 0
0 3,
073
6,88
5 40
-Row
Acq
uisi
tion+
Perm
its38
,052
0
0 0
0 0
0 5,
497
43,5
49
50-C
onst
ruct
ion
237,
962
50
0 0
0 0
0 43
,010
28
1,02
2 55
-Con
stru
ctio
n Se
rvic
es
17,3
04
15
0 0
0 0
0 20
3 17
,522
80
-Sys
tem
Tes
ting+
Star
tup
1,36
3 0
0 0
0 0
0 53
7 1,
900
Tota
l $3
29,4
02
$146
$0
$0
$0
$0
$0
$5
3,69
3 $3
83,2
41
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 68 of 144
Syst
em E
xpan
sion
LI
NK
4X44
5 Fe
dera
l Way
Lin
k Ex
tens
ion
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
7.8
mile
ext
ensi
on o
f lig
ht ra
il fro
m S
outh
200
th S
treet
in S
eaTa
c to
Fed
eral
Way
Tra
nsit
Cen
ter.
St
atio
ns w
ill be
loca
ted
at K
ent-D
es M
oine
s R
oad
in K
ent,
Sout
h 27
2nd
Stre
et in
Fed
eral
Way
, and
the
Fede
ral W
ay T
rans
it C
ente
r.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
righ
t-of-w
ay a
cqui
sitio
n ac
tiviti
es a
nd u
tility
relo
catio
n w
ork
by o
ther
s; c
ontin
ue d
esig
n an
d be
gin
maj
or c
onst
ruct
ion
wor
k on
des
ign-
build
con
stru
ctio
n co
ntra
ct; c
ontin
ue th
ird p
arty
coo
rdin
atio
n ac
tiviti
es w
ith a
ll Au
thor
ities
Hav
ing
Juris
dict
ion
(AH
J).
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$2
,451
,535
Ba
selin
e:
2024
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$1,2
54,3
90
2019
TIP
: $2
,451
,535
20
19 :
2024
20
19 C
ost E
stim
ate:
$1
,779
,470
20
20 T
IP:
$2,4
51,5
35
2020
: 20
24
2020
Cos
t Est
imat
e:
$1,7
79,4
70
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$3
64,4
09
$313
,935
$3
34,0
08
$310
,809
$3
29,0
10
$408
,966
$1
71,2
45
$219
,153
$2,
451,
535
Tota
l $3
64,4
09
$313
,935
$3
34,0
08
$310
,809
$3
29,0
10
$408
,966
$1
71,2
45
$219
,153
$2,
451,
535
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$20,
684
$7,3
07
$10,
445
$10,
916
$13,
766
$13,
082
$8,5
17
$11,
803
$96,
520
20-P
relim
Eng
inee
ring/
Env
Rev
iew
45
,279
25
0 40
0 30
0 92
4 1,
798
0 0
48,9
51
30-F
inal
Des
ign+
Spec
ifica
tions
93
7 20
8 1,
242
175
414
109
0 0
3,08
5
35-T
hird
Par
ty
5,53
1 2,
201
4,11
4 4,
626
4,33
1 2,
240
4,43
9 25
8 27
,741
40
-Row
Acq
uisi
tion+
Perm
its12
9,37
6 90
,089
25
,631
4,
982
4,98
2 80
,941
2,
782
0 33
8,78
3 50
-Con
stru
ctio
n 15
2,24
5 19
8,21
0 27
5,40
5 27
2,53
8 27
8,65
1 29
5,40
0 12
8,70
3 20
7,09
2 1,
808,
244
55-C
onst
ruct
ion
Serv
ices
10
,356
15
,671
16
,771
17
,272
15
,463
4,
669
26,8
04
0 10
7,00
6 80
-Sys
tem
Tes
ting+
Star
tup
0 0
0 0
10,4
79
10,7
26
0 0
21,2
05
Tota
l $3
64,4
09
$313
,935
$3
34,0
08
$310
,809
$3
29,0
10
$408
,966
$1
71,2
45
$219
,153
$2,
451,
535
Proj
ect R
isk
Asse
ssm
ent
Ris
k to
this
pro
ject
incl
udes
reac
hing
agr
eem
ent o
n M
idw
ay la
ndfil
l with
WSD
OT
and
SPU
, enc
ount
erin
g un
know
n co
ntam
inat
ed
mat
eria
ls a
nd u
tiliti
es, a
nd s
ecur
ing
rem
aini
ng ri
ght-o
f-way
for a
cqui
sitio
n an
d re
loca
tions
.
Sy
stem
Exp
ansi
on
LIN
K
4X60
0 Ea
st L
ink
Exte
nsio
n M
anag
ed b
y: D
ECM
Plan
, des
ign,
and
con
stru
ct a
14
mile
ext
ensi
on o
f lig
ht ra
il fro
m th
e In
tern
atio
nal D
istri
ct in
dow
ntow
n Se
attle
to th
e O
verla
ke a
rea
of
Red
mon
d vi
a at
-gra
de, t
unne
l, an
d el
evat
ed a
lignm
ents
. St
atio
ns w
ill be
loca
ted
at J
udki
ns P
ark,
Mer
cer I
slan
d, S
outh
Bel
levu
e, E
ast
Mai
n in
Bel
levu
e, d
ownt
own
Belle
vue,
Wilb
urto
n, th
e Sp
ring
Dis
trict
/120
th S
t, Be
l-Red
/130
th S
treet
, Ove
rlake
Villa
ge, a
nd R
edm
ond
Tech
nolo
gy C
ente
r.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: N
one.
Budg
et y
ear a
ctiv
ities
: Rea
chin
g su
bsta
ntia
l com
plet
ion
on a
ll se
gmen
ts e
xcep
t E33
5 an
d sy
stem
s. S
yste
m w
orks
con
tinue
s. S
ome
star
t up
activ
ities
to s
uppo
rt O
MF
East
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$3
,677
,150
Ba
selin
e:
2023
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$4,0
19,7
93
2019
TIP
: $3
,677
,150
20
19 :
2023
20
19 C
ost E
stim
ate:
$3
,699
,287
20
20 T
IP:
$3,6
77,1
50
2020
: 20
23
2020
Cos
t Est
imat
e:
$3,6
99,2
87
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
4,05
8 $3
,636
$1
,489
$8
53
$786
$8
76
$158
$2
06
$22,
063
East
Kin
g 2,
329,
011
602,
348
246,
752
141,
242
130,
234
145,
204
26,2
51
34,0
46
3,65
5,08
7 To
tal
$2,3
43,0
70
$605
,984
$2
48,2
41
$142
,094
$1
31,0
20
$146
,080
$2
6,41
0 $3
4,25
1 $3
,677
,150
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$89,
946
$14,
920
$17,
160
$17,
806
$19,
446
$18,
383
$8,5
40
$0
$186
,200
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
54,7
76
0 0
0 0
3 80
1,
040
55,9
00
30-F
inal
Des
ign+
Spec
ifica
tions
22
3,69
1 13
,355
11
,699
7,
673
6,51
7 6,
262
10,0
88
3,71
5 28
3,00
0
35-T
hird
Par
ty
29,0
15
5,29
1 5,
155
4,33
4 2,
768
4,40
0 0
1,18
7 52
,150
40
-Row
Acq
uisi
tion+
Perm
its27
0,77
6 2,
650
550
683
0 23
,491
0
0 29
8,15
0 50
-Con
stru
ctio
n 1,
554,
403
530,
868
194,
577
91,9
81
85,9
39
69,3
82
1,01
2 16
,138
2,
544,
300
55-C
onst
ruct
ion
Serv
ices
12
0,46
2 38
,900
19
,100
19
,618
16
,351
24
,159
6,
690
12,1
71
257,
450
Tota
l $2
,343
,070
$6
05,9
84
$248
,241
$1
42,0
94
$131
,020
$1
46,0
80
$26,
410
$34,
251
$3,6
77,1
50
Proj
ect R
isk
Asse
ssm
ent
The
risks
to th
is la
rge
proj
ect i
nclu
de; m
ultip
le c
ontra
ct in
terfa
ces,
infla
tiona
ry p
ress
ure
on b
oth
mat
eria
ls a
nd la
bor (
due
to
shor
tage
s), t
he c
oord
inat
ion
with
third
par
ties
(City
of S
eattl
e, W
SDO
T, M
I and
Red
mon
d) w
hich
cou
ld h
ave
impa
cts
on b
oth
sche
dule
and
bud
get.
2020 Financial Plan & Proposed Budget 69 of 144
Syst
em E
xpan
sion
LI
NK
4X63
0 D
ownt
own
Red
mon
d Li
nk E
xten
sion
M
anag
ed b
y: D
ECM
Plan
, des
ign,
and
con
stru
ct a
3.7
mile
ligh
t rai
l ext
ensi
on fr
om O
verla
ke T
rans
it C
ente
r to
dow
ntow
n R
edm
ond.
Sta
tions
will
be
loca
ted
at s
outh
east
Red
mon
d an
d do
wnt
own
Red
mon
d.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
men
ce ri
ght o
f way
acq
uisi
tions
, com
plet
e de
sign
and
dev
elop
agr
eem
ents
with
City
of R
edm
ond,
W
ashi
ngto
n D
epar
tmen
t of T
rans
porta
tion
(WSD
OT)
and
Kin
g C
ount
y. R
evie
w a
nd e
valu
ate
resp
onse
to th
e R
eque
st fo
r Pro
posa
l (R
FP) a
nd a
war
d a
desi
gn-b
uild
con
tract
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$1
,530
,000
Ba
selin
e:
2024
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$1,2
42,2
78
2019
TIP
: $1
,530
,000
20
19 :
2024
20
19 C
ost E
stim
ate:
$1
,266
,816
20
20 T
IP:
$1,5
30,0
00
2020
: 20
24
2020
Cos
t Est
imat
e:
$1,2
66,8
16
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Ea
st K
ing
$120
,743
$1
49,6
07
$254
,915
$3
22,4
75
$307
,764
$1
19,7
44
$125
,812
$1
28,9
39 $
1,53
0,00
0 To
tal
$120
,743
$1
49,6
07
$254
,915
$3
22,4
75
$307
,764
$1
19,7
44
$125
,812
$1
28,9
39 $
1,53
0,00
0
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$8,1
12
$5,0
00
$12,
299
$13,
665
$12,
731
$11,
458
$8,3
81
$5,3
54
$77,
000
20-P
relim
Eng
inee
ring/
Env
Rev
iew
18
,519
50
0 51
4 0
0 0
261
3,20
6 23
,000
30-F
inal
D
esig
n+Sp
ecifi
catio
ns14
5 17
5 1,
253
1,08
8 65
4 12
0 0
1,06
5 4,
500
35-T
hird
Par
ty
2,80
4 2,
005
2,80
0 3,
130
1,46
4 76
3 1,
864
2,17
0 17
,000
40
-Row
Acq
uisi
tion+
Perm
its66
,405
26
,371
18
,670
7,
500
2,75
0 75
0 25
0 76
,304
19
9,00
0 50
-Con
stru
ctio
n 21
,600
10
8,35
6 20
9,62
9 28
3,84
2 27
0,16
5 86
,384
11
0,15
0 40
,351
1,
130,
477
55-C
onst
ruct
ion
Serv
ices
3,
158
7,20
0 9,
500
12,2
50
14,7
50
12,2
69
4,00
0 48
9 63
,616
80
-Sys
tem
Tes
ting+
Star
tup
0 0
250
1,00
0 5,
250
8,00
0 90
7 0
15,4
07
Tota
l $1
20,7
43
$149
,607
$2
54,9
15
$322
,475
$3
07,7
64
$119
,744
$1
25,8
12
$128
,939
$1,
530,
000
P roj
ect R
isk
Asse
ssm
ent
Budg
et a
nd s
ched
ule
risk
is a
con
cern
as
mar
ketp
lace
infla
tiona
ry p
ress
ure
on p
rope
rty a
cqui
sitio
ns a
nd c
onst
ruct
ion
pric
ing
may
in
crea
se re
sulti
ng in
a b
udge
t adj
ustm
ents
.
2020 Financial Plan & Proposed Budget 70 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Syst
em E
xpan
sion
SOU
ND
ER
Proj
ect N
umbe
r and
Nam
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Prel
imin
ary
Engi
neer
ing
3000
19
Lake
woo
d St
atio
n Im
prov
emen
ts
$292
$8
11
$152
$0
$0
$0
$0
$0
$1
,255
30
0035
Ke
nt S
tatio
n Pa
rkin
g an
d Ac
cess
Impr
ovem
ents
3,
867
7,30
4 4,
440
0 0
0 0
0 15
,611
3000
40
Aubu
rn S
tatio
n Pa
rkin
g an
d Ac
cess
Impr
ovem
ents
4,
032
5,33
5 2,
074
0 0
0 0
0 11
,441
3000
87
Edm
onds
and
Muk
ilteo
Sta
tions
Pa
rkin
g &
Acce
ss Im
prov
emen
ts
938
1,16
1 41
2 0
0 0
0 0
2,51
1
Subt
otal
9,
128
14,6
11
7,07
8 0
0 0
0 0
30,8
18
Fina
l Des
ign
& R
OW
30
0004
So
unde
r Mai
nten
ance
Bas
e 8,
413
2,98
2 1,
573
0 0
0 0
0 12
,968
30
0018
Su
mne
r Sta
tion
Park
ing
and
Acce
ss Im
prov
emen
ts
9,49
5 7,
686
601
0 0
0 0
0 17
,782
3X51
0 So
unde
r Sou
th E
xpan
ded
Serv
ice
200,
843
75
0 0
0 0
0 4,
650
205,
568
Subt
otal
21
8,75
1 10
,743
2,
174
0 0
0 0
4,65
0 23
6,31
8 Ba
selin
e30
0017
Pu
yallu
p St
atio
n Pa
rkin
g an
d Ac
cess
Impr
ovem
ents
10
,560
24
,375
37
,813
2,
603
3,74
9 0
0 0
79,1
00
3000
21
Taco
ma
Tres
tle T
rack
& S
igna
l 12
5,02
1 25
8 0
0 0
0 0
35,7
38
161,
017
3000
26
Soun
der Y
ard
Expa
nsio
n 16
,305
55
0
0 0
0 0
4,19
0 20
,550
30
0027
Po
int D
efia
nce
Bypa
ss
75,2
12
50
0 0
0 0
0 8,
408
83,6
70
3X13
5 D
St-M
St T
rack
& S
igna
l 15
2,90
3 30
0
0 0
0 0
5,32
8 15
8,26
2 3X
206
Muk
ilteo
Sta
tion,
S P
latfo
rm
17,2
94
379
0 0
0 0
640
0 18
,313
3X
236
Tukw
ila S
tatio
n 38
,889
50
0
0 0
0 0
7,03
0 45
,969
Su
btot
al
436,
184
25,1
97
37,8
13
2,60
3 3,
749
0 64
0 60
,695
56
6,88
1 Pr
ogra
m30
0056
So
uth
Soun
der C
apac
ity E
xpan
sion
2,
073
1,15
9 36
2 0
0 0
0 0
3,59
4 7X
755
Soun
der F
leet
Exp
ansi
on
52,1
00
5,23
6 2,
631
7,23
4 0
0 0
0 67
,200
Su
btot
al
54,1
73
6,39
5 2,
993
7,23
4 0
0 0
0 70
,794
Tota
l $7
18,2
36
$56,
946
$50,
058
$9,8
37
$3,7
49
$0
$640
$6
5,34
4 $9
04,8
11
2020 Financial Plan & Proposed Budget 71 of 144
2020
Cas
hflo
w b
y Su
bare
a
(in
thou
sand
s)
Syst
em E
xpan
sion
SO
UN
DER
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$19,
494
$1,9
88
$648
$0
$0
$0
$6
40
$0
$22,
769
3 - S
outh
Kin
g 56
,292
13
,237
6,
676
0 0
0 0
9,23
4 85
,439
5
- Pie
rce
642,
451
41,7
22
42,7
34
9,83
7 3,
749
0 0
56,1
10
796,
603
Tota
l $7
18,2
36
$56,
946
$50,
058
$9,8
37
$3,7
49
$0
$640
$6
5,34
4 $9
04,8
11
2020
Cas
hflo
w b
y Ph
ase
(in
thou
sand
s)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 10
-Age
ncy
Adm
inis
tratio
n$3
2,61
1 $4
,681
$1
,821
$1
04
$224
$0
$8
1 $4
,357
$4
3,87
9 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w23
,534
2,
751
2,13
6 0
221
0 0
496
29,1
39
30-F
inal
Des
ign+
Spec
ifica
tions
36,4
04
310
223
0 8
0 13
5 5,
249
42,3
29
35-T
hird
Par
ty2,
955
7,21
3 60
5 0
30
0 1
3,59
9 14
,403
40
-Row
Acq
uisi
tion+
Perm
its25
7,35
5 9,
194
4,35
6 0
268
0 58
7,
331
278,
562
50-C
onst
ruct
ion
279,
675
21,4
58
34,7
23
1,67
7 2,
887
0 23
9 37
,990
37
8,65
0 55
-Con
stru
ctio
n Se
rvic
es23
,633
6,
103
3,56
3 82
2 11
1 0
125
6,32
3 40
,681
70
-Veh
icle
s61
,023
5,
236
2,63
1 7,
234
0 0
0 0
76,1
24
80-S
yste
m T
estin
g+St
artu
p1,
046
0 0
0 0
0 0
0 1,
046
Tota
l $7
18,2
36
$56,
946
$50,
058
$9,8
37
$3,7
49
$0
$640
$6
5,34
4 $9
04,8
11
2020 Financial Plan & Proposed Budget 72 of 144
Syst
em E
xpan
sion
SO
UN
DER
3000
04
Soun
der M
aint
enan
ce B
ase
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
hea
vy ra
il st
orag
e an
d m
aint
enan
ce fa
cilit
y in
sup
port
of a
genc
y ra
il op
erat
ions
.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
bas
elin
e ac
tiviti
es, a
dvan
ced
utilit
y re
loca
tions
, and
righ
t of w
ay a
cqui
sitio
n ac
tiviti
es. B
egin
fina
l de
sign
and
con
stru
ctio
n th
roug
h th
e de
sign
-bui
ld c
ontra
ct.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$217
,193
2019
TIP
: $1
2,96
8 20
19 :
2023
20
19 C
ost E
stim
ate:
$1
90,8
75
2020
TIP
: $1
2,96
8 20
20 :
2023
20
20 C
ost E
stim
ate:
$1
90,8
75
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$1,2
62
$447
$2
36
$0
$0
$0
$0
$0
$1,9
45
Pier
ce
7,15
1 2,
535
1,33
7 0
0 0
0 0
11,0
23
Tota
l $8
,413
$2
,982
$1
,573
$0
$0
$0
$0
$0
$1
2,96
8
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,1
09
$327
$7
5 $0
$0
$0
$0
$0
$2
,511
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
2,59
8 10
0 76
7 0
0 0
0 0
3,46
5
40-R
ow A
cqui
sitio
n+Pe
rmits
2,35
6 63
5 1
0 0
0 0
0 2,
992
50-C
onst
ruct
ion
500
1,25
0 25
0 0
0 0
0 0
2,00
0 55
-Con
stru
ctio
n Se
rvic
es
850
670
480
0 0
0 0
0 2,
000
Tota
l $8
,413
$2
,982
$1
,573
$0
$0
$0
$0
$0
$1
2,96
8
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
a h
igh
risk
that
adv
ance
d ut
ility
relo
catio
n, p
oten
tial d
iffer
ing
site
con
ditio
ns, a
nd th
e in
abilit
y to
del
iver
tim
ely
prop
erty
ac
quis
ition
and
relo
catio
ns c
ould
impa
ct b
oth
the
sche
dule
and
bud
get.
Sy
stem
Exp
ansi
on
SOU
ND
ER
3000
17
Puya
llup
Stat
ion
Park
ing
and
Acce
ss Im
prov
emen
ts
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct a
par
king
gar
age
and
acce
ss im
prov
emen
ts to
the
exis
ting
Puya
llup
Soun
der S
tatio
n fo
r bic
yclis
ts, b
us
rider
s, a
nd d
river
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e rig
ht-o
f-way
acq
uisi
tion
activ
ities
. D
esig
n-bu
ild c
ontra
ctor
will
star
t fin
al d
esig
n an
d be
gin
cons
truct
ion.
Des
ign-
build
/pro
ject
man
agem
ent w
ill be
on
boar
d su
ppor
ting
the
cont
ract
or.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$7
9,10
0 Ba
selin
e:
2022
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$84,
810
2019
TIP
: $7
9,10
0 20
19 :
2022
20
19 C
ost E
stim
ate:
$7
1,68
8 20
20 T
IP:
$79,
100
2020
: 20
22
2020
Cos
t Est
imat
e:
$71,
688
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$1
0,56
0 $2
4,37
5 $3
7,81
3 $2
,603
$3
,749
$0
$0
$0
$7
9,10
0 To
tal
$10,
560
$24,
375
$37,
813
$2,6
03
$3,7
49
$0
$0
$0
$79,
100
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,8
49
$1,3
07
$1,1
31
$104
$2
24
$0
$0
$0
$4,6
14
20-P
relim
Eng
inee
ring/
Env
Rev
iew
2,
567
100
0 0
221
0 0
0 2,
888
30-F
inal
D
esig
n+Sp
ecifi
catio
ns14
4 10
13
0
8 0
0 0
175
35-T
hird
Par
ty
60
50
190
0 30
0
0 0
330
40-R
ow A
cqui
sitio
n+Pe
rmits
4,37
6 99
2 0
0 26
8 0
0 0
5,63
6 50
-Con
stru
ctio
n 1,
415
19,8
66
34,4
41
1,67
7 2,
887
0 0
0 60
,286
55
-Con
stru
ctio
n Se
rvic
es
150
2,05
0 2,
038
822
111
0 0
0 5,
171
Tota
l $1
0,56
0 $2
4,37
5 $3
7,81
3 $2
,603
$3
,749
$0
$0
$0
$7
9,10
0
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
risk
to b
udge
t and
sch
edul
e, if
the
proj
ect c
an n
ot a
chie
ve ti
mel
y pr
oper
ty a
cqui
sitio
ns a
nd c
oord
inat
ion
with
juris
dict
ions
an
d ut
ilitie
s.
2020 Financial Plan & Proposed Budget 73 of 144
Syst
em E
xpan
sion
SO
UN
DER
3000
18
Sum
ner S
tatio
n Pa
rkin
g an
d Ac
cess
Impr
ovem
ents
M
anag
ed b
y: D
ECM
Plan
, des
ign,
and
con
stru
ct a
par
king
gar
age
and
acce
ss im
prov
emen
ts to
the
exis
ting
Sum
ner S
ound
er S
tatio
n fo
r bic
yclis
ts, b
us
rider
s, a
nd d
river
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e de
sign
-bui
ld b
ridgi
ng d
ocum
ents
and
righ
t-of-w
ay a
cqui
sitio
n ac
tiviti
es.
Con
tinue
the
Req
uest
for
Prop
osal
(RFP
) pro
cess
for t
he d
esig
n-bu
ild a
nd d
esig
n-bu
ild/p
roje
ct m
anag
emen
t con
tract
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$59,
450
2019
TIP
: $1
7,78
2 20
19 :
2021
20
19 C
ost E
stim
ate:
$5
4,84
5 20
20 T
IP:
$17,
782
2020
: 20
21
2020
Cos
t Est
imat
e:
$54,
845
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$9
,495
$7
,686
$6
01
$0
$0
$0
$0
$0
$17,
782
Tota
l $9
,495
$7
,686
$6
01
$0
$0
$0
$0
$0
$17,
782
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,4
48
$514
$2
11
$0
$0
$0
$0
$0
$2,1
73
20-P
relim
Eng
inee
ring/
Env
Rev
iew
2,
521
170
305
0 0
0 0
0 2,
996
35-T
hird
Par
ty
1,54
6 6,
088
8 0
0 0
0 0
7,64
2 40
-Row
Acq
uisi
tion+
Perm
its3,
883
531
0 0
0 0
0 0
4,41
4 50
-Con
stru
ctio
n 97
0
32
0 0
0 0
0 12
9 55
-Con
stru
ctio
n Se
rvic
es
0 38
3 45
0
0 0
0 0
428
Tota
l $9
,495
$7
,686
$6
01
$0
$0
$0
$0
$0
$17,
782
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
a ri
sk to
bud
get a
nd s
ched
ule,
if th
e pr
ojec
t can
not
ach
ieve
tim
ely
prop
erty
acq
uisi
tion
and
coor
dina
tion
with
juris
dict
ions
.
Sy
stem
Exp
ansi
on
SOU
ND
ER
3000
19
Lake
woo
d St
atio
n Im
prov
emen
ts
Man
aged
by:
PEP
D
Plan
, des
ign,
and
con
stru
ct a
par
king
gar
age
and
acce
ss im
prov
emen
ts to
the
exis
ting
Lake
woo
d So
unde
r Sta
tion
for b
icyc
lists
, bus
rid
ers,
and
driv
ers.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $8
51 th
ousa
nd in
sup
port
of p
roje
ct a
ctiv
ities
for a
ltern
ativ
es
anal
ysis
and
righ
t of w
ay.
Budg
et y
ear a
ctiv
ities
: Com
men
ce a
ltern
ativ
e an
alys
is.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$51,
917
2019
TIP
: $4
04
2019
: 20
16
2019
Cos
t Est
imat
e:
$44,
199
2020
TIP
: $1
,255
20
20 :
2025
20
20 C
ost E
stim
ate:
$4
4,19
9
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$2
92
$811
$1
52
$0
$0
$0
$0
$0
$1,2
55
Tota
l $2
92
$811
$1
52
$0
$0
$0
$0
$0
$1,2
55
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$40
$240
$1
2 $0
$0
$0
$0
$0
$2
92
20-P
relim
Eng
inee
ring/
Env
Rev
iew
0
570
29
0 0
0 0
0 59
9
35-T
hird
Par
ty
252
0 11
2 0
0 0
0 0
363
40-R
ow A
cqui
sitio
n+Pe
rmits
0 1
0 0
0 0
0 0
1 To
tal
$292
$8
11
$152
$0
$0
$0
$0
$0
$1
,255
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 74 of 144
Syst
em E
xpan
sion
SO
UN
DER
3000
21
Taco
ma
Tres
tle T
rack
& S
igna
l M
anag
ed b
y: D
ECM
Plan
, des
ign,
and
con
stru
ct a
dou
ble-
track
repl
acem
ent o
f the
Tac
oma
Tres
tle b
etw
een
the
Taco
ma
Dom
e an
d M
Stre
et in
Tac
oma.
Fu
nds
budg
eted
bey
ond
2019
are
con
side
red
surp
lus.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Fin
aliz
e fo
llow
-on
wor
k an
d co
ntin
ue p
roje
ct c
lose
out a
ctiv
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$1
61,0
17
Base
line:
20
18
Vote
r-App
rove
d C
ost
Estim
ate:
$9
2,06
1
2019
TIP
: $1
61,0
17
2019
: 20
19
2019
Cos
t Est
imat
e:
$175
,538
20
20 T
IP:
$161
,017
20
20 :
2019
20
20 C
ost E
stim
ate:
$1
75,5
38
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$1
25,0
21
$258
$0
$0
$0
$0
$0
$3
5,73
8 $1
61,0
17
Tota
l $1
25,0
21
$258
$0
$0
$0
$0
$0
$3
5,73
8 $1
61,0
17
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$5,6
06
$145
$0
$0
$0
$0
$0
$2
,343
$8
,094
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
4,06
2 0
0 0
0 0
0 0
4,06
2
30-F
inal
D
esig
n+Sp
ecifi
catio
ns11
,185
10
0 0
0 0
0 0
3,91
3 15
,198
35-T
hird
Par
ty
340
0 0
0 0
0 0
1,44
2 1,
781
40-R
ow A
cqui
sitio
n+Pe
rmits
6,69
7 0
0 0
0 0
0 3,
364
10,0
61
50-C
onst
ruct
ion
91,1
89
13
0 0
0 0
0 23
,038
11
4,24
0 55
-Con
stru
ctio
n Se
rvic
es
5,94
2 0
0 0
0 0
0 1,
639
7,58
1 To
tal
$125
,021
$2
58
$0
$0
$0
$0
$0
$35,
738
$161
,017
P roj
ect R
isk
Asse
ssm
ent
The
risk
of a
con
stru
ctio
n cl
aim
is h
igh.
Sy
stem
Exp
ansi
on
SOU
ND
ER
3000
26
Soun
der Y
ard
Expa
nsio
n M
anag
ed b
y: D
ECM
Plan
, des
ign,
and
con
stru
ct a
hea
vy ra
il la
yove
r yar
d to
incr
ease
sto
rage
cap
acity
in L
akew
ood
in s
uppo
rt of
incr
ease
d pa
ssen
ger
serv
ice.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
clo
seou
t act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$2
0,55
0 Ba
selin
e:
2014
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
0,55
0 20
19 :
2019
20
19 C
ost E
stim
ate:
$2
4,57
1 20
20 T
IP:
$20,
550
2020
: 20
19
2020
Cos
t Est
imat
e:
$24,
571
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$8
,576
$2
9 $0
$0
$0
$0
$0
$2
,204
$1
0,80
9 Pi
erce
7,
728
26
0 0
0 0
0 1,
986
9,74
1 To
tal
$16,
305
$55
$0
$0
$0
$0
$0
$4,1
90
$20,
550
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,3
72
$55
$0
$0
$0
$0
$0
$98
$1,5
25
20-P
relim
Eng
inee
ring/
Env
Rev
iew
1,
208
0 0
0 0
0 0
496
1,70
4
40-R
ow A
cqui
sitio
n+Pe
rmits
182
00
00
00
218
400
50-C
onst
ruct
ion
12,3
33
0 0
0 0
0 0
3,18
8 15
,521
55
-Con
stru
ctio
n Se
rvic
es
1,21
0 0
0 0
0 0
0 19
0 1,
400
Tota
l $1
6,30
5 $5
5 $0
$0
$0
$0
$0
$4
,190
$2
0,55
0
P roj
ect R
isk
Asse
ssm
ent
N/A
2020 Financial Plan & Proposed Budget 75 of 144
Syst
em E
xpan
sion
SO
UN
DER
3000
27
Poin
t Def
ianc
e B
ypas
s M
anag
ed b
y: D
ECM
Und
er th
e di
rect
ion
of W
SDO
T, in
stal
l sig
nal a
nd s
afet
y im
prov
emen
ts a
nd c
onst
ruct
a n
ew s
econ
d tra
ck a
djac
ent t
o th
e ex
istin
g ra
il lin
e be
twee
n So
uth
Taco
ma
and
Lake
woo
d. A
dditi
onal
ly, i
nsta
ll tra
ck a
nd s
igna
l im
prov
emen
ts a
t BN
SF’s
mai
n lin
e co
nnec
tion
near
N
isqu
ally
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
clo
seou
t act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$8
3,67
0 Ba
selin
e:
2015
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $8
3,67
0 20
19 :
2017
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $8
3,67
0 20
20 :
2017
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$7
5,21
2 $5
0 $0
$0
$0
$0
$0
$8
,408
$8
3,67
0 To
tal
$75,
212
$50
$0
$0
$0
$0
$0
$8,4
08
$83,
670
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,8
04
$50
$0
$0
$0
$0
$0
$347
$3
,201
30
-Fin
al
Des
ign+
Spec
ifica
tions
103
0 0
0 0
0 0
97
200
40-R
ow A
cqui
sitio
n+Pe
rmits
52
0 0
0 0
0 0
348
400
50-C
onst
ruct
ion
65,3
60
0 0
0 0
0 0
4,26
3 69
,623
55
-Con
stru
ctio
n Se
rvic
es
6,89
4 0
0 0
0 0
0 3,
352
10,2
46
Tota
l $7
5,21
2 $5
0 $0
$0
$0
$0
$0
$8
,408
$8
3,67
0
P roj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
SOU
ND
ER
3000
35
Ken
t Sta
tion
Park
ing
and
Acce
ss Im
prov
emen
ts
Man
aged
by:
PEP
D
Plan
, des
ign,
and
con
stru
ct a
par
king
gar
age
and
acce
ss im
prov
emen
ts to
the
exis
ting
Kent
Sou
nder
Sta
tion
for b
icyc
lists
, bus
ride
rs,
and
driv
ers.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $2
.5 m
illion
in s
uppo
rt of
eng
inee
ring/
cons
truct
ion
serv
ices
and
de
sign
revi
ew s
ervi
ces.
Budg
et y
ear a
ctiv
ities
: Sta
rt de
sign
-bui
ld b
ridgi
ng d
ocum
ents
, sta
rt th
e R
eque
st fo
r Pro
posa
l (R
FP) p
roce
ss fo
r the
des
ign-
build
co
ntra
cts,
and
righ
t of w
ay a
ctiv
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$43,
166
2019
TIP
: $1
3,11
1 20
19 :
2023
20
19 C
ost E
stim
ate:
$7
1,41
2 20
20 T
IP:
$15,
611
2020
: 20
23
2020
Cos
t Est
imat
e:
$71,
412
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$3
,867
$7
,304
$4
,440
$0
$0
$0
$0
$0
$1
5,61
1 To
tal
$3,8
67
$7,3
04
$4,4
40
$0
$0
$0
$0
$0
$15,
611
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,0
70
$539
$1
01
$0
$0
$0
$0
$0
$1,7
10
20-P
relim
Eng
inee
ring/
Env
Rev
iew
2,
784
300
325
0 0
0 0
0 3,
409
35-T
hird
Par
ty
0 50
0 10
5 0
0 0
0 0
605
40-R
ow A
cqui
sitio
n+Pe
rmits
13
4,46
5 3,
409
0 0
0 0
0 7,
887
55-C
onst
ruct
ion
Serv
ices
0
1,50
0 50
0 0
0 0
0 0
2,00
0 To
tal
$3,8
67
$7,3
04
$4,4
40
$0
$0
$0
$0
$0
$15,
611
Proj
ect R
isk
Asse
ssm
ent
Inab
ility
to re
ach
conc
urre
nce
with
the
City
on
perm
ittin
g re
quire
men
ts a
nd o
ther
loca
l cod
es th
at m
ay im
pact
pro
ject
bud
get a
nd
sche
dule
.
2020 Financial Plan & Proposed Budget 76 of 144
Syst
em E
xpan
sion
SO
UN
DER
3000
40
Aubu
rn S
tatio
n Pa
rkin
g an
d Ac
cess
Impr
ovem
ents
M
anag
ed b
y: P
EPD
Plan
, des
ign,
and
con
stru
ct a
par
king
gar
age
and
acce
ss im
prov
emen
ts to
the
exis
ting
Aubu
rn S
ound
er S
tatio
n fo
r bic
yclis
ts, b
us
rider
s, a
nd d
river
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $2
.5 m
illion
in s
uppo
rt of
eng
inee
ring/
cons
truct
ion
serv
ices
and
th
ird p
arty
agr
eem
ents
.
Budg
et y
ear a
ctiv
ities
: Sta
rt de
sign
-bui
ld b
ridgi
ng d
ocum
ents
, sta
rt th
e R
eque
st fo
r Pro
posa
l (R
FP) p
roce
ss fo
r the
des
ign-
build
co
ntra
cts,
and
righ
t of w
ay a
ctiv
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$45,
041
2019
TIP
: $8
,941
20
19 :
2023
20
19 C
ost E
stim
ate:
$6
5,81
9 20
20 T
IP:
$11,
441
2020
: 20
23
2020
Cos
t Est
imat
e:
$65,
819
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$4
,032
$5
,335
$2
,074
$0
$0
$0
$0
$0
$1
1,44
1 To
tal
$4,0
32
$5,3
35
$2,0
74
$0
$0
$0
$0
$0
$11,
441
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,0
53
$502
$8
4 $0
$0
$0
$0
$0
$1
,639
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
2,61
1 30
0 49
8 0
0 0
0 0
3,40
9
35-T
hird
Par
ty
15
545
45
0 0
0 0
0 60
5 40
-Row
Acq
uisi
tion+
Perm
its35
3 2,
488
947
0 0
0 0
0 3,
788
55-C
onst
ruct
ion
Serv
ices
0
1,50
0 50
0 0
0 0
0 0
2,00
0 To
tal
$4,0
32
$5,3
35
$2,0
74
$0
$0
$0
$0
$0
$11,
441
Proj
ect R
isk
Asse
ssm
ent
Inab
ility
to re
ach
conc
urre
nce
with
the
City
on
perm
ittin
g re
quire
men
ts a
nd o
ther
loca
l cod
es th
at m
ay im
pact
pro
ject
bud
get a
nd
sche
dule
.
Sy
stem
Exp
ansi
on
SOU
ND
ER
3000
56
Sout
h So
unde
r Cap
acity
Exp
ansi
on
Man
aged
by:
PEP
D
Plan
, des
ign,
and
est
ablis
h a
capi
tal p
rogr
am to
impr
ove
Sout
h So
unde
r acc
ess,
cap
acity
, and
ser
vice
s in
resp
onse
to in
crea
se in
de
man
d.
Prog
ram
ele
men
ts c
ould
incl
ude
plat
form
ext
ensi
ons,
trac
k an
d si
gnal
upg
rade
s an
d ot
her r
elat
ed in
frast
ruct
ure
to fa
cilit
ate
addi
tiona
l ca
paci
ty, a
nd a
cces
s el
emen
ts s
uch
as im
prov
emen
ts fo
r ped
estri
ans,
bic
yclis
ts, b
uses
, and
priv
ate
vehi
cles
, prio
ritiz
ed p
er S
ound
Tr
ansi
t's S
yste
m A
cces
s Po
licy.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $9
98 th
ousa
nd in
sup
port
of e
ngin
eerin
g ac
tiviti
es a
nd B
NSF
co
ordi
natio
n.
Budg
et y
ear a
ctiv
ities
: Com
plet
e th
e So
unde
r Stra
tegi
c D
evel
opm
ent &
Impl
emen
tatio
n Pl
an a
nd B
NSF
coo
rdin
atio
n.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$1,1
39,5
93
2019
TIP
: $2
,596
20
19 :
2036
20
19 C
ost E
stim
ate:
$1
,137
,864
20
20 T
IP:
$3,5
94
2020
: 20
36
2020
Cos
t Est
imat
e:
$1,1
37,8
64
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$9
28
$519
$1
62
$0
$0
$0
$0
$0
$1,6
08
Pier
ce
1,14
5 64
0 20
0 0
0 0
0 0
1,98
6 To
tal
$2,0
73
$1,1
59
$362
$0
$0
$0
$0
$0
$3
,594
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$731
$3
66
$55
$0
$0
$0
$0
$0
$1,1
52
20-P
relim
Eng
inee
ring/
Env
Rev
iew
1,
342
593
97
0 0
0 0
0 2,
032
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
200
210
0 0
0 0
0 41
0
Tota
l $2
,073
$1
,159
$3
62
$0
$0
$0
$0
$0
$3,5
94
Proj
ect R
isk
Asse
ssm
ent
The
com
plet
ion
of th
e st
rate
gic
plan
may
iden
tify
risks
that
cou
ld e
ffect
the
scop
e, s
ched
ule,
and
bud
get.
Con
curre
nce
with
oth
er
juris
dict
ions
can
not b
e re
ache
d.
2020 Financial Plan & Proposed Budget 77 of 144
Syst
em E
xpan
sion
SO
UN
DER
3000
87
Edm
onds
and
Muk
ilteo
Sta
tions
Par
king
& A
cces
s Im
prov
emen
ts
Man
aged
by:
PEP
D
Plan
, des
ign,
and
con
stru
ct s
yste
m a
cces
s im
prov
emen
ts a
t the
Muk
ilteo
and
Edm
onds
Sou
nder
sta
tions
.
Ch a
nges
to p
roje
ct a
lloca
tion
sinc
e 20
19: N
one.
Budg
et y
ear a
ctiv
ities
: Fin
ish
Phas
e 1
of p
relim
inar
y en
gine
erin
g. A
dvan
ce P
hase
2 o
f the
feas
ibilit
y st
udy
to a
naly
ze s
ubse
t of
proj
ects
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$48,
398
2019
TIP
: $2
,511
20
19 :
2020
20
19 C
ost E
stim
ate:
$4
8,19
4 20
20 T
IP:
$2,5
11
2020
: 20
21
2020
Cos
t Est
imat
e:
$48,
194
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$938
$1
,161
$4
12
$0
$0
$0
$0
$0
$2,5
11
Tota
l $9
38
$1,1
61
$412
$0
$0
$0
$0
$0
$2
,511
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$398
$4
31
$153
$0
$0
$0
$0
$0
$9
82
20-P
relim
Eng
inee
ring/
Env
Rev
iew
53
0 61
8 11
4 0
0 0
0 0
1,26
2
35-T
hird
Par
ty
10
30
145
0 0
0 0
0 18
5 40
-Row
Acq
uisi
tion+
Perm
its0
82
0 0
0 0
0 0
82
Tota
l $9
38
$1,1
61
$412
$0
$0
$0
$0
$0
$2
,511
P roj
ect R
isk
Asse
ssm
ent
Cha
lleng
e in
equ
itabl
y al
loca
ting
proj
ect b
udge
t bet
wee
n 2
stat
ions
are
a. C
ities
and
sta
keho
lder
s de
sire
s fo
r mor
e pa
rkin
g th
an
appe
ar a
fford
able
.
Sy
stem
Exp
ansi
on
SOU
ND
ER
3X13
5 D
St-M
St T
rack
& S
igna
l M
anag
ed b
y: D
ECM
Plan
, des
ign,
and
con
stru
ct a
1.4
mile
rail
conn
ectio
n be
twee
n Ta
com
a D
ome
Stat
ion
and
Lake
woo
d.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Fin
aliz
e im
prov
emen
ts a
nd fo
llow
-on
wor
k w
ith lo
cal j
uris
dict
ion,
and
com
plet
e cl
oseo
ut a
ctiv
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$1
61,5
81
Base
line:
20
12
Vote
r-App
rove
d C
ost
Estim
ate:
$1
61,5
81
2019
TIP
: $1
58,2
62
2019
: 20
19
2019
Cos
t Est
imat
e:
$158
,262
20
20 T
IP:
$158
,262
20
20 :
2019
20
20 C
ost E
stim
ate:
$1
58,2
62
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$1
52,9
03
$30
$0
$0
$0
$0
$0
$5,3
28
$158
,262
To
tal
$152
,903
$3
0 $0
$0
$0
$0
$0
$5
,328
$1
58,2
62
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$8,9
61
$30
$0
$0
$0
$0
$0
$615
$9
,606
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
1,73
3 0
0 0
0 0
0 0
1,73
3
30-F
inal
D
esig
n+Sp
ecifi
catio
ns17
,308
0
0 0
0 0
0 80
4 18
,112
35-T
hird
Par
ty60
50
00
00
0 24
1 84
640
-Row
Acq
uisi
tion+
Perm
its42
,144
0
0 0
0 0
0 1,
485
43,6
29
50-C
onst
ruct
ion
66,9
80
0 0
0 0
0 0
1,58
3 68
,563
55
-Con
stru
ctio
n Se
rvic
es
5,17
3 0
0 0
0 0
0 60
0 5,
773
70-V
ehic
les
8,95
3 0
0 0
0 0
0 0
8,95
3 80
-Sys
tem
Tes
ting+
Star
tup
1,04
6 0
0 0
0 0
0 0
1,04
6 To
tal
$152
,903
$3
0 $0
$0
$0
$0
$0
$5
,328
$1
58,2
62
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 78 of 144
Syst
em E
xpan
sion
SO
UN
DER
3X20
6 M
ukilt
eo S
tatio
n, S
Pla
tform
M
anag
ed b
y: D
ECM
Con
stru
ct th
e so
uth
plat
form
and
inst
all s
tairs
, ele
vato
rs, a
nd a
ped
estri
an b
ridge
in s
uppo
rt of
Sou
nder
ope
ratio
ns a
t Muk
ilteo
Sta
tion.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
follo
w-o
n w
ork
and
proj
ect c
lose
out a
ctiv
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$1
8,31
3 Ba
selin
e:
2019
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$15,
511
2019
TIP
: $1
8,31
3 20
19 :
2019
20
19 C
ost E
stim
ate:
$1
2,60
2 20
20 T
IP:
$18,
313
2020
: 20
20
2020
Cos
t Est
imat
e:
$12,
602
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$17,
294
$379
$0
$0
$0
$0
$6
40
$0
$18,
313
Tota
l $1
7,29
4 $3
79
$0
$0
$0
$0
$640
$0
$1
8,31
3
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,7
21
$75
$0
$0
$0
$0
$81
$0
$1,8
77
30-F
inal
D
esig
n+Sp
ecifi
catio
ns2,
274
0 0
0 0
0 13
5 0
2,40
9
35-T
hird
Par
ty
34
0 0
0 0
0 1
0 35
40
-Row
Acq
uisi
tion+
Perm
its1,
720
0 0
0 0
0 58
0
1,77
8 50
-Con
stru
ctio
n 9,
820
304
0 0
0 0
239
0 10
,363
55
-Con
stru
ctio
n Se
rvic
es
1,72
5 0
0 0
0 0
125
0 1,
850
Tota
l $1
7,29
4 $3
79
$0
$0
$0
$0
$640
$0
$1
8,31
3
Proj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
SOU
ND
ER
3X23
6 Tu
kwila
Sta
tion
Man
aged
by:
DEC
M
Des
ign
and
cons
truct
a c
omm
uter
rail
stat
ion
and
acce
ss im
prov
emen
ts, r
epla
cing
the
tem
pora
ry T
ukw
ila S
ound
er S
tatio
n. C
urre
ntly
on
trac
k to
clo
seou
t by
end
of O
ctob
er, 2
019.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
clo
se o
ut a
ctiv
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$4
5,96
9 Ba
selin
e:
2010
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$45,
258
2019
TIP
: $4
5,96
9 20
19 :
2010
20
19 C
ost E
stim
ate:
$5
7,71
4 20
20 T
IP:
$45,
969
2020
: 20
10
2020
Cos
t Est
imat
e:
$57,
714
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$3
8,88
9 $5
0 $0
$0
$0
$0
$0
$7
,030
$4
5,96
9 To
tal
$38,
889
$50
$0
$0
$0
$0
$0
$7,0
30
$45,
969
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,9
31
$50
$0
$0
$0
$0
$0
$792
$2
,773
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
1,10
1 0
0 0
0 0
0 0
1,10
1
30-F
inal
D
esig
n+Sp
ecifi
catio
ns4,
600
0 0
0 0
0 0
324
4,92
4
40-R
ow A
cqui
sitio
n+Pe
rmits
10,3
87
0 0
0 0
0 0
622
11,0
09
50-C
onst
ruct
ion
19,1
82
0 0
0 0
0 0
4,89
9 24
,081
55
-Con
stru
ctio
n Se
rvic
es
1,68
9 0
0 0
0 0
0 39
2 2,
081
Tota
l $3
8,88
9 $5
0 $0
$0
$0
$0
$0
$7
,030
$4
5,96
9
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 79 of 144
Syst
em E
xpan
sion
SO
UN
DER
3X51
0 So
unde
r Sou
th E
xpan
ded
Serv
ice
Man
aged
by:
DEC
M
Purc
hase
four
add
ition
al c
omm
uter
rail
ease
men
ts b
etw
een
Seat
tle a
nd L
akew
ood
from
Bur
lingt
on N
orth
ern
Sant
a Fe
(BN
SF)
Rai
lroad
and
ens
ure
com
plia
nce
with
fede
ral a
nd s
tate
env
ironm
enta
l and
miti
gatio
n re
quire
men
ts.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
clo
seou
t act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$298
,229
2019
TIP
: $2
05,5
68
2019
: 20
19
2019
Cos
t Est
imat
e:
$379
,163
20
20 T
IP:
$205
,568
20
20 :
2019
20
20 C
ost E
stim
ate:
$3
79,1
63
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$2
00,8
43
$75
$0
$0
$0
$0
$0
$4,6
50
$205
,568
To
tal
$200
,843
$7
5 $0
$0
$0
$0
$0
$4
,650
$2
05,5
68
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,4
88
$50
$0
$0
$0
$0
$0
$161
$1
,700
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
479
0 0
0 0
0 0
0 47
9
30-F
inal
D
esig
n+Sp
ecifi
catio
ns79
0 0
0 0
0 0
0 11
0 90
0
35-T
hird
Par
ty
93
0 0
0 0
0 0
1,91
7 2,
010
40-R
ow A
cqui
sitio
n+Pe
rmits
185,
192
0 0
0 0
0 0
1,29
3 18
6,48
5 50
-Con
stru
ctio
n 12
,800
25
0
0 0
0 0
1,01
9 13
,844
55
-Con
stru
ctio
n Se
rvic
es
0 0
0 0
0 0
0 15
0 15
0 To
tal
$200
,843
$7
5 $0
$0
$0
$0
$0
$4
,650
$2
05,5
68
P roj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
SOU
ND
ER
7X75
5 So
unde
r Fle
et E
xpan
sion
M
anag
ed b
y: O
pera
tions
Proc
ure,
acc
ept a
nd te
st lo
com
otiv
es, c
oach
es, a
nd c
ab c
ars
to s
uppo
rt ad
ditio
nal t
rips
betw
een
Seat
tle a
nd L
akew
ood
stat
ions
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
cure
men
t of t
hree
new
cab
car
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$41,
314
2019
TIP
: $6
7,20
0 20
19 :
2020
20
19 C
ost E
stim
ate:
$5
1,70
4 20
20 T
IP:
$67,
200
2020
: 20
22
2020
Cos
t Est
imat
e:
$51,
704
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$5
2,10
0 $5
,236
$2
,631
$7
,234
$0
$0
$0
$0
$6
7,20
0 To
tal
$52,
100
$5,2
36
$2,6
31
$7,2
34
$0
$0
$0
$0
$67,
200
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$29
$0
$0
$0
$0
$0
$0
$0
$29
70-V
ehic
les
52,0
70
5,23
6 2,
631
7,23
4 0
0 0
0 67
,171
To
tal
$52,
100
$5,2
36
$2,6
31
$7,2
34
$0
$0
$0
$0
$67,
200
P roj
ect R
isk
Asse
ssm
ent
Proc
urem
ent o
f loc
omot
ive
is d
epen
dent
on
a qu
alifi
ed lo
com
otiv
e be
ing
avai
labl
e as
wel
l as
the
cab
cars
. Th
e lo
w n
umbe
r of c
ab
cars
requ
ires
a co
llect
ive
of s
ever
al s
mal
l ord
ers
to g
ener
ate
a la
rge
enou
gh o
rder
to m
ake
the
proc
urem
ent c
ost e
ffect
ive
for b
oth
the
man
ufac
ture
r and
the
agen
cy.
As s
uch,
the
antic
ipat
ed s
ched
ule
for p
rocu
rem
ent m
ust a
ddre
ss s
ever
al v
aria
bles
to b
e su
cces
sful
.
2020 Financial Plan & Proposed Budget 80 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Syst
em E
xpan
sion
REG
ION
AL E
XPR
ESS
Proj
ect N
umbe
r and
Nam
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Prel
imin
ary
Engi
neer
ing
5000
05
Bus
Base
Sou
th
$1,2
05
$600
$2
,685
$1
,318
$0
$0
$0
$0
$5
,808
50
0030
Bo
thel
l Tra
nsit
Rel
ated
Impr
ovem
ents
7
0 1,
010
4,02
3 0
0 0
0 5,
040
5000
86
Bus
on S
houl
der
867
1,49
5 1,
504
12
0 0
0 0
3,87
8 50
0110
R
apid
Rid
e C
and
D
661
5,49
5 15
,020
17
,395
17
,245
9,
184
0 0
65,0
00
5001
11
Paci
fic A
ve S
R 7
Bus
Rap
id T
rans
it 2,
542
10,5
90
24,1
65
21,6
65
1,53
8 0
0 0
60,5
00
5001
17
Nor
th S
amm
amis
h Pa
rk-a
nd-R
ide
248
765
1,05
2 0
0 0
0 0
2,06
5 Su
btot
al
5,52
9 18
,945
45
,436
44
,413
18
,783
9,
184
0 0
142,
291
Base
line
5X38
7 I-9
0 Tw
o-W
ay T
rans
it &
HO
VO
pera
tions
, Sta
ge 3
19
8,40
5 1,
570
3,77
1 2,
555
2,55
5 28
5 0
16,5
08
225,
648
Subt
otal
19
8,40
5 1,
570
3,77
1 2,
555
2,55
5 28
5 0
16,5
08
225,
648
Prog
ram
7007
20
ST E
xpre
ss F
leet
Exp
ansi
on
23,9
40
22,8
17
0 0
0 0
0 0
46,7
57
Subt
otal
23
,940
22
,817
0
0 0
0 0
0 46
,757
Tota
l $2
27,8
74
$43,
332
$49,
207
$46,
968
$21,
338
$9,4
69
$0
$16,
508
$414
,696
2020 Financial Plan & Proposed Budget 81 of 144
2020
Cas
hflo
w b
y Su
bare
a (in
th
ousa
nds)
Sy
stem
Exp
ansi
on
REG
ION
AL E
XPR
ESS
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$3,5
06
$3,4
72
$996
$2
40
$0
$0
$0
$0
$8,2
14
2 - N
orth
Kin
g 66
1 5,
495
15,0
20
17,3
95
17,2
45
9,18
4 0
0 65
,000
3
- Sou
th K
ing
3,04
7 3,
069
827
157
0 0
0 0
7,10
0 4
- Eas
t Kin
g 21
6,55
2 19
,133
7,
081
7,19
1 2,
555
285
0 16
,508
26
9,30
6 5
- Pie
rce
4,10
9 12
,162
25
,282
21
,985
1,
538
0 0
0 65
,075
To
tal
$227
,874
$4
3,33
2 $4
9,20
7 $4
6,96
8 $2
1,33
8 $9
,469
$0
$1
6,50
8 $4
14,6
96
2020
Cas
hflo
w b
y Ph
ase
(in
thou
sand
s)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 10
-Age
ncy
Adm
inis
tratio
n$3
,399
$7
40
$911
$6
41
$238
$2
19
$0
$839
$6
,988
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w3,
054
1,67
0 3,
582
1,30
5 10
0 0
0 0
9,71
2 30
-Fin
al D
esig
n+Sp
ecifi
catio
ns18
,451
1,
100
1,00
0 0
0 0
0 3,
570
24,1
21
35-T
hird
Par
ty2,
862
15,5
20
39,6
50
42,5
00
18,5
00
9,00
0 0
0 12
8,03
2 40
-Row
Acq
uisi
tion+
Perm
its3
15
248
10
0 0
0 0
276
50-C
onst
ruct
ion
176,
164
1,47
0 3,
816
2,51
2 2,
500
250
0 12
,099
19
8,81
0 70
-Veh
icle
s23
,940
22
,817
0
0 0
0 0
0 46
,757
To
tal
$227
,874
$4
3,33
2 $4
9,20
7 $4
6,96
8 $2
1,33
8 $9
,469
$0
$1
6,50
8 $4
14,6
96
2020 Financial Plan & Proposed Budget 82 of 144
Syst
em E
xpan
sion
R
EGIO
NAL
EX
PRES
S 50
0005
B
us B
ase
Sout
h M
anag
ed b
y: P
EPD
Plan
, des
ign,
and
con
stru
ct a
bus
bas
e fo
r ope
ratin
g an
d m
aint
aini
ng th
e ST
Exp
ress
bus
flee
t.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Res
ume
conc
eptu
al e
ngin
eerin
g an
d en
viro
nmen
tal d
ocum
enta
tion
upon
dire
ctio
n of
the
Boar
d.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$242
,876
2019
TIP
: $5
,808
20
19 :
2019
20
19 C
ost E
stim
ate:
$2
34,6
57
2020
TIP
: $5
,808
20
20 :
2019
20
20 C
ost E
stim
ate:
$2
34,6
57
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$216
$1
07
$481
$2
36
$0
$0
$0
$0
$1,0
40
Sout
h Ki
ng
140
70
311
153
0 0
0 0
674
East
Kin
g 56
0 27
9 1,
248
613
0 0
0 0
2,70
1 Pi
erce
28
9 14
4 64
4 31
6 0
0 0
0 1,
394
Tota
l $1
,205
$6
00
$2,6
85
$1,3
18
$0
$0
$0
$0
$5,8
08
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$404
$1
00
$87
$253
$0
$0
$0
$0
$8
44
20-P
relim
Eng
inee
ring/
Env
Rev
iew
79
8 50
0 2,
410
1,05
5 0
0 0
0 4,
763
40-R
ow A
cqui
sitio
n+Pe
rmits
3 0
188
10
0 0
0 0
201
Tota
l $1
,205
$6
00
$2,6
85
$1,3
18
$0
$0
$0
$0
$5,8
08
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
risk
with
the
unce
rtain
ties
in s
iting
, des
ign,
env
ironm
enta
l, th
ird p
arty
and
juris
dict
iona
l req
uire
men
ts th
at c
ould
influ
ence
th
e bu
dget
and
sch
edul
e.
Sy
stem
Exp
ansi
on
REG
ION
AL
EXPR
ESS
5000
86
Bus
on
Shou
lder
M
anag
ed b
y: P
EPD
Des
ign
and
impl
emen
t fre
eway
sho
ulde
r im
prov
emen
ts to
ena
ble
buse
s to
use
sho
ulde
rs o
n fre
eway
s an
d st
ate
rout
e fa
cilit
ies
durin
g pe
riods
of c
onge
stio
n al
ong
I-5.
Ch a
nges
in a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
feas
ibilit
y st
udy
with
pot
entia
l oth
er c
andi
date
s. A
dvan
ce ta
sk o
rder
with
WSD
OT
for f
inal
des
ign,
cos
t es
timat
e an
d en
viro
nmen
tal f
or th
e se
lect
ed c
andi
date
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$123
,415
2019
TIP
: $3
,878
20
19 :
2023
20
19 C
ost E
stim
ate:
$1
23,4
15
2020
TIP
: $3
,878
20
20 :
2023
20
20 C
ost E
stim
ate:
$1
23,4
15
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$297
$5
13
$516
$4
$0
$0
$0
$0
$1
,330
So
uth
King
29
7 51
3 51
6 4
0 0
0 0
1,33
0 Pi
erce
27
2 46
9 47
2 4
0 0
0 0
1,21
8 To
tal
$867
$1
,495
$1
,504
$1
2 $0
$0
$0
$0
$3
,878
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$136
$1
35
$185
$0
$0
$0
$0
$0
$4
56
20-P
relim
Eng
inee
ring/
Env
Rev
iew
10
0 25
0 19
5 0
0 0
0 0
545
30-F
inal
Des
ign+
Spec
ifica
tions
0
1,00
0 1,
000
0 0
0 0
0 2,
000
35-T
hird
Par
ty
362
0 10
0
0 0
0 0
372
40-R
ow A
cqui
sitio
n+Pe
rmits
0 10
15
0
0 0
0 0
25
50-C
onst
ruct
ion
268
100
100
12
0 0
0 0
480
Tota
l $8
67
$1,4
95
$1,5
04
$12
$0
$0
$0
$0
$3,8
78
Proj
ect R
isk
Asse
ssm
ent
The
risk
exis
ts th
at th
e se
lect
ed c
andi
date
s ca
n fin
ally
not
be
elig
ible
whe
n en
viro
nmen
tal a
nd d
esig
n ar
e do
ne.
2020 Financial Plan & Proposed Budget 83 of 144
Syst
em E
xpan
sion
R
EGIO
NAL
EX
PRES
S 50
0110
R
apid
Rid
e C
and
D
Man
aged
by:
PEP
D
Des
ign
and
cons
truct
tran
sit p
riorit
y im
prov
emen
ts a
long
Kin
g C
ount
y M
etro
’s R
apid
Rid
e C
and
D li
nes
that
pro
vide
ser
vice
to B
alla
rd
and
Wes
t Sea
ttle
to im
prov
e sp
eed
and
relia
bilit
y in
adv
ance
of l
ight
rail
oper
atio
ns.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $6
2.65
milli
on to
fund
ant
icip
ated
inte
r-gov
ernm
enta
l agr
eem
ents
w
ith K
ing
Cou
nty
Met
ro a
nd C
ity o
f Sea
ttle
for R
apid
Rid
e C
and
D a
nd M
adis
on S
treet
BR
T im
prov
emen
ts.
Budg
et y
ear a
ctiv
ities
: Ent
er in
to in
ter-l
ocal
agr
eem
ents
with
City
of S
eattl
e an
d Ki
ng C
ount
y M
etro
KC
M to
par
tially
fund
the
City
's
Mad
ison
Stre
et B
RT
proj
ect,
and
reim
burs
e th
e C
ity a
nd K
CM
for s
elec
ted
Rap
idR
ide
C a
nd D
impr
ovem
ent p
roje
cts.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$78,
647
2019
TIP
: $2
,350
20
19 :
N/A
20
19 C
ost E
stim
ate:
$7
7,77
7 20
20 T
IP:
$65,
000
2020
: 20
24
2020
Cos
t Est
imat
e:
$77,
777
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $6
61
$5,4
95
$15,
020
$17,
395
$17,
245
$9,1
84
$0
$0
$65,
000
Tota
l $6
61
$5,4
95
$15,
020
$17,
395
$17,
245
$9,1
84
$0
$0
$65,
000
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$61
$95
$120
$1
45
$145
$1
84
$0
$0
$750
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
600
400
400
250
100
0 0
0 1,
750
35-T
hird
Par
ty
0 5,
000
14,5
00
17,0
00
17,0
00
9,00
0 0
0 62
,500
To
tal
$661
$5
,495
$1
5,02
0 $1
7,39
5 $1
7,24
5 $9
,184
$0
$0
$6
5,00
0
Proj
ect R
isk
Asse
ssm
ent
Sche
dule
risk
exi
sts
as th
e co
ordi
natio
n of
mul
tiple
juris
dict
ions
to a
chie
ve m
utua
l agr
eem
ent t
o co
mpl
ete
the
deliv
erab
les
by 2
024.
Sy
stem
Exp
ansi
on
REG
ION
AL
EXPR
ESS
5001
11
Paci
fic A
ve S
R 7
Bus
Rap
id T
rans
it M
anag
ed b
y: P
EPD
Cap
ped
capi
tal c
ontri
butio
n to
Pie
rce
Tran
sit f
or b
us c
apita
l enh
ance
men
ts fo
r spe
ed, r
elia
bilit
y an
d co
nven
ienc
e al
ong
Paci
fic A
venu
e / S
tate
Rou
te 7
(SR
7) in
Tac
oma
and
Pier
ce C
ount
y.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
to s
uppo
rt pr
ojec
t dev
elop
men
t, de
sign
and
env
ironm
enta
l act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$71,
630
2019
TIP
: $6
0,50
0 20
19 :
2023
20
19 C
ost E
stim
ate:
$6
9,81
5 20
20 T
IP:
$60,
500
2020
: 20
23
2020
Cos
t Est
imat
e:
$69,
815
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$2
,542
$1
0,59
0 $2
4,16
5 $2
1,66
5 $1
,538
$0
$0
$0
$6
0,50
0 To
tal
$2,5
42
$10,
590
$24,
165
$21,
665
$1,5
38
$0
$0
$0
$60,
500
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$42
$90
$165
$1
65
$38
$0
$0
$0
$500
35
-Thi
rd P
arty
2,
500
10,5
00
24,0
00
21,5
00
1,50
0 0
0 0
60,0
00
Tota
l $2
,542
$1
0,59
0 $2
4,16
5 $2
1,66
5 $1
,538
$0
$0
$0
$6
0,50
0
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 84 of 144
Syst
em E
xpan
sion
R
EGIO
NAL
EX
PRES
S 50
0117
N
orth
Sam
mam
ish
Park
-and
-Rid
e M
anag
ed b
y: P
EPD
Plan
, des
ign,
and
con
stru
ct a
par
k an
d rid
e fa
cilit
y in
the
city
of S
amm
amis
h.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: C
ondu
ct c
once
ptua
l eng
inee
ring,
con
cept
ual d
esig
n an
d en
viro
nmen
tal r
evie
w o
f the
pre
ferre
d pa
rk-a
nd-ri
de
site
. Con
tinue
wor
king
in p
artn
ersh
ip w
ith th
e C
ity o
f Sam
mam
ish,
Kin
g C
ount
y M
etro
and
the
publ
ic to
gai
n in
put a
nd fe
edba
ck o
n ea
rly d
esig
n co
ncep
ts. D
evel
op p
artn
ersh
ip a
gree
men
ts a
s ne
cess
ary
with
the
City
of S
amm
amis
h, K
ing
Cou
nty
Met
ro a
nd/o
r priv
ate
deve
lopm
ent p
artn
ers.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$24,
254
2019
TIP
: $2
,065
20
19 :
2024
20
19 C
ost E
stim
ate:
$2
4,19
0 20
20 T
IP:
$2,0
65
2020
: 20
24
2020
Cos
t Est
imat
e:
$24,
190
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Ea
st K
ing
$248
$7
65
$1,0
52
$0
$0
$0
$0
$0
$2,0
65
Tota
l $2
48
$765
$1
,052
$0
$0
$0
$0
$0
$2
,065
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$240
$2
20
$290
$0
$0
$0
$0
$0
$7
50
20-P
relim
Eng
inee
ring/
Env
Rev
iew
8
520
577
0 0
0 0
0 1,
105
35-T
hird
Par
ty
0 20
14
0 0
0 0
0 0
160
40-R
ow A
cqui
sitio
n+Pe
rmits
0 5
45
0 0
0 0
0 50
To
tal
$248
$7
65
$1,0
52
$0
$0
$0
$0
$0
$2,0
65
Proj
ect R
isk
Asse
ssm
ent
Budg
et a
nd s
ched
ule
risk
asso
ciat
ed w
ith th
e ci
ty’s
pre
fere
nces
and
zon
ing
code
s w
hich
favo
r stru
ctur
ed p
arki
ng e
ven
thou
gh th
e ST
3 co
st e
stim
ate
was
bas
ed o
n a
surfa
ce p
arki
ng s
cena
rio. B
udge
t and
sch
edul
e ris
k is
als
o as
soci
ated
with
the
stro
ng p
ossi
bilit
y of
a jo
int d
evel
opm
ent p
roje
ct d
eliv
ery
appr
oach
, as
wel
l as
high
mar
ket c
osts
for p
rope
rty a
nd a
tigh
teni
ng c
onst
ruct
ion
mar
ket.
Sy
stem
Exp
ansi
on
REG
ION
AL
EXPR
ESS
5X38
7 I-9
0 Tw
o-W
ay T
rans
it &
HO
V O
pera
tions
, Sta
ge 3
Man
aged
by:
DEC
M
Plan
, des
ign,
and
con
stru
ct fr
eew
ay im
prov
emen
ts to
ach
ieve
relia
ble
two-
way
tran
sit a
nd H
OV
oper
atio
ns e
astb
ound
and
wes
tbou
nd
on I-
90 b
etw
een
80th
Ave
nue
SE o
n M
erce
r Isl
and
and
Rai
nier
Ave
nue/
I-5 in
Sea
ttle.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
the
adm
inis
trativ
e cl
oseo
ut p
roce
ss.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$2
25,6
48
Base
line:
20
20
Vote
r-App
rove
d C
ost
Estim
ate:
$1
09,2
22
2019
TIP
: $2
25,6
48
2019
: 20
19
2019
Cos
t Est
imat
e:
$225
,648
20
20 T
IP:
$225
,648
20
20 :
2020
20
20 C
ost E
stim
ate:
$2
25,6
48
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Ea
st K
ing
$198
,405
$1
,570
$3
,771
$2
,555
$2
,555
$2
85
$0
$16,
508
$225
,648
To
tal
$198
,405
$1
,570
$3
,771
$2
,555
$2
,555
$2
85
$0
$16,
508
$225
,648
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,5
09
$100
$5
5 $5
5 $5
5 $3
5 $0
$8
39
$3,6
48
20-P
relim
Eng
inee
ring/
Env
Rev
iew
1,
549
0 0
0 0
0 0
0 1,
549
30-F
inal
D
esig
n+Sp
ecifi
catio
ns18
,451
10
0 0
0 0
0 0
3,57
0 22
,121
50-C
onst
ruct
ion
175,
896
1,37
0 3,
716
2,50
0 2,
500
250
0 12
,099
19
8,33
0 To
tal
$198
,405
$1
,570
$3
,771
$2
,555
$2
,555
$2
85
$0
$16,
508
$225
,648
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
a ri
sk th
at fi
nal c
omm
issi
onin
g of
Sup
ervi
sory
Con
trol A
nd D
ata
Acqu
isiti
on (S
CAD
A) s
yste
m m
ay d
elay
the
proj
ect
sche
dule
.
2020 Financial Plan & Proposed Budget 85 of 144
Syst
em E
xpan
sion
R
EGIO
NAL
EX
PRES
S 70
0720
ST
Exp
ress
Fle
et E
xpan
sion
M
anag
ed b
y: O
pera
tions
Proc
ure,
acc
ept,
and
com
mis
sion
44
buse
s to
sup
port
peak
hou
r bus
ser
vice
dem
ands
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Del
iver
y, te
stin
g an
d co
mm
issi
onin
g of
19
buse
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$46,
008
2019
TIP
: $4
6,75
7 20
19 :
2020
20
19 C
ost E
stim
ate:
$6
4,97
2 20
20 T
IP:
$46,
757
2020
: 20
20
2020
Cos
t Est
imat
e:
$64,
972
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$2,9
92
$2,8
52
$0
$0
$0
$0
$0
$0
$5,8
45
Sout
h Ki
ng
2,60
9 2,
487
0 0
0 0
0 0
5,09
6 Ea
st K
ing
17,3
32
16,5
19
0 0
0 0
0 0
33,8
52
Pier
ce
1,00
5 95
8 0
0 0
0 0
0 1,
964
Tota
l $2
3,94
0 $2
2,81
7 $0
$0
$0
$0
$0
$0
$4
6,75
7
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
70-V
ehic
les
$23,
940
$22,
817
$0
$0
$0
$0
$0
$0
$46,
757
Tota
l $2
3,94
0 $2
2,81
7 $0
$0
$0
$0
$0
$0
$4
6,75
7
Proj
ect R
isk
Asse
ssm
ent
Som
e ris
k ex
ists
with
the
unce
rtain
ty o
f the
com
posi
tion
of th
e fle
et w
ith b
us ty
pe, s
ize
and
fuel
as
wel
l as
our t
rans
it pa
rtner
s ab
ility
to b
ase
and
mai
ntai
n ou
r bus
es a
s w
e ap
proa
ch b
ase
capa
citie
s w
hich
cou
ld e
ffect
fina
l cos
t.
2020 Financial Plan & Proposed Budget 86 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Syst
em E
xpan
sion
STR
IDE
Proj
ect N
umbe
r and
Nam
e Li
fe to
D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l
Prel
imin
ary
Engi
neer
ing
5000
50
I-405
Bus
Rap
id T
rans
it$6
7,74
5 $6
3,29
8 $4
5,91
0 $3
2,17
5 $1
6,88
7 $1
03
$0
$0
$226
,118
5000
51
SR 5
22/N
E 14
5th
St B
RT
18,0
61
27,1
78
10,0
95
9,04
1 0
0 0
0 64
,375
5000
70
Bus
Base
Nor
th26
,401
2,
090
11,0
55
3,00
0 3,
300
2,83
0 0
0 48
,676
Su
btot
al
112,
207
92,5
66
67,0
61
44,2
16
20,1
87
2,93
3 0
0 33
9,16
9
Tota
l $1
12,2
07
$92,
566
$67,
061
$44,
216
$20,
187
$2,9
33
$0
$0
$339
,169
2020 Financial Plan & Proposed Budget 87 of 144
2020
Cas
hflo
w b
y Su
bare
a
(in
thou
sand
s)
Syst
em E
xpan
sion
ST
RID
E
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$3,1
07
$2,1
58
$1,8
80
$1,1
61
$666
$9
7 $0
$0
$9
,068
2
- Nor
th K
ing
10,2
58
15,4
37
5,73 4
5,13
5 0
0 0
0 36
,565
3 - S
outh
Kin
g 19
,394
13
,470
11
,735
7,
246
4,15
8 60
4 0
0 56
,608
4
- Eas
t Kin
g 79
,447
61
,501
47
,712
30
,674
15
,362
2,
232
0 0
236,
928
Tota
l $1
12,2
07
$92,
566
$67,
061
$44,
216
$20,
187
$2,9
33
$0
$0
$339
,169
2020
Cas
hflo
w b
y Ph
ase
(in
th
ousa
nds)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 10
-Age
ncy
Adm
inis
tratio
n$7
,548
$5
,345
$6
,118
$0
$0
$0
$0
$0
$1
9,01
1 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w25
,167
29
,438
14
,438
0
0 0
0 0
69,0
43
35-T
hird
Par
ty42
3 38
0 1,
75 1 0
0 0
0 0
2,55
4
40-R
ow A
cqui
sitio
n+Pe
rmits
46,5
62
12,0
12
9,28 7
1,97
5 84
7 0
0 0
70,6
81
50-C
onst
ruct
ion
32,5
07
44,7
80
32,0
72
39,0
41
15,8
40
0 0
0 16
4,24
0 55
-Con
stru
ctio
n Se
rvic
es0
612
3,39 5
3,20
0 3,
500
2,93
3 0
0 13
,640
Tota
l $1
12,2
07
$92,
566
$67,
061
$44,
216
$20,
187
$2,9
33
$0
$0
$339
,169
2020 Financial Plan & Proposed Budget 88 of 144
Syst
em E
xpan
sion
ST
RID
E
5000
50
I-405
Bus
Rap
id T
rans
it M
anag
ed b
y: P
EPD
Plan
, des
ign,
and
laun
ch a
Bus
Rap
id T
rans
it (B
RT)
sys
tem
from
the
Lynn
woo
d Tr
ansi
t Cen
ter t
o th
e Bu
rien
Tran
sit C
ente
r via
I-5,
I-40
5, a
nd S
R 5
18, t
o in
clud
e ne
w a
nd u
pgra
ded
trans
it ce
nter
s, fl
yer s
tops
, new
par
k-an
d-rid
e ca
paci
ty, a
nd a
cces
s im
prov
emen
ts to
th
e st
atio
ns.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $5
milli
on to
fund
Pha
se 3
Pre
limin
ary
Engi
neer
ing
and
early
G
EC c
onsu
ltant
ove
rsig
ht.
Budg
et y
ear a
ctiv
ities
: Con
tinue
pro
ject
dev
elop
men
t act
iviti
es, r
ight
of w
ay a
ppra
isal
s an
d ac
quis
ition
s, a
nd th
e pr
elim
inar
y en
gine
erin
g of
the
Was
hing
ton
Stat
e D
epar
tmen
t of T
rans
porta
tion
(WSD
OT)
85t
h St
reet
Inte
rcha
nge
and
Bric
kyar
d In
-Lin
e Fr
eew
ay S
tatio
n. C
ompl
etio
n of
env
ironm
enta
l rev
iew
and
app
rova
l. C
ontin
ue c
onst
ruct
ion
with
WSD
OT
at N
E 44
th S
treet
In
terc
hang
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$989
,681
2019
TIP
: $2
21,1
67
2019
: 20
24
2019
Cos
t Est
imat
e:
$989
,681
20
20 T
IP:
$226
,118
20
20 :
2024
20
20 C
ost E
stim
ate:
$9
85,2
46
Cash
flow
(YO
E $0
00s)
Suba
rea
Life
to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Snoh
omis
h $2
,315
$2
,095
$1
,548
$1
,071
$5
67
$12
$0
$0
$7,6
08
Sout
h Ki
ng
13
,850
1
3,03
1
9,
413
6
,616
3,4
65
10
0 0
46,3
86
East
Kin
g
51,5
81
48,
172
3
4,94
9
24,
488
12,8
54
8
1
0 0
172,
124
To
tal
$67,
745
$
63,2
98
$
45,9
10
$
32,1
75
$
16,8
87
$103
$0
$0
$2
26,1
1 8
Phas
e Li
fe to
D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l
10-A
genc
y Ad
min
istra
tion
$3,9
42
$2,7
00
$1,6
44
$0
$0
$0
$0
$0
$8,2
86
20-P
relim
Eng
inee
ring/
Env
Rev
iew
18
,839
22
,368
8,
519
0 0
0 0
0 49
,726
35-T
hird
Par
ty
230
180
540
0 0
0 0
0 95
0 40
-Row
Ac
quis
ition
+Per
mits
20
,334
8,
000
5,00
8 1,
975
847
0 0
0 36
,163
50-C
onst
ruct
ion
24,4
00
30,0
00
30,0
00
30,0
00
15,8
40
0 0
0 10
5,84
0 55
-Con
stru
ctio
n Se
rvic
es
0 50
20
0 20
0 20
0 10
3 0
0 75
3 To
tal
$67,
745
$63,
298
$45,
910
$32,
175
$16,
887
$103
$0
$0
$2
26,1
1 8
Proj
ect R
isk
Asse
ssm
ent
Agen
cy w
ide
risk
in th
e tim
ely
acqu
isiti
on o
f rig
ht-o
f-way
rem
ains
a c
halle
nge.
M
ulti-
juris
dict
ion
coor
dina
tion
on s
tatio
ns.
Syst
em E
xpan
sion
ST
RID
E
5000
51
SR 5
22/N
E 14
5th
St B
RT
Man
aged
by:
PEP
D
Plan
, des
ign,
and
laun
ch a
Bus
Rap
id T
rans
it (B
RT)
sys
tem
from
the
Sout
h Sh
orel
ine
light
rail
stat
ion
to U
W B
othe
ll ca
mpu
s w
ith
conn
ectin
g se
rvic
e to
Woo
dinv
ille, i
nclu
ding
par
k an
d rid
e, a
cces
s im
prov
emen
ts, a
nd tr
ansi
t cen
ters
.
Cha
nges
to p
roje
ct a
lloca
tion
sinc
e 20
19: I
ncre
ased
by
$12
milli
on to
fund
Pha
se 3
of p
relim
inar
y en
gine
erin
g, c
onst
ruct
ion
serv
ice
for
pre-
acqu
isiti
on, a
cqui
sitio
n, a
ppra
isal
ser
vice
s fo
r rig
ht o
f way
.
Budg
et y
ear a
ctiv
ities
: Com
plet
e co
ncep
tual
eng
inee
ring
and
envi
ronm
enta
l rev
iew
s, a
dvan
ce in
to p
hase
3 e
ngin
eerin
g. C
ontin
ue
cons
truct
ion
of th
e Bu
sine
ss A
cces
s an
d Tr
ansi
t (BA
T) la
nes
in B
othe
ll. N
egot
iate
and
coo
rdin
ate
with
WSD
OT
and
City
of B
othe
ll to
st
art d
esig
n. N
egot
iate
and
adv
ance
con
tract
for d
esig
n an
d co
nstru
ctio
n m
anag
emen
t. Be
gin
acqu
isiti
on a
ctiv
ities
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$482
,840
2019
TIP
: $5
2,55
6 20
19 :
2025
20
19 C
ost E
stim
ate:
$4
80,9
45
2020
TIP
: $6
4,37
5 20
20 :
2025
20
20 C
ost E
stim
ate:
$4
80,9
45
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
0,25
8 $1
5,43
7 $5
,734
$5
,135
$0
$0
$0
$0
$3
6,56
5 Ea
st K
ing
7,80
2 11
,741
4,
361
3,90
6 0
0 0
0 27
,810
To
tal
$18,
061
$27,
178
$10,
095
$9,0
41
$0
$0
$0
$0
$64,
375
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,9
11
$1,6
05
$1,7
85
$0
$0
$0
$0
$0
$6,3
01
20-P
relim
Eng
inee
ring/
Env
Rev
iew
5,
231
6,84
0 4,
941
0 0
0 0
0 17
,012
35-T
hird
Par
ty
193
150
1,10
1 0
0 0
0 0
1,44
4 40
-Row
Acq
uisi
tion+
Perm
its1,
620
3,71
2 0
0 0
0 0
0 5,
331
50-C
onst
ruct
ion
8,10
7 14
,780
2,
072
9,04
1 0
0 0
0 34
,000
55
-Con
stru
ctio
n Se
rvic
es
0 92
19
5 0
0 0
0 0
287
Tota
l $1
8,06
1 $2
7,17
8 $1
0,09
5 $9
,041
$0
$0
$0
$0
$6
4,37
5
Proj
ect R
isk
Asse
ssm
ent
Early
del
iver
able
pro
ject
, whi
ch in
volv
es c
lose
coo
rdin
atio
n w
ith m
ultip
le p
roje
ct p
artn
ers.
Cos
t esc
alat
ion
and
right
of w
ay a
cqui
sitio
n ch
alle
nges
cre
ate
budg
et a
nd s
ched
ule
unce
rtain
ty.
2020 Financial Plan & Proposed Budget 89 of 144
Syst
em E
xpan
sion
ST
RID
E
5000
70
Bus
Bas
e N
orth
M
anag
ed b
y: P
EPD
Plan
, des
ign,
and
laun
ch a
bus
ope
ratio
ns a
nd m
aint
enan
ce fa
cilit
y to
sup
port
both
the
I-405
Bus
Rap
id T
rans
it an
d th
e SR
522
/NE
145t
h St
. Bus
Rap
id T
rans
it pr
ojec
ts.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $1
1.6
milli
on to
fund
des
ign-
build
pro
ject
man
agem
ent s
ervi
ces.
Budg
et y
ear a
ctiv
ities
: Con
tinue
pro
ject
dev
elop
men
t act
iviti
es a
nd ri
ght o
f way
acq
uisi
tion
activ
ities
. Com
plet
ion
of e
nviro
nmen
tal
revi
ew a
nd a
ppro
val.
Begi
n pr
ocur
emen
t of d
esig
n-bu
ild c
ontra
ct.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$183
,569
2019
TIP
: $3
7,07
6 20
19 :
2024
20
19 C
ost E
stim
ate:
$1
83,5
69
2020
TIP
: $4
8,67
6 20
20 :
2024
20
20 C
ost E
stim
ate:
$1
82,7
46
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Snoh
omis
h $7
92
$63
$332
$9
0 $9
9 $8
5 $0
$0
$1
,460
So
uth
King
5,
544
439
2,32
2 63
0 69
3 59
4 0
0 10
.22
East
Kin
g 20
,065
1,
588
8,40
2 2,
280
2,50
8 2,
151
0 0
36.9
9 To
tal
$26,
401
$2,0
90
$11,
055
$3,0
00
$3,3
00
$2,8
30
$0
$0
$48,
67 6
Phas
e Li
fe to
D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l
10-A
genc
y Ad
min
istra
tion
$696
$1
,040
$2
,688
$0
$0
$0
$0
$0
4,
424
20-P
relim
Eng
inee
ring/
Env
Rev
iew
1,
097
230
978
0 0
0 0
0 2,
305
35-T
hird
Par
ty
0 50
11
0 0
0 0
0 0
160
40-R
ow A
cqui
sitio
n+Pe
rmits
24
,608
30
0 4,
279
0 0
0 0
0 29
,187
50
-Con
stru
ctio
n 0
0 0
0 0
0 0
0 24
,400
55
-Con
stru
ctio
n Se
rvic
es
0 47
0 3,
000
3,00
0 3,
300
2,83
0 0
0 12
,600
To
tal
$26,
401
$2,0
90
$11,
055
$
3,00
0
$3,3
00
$
2,83
0
$ 0 $0
48
,676
Proj
ect R
isk
Asse
ssm
ent
Agen
cy w
ide
risk
in th
e tim
ely
acqu
isiti
on o
f rig
ht-o
f-way
rem
ains
a c
halle
nge.
Mul
ti-ju
risdi
ctio
n co
ordi
natio
n on
sta
tions
.
2020 Financial Plan & Proposed Budget 90 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Syst
em E
xpan
sion
OTH
ER
Proj
ect N
umbe
r and
Nam
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Prel
imin
ary
Engi
neer
ing
6000
38
Nex
t Gen
erat
ion
OR
CA
$3,1
39
$2,9
68
$18,
826
$2,1
30
$4,4
59
$0
$0
$0
$31,
523
6001
43
Envi
ronm
enta
l Rem
edia
tion
0 50
0 0
0 0
0 0
0 50
0 Su
btot
al
3,13
9 3,
468
18,8
26
2,13
0 4,
459
0 0
0 32
,023
O
pera
ting
6006
68
STar
t Ope
ratio
ns &
Mai
nten
ance
1,
598
321
313
426
480
509
530
15,1
83
19,3
59
Subt
otal
1,
598
321
313
426
480
509
530
15,1
83
19,3
59
Prog
ram
3X21
2 Fa
re C
olle
ctio
n 8,
919
17
81
108
73
112
88
5,47
4 14
,870
5X
410
Res
earc
h &
Tech
nolo
gy
11,2
95
3,10
0 1,
425
507
0 0
0 3,
673
20,0
00
6000
16
Fare
Adm
inis
tratio
n 2,
851
630
879
504
454
354
150
121
5,94
1 60
0039
R
esea
rch
and
Busi
ness
D
evel
opm
ent P
rogr
am
109
534
499
0 0
0 0
0 1,
143
6000
73
Tran
sit S
yste
m A
cces
s Pr
ogra
m
1,71
7 5,
900
5,75
0 5,
750
6,00
0 6,
000
5,70
0 10
5,32
2 14
2,13
9 60
0076
In
nova
tion
and
Tech
nolo
gy P
rogr
am
2,58
8 2,
425
2,17
8 2,
253
2,35
5 2,
436
7,37
3 84
,996
10
6,60
4 60
0132
Ef
ficie
ncy
& Su
stai
nabi
lity
5 89
6 74
7 80
0 80
0 81
0 85
0 20
,092
25
,000
6X
668
STar
t 26
,941
6,
303
9,08
1 6,
674
6,99
8 6,
313
3,33
8 95
,553
16
1,20
1 80
4100
Tr
ansi
t Orie
nted
Dev
elop
men
t Pr
oper
ty D
ispo
sitio
n 6,
150
1,22
1 80
8 61
3 41
6 2,
407
0 0
11,6
15
8043
02
Tran
sit O
rient
ed D
evel
opm
ent
Plan
ning
Pro
gram
13
3 1,
065
1,16
0 1,
050
1,15
0 25
,613
0
0 30
,171
8091
00
ST3
Plan
ning
26
,766
3,
087
1,97
5 1,
825
625
625
341
6,28
3 41
,527
Su
btot
al
87,4
75
25,1
77
24,5
82
20,0
83
18,8
70
44,6
70
17,8
40
321,
514
560,
212
Tota
l $9
2,21
2 $2
8,96
6 $4
3,72
1 $2
2,64
0 $2
3,80
9 $4
5,17
9 $1
8,37
0 $3
36,6
97
$611
,594
2020 Financial Plan & Proposed Budget 91 of 144
2020
Cas
hflo
w b
y Su
bare
a
(in
thou
sand
s)
Syst
em E
xpan
sion
O
THER
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$8,7
68
$2,6
79
$3,2
89
$2,7
77
$2,9
05
$2,7
65
$2,0
33
$47,
284
$72,
500
2 - N
orth
Kin
g 15
,118
4,
903
4,79 6
3,90
9 3,
875
5,66
9 2,
309
54,5
29
95,1
08
3 - S
outh
Kin
g 5,
755
1,69
5 1,
90 0 1,
734
1,80
1 1,
764
1,46
9 31
,545
47
,663
4 - E
ast K
ing
6,82
0 2,
626
3,20 2
2,70
2 2,
834
2,69
2 1,
986
45,3
80
68,2
42
5 - P
ierc
e 8,
864
2,35
9 2,
84 4 2,
449
2,55
2 2,
451
1,85
9 42
,794
66
,172
6 - S
yste
mw
ide
46,8
87
14,7
05
27,6
89
9,06
9 9,
843
29,8
38
8,71
4 11
5,16
5 26
1,90
9 To
tal
$92,
212
$28,
966
$43,
721
$22,
640
$23,
809
$45,
179
$18,
370
$336
,697
$6
11,5
94
2020
Cas
hflo
w b
y Ph
ase
(in
thou
sand
s)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 01
-Ope
ratio
n+M
aint
enan
ce$1
25
$17
$23
$37
$15
$17
$50
$527
$8
10
02-O
pera
tion+
Mai
nten
ance
-Age
ncy
1,00
3 24
2 16
3 18
2 22
8 24
9 26
2 11
,215
13
,543
10
-Age
ncy
Adm
inis
tratio
n15
,109
4,
888
4,87
4 3,
751
6,63
4 8,
964
7,63
5 24
,083
75
,937
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w27
,043
8,
016
5,82
4 4,
217
3,27
6 15
,072
1,
890
95,9
23
161,
260
26-R
esea
rch+
Tech
nolo
gy11
,641
2,
544
17,2
85
1,81
5 81
2 0
0 2,
018
36,1
15
30-F
inal
Des
ign+
Spec
ifica
tions
0 0
150
150
150
150
150
3,01
8 3,
768
35-T
hird
Par
ty63
7 5,
450
5,27
5 5,
275
5,27
5 5,
275
5,27
5 90
,523
12
2,98
5 40
-Row
Acq
uisi
tion+
Perm
its3,
708
1,26
1 93
0 37
5 37
5 9,
284
0 0
15,9
33
50-C
onst
ruct
ion
8,39
0 89
6 76
7 83
4 73
6 56
6 50
0 22
,175
34
,865
61
-Art
24,5
56
5,65
3 8,
431
6,00
4 6,
308
5,60
3 2,
608
87,2
16
146,
379
Tota
l $9
2,21
2 $2
8,96
6 $4
3,72
1 $2
2,64
0 $2
3,80
9 $4
5,17
9 $1
8,37
0 $3
36,6
97
$611
,594
2020 Financial Plan & Proposed Budget 92 of 144
Syst
em E
xpan
sion
O
THER
3X21
2 Fa
re C
olle
ctio
n M
anag
ed b
y: IT
S
Mai
nten
ance
of A
genc
y fa
re c
olle
ctio
n an
d en
forc
emen
t sys
tem
s, a
s re
quire
d, in
clud
ing:
Tic
ket V
endi
ng M
achi
nes
(TVM
s), O
ne
Reg
iona
l Car
d fo
r All
(OR
CA)
pay
men
t rea
der s
yste
m fo
r Lin
k, s
ecur
e pa
ymen
t req
uire
men
ts, a
nd e
lect
roni
c ci
tatio
n sy
stem
and
ha
rdw
are
for f
are
valid
atio
n an
d en
forc
emen
t.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Ins
tall
a sy
stem
-wid
e up
grad
e to
the
oper
atin
g so
ftwar
e th
at w
ill im
prov
e sy
stem
sec
urity
com
plia
nce
and
perfo
rman
ce; c
ontin
ue im
plem
enta
tion
of e
lect
roni
c ci
tatio
n sy
stem
for f
are
enfo
rcem
ent.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
4,87
0 20
19 :
2025
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
4,87
0 20
20 :
2041
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$1,9
80
$4
$18
$24
$16
$25
$19
$1,2
15
$3,3
01
Sout
h Ki
ng
3,22
0 6
29
39
26
41
32
1,97
6 5,
368
East
Kin
g 25
0 0
2 3
2 3
2 15
3 41
6 Pi
erce
3,
469
6 31
42
28
44
34
2,
129
5,78
5 To
tal
$8,9
19
$17
$81
$108
$7
3 $1
12
$88
$5,4
74
$14,
870
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
01-O
pera
tion+
Mai
nten
ance
$1
10
$17
$23
$37
$15
$17
$50
$527
$7
95
10-A
genc
y Ad
min
istra
tion
717
0 0
0 58
96
37
10
0 1,
008
20-P
relim
Eng
inee
ring/
Env
Rev
iew
15
0 0
0 0
0 0
0 0
150
50-C
onst
ruct
ion
7,94
2 0
57
71
0 0
0 4,
847
12,9
17
Tota
l $8
,919
$1
7 $8
1 $1
08
$73
$112
$8
8 $5
,474
$1
4,87
0
Proj
ect R
isk
Asse
ssm
ent
The
risk
to b
udge
t rem
ains
hig
h un
til a
sses
smen
t of t
he c
ondi
tion
of th
e fie
lded
ass
ets
and
asso
ciat
ed re
pair
and
repl
acem
ent c
osts
ar
e co
mpl
eted
.
Sy
stem
Exp
ansi
on
OTH
ER
5X41
0 R
esea
rch
& T
echn
olog
y M
anag
ed b
y: IT
S
Asse
ss c
urre
nt im
plem
enta
tion
of th
e te
chno
logy
net
wor
k, in
clud
ing
capa
city
con
stra
ints
; ass
ess
the
new
des
ired
stat
e as
dic
tate
d by
ST
3; a
nd d
evel
op a
road
map
that
pro
vide
s re
med
iatio
n of
des
ign
conc
erns
, sta
te o
f goo
d re
pair
for a
ging
com
pone
nts,
sys
tem
ex
pans
ion
need
s, a
nd s
uppo
rt fo
r a n
ew, o
ngoi
ng o
pera
tiona
l mod
el fo
r net
wor
k su
ppor
t.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Ide
ntify
exi
stin
g ga
ps in
info
rmat
ion
syst
em's
net
wor
k to
sup
port
incr
ease
d ca
paci
ty d
eman
ds, a
nd e
stab
lish
cost
est
imat
es fo
r im
plem
enta
tion.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
0,00
0 20
19 :
2023
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $2
0,00
0 20
20 :
2023
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $1
1,29
5 $3
,100
$1
,425
$5
07
$0
$0
$0
$3,6
73
$20,
000
Tota
l $1
1,29
5 $3
,100
$1
,425
$5
07
$0
$0
$0
$3,6
73
$20,
000
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,5
05
$975
$5
25
$0
$0
$0
$0
$1,5
95
$4,6
00
20-P
relim
Eng
inee
ring/
Env
Rev
iew
2,
040
2,10
0 90
0 0
0 0
0 60
5,
100
26-R
esea
rch+
Tech
nolo
gy
7,75
0 25
0
507
0 0
0 2,
018
10,3
00
Tota
l $1
1,29
5 $3
,100
$1
,425
$5
07
$0
$0
$0
$3,6
73
$20,
000
P roj
ect R
isk
Asse
ssm
ent
Elem
ents
of t
his
prog
ram
are
in v
ario
us s
tage
s of
des
ign
and
incl
ude
new
tech
nolo
gies
that
requ
ire c
usto
m s
oftw
are
deve
lopm
ent
whi
ch c
reat
es b
udge
t and
sch
edul
e ris
k w
hile
a p
roje
ct p
rogr
esse
s fro
m a
n id
ea o
r con
cept
to a
fully
sco
ped
proj
ect.
Ext
ensi
ve
coor
dina
tion
with
ext
erna
l par
tner
age
ncie
s ad
ds a
leve
l of s
ched
ule
risk.
2020 Financial Plan & Proposed Budget 93 of 144
Syst
em E
xpan
sion
O
THER
6000
16
Fare
Adm
inis
trat
ion
Man
aged
by:
FIN
Man
age
the
fare
s, p
ricin
g, a
nd fa
re c
olle
ctio
n pr
ogra
m fo
r Sou
nd T
rans
it. P
rovi
de fu
ndin
g fo
r the
mai
nten
ance
, upg
rade
, and
in
stal
latio
n of
the
exis
ting
regi
onal
sm
art c
ard
syst
em (O
RC
A).
Addi
tiona
l ele
men
ts o
f the
pro
gram
incl
ude
mon
itorin
g fa
re re
venu
es a
nd tr
acki
ng p
erfo
rman
ce, a
nd e
stab
lishi
ng p
ricin
g fo
r cas
h fa
res,
reta
il pa
sses
, and
bus
ines
s ac
coun
ts: M
anag
e th
e fa
re c
hang
e pr
oces
s: A
dmin
iste
r the
Sou
nd T
rans
it Fa
re P
olic
y; a
nd m
aint
ain
the
fare
ela
stic
ity a
nd re
venu
e pr
ojec
tion
mod
els.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $5
00 th
ousa
nd to
incl
ude
Tran
sit C
oord
inat
ion
gran
t.
Budg
et y
ear a
ctiv
ities
: Man
agem
ent o
f far
es p
rogr
am in
clud
ing,
impl
emen
tatio
n of
fare
cha
nges
, exp
andi
ng o
utre
ach
of th
e O
RC
A LI
FT p
rogr
am, p
rom
otio
ns fo
r OR
CA
syst
em e
nhan
cem
ents
to le
gacy
OR
CA
syst
em, e
quip
men
t rep
lace
men
t and
mob
ile ti
cket
ing.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
,441
20
19 :
2023
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $5
,941
20
20 :
2026
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $2
,851
$6
30
$879
$5
04
$454
$3
54
$150
$1
21
$5,9
41
Tota
l $2
,851
$6
30
$879
$5
04
$454
$3
54
$150
$1
21
$5,9
41
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$0
$0
$0
$0
$0
$0
$0
$0
20-P
relim
Eng
inee
ring/
Env
Rev
iew
1,
879
630
879
504
454
354
150
121
4,96
9
26-R
esea
rch+
Tech
nolo
gy
972
0 0
0 0
0 0
0 97
2 To
tal
$2,8
51
$630
$8
79
$504
$4
54
$354
$1
50
$121
$5
,941
Proj
ect R
isk
Asse
ssm
ent
OR
CA
is a
regi
onal
uni
vers
al fa
re p
aym
ent s
yste
m.
The
equi
pmen
t and
sof
twar
e te
chno
logy
that
cur
rent
ly s
uppo
rts th
e pr
ogra
m is
ap
proa
chin
g th
e en
d of
its
usef
ul li
fe.
The
risk
to b
udge
t is
the
unce
rtain
ty o
f cos
t whe
n th
e sy
stem
sco
pe to
be
desi
gned
and
im
plem
ente
d ha
s no
t bee
n id
entif
ied,
nor
has
the
asso
ciat
ed e
quip
men
t to
supp
ort t
he p
rogr
am.
Sy
stem
Exp
ansi
on
OTH
ER
6000
38
Nex
t Gen
erat
ion
OR
CA
Man
aged
by:
FIN
Fund
ing
for S
ound
Tra
nsit’
s sh
are
of c
osts
rela
ted
to th
e pl
anni
ng, d
evel
opm
ent a
nd im
plem
enta
tion
of a
nex
t gen
erat
ion
OR
CA
fare
co
llect
ion
syst
em.
Cha
nges
in a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Fin
aliz
e de
sign
, sta
rt so
ftwar
e de
velo
pmen
t of t
he s
yste
m.
Des
ign
and
begi
n pr
oduc
tion
of s
yste
m d
evic
es,
incl
udin
g pr
elim
inar
y ac
cept
ance
test
ing
of d
evic
es.
Con
tinue
d de
velo
pmen
t of t
he D
ARe
data
war
ehou
se.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
1,52
3 20
19 :
2023
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $3
1,52
3 20
20 :
2023
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $3
,139
$2
,968
$1
8,82
6 $2
,130
$4
,459
$0
$0
$0
$3
1,52
3 To
tal
$3,1
39
$2,9
68
$18,
826
$2,1
30
$4,4
59
$0
$0
$0
$31,
523
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$221
$4
49
$1,5
42
$823
$3
,647
$0
$0
$0
$6
,680
26
-Res
earc
h+Te
chno
logy
2,
919
2,51
9 17
,285
1,
308
812
0 0
0 24
,842
To
tal
$3,1
39
$2,9
68
$18,
826
$2,1
30
$4,4
59
$0
$0
$0
$31,
523
P roj
ect R
isk
Asse
ssm
ent
The
prog
ram
is s
ched
ule-
driv
en s
o th
at it
may
be
deliv
ered
prio
r to
the
suns
et o
f the
cur
rent
OR
CA
syst
em a
nd in
tim
e fo
r the
re
gion
’s p
lann
ed tr
ansi
t exp
ansi
ons.
Whi
le th
ere
is s
ome
sche
dule
risk
, it i
s ac
tivel
y be
ing
miti
gate
d by
focu
sed
sche
dule
trac
king
an
d m
ilest
one
achi
evem
ent.
Anot
her k
ey ri
sk re
late
s to
the
cuto
ver f
rom
the
curre
nt O
RC
A sy
stem
to th
e ne
xt g
ener
atio
n sy
stem
. Th
e pr
ogra
m w
ill w
ork
with
the
Syst
ems
Inte
grat
or to
ens
ure
that
ther
e w
ill be
as
smoo
th a
tran
sitio
n fo
r cus
tom
ers
as p
ossi
ble.
2020 Financial Plan & Proposed Budget 94 of 144
Syst
em E
xpan
sion
O
THER
6000
39
Res
earc
h an
d B
usin
ess
Dev
elop
men
t Pro
gram
M
anag
ed b
y: P
EPD
Res
earc
h an
d de
velo
p bu
sine
ss p
ract
ices
to im
prov
e re
gion
al m
obilit
y an
d sy
stem
effi
cien
cy. D
evel
op d
ata-
driv
en s
trate
gies
and
tool
s to
sup
port
the
agen
cy in
impr
ovin
g th
e m
atch
bet
wee
n m
arke
t nee
ds a
nd s
yste
m p
erfo
rman
ce.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Fun
d da
ta c
olle
ctio
n to
sup
port
syst
em a
cces
sibi
lity
rese
arch
and
pro
vide
loca
l gra
nt-m
atch
sup
port
for a
pr
opos
ed m
obilit
y re
sear
ch p
roje
ct b
y th
e U
nive
rsity
of W
ashi
ngto
n.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,143
20
19 :
2023
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,143
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $1
09
$534
$4
99
$0
$0
$0
$0
$0
$1,1
43
Tota
l $1
09
$534
$4
99
$0
$0
$0
$0
$0
$1,1
43
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$61
$240
$2
79
$0
$0
$0
$0
$0
$580
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
49
294
220
0 0
0 0
0 56
3
Tota
l $1
09
$534
$4
99
$0
$0
$0
$0
$0
$1,1
43
P roj
ect R
isk
Asse
ssm
ent
The
proj
ect r
isk
is m
inim
al a
s th
e po
licy
revi
ew is
lim
ited
by a
vaila
ble
fund
s.
Sy
stem
Exp
ansi
on
OTH
ER
6000
73
Tran
sit S
yste
m A
cces
s Pr
ogra
m
Man
aged
by:
PEP
D
Inve
st in
add
ition
al n
on-m
otor
ized
, tra
nsit,
and
pic
k-up
/dro
p-of
f acc
ess
impr
ovem
ents
at a
nd a
roun
d So
und
Tran
sit p
asse
nger
fa
cilit
ies,
in p
artn
ersh
ip w
ith h
ost j
uris
dict
ions
and
ope
ratin
g pa
rtner
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Neg
otia
te in
divi
dual
aw
arde
e ag
reem
ents
to s
et th
e te
rms
of d
istri
butio
n of
fina
ncia
l aw
ards
con
sist
ent w
ith th
e sc
ope
of th
e in
divi
dual
pro
ject
. Be
gin
initi
al d
istri
butio
n of
202
0 aw
ards
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
42,1
39
2019
: 20
40
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$142
,139
20
20 :
2040
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$343
$1
,180
$1
,150
$1
,150
$1
,200
$1
,200
$1
,140
$2
1,06
4 $2
8,42
8 N
orth
Kin
g 34
3 1,
180
1,15
0 1,
150
1,20
0 1,
200
1,14
0 21
,064
28
,428
So
uth
King
34
3 1,
180
1,15
0 1,
150
1,20
0 1,
200
1,14
0 21
,064
28
,428
Ea
st K
ing
343
1,18
0 1,
150
1,15
0 1,
200
1,20
0 1,
140
21,0
64
28,4
28
Pier
ce
343
1,18
0 1,
150
1,15
0 1,
200
1,20
0 1,
140
21,0
64
28,4
28
Tota
l $1
,717
$5
,900
$5
,750
$5
,750
$6
,000
$6
,000
$5
,700
$1
05,3
22
$142
,139
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,1
73
$500
$5
00
$500
$5
00
$500
$5
00
$6,3
27
$10,
500
20-P
relim
Eng
inee
ring/
Env
Rev
iew
54
4 40
0 25
0 25
0 50
0 50
0 20
0 3,
256
5,90
0
35-T
hird
Par
ty
0 5,
000
5,00
0 5,
000
5,00
0 5,
000
5,00
0 89
,985
11
9,98
5 50
-Con
stru
ctio
n0
00
00
00
5,75
4 5,
754
Tota
l $1
,717
$5
,900
$5
,750
$5
,750
$6
,000
$6
,000
$5
,700
$1
05,3
22
$142
,139
Proj
ect R
isk
Asse
ssm
ent
Third
-par
ty in
tere
st in
the
fund
may
intro
duce
sch
edul
e ris
ks a
s w
ell a
s in
dica
te n
eeds
in e
xces
s of
reso
urce
s av
aila
ble,
pos
sibl
e af
fect
ing
the
abilit
y to
sup
port
qual
ifyin
g pr
ojec
ts.
2020 Financial Plan & Proposed Budget 95 of 144
Syst
em E
xpan
sion
O
THER
6000
76
Inno
vatio
n an
d Te
chno
logy
Pro
gram
M
anag
ed b
y: P
EPD
Res
earc
h, a
naly
sis,
and
impl
emen
tatio
n of
inno
vativ
e be
st p
ract
ices
, par
tner
ship
and
tech
nolo
gies
to in
crea
se ri
ders
hip,
impr
ove
serv
ice,
and
enh
ance
effi
cien
cy o
f reg
iona
l mob
ility
outs
ide
of n
ew in
vest
men
ts in
larg
e ca
pita
l pro
ject
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Set
up o
f int
erna
l gra
nt p
rogr
am; v
ideo
ana
lytic
s re
sear
ch/p
ilots
, JR
D S
mar
t Ste
p Es
cala
tor s
enso
r, cu
stom
er
serv
ices
Cha
bot,
and
Find
it-F
ix it
app
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
Co
mpl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$84,
865
2019
TIP
: $1
06,6
04
2019
: 20
41
2019
Cos
t Est
imat
e:
$84,
865
2020
TIP
: $1
06,6
04
2020
: 20
41
2020
Cos
t Est
imat
e:
$84,
865
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $2
,588
$2
,425
$2
,178
$2
,253
$2
,355
$2
,436
$7
,373
$8
4,99
6 $1
06,6
04
Tota
l $2
,588
$2
,425
$2
,178
$2
,253
$2
,355
$2
,436
$7
,373
$8
4,99
6 $1
06,6
04
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,0
21
$933
$1
,028
$1
,064
$1
,102
$1
,141
$6
,036
$0
$1
3,32
5 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
567
1,49
2 1,
150
1,18
9 1,
253
1,29
5 1,
337
84,9
96
93,2
79
Tota
l $2
,588
$2
,425
$2
,178
$2
,253
$2
,355
$2
,436
$7
,373
$8
4,99
6 $1
06,6
04
P roj
ect R
isk
Asse
ssm
ent
Man
y pl
anne
d/po
tent
ial p
roje
cts
rely
on
partn
ersh
ip w
ith o
ther
age
ncie
s an
d or
gani
zatio
ns, w
hich
intro
duce
add
ition
al s
cope
, sc
hedu
le, a
nd c
ost r
isks
.
Sy
stem
Exp
ansi
on
OTH
ER
6001
32
Effic
ienc
y &
Sus
tain
abili
ty
Man
aged
by:
PEP
D
Syst
em w
ide
reso
urce
con
serv
atio
n an
d po
llutio
n m
itiga
tion
proj
ects
, with
a fo
cus
on p
roje
cts
that
redu
ce lo
ng-te
rm o
pera
tions
&
mai
nten
ance
, util
ity a
nd fu
el c
osts
. The
se p
roje
cts
will
be fo
cuse
d on
exi
stin
g fa
cilit
ies
and
syst
em w
ide
impr
ovem
ents
that
pro
vide
re
sour
ce c
onse
rvat
ion
oppo
rtuni
ties
acro
ss n
ew a
nd e
xist
ing
faci
litie
s. T
he re
sour
ce e
ffici
ency
pro
ject
s de
velo
ped
in th
is p
rogr
am w
ill be
man
aged
by
agen
cy s
taff
and
plan
ned,
des
igne
d an
d co
nstru
cted
by
cons
ulta
nts.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Ass
ess
and
prio
ritiz
e en
ergy
effi
cien
cy a
udits
and
rene
wab
le e
nerg
y as
sess
men
ts a
nd re
sour
ce e
ffici
ency
im
prov
emen
ts in
the
Plan
ning
, Env
ironm
ent a
nd P
roje
ct D
epar
tmen
t (PE
PD) a
nd th
e O
pera
tions
Dep
artm
ent.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
5,00
0 20
19 :
2041
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $2
5,00
0 20
20 :
2041
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $5
$8
96
$747
$8
00
$800
$8
10
$850
$2
0,09
2 $2
5,00
0 To
tal
$5
$896
$7
47
$800
$8
00
$810
$8
50
$20,
092
$25,
000
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2
$0
$0
$0
$0
$10
$50
$3,7
55
$3,8
18
20-P
relim
Eng
inee
ring/
Env
Rev
iew
0
0 15
0 15
0 15
0 15
0 15
0 1,
745
2,49
5
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
0 15
0 15
0 15
0 15
0 15
0 3,
018
3,76
8
50-C
onst
ruct
ion
3 89
6 44
7 50
0 50
0 50
0 50
0 11
,574
14
,920
To
tal
$5
$896
$7
47
$800
$8
00
$810
$8
50
$20,
092
$25,
000
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 96 of 144
Syst
em E
xpan
sion
O
THER
6001
43
Envi
ronm
enta
l Rem
edia
tion
Man
aged
by:
PEP
D
In c
ompl
ianc
e w
ith th
e M
odel
Tox
ics
Con
trol A
ct p
repa
red,
prio
ritiz
e fo
r fur
ther
eva
luat
ion
for a
site
rem
edia
tion
clea
n-up
stra
tegy
an
d/or
adm
inis
trativ
e cl
osur
e te
n si
tes
whi
ch re
quire
iden
tific
atio
n of
dat
a ga
ps, c
ondu
ctin
g ad
ditio
nal i
nves
tigat
ion
and/
or re
med
iatio
n de
sign
whe
re a
ppro
pria
te.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: N
ew p
roje
ct o
f $50
0 th
ousa
nd to
com
men
ce id
entif
icat
ion
of e
nviro
nmen
tal
rem
edia
tion
of 1
0 So
und
Tran
sit o
wne
d pr
oper
ties.
Budg
et y
ear a
ctiv
ities
: Ide
ntifi
catio
n of
dat
a ga
ps, c
ondu
ctin
g ad
ditio
nal i
nves
tigat
ion
and/
or re
med
iatio
n de
sign
whe
re a
ppro
pria
te o
n te
n id
entif
ied
Soun
d Tr
ansi
t ow
ned
parc
els.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $5
00
2020
: 20
20
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $0
$5
00
$0
$0
$0
$0
$0
$0
$500
To
tal
$0
$500
$0
$0
$0
$0
$0
$0
$5
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$50
$0
$0
$0
$0
$0
$0
$50
20-P
relim
Eng
inee
ring/
Env
Rev
iew
0
450
0 0
0 0
0 0
450
Tota
l $0
$5
00
$0
$0
$0
$0
$0
$0
$500
Proj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
OTH
ER
6006
68
STar
t Ope
ratio
ns &
Mai
nten
ance
M
anag
ed b
y: D
ECM
Mai
ntai
n So
und
Tran
sit i
nsta
lled
art,
incl
udin
g do
cum
enta
tion,
mon
itorin
g, c
lean
ing,
repa
ir an
d po
ssib
le re
plac
emen
t.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Cle
an o
ver 7
5 ar
twor
ks a
t tra
nsit
faci
litie
s th
roug
h ne
w o
n-ca
ll ve
ndor
. Add
ition
al a
rtwor
k re
furb
ishm
ent a
nd s
ched
uled
m
aint
enan
ce w
ill be
per
form
ed a
t Sou
nder
’s A
ubur
n, K
ent,
and
Muk
ilteo
sta
tions
, alo
ng w
ith L
ink’
s So
Do
Stat
ion,
Sea
Tac
Airp
ort,
and
Tukw
ila
Inte
rnat
iona
l Bou
leva
rd s
tatio
ns.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Est
imat
e:
N/A
2019
TIP
: $1
9,34
4 20
19 :
2025
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
9,34
4 20
20 :
2041
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Snoh
omis
h $3
59
$72
$71
$96
$108
$1
15
$120
$3
,428
$4
,370
Nor
th K
ing
481
97
94
129
145
154
160
4,58
1 5,
841
Sout
h Ki
ng
122
25
24
33
37
39
41
1,16
6 1,
486
East
Kin
g 34
7 70
68
93
10
5 11
1 11
6 3,
313
4,22
2
Pier
ce
282
57
55
75
85
90
94
2,68
7 3,
425
Tota
l $1
,591
$3
21
$313
$4
26
$480
$5
09
$530
$1
5,17
6 $1
9,34
4
Phas
e Li
fe to
D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l
01-O
pera
tion+
Mai
nten
ance
$7
$0
$0
$0
$0
$0
$0
$0
$7
02-O
pera
tion+
Mai
nten
ance
-Ag
ency
1,
003
201
163
182
228
249
262
11,2
08
13,4
95
10-A
genc
y Ad
min
istra
tion
580
120
150
244
252
260
268
3,96
8 5,
842
Tota
l $1
,591
$3
21
$313
$4
26
$480
$5
09
$530
$1
5,17
6 $1
9,34
4
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 97 of 144
Syst
em E
xpan
sion
O
THER
6X66
8 ST
art
Man
aged
by:
DEC
M
Inco
rpor
ate
art i
nto
Soun
d Tr
ansi
t fac
ilitie
s re
flect
ing
the
com
mun
ities
ser
ved
and
cont
ribut
e to
a p
ositi
ve e
xper
ienc
e fo
r cus
tom
ers.
The
Boar
d su
ppor
ts a
pub
lic a
rt bu
dget
of o
ne p
erce
nt o
f con
stru
ctio
n co
sts
excl
udin
g tu
nnel
ing
for a
ll So
und
Mov
e, S
T2, a
nd S
T3
proj
ects
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
fabr
icat
ion
and
inst
alla
tion
of a
rt pr
ojec
ts fo
r Eas
t Lin
k an
d N
orth
gate
Lin
k ex
tens
ions
. C
ontin
ue
artw
ork
desi
gn fo
r Lyn
nwoo
d Li
nk a
nd T
acom
a Li
nk e
xten
sion
s. A
rtwor
k de
sign
for F
eder
al W
ay L
ink
and
Dow
ntow
n R
edm
ond
Link
. Be
gin
artw
ork
plan
ning
for S
umne
r and
Puy
allu
p pa
rkin
g ga
rage
s. B
egin
des
ign
for B
RT
shel
ter a
t int
erse
ctio
n of
I-40
5 an
d SR
522
corri
dors
. One
pro
ject
man
ager
pos
ition
add
ed.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
61,2
01
2019
: 20
24
2019
Cos
t Est
imat
e:
$58,
480
2020
TIP
: $1
61,2
01
2020
: 20
41
2020
Cos
t Est
imat
e:
$157
,760
Cash
flow
(YO
E $0
00s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$6,0
83
$1,4
23
$2,0
50
$1,5
07
$1,5
80
$1,4
25
$754
$2
1,57
6 $3
6,39
9 N
orth
Kin
g 8,
141
1,90
5 2,
744
2,01
7 2,
115
1,90
8 1,
009
28,8
76
48,7
15
Sout
h Ki
ng
2,06
9 48
4 69
7 51
3 53
7 48
5 25
6 7,
339
12,3
80
East
Kin
g 5,
878
1,37
5 1,
981
1,45
6 1,
527
1,37
7 72
8 20
,850
35
,174
Pi
erce
4,
768
1,11
6 1,
607
1,18
1 1,
239
1,11
7 59
1 16
,913
28
,533
To
tal
$26,
941
$6,3
03
$9,0
81
$6,6
74
$6,9
98
$6,3
13
$3,3
38
$95,
553
$161
,201
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,3
85
$650
$6
50
$670
$6
90
$710
$7
30
$8,3
37
$14,
822
61-A
rt 24
,556
5,
653
8,43
1 6,
004
6,30
8 5,
603
2,60
8 87
,216
14
6,37
9 To
tal
$26,
941
$6,3
03
$9,0
81
$6,6
74
$6,9
98
$6,3
13
$3,3
38
$95,
553
$161
,201
Proj
ect R
isk
Asse
ssm
ent
N/A
.
Sy
stem
Exp
ansi
on
OTH
ER
8041
00
Tran
sit O
rient
ed D
evel
opm
ent P
rope
rty
Dis
posi
tion
Man
aged
by:
PEP
D
Prov
ide
plan
ning
and
tech
nica
l ass
ista
nce
to lo
cal j
uris
dict
ions
and
Sou
nd T
rans
it (S
T) p
roje
ct te
ams
to h
elp
iden
tify
and
shap
e tra
nsit
orie
nted
dev
elop
men
t and
join
t dev
elop
men
t opp
ortu
nitie
s. D
ispo
se o
f pro
perti
es th
at h
ave
been
dec
lare
d su
rplu
s an
d ar
e su
itabl
e fo
r tra
nsit
orie
nted
dev
elop
men
t bas
ed o
n si
ze a
nd p
roxi
mity
to S
T tra
nsit
serv
ices
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Ass
ess
join
t dev
elop
men
t and
pub
lic/p
rivat
e or
pub
lic/p
ublic
par
tner
ship
s op
portu
nitie
s to
dev
elop
Sou
nd
Tran
sit o
wne
d si
tes
near
tran
sit s
tatio
ns.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
1,61
5 20
19 :
2021
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
1,61
5 20
20 :
2024
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $6
,150
$1
,221
$8
08
$613
$4
16
$2,4
07
$0
$0
$11,
615
Tota
l $6
,150
$1
,221
$8
08
$613
$4
16
$2,4
07
$0
$0
$11,
615
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$2,0
04
$300
$0
$3
00
$135
$7
71
$0
$0
$3,5
10
20-P
relim
Eng
inee
ring/
Env
Rev
iew
0
50
50
50
44
0 0
0 19
4
40-R
ow A
cqui
sitio
n+Pe
rmits
3,70
1 87
1 49
5 0
0 1,
570
0 0
6,63
7 50
-Con
stru
ctio
n 44
6 0
263
263
236
66
0 0
1,27
4 To
tal
$6,1
50
$1,2
21
$808
$6
13
$416
$2
,407
$0
$0
$1
1,61
5
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 98 of 144
Syst
em E
xpan
sion
O
THER
8043
02
Tran
sit O
rient
ed D
evel
opm
ent P
lann
ing
Prog
ram
M
anag
ed b
y: P
EPD
Supp
ort T
rans
it O
rient
ed D
evel
opm
ent(T
OD
) pla
nnin
g an
d pr
e-de
velo
pmen
t act
iviti
es n
eede
d to
iden
tify,
refin
e an
d sh
ape
the
offe
ring
of T
OD
pro
perti
es ta
rget
ed b
y ST
3 pl
an.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Sup
port
the
Wes
t Sea
ttle-
Balla
rd L
ink
Exte
nsio
ns, D
ownt
own
Red
mon
d Li
nk E
xten
sion
, Fed
eral
Way
Lin
k Ex
tens
ion,
Tac
oma
Dom
e Li
nk E
xten
sion
, I-4
05 B
RT,
and
SR
522/
NE
145t
h BR
T pr
ojec
ts b
y fu
ndin
g th
e pr
epar
atio
n of
TO
D
impl
emen
tatio
n st
rate
gies
and
oth
er p
re-d
evel
opm
ent a
ctiv
ities
for p
rope
rties
that
may
hav
e jo
int d
evel
opm
ent p
oten
tial o
r tha
t may
be
com
e su
rplu
s to
the
agen
cy.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$23,
495
2019
TIP
: $3
0,17
1 20
19 :
2041
20
19 C
ost E
stim
ate:
$2
3,49
5 20
20 T
IP:
$30,
171
2020
: 20
41
2020
Cos
t Est
imat
e:
$23,
495
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $1
33
$1,0
65
$1,1
60
$1,0
50
$1,1
50
$25,
613
$0
$0
$30,
171
Tota
l $1
33
$1,0
65
$1,1
60
$1,0
50
$1,1
50
$25,
613
$0
$0
$30,
171
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$133
$1
25
$150
$1
00
$200
$5
,426
$0
$0
$6
,134
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
0 55
0 57
5 57
5 57
5 12
,474
0
0 14
,749
40-R
ow A
cqui
sitio
n+Pe
rmits
0 39
0 43
5 37
5 37
5 7,
714
0 0
9,28
9 To
tal
$133
$1
,065
$1
,160
$1
,050
$1
,150
$2
5,61
3 $0
$0
$3
0,17
1
P roj
ect R
isk
Asse
ssm
ent
N/A
Sy
stem
Exp
ansi
on
OTH
ER
8091
00
ST3
Plan
ning
M
anag
ed b
y: P
EPD
Supp
ort s
yste
m e
xpan
sion
act
iviti
es th
at a
re n
ot c
orrid
or s
peci
fic, i
nclu
ding
but
not
lim
ited
to ri
ders
hip
fore
cast
ing,
ope
ratio
n an
alys
is,
envi
ronm
enta
l ana
lysi
s, a
nd p
re-p
roje
ct d
evel
opm
ent f
or fu
ture
pro
ject
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
d rid
ersh
ip fo
reca
stin
g, li
ght r
ail o
pera
tions
ana
lysi
s an
d en
viro
nmen
tal m
itiga
tion
wor
k w
ith
Dep
artm
ent o
f Ene
rgy.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$59,
689
2019
TIP
: $4
1,52
7 20
19 :
2024
20
19 C
ost E
stim
ate:
$3
4,60
7 20
20 T
IP:
$41,
527
2020
: 20
24
2020
Cos
t Est
imat
e:
$34,
607
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $2
6,76
6 $3
,087
$1
,975
$1
,825
$6
25
$625
$3
41
$6,2
83
$41,
527
Tota
l $2
6,76
6 $3
,087
$1
,975
$1
,825
$6
25
$625
$3
41
$6,2
83
$41,
527
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
02-O
pera
tion+
Mai
nten
ance
-Ag
ency
$0
$4
1 $0
$0
$0
$0
$0
$0
$4
1
10-A
genc
y Ad
min
istra
tion
4,30
8 54
6 50
50
50
50
14
0
5,06
8 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
21,8
14
2,05
0 1,
650
1,50
0 30
0 30
0 52
5,
745
33,4
11
35-T
hird
Par
ty
637
450
275
275
275
275
275
538
3,00
0 40
-Row
Acq
uisi
tion+
Perm
its7
0 0
0 0
0 0
0 7
Tota
l $2
6,76
6 $3
,087
$1
,975
$1
,825
$6
25
$625
$3
41
$6,2
83
$41,
527
Proj
ect R
isk
Asse
ssm
ent
Fund
ing
for t
his
proj
ect w
as re
duce
d in
201
9 to
the
leve
l nee
ded
to s
uppo
rt an
ticip
ated
wor
k. F
urth
er re
duct
ions
cou
ld je
opar
dize
th
e ag
ency
's a
bilit
y to
adv
ance
una
ntic
ipat
ed p
lann
ing
wor
k on
sys
tem
ic is
sues
not
cha
rged
to s
peci
fic p
roje
cts.
2020 Financial Plan & Proposed Budget 99 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Enha
ncem
ent
ALL
MO
DES
Proj
ect N
umbe
r and
Nam
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Prel
imin
ary
Engi
neer
ing
6000
84 P
asse
nger
Info
rmat
ion
Man
agem
ent
Syst
em
$5,0
72
$8,9
58
$9,0
51
$6,4
47
$11,
051
$8,4
46
$551
$0
$4
9,57
6
6000
85 S
OD
O/M
LK H
azar
d M
itiga
tion
1,03
6 61
0 1,
490
0 0
0 0
0 3,
136
6001
45 D
esig
n C
riter
ia M
anua
l Upd
ate
0 20
0 0
0 0
0 0
0 20
0 70
0654
Sea
Tac
Airp
ort S
econ
d El
evat
or
0 74
5 2,
684
2,64
2 0
0 0
0 6,
070
7007
10 L
ocom
otiv
e In
boar
d C
amer
as
0 30
0 0
0 0
0 0
0 30
0 70
0723
Dow
ntow
n Se
attle
& R
egio
nal
Mob
ility
Impr
ovem
ents
9,
007
3,32
7 0
0 0
0 0
0 12
,334
Subt
otal
15
,115
14
,140
13
,225
9,
089
11,0
51
8,44
6 55
1 0
71,6
16
Bas
elin
e 30
0011
Pos
itive
Tra
in C
ontro
l 43
,144
22
0 0
0 0
0 0
9,69
0 53
,054
70
0730
Ope
ratio
ns &
Mai
nten
ance
Fac
ility
Ligh
t Rai
l Veh
icle
Lift
3,
764
1,13
4 0
0 0
0 0
0 4,
898
Subt
otal
46
,908
1,
354
0 0
0 0
0 9,
690
57,9
52
Ope
ratin
g 5X
261
Bus
Mai
nten
ance
Fac
ility
9,39
0 0
12,6
43
0 0
0 0
0 22
,033
60
0029
Tac
oma
Link
Far
e C
olle
ctio
n 64
0
0 0
534
0 0
0 59
9 70
0651
Sea
Tac
Airp
ort W
rong
Doo
r Fal
l Pr
otec
tion
0 56
1 13
8 0
0 0
0 0
699
7006
65 V
ideo
Man
agem
ent S
yste
m
Upg
rade
90
0 39
0 59
0 0
0 0
0 0
1,88
0
7006
76 T
acom
a Li
nk R
adio
Upg
rade
74
8 0
0 0
0 0
0 0
748
7006
84 L
ight
Rai
l Veh
icle
Wire
less
C
omm
unic
atio
n U
pgra
de
146
0 25
9 0
0 0
0 0
405
7006
85 E
vere
tt St
atio
n Se
curit
y Im
prov
emen
ts
289
00
00
00
0 28
9
7006
86 S
ecur
ity R
adio
Sys
tem
24
5 1,
008
0 0
0 0
0 0
1,25
3 70
0687
Sec
urity
Ope
ratio
ns C
ente
r - V
ideo
M
onito
ring
Impr
ovem
ents
24
10
00
00
00
241
7006
89 P
ierc
e Tr
ansi
t - G
loba
l Pos
ition
ing
Syst
em R
epea
ter
0 0
1,66
2 0
0 0
0 0
1,66
2
7006
90 C
omm
unity
Tra
nsit
- On-
Boar
d C
omm
unic
atio
n U
pgra
de
1,04
7 1,
033
0 0
0 0
0 0
2,08
0
2020 Financial Plan & Proposed Budget 101 of 144
7006
91 O
pera
tions
Mai
nten
ance
Fac
ility
(OM
F) -
Link
Con
trol C
ente
r (LC
C)
Upg
rade
s
50
566
00
00
00
616
7006
92 O
pera
tions
Mai
nten
ance
Fac
ility
(OM
F) E
xpan
ded
Park
ing
516
105
0 0
0 0
0 0
621
7006
93 O
pera
tions
Mai
nten
ance
Fac
ility
(OM
F) -
Ren
ovat
ions
2,
971
5,65
4 2,
480
0 0
0 0
0 11
,105
7006
97 L
RV
Betw
een
Car
Bar
riers
41
2 0
108
0 0
0 0
0 52
0 70
0706
OM
F En
ergy
Effi
cien
cy
1,04
8 0
50
0 0
0 0
0 1,
098
7007
08 C
usto
mer
Em
erge
ncy
Stat
ions
24
3 0
557
0 0
0 0
0 80
0 70
0711
Sou
nder
Pas
seng
er E
mer
genc
y In
terc
om
0 1,
500
0 0
0 0
0 0
1,50
0
7007
13 L
RV
Was
h Ba
y M
odifi
catio
ns
300
0 0
0 0
0 0
0 30
0 70
0724
Puy
allu
p St
atio
n LE
D L
ight
ing
151
0 27
0
0 0
0 0
178
7007
25 S
umne
r Sta
tion
LED
Lig
htin
g 10
4 0
30
0 0
0 0
0 13
4 70
0726
Ken
t Sta
tion
Plat
form
Lig
htin
g 14
0 0
96
0 0
0 0
0 23
6 70
0727
Ken
t Sta
tion
Park
ing
Lot P
avin
g 76
0
624
0 0
0 0
0 70
0 70
0736
Uni
on S
tatio
n G
arde
n Le
vel
Rem
odel
1,
715
0 13
9 0
0 0
0 0
1,85
4
Subt
otal
20
,798
10
,817
19
,401
0
534
0 0
0 51
,552
Pr
ogra
m
4001
22 E
scal
ator
Mod
erni
zatio
n Pr
ogra
m
1,80
0 3,
427
10,5
00
9,70
0 8,
000
2,52
0 2,
320
6,96
0 45
,227
4X
340
Noi
se A
bate
men
t 9,
432
900
750
699
672
547
0 0
13,0
00
6000
80 B
ike
Park
ing
Prog
ram
2,
334
2,28
4 1,
367
2,00
8 1,
706
0 0
0 9,
700
6001
33 P
arki
ng M
anag
emen
t Pro
gram
0
1,92
6 1,
555
2,33
6 4,
291
3,58
6 0
0 13
,692
70
0688
LED
Lig
htin
g Pr
ogra
m
409
245
846
0 0
0 0
0 1,
500
7007
81 N
on-re
venu
e Su
ppor
t Veh
icle
s 1,
793
3,01
4 1,
342
0 0
0 0
0 6,
149
7007
93 S
igna
ge Im
prov
emen
ts
607
280
185
143
26
5 5
41
1,29
3 Su
btot
al
16,3
75
12,0
75
16,5
45
14,8
86
14,6
95
6,65
8 2,
325
7,00
1 90
,561
To
tal
$99,
197
$38,
387
$49,
171
$23,
975
$26,
280
$15,
105
$2,8
76
$16,
691
$271
,681
2020 Financial Plan & Proposed Budget 102 of 144
2020
Cas
hflo
w b
y Su
bare
a (in
thou
sand
s)
Enha
ncem
ent
ALL
MO
DES
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$5,8
84
$1,3
12
$1,9
98
$0
$0
$0
$0
$688
$9
,884
2
- Nor
th K
ing
28,7
39
19,7
78
17,9
09
13,9
31
13,9
08
6,48
2 2,
322
6,98
0 11
0,04
9 3
- Sou
th K
ing
10,0
01
6,12
1 8,
073
2,93
7 22
7 17
6 3
448
27,9
85
4 - E
ast K
ing
5,21
7 75
0 6,
441
659
560
0 0
0 13
,627
5
- Pie
rce
41,6
67
878
4,96
9 1
535
0 0
8,57
6 56
,626
6
- Sys
tem
wid
e
7,68
7 9,
548
9,78
0 6,
447
11,0
51
8,44
6 55
1 0
53,5
10
Tota
l $9
9,19
7 $3
8,38
7 $4
9,17
1 $2
3,97
5 $2
6,28
0 $1
5,10
5 $2
,876
$1
6,69
1 $2
71,6
81
2020
Cas
hflo
w b
y Ph
ase
(in th
ousa
nds)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 01
-Ope
ratio
n+M
aint
enan
ce
$0
$350
$8
55
$1,3
33
$1,8
87
$1,5
75
$0
$0
$6,0
00
10-A
genc
y Ad
min
istra
tion
7,77
8 2,
486
2,40
7 1,
633
1,51
5 80
2 65
6 53
8 17
,816
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
1,32
6 1,
576
663
811
2,21
6 1,
511
0 0
8,10
2 30
-Fin
al D
esig
n+Sp
ecifi
catio
ns
3,42
1 3,
898
2,33
0 1,
434
1,52
5 60
1 10
0 39
1 13
,701
35
-Thi
rd P
arty
12,3
97
3,17
0 0
0 20
0 20
0 0
367
16,3
34
40-R
ow A
cqui
sitio
n+Pe
rmits
750
00
00
00
7550
-Con
stru
ctio
n
69,0
00
22,9
18
40,1
47
17,7
63
17,9
37
10,1
16
1,92
0 8,
669
188,
470
55-C
onst
ruct
ion
Serv
ices
3,27
7 97
5 1,
426
1,00
0 1,
000
300
200
3,64
2 11
,820
70
-Veh
icle
s
1,79
3 3,
014
1,34
2 0
0 0
0 0
6,14
9 80
-Sys
tem
Tes
ting+
Star
tup
129
0 0
0 0
0 0
1,36
1 1,
490
90-C
ontin
genc
y
0 0
0 0
0 0
0 1,
725
1,72
5 To
tal
$99,
197
$38,
387
$49,
171
$23,
975
$26,
280
$15,
105
$2,8
76
$16,
691
$271
,681
2020 Financial Plan & Proposed Budget 103 of 144
Enha
ncem
ent
LIN
K
4001
22
Esca
lato
r Mod
erni
zatio
n Pr
ogra
m
Man
aged
by:
DEC
M
Des
ign
and
impl
emen
t mod
erni
zatio
n of
esc
alat
ors
at U
nive
rsity
of W
ashi
ngto
n St
atio
n an
d up
grad
e em
erge
ncy
egre
ss s
tairw
ells
at
Uni
vers
ity o
f Was
hing
ton
Stat
ion
and
Cap
itol H
ill St
atio
n.
Sinc
e U
-Lin
k op
ened
in 2
016,
the
esca
lato
rs a
t Uni
vers
ity o
f Was
hing
ton
(UW
) hav
e un
derp
erfo
rmed
. The
lack
of s
tairs
has
mad
e th
e pr
oble
m w
orse
, lea
ding
to m
ultip
le o
ccas
ions
whe
re c
usto
mer
s ha
ve h
ad to
line
up
for l
imite
d el
evat
or s
pace
to e
ither
ent
er o
r exi
t the
st
atio
n. A
s co
mm
itted
to th
e Bo
ard
in O
ctob
er 2
018,
due
to a
n un
antic
ipat
ed re
duct
ion
in s
ervi
ce li
fe, i
t is
nece
ssar
y to
initi
ate
the
repl
acem
ent o
f the
esc
alat
ors
at th
is ti
me.
Pro
ject
incl
udes
: Upg
rade
s/re
plac
emen
t of 1
1 of
13
esca
lato
rs; d
esig
n an
d in
stal
ling
a se
t of
per
man
ent s
tairs
in li
eu o
f tw
o of
the
curre
nt s
ets
of e
scal
ator
s (tw
o of
the
esca
lato
rs to
be
rem
oved
for s
tairs
.).
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $4
0.26
milli
on to
des
ign,
pro
cure
and
inst
all e
scal
ator
s at
Uni
vers
ity
of W
ashi
ngto
n St
atio
n.
Budg
et y
ear a
ctiv
ities
: Ful
l mod
erni
zatio
n of
11
esca
lato
rs a
t UW
Sta
tion
with
app
ropr
iate
spe
cific
atio
n of
equ
ipm
ent.
Impr
ove
publ
ic
circ
ulat
ion
path
s vi
a co
nnec
ted
sub-
mez
zani
nes.
Rep
lace
two
(of t
he c
urre
nt 1
3) e
scal
ator
s w
ith fi
xed
publ
ic s
tair
to p
rovi
de
perm
anen
t pub
lic a
cces
s w
ithou
t dep
ende
nce
on e
scal
ator
ope
ratio
n.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$4
,963
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
,963
20
19 :
2019
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $4
5,22
7 20
20 :
2026
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,800
$3
,427
$1
0,50
0 $9
,700
$8
,000
$2
,520
$2
,320
$6
,960
$4
5,22
7 To
tal
$1,8
00
$3,4
27
$10,
500
$9,7
00
$8,0
00
$2,5
20
$2,3
20
$6,9
60
$45,
227
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$302
$2
67
$800
$8
00
$800
$2
00
$100
$3
00
$3,5
69
30-F
inal
D
esig
n+Sp
ecifi
catio
ns26
3 50
0 80
0 60
0 60
0 10
0 10
0 30
0 3,
263
50-C
onst
ruct
ion
1,19
5 2,
375
7,90
0 7,
300
5,60
0 1,
920
1,92
0 5,
760
33,9
70
55-C
onst
ruct
ion
Serv
ices
40
28
5 1,
000
1,00
0 1,
000
300
200
600
4,42
5 To
tal
$1,8
00
$3,4
27
$10,
500
$9,7
00
$8,0
00
$2,5
20
$2,3
20
$6,9
60
$45,
227
Proj
ect R
isk
Asse
ssm
ent
Unk
now
n co
nditi
ons
and
feas
ibilit
y st
udie
s tie
d to
the
esca
lato
r dis
cove
ry s
tage
and
sch
edul
e re
pres
ent h
igh
risk
in te
rms
of
sche
dule
and
cos
t.
En
hanc
emen
t LI
NK
4X34
0 N
oise
Aba
tem
ent
Man
aged
by:
DEC
M
Des
ign
and
cons
truct
a n
oise
wal
l alo
ng th
e Li
nk e
leva
ted
guid
eway
in T
ukw
ila. F
undi
ng fo
r the
com
plet
ion
of th
e R
esid
entia
l Sou
nd
Insu
latio
n Pr
ogra
m (R
SIP)
for r
esid
ence
s im
pact
ed b
y no
ise
from
ope
ratio
ns o
f Cen
tral L
ink
in th
e R
aini
er V
alle
y is
incl
uded
in th
is
proj
ect.
Scop
e ad
ditio
n in
201
9 fo
r per
iodi
c no
ise
and
vibr
atio
n da
ta c
olle
ctio
n an
d te
stin
g, w
heel
/rail
inte
ract
ion
inve
stig
atio
n an
d co
rrela
tion
of tr
ack/
vehi
cle
inte
ract
ion
to n
oise
, vib
ratio
n an
d m
aint
enan
ce is
sues
bet
wee
n th
e ye
ars
2018
and
202
3.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Noi
se a
nd v
ibra
tion
data
col
lect
ion,
whe
el/ra
il in
tera
ctio
n in
vest
igat
ion
and
corre
latio
n of
trac
k/ve
hicl
e in
tera
ctio
n to
noi
se, v
ibra
tion
and
mai
nten
ance
issu
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
Co
mpl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
3,00
0 20
19 :
2024
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
3,00
0 20
20 :
2024
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $6
,440
$6
15
$512
$4
77
$459
$3
74
$0
$0
$8,8
76
Sout
h Ki
ng
2,99
2 28
5 23
8 22
2 21
3 17
4 0
0 4,
124
Tota
l $9
,432
$9
00
$750
$6
99
$672
$5
47
$0
$0
$13,
000
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,0
58
$50
$50
$49
$47
$46
$0
$0
$1,3
00
30-F
inal
D
esig
n+Sp
ecifi
catio
ns39
1 85
0 70
0 65
0 62
5 50
1 0
0 3,
718
40-R
ow A
cqui
sitio
n+Pe
rmits
16
0 0
0 0
0 0
0 16
50
-Con
stru
ctio
n5,
879
00
00
00
0 5,
879
55-C
onst
ruct
ion
Serv
ices
2,
088
0 0
0 0
0 0
0 2,
088
Tota
l $9
,432
$9
00
$750
$6
99
$672
$5
47
$0
$0
$13,
000
Proj
ect R
isk
Asse
ssm
ent
Del
ays
in fi
eld
trial
com
plet
ion
resu
lting
in p
rolo
nged
test
tria
l per
iod;
Del
ays
in im
plem
entin
g ne
wer
whe
el s
hape
s in
ST2
Orig
inal
Eq
uipm
ent M
anuf
actu
rer (
OEM
) veh
icle
s.
2020 Financial Plan & Proposed Budget 105 of 144
Enha
ncem
ent
LIN
K
6000
29
Taco
ma
Link
Far
e C
olle
ctio
n M
anag
ed b
y: IT
S
Inst
all a
nd c
omm
issi
on ti
cket
ven
ding
mac
hine
s at
Tac
oma
Link
sta
tions
, est
ablis
h a
spar
e pa
rts in
vent
ory,
set
up
fare
col
lect
ion
and
fare
enf
orce
men
t sup
port,
and
con
duct
pub
lic o
utre
ach.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $8
5 th
ousa
nd fo
r cha
nge
of h
ardw
are
spec
ifica
tion.
Budg
et y
ear a
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
14
2019
: 20
22
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$599
20
20 :
2023
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$6
4 $0
$0
$0
$5
34
$0
$0
$0
$599
To
tal
$64
$0
$0
$0
$534
$0
$0
$0
$5
99
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$64
$0
$0
$0
$534
$0
$0
$0
$5
99
Tota
l $6
4 $0
$0
$0
$5
34
$0
$0
$0
$599
Proj
ect R
isk
Asse
ssm
ent
Key
proj
ect r
isks
incl
ude:
Fur
ther
def
erm
ent o
f im
plem
enta
tion;
Nex
t gen
erat
ion
fare
sys
tem
cha
nges
acr
oss
the
regi
on m
ay a
ffect
co
ntra
ctor
tim
elin
es fo
r sof
twar
e an
d ha
rdw
are
deve
lopm
ent;
Com
plic
atio
ns m
ay b
e dr
iven
by
the
abilit
y to
reac
h in
terg
over
nmen
tal
agre
emen
ts fo
r far
e en
forc
emen
t, w
hich
may
cau
se a
del
ay o
nce
impl
emen
tatio
n is
app
rove
d.
En
hanc
emen
t LI
NK
7006
51
SeaT
ac A
irpor
t Wro
ng D
oor F
all P
rote
ctio
n M
anag
ed b
y: O
pera
tions
Rem
ove
and
repl
ace
144
linea
r fee
t of h
andr
ails
on
the
exte
rior s
ide
of th
e ea
st a
nd w
est p
latfo
rms
and
fabr
icat
e an
d in
stal
l new
w
inds
cree
ns.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: New
pro
ject
of $
699
thou
sand
for t
he in
stal
latio
n an
d ex
pans
ion
of b
arrie
rs a
t th
e Se
aTac
Airp
ort S
tatio
n to
pre
vent
pas
seng
ers
exiti
ng th
e w
rong
doo
r.
Budg
et y
ear a
ctiv
ities
: Rem
oval
of a
ppro
xim
atel
y 14
4 lin
ear f
eet o
f han
drai
ls o
n th
e ex
terio
r sid
e of
the
east
and
wes
t pla
tform
s to
pr
epar
e fo
r the
inst
alla
tion
of th
e ne
w w
inds
cree
ns.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $6
99
2020
: 20
21
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$0
$5
61
$138
$0
$0
$0
$0
$0
$6
99
Tota
l $0
$5
61
$138
$0
$0
$0
$0
$0
$6
99
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$63
$16
$0
$0
$0
$0
$0
$79
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
348
00
00
0 42
50-C
onst
ruct
ion
0 46
4 11
40
00
00
578
Tota
l $0
$5
61
$138
$0
$0
$0
$0
$0
$6
99
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 106 of 144
Enha
ncem
ent
LIN
K
7006
54
SeaT
ac A
irpor
t Sec
ond
Elev
ato r
M
anag
ed b
y: O
pera
tions
Des
ign
and
cons
truct
a s
econ
d el
evat
or a
t the
eas
t sid
e of
the
SeaT
ac/A
irpor
t Sta
tion
pede
stria
n br
idge
.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: New
pro
ject
for $
6.1
milli
on fo
r des
ign
and
cons
truct
ion
of a
sec
ond
elev
ator
at
Airp
ort S
tatio
n.
Budg
et y
ear a
ctiv
ities
: C
omm
ence
the
elev
ator
des
ign
proc
ess
to in
clud
e si
te a
sses
smen
t, ut
ility
acce
ss, i
nitia
l per
mitt
ing
and
prel
imin
ary
engi
neer
ing
and
begi
n pr
ocur
emen
t pro
cess
to a
war
d co
ntra
ct.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $6
,070
20
20 :
2022
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$0
$7
45
$2,6
84
$2,6
42
$0
$0
$0
$0
$6,0
70
Tota
l $0
$7
45
$2,6
84
$2,6
42
$0
$0
$0
$0
$6,0
70
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$112
$1
12
$112
$0
$0
$0
$0
$3
37
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
632
126
84
0 0
0 0
843
50-C
onst
ruct
ion
0 0
2,44
5 2,
445
0 0
0 0
4,89
0 To
tal
$0
$745
$2
,684
$2
,642
$0
$0
$0
$0
$6
,070
Proj
ect R
isk
Asse
ssm
ent
Both
pro
ject
and
sch
edul
e ris
k ex
ist a
s a
the
proj
ect h
as n
ot c
ompl
eted
a c
ost e
stim
ate.
Sch
edul
e ris
k ex
ists
as
the
seco
nd e
leva
tor
will
have
to in
stal
led
durin
g re
gula
r ope
ratio
ns o
f the
exi
stin
g el
evat
or.
En
hanc
emen
t LI
NK
7006
76
Taco
ma
Link
Rad
io U
pgra
de
Man
aged
by:
Ope
ratio
ns
Des
ign,
inst
all.
conn
ect a
nd c
omm
issi
on a
new
low
-pow
er S
imul
cast
dig
ital m
obile
radi
o (D
MR
) rad
io s
yste
m a
t eac
h st
atio
n lin
king
th
e re
peat
ers
via
fiber
opt
ic c
able
. Ins
tall
a pa
ssiv
e re
peat
er a
t the
exi
stin
g tra
ctio
n po
wer
sub
stat
ion.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $7
48
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$748
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$7
48
$0
$0
$0
$0
$0
$0
$0
$748
To
tal
$748
$0
$0
$0
$0
$0
$0
$0
$7
48
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$22
$0
$0
$0
$0
$0
$0
$0
$22
50-C
onst
ruct
ion
726
0 0
0 0
0 0
0 72
6 To
tal
$748
$0
$0
$0
$0
$0
$0
$0
$7
48
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 107 of 144
Enha
ncem
ent
LIN
K
7006
84
Ligh
t Rai
l Veh
icle
Wire
less
Com
mun
icat
ion
Upg
rade
M
anag
ed b
y: O
pera
tions
Plan
and
inst
all a
wire
less
sol
utio
n th
at w
ill su
ppor
t tim
ely
trans
mis
sion
of a
utom
ated
pas
seng
er c
ount
(APC
) dat
a, li
ght r
ail v
ehic
le
(LR
V) m
aint
enan
ce in
form
atio
n, a
nd fu
ture
sig
nage
dat
a su
ch a
s pa
ssag
e al
erts
, em
erge
ncy
notif
icat
ions
and
oth
er im
porta
nt ri
der
aler
ts.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
05
2019
: 20
20
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$405
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $9
8 $0
$1
73
$0
$0
$0
$0
$0
$270
So
uth
King
49
0
86
0 0
0 0
0 13
4 To
tal
$146
$0
$2
59
$0
$0
$0
$0
$0
$405
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
30-F
inal
D
esig
n+Sp
ecifi
catio
ns$0
$0
$3
0 $0
$0
$0
$0
$0
$3
0
50-C
onst
ruct
ion
146
0 22
9 0
0 0
0 0
375
Tota
l $1
46
$0
$259
$0
$0
$0
$0
$0
$4
05
Proj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t LI
NK
7006
91
Ope
ratio
ns M
aint
enan
ce F
acili
ty (O
MF)
- Li
nk C
ontr
ol C
ente
r (LC
C)
Upg
rade
s M
anag
ed b
y: O
pera
tions
Afte
r bus
es le
ave
the
Dow
ntow
n Se
attle
Tra
nsit
Tunn
el in
201
9, th
e O
MF:
Cen
tral w
ill be
com
e th
e ne
w p
rimar
y lo
catio
n fo
r the
LC
C.
This
pro
ject
will
impl
emen
t upg
rade
s an
d en
hanc
emen
ts fo
r the
OM
F lo
catio
n to
allo
w fu
ll fu
nctio
nalit
y of
the
cont
rol c
ente
r at t
he
OM
F.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $2
16 th
ousa
nd to
upg
rade
vid
eo w
all.
Budg
et y
ear a
ctiv
ities
: Rem
ove
the
exis
ting
smal
l ove
rvie
w d
ispl
ay, i
nsta
ll a
full
size
and
feat
ure
vide
o w
all t
o up
date
d sp
ecifi
catio
ns,
and
perfo
rm o
ptio
n in
stal
latio
ns fo
r lar
ge s
cree
n m
onito
rs.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
00
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$616
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $3
3 $3
78
$0
$0
$0
$0
$0
$0
$411
So
uth
King
17
18
8 0
0 0
0 0
0 20
5 To
tal
$50
$566
$0
$0
$0
$0
$0
$0
$6
16
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$14
$0
$0
$0
$0
$0
$0
$14
30-F
inal
D
esig
n+Sp
ecifi
catio
ns50
00
00
00
0 50
50-C
onst
ruct
ion
0 55
30
00
00
0 55
3To
tal
$50
$566
$0
$0
$0
$0
$0
$0
$6
16
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 108 of 144
Enha
ncem
ent
LIN
K
7006
92
Ope
ratio
ns M
aint
enan
ce F
acili
ty (O
MF)
Exp
ande
d Pa
rkin
g M
anag
ed b
y: O
pera
tions
Des
ign
and
cons
truct
four
teen
new
par
king
spa
ces
on th
e ea
st s
ide
of th
e O
MF.
Est
ablis
h an
d in
stal
l a s
uita
ble
amou
nt o
f ele
ctric
al
vehi
cle
char
gers
in th
ose
spac
es fo
r use
by
agen
cy v
ehic
les
only
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
clo
seou
t act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $6
21
2019
: 20
20
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$621
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $3
44
$70
$0
$0
$0
$0
$0
$0
$415
So
uth
King
17
1 35
0
0 0
0 0
0 20
6 To
tal
$516
$1
05
$0
$0
$0
$0
$0
$0
$621
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$27
$46
$0
$0
$0
$0
$0
$0
$72
20-P
relim
Eng
inee
ring/
Env
Rev
iew
25
00
00
00
0 25
30-F
inal
D
esig
n+Sp
ecifi
catio
ns11
1 16
00
00
00
127
50-C
onst
ruct
ion
352
44
0 0
0 0
0 0
396
Tota
l $5
16
$105
$0
$0
$0
$0
$0
$0
$6
21
P roj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t LI
NK
7006
93
Ope
ratio
ns M
aint
enan
ce F
acili
ty (O
MF)
- R
enov
atio
ns
Man
aged
by:
Ope
ratio
ns
Ren
ovat
e th
e Li
nk O
MF
in S
eattl
e, in
clud
ing:
resi
ze e
nclo
sed
offic
es fo
r mor
e ef
ficie
nt u
sage
of s
pace
; cre
ate
addi
tiona
l wor
ksta
tions
; se
cure
the
area
aro
und
the
Link
Con
trol C
ente
r (LC
C);
and
regr
oup
divi
sion
s to
be
co-lo
cate
d fo
r gre
ater
effi
cien
cy.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $3
.8 m
illion
for i
ncre
asin
g O
MF
elec
trica
l cap
acity
and
ove
rhau
l an
d re
loca
tion
of h
eatin
g, v
entil
atio
n an
d ai
r con
ditio
ning
(HVA
C) u
nit.
Budg
et y
ear a
ctiv
ities
: Beg
in d
esig
n of
ele
ctric
al e
quip
men
t, al
ong
with
initi
al w
ork
on th
e H
VAC
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $7
,338
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
1,10
5 20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,985
$3
,777
$1
,657
$0
$0
$0
$0
$0
$7
,418
So
uth
King
98
6 1,
877
823
0 0
0 0
0 3,
687
Tota
l $2
,971
$5
,654
$2
,480
$0
$0
$0
$0
$0
$1
1,10
5
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$78
$413
$1
61
$0
$0
$0
$0
$0
$652
30
-Fin
al
Des
ign+
Spec
ifica
tions
494
464
225
0 0
0 0
0 1,
182
50-C
onst
ruct
ion
2,25
3 4,
413
1,69
3 0
0 0
0 0
8,35
8 55
-Con
stru
ctio
n Se
rvic
es
146
365
401
0 0
0 0
0 91
2 To
tal
$2,9
71
$5,6
54
$2,4
80
$0
$0
$0
$0
$0
$11,
105
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 109 of 144
Enha
ncem
ent
LIN
K
7006
97
LRV
Bet
wee
n C
ar B
arrie
rs
Man
aged
by:
Ope
ratio
ns
Proc
ure
and
inst
all p
latfo
rm m
ount
ed b
arrie
rs fo
r ins
talla
tion
at 2
1 Li
nk s
tatio
ns.
Fede
ral T
rans
it Au
thor
ity R
egul
atio
n 49
CFR
38.
85 re
quire
s ba
rrier
s on
the
plat
form
to p
reve
nt v
isua
lly im
paire
d rid
ers
from
mis
taki
ng
the
spac
e be
twee
n lig
ht ra
il ve
hicl
es a
s an
ope
n do
or.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
20
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$520
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $3
47
$0
$91
$0
$0
$0
$0
$0
$438
So
uth
King
65
0
17
0 0
0 0
0 82
To
tal
$412
$0
$1
08
$0
$0
$0
$0
$0
$520
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1
$0
$7
$0
$0
$0
$0
$0
$8
50-C
onst
ruct
ion
411
0 10
1 0
0 0
0 0
512
Tota
l $4
12
$0
$108
$0
$0
$0
$0
$0
$5
20
Proj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t LI
NK
7007
06
OM
F En
ergy
Effi
cien
cy
Man
aged
by:
Ope
ratio
ns
Rep
lace
exi
stin
g O
pera
tions
and
Mai
nten
ance
Fac
ility
(OM
F) s
hop
bay
light
ing
(met
al h
alid
e) w
ith L
ED fi
xtur
es, a
nd re
plac
e th
e di
rect
di
gita
l con
trols
on
the
HVA
C s
yste
m to
allo
w in
tegr
atio
n w
ith U
nion
Sta
tion
cont
rols
, to
incr
ease
ene
rgy
effic
ienc
y an
d re
duce
op
erat
ing
cost
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,098
20
19 :
2019
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,098
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $7
00
$0
$33
$0
$0
$0
$0
$0
$733
So
uth
King
34
8 0
17
0 0
0 0
0 36
5 To
tal
$1,0
48
$0
$50
$0
$0
$0
$0
$0
$1,0
98
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$1,0
48
$0
$50
$0
$0
$0
$0
$0
$1,0
98
Tota
l $1
,048
$0
$5
0 $0
$0
$0
$0
$0
$1
,098
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 110 of 144
Enha
ncem
ent
LIN
K
7007
13
LRV
Was
h B
ay M
odifi
catio
ns
Man
aged
by:
Ope
ratio
ns
Inst
all u
pgra
des
to th
e el
ectri
cal a
nd m
echa
nica
l equ
ipm
ent c
ompo
nent
s of
the
ink
light
rail
vehi
cle
(LR
V) c
ar w
ash
syst
em a
t the
Lin
k O
pera
tions
and
Mai
nten
ance
Fac
ility,
to p
rovi
de a
utom
atic
LR
V fo
rehe
ad c
lean
ing
and
elim
inat
e m
anua
l was
hing
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
00
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$300
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $2
00
$0
$0
$0
$0
$0
$0
$0
$200
So
uth
King
10
0 0
0 0
0 0
0 0
100
Tota
l $3
00
$0
$0
$0
$0
$0
$0
$0
$300
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$57
$0
$0
$0
$0
$0
$0
$0
$57
30-F
inal
D
esig
n+Sp
ecifi
catio
ns75
00
00
00
0 75
50-C
onst
ruct
ion
168
00
00
00
0 16
8To
tal
$300
$0
$0
$0
$0
$0
$0
$0
$3
00
P roj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t LI
NK
7007
30
Ope
ratio
ns &
Mai
nten
ance
Fac
ility
Lig
ht R
ail V
ehic
le L
ift
Man
aged
by:
Ope
ratio
ns
Des
ign,
pro
cure
and
inst
all a
sec
ond
lift i
n th
e Li
nk O
pera
tions
and
Mai
nten
ance
Fac
ility.
The
inst
alla
tion
of a
sec
ond
lift i
n su
ppor
t of
oper
atio
ns is
requ
ired
to a
ccom
mod
ate
sche
dule
d an
d un
sche
dule
d lig
ht ra
il ve
hicl
e (L
RV)
mai
nten
ance
nee
ds a
nd c
apac
ity.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e in
stal
latio
n of
bot
h lif
t hoi
st a
nd tu
rnta
ble,
incl
udin
g te
stin
g an
d co
mm
issi
onin
g.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$4
,898
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
,898
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $4
,898
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $3
,211
$9
68
$0
$0
$0
$0
$0
$0
$4,1
79
Sout
h Ki
ng
553
167
0 0
0 0
0 0
719
Tota
l $3
,764
$1
,134
$0
$0
$0
$0
$0
$0
$4
,898
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$835
$2
00
$0
$0
$0
$0
$0
$0
$1,0
35
20-P
relim
Eng
inee
ring/
Env
Rev
iew
15
6 0
0 0
0 0
0 0
156
30-F
inal
Des
ign+
Spec
ifica
tions
48
5 10
0 0
0 0
0 0
0 58
5
50-C
onst
ruct
ion
2,28
0 53
4 0
0 0
0 0
0 2,
814
55-C
onst
ruct
ion
Serv
ices
9
300
0 0
0 0
0 0
309
Tota
l $3
,764
$1
,134
$0
$0
$0
$0
$0
$0
$4
,898
Proj
ect R
isk
Asse
ssm
ent
Con
stru
ctab
ility
of p
roje
ct, g
iven
the
cons
train
ts o
f hav
ing
to in
stal
l the
lift
in a
n on
-goi
ng w
orki
ng e
nviro
nmen
t, cr
eate
s ch
alle
nges
in
both
sch
edul
e an
d co
st.
2020 Financial Plan & Proposed Budget 111 of 144
Enha
ncem
ent
LIN
K
7007
81
Non
-rev
enue
Sup
port
Veh
icle
s M
anag
ed b
y: O
pera
tions
Purc
hase
and
repl
ace
mai
nten
ance
sup
port
and
spec
ialty
sup
port
vehi
cles
to im
prov
e m
aint
enan
ce e
ffici
enci
es fo
r the
Lin
k lig
ht ra
il sy
stem
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Est
ablis
h sp
ecifi
catio
ns a
nd p
rocu
re 6
spe
cial
ty tr
ucks
, 2 tr
ansi
t van
s, a
nd 6
spo
rts u
tility
veh
icle
(SU
V).
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $6
,149
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $6
,149
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,192
$2
,004
$8
92
$0
$0
$0
$0
$0
$4,0
89
Sout
h Ki
ng
601
1,01
0 45
0 0
0 0
0 0
2,06
0 To
tal
$1,7
93
$3,0
14
$1,3
42
$0
$0
$0
$0
$0
$6,1
49
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
70-V
ehic
les
$1,7
93
$3,0
14
$1,3
42
$0
$0
$0
$0
$0
$6,1
49
Tota
l $1
,793
$3
,014
$1
,342
$0
$0
$0
$0
$0
$6
,149
P roj
ect R
isk
Asse
ssm
ent
The
grow
th o
f the
age
ncy
and
the
pote
ntia
l for
cha
ngin
g ve
hicl
e ne
eds
coul
d ha
ve b
udge
t im
plic
atio
ns.
En
hanc
emen
t LI
NK
7007
93
Sign
age
Impr
ovem
ents
M
anag
ed b
y: D
ECM
Inst
all,
mod
ify, a
nd u
pgra
de s
igna
ge a
t new
and
exi
stin
g Li
nk a
nd S
ound
er s
tatio
ns a
nd ti
cket
ven
ding
mac
hine
(TVM
) loc
atio
ns to
im
prov
e w
ayfin
ding
and
refle
ct s
yste
m e
xpan
sion
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $1
61.7
thou
sand
for a
dditi
onal
202
0 ac
tiviti
es to
upd
ate
Soun
der
cust
omer
pan
els
syst
em-w
ide
and
refa
ce th
e ex
it si
gnag
e at
U L
ink
and
Red
Lin
e st
atio
ns.
Budg
et y
ear a
ctiv
ities
: Com
plet
e Ai
rpor
t way
findi
ng d
esig
n, re
face
exi
t sig
nage
at U
nive
rsity
Lin
k an
d C
entra
l Lin
k St
atio
ns,
upda
te
Soun
der c
usto
mer
pan
els
syst
em-w
ide,
and
com
plet
e up
date
s to
real
tim
e Li
nk s
igna
ge.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,131
20
19 :
2041
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,293
20
20 :
2041
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$2
$1
$1
$0
$0
$0
$0
$0
$4
Nor
th K
ing
290
134
88
68
13
3 2
20
618
Sout
h Ki
ng
312
144
95
73
13
3 3
21
663
East
Kin
g 0
0 0
0 0
0 0
0 1
Pier
ce3
11
10
00
07
T ota
l $6
07
$280
$1
85
$143
$2
6 $5
$5
$4
1 $1
,293
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$115
$2
1 $2
1 $2
1 $2
1 $5
$5
$0
$2
09
30-F
inal
D
esig
n+Sp
ecifi
catio
ns23
8 9
9 0
0 0
0 38
29
4
50-C
onst
ruct
ion
255
250
155
122
5 0
0 3
790
Tota
l $6
07
$280
$1
85
$143
$2
6 $5
$5
$4
1 $1
,293
Proj
ect R
isk
Asse
ssm
ent
Coo
rdin
atio
n w
ith g
over
nmen
t ent
ities
and
juris
dict
ions
to e
nsur
e co
nsis
tenc
y an
d co
ntin
uity
of t
heir
sign
age
requ
irem
ents
.
2020 Financial Plan & Proposed Budget 112 of 144
Enha
ncem
ent
SOU
ND
ER
3000
11
Posi
tive
Trai
n C
ontr
ol
Man
aged
by:
DEC
M
Inte
grat
e co
mm
and,
con
trol,
com
mun
icat
ions
, and
info
rmat
ion
syst
ems
for c
ontro
lling
pass
enge
r tra
in m
ovem
ents
with
saf
ety,
se
curit
y, p
reci
sion
, and
effi
cien
cy. T
hese
sys
tem
s w
ill im
prov
e ra
ilroa
d sa
fety
by
sign
ifica
ntly
redu
cing
the
prob
abilit
y of
col
lisio
ns
betw
een
train
s, c
asua
lties
to ra
ilway
wor
kers
and
dam
age
to th
eir e
quip
men
t, an
d ov
er s
peed
acc
iden
ts.
Fede
ral r
egul
atio
ns h
as m
anda
ted
that
pos
itive
trai
n co
ntro
l (PT
C) b
e op
erat
iona
l on
all p
asse
nger
rail
syst
ems
by th
e en
d of
D
ecem
ber 2
018.
Bud
get d
ispl
ayed
bey
ond
2019
is c
onsi
dere
d su
rplu
s.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
pro
ject
clo
seou
t act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$5
3,05
4 Ba
selin
e:
2016
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
3,05
4 20
19 :
2018
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $5
3,05
4 20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$3,0
63
$16
$0
$0
$0
$0
$0
$688
$3
,767
So
uth
King
1,
898
10
0 0
0 0
0 42
6 2,
334
Pier
ce
38,1
83
195
0 0
0 0
0 8,
576
46,9
53
Tota
l $4
3,14
4 $2
20
$0
$0
$0
$0
$0
$9,6
90
$53,
054
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1,8
50
$150
$0
$0
$0
$0
$0
$2
38
$2,2
38
30-F
inal
D
esig
n+Sp
ecifi
catio
ns22
6 0
0 0
0 0
0 52
27
9
35-T
hird
Par
ty
3,90
0 0
0 0
0 0
0 36
7 4,
267
50-C
onst
ruct
ion
36,0
44
45
0 0
0 0
0 2,
905
38,9
95
55-C
onst
ruct
ion
Serv
ices
99
5 25
0
0 0
0 0
3,04
2 4,
062
80-S
yste
m T
estin
g+St
artu
p 12
9 0
0 0
0 0
0 1,
361
1,49
0 90
-Con
tinge
ncy
0 0
0 0
0 0
0 1,
725
1,72
5 To
tal
$43,
144
$220
$0
$0
$0
$0
$0
$9
,690
$5
3,05
4
Proj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t SO
UN
DER
7007
08
Cus
tom
er E
mer
genc
y St
atio
ns
Man
aged
by:
Ope
ratio
ns
Inst
alla
tion
of c
usto
mer
em
erge
ncy
stat
ions
at t
he K
ent a
nd A
ubur
n pa
rkin
g ga
rage
s.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $8
00
2019
: 20
18
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$800
20
20 :
2018
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$2
43
$0
$557
$0
$0
$0
$0
$0
$8
00
Tota
l $2
43
$0
$557
$0
$0
$0
$0
$0
$8
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$243
$0
$5
57
$0
$0
$0
$0
$0
$800
To
tal
$243
$0
$5
57
$0
$0
$0
$0
$0
$800
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 113 of 144
Enha
ncem
ent
SOU
ND
ER
7007
10
Loco
mot
ive
Inbo
ard
Cam
eras
M
anag
ed b
y: O
pera
tions
Com
ply
with
Fed
eral
Rai
lroad
Adm
inis
tratio
n ru
le re
quiri
ng in
boar
d fa
cing
cam
eras
inst
alle
d in
loco
mot
ives
to m
onito
r the
act
ions
of
the
engi
neer
s in
han
dlin
g a
train
. Thi
s pr
ojec
t is
for a
tota
l of 4
1 pi
eces
of e
quip
men
t.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Ins
tall
cam
eras
on
Soun
der l
ocom
otiv
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
00
2019
: 20
20
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$300
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$0
$44
$0
$0
$0
$0
$0
$0
$44
Sout
h Ki
ng
0 14
3 0
0 0
0 0
0 14
3 Pi
erce
0
114
0 0
0 0
0 0
114
Tota
l $0
$3
00
$0
$0
$0
$0
$0
$0
$300
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$30
$0
$0
$0
$0
$0
$0
$30
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
300
00
00
0 30
50-C
onst
ruct
ion
0 24
00
00
00
0 24
0To
tal
$0
$300
$0
$0
$0
$0
$0
$0
$3
00
P roj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t SO
UN
DER
7007
11
Soun
der P
asse
nger
Em
erge
ncy
Inte
rcom
M
anag
ed b
y: O
pera
tions
Upg
rade
com
mun
icat
ion
syst
em o
n al
l car
s w
ith a
Pas
seng
er E
mer
genc
y In
terc
om (P
EI) s
yste
m th
at w
ill en
able
pas
seng
ers
to s
peak
di
rect
ly to
the
cond
ucto
r ins
tead
of t
he e
ngin
eer.
New
FR
A ru
le re
quire
s pa
ssen
gers
to b
e ab
le to
spe
ak d
irect
ly w
ith a
trai
n cr
ew m
embe
r. Th
e ne
w B
omba
rdie
r Cab
Car
s ar
e co
min
g w
ith a
sys
tem
to m
eet t
his
new
rule
. How
ever
, thi
s sy
stem
will
onl
y al
low
pas
seng
ers
to ta
lk d
irect
ly w
ith th
e en
gine
er, n
ot th
e co
nduc
tor.
Ther
e is
an
“Em
erge
ncy
Ord
er” p
ut o
ut b
y th
e FR
A th
at p
rohi
bits
an
engi
neer
from
bei
ng d
istu
rbed
by
a ce
ll ph
one.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Upg
rade
com
mun
icat
ion
syst
em in
Sou
nder
cab
car
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,500
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,500
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$0
$219
$0
$0
$0
$0
$0
$0
$2
19
Sout
h Ki
ng
0 71
3 0
0 0
0 0
0 71
3 Pi
erce
0
569
0 0
0 0
0 0
569
Tota
l $0
$1
,500
$0
$0
$0
$0
$0
$0
$1
,500
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$150
$0
$0
$0
$0
$0
$0
$1
50
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
300
0 0
0 0
0 0
300
50-C
onst
ruct
ion
0 1,
050
0 0
0 0
0 0
1,05
0 To
tal
$0
$1,5
00
$0
$0
$0
$0
$0
$0
$1,5
00
P roj
ect R
isk
Asse
ssm
ent
Sche
dulin
g ad
equa
te re
sour
ces
to th
e pr
ojec
t has
resu
lted
in a
one
yea
r del
ay o
f the
pro
ject
. R
esou
rce
avai
labi
lity
cont
inue
s to
be
a ris
k to
pro
ject
sch
edul
e.
2020 Financial Plan & Proposed Budget 114 of 144
Enha
ncem
ent
SOU
ND
ER
7007
24
Puya
llup
Stat
ion
LED
Lig
htin
g M
anag
ed b
y: O
pera
tions
Inst
all e
nerg
y ef
ficie
nt li
ghtin
g at
Puy
allu
p St
atio
n.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
78
2019
: 20
18
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$178
20
20 :
2018
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$1
51
$0
$27
$0
$0
$0
$0
$0
$178
To
tal
$151
$0
$2
7 $0
$0
$0
$0
$0
$1
78
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$3
$0
$0
$0
$0
$0
$0
$0
$3
50-C
onst
ruct
ion
148
0 27
0
0 0
0 0
175
Tota
l $1
51
$0
$27
$0
$0
$0
$0
$0
$178
P roj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t SO
UN
DER
7007
25
Sum
ner S
tatio
n LE
D L
ight
ing
Man
aged
by:
Ope
ratio
ns
Inst
all e
nerg
y ef
ficie
nt li
ghtin
g at
Sum
ner S
tatio
n. W
ork
will
resu
lt in
rece
ivin
g a
utilit
y in
cent
ive
base
d up
on th
e en
ergy
redu
ctio
n ac
hiev
ed a
nd w
ill re
duce
ene
rgy
cons
umpt
ion
on a
ong
oing
bas
is.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
34
2019
: 20
17
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$134
20
20 :
2017
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$1
04
$0
$30
$0
$0
$0
$0
$0
$134
To
tal
$104
$0
$3
0 $0
$0
$0
$0
$0
$1
34
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$3
$0
$0
$0
$0
$0
$0
$0
$3
50-C
onst
ruct
ion
102
0 30
0
0 0
0 0
131
Tota
l $1
04
$0
$30
$0
$0
$0
$0
$0
$134
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 115 of 144
Enha
ncem
ent
SOU
ND
ER
7007
26
Ken
t Sta
tion
Plat
form
Lig
htin
g M
anag
ed b
y: O
pera
tions
Inst
all e
nerg
y ef
ficie
nt li
ghtin
g at
Ken
t Sta
tion
to in
clud
e up
grad
es to
the
plat
form
, sur
face
lots
, ped
estri
an b
ridge
, and
bus
loop
are
as.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
36
2019
: 20
18
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$236
20
20 :
2018
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$1
40
$0
$96
$0
$0
$0
$0
$0
$236
To
tal
$140
$0
$9
6 $0
$0
$0
$0
$0
$2
36
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$140
$0
$9
6 $0
$0
$0
$0
$0
$2
36
Tota
l $1
40
$0
$96
$0
$0
$0
$0
$0
$236
P roj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t SO
UN
DER
7007
27
Ken
t Sta
tion
Park
ing
Lot P
avin
g M
anag
ed b
y: O
pera
tions
Des
ign
and
inst
all p
aved
and
land
scap
ed c
omm
uter
par
king
for a
n ad
ditio
nal 3
6 st
anda
rd s
pace
s, 1
com
pact
spa
ce, a
nd 2
Am
eric
ans
with
Dis
abilit
ies
Act (
ADA)
spa
ces.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $7
00
2019
: 20
18
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$700
20
20 :
2018
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$7
6 $0
$6
24
$0
$0
$0
$0
$0
$700
To
tal
$76
$0
$624
$0
$0
$0
$0
$0
$7
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$1
$0
$1
$0
$0
$0
$0
$0
$2
20-P
relim
Eng
inee
ring/
Env
Rev
iew
75
0
63
0 0
0 0
0 13
8
50-C
onst
ruct
ion
0 0
560
0 0
0 0
0 56
0 To
tal
$76
$0
$624
$0
$0
$0
$0
$0
$7
00
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 116 of 144
Enha
ncem
ent
REG
ION
AL
EXPR
ESS
5X26
1 B
us M
aint
enan
ce F
acili
ty
Man
aged
by:
Ope
ratio
ns
Expa
nd S
ound
Tra
nsit'
s fle
et m
aint
enan
ce c
apac
ity th
roug
h fu
ndin
g co
ntrib
utio
ns to
faci
litie
s m
anag
ed b
y th
ird p
arty
ser
vice
pr
ovid
ers.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
2,03
3 20
19 :
2023
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $2
2,03
3 20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$1,4
84
$0
$1,9
98
$0
$0
$0
$0
$0
$3,4
81
Sout
h Ki
ng
1,04
2 0
1,40
3 0
0 0
0 0
2,44
6 Ea
st K
ing
4,45
1 0
5,99
3 0
0 0
0 0
10,4
44
Pier
ce
2,41
3 0
3,24
9 0
0 0
0 0
5,66
2 To
tal
$9,3
90
$0
$12,
643
$0
$0
$0
$0
$0
$22,
033
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$26
$0
$360
$0
$0
$0
$0
$0
$3
86
20-P
relim
Eng
inee
ring/
Env
Rev
iew
8
0 13
3 0
0 0
0 0
141
40-R
ow A
cqui
sitio
n+Pe
rmits
59
0 0
0 0
0 0
0 59
50
-Con
stru
ctio
n 9,
297
0 12
,150
0
0 0
0 0
21,4
47
Tota
l $9
,390
$0
$1
2,64
3 $0
$0
$0
$0
$0
$2
2,03
3
P roj
ect R
isk
Asse
ssm
ent
The
sche
dule
is fl
exib
le a
s it
relie
s on
par
tner
s to
sub
mit
proj
ects
for p
artic
ipat
ion.
The
sch
edul
es d
ates
can
cha
nge
if no
pro
ject
s ar
e pl
anne
d.
En
hanc
emen
t R
EGIO
NAL
EX
PRES
S 70
0689
Pi
erce
Tra
nsit
- Glo
bal P
ositi
onin
g Sy
stem
Rep
eate
r M
anag
ed b
y: O
pera
tions
Proc
ure
and
inst
all r
adio
infra
stru
ctur
e on
radi
o to
wer
s ow
ned
or u
sed
by P
ierc
e Tr
ansi
t nec
essa
ry to
com
mun
icat
e w
ith S
T Ex
pres
s bu
ses
oper
ated
by
Pier
ce T
rans
it ou
tsid
e of
Pie
rce
Tran
sit’s
sta
ndar
d da
ta ra
dio
rang
e. T
his
is a
sha
red
cost
with
Pie
rce
Tran
sit.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et Y
ear A
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,662
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,662
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$0
$0
$1
,662
$0
$0
$0
$0
$0
$1
,662
To
tal
$0
$0
$1,6
62
$0
$0
$0
$0
$0
$1,6
62
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$0
$0
$1,6
62
$0
$0
$0
$0
$0
$1,6
62
Tota
l $0
$0
$1
,662
$0
$0
$0
$0
$0
$1
,662
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
sig
nific
ant s
ched
ule
risk
as S
ound
Tra
nsit
is a
fina
ncia
l con
tribu
tor t
o th
e pr
ojec
t but
Pie
rce
Tran
sit w
ill le
ad th
e ef
fort
and
proj
ect m
anag
e th
e in
stal
latio
n th
roug
h co
mpl
etio
n. S
ound
Tra
nsit
has
no in
fluen
ce in
to th
e sc
hedu
le o
r ins
talla
tion.
2020 Financial Plan & Proposed Budget 117 of 144
Enha
ncem
ent
REG
ION
AL
EXPR
ESS
7006
90
Com
mun
ity T
rans
it - O
n-B
oard
Com
mun
icat
ion
Upg
rade
M
anag
ed b
y: O
pera
tions
Purc
hase
and
inst
all n
ew o
n-bo
ard
com
mun
icat
ions
and
dat
a co
llect
ion
com
pone
nts,
incl
udin
g ba
se in
frast
ruct
ure,
on
buse
s ba
sed
at
Com
mun
ity T
rans
it.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e in
stal
latio
n of
on
boar
d co
mm
unic
atio
ns a
nd d
ata
colle
ctio
n co
mpo
nent
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
,080
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $2
,080
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$1,0
47
$1,0
33
$0
$0
$0
$0
$0
$0
$2,0
80
Tota
l $1
,047
$1
,033
$0
$0
$0
$0
$0
$0
$2
,080
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$1,0
47
$1,0
33
$0
$0
$0
$0
$0
$0
$2,0
80
Tota
l $1
,047
$1
,033
$0
$0
$0
$0
$0
$0
$2
,080
P roj
ect R
isk
Asse
ssm
ent
The
upgr
ade
is in
tend
ed fo
r the
cur
rent
flee
t. T
here
will
be s
ome
sche
dule
risk
as
each
bus
will
have
to b
e pu
lled
from
the
wor
king
se
rvic
e fle
et to
hav
e th
e co
mm
unic
atio
n up
grad
e in
stal
led.
Bus
ava
ilabi
lity
for t
he in
stal
l will
be im
porta
nt.
Inte
rgov
ernm
enta
l ag
reem
ent i
s in
pro
gres
s.
En
hanc
emen
t O
THER
6000
80
Bik
e Pa
rkin
g Pr
ogra
m
Man
aged
by:
PEP
D
Prov
ide
bicy
cle
park
ing
at S
ound
Tra
nsit
faci
litie
s in
resp
onse
to d
eman
d or
for m
aint
enan
ce, r
epla
cem
ent o
r upg
rade
nee
ds.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Bik
e lo
cker
s in
stal
latio
n at
Bon
ney
Lake
Par
k an
d R
ide,
Edm
onds
Sta
tion,
Issa
quah
Tra
nsit
Cen
ter,
Mer
cer
Isla
nd P
ark
and
Rid
e, M
ukilt
eo S
tatio
n, T
ukw
ila In
tern
atio
nal B
lvd
stat
ion.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $9
,700
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $9
,700
20
20 :
2023
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,568
$1
,535
$9
19
$1,3
49
$1,1
46
$0
$0
$0
$6,5
17
East
Kin
g 76
6 74
9 44
9 65
9 56
0 0
0 0
3,18
3 To
tal
$2,3
34
$2,2
84
$1,3
67
$2,0
08
$1,7
06
$0
$0
$0
$9,7
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
01-O
pera
tion+
Mai
nten
ance
$0
$0
$6
7 $1
08
$312
$0
$0
$0
$4
88
10-A
genc
y Ad
min
istra
tion
104
100
100
100
96
0 0
0 50
0 30
-Fin
al
Des
ign+
Spec
ifica
tions
0 0
100
100
300
0 0
0 50
0
50-C
onst
ruct
ion
2,23
1 2,
184
1,10
0 1,
700
998
0 0
0 8,
212
Tota
l $2
,334
$2
,284
$1
,367
$2
,008
$1
,706
$0
$0
$0
$9
,700
P roj
ect R
isk
Asse
ssm
ent
This
pro
ject
is fo
cuse
d on
add
ress
ing
loca
lized
hig
h de
man
d fo
r bik
e lo
cker
s in
spe
cific
are
as.
The
tech
nolo
gy is
pro
vide
d by
one
ve
ndor
and
is d
epen
dent
on
the
vend
or's
abi
lity
to p
rovi
de a
nd s
uppo
rt th
e eq
uipm
ent a
nd th
e so
ftwar
e.
2020 Financial Plan & Proposed Budget 118 of 144
Enha
ncem
ent
OTH
ER
6000
84
Pass
enge
r Inf
orm
atio
n M
anag
emen
t Sys
tem
M
anag
ed b
y: IT
S
Des
ign
and
impl
emen
t a d
igita
l inf
orm
atio
n sy
stem
for s
harin
g pa
ssen
ger u
sage
dat
a to
cre
ate
a be
tter u
ser e
xper
ienc
e an
d a
mor
e ef
ficie
nt m
ulti-
mod
al tr
ansi
t sys
tem
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Est
ablis
h pr
elim
inar
y en
gine
erin
g m
ilest
ones
, dev
elop
and
refin
e pr
ojec
t sco
pe a
nd d
eter
min
e pr
ogra
m
inte
rface
requ
irem
ents
with
var
ious
age
ncy
affe
cted
sys
tem
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
9,57
6 20
19 :
2025
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $4
9,57
6 20
20 :
2025
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $5
,072
$8
,958
$9
,051
$6
,447
$1
1,05
1 $8
,446
$5
51
$0
$49,
576
Tota
l $5
,072
$8
,958
$9
,051
$6
,447
$1
1,05
1 $8
,446
$5
51
$0
$49,
576
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$3,0
50
$551
$5
51
$551
$5
51
$551
$5
51
$0
$6,3
55
20-P
relim
Eng
inee
ring/
Env
Rev
iew
1,
062
0 0
0 0
0 0
0 1,
062
30-F
inal
Des
ign+
Spec
ifica
tions
96
0 90
7 0
0 0
0 0
0 1,
867
50-C
onst
ruct
ion
0 7,
500
8,50
0 5,
896
10,5
00
7,89
6 0
0 40
,292
To
tal
$5,0
72
$8,9
58
$9,0
51
$6,4
47
$11,
051
$8,4
46
$551
$0
$4
9,57
6
P roj
ect R
isk
Asse
ssm
ent
The
proj
ect i
s ju
st b
egin
ning
to e
nter
a d
isco
very
pha
se o
f the
pro
ject
to d
efin
e th
e br
eadt
h of
impa
ct th
is p
rogr
am w
ill ha
ve a
cros
s 4
mod
es -
Link
, Sou
nder
, Bus
Rap
id T
rans
it an
d R
egio
nal E
xpre
ss.
The
scop
e of
the
proj
ect a
nd e
stim
ate
of c
ost t
o de
liver
the
unde
fined
sco
pe c
an c
reat
e co
st v
olat
ility
due
to th
e un
certa
inty
. Th
e pr
ogra
m w
ill be
follo
win
g a
phas
e ga
te p
roce
ss to
ens
ure
key
deci
sion
mak
ers
are
invo
lved
dur
ing
the
scop
ing
and
prel
imin
ary
engi
neer
ing
proc
esse
s.
En
hanc
emen
t O
THER
6000
85
SOD
O/M
LK H
azar
d M
itiga
tion
Man
aged
by:
DEC
M
Vario
us a
t-gra
de c
ross
ings
in 2
016
and
early
201
7 m
et th
e th
resh
old
for U
nacc
epta
ble
Haz
ardo
us C
ondi
tions
. As
a re
sult,
thre
e So
und
Tran
sit d
epar
tmen
ts (D
esig
n En
gine
erin
g &
Con
stru
ctio
n M
anag
emen
t, Sa
fety
and
Qua
lity
Assu
ranc
e, a
nd O
pera
tions
) and
Se
attle
’s D
epar
tmen
t of T
rans
porta
tion
(SD
OT)
par
tner
ed to
ass
ess
the
perfo
rman
ce o
f at-g
rade
cro
ssin
gs s
yste
m w
ide
and
iden
tify
oppo
rtuni
ties
for e
nhan
cem
ents
and
impl
emen
t rem
edie
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Add
ress
ille
gal l
eft t
urns
alo
ng M
artin
Lut
her K
ing
(MLK
), up
grad
e pe
dest
rian
war
ning
sig
ns, i
nsta
ll se
cond
trai
n w
arni
ng d
evic
es a
t bus
way
and
MLK
sta
tions
. Ins
tall
clos
e ci
rcui
t tel
evis
ion
(CC
TV) c
amer
as a
t Roy
al B
roug
ham
, Hol
gate
, Lan
der,
Oth
ello
, and
Hen
ders
on.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
,136
20
19 :
2019
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $3
,136
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,036
$6
10
$1,4
90
$0
$0
$0
$0
$0
$3,1
36
Tota
l $1
,036
$6
10
$1,4
90
$0
$0
$0
$0
$0
$3,1
36
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$201
$1
00
$199
$0
$0
$0
$0
$0
$5
00
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
0 33
1 0
0 0
0 0
331
50-C
onst
ruct
ion
835
510
935
0 0
0 0
0 2,
280
55-C
onst
ruct
ion
Serv
ices
0
0 25
0
0 0
0 0
25
Tota
l $1
,036
$6
10
$1,4
90
$0
$0
$0
$0
$0
$3,1
36
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 119 of 144
Enha
ncem
ent
OTH
ER
6001
33
Park
ing
Man
agem
ent P
rogr
am
Man
aged
by:
PEP
D
Impl
emen
t par
king
man
agem
ent f
or S
ound
Tra
nsit-
owne
d pa
rkin
g fa
cilit
ies.
Par
king
man
agem
ent i
nclu
des
char
ging
for p
arki
ng (d
aily
ch
arge
s an
d m
onth
ly p
erm
ittin
g); c
olle
ctin
g an
d di
ssem
inat
ing
park
ing
capa
city
info
rmat
ion;
and
val
idat
ing
that
driv
ers
park
ing
car a
t ou
r fac
ilitie
s ar
e us
ing
trans
it af
ter t
hey
park
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: New
pro
gram
for $
13.7
milli
on to
man
age
park
ing
at S
T ow
ned
faci
litie
s.
Budg
et y
ear a
ctiv
ities
: Per
mits
mig
ratio
n co
re d
eliv
ery;
Pay
men
t Man
agem
ent S
yste
m in
stal
latio
n co
re d
eliv
ery;
Par
king
Ove
rsig
ht
man
agem
ent;
Park
ing
Enfo
rcem
ent H
W in
stal
l and
mai
nten
ance
, enf
orce
men
t and
veh
icle
; Goo
d2G
0 op
tiona
l del
iver
y, a
nd C
usto
mer
in
form
atio
n fa
bric
atio
n an
d in
stal
latio
n.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
Co
mpl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
3,69
2 20
20 :
2024
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $0
$1
,926
$1
,555
$2
,336
$4
,291
$3
,586
$0
$0
$1
3,69
2 To
tal
$0
$1,9
26
$1,5
55
$2,3
36
$4,2
91
$3,5
86
$0
$0
$13,
692
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
01-O
pera
tion+
Mai
nten
ance
$0
$3
50
$788
$1
,225
$1
,575
$1
,575
$0
$0
$5
,513
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
0 1,
576
467
811
2,21
6 1,
511
0 0
6,58
0
35-T
hird
Par
ty
0 0
0 0
200
200
0 0
400
50-C
onst
ruct
ion
0 0
300
300
300
300
0 0
1,20
0 To
tal
$0
$1,9
26
$1,5
55
$2,3
36
$4,2
91
$3,5
86
$0
$0
$13,
692
P roj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t O
THER
6001
45
Des
ign
Crit
eria
Man
ual U
pdat
e M
anag
ed b
y: D
ECM
Coo
rdin
ate,
adm
inis
ter a
nd u
pdat
e m
ultip
le s
tand
ard
docu
men
ts to
incl
ude
the
desi
gn c
riter
ia m
anua
l (D
CM
), en
gine
erin
g pr
oced
ures
(E
Ps),
stan
dard
spe
cific
atio
ns a
nd m
any
othe
r doc
umen
ts.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: New
pro
ject
of $
300
thou
sand
to s
uppo
rt th
e up
date
of t
he d
esig
n cr
iteria
m
anua
l.
Budg
et y
ear a
ctiv
ities
: Pr
ocur
e a
cons
ulta
nt to
ser
ve a
s a
subj
ect m
atte
r exp
ert r
elat
ed to
sta
ndar
ds a
nd te
chni
cal s
tudi
es, d
rafti
ng
supp
ort,
rese
arch
, and
arc
hite
ctur
al re
nder
ings
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $2
00
2020
: 20
20
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $0
$2
00
$0
$0
$0
$0
$0
$0
$200
To
tal
$0
$200
$0
$0
$0
$0
$0
$0
$2
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$200
$0
$0
$0
$0
$0
$0
$2
00
Tota
l $0
$2
00
$0
$0
$0
$0
$0
$0
$200
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 120 of 144
Enha
ncem
ent
OTH
ER
7006
65
Vide
o M
anag
emen
t Sys
tem
Upg
rade
M
anag
ed b
y: O
pera
tions
Upg
rade
the
exis
ting
Vide
o M
anag
emen
t Sys
tem
cur
rent
ly b
eing
use
d in
the
Secu
rity
Ope
ratio
ns C
ente
r to
mon
itor a
nd in
vest
igat
e in
cide
nts
at a
ll So
unde
r, Ta
com
a Li
nk, S
T Ex
pres
s Bu
s an
d So
und
Tran
sit o
ffice
loca
tions
. Ins
tall
vide
o an
alyt
ics
softw
are
to
max
imiz
e vi
ewer
atte
ntio
n to
pot
entia
l inc
iden
ts.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $9
80 th
ousa
nd fo
r vid
eo a
naly
tics
softw
are
inst
alla
tion.
Budg
et y
ear a
ctiv
ities
: Ins
talla
tion
of th
e vi
deo
anal
ytic
s so
ftwar
e th
at w
ill si
t on
top
of th
e ex
istin
g vi
deo
man
agem
ent u
pgra
de p
roje
ct.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $9
00
2019
: 20
20
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$1,8
80
2020
: 20
21
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $9
00
$390
$5
90
$0
$0
$0
$0
$0
$1,8
80
Tota
l $9
00
$390
$5
90
$0
$0
$0
$0
$0
$1,8
80
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$900
$3
90
$590
$0
$0
$0
$0
$0
$1
,880
To
tal
$900
$3
90
$590
$0
$0
$0
$0
$0
$1
,880
P roj
ect R
isk
Asse
ssm
ent
N/A
.
En
hanc
emen
t O
THER
7006
85
Ever
ett S
tatio
n Se
curit
y Im
prov
emen
ts
Man
aged
by:
Ope
ratio
ns
Proc
ure
and
inst
all 4
0 C
CTV
Cam
eras
and
ass
ocia
ted
reco
rdin
g eq
uipm
ent.
Inst
all 1
4 C
ES (C
usto
mer
Em
erge
ncy
Stat
ions
) in
area
s ar
ound
the
stat
ion.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
89
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$289
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$289
$0
$0
$0
$0
$0
$0
$0
$2
89
Tota
l $2
89
$0
$0
$0
$0
$0
$0
$0
$289
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$289
$0
$0
$0
$0
$0
$0
$0
$2
89
Tota
l $2
89
$0
$0
$0
$0
$0
$0
$0
$289
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 121 of 144
Enha
ncem
ent
OTH
ER
7006
86
Secu
rity
Rad
io S
yste
m
Man
aged
by:
Ope
ratio
ns
Proc
ure,
upg
rade
and
enh
ance
Sou
nd T
rans
it 's
sec
urity
radi
o sy
stem
s an
d eq
uipm
ent f
or e
xpan
sion
of s
ecur
ity s
ervi
ces
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e in
stal
latio
n of
equ
ipm
ent.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,253
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,253
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $2
45
$1,0
08
$0
$0
$0
$0
$0
$0
$1,2
53
Tota
l $2
45
$1,0
08
$0
$0
$0
$0
$0
$0
$1,2
53
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$245
$1
,008
$0
$0
$0
$0
$0
$0
$1
,253
To
tal
$245
$1
,008
$0
$0
$0
$0
$0
$0
$1
,253
P roj
ect R
isk
Asse
ssm
ent
Som
e ris
k ex
ists
giv
en th
e ne
ed fo
r com
patib
ility
to o
ur s
yste
ms
affe
ctin
g sc
hedu
le.
Fina
ncia
l ris
k is
min
imiz
ed b
ecau
se th
e w
ork
is
larg
ely
cove
red
thro
ugh
a fe
dera
l gra
nt.
En
hanc
emen
t O
THER
7006
87
Secu
rity
Ope
ratio
ns C
ente
r - V
ideo
Mon
itorin
g Im
prov
emen
ts
Man
aged
by:
Ope
ratio
ns
Inst
all a
ppro
xim
atel
y 10
add
ition
al m
onito
rs in
the
secu
rity
oper
atio
ns c
ente
r, as
soci
ated
har
dwar
e an
d vi
deo
proc
essi
ng e
quip
men
t. R
emov
e ol
d eq
uipm
ent a
s ne
cess
ary.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pr
ojec
t is
com
plet
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
41
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$241
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $2
41
$0
$0
$0
$0
$0
$0
$0
$241
To
tal
$241
$0
$0
$0
$0
$0
$0
$0
$2
41
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$241
$0
$0
$0
$0
$0
$0
$0
$2
41
Tota
l $2
41
$0
$0
$0
$0
$0
$0
$0
$241
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 122 of 144
Enha
ncem
ent
OTH
ER
7006
88
LED
Lig
htin
g Pr
ogra
m
Man
aged
by:
Ope
ratio
ns
Upg
rade
exi
stin
g lig
htin
g fix
ture
s at
sel
ecte
d ST
ow
ned
stat
ions
to L
ight
Em
ittin
g D
iode
(LED
) bas
ed fi
xtur
es to
redu
ce a
nnua
l ene
rgy
cost
s an
d m
aint
enan
ce.
Stat
ions
incl
ude;
Uni
vers
ity o
f Was
hing
ton,
Tuk
wila
Inte
rnat
iona
l Blv
d, A
irpor
t, M
t. Ba
ker,
Col
umbi
a C
ity, O
thel
lo, R
aine
r Bea
ch li
nk
light
rail
stat
ions
, Ken
t Sou
nder
sta
tion
and
Mou
ntla
ke T
erra
ce R
egio
nal E
xpre
ss s
tatio
n.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Lig
htin
g re
trofit
at K
ent G
arag
e an
d up
grad
e of
ligh
ting
fixtu
res
at M
ount
lake
Ter
race
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,500
20
19 :
2021
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,500
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$4
09
$245
$8
46
$0
$0
$0
$0
$0
$1,5
00
Tota
l $4
09
$245
$8
46
$0
$0
$0
$0
$0
$1,5
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$20
$30
$0
$0
$0
$0
$0
$50
50-C
onst
ruct
ion
409
225
816
0 0
0 0
0 1,
450
Tota
l $4
09
$245
$8
46
$0
$0
$0
$0
$0
$1,5
00
Proj
ect R
isk
Asse
ssm
ent
Alth
ough
the
curre
nt in
stal
latio
ns h
ave
been
suc
cess
ful,
the
addi
tion
of s
cope
has
a ri
sk o
f inf
luen
cing
fina
l bud
get a
nd e
xten
ding
th
e sc
hedu
le to
acc
omm
odat
e sc
ope
chan
ges.
En
hanc
emen
t O
THER
7007
23
Dow
ntow
n Se
attle
& R
egio
nal M
obili
ty Im
prov
emen
ts
Man
aged
by:
Ope
ratio
ns
Fina
ncia
l con
tribu
te to
the
One
Cen
ter C
ity P
lan
partn
ersh
ip fo
r a s
erie
s of
miti
gatio
n im
prov
emen
ts, i
nclu
ding
stre
et im
prov
emen
ts in
do
wnt
own
Seat
tle, t
o m
itiga
te im
pact
s to
bus
ope
ratio
ns a
s bu
ses
trans
ition
from
the
Dow
ntow
n Se
attle
Tra
nsit
Tunn
el (D
STT)
to
surfa
ce s
treet
s to
acc
omm
odat
e in
crea
sed
light
rail
activ
ity in
the
tunn
el.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tribu
te to
cap
ital i
mpr
ovem
ents
per
agr
eem
ents
with
the
City
of S
eattl
e an
d Ki
ng C
ount
y M
etro
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
2,33
4 20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
2,33
4 20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $9
,007
$3
,327
$0
$0
$0
$0
$0
$0
$1
2,33
4 To
tal
$9,0
07
$3,3
27
$0
$0
$0
$0
$0
$0
$12,
334
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$43
$0
$0
$0
$0
$0
$0
$0
$43
30-F
inal
D
esig
n+Sp
ecifi
catio
ns10
7 57
0
0 0
0 0
0 16
4
35-T
hird
Par
ty
8,49
7 3,
170
0 0
0 0
0 0
11,6
67
50-C
onst
ruct
ion
360
100
0 0
0 0
0 0
460
Tota
l $9
,007
$3
,327
$0
$0
$0
$0
$0
$0
$1
2,33
4
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 123 of 144
Enha
ncem
ent
OTH
ER
7007
36
Uni
on S
tatio
n G
arde
n Le
vel R
emod
el
Man
aged
by:
Ope
ratio
ns
Ren
ovat
e U
nion
Sta
tion'
s G
arde
n Le
vel:
conv
ert c
ubic
le s
pace
from
8X8
to 6
X8 c
onfig
urat
ion,
add
7 e
nclo
sed
offic
es, r
eloc
ate
3 of
fices
, cre
ate
a ne
w m
ailro
om, i
nsta
ll ne
w c
arpe
t, pu
rcha
se a
nd in
stal
l 132
cub
icle
s, a
nd in
stal
l new
dat
a ca
blin
g to
sup
port
addi
tiona
l st
aff a
nd c
onsu
ltant
s.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,854
20
19 :
2019
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,854
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $1
,715
$0
$1
39
$0
$0
$0
$0
$0
$1,8
54
Tota
l $1
,715
$0
$1
39
$0
$0
$0
$0
$0
$1,8
54
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$3
$0
$0
$0
$0
$0
$0
$0
$3
30-F
inal
D
esig
n+Sp
ecifi
catio
ns21
0
0 0
0 0
0 0
21
50-C
onst
ruct
ion
1,69
1 0
139
0 0
0 0
0 1,
831
Tota
l $1
,715
$0
$1
39
$0
$0
$0
$0
$0
$1,8
54
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 124 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Stat
e of
Goo
d R
epai
r AL
L M
OD
ES
Proj
ect N
umbe
r and
Nam
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Prel
imin
ary
Engi
neer
ing
4001
16 D
STT
Cap
ital I
mpr
ovem
ents
$5
,350
$2
4,16
0 $2
2,36
0 $2
2,36
0 $2
2,17
0 $0
$0
$0
$9
6,40
0 70
0657
Whe
el T
ruin
g M
achi
ne
960
1,39
5 1,
608
0 0
0 0
0 3,
963
Subt
otal
6,
310
25,5
55
23,9
68
22,3
60
22,1
70
0 0
0 10
0,36
3 O
pera
ting
4000
46 C
onve
ntio
n Pl
ace
Dev
elop
men
t Sy
stem
s R
etro
fit
1,27
7 2,
214
242
0 0
0 0
0 3,
732
6000
33 L
ink
CC
TV S
yste
m U
pgra
de
2,81
6 27
8 0
0 0
0 0
0 3,
094
7006
52 O
T Vi
rtual
Sys
tem
Har
dwar
e U
pgra
de
0 60
0 0
0 0
0 0
0 60
0
7006
55 K
inki
shar
yo L
RV
Syst
ems
Upg
rade
0
3,30
0 8,
800
3,50
0 2,
200
0 0
0 17
,800
70
0682
Tac
oma
Link
HVA
C a
nd B
uild
ing
Syst
ems
Upg
rade
30
37
0 0
0 0
0 0
0 40
0
7006
95 A
cces
s C
ontro
l Car
d U
pgra
de
1,49
6 76
8 0
0 0
0 0
0 2,
264
7007
04 L
ink
Rad
io U
pgra
de
986
0 14
0
0 0
0 0
1,00
0 70
0705
Lin
k Br
idge
Rep
airs
0
200
350
0 0
0 0
0 55
0 70
0718
Tac
oma
Link
Lig
ht R
ail V
ehic
le
Ove
rhau
l 24
8 38
6 97
0
0 0
0 0
731
7007
28 L
ink
Stat
ion
Tile
Rep
lace
men
t 0
846
614
0 0
0 0
0 1,
460
7007
69 L
ight
Rai
l Veh
icle
Ove
rhau
l 2,
092
950
1,95
8 0
0 0
0 0
5,00
0 7X
356
Taco
ma
Dom
e St
atio
n 2,
210
0 1,
342
0 0
0 0
0 3,
553
Subt
otal
11
,156
9,
911
13,4
17
3,50
0 2,
200
0 0
0 40
,183
Pr
ogra
m
7006
77 L
ink
Ligh
t Rai
l Veh
icle
Ove
rhau
l 5,
127
2,00
0 2,
000
2,00
0 2,
000
1,61
5 0
0 14
,742
70
0770
Sou
nder
Veh
icle
Ove
rhau
l Pro
gram
24
,830
6,
692
6,32
3 3,
877
3,58
5 90
1 0
0 46
,209
70
0771
Sta
tion
Mid
life
Ref
urbi
shm
ent
Prog
ram
2,
515
2,23
9 1,
164
205
0 0
0 0
6,12
3
7X70
1 ST
Exp
ress
Fle
et R
epla
cem
ent
148,
791
26,0
99
14,3
79
0 0
0 0
0 18
9,26
9 7X
740
Smal
l Wor
ks P
rogr
am
4,56
5 1,
798
1,61
7 1,
244
1,24
4 1,
595
0 0
12,0
64
8701
00 I
nfor
mat
ion
Tech
nolo
gy (I
T)
Infra
stru
ctur
e 3,
599
1,73
0 2,
209
1,04
6 1,
127
2,68
7 2,
525
31,9
19
46,8
43
8701
01 I
T Tr
ansi
t Sys
tem
s 44
4 78
29
8 62
6 32
0 58
6 31
2 3,
241
5,90
5 Su
btot
al
189,
872
40,6
36
27,9
90
8,99
9 8,
277
7,38
3 2,
837
35,1
60
321,
155
Tota
l $2
07,3
38
$76,
102
$65,
375
$34,
859
$32,
647
$7,3
83
$2,8
37
$35,
160
$461
,701
2020 Financial Plan & Proposed Budget 125 of 144
2020
Cas
hflo
w b
y Su
bare
a (in
thou
sand
s)
Stat
e of
Goo
d R
epai
r AL
L M
OD
ES
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$30,
182
$5,7
44
$3,6
07
$693
$6
53
$331
$0
$0
$4
1,21
0 2
- Nor
th K
ing
13,1
51
7,56
0 5,
742
2,30
0 2,
360
3,31
0 1,
871
23,6
46
59,9
39
3 - S
outh
Kin
g
35,3
28
9,60
0 7,
672
3,28
8 3,
020
1,94
2 65
4 8,
274
69,7
78
4 - E
ast K
ing
69,3
11
12,3
47
6,92
1 23
6 23
6 30
3 0
0 89
,356
5
- Pie
rce
52,6
10
11,3
17
8,36
6 1,
856
1,68
8 91
1 0
0 76
,750
6
- Sys
tem
wid
e
6,75
4 29
,533
33
,067
26
,486
24
,690
58
6 31
2 3,
241
124,
668
Tota
l $2
07,3
38
$76,
102
$65,
375
$34,
859
$32,
647
$7,3
83
$2,8
37
$35,
160
$461
,701
2020
Cas
hflo
w b
y Ph
ase
(in th
ousa
nds)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 01
-Ope
ratio
n+M
aint
enan
ce
$6,3
59
$8,8
22
$9,0
58
$6,0
82
$5,5
85
$2,5
15
$0
$0
$38,
422
09-A
dmin
Cap
ital
3,58
0 1,
130
609
296
552
797
725
1,99
5 9,
684
10-A
genc
y Ad
min
istra
tion
1,12
9 1,
644
1,68
4 1,
060
945
810
810
9,21
9 17
,301
20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
164
0 0
0 0
0 0
0 16
4 30
-Fin
al D
esig
n+Sp
ecifi
catio
ns
1,05
4 3,
548
1,63
2 1,
600
1,50
0 0
0 0
9,33
5 35
-Thi
rd P
arty
0 0
150
0 0
0 0
0 15
0 50
-Con
stru
ctio
n
32,2
77
29,3
21
26,9
18
22,3
21
21,8
65
3,26
1 1,
302
23,9
46
161,
210
55-C
onst
ruct
ion
Serv
ices
60
372
90
0 0
0 0
0 52
2 70
-Veh
icle
s
162,
715
31,2
65
25,2
34
3,50
0 2,
200
0 0
0 22
4,91
3 To
tal
$207
,338
$7
6,10
2 $6
5,37
5 $3
4,85
9 $3
2,64
7 $7
,383
$2
,837
$3
5,16
0 $4
61,7
01
2020 Financial Plan & Proposed Budget 126 of 144
Stat
e of
Goo
d R
epai
r LI
NK
4000
46
Con
vent
ion
Plac
e D
evel
opm
ent S
yste
ms
Ret
rofit
M
anag
ed b
y: D
ECM
Rep
lace
exi
stin
g em
erge
ncy
gene
rato
r and
inst
all e
lect
rical
dis
tribu
tion
equi
pmen
t tha
t is
nece
ssar
y fo
r the
ope
ratio
n an
d in
tegr
atio
n of
the
Pine
Stre
et fa
cilit
y w
ith th
e U
nive
rsity
Lin
k an
d th
e D
ownt
own
Seat
tle T
rans
it Tu
nnel
(DST
T).
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $7
32 th
ousa
nd to
cov
er in
crea
se in
con
tract
or's
cos
t est
imat
e to
co
mpl
ete
the
wor
k.
Budg
et y
ear a
ctiv
ities
: Ins
tall
elec
trica
l dis
tribu
tion
equi
pmen
t in
the
Con
vent
ion
Plac
e/Pi
ne S
treet
are
a.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
,000
20
19 :
2021
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $3
,732
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,277
$2
,214
$2
42
$0
$0
$0
$0
$0
$3,7
32
Tota
l $1
,277
$2
,214
$2
42
$0
$0
$0
$0
$0
$3,7
32
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$279
$1
96
$131
$0
$0
$0
$0
$0
$6
06
30-F
inal
D
esig
n+Sp
ecifi
catio
ns37
00
00
00
0 37
50-C
onst
ruct
ion
901
1,79
6 61
0
0 0
0 0
2,75
7 55
-Con
stru
ctio
n Se
rvic
es
60
222
50
0 0
0 0
0 33
2 To
tal
$1,2
77
$2,2
14
$242
$0
$0
$0
$0
$0
$3
,732
P roj
ect R
isk
Asse
ssm
ent
Coo
rdin
atio
n w
ith L
ink
Ope
ratio
ns a
nd K
ing
Cou
nty
Met
ro to
avo
id im
pact
s to
exi
stin
g D
STT
oper
atio
ns w
ill be
cha
lleng
ing
and
may
ha
ve s
ched
ule
and
cost
impa
cts.
St
ate
of G
ood
Rep
air
LIN
K
4001
16
DST
T C
apita
l Im
prov
emen
ts
Man
aged
by:
EXE
Asse
ss a
nd id
entif
y fa
cilit
y is
sues
in th
e D
ownt
own
Seat
tle T
rans
it Tu
nnel
that
neg
ativ
ely
affe
ct th
e cu
stom
er e
xper
ienc
e, a
re n
ot
com
plia
nt w
ith c
urre
nt b
uild
ing
code
s, o
r pre
sent
saf
ety
and
secu
rity
haza
rds.
Des
ign
and
perfo
rm im
prov
emen
ts to
add
ress
iden
tifie
d is
sues
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
e by
$86
.4 m
illion
for t
unne
l im
prov
emen
ts.
Budg
et y
ear a
ctiv
ities
: Add
ress
the
verti
cal c
onve
yanc
e sy
stem
s, li
ghtin
g re
trofit
s, a
nd in
gres
s an
d eg
ress
impr
ovem
ents
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
0,00
0 20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $9
6,40
0 20
20 :
2023
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $5
,350
$2
4,16
0 $2
2,36
0 $2
2,36
0 $2
2,17
0 $0
$0
$0
$9
6,40
0 To
tal
$5,3
50
$24,
160
$22,
360
$22,
360
$22,
170
$0
$0
$0
$96,
400
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$50
$760
$7
60
$760
$6
70
$0
$0
$0
$3,0
00
30-F
inal
D
esig
n+Sp
ecifi
catio
ns30
0 3,
400
1,60
0 1,
600
1,50
0 0
0 0
8,40
0
50-C
onst
ruct
ion
5,00
0 20
,000
20
,000
20
,000
20
,000
0
0 0
85,0
00
Tota
l $5
,350
$2
4,16
0 $2
2,36
0 $2
2,36
0 $2
2,17
0 $0
$0
$0
$9
6,40
0
Proj
ect R
isk
Asse
ssm
ent
Proj
ect r
isk
is m
ediu
m b
ecau
se th
e D
STT
cond
ition
ass
essm
ent w
as re
ceiv
ed in
Dec
embe
r 201
8 a
nd a
refin
ed s
cope
and
sch
edul
e ha
s ye
t to
be c
ompl
eted
.
2020 Financial Plan & Proposed Budget 127 of 144
Stat
e of
Goo
d R
epai
r LI
NK
6000
33
Link
CC
TV S
yste
m U
pgra
de
Man
aged
by:
Ope
ratio
ns
Upg
rade
exi
stin
g Li
nk li
ght r
ail C
lose
d-C
ircui
t Tel
evis
ion
(CC
TV) N
iceV
isio
n sy
stem
at 1
6 st
atio
ns a
nd L
ink
Ope
ratio
ns a
nd
Mai
nten
ance
Fac
ility
with
dig
ital c
amer
as to
be
com
patib
le w
ith th
e ne
w e
quip
men
t ins
talle
d fo
r Uni
vers
ity L
ink
and
Sout
h 20
0th
Link
ex
tens
ions
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pr
ojec
t clo
seou
t act
iviti
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
,094
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $3
,094
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,884
$1
86
$0
$0
$0
$0
$0
$0
$2,0
70
Sout
h Ki
ng
932
92
0 0
0 0
0 0
1,02
4 To
tal
$2,8
16
$278
$0
$0
$0
$0
$0
$0
$3
,094
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$20
$0
$0
$0
$0
$0
$0
$0
$20
30-F
inal
D
esig
n+Sp
ecifi
catio
ns50
0
0 0
0 0
0 0
50
50-C
onst
ruct
ion
2,74
6 27
8 0
0 0
0 0
0 3,
024
Tota
l $2
,816
$2
78
$0
$0
$0
$0
$0
$0
$3,0
94
P roj
ect R
isk
Asse
ssm
ent
Com
plet
ion
of th
e pr
ojec
t in
2019
requ
ires
all s
tatio
ns c
an b
e sc
hedu
led
for i
nsta
llatio
n of
a la
rge
volu
me
of c
amer
as a
nd in
tegr
atio
n in
to th
e ag
ency
CC
TV s
yste
m.
St
ate
of G
ood
Rep
air
LIN
K
7006
52
OT
Virt
ual S
yste
m H
ardw
are
Upg
rade
M
anag
ed b
y: O
pera
tions
Perfo
rm li
fecy
cle
repl
acem
ent a
nd u
pgra
de o
f ser
ver h
ardw
are
and
supp
ort s
yste
ms
serv
ing
as th
e in
form
atio
n sy
stem
s pl
atfo
rm fo
r ru
nnin
g co
mm
unic
atio
n an
d co
ntro
l (SC
ADA)
virt
ual s
erve
rs.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: New
pro
ject
of $
600
thou
sand
for i
nfor
mat
ion
tech
nolo
gy h
ardw
are
upgr
ades
in
supp
ort o
f the
Lin
k SC
ADA
prog
ram
.
Budg
et y
ear a
ctiv
ities
: pro
cure
con
sulta
nt a
nd e
quip
men
t in
supp
ort o
f rep
lace
men
t and
upg
rade
of e
xist
ing
softw
are
and
hard
war
e pl
atfo
rms
used
for r
unni
ng c
omm
unic
atio
n an
d vi
rtual
ser
vers
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $6
00
2020
: 20
20
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $0
$6
00
$0
$0
$0
$0
$0
$0
$600
To
tal
$0
$600
$0
$0
$0
$0
$0
$0
$6
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$0
$600
$0
$0
$0
$0
$0
$0
$6
00
Tota
l $0
$6
00
$0
$0
$0
$0
$0
$0
$600
Proj
ect R
isk
Asse
ssm
ent
2020 Financial Plan & Proposed Budget 128 of 144
Stat
e of
Goo
d R
epai
r LI
NK
7006
55
Kin
kish
aryo
LR
V Sy
stem
s U
pgra
de
Man
aged
by:
Ope
ratio
ns
Rep
lace
and
upd
ate
onbo
ard
com
mun
icat
ions
, LR
V co
ntro
l sys
tem
s an
d in
stal
l aut
omat
ic p
asse
nger
cou
nter
s in
all
Kink
isha
ryo
LRV
vehi
cles
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: New
pro
ject
of $
17.8
milli
on fo
r com
mun
icat
ions
sys
tem
s up
grad
es to
Ki
nkas
hary
o lig
ht ra
il ve
hicl
es (L
RV)
for a
four
yea
r pro
ject
from
202
0 un
til 2
023.
Budg
et y
ear a
ctiv
ities
: Eac
h LR
V w
ill ha
ve o
nboa
rd c
omm
unic
atio
n an
d co
ntro
l sys
tem
s up
grad
ed in
ord
er to
mai
ntai
n th
e fle
et in
in a
go
od s
tate
of r
epai
r.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $0
20
19 :
N/A
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
7,80
0 20
20 :
2023
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $0
$3
,300
$8
,800
$3
,500
$2
,200
$0
$0
$0
$1
7,80
0 To
tal
$0
$3,3
00
$8,8
00
$3,5
00
$2,2
00
$0
$0
$0
$17,
800
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
70-V
ehic
les
$0
$3,3
00
$8,8
00
$3,5
00
$2,2
00
$0
$0
$0
$17,
800
Tota
l $0
$3
,300
$8
,800
$3
,500
$2
,200
$0
$0
$0
$1
7,80
0
Proj
ect R
isk
Asse
ssm
ent
N/A
.
St
ate
of G
ood
Rep
air
LIN
K
7006
57
Whe
el T
ruin
g M
achi
ne
Man
aged
by:
Ope
ratio
ns
Proc
ure
and
take
del
iver
of a
por
tabl
e w
heel
trui
ng m
achi
ne fo
r lig
ht ra
il ve
hicl
es.
Rem
ove
and
repl
ace
exis
ting
fixed
whe
el tr
uing
m
achi
ne a
t the
Ope
ratio
ns a
nd M
aint
enan
ce F
acilit
y (O
MF)
- C
entra
l.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $3
milli
on to
repl
ace
the
whe
el tr
uing
mac
hine
at t
he O
MF-
Cen
tral
whi
ch h
as re
ache
d th
e en
d of
its
usef
ul li
fe.
Budg
et y
ear a
ctiv
ities
: Est
ablis
h sp
ecifi
catio
ns, c
omm
ence
pro
cure
men
t pro
cess
and
aw
ard
cont
ract
to re
plac
e ex
istin
g w
heel
trui
ng
mac
hine
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $9
60
2019
: 20
21
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$3,9
63
2020
: 20
21
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $9
60
$1,3
95
$1,6
08
$0
$0
$0
$0
$0
$3,9
63
Tota
l $9
60
$1,3
95
$1,6
08
$0
$0
$0
$0
$0
$3,9
63
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$960
$1
,395
$1
,608
$0
$0
$0
$0
$0
$3
,963
To
tal
$960
$1
,395
$1
,608
$0
$0
$0
$0
$0
$3
,963
Proj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 129 of 144
Stat
e of
Goo
d R
epai
r LI
NK
7006
77
Link
Lig
ht R
ail V
ehic
le O
verh
aul
Man
aged
by:
Ope
ratio
ns
Plan
and
impl
emen
t a li
ght r
ail v
ehic
le o
verh
aul p
rogr
am to
per
form
requ
ired
mid
-life
mai
nten
ance
and
com
pone
nt o
verh
auls
requ
ired
to k
eep
vehi
cles
in a
sta
te o
f goo
d re
pair
and
achi
eve
full
life
expe
ctan
cy.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Ove
rhau
l suc
h as
Bra
kes,
C-T
ruck
Axl
e, P
anto
grap
h, a
nd C
oupl
er a
ssem
bly.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
4,74
2 20
19 :
2022
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
4,74
2 20
20 :
2024
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $3
,430
$1
,338
$1
,338
$1
,338
$1
,338
$1
,080
$0
$0
$9
,862
So
uth
King
1,
697
662
662
662
662
534
0 0
4,88
0 To
tal
$5,1
27
$2,0
00
$2,0
00
$2,0
00
$2,0
00
$1,6
15
$0
$0
$14,
742
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
01-O
pera
tion+
Mai
nten
ance
$4
,889
$2
,000
$2
,000
$2
,000
$2
,000
$1
,615
$0
$0
$1
4,50
3 70
-Veh
icle
s 23
9 0
0 0
0 0
0 0
239
Tota
l $5
,127
$2
,000
$2
,000
$2
,000
$2
,000
$1
,615
$0
$0
$1
4,74
2
Proj
ect R
isk
Asse
ssm
ent
Ther
e ar
e bo
th s
ched
ule
and
budg
et ri
sks:
pro
ject
del
ays
coul
d co
mpr
omis
e lig
ht ra
il ve
hicl
es s
tate
of g
ood
repa
ir an
d av
aila
bilit
y fo
r us
e an
d ha
ve a
n af
fect
on
the
budg
et re
quire
men
ts to
fund
the
prog
ram
.
St
ate
of G
ood
Rep
air
LIN
K
7006
82
Taco
ma
Link
HVA
C a
nd B
uild
ing
Syst
ems
Upg
rade
M
anag
ed b
y: O
pera
tions
Coo
rdin
ate,
repl
ace
and
upgr
ade
of th
e or
igin
al h
eatin
g, v
entil
atio
n an
d ai
r-con
ditio
ning
(HVA
C) s
yste
ms
and
build
ing
cont
rols
at t
he
Taco
ma
Ope
ratio
ns a
nd M
aint
enan
ce F
acilit
y (O
MF)
dur
ing
the
cons
truct
ion
of th
e H
illtop
Tac
oma
Link
Ext
ensi
on p
roje
ct.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Upg
rade
the
heat
ing,
ven
tilat
ion,
and
air
cond
ition
ing
(HVA
C) a
nd b
uild
ing
syst
ems.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
00
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$400
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$3
0 $3
70
$0
$0
$0
$0
$0
$0
$400
To
tal
$30
$370
$0
$0
$0
$0
$0
$0
$4
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
30-F
inal
D
esig
n+Sp
ecifi
catio
ns$3
0 $0
$0
$0
$0
$0
$0
$0
$3
0
50-C
onst
ruct
ion
0 37
00
00
00
0 37
0To
tal
$30
$370
$0
$0
$0
$0
$0
$0
$4
00
P roj
ect R
isk
Asse
ssm
ent
Coo
rdin
atio
n w
ith th
e Ta
com
a Li
nk E
xpan
sion
pro
ject
is c
ritic
al to
obt
aini
ng a
n in
tegr
ated
, ful
ly fu
nctio
nal b
uild
ing
cont
rol a
nd H
VAC
sy
stem
for t
he n
ew c
ombi
ned
faci
lity.
2020 Financial Plan & Proposed Budget 130 of 144
Stat
e of
Goo
d R
epai
r LI
NK
7006
95
Acce
ss C
ontr
ol C
ard
Upg
rade
M
anag
ed b
y: O
pera
tions
Upg
rade
the
exis
ting
acce
ss c
ontro
l sys
tem
that
man
ages
the
secu
re a
cces
s to
Sou
nd T
rans
it Li
nk fa
cilit
ies
achi
evin
g a
sing
le a
cces
s co
ntro
l pla
tform
for a
ll of
the
agen
cy's
Lin
k fa
cilit
ies.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e up
grad
e of
acc
ess
cont
rol c
ard
syst
em.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $2
,264
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $2
,264
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,151
$5
91
$0
$0
$0
$0
$0
$0
$1,7
41
Sout
h Ki
ng
345
177
0 0
0 0
0 0
523
Tota
l $1
,496
$7
68
$0
$0
$0
$0
$0
$0
$2,2
64
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$1,4
96
$768
$0
$0
$0
$0
$0
$0
$2
,264
To
tal
$1,4
96
$768
$0
$0
$0
$0
$0
$0
$2
,264
P roj
ect R
isk
Asse
ssm
ent
N/A
.
St
ate
of G
ood
Rep
air
LIN
K
7007
04
Link
Rad
io U
pgra
de
Man
aged
by:
Ope
ratio
ns
Inst
all u
pgra
ded
Dis
tribu
ted
Ante
nna
Syst
em (D
AS) i
n th
e D
ownt
own
Seat
tle T
rans
it Tu
nnel
and
the
Beac
on H
ill Tu
nnel
.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
ject
is c
ompl
ete.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,000
20
19 :
2019
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,000
20
20 :
2019
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $6
59
$0
$9
$0
$0
$0
$0
$0
$668
So
uth
King
32
7 0
5 0
0 0
0 0
332
Tota
l $9
86
$0
$14
$0
$0
$0
$0
$0
$1,0
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$66
$0
$14
$0
$0
$0
$0
$0
$80
20-P
relim
Eng
inee
ring/
Env
Rev
iew
10
0 0
0 0
0 0
0 0
100
30-F
inal
D
esig
n+Sp
ecifi
catio
ns12
0 0
0 0
0 0
0 0
120
50-C
onst
ruct
ion
700
0 0
0 0
0 0
0 70
0 To
tal
$986
$0
$1
4 $0
$0
$0
$0
$0
$1
,000
P roj
ect R
isk
Asse
ssm
ent
N/A
.
2020 Financial Plan & Proposed Budget 131 of 144
Stat
e of
Goo
d R
epai
r LI
NK
7007
05
Link
Brid
ge R
epai
rs
Man
aged
by:
Ope
ratio
ns
Rep
air b
ridge
stru
ctur
es w
ithin
the
Tukw
ila F
reew
ay R
oute
and
E-3
Bus
way
seg
men
ts o
f the
Lin
k lig
ht ra
il al
ignm
ent t
o co
rrect
are
as
of d
eter
iora
tion.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Per
form
brid
ge b
earin
g re
pairs
and
oth
er m
aint
enan
ce w
orks
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
50
2019
: 20
20
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$550
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $0
$2
00
$350
$0
$0
$0
$0
$0
$5
50
Tota
l $0
$2
00
$350
$0
$0
$0
$0
$0
$5
50
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$20
$30
$0
$0
$0
$0
$0
$50
30-F
inal
D
esig
n+Sp
ecifi
catio
ns0
500
00
00
0 50
50-C
onst
ruct
ion
0 13
0 32
0 0
0 0
0 0
450
Tota
l $0
$2
00
$350
$0
$0
$0
$0
$0
$5
50
Proj
ect R
isk
Asse
ssm
ent
Ther
e is
a li
mite
d re
pair
win
dow
to p
erfo
rm re
pairs
with
out i
mpa
ctin
g lig
ht ra
il op
erat
ions
. Effe
ctiv
e sc
hedu
le a
nd e
ffici
ent e
xecu
tion
of re
pairs
is re
quire
d.
St
ate
of G
ood
Rep
air
LIN
K
7007
18
Taco
ma
Link
Lig
ht R
ail V
ehic
le O
verh
aul
Man
aged
by:
Ope
ratio
ns
Mai
ntai
n, p
rese
rve,
and
ext
end
the
life
of th
e Ta
com
a Li
nk fl
eet o
f fou
r lig
ht ra
il ve
hicl
es.
Rep
air,
repl
ace
and
over
haul
trac
tion
mot
ors
and
truck
s, in
clud
ing
whe
el a
ssem
blie
s an
d ge
ar b
oxes
for t
he li
ght r
ail v
ehic
les
per t
he
man
ufac
ture
r’s 3
75,0
00 m
ile o
verh
aul g
uide
lines
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
ove
rhau
l of 4
Tac
oma
Link
ligh
t rai
l veh
icle
trac
tion
mot
ors
and
truck
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $7
31
2019
: 20
20
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$731
20
20 :
2020
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$2
48
$386
$9
7 $0
$0
$0
$0
$0
$7
31
Tota
l $2
48
$386
$9
7 $0
$0
$0
$0
$0
$7
31
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
70-V
ehic
les
$248
$3
86
$97
$0
$0
$0
$0
$0
$731
To
tal
$248
$3
86
$97
$0
$0
$0
$0
$0
$731
P roj
ect R
isk
Asse
ssm
ent
Ther
e is
a s
mal
l ris
k th
e le
ngth
of t
ime
to p
erfo
rm th
e ov
erha
ul a
ctiv
ities
cou
ld h
ave
sche
dule
impa
cts.
132 of 144
Stat
e of
Goo
d R
epai
r LI
NK
7007
28
Link
Sta
tion
Tile
Rep
lace
men
t M
anag
ed b
y: O
pera
tions
Dem
oliti
on a
nd re
inst
alla
tion
of ti
le a
t fiv
e Li
nk li
ght r
ail s
tatio
ns: S
tadi
um, S
odo,
Col
umbi
a C
ity, O
thel
lo, a
nd R
aini
er B
each
.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $1
milli
on to
acc
omm
odat
e co
st in
crea
se fo
r tile
repl
acem
ent i
n 3
Link
sta
tions
.
Budg
et y
ear a
ctiv
ities
: Con
stru
ctio
n w
ork
at S
tadi
um S
tatio
n du
ring
DST
T cl
osur
e fo
r sin
gle
track
ing,
and
way
findi
ng ti
le re
plac
emen
t w
ork
at o
ther
sta
tions
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
35
2019
: 20
19
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$1,4
60
2020
: 20
21
2020
Cos
t Est
imat
e:
N/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $0
$8
46
$614
$0
$0
$0
$0
$0
$1
,460
To
tal
$0
$846
$6
14
$0
$0
$0
$0
$0
$1,4
60
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$0
$30
$20
$0
$0
$0
$0
$0
$50
50-C
onst
ruct
ion
0 76
6 55
4 0
0 0
0 0
1,32
0 55
-Con
stru
ctio
n Se
rvic
es
0 50
40
0
0 0
0 0
90
Tota
l $0
$8
46
$614
$0
$0
$0
$0
$0
$1
,460
Proj
ect R
isk
Asse
ssm
ent
N/A
.
St
ate
of G
ood
Rep
air
LIN
K
7007
69
Ligh
t Rai
l Veh
icle
Ove
rhau
l M
anag
ed b
y: D
ECM
Com
plet
e re
pairs
of t
he g
ear u
nits
and
trac
tion
mot
ors
on li
ght r
ail v
ehic
les
(LR
Vs),
and
purc
hase
mat
eria
ls, e
quip
men
t, se
rvic
es, a
nd
labo
r nec
essa
ry to
com
plet
e re
pairs
.
This
wor
k is
con
side
red
war
rant
y w
ork
to b
e re
imbu
rsed
by
the
man
ufac
ture
r. A
ccep
tanc
e of
repa
irs p
erfo
rmed
are
bei
ng te
stin
g an
d un
der r
elia
bilit
y re
view
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Com
plet
e te
stin
g of
spa
re tr
actio
n po
wer
mot
ors
and
gear
box
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
,000
20
19 :
2020
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $5
,000
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $1
,399
$6
36
$1,3
10
$0
$0
$0
$0
$0
$3,3
45
Sout
h Ki
ng
692
314
648
0 0
0 0
0 1,
655
Tota
l $2
,092
$9
50
$1,9
58
$0
$0
$0
$0
$0
$5,0
00
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
70-V
ehic
les
$2,0
92
$950
$1
,958
$0
$0
$0
$0
$0
$5
,000
To
tal
$2,0
92
$950
$1
,958
$0
$0
$0
$0
$0
$5
,000
Proj
ect R
isk
Asse
ssm
ent
Budg
et ri
sk re
mai
ns h
igh
give
n th
at n
o ag
reem
ent r
egar
ding
the
war
rant
y co
vera
ge o
n re
pairs
has
bee
n re
ache
d be
twee
n m
anuf
actu
rer,
supp
lier a
nd S
ound
Tra
nsit.
133 of 144
Stat
e of
Goo
d R
epai
r SO
UN
DER
7007
70
Soun
der V
ehic
le O
verh
aul P
rogr
am
Man
aged
by:
Ope
ratio
ns
Mai
ntai
n, p
rese
rve,
and
ext
end
the
life
of S
ound
er lo
com
otiv
es, c
ab c
ars,
and
coa
ch c
ars
fleet
.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
loco
mot
ive
over
haul
, inc
ludi
ng o
verh
aulin
g H
VAC
, HEP
con
trolle
rs, H
EP fa
ns a
nd ra
diat
ors,
car
do
ors,
and
truc
ks. B
egin
coa
ch c
ar o
verh
auls
incl
udin
g ne
w c
ar p
aint
ing,
car
pet,
seat
s, li
ghtin
g an
d la
vato
ries.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
6,20
9 20
19 :
2024
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $4
6,20
9 20
20 :
2024
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$3,4
02
$917
$8
66
$531
$4
91
$123
$0
$0
$6
,331
So
uth
King
13
,011
3,
507
3,31
3 2,
032
1,87
9 47
2 0
0 24
,213
Pi
erce
8,
417
2,26
9 2,
143
1,31
4 1,
215
305
0 0
15,6
65
Tota
l $2
4,83
0 $6
,692
$6
,323
$3
,877
$3
,585
$9
01
$0
$0
$46,
209
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
01-O
pera
tion+
Mai
nten
ance
$1
,420
$6
,162
$6
,323
$3
,877
$3
,585
$9
01
$0
$0
$22,
269
50-C
onst
ruct
ion
12,2
54
0 0
0 0
0 0
0 12
,254
70
-Veh
icle
s 11
,156
53
0 0
0 0
0 0
0 11
,686
To
tal
$24,
830
$6,6
92
$6,3
23
$3,8
77
$3,5
85
$901
$0
$0
$4
6,20
9
P roj
ect R
isk
Asse
ssm
ent
Mul
tiple
Sou
nder
veh
icle
s be
ing
over
haul
ed o
r und
er g
oing
maj
or re
pairs
con
tinue
to ru
n th
e ris
k of
cos
t ove
rruns
or s
ched
ule
dela
ys.
St
ate
of G
ood
Rep
air
REG
ION
AL
EXPR
ESS
7007
71
Stat
ion
Mid
life
Ref
urbi
shm
ent P
rogr
am
Man
aged
by:
Ope
ratio
ns
Prov
ide
reha
bilit
atio
n an
d m
id-li
fe m
aint
enan
ce fo
r Sou
nd T
rans
it fa
cilit
ies
that
hav
e be
en in
ser
vice
for f
iftee
n ye
ars
or lo
nger
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $2
.5 m
illion
for r
epai
rs a
nd re
plac
emen
t of s
idew
alk,
par
king
ga
rage
fire
ala
rm s
yste
m, 9
bus
she
lters
at K
ent S
tatio
n, a
nd C
CTV
at I
ssaq
uah
and
Lake
woo
d Tr
ansi
t Cen
ters
.
Budg
et y
ear a
ctiv
ities
: Rep
lace
sid
ewal
k, p
arki
ng g
arag
e fir
e al
arm
sys
tem
, and
9 b
us s
helte
rs a
t Ken
t Sta
tion.
Rep
lace
CC
TV in
Is
saqu
ah a
nd L
akew
ood
Tran
sit C
ente
rs.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
Co
mpl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
,574
20
19 :
2022
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $6
,123
20
20 :
2022
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l So
uth
King
$1
,678
$1
,494
$7
76
$137
$0
$0
$0
$0
$4
,084
Pi
erce
83
7 74
6 38
8 68
0
0 0
0 2,
039
Tota
l $2
,515
$2
,239
$1
,164
$2
05
$0
$0
$0
$0
$6,1
23
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
01-O
pera
tion+
Mai
nten
ance
$5
0 $6
60
$735
$2
05
$0
$0
$0
$0
$1,6
50
10-A
genc
y Ad
min
istra
tion
122
32
18
0 0
0 0
0 17
2 30
-Fin
al
Des
ign+
Spec
ifica
tions
224
28
0 0
0 0
0 0
252
50-C
onst
ruct
ion
2,11
9 1,
419
411
0 0
0 0
0 3,
949
55-C
onst
ruct
ion
Serv
ices
0
100
0 0
0 0
0 0
100
Tota
l $2
,515
$2
,239
$1
,164
$2
05
$0
$0
$0
$0
$6,1
23
Proj
ect R
isk
Asse
ssm
ent
Und
efin
ed s
cope
of w
ork
at th
e va
rious
sta
tion
loca
tions
cou
ld a
ffect
bot
h th
e bu
dget
and
sch
edul
e.
134 of 144
Stat
e of
Goo
d R
epai
r R
EGIO
NAL
EX
PRES
S 7X
701
ST E
xpre
ss F
leet
Rep
lace
men
t M
anag
ed b
y: O
pera
tions
Proc
ure
repl
acem
ent b
uses
for t
he S
T Ex
pres
s fle
et.
Cur
rent
Ass
umpt
ions
: FTA
gui
delin
es in
dica
te th
at b
uses
are
to b
e re
plac
ed n
o ea
rlier
than
eith
er 1
2 ye
ars
of s
ervi
ce o
r 500
,000
m
iles.
Due
to th
e un
ique
ser
vice
cha
ract
eris
tics
of th
e ST
Exp
ress
flee
t, So
und
Tran
sit b
uses
typi
cally
reac
h 50
0,00
0 m
iles
afte
r onl
y 10
yea
rs o
f ope
ratio
ns y
et S
ound
Tra
nsit
ofte
n ke
eps
buse
s fo
r sev
eral
yea
rs p
ast t
he m
inim
al d
eadl
ine.
Rep
lace
men
t dec
isio
ns a
re
info
rmed
by
spec
ific
fleet
per
form
ance
in c
onsu
ltatio
n w
ith o
ur o
pera
ting
partn
er a
genc
ies.
Dur
ing
the
perio
d fro
m 2
017-
2021
150
bu
ses
will
be re
plac
ed. T
he fl
eet s
ize
as J
anua
ry 2
019
is 3
18.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Del
iver
y, te
stin
g an
d co
mm
issi
onin
g of
25
New
Fly
er s
ixty
-foot
bus
es.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
89,2
69
2019
: 20
21
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$189
,269
20
20 :
2021
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$26,
187
$4,5
93
$2,5
31
$0
$0
$0
$0
$0
$33,
311
Sout
h Ki
ng
15,0
28
2,63
6 1,
452
0 0
0 0
0 19
,116
Ea
st K
ing
68,4
44
12,0
05
6,61
4 0
0 0
0 0
87,0
64
Pier
ce
39,1
32
6,86
4 3,
782
0 0
0 0
0 49
,778
To
tal
$148
,791
$2
6,09
9 $1
4,37
9 $0
$0
$0
$0
$0
$1
89,2
69
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$47
$0
$0
$0
$0
$0
$0
$0
$47
70-V
ehic
les
148,
745
26,0
99
14,3
79
0 0
0 0
0 18
9,22
2 To
tal
$148
,791
$2
6,09
9 $1
4,37
9 $0
$0
$0
$0
$0
$1
89,2
69
P roj
ect R
isk
Asse
ssm
ent
Budg
et ri
sk is
a c
once
rn a
s th
e co
st e
stim
ates
and
veh
icle
type
s ar
e an
nual
ly re
view
ed a
s re
plac
emen
ts a
re id
entif
ied
and
the
agen
cy a
dopt
s on
-boa
rd te
chno
logi
es to
be
incl
uded
in fu
ture
repl
acem
ents
.
Bus
Base
cap
acity
issu
es w
ith o
ur s
ervi
ce p
artn
ers,
par
ticul
arly
KC
M, i
s a
risk
to th
e tim
ing
of b
us d
eliv
ery.
St
ate
of G
ood
Rep
air
OTH
ER
7X35
6 Ta
com
a D
ome
Stat
ion
Man
aged
by:
Ope
ratio
ns
Prov
ide
finan
cial
sup
port
to a
ddre
ss m
ajor
mai
nten
ance
requ
irem
ent a
t Tac
oma
Dom
e St
atio
n pe
r agr
eem
ent w
ith P
ierc
e Tr
ansi
t.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Non
e.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $3
,553
20
19 :
2023
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $3
,553
20
20 :
2023
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Pi
erce
$2
,210
$0
$1
,342
$0
$0
$0
$0
$0
$3
,553
To
tal
$2,2
10
$0
$1,3
42
$0
$0
$0
$0
$0
$3,5
53
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$2,2
10
$0
$1,3
42
$0
$0
$0
$0
$0
$3,5
53
Tota
l $2
,210
$0
$1
,342
$0
$0
$0
$0
$0
$3
,553
P roj
ect R
isk
Asse
ssm
ent
The
agen
cy h
as a
gree
d to
fund
a p
ropo
rtion
al s
hare
at c
ompl
etio
n. T
he b
udge
t rep
rese
nts
ST's
sha
re o
f the
cos
t est
imat
e. I
t is
poss
ible
that
the
agen
cy w
ould
be
resp
onsi
ble
for t
he s
ame
shar
e of
cos
t ove
rruns
.
135 of 144
Stat
e of
Goo
d R
epai
r O
THER
7X74
0 Sm
all W
orks
Pro
gram
M
anag
ed b
y: O
pera
tions
Proj
ects
com
plet
ed u
nder
the
smal
l wor
ks p
rogr
am in
clud
e m
odifi
catio
n/re
pairs
of o
pera
ting
faci
litie
s an
d sy
stem
s w
ith a
n es
timat
ed
tota
l cos
t of l
ess
than
$35
0,00
0 pe
r pro
ject
. The
bud
get f
or th
is p
rogr
am is
bas
ed o
n nu
mbe
r of s
ites
mai
ntai
ned,
age
of f
acilit
ies,
and
am
ount
of u
se.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Con
tinue
wor
k in
pro
gres
s fro
m 2
019,
est
ablis
h 20
20 p
roje
ct li
st a
nd d
eliv
er p
roje
cts
usin
g tra
ditio
nal
proc
urem
ent m
etho
ds, j
ob o
rder
con
tract
ing
(JO
C),
and
inte
rnal
reso
urce
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
2,06
4 20
19 :
2024
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
2,06
4 20
20 :
2024
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$593
$2
34
$210
$1
62
$162
$2
07
$0
$0
$1,5
68
Nor
th K
ing
685
270
243
187
187
239
0 0
1,81
0 So
uth
King
68
5 27
0 24
3 18
7 18
7 23
9 0
0 1,
810
East
Kin
g 86
7 34
2 30
7 23
6 23
6 30
3 0
0 2,
292
Pier
ce
1,73
5 68
3 61
5 47
3 47
3 60
6 0
0 4,
585
Tota
l $4
,565
$1
,798
$1
,617
$1
,244
$1
,244
$1
,595
$0
$0
$1
2,06
4
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
10-A
genc
y Ad
min
istra
tion
$571
$6
$1
2 $0
$0
$0
$0
$0
$5
89
20-P
relim
Eng
inee
ring/
Env
Rev
iew
64
0
0 0
0 0
0 0
64
30-F
inal
D
esig
n+Sp
ecifi
catio
ns29
4 70
32
0
0 0
0 0
396
35-T
hird
Par
ty
0 0
150
0 0
0 0
0 15
0 50
-Con
stru
ctio
n 3,
400
1,72
2 1,
423
1,24
4 1,
244
1,59
5 0
0 10
,629
70
-Veh
icle
s 23
6 0
0 0
0 0
0 0
236
Tota
l $4
,565
$1
,798
$1
,617
$1
,244
$1
,244
$1
,595
$0
$0
$1
2,06
4
Proj
ect R
isk
Asse
ssm
ent
Proj
ect r
isks
are
min
imal
, how
ever
, the
vol
ume
of s
mal
l wor
ks e
ligib
le p
roje
cts
and
the
limits
of i
nter
nal r
esou
rces
cou
ld im
pact
the
deliv
ery
of p
roje
ct re
ques
ts.
Giv
en re
cent
spe
ndin
g, a
ge a
nd g
row
th o
f the
Age
ncy
asse
t bas
e th
e ou
t yea
rs (2
019-
2023
) will
requ
ire a
dditi
onal
fina
ncia
l res
ourc
es to
mee
t the
dem
and
of s
mal
l wor
ks q
ualif
ied
proj
ects
.
St
ate
of G
ood
Rep
air
OTH
ER
8701
00
Info
rmat
ion
Tech
nolo
gy (I
T) In
fras
truc
ture
M
anag
ed b
y: IT
S
Prov
ide
lifec
ycle
mai
nten
ance
of t
he IT
infra
stru
ctur
e ac
ross
all
agen
cy a
nd re
venu
e sy
stem
s in
clud
ing
but n
ot li
mite
d to
: ser
vers
, st
orag
e ar
ea n
etw
orks
, net
wor
king
equ
ipm
ent,
back
end
for c
usto
mer
-faci
ng s
yste
ms
(i.e.
Vid
eo M
essa
ging
Sys
tem
) and
oth
er
com
pute
r-bas
ed in
frast
ruct
ure,
plu
s en
hanc
emen
ts a
nd m
aint
enan
ce fo
r IT
netw
ork
and
data
sec
urity
, inc
ludi
ng fi
rew
alls
and
oth
er
rela
ted
tech
nolo
gy s
yste
ms.
This
pro
ject
enc
ompa
sses
the
infra
stru
ctur
e sy
stem
s fo
r the
ent
irety
of t
he a
genc
y da
tace
nter
s an
d ne
twor
k an
d th
e ba
cken
d in
frast
ruct
ure
syst
ems
for t
he L
ink
light
rail
syst
ems,
incl
udin
g SC
ADA.
The
pro
ject
als
o in
clud
es in
tegr
atio
n an
d up
grad
es o
f leg
acy
hard
war
e/so
ftwar
e at
Lin
k lig
ht ra
il st
atio
ns a
nd c
ontro
l cen
ters
with
upc
omin
g fu
ture
ligh
t rai
l exp
ansi
on.
Ch a
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Per
form
ong
oing
sta
te o
f goo
d re
pair
and
lifec
ycle
mai
nten
ance
of a
genc
y an
d op
erat
iona
l sys
tem
bac
kend
te
chno
logy
infra
stru
ctur
e, w
hich
incl
udes
ser
vers
, sto
rage
are
a ne
twor
ks, n
etw
orki
ng e
quip
men
t, an
d ot
her c
ompu
ter-b
ased
in
frast
ruct
ure;
IT S
CAD
A ba
cken
d se
curit
y, a
nd L
RV
wire
less
net
wor
k.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $4
6,84
3 20
19 :
2025
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $4
6,84
3 20
20 :
2041
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l N
orth
Kin
g $2
,666
$1
,281
$1
,636
$7
75
$835
$1
,991
$1
,871
$2
3,64
6 $3
4,70
1 So
uth
King
93
3 44
8 57
3 27
1 29
2 69
7 65
4 8,
274
12,1
42
Tota
l $3
,599
$1
,730
$2
,209
$1
,046
$1
,127
$2
,687
$2
,525
$3
1,91
9 $4
6,84
3
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
09-A
dmin
Cap
ital
$3,5
80
$1,1
30
$609
$2
96
$552
$7
97
$725
$1
,995
$9
,684
10
-Age
ncy
Adm
inis
tratio
n 19
60
0 70
0 30
0 27
5 81
0 81
0 9,
219
12,7
33
50-C
onst
ruct
ion
0 0
900
450
300
1,08
0 99
0 20
,706
24
,426
To
tal
$3,5
99
$1,7
30
$2,2
09
$1,0
46
$1,1
27
$2,6
87
$2,5
25
$31,
919
$46,
843
Proj
ect R
isk
Asse
ssm
ent
Pote
ntia
l for
risk
of i
ncre
ased
cos
t as
syst
em e
xpan
ds a
nd in
tegr
atio
n an
d su
ppor
t req
uire
mor
e re
sour
ces
to m
eet s
yste
m
com
plia
nce
stan
dard
s.
136 of 144
Stat
e of
Goo
d R
epai
r O
THER
8701
01
IT T
rans
it Sy
stem
s M
anag
ed b
y: IT
S
Mai
ntai
n, u
pgra
de a
nd re
plac
e m
ultip
le c
ompu
ter a
nd te
chno
logy
-bas
ed s
yste
ms
at S
ound
er s
tatio
ns a
nd S
T Ex
pres
s tra
nsit
cent
ers
to k
eep
them
saf
e, s
ecur
e, a
nd fu
nctio
nal f
or o
ur c
usto
mer
s.
Syst
ems
mai
ntai
ned
incl
ude:
Sou
nder
Sta
tions
& T
rans
it C
ente
rs -
clos
ed c
ircui
t tel
evis
ion
acce
ss c
ontro
l and
cus
tom
er e
mer
genc
y st
atio
ns; S
ound
er -
pass
enge
r inf
orm
atio
n sy
stem
s, a
utom
ated
pas
seng
er c
ount
ers
and
varia
ble
mes
sage
sig
nage
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Act
iviti
es w
ill be
focu
sed
on p
roje
cts
supp
ortin
g th
e tra
nsit
secu
rity
grou
p an
d m
odal
ope
ratio
ns.
Antic
ipat
e so
me
smal
l cap
ital p
urch
ases
of m
ore
than
$5,
000
per i
tem
as
need
ed.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $5
,905
20
19 :
2023
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $5
,905
20
20 :
2027
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $4
44
$78
$298
$6
26
$320
$5
86
$312
$3
,241
$5
,905
To
tal
$444
$7
8 $2
98
$626
$3
20
$586
$3
12
$3,2
41
$5,9
05
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
50-C
onst
ruct
ion
$444
$7
8 $2
98
$626
$3
20
$586
$3
12
$3,2
41
$5,9
05
Tota
l $4
44
$78
$298
$6
26
$320
$5
86
$312
$3
,241
$5
,905
Proj
ect R
isk
Asse
ssm
ent
Info
rmat
ion
tech
nolo
gy is
eve
r cha
ngin
g an
d co
uld
adve
rsel
y af
fect
bot
h th
e co
st o
f the
equ
ipm
ent a
nd th
e av
aila
bilit
y of
the
equi
pmen
t and
tech
nolo
gy.
137 of 144
2020
Cas
hflo
w b
y B
udge
t App
rova
l (in
thou
sand
s)
Adm
inis
trativ
eAL
L M
OD
ES
Proj
ect N
umbe
r and
Nam
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
Prog
ram
0X
002
Agen
cy A
dmin
istra
tion
Ope
ratin
g $5
42,0
33
$112
,520
$1
28,7
90
$131
,620
$1
33,6
75
$133
,760
$1
35,3
61
$0
$1,3
17,7
59
6000
25 E
nviro
nmen
tal M
itiga
tion,
M
onito
ring
& M
aint
enan
ce
691
100
130
130
130
130
160
0 1,
471
8020
00 A
dmin
istra
tive
Cap
ital
14,3
56
6,45
2 3,
743
4,34
3 4,
398
3,96
4 3,
964
21,0
66
62,2
84
8038
00 I
nfor
mat
ion
Tech
nolo
gy P
rogr
am
26,9
20
8,24
3 5,
325
5,72
5 3,
708
4,69
5 5,
496
53,4
22
113,
536
Subt
otal
58
4,00
0 12
7,31
5 13
7,98
8 14
1,81
8 14
1,91
0 14
2,54
9 14
4,98
1 74
,488
1,
495,
050
Tota
l $5
84,0
00
$127
,315
$1
37,9
88
$141
,818
$1
41,9
10
$142
,549
$1
44,9
81
$74,
488
$1,4
95,0
50
139 of 144
2020
Cas
hflo
w b
y Su
bare
a (in
thou
sand
s)
Adm
inis
trativ
eAL
L M
OD
ES
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 1
- Sno
hom
ish
$121
$1
8 $2
3 $2
3 $2
3 $2
3 $2
8 $0
$2
57
3 - S
outh
Kin
g
428
62
81
81
81
81
99
0 91
2 4
- Eas
t Kin
g
406
88
88
90
865
- Pie
rce
101
15
19
19
19
19
24
0 21
6 6
- Sys
tem
wid
e
583,
309
127,
215
137,
858
141,
688
141,
780
142,
419
144,
821
74,4
88
1,49
3,57
9 To
tal
$584
,000
$1
27,3
15
$137
,988
$1
41,8
18
$141
,910
$1
42,5
49
$144
,981
$7
4,48
8 $1
,495
,050
2020
Cas
hflo
w b
y Ph
ase
(in th
ousa
nds)
Phas
e #
and
Des
crip
tion
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l 09
-Adm
in C
apita
l
$35,
961
$12,
595
$7,4
24
$9,1
72
$7,9
01
$8,3
94
$9,2
53
$73,
412
$164
,113
10
-Age
ncy
Adm
inis
tratio
n
545,
943
114,
380
130,
195
132,
302
133,
675
133,
760
135,
361
0 1,
325,
616
20-P
relim
Eng
inee
ring/
Env
Rev
iew
2,09
6 34
0 36
9 34
4 33
4 39
4 36
7 1,
076
5,32
1 To
tal
$584
,000
$1
27,3
15
$137
,988
$1
41,8
18
$141
,910
$1
42,5
49
$144
,981
$7
4,48
8 $1
,495
,050
140 of 144
Adm
inis
trativ
e O
THER
0X00
2 Ag
ency
Adm
inis
trat
ion
Ope
ratin
g M
anag
ed b
y: F
IN
Fund
s ad
min
istra
tive
over
head
exp
ense
s th
at a
re c
harg
ed to
tran
sit o
pera
tions
, pro
ject
s as
wel
l as
over
head
exp
ense
s th
at a
re n
ot
allo
cate
d to
eith
er c
apita
l pro
ject
s or
tran
sit o
pera
tions
. Ove
rhea
d ex
pens
es a
lloca
ted
to p
roje
cts
are
incl
uded
in th
e ca
pita
lized
cos
t of
the
resu
lting
ass
ets.
Una
lloca
ted
over
head
exp
ense
s ar
e in
clud
ed in
gen
eral
and
adm
inis
trativ
e ex
pens
es fo
r the
age
ncy.
The
agen
cy u
ses
a co
st a
lloca
tion
plan
app
rove
d by
the
Fede
ral T
rans
it Ad
min
istra
tion.
(Use
of t
his
appr
oved
mod
el m
akes
the
maj
ority
of i
ndire
ct p
roje
ct e
xpen
ses
elig
ible
for f
eder
al g
rant
fund
ing.
)
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Inc
reas
ed b
y $1
78 m
illion
for a
ntic
ipat
ed a
genc
y ad
min
istra
tive
oper
atin
g co
sts
up to
202
5.
Bud g
et y
ear a
ctiv
ities
: Fun
d ad
min
istra
tive
over
head
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To
Dat
e (Y
OE
$000
s)
Com
plet
ion
Sche
dule
Fi
nanc
ial P
lan
Proj
ect E
stim
ate
(201
9 $0
00s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
$791
,918
2019
TIP
: $1
,139
,488
20
19 :
2025
20
19 C
ost E
stim
ate:
$1
,139
,488
20
20 T
IP:
$1,3
17,7
59
2020
: 20
25
2020
Cos
t Est
imat
e:
$1,3
17,7
59
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to
Date
20
20
2021
20
22
2023
20
24
2025
Fu
tur
e To
tal
Syst
emw
ide
$542
,033
$1
12,5
20
$128
,790
$1
31,6
20
$133
,675
$1
33,7
60
$135
,361
$0
$1
,317
,759
To
tal
$542
,033
$1
12,5
20
$128
,790
$1
31,6
20
$133
,675
$1
33,7
60
$135
,361
$0
$1
,317
,759
Phas
e Li
fe to
Da
te
2020
20
21
2022
20
23
2024
20
25
Fut
ure
Tota
l
10-A
genc
y Ad
min
istra
tion
$542
,033
$1
12,5
20
$128
,790
$1
31,6
20
$133
,675
$1
33,7
60
$135
,361
$0
$1
,317
,759
Tota
l $5
42,0
33
$112
,520
$1
28,7
90
$131
,620
$1
33,6
75
$133
,760
$1
35,3
61
$0
$1,3
17,7
59
Proj
ect R
isk
Asse
ssm
ent
N/A
.
Adm
inis
trativ
e O
THER
6000
25
Envi
ronm
enta
l Miti
gatio
n, M
onito
ring
& M
aint
enan
ce
Man
aged
by:
PEP
D
Mon
itor a
nd m
aint
ain
post
-con
stru
ctio
n en
viro
nmen
tal m
itiga
tion
incl
udin
g w
etla
nd h
ydro
logy
, pla
nt e
stab
lishm
ent,
and
othe
r site
fe
atur
es. D
urat
ion
depe
nds
upon
per
mit
cond
ition
s an
d m
ay b
e 10
yea
rs o
r may
last
for t
he li
fe o
f the
pro
perty
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: N
one.
Budg
et y
ear a
ctiv
ities
: Mon
itor a
nd m
aint
ain
miti
gatio
n m
aint
enan
ce a
ctiv
ities
at T
acom
a Tr
estle
, Tuk
wila
, and
McK
inle
y Pa
rk tr
ansi
t ce
nter
s.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
,471
20
19 :
2030
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $1
,471
20
20 :
2025
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sn
ohom
ish
$121
$1
8 $2
3 $2
3 $2
3 $2
3 $2
8 $0
$2
57
Sout
h Ki
ng
428
62
81
81
81
81
99
0 91
2 Ea
st K
ing
40
6 8
8 8
8 9
0 86
Pi
erce
10
1 15
19
19
19
19
24
0
216
Tota
l $6
91
$100
$1
30
$130
$1
30
$130
$1
60
$0
$1,4
71
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
20-P
relim
Eng
inee
ring/
Env
Rev
iew
$6
91
$100
$1
30
$130
$1
30
$130
$1
60
$0
$1,4
71
Tota
l $6
91
$100
$1
30
$130
$1
30
$130
$1
60
$0
$1,4
71
P roj
ect R
isk
Asse
ssm
ent
N/A
.
141 of 144
Adm
inis
trativ
e O
THER
8020
00
Adm
inis
trat
ive
Cap
ital
Man
aged
by:
FIN
Fund
s ca
pita
l exp
endi
ture
s fo
r adm
inis
trativ
e as
sets
that
sup
port
agen
cy s
taff,
incl
udin
g ad
min
istra
tive
faci
litie
s, n
on-re
venu
e ad
min
istra
tive
fleet
, offi
ce e
quip
men
t, sp
ace
plan
ning
, and
furn
ishi
ngs.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Pro
cure
and
com
mis
sion
into
the
adm
inis
trativ
e fle
et 1
4 el
ectri
c ca
rs, 1
pic
k-up
truc
k, 4
SU
Vs, 4
van
s, b
egin
ye
ar tw
o of
a th
ree
year
repl
acem
ent o
f 96
varia
ble
air e
xcha
nger
s an
d th
ree
HVA
C c
ompr
esso
r at U
nion
Sta
tion,
and
pro
cure
fu
rnis
hing
s to
acc
omm
odat
e ag
ency
gro
wth
.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $6
2,28
4 20
19 :
2041
20
19 C
ost E
stim
ate:
N
/A
2020
TIP
: $6
2,28
4 20
20 :
2041
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $1
4,35
6 $6
,452
$3
,743
$4
,343
$4
,398
$3
,964
$3
,964
$2
1,06
6 $6
2,28
4 To
tal
$14,
356
$6,4
52
$3,7
43
$4,3
43
$4,3
98
$3,9
64
$3,9
64
$21,
066
$62,
284
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
09-A
dmin
Cap
ital
$14,
337
$6,3
52
$3,7
43
$4,3
43
$4,3
98
$3,9
64
$3,9
64
$21,
066
$62,
165
10-A
genc
y Ad
min
istra
tion
19
100
0 0
0 0
0 0
119
Tota
l $1
4,35
6 $6
,452
$3
,743
$4
,343
$4
,398
$3
,964
$3
,964
$2
1,06
6 $6
2,28
4
Proj
ect R
isk
Asse
ssm
ent
The
accu
mul
atio
n of
cha
nges
ove
r tim
e, to
sta
ffing
, spa
ce, a
nd g
row
th o
f adm
inis
trativ
e fa
cilit
ies
coul
d ou
tpac
e th
e fu
ndin
g of
this
pr
ojec
t.
Ad
min
istra
tive
OTH
ER
8038
00
Info
rmat
ion
Tech
nolo
gy P
rogr
am
Man
aged
by:
ITS
Supp
ort a
genc
ywid
e ha
rdw
are
and
softw
are
tech
nolo
gy, d
evel
op a
nd im
plem
ent t
echn
olog
y so
lutio
ns to
impr
ove
adm
inis
trativ
e ef
ficie
ncy
thro
ugh
2041
.
Cha
nges
to a
utho
rized
pro
ject
allo
catio
n si
nce
2019
: Non
e.
Budg
et y
ear a
ctiv
ities
: Im
plem
ent R
ight
of W
ay tr
acki
ng s
oftw
are,
Ope
ratin
g Pe
rform
ance
Rep
ortin
g an
d In
form
atio
n Se
curit
y so
ftwar
e. C
ontin
ue S
hare
Poin
t/Offi
ce 3
60 U
pgra
de a
nd o
ther
stra
tegi
c pr
ojec
ts a
s id
entif
ied.
Auth
oriz
ed P
roje
ct A
lloca
tion
To D
ate
(YO
E $0
00s)
C
ompl
etio
n Sc
hedu
le
Fina
ncia
l Pla
n Pr
ojec
t Est
imat
e (2
019
$000
s)
Base
line:
$0
Ba
selin
e:
N/A
Vo
ter-A
ppro
ved
Cos
t Es
timat
e:
N/A
2019
TIP
: $1
13,5
36
2019
: 20
23
2019
Cos
t Est
imat
e:
N/A
20
20 T
IP:
$113
,536
20
20 :
2041
20
20 C
ost E
stim
ate:
N
/A
Cas
hflo
w (Y
OE
$000
s)
Suba
rea
Life
to D
ate
2020
20
21
2022
20
23
2024
20
25
Futu
re
Tota
l Sy
stem
wid
e $2
6,92
0 $8
,243
$5
,325
$5
,725
$3
,708
$4
,695
$5
,496
$5
3,42
2 $1
13,5
36
Tota
l $2
6,92
0 $8
,243
$5
,325
$5
,725
$3
,708
$4
,695
$5
,496
$5
3,42
2 $1
13,5
36
Phas
e Li
fe to
Dat
e 20
20
2021
20
22
2023
20
24
2025
Fu
ture
To
tal
09-A
dmin
Cap
ital
$21,
624
$6,2
43
$3,6
81
$4,8
30
$3,5
04
$4,4
31
$5,2
89
$52,
347
$101
,948
10
-Age
ncy
Adm
inis
tratio
n 3,
891
1,76
0 1,
405
682
0 0
0 0
7,73
7 20
-Pre
lim E
ngin
eerin
g/En
v R
evie
w
1,40
5 24
0 23
9 21
4 20
4 26
4 20
7 1,
076
3,85
0
Tota
l $2
6,92
0 $8
,243
$5
,325
$5
,725
$3
,708
$4
,695
$5
,496
$5
3,42
2 $1
13,5
36
Proj
ect R
isk
Asse
ssm
ent
Futu
re y
ear f
orec
asts
refle
ct in
itial
pla
nnin
g es
timat
es s
o co
sts
are
subj
ect t
o ch
ange
. Sch
edul
es a
re d
epen
dent
on
staf
f cap
acity
an
d th
e sp
ecifi
c ap
plic
atio
n or
app
roac
h se
lect
ed.
142 of 144