Badar Kharusi GOLDEN RULES LIFE SAVING RULES 1 2 3 4 5 6 7 8 9 10 11 12 Items in black are new For Inquiries Contact UIC/1 Team 2018 UID HSSE PLAN + = Infrastructure Directorate UID LT Commitments & Approvals UIPT UII UIB UIC PCB/1 UIE UIK UIR FBI 2018 UID HSSE SCORECARD TEAM UNIT WEIGHT BELOW TARGET ON TARGET ABOVE TARGET Work related fatalities All Number 15% ≥1 0 0 Motor vehicle incidents (MVIF) All Number 15% 0.06 0.05 0.04 Lost time injury frequency (LTIF) All Number 15% 0.17 0.16 0.15 Tier-1 incidents UIPT Number 15% >1 1 0 Global warming (million tones of CO2 equivalent) UIE (Tons) million 10% 3.2 3.0 2.8 Total Food Waste : 20% from Current Waste of 8,800Kg UIB KG 10% 8800 7000 6000 Closure of PIM serious/high actions timely UIC/1 % 10% <100% 100% N/A PEMS installation for power stations (100% completion for all power stations) UIE Time 5% August July June Deliver 90% SLA compliance in the treatment of four major Hazardous wastes streams ( NORM, OBM Cutting, Oily Sludge and Contaminated Soil) UIK Time 5% Jan’19 December November

2018 UID HSSE PLAN Infrastructure Directorate - pdo.co.om · house training on How to promote Hazard Identification and Incident ... HSEMS System UIK- TRBE UIL UIK UlB51/UlK42 UlB51/UlK42

Embed Size (px)

Citation preview

Badar Kharusi

GOLDEN RULES

LIFE SAVING RULES

1

2

3

4

5

6

7

8

9

10

11

12

Items in black are new For Inquiries Contact UIC/1 Team

2018 UID HSSE PLAN

+ =

Infrastructure Directorate

UID LT Commitments & Approvals UIPT UII UIB UIC

PCB/1 UIE UIK UIR FBI

2018 UID HSSE SCORECARD TEAM UNIT WEIGHT BELOW

TARGET ON TARGET

ABOVE

TARGET Work related fatalities All Number 15% ≥1 0 0

Motor vehicle incidents (MVIF) All Number 15% 0.06 0.05 0.04

Lost time injury frequency (LTIF) All Number 15% 0.17 0.16 0.15

Tier-1 incidents UIPT Number 15% >1 1 0

Global warming (million tones of CO2 equivalent) UIE (Tons) million 10% 3.2 3.0 2.8

Total Food Waste : 20% from Current Waste of 8,800Kg UIB KG 10% 8800 7000 6000

Closure of PIM serious/high actions timely UIC/1 % 10% <100% 100% N/A

PEMS installation for power stations (100% completion for all power stations) UIE Time 5% August July June

Deliver 90% SLA compliance in the treatment of four major Hazardous wastes

streams ( NORM, OBM Cutting, Oily Sludge and Contaminated Soil) UIK Time 5% Jan’19 December November