2019 Oregon Structural Specialty Code Board review matrix
Page 1 of 21
The following is a summary matrix showing the Building Codes Structures Board’s recommendation for the adoption of the
2019 Oregon Structural Specialty Code (OSSC).
Source abbreviations
IBC CH – International Building Code (IBC) change
OR A – Existing Oregon amendment
SAM – Statewide Alternate Method
Interp – Statewide Code Interpretation
Committee outcome markings
* Denotes an item with a fiscal impact. The committee's estimated impact can be found in the description column.
Section Subject and description of change Board outcomes
Chapter 2
201, 202 Chapter 2 definitions include various existing amendments and new model code terms related to new model
code provisions and referenced standards. The code review committee’s action on the provisions located in the
body of the code will guide and dictate removal or modification of terms in Chapter 2, as applicable.
Approved
Chapter 3
302 Classification of outdoor areas. | IBC CH Approved IBC CH
304.2 Lockup facilities. | OR A: added provisions for lockup facilities defined in ORS 169.005(4). Retained OR A
306.3 Low-hazard factory industrial, Group F-2. | OR A: added wood barrel and bottled wine to Group F-2. Retained OR A
307.2.1 Storage of Class 1.4G Class C Common. Fireworks. | OR A: added section for temporary storage of Class C
Common fireworks in permanent buildings. (14 OSSC 307.1.2)
Retained OR A
308, 310 DHS Licensed facilities. | Public proposal no. OSSC-13 ~ Dan Purgiel
Committee review:
March 15, 2018 Committee requested more information from the proponent.
March 29, 2018 Committee approved the proposal to update the existing amendments that align the
OSSC with federal requirements for healthcare occupancies and DHS requirements.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
308.2
308.2.1
308.2.2
308.2.3
308.2.4
Institutional Group I-1. | OR A: modified section to exclude staff from the person count. (14 OSSC 308.3)
Condition 1. | OR A: aligned to DHS and specified the facilities under Condition 1. (14 OSSC 308.3.1)
Condition 2. | OR A: aligned to DHS and specified the facilities under Condition 2. (14 OSSC 308.3.2)
Six to sixteen persons receiving custodial care. | OR A| Aligns with 18 IBC. (14 OSSC 308.3.3)
≤ Five persons receiving custodial care. | OR A: added reference to ORSC, App. T. (14 OSSC 308.3.4)
Retained OR A
Retained OR A
Retained OR A
Rescinded OR A
Retained OR A
308.3.2 ≤ Five persons receiving medical care. | OR A: added reference to ORSC, App. T. (14 OSSC 308.4.1) Retained OR A
308.5.5 Family childcare homes. | OR A: added for those located in a private residence. (14 OSSC 308.6.5) Rescinded OR A
310.3 Residential Group R-2. | IBC CH | OR A: added for occupancies providing 21 or more housing units for low-
income elderly. (14 OSSC 310.4)
Approved IBC CH
Retained OR A
310.4 Residential Group R-3. | IBC CH and OR A: added adult care facilities, child care facilities, adult foster
homes and lodging houses. (14 OSSC 310.5)
Approved IBC CH
Rescinded OR A
310.4.2 Lodging houses. | IBC CH | added section in 2015 and modified the section in 2018.
Committee review:
March 29, 2018 Committee approved IBC CH, modified by deleting “owner-occupied” to align with
the ORSC number of occupants from 10 or fewer to 16 or fewer.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Final outcome: Approved the model code change and added a reference to ORSC, App. T.
Approved IBC CH
(modified)
310.5
310.5.1
310.5.2
Residential Group R-4. | OR A: modified for the addition of two sections. (14 OSSC 310.6)
Condition 1. | OR A: added and specified the facilities under Condition 1. (14 OSSC 310.6.1)
Condition 2. | OR A: added, align to DHS, and specified the facilities under Condition 2. (14 OSSC 310.6.2)
Retained OR A
Retained OR A
Retained OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 2 of 21
Section Subject and description of change Board outcomes
311.1.1 Accessory storage spaces. | IBC CH | Public proposal no. OSSC-14 ~ Johnathan Balkema, OBOA
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
March 29, 2018 Committee approved the IBC CH, modified by the proposal to make the provision
optional.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Feb. 6, 2019 Board reaffirmed the approval of the proposal.
Approved IBC CH
modified by the
Approved proposal
311.3 Low-hazard storage, Group S-2. | OR A: added wood barrels to Group S-2. Retained OR A
311.4 Mausoleums and Columbariums. Group S-3. | OR A: added Group S-3. Retained OR A
312.1 Classification of communication equipment structures. | IBC CH Approved IBC CH
312.1.1 Greenhouses. | IBC CH Approved IBC CH
Chapter 4
403.6.1 Fire service access elevator. | Public proposal no. OSSC-15 ~ Jesse Emory, GBD Architects
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee disapproved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Disapproved proposal
404.5 Smoke Control. | Exception. | IBC CH Approved IBC CH
404.6 Enclosure of atriums. | IBC CH Approved IBC CH
406 Motor Vehicle-Related Occupancies. | IBC CH Approved IBC CH
406.2.2 Clear Height. | IBC CH ~ *Fiscal impact: ≤ 5% increase. Approved IBC CH*
406.3.1 Classification. | IBC CH ~ *Fiscal impact: ≤ 5% increase. Approved IBC CH*
406.8 Repair Garages. | IBC CH ~ *Fiscal impact: ≤ 5% increase. Approved IBC CH*
407 Group I-2. | IBC CH Approved IBC CH
407.1 Group I-2 General. | IBC CH Approved IBC CH
407.2.5 Nursing Home Housing Units. | IBC CH Approved IBC CH
407.5 Maximum Smoke Compartment Size I-2. | IBC CH Approved IBC CH
408.2 Other occupancies Group I-3. | OR A: modified for security operations. Retained OR A
408.3.9 Cell tier exiting. | OR A: added cell tier exiting provisions. Retained OR A
408.9 Windowless buildings. | OR A: deleted. Retained OR A
408.11 Emergency ventilation. | OR A: added requirement for Group I-3 resident housing areas. Retained OR A
412.3.1
412.4.3
412.4.4
412.4.6
Exterior walls. (14 OSSC 412.4.1) | Public proposal no. OSSC-16 | Aron Faegre, OR Aviation Industries
Floor surface. (14 OSSC 412.3.3) | Public proposal no. OSSC-17 | Aron Faegre, OR Aviation Industries
Heating equip. (14 OSSC 412.3.4) | Public proposal no. OSSC-18 | Aron Faegre, OR Aviation Industries
Fire suppression. (14 OSSC 412.3.6) | Public proposal no. OSSC-19 | Aron Faegre, OR Aviation Industries
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee disapproved the proposals.
Board review:
The BCSB reviewed this proposals separately and adopted temporary amendments for the 2014 OSSC.
Action outside of
Code review process
412.5 Aircraft Paint Hangars. | IBC CH ~ *Fiscal impact: Slight decrease Approved IBC CH*
412.5.6 Fire suppression. | OR A: added another exception. (14 OSSC 412.4.6) | Updated due to concurrent board
action.
Rescinded OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 3 of 21
Section Subject and description of change Board outcomes
415.5 Emergency Alarms. | IBC CH Approved IBC CH
420 Groups I-1, R-1, R-2, R-3, and R-4. | IBC CH Approved IBC CH
420.6 Smoke barriers in Group I-1 Condition 2. | OR A | (14 OSSC 420.4 and 420.4.1) | Aligns with 18 IBC. Rescinded OR A
422.6 Electrical Systems in Ambulatory… | IBC CH Approved IBC CH
455 Piers and Wharves. | OR A: added section. (14 OSSC 424) Retained OR A
425 Hyperbaric facilities. | IBC CH Approved IBC CH
456 Mausoleums and Columbariums. | OR A: added sections. (14 OSSC 425) Retained OR A
426 Combustible Dusts, Grain Processing and Storage. | IBC CH Approved IBC CH
427 Medical Gas Systems. | IBC CH Approved IBC CH
428 Higher Education Laboratories. | IBC CH Approved IBC CH
New Earthquake relief shelter. | Public proposal no. OSSC-12 ~ Jeffrey Soulages, OSSPAC
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee reviewed testimony and agreed to forward the proposal for review.
April 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2018 Board received testimony in opposition and ultimately disapproved the proposal.
Disapproved proposal
Chapter 5
Table 504.3 Allowable building heights and areas. | OR A: added Group S-3. (14 OSSC Table 503) Retained OR A
503.1.4 Occupied roofs. | IBC CH Approved IBC CH
504 Building Height and Number of Stories. | IBC CH Approved IBC CH
504.2 Automatic sprinkler system increase. | OR A: added I-1 Condition 2 to the exception. | No longer necessary Rescinded OR A
505.2.3 Openness. | IBC CH Approved IBC CH
Table 506.2 Allowable Area Factor. | IBC CH Approved IBC CH
506.3 Automatic Sprinkler system increase. | OR A: limited I-3 occupancy allowance. | No longer necessary Rescinded OR A
507.1 Unlimited Area Building. | IBC CH Approved IBC CH
508.1 General. | OR A: added 4th exception per winery regulations. Retained OR A
Table 508.4 Required separation of occupancies. | Public proposal no. OSSC-21 ~ Jack Applegate, NCPA
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Committee approved the proposal to add values for the blanks in the Table.
Board review:
Aug. 1, 2018 Committee Board affirmed the committee’s recommendation.
Public proposal no. OSSC-20 | Johnathan Balkema, OBOA (Withdrawn by proponent)
Approved proposal
510.2 Horizontal Building Separation Allowance. | IBC CH Approved IBC CH
Chapter 6
2019 Oregon Structural Specialty Code Board review matrix
Page 4 of 21
Section Subject and description of change Board outcomes
Table 601 Fire-resistance rating requirements for building elements. |
OR A: added a footnote that prohibits the reduction from roofs supporting rooftop structures in Section 1509.
Public proposal no. OSSC-22 | Eric Bressman, Ankrom Moison Architects
Committee review:
April 26, 2018 Committee approved the proposal to add a footnote modified as follows:
“For the purpose of determining the fire-resistance rating of joints, penetrations, openings
and ducts in concrete floor and roof two-way slabs having direct connection to the
columns, the fire-resistance rating for associated secondary members shall be used. All
reinforcing steel and post-tensioning tendons shall have concrete coverage adequate to
provide the fire-resistance rating required for primary structural frame elements.”
[Also see Section 711.2.4] ~*Fiscal impact: Slight decrease.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Retained OR A
Approved proposal
602 Construction Classification. | IBC CH Approved IBC CH
Table 602 Fire-resistance rating requirements for exterior walls.... | OR A: added S-3 occupancies to Table. Retained OR A
602.4 Type IV. Construction classification. | IBC CH Approved IBC CH
602.4 SAM 15-01 | Cross-laminated timber provisions. Retained SAM
Chapter 7
706.2 SCI 06-03 | Sprinkler system installation in buildings with firewalls. Retained Interp
703.2.4 Supplemental Features. | IBC CH ~ *Fiscal impact: Slight decrease. Approved IBC CH*
Table 705.2 Minimum Distance of Projection. | IBC CH | OR A | Aligns with 18 IBC. Approved IBC CH
705.2.3 Combustible projections. | OR A: modified. Rescinded OR A
705.6 Structural Stability, Exterior Walls. | IBC CH Approved IBC CH
705.8.6 Vertical exposure. | OR A: added charging information for the vertical exposure opening protectives. Retained OR A
705.8.6.1 Vertical exposure for buildings on the same lot. | OR A: modified the points of measurements. Retained OR A
705.8.6.2 Vertical exposure for buildings on separate lots. | OR A: added provisions for those on separate lots. Retained OR A
Table 705.8 Maximum Area (Exterior) | Public proposal no. OSSC-23 ~ Jack Applegate, Northwest Code Professionals
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Committee disapproved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Disapproved proposal
706.1.1 Party Walls Not … Fire Walls. | IBC CH | Public proposal no. OSSC-24 ~ Johnathan Balkema, OBOA
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Committee approved the proposal to disapprove the model code change by deleting
the second exception that would no longer require a fire wall at lot lines when the
building height and area comply with the code.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Disapproved IBC CH
Approved proposal
706.2 Structural Stability, Fire Walls. | IBC CH ~ *Fiscal impact: Slight decrease. Approved IBC CH*
708.4 Continuity of Fire Partitions. | IBC CH Approved IBC CH
709.5 Openings. | OR A: added Group I-1 Condition 2. | No longer necessary Rescinded OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 5 of 21
Section Subject and description of change Board outcomes
711.2.4 Fire-resistance rating. | Public proposal no. OSSC-22 ~ Eric Bressman, Ankrom Moison Architects
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Committee discussed modifying the proposal and tabled the item for more info.
April 26, 2018 Committee approved the proposal to add an exception to see Table 601 for
“concrete floor or roof two-way assemblies having direct connection to the column.”
~ *Fiscal impact: Slight decrease.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal*
714.5.2 Membrane Penetrations. | IBC CH ~ *Fiscal impact: Slight increase. Approved IBC CH*
Chapter 8
803.11 / 12 Flame Spread Testing of Laminates and Veneers. | IBC CH Approved IBC CH
Chapter 9
901.1 Scope. | OR A: modified. Retained OR A
901.1.2 Fire protection system shop drawings. | OR A: added section. Retained OR A
902.1.3 Environment. | Public proposal no. OSSC-26 ~ Johnathan Balkema, OBOA
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Committee approved the proposal to clarify that rooms being heated solely for
freeze protection are intended to be considered low-energy buildings, modified by
adding “and shall not be considered a conditioned space.”
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Approved proposal
(modified)
903 Automatic Sprinkler Systems. | IBC CH | Fiscal impact: ≤ $2.65 per square foot increase. Approved IBC CH*
903.2.1.6 Assembly occupancies on roofs. | IBC CH specific sprinkler requirements. Approved IBC CH
903.2.1.7 Multiple fire areas. | IBC CH Approved IBC CH
903.2.4.1 SCI 08-04 | Automatic sprinkler requirements in F-1 woodworking operations. Retained Interp
903.2.6 Group I. | OR A: deleted exception number 2. | No longer necessary. Rescinded OR A
903.2.7 Group M. | OR A: deleted item number 4 and added Section 903.2.7.2.
Committee review:
April 12, 2018 Committee approved the IBC language and rescinded the existing amendment. ~
*Fiscal impact: Less than or equal to $2.65 per square foot increase.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Rescinded OR A*
903.2.8 Group R. | OR A: modified and added section. Rescinded OR A
903.2.8.4 Care facilities. | Deleted to align with the Chapter 3 changes. Deleted IBC language
903.2.8.5 Substantial Alterations of Group R2. | OR A: modified. Retained OR A
903.3.1.2.1 Balconies and Decks. | OR A | Public proposal no. OSSC-27 ~ Johnathan Balkema, OBOA
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Committee approved the proposal to retain the OR A that requires sprinkler
protection regardless if a deck or roof is above. ~ *Fiscal impact Slight increase.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Approved proposal to
retain OR A*
2019 Oregon Structural Specialty Code Board review matrix
Page 6 of 21
Section Subject and description of change Board outcomes
904.13 Domestic cooking systems. | IBC CH requires protection on domestic cooking systems for R-2 dorms.
Committee review:
April 12, 2018 Committee approved the IBC CH, modified by adding “operated by a college or
university for student housing.”
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH
(modified)
904.13.1.2 Protection from fire. | Public proposal no. OSSC-28 ~ Johnathan Balkema, OBOA
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Committee disapproved the proposal and approved the IBC language.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Disapproved proposal
906 Portable fire extinguishers. | OR A: deleted entire section. Retained OR A
907.2.3 Group E, Emergency voice/alarm communication system. | OR A | IBC CH | Aligns with 18 IBC. Approved IBC CH
907.2.6 SCI 12-02 | Fire alarm design in health care facilities public vs. private mode. Retained Interp
907.2.9.3 Group R-2 college and university buildings. | IBC CH Approved IBC CH
907.2.10 Single- and multiple-station smoke alarms. | OR A: doesn't adopt Sect. 29.3.8 of NFPA 72. Retained OR A
907.5.2.3 Visible Alarms. | IBC CH expanded appliances in I-1, R-1, R-2. | OR A: modified R-2.
Committee review:
April 12, 2018 Committee approved the IBC CH and rescinded the OR A. ~ *Fiscal impact:
$280/unit
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Feb. 6, 2019 Board received testimony reversed the committee’s recommendation, disapproved
the IBC CH and retained the OR A.
Disapproved IBC CH
Retained OR A
909.21.1 Pressurization requirements. | IBC CH Approved IBC CH
910 Smoke and Heat Removal. | IBC CH Approved IBC CH
Load Performance. | Public proposal no. OSSC–30 ~ Herb Kroeger, Architectural Specialties
Committee review:
March 15, 2018 Committee requested a detailed fiscal analysis and more info about the proposal.
March 29, 2018 Committee requested a detailed fiscal analysis and more info about the proposal.
April 12, 2018 Committee requested a detailed fiscal analysis and more info about the proposal.
April 26, 2018 Committee disapproved the proposal.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Disapproved proposal
915 Carbon Monoxide Detection. | IBC CH: moved, added Group E, and excluded Group I-3.
Committee review:
April 26, 2018 Committee tabled the item to gather more information.
May 17, 2018 Committee approved the IBC code changes.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Feb. 6, 2019 Board received more testimony and approved the IBC change.
May 1, 2019 Topic returned to the board for additional discussion and revisited process,
including related public proposal.
Final outcome: The model code change was disapproved. The provisions will remain the same as in the
2014 OSSC.
Disapprove IBC CH
2019 Oregon Structural Specialty Code Board review matrix
Page 7 of 21
Section Subject and description of change Board outcomes
915.2.4 Groups A, B, and M. | Public proposal no. OSSC-29 ~ Mark Kohorst, NEMA
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Proponent requested that the proposal be discussed at the next committee meeting.
The committee tabled the item.
April 26, 2018 Committee requested to see the proposal language as a modification to the 18 IBC
for review. The committee tabled the item.
Testimony: Kenneth Ball, NEMA
May 17, 2018 Committee approved the proposal as modified and submitted by the proponent.
Board review:
Nov. 7, 2018 Board discussed the committee’s recommendation.
May 1, 2019 Proponent provided additional, extended testimony.
Feb. 6, 2019 Board received more testimony and ultimately disapproved the proposal.
Disapproved proposal
915.5 Carbon monoxide alarms. | OR A: doesn't adopt NFPA 720 section 9.4.2.2. (14 OSSC 908.7) Retained OR A
915.6 Group R. | OR A: separated out Group R provisions and added a Group R section. (14 OSSC 908.7.2)
Committee review:
April 12, 2018 Committee tabled the item.
April 26, 2018 Committee tabled the item.
May 17, 2018 Committee rescinded the existing amendments.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Feb. 6, 2019 Board received more testimony, reversed the committee’s recommendation, and
retained the existing amendment.
Rescinded OR A
917 Mass Notification Systems. | IBC CH | Fiscal impact: Approx. $5,000 increase Approved IBC CH*
Chapter 10
1003.2 Ceiling height. | OR A: added hallways and corridors to exception. ~ Fiscal impact: Slight increase. Rescinded OR A *
1004.2 Cumulative Occupant Loads. | IBC CH Approved IBC CH
T. 1004.5 Maximum Floor Area Allowances per Occupant. | IBC CH Approved IBC CH
1006 Number of Exits and Exit Access Doorways. | IBC CH Approved IBC CH
1007 Exit and Exit Access. Doorway Configuration. | IBC CH |
Public proposal no. OSSC-31 | Heather Christenson, OBOA
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 26, 2018 Committee disapproved the proposal and approved the IBC CH.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH
Disapproved proposal
1006.3 SCI 11-03 | Emergency power illumination in warehouse applications. Retained Interp
1008.1.2 Door Swing. | Public proposal no. OSSC-32 ~ Jesse Emory, GBD Architects
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 26, 2018 Committee disapproved the proposal.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Disapproved proposal
1010.1.4.4 Locking Arrangements in Educational Occupancies. | IBC CH Approved IBC CH
1010.1.9 Door operations. | IBC CH | Fiscal impact: Slight increase. Approved IBC CH*
1010.1.10 Panic and fire hardware. | OR A: modified. Retained OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 8 of 21
Section Subject and description of change Board outcomes
1009.16 Stairways to roof. | Public proposal no. OSSC-33 ~ Eric Bressman, Ankrom Moisan Architects
(14 OSSC 1009.16)
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee agreed to forward the proposal for review.
April 26, 2018 Committee approved the proposal as modified by removing the structural language
in the proposal and adopt the proposal to allow an alternating tread device, a ship
stair or ladder that is constructed of “noncombustible material” rather than “steel.”
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Approved proposal as
modified
1011.15 Ship Ladders, Ladders. Approved IBC CH
T. 1017.2 Exit Access Travel Distance. | OR A: added note D. Rescinded OR A
1017.2.2 Groups F-1 and S-1 increase. | IBC CH Approved IBC CH
1018.1 Construction. | OR A: modified – adds exception. (14 OSSC 1017.1.) Rescinded OR A
1018.3 Aisles in Groups B and M. | IBC CH Approved IBC CH
1023.3.1 Extension. | IBC CH ~ * Fiscal impact: Slight decrease. Approved IBC CH*
Chapter 11
1101.2.1 Alternate Methods. | OR A: added sections. Retained OR A
1103.1 SCI 95-04 | Accessibility requirements. - church baptisteries Retained OR A
1103.2.8 Areas in Places of Religious Worship. | IBC CH Approved IBC CH
1103.2.14 Access to Walk-In Coolers. | IBC CH Approved IBC CH
1103.2.16 Private membership clubs and churches. | OR A: added section. Retained OR A
1104.4 Multistory-Multilevel buildings and facilities. | OR A: modified. Retained OR A
1104.4 Multistory Buildings and Facilities. | IBC CH Approved IBC CH
1104.5 Elevators Required. | OR A: added section. Retained OR A
T. 1106.1 Accessible Parking Spaces. | OR A: added. Retained OR A
1106.5 Van Spaces. | OR A: added sentence. Retained OR A
1106.7 Parking spaces. | OR A: added section. Retained OR A
1106.8.2.1 Group I-2. | OR A: added section. Retained OR A
1107.3/4 Accessible Spaces and Routes. | IBC CH Approved IBC CH
1107.5 Group I-1. | OR A: modified and added language. (DHS Alignment) Retained OR A
1107.5.1.1 Accessible Units in ALFs. | IBC CH Approved IBC CH
1107.6.1.1 Group R – Accessible Units. | IBC CH Retained OR A
1107.6.4 Group R-4. | OR A: modified and added language. Retained OR A
1108.2 Assembly area seating. | OR A: modified. Retained OR A
1108.2.9 Dining and drinking areas. | OR A: deleted exception 2. Retained OR A
1108.2.9.1 Dining and drinking areas. | OR A: added language. Retained OR A
1109.2.1.2 Family or Assisted-Use Toilet Rooms. | IBC CH Approved IBC CH
2019 Oregon Structural Specialty Code Board review matrix
Page 9 of 21
Section Subject and description of change Board outcomes
Privacy. | Public proposal no. OSSC-35 ~ Jason Phelps
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee agreed to forward the proposal for review.
April 26, 2018 Committee approved the proposal as modified by the following:
“Doors to single-user, an occupied indicator in accordance with Section 1010.1.9.6.”
And not include a change in Chapter 11. In Chapter 12 add to Section 1209.3.1:
"Single-Use Toilet and Bathing Rooms"
*Fiscal impact: $50 per door increase.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH as
modified*
1109.2 Accessible Water Closet Compartments. | IBC CH Approved IBC CH
1109.2.3 Accessible Lavatories. | IBC CH Approved IBC CH
1109.15 Gaming Machines and Gaming Tables. | IBC CH Approved IBC CH
1110.4.13 Access to Children’s Play Areas. | IBC CH Approved IBC CH
1111 Clustered mailboxes. | OR A: added section.
Committee review:
June 12, 2018 Committee retained the existing amendment and requested clearer language
showing that the intent was for exterior use.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Retained OR A
Chapter 12
1204.1 Lighting, General. | IBC CH Approved IBC CH
93-94 | Moisture proofing in toilet rooms. Retained Interp
1210.4 Fixture clearances. | OR A: added section. Retained OR A
Chapter 14
1403.2.1 Exterior wall envelope drainage. | Public proposal no. OSSC-37 ~ Johnathan Balkema, OBOA
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee agreed to forward the proposal for review.
June 12, 2018 Committee voted to disapproved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Disapproved proposal
1402.5 Vertical and lateral flame propagation. | OR A: modified and added exceptions. Rescinded OR A
1404.3 Vapor retarders. | IBC CH Approved IBC CH
1404.3.1 Class III Vapor Retarders. | OR A: modified table and added notes. Retained OR A
1404.6.2 Seismic requirements. | OR A: added language. | (14 OSSC 1405.6.2)
Public proposal no. OSSC-38 ~ Tom Young, Northwest Concrete Masonry
Public proposal no. SEAO-2 ~ SEAO
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis for OSSC-38.
March 29, 2018 Committee agreed to forward the proposal for review.
June 12, 2018 Committee approved both proposals and rescinded the OR A.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Rescinded OR A
Approved proposal
Approved proposal
1404.10.3 Interior adhered masonry veneers. | OR A: added exception. Retained OR A
1405.4 SCI 94-04 | Acceptable window and door sealing methods. Retained Interp
2019 Oregon Structural Specialty Code Board review matrix
Page 10 of 21
Section Subject and description of change Board outcomes
1405.3 Vapor retarders. | OR A: modified and added exceptions. Retained OR A
1406 Metal Composite Materials MCM. | IBC CH Approved IBC CH
1406.3 SCI 07-03 | Stacked decks on buildings of types III, IV, and V construction. Retained Interp
1407.4.1 EIFS. | OR A: modified. Retained OR A
1408 SCI 08-01 | Use of exterior insulation and finish systems. Retained Interp
Chapter 15
1509.7.2 Structural Fire Resistance. | OR A: modified and deleted Sections 1509.7.3 and 7.4. Rescinded OR A
1510.3.1 Reroofing inspection. | OR A: added section. Retained OR A
1510.3.2 Final Inspection. | OR A: added section. Retained OR A
1512 Solar Photovoltaic. | OR A: deleted. Retained OR A
Chapter 16
1602.1 Notations. | OR A: modified “E” to include seismically induced lateral earth pressure and deleted “Fa” Flood
Load notation.
Note: Section 2.3.6 of ASCE 7-16 via ’18 IBC CH now specifically addresses, includes and clarifies this
requirement. Flood Load, Fa is specific to ASCE 7-16 requirements/load combinations.
Retained OR A
1603.1 General. | IBC CH | OR A: modified by deleting item #5, providing flood design data on CDs for
conventional light-frame construction located in flood hazard area.
Approved IBC CH
Retained OR A
1603.1.3 Roof Snow Load data. | IBC CH Approved IBC CH
1603.1.4 Wind design data. | IBC CH Approved IBC CH
1603.1.7 Flood design data. | OR A: deleted this section. Retained OR A
1603.1.8 Special loads. | IBC CH Approved IBC CH
1603.1.8.1 Photovoltaic panel systems. | IBC CH Approved IBC CH
1603.1.9 Roof rain load data. | IBC CH Approved IBC CH
1603.1.9 Systems and components requiring... | IBC CH Approved IBC CH
T. 1604.3 Deflection Limits. | IBC CH Approved IBC CH
1604.3 Serviceability. | IBC CH Approved IBC CH
1604.3.3 Steel. | IBC CH Approved IBC CH
1604.3.7 Framing supporting glass. | IBC CH Approved IBC CH
1604.4 Analysis. | OR A: modified and added language regarding rigid diaphragm determination. |
IBC CH | OR A is no longer necessary.
Rescinded OR A
Approved IBC CH
1604.5 Risk category. | IBC CH Disapproved IBC CH
1604.5 Risk category. | IBC CH Approved IBC CH
T. 1604.5 Risk category of buildings and other structures. | IBC CH Approved IBC CH
1604.5.1 Multiple Occupancies. | IBC CH Approved IBC CH
1604.9 Counteracting Structural Actions. | IBC CH Approved IBC CH
2019 Oregon Structural Specialty Code Board review matrix
Page 11 of 21
Section Subject and description of change Board outcomes
Wind and seismic detailing. | Public proposal no. SEAO-03 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1604.10 Storm Shelters. | IBC CH: added a new section.
Committee review:
May 17, 2018 Approved the IBC CH.
Board review:
Nov. 7, 2018 Disapproved the IBC CH because it is not applicable in Oregon.
Disapproved proposal
1605.2.1 Other loads. | OR A: modified. | No longer necessary. Rescinded OR A
1605.3.1.2 Other loads. | OR A: modified. | No longer necessary. Rescinded OR A
1605.3.2.1 Other loads. | OR A: modified. Retained OR A
T. 1607.1 Minimum Live Loads. | IBC CH | OR A: modified | Public proposal no. SEAO-06 ~ SEAO
Committee review:
May 17, 2018 Committee approved the IBC code changes, approved the proposal, and retained
item #31 for storage loads and item #36 for exterior foot bridges from the existing
Oregon amendment. Fiscal impact: Slight increase for wood balconies.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH*
Approved proposal
Retained OR A
1607.10.3 Elements supporting hoists for facade acces... | IBC CH Approved IBC CH
1607.10.4 Fall arrest and lifeline anchorages. | IBC CH Approved IBC CH
1607.13.3 Occupiable roofs. | IBC CH Approved IBC CH
1607.13.5 Interior walls and partitions. | IBC CH Approved IBC CH
1607.15 Fire walls. | IBC CH Approved IBC CH
1607.15.2 Photovoltaic panel systems. | IBC CH Approved IBC CH
306, 311 SAM 16-08 | Electronic snow load locator.
Use of the Oregon electronic snow load map as created by the SEAO as an alternate method to the snow load
provisions.
Rescinded SAM
1608.1 General. | OR A: modified. | Public proposal no. SEAO-10 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal and rescinded the OR A.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Rescinded OR A
Approved proposal
1608.2 Ground Snow Loads. | OR A: modified | public proposal no. SEAO-09 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal and rescinded the OR A.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Rescinded OR A
Approved proposal
1609 Wind Loads. | IBC CH | The IBC maps allow site-specific wind speeds to be determined from
https://hazards.atcouncil.org/ via Note 6 on Figures 1609.3 (1-4). Special wind regions identified on the maps
fall to local jurisdiction for design wind speed determination.
Disapproved IBC CH
1609 Figures A, B, C: Ultimate Wind Speed. | OR A: added Oregon specific figures on ultimate design wind
speed. – See item #45 below.
Retained OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 12 of 21
Section Subject and description of change Board outcomes
1609.1.1 Determination of wind loads. | IBC CH | Public proposal no. SEAO-11 ~ SEAO
Committee review:
May 17, 2018 Tabled the item and requested more information.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH
Approved proposal
1609.1.1 Wind Tunnel Test Adoption. | Public proposal no. SEAO-30 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal as modified by removing exception #7 and
everything after.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal as
modified
1610.1 Soil lateral loads. | OR A: added clarifying language when ascending backfill slope is present. Retained OR A
1612.1 Flood loads. | OR A: modified in alignment with ORS. Retained OR A
1612.3 Establishment of flood hazard areas. | OR A: modified. Retained OR A
1612.3.1 Design flood elevations. | OR A: deleted. Determination of impacts. | OR A: deleted. Retained OR A
1613.1 SAM 08-02 | Power actuated fasteners. Retained SAM
1613.1 SCI 10-01 | Construction requirements for suspended ceiling systems. Retained Interp
1613.1 Earthquake loads. - Scope. | IBC CH | Public proposal no. SEAO-04 ~ SEAO
Committee review:
May 17, 2018 Committee approved the IBC CH and the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH
Approved proposal
1613.2.3 ASCE 7-16 Modifications. | Public proposal no. SEAO-40 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1613.3 Ballasted Photovoltaic Panel Systems. | IBC CH Approved IBC CH
1613.3.5.1 Alternative seismic design category determination. | IBC CH Approved IBC CH
1613.3.1 Mapped acceleration parameters. | OR A: modified. Retained OR A
F.
1613.3.1(1)
Risk targeted maximum considered earthquake. | OR A: replaced. Retained OR A
F.
1613.3.1(2)
Risk targeted maximum considered earthquake. | OR A: replaced. Retained OR A
1613.4 Alternatives to ASCE 7. | IBC CH Approved IBC CH
1613.5.5 ASCE 7-16 modification. | Public proposal no. SEAO-12 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
2019 Oregon Structural Specialty Code Board review matrix
Page 13 of 21
Section Subject and description of change Board outcomes
1613.5 Modifications to ASCE 7-10. | OR A: added section.
Committee review:
May 17, 2018 Committee Retained OR A existing amendments in Sections 1613.5.4, 1613.5.5,
1613.5.6, 1613.5.7, 1613.5.8, 1613.5.9, 1613.5.10, and 1613.5.12.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Retained OR A
1613.5.1 ASCE 7 modification replaces. | Public proposal no. SEAO-13 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1613.5.2 Clarification of component anchorage requirements. | Public proposal no. SEAO-14 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1613.5.3 ASCE 7-10. | Public proposal no. OSSC-39 ~ Jon-Paul Cardin, American Iron and Steel Institute
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Committee agreed to forward the proposal for review.
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1613.5.3 ASCE 7 modification repeal. |
Public proposal no. OSSC-39 ~ Jon-Paul Cardin, American Iron and Steel Institute
Public proposal no. SEAO-15 ~ SEAO
Committee review:
May 17, 2018 Committee approved both of the proposals.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1613.5.11 ASCE 7 modification repeal. | Public proposal no. SEAO-23 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1613.5.13 ASCE 7 modification repeal. | Public proposal no. SEAO-25 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1613.6 Earthquake recording instrumentation. | Public proposal no. SEAO-27 ~ SEAO (14 OSSC 1613.7)
Committee review:
May 17, 2018 Committee approved the proposal as modified to align with OAR 632-001-0012.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved modified
proposal
1613.6 Amendment to ASCE 7-05. | OR A: added section requiring suspended ceilings less than 1,000 sq. ft. in
SDC D-F have horizontal restraint to the structural system/framing.
Retained OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 14 of 21
Section Subject and description of change Board outcomes
1613.7 Earthquake recording instruments. | OR A: added section.
Committee review:
May 17, 2018 Committee retained OR A the existing amendment as modified by item no. 71
(above).
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Retained OR A as
modified
1615
Tsunami Loads. | IBC CH: added a new section |Public proposal no. SEAO-05 ~ SEAO
Committee review:
May 17, 2018 Disapproved the IBC CH code change.
Board review:
Feb. 6, 2019 Board affirmed the committee’s recommendation to disapprove the IBC code
change and approved the division’s proposed changes to 1615.1 identifying the
buildings and structures required to be designed and constructed in accordance with
Chapter 6 of ASCE 7, where they are located in a DOGAMI-established tsunami
inundation zone.
Disapproved IBC CH
Disapproved proposal
New OR A
Chapter 17
1704.2.5.1 Fabricator approval. | IBC CH | OR A: added “by a nationally recognized accrediting authority.” Approved IBC CH
Retained OR A
1704.3 Statement of special instructions. | IBC CH Approved IBC CH
1704.5 Submittals to the Building Official. | IBC CH Approved IBC CH
1704.6.1 Structural observation. | IBC CH Approved IBC CH
1705.2 Steel construction. | IBC CH Disapproved IBC CH
1705.2 Steel construction. | OR A: modified. Maintain OR A. Retained OR A the Table. Retained OR A
1705.2.3 Open Web Steel Joists and Joist Girders. | IBC CH | Fiscal impact: Greater than 0.1% increase. Approved IBC CH*
1705.3 Required Special Inspections of Concrete Construction. | IBC CH Approved IBC CH
1705.5.2 Metal-plate-connected Wood Trusses. | IBC CH
SEE IBC Errata – This was withdrawn by proponent and subsequently changed back to model code but does
appear in first printing of 2018 iteration.
Approved Errata
1705.11 Special inspections for wind resistance. | IBC CH Approved IBC CH*
1705.12 Special Inspections for seismic resistance. | IBC CH | OR A | Public proposal no. SEAO-32 ~ SEAO
Committee review:
May 17, 2018 Approve the model code language, rescind the Oregon Amendment, disapprove the
proposal. ~ *Fiscal impact: 10% of the production 0.5% cost allocated to special
inspections.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH*
Rescinded OR A
Disapproved proposal
1705.12.1 Structural steel. | Public proposal no. SEAO-33 ~ SEAO (14 OSSC 1705.11.1)
Committee review:
May 17, 2018 Approved as modified by adding only “In addition to the quality assurance
requirements contained in AISC 341, Chapter J, Section J5 Inspection Tasks., the
requirements of Section 1705.2 and Table 1705.2 of the Building Code shall
apply.”
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal as
modified
2019 Oregon Structural Specialty Code Board review matrix
Page 15 of 21
Section Subject and description of change Board outcomes
1705.12.2
1705.12.3
1705.12.5
Structural wood. | Public proposal no. SEAO-34 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal. ~ *Fiscal impact: Slight decrease.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal*
1705.12.6 Plumbing, mechanical and electrical components. | IBC CH ~ *Fiscal impact: Less than or equal to 1%
increase of the special inspections cost.
Approved IBC CH*
1705.12.9 Cold-formed steel special bolted moment frames. | IBC CH Approved IBC CH
1705.13.2 Nonstructural components – Seismic qualification. | Public proposal no. SEAO-36 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1705.13.3 Designated seismic systems. | Public proposal no. SEAO-37 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal. ~ *Fiscal impact: Slight decrease.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal*
1705.18 Radon Mitigation Inspections. | OR A: added section. Retained OR A
1705.18.1 Soil-Gas-Retarder Membrane. | OR A: added section. Retained OR A
1705.18.2 Sealing of construction joints, penetrations. | OR A: added section. Retained OR A
1708 Test safe load. | IBC CH Approved IBC CH
1708.2.2 Static Load Testing. | IBC CH Approved IBC CH
1709.5 Exterior Window and Door Assemblies. | IBC CH Approved IBC CH
1711 Material and Test Standards. | IBC CH Approved IBC CH
Chapter 18
1803.2 Investigations required. | OR A: added language.
Tsunami inundation zone. | OR A: added language. | Note: BCD moved to Chapter 16
Retained OR A
Retained OR A
1803.3.2 Seismic site hazard investigation. | OR A: added section. Retained OR A
1803.3.2.1 Design earthquake. | OR A: added section. Retained OR A
1803.5.6 Rock strata. | IBC CH Approved IBC CH
1803.5.7 Excavation near foundations. | IBC CH | Fiscal impact: $3,000 increase per report. Approved IBC CH*
1803.5.12 Seismic Design Categories D through F. | OR A: added language. Rescinded OR A
1803.5.13 Seismic Design Categories D through F. | Public proposal no. SEAO-38 ~ SEAO
Committee review:
May 17, 2018 Committee approved the proposal.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
1803.7 Seismic site hazard report. | OR A: added section. Retained OR A
1803.8 Seismic site hazard report review. | OR A: added section. Retained OR A
1803.9 Seismic site hazard report submittal. | OR A: added section. Retained OR A
1804.1 Excavation Near Foundations. | IBC CH Approved IBC CH
2019 Oregon Structural Specialty Code Board review matrix
Page 16 of 21
Section Subject and description of change Board outcomes
1804.2 Underpinning. | IBC CH Approved IBC CH
1804.2.1 Underpinning sequencing. | IBC CH | Fiscal impact: $100 increase. Approved IBC CH*
1804.4 Site Grading. | IBC CH Approved IBC CH
1804.8 Under-floor drainage. | OR A: added section. Retained OR A
1805.1.2.1 Flood Hazard Areas. | OR A: deleted. Retained OR A
1807.2 Retaining Walls. | IBC CH Approved IBC CH
1808.3.2 Surcharge. | IBC CH Approved IBC CH
1808.8.5.1 Grounding of foundation rebar. | OR A: added section. Retained OR A
1810.2.5 Group effects. | IBC CH Approved IBC CH
1810.3.2.3 Steel. | IBC CH Approved IBC CH
1810.3.3.1.6 Allowable uplift load of grouped deep foundation elements. | IBC CH Approved IBC CH
1810.3.5.3.2 Fully welded steel piles fabricated from plates. | IBC CH Approved IBC CH
1810.3.5.3.3 Structural steel sheet piling. | IBC CH Approved IBC CH
1810.3.8.3 Precast Prestressed Piles. | IBC CH Approved IBC CH
1811 Radon control methods public buildings. | OR A: added section. Retained OR A
1812 Radon control methods R-2 and R-3 occupancies. | OR A: added section. Retained OR A
Chapter 19
1901.2 Plain and reinforced concrete. | IBC CH Approved IBC CH
1901.3 Anchoring to concrete. | IBC CH Approved IBC CH
1901.4 Composite structural steel and concrete structures. | IBC CH Approved IBC CH
1904 Durability requirements. | IBC CH Approved IBC CH
1905 Modifications to ACI 318. | IBC CH Approved IBC CH
1909.1 SCI 2011-01 | Power actuated fasteners for suspended ceilings and concrete. Retained Interp
2100 Masonry. | IBC CH Approved IBC CH
2104.1 Construction. | Public proposal no. OSSC-40 ~ Tom Young, Northwest Concrete Masonry
Committee review:
March 15, 2018 Committee requested more detailed fiscal analysis.
March 29, 2018 Reviewed the submitted information and Committee agreed to forward the
proposal for review.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal
2111 Masonry Fireplaces. | IBC CH Approved IBC CH
2113 Masonry Chimneys. | IBC CH Approved IBC CH
Chapter 22
2201.1 Scope. | IBC CH Approved IBC CH
2207.1 General. | IBC CH Approved IBC CH
2209.2 Cantilevered Steel Storage Racks. | IBC CH Approved IBC CH
2210.1.1.3 Composite slabs on steel decks. | IBC CH Approved IBC CH
2019 Oregon Structural Specialty Code Board review matrix
Page 17 of 21
Section Subject and description of change Board outcomes
2211 Cold-Formed Steel Light-Frame Construction. | IBC CH Approved IBC CH
Chapter 23
2300 Tall Wood Building Code | Public proposal no. OSSC-10 | Samir Mokashi, Code Unlimited, LLC
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
April 12, 2018 Tabled the item.
April 26, 2018 Committee approved the proposal.
Testimony: Tien Peng, NRMCA
Testimony: James Bela, Oregon Earthquake Awareness
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved proposal as
modified
SAM 2009-01 | Western Juniper. Retained SAM
2303.1.4 Structural Glued Cross-Laminated Timber. | IBC CH: added a new subsection referring to ANSI/APA
PRG 320.
Committee review:
May 17, 2018 Approved IBC CH code as modified by adopting an amendment in Chapter 35
revising the edition of ANSI/APA PRG 320 to the 2018 edition.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Approved IBC CH as
modified
2303.1.13 Engineered Wood Rim Board. | IBC CH Approved IBC CH
2303.2.2 Fire-Retardant-Treated Wood. | IBC CH Approved IBC CH
2303.6 Nails and Staples. | IBC CH Approved IBC CH
2304.11 Heavy timber construction. | IBC CH Approved IBC CH
2304.12 Protection Against Decay and Termites. | IBC CH Approved IBC CH
T. 2304.10.1 Fastening Schedule. | IBC CH Approved IBC CH
2304.10.5.1 Fasteners and connectors in contact with PT or FRT wood. | IBC CH
Fiscal impact: Slight increase.
Approved IBC CH*
2304.10.6 Load Path. | IBC CH Approved IBC CH
2304.12.2.5 Supporting Members for Permeable Floors and Roofs. | IBC CH Approved IBC CH
2304.6 Exterior Wall Sheathing. | IBC CH Approved IBC CH
T. 2304.10.1 Fastening Schedule. | OR A: modified. Rescinded OR A
T. 2304.9.3.2 Fastening Schedule for Mechanically Laminated Decking. | IBC CH Approved IBC CH
2308 Conventional Light-Frame Construction. | IBC CH | OR A | Aligns with 18 IBC. Approved IBC CH
2308.3.1 Foundation plates or sills. | IBC CH Approved IBC CH
T. 2308.4.1.1 Headers and Girder Spans - Exterior Walls. | IBC CH Approved IBC CH
T. 2308.4.1.1 Headers and Girder Spans - Interior Walls. | IBC CH Approved IBC CH
2308.5.5.1 Openings in Exterior Bearing Walls. | IBC CH Approved IBC CH
2309 Wood Frame Construction Manual. | IBC CH Approved IBC CH
Chapter 26
2406.4.7 Safety Glazing Adjacent to Bottom Stair Landing. | IBC CH Approved IBC CH
2014-02 Safety Glazing Tub and Shower Enclosures. Retained OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 18 of 21
Section Subject and description of change Board outcomes
2407.1 Structural Glass Baluster Panels. Materials. | IBC CH Approved IBC CH
SCI 1994-01 | Building within a building. Retained
2603.10.1 Exterior Walls. | OR A: deleted. Rescinded OR A
2603.13 Cladding Attachment over Foam Sheathing to Wood Framing. | IBC CH Approved IBC CH
Chapter 27
2702.1 Installation. | OR A: added exception. Rescinded OR A
2702.2.3 Emergency Responder Radio Coverage System. | IBC CH Approved IBC CH
2702.2.21 Group I-2. | OR A: added section. Rescinded OR A
2702.3 Critical Circuits. | IBC CH Approved IBC CH
Chapter 29
2901.1 Scope. | OR A: modified. Retained OR A
2902 Minimum Plumbing Facilities. | IBC CH
Committee review:
March 15, 2018 Approved the IBC CH code; use the 18 IBC Table and Retained OR A the drinking
fountain column, delete “other” column, and maintain the existing footnote
amendments.
Board review:
Nov. 7, 2019 Committee approved the proposal as modified.
Approved IBC CH as
modified
2902.1 Minimum number of fixtures. Table 2902.1 (See 2902) Rescinded OR A
2902.2 Separate facilities. | OR A: added exception. Retained OR A
2902.2 Separate facilities. | Public proposal no. OSSC-41 ~ Tom Schmidt, Hacker Architects
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
March 29, 2018 Committee agreed to forward the proposal for review.
June 12, 2018 Committee approved the proposal as modified – add ‘shall be based on separate
facilities.’
Board review:
Nov. 7, 2018 Disapproved the proposal.
Disapproved proposal
2902.3 Public Toilet Facilities. | IBC CH Approved IBC CH
2902.3.3 Location of toilet facilities in occupancies other than malls. | OR A: added exception. Retained OR A
2902.5 Drinking fountain locations. | OR A: modified.
Committee review:
June 12, 2018 Committee adopted a new OR A deleting the section.
Board review:
Aug. 1, 2018 Board affirmed the committee’s recommendation.
Rescinded OR A
New OR A
2903 Alteration of existing group A, M &E Occupancies. | OR A: added section. Rescinded OR A
Chapter 30
3001.2 Emergency Elevator Communications Systems. | IBC CH ~*Fiscal impact: $5,000 increase per elevator.
(Note: Section is deleted due to authority.)
Approved IBC CH*
3001.2 Reference standards. | OR A: modified and added language. Retained OR A
3003.1.3 Two or more elevators. | OR A: modified. Retained OR A
3004 Elevator hoistway venting. | IBC CH Approved IBC CH
3004.1 Vents required. | OR A: modified to clarify the measurement. Rescinded OR A
2019 Oregon Structural Specialty Code Board review matrix
Page 19 of 21
Section Subject and description of change Board outcomes
3004.2 Location of vents. | OR A: added language. Rescinded OR A
3004.4 Plumbing and mechanical systems. | OR A: modified and deleted exception. Retained OR A
Rated Corridors. | Public proposal no. OSSC-42 ~ Justin Schmidt, Interior Tech Withdrawn by
proponent
Chapter 31
3111 Solar Energy Systems. | IBC CH: added a new section covering "solar energy systems."
Solar photovoltaic panels/modules. | OR A: added a section incorporating provisions from the now fully
integrated Solar Code regarding photovoltaic panels and modules.
Committee review:
June 12, 2018 Retained OR A the existing amendment, with necessary updates, and add a
requirement for “accessible ground level disconnect.”
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Final outcome: Accepted the IBC CH and retained the OR A. (Note Accessible ground level
disconnect provisions could not be added because it is regulated by the Oregon
Electrical Specialty Code.)
Retained OR A as
modified
3111.1.1 Wind tunnel testing for solar panels. | Public proposal no. SEAO-50 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2018 Committee approved the proposal.
Final outcome: Added to the charging statement in Section 3111.1
Approved proposal
3113 Relocatable Buildings. | IBC CH: added a new section. Disapproved IBC CH
3314 Fire Watch during Construction. | IBC CH
Committee review:
June 12, 2018 Disapproved the IBC CH code language.
Board review:
Nov. 7, 2018 Board affirmed the committee’s recommendation.
Disapproved IBC CH
3400 Existing Structures. | IBC CH: deleted. This chapter has been removed completely.
Committee review:
June 12, 2018 Approved the IBC change and adopted the 18 IEBC where it doesn’t create
substantial increases in cost, incorporate the existing Oregon amendments and
Approved proposed amendments as discussed where it does not conflict with
statutory requirements.
Board review:
Nov. 7, 2018 Tabled for more information.
Feb. 6, 2019 Approved the draft Chapter 34 presented at the board meeting.
Approved IBC CH as
modified
IEBC 301.3 Alteration, addition or change of occupancy. | Public proposal no. SEAO-42 ~ SEAO
Committee review:
June 12, 2018 Disapproved the proposal.
Board review:
Feb. 6, 2019
Disapproved proposal
2019 Oregon Structural Specialty Code Board review matrix
Page 20 of 21
Section Subject and description of change Board outcomes
IEBC 303.3.2 Compliance alternatives. | Public proposal no. OSSC-45 ~Scott Caufield, Clackamas County
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
June 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2018 Tabled for more information.
Feb. 6, 2019 Board affirmed the committee’s recommendation.
Approved proposal
IEBC 302.5 New and replacement materials. | Public proposal no. SEAO-43 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2018 Tabled for more information
Feb. 6, 2019 Board affirmed the committee’s recommendation.
Approved proposal
IEBC 302.7 Seismic loads for Change of Occupancy. | Public proposal no. SEAO-44 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal. Vote: 5/3 and 1 abstain.
Fiscal impact: $20K increase per floor.
Board review:
Nov. 7, 2018 Tabled for more information.
Feb. 6, 2019 The board received more testimony about BCD’s statutory authority and
disapproved the proposal.
Disapproved proposal
IEBC 303.3.2 Removes Appendix A as optional compliance method. | Public proposal no. SEAO-45 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2019 Tabled for more information.
Feb. 6, 2019 Board affirmed the committee’s recommendation.
Approved proposal
IEBC 401.2 Existing Building Repair. | Public proposal no. OSSC-44 ~ Scott Caufield, Clackamas County
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
June 12, 2018 Committee approved the proposal as modified by adding “legally existing.”
Board review:
Nov. 7, 2018 Tabled for more information
Feb. 6, 2019 Board affirmed the committee’s recommendation.
Approved proposal as
modified
IEBC 405.2.1 Repairs for less than substantial structural damage. | Public proposal no. SEAO-46 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal as modified by adding “structural.”
Board review:
Nov. 7, 2018 Tabled for more information.
Feb. 6, 2019 Board affirmed the committee’s recommendation.
Approved proposal as
modified
IEBC 506.4.3 Seismic loads and seismic force-resisting system. | Public proposal no. SEAO-47 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2018 Tabled for more information.
Feb. 6, 2019 Board disapproved the proposal due to statutory conflict and unspecified fiscal
impact from the existing Chapter 34 allowances.
Approved proposal
2019 Oregon Structural Specialty Code Board review matrix
Page 21 of 21
Section Subject and description of change Board outcomes
14OSSC 3408 Compliance. | Public proposal no. OSSC-43 ~ Warren Jackson, Marion County
Committee review:
March 15, 2018 Committee agreed to forward the proposal for review.
June 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2018 Tabled for more information.
Feb. 6, 2019 Board affirmed the committee’s recommendation.
Approved proposal
IEBC 706.3.1 Bracing for unreinforced masonry bearing wall parapets. | Public proposal no. SEAO-48 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal.
Board review:
Nov. 7, 2018 Tabled for more information.
Feb. 6, 2019 Board affirmed the committee’s recommendation.
Approved proposal
IEBC 1006.3 Seismic loads. | Public proposal no. SEAO-49 ~ SEAO
Committee review:
June 12, 2018 Committee approved the proposal.
Board review:
Feb. 6, 2019 Board disapproved the proposal due to statutory conflict and unspecified fiscal
impact from the existing Chapter 34 allowances.
Disapproved proposal
App A Employee qualifications. | Not adopted by OR but can be adopted locally. Retained OR A
App B Board of Appeals. | Not adopted by OR Abut can be adopted locally. Retained OR A
App C Group U – Agricultural Buildings. | OR A: modified scope. Retained OR A
App D Fire Districts. | Not adopted by OR but can be adopted locally. Retained OR A
App E Supplementary accessibility requirements. | Not adopted by OR and cannot be adopted locally. Retained OR A
App F Rodent proofing. | Not adopted by OR but can be adopted locally. Retained OR A
App G Flood-resistant construction. | Not adopted by OR Abut can be adopted locally. Retained OR A
App H Signs. | Not adopted by OR but can be adopted locally. Retained OR A
App I Patio covers. | OR adds modified and new language. Retained OR A
App J Grading. | Not adopted by OR but can be adopted locally. Retained OR A
App K Administrative provisions. | Not adopted by OR and cannot be adopted locally. Retained OR A
App L Earthquake recording instrument. | Not adopted by OR and cannot be adopted locally. Retained OR A
App M Tsunami-generated flood hazard. | Not adopted by OR and cannot be adopted locally. Retained OR A
App N Guidelines for Replicable Buildings. | New appendix. Not adopted by OR. Disapproved IBC
CH
App O Tsumani loads. | Added during 2019 OSSC publishing due to legislation.
App P Tall wood buildings. | Added during 2019 OSSC publishing to incorporate the existing SAM