STAFFORD BRIDGE REHABILITATION October 23 - 25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager Steve Hagy, PE, Project Engineer

2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

STAFFORD BRIDGE REHABILITATION

October 23-25, 2018

2018 STATEWIDE CONFERENCE

ON LOCAL BRIDGES

Matt Hunt, PE, Associate, Project ManagerSteve Hagy, PE, Project Engineer

Page 2: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Introduction

• Stafford Bridge Rd (CR 67) over Fish Creek,

Saratoga County

• Bridge rehabilitation including deck replacement

• Locally Administered Federal-Aid (LAFA) Project

• Owner/Sponsor: Saratoga County

• Design & CI Consultant: Creighton Manning

• Contractor: New Century Construction

Page 3: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Presentation Objectives

• Walk through the bridge rehabilitation process

• Gain insight into identifying solutions to various challenges associated with rehabilitations

• Provide recommendations to accommodate unknowns that may surface during construction

Page 4: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 5: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 6: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 7: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

• Generally speaking, the girders were in very good condition

Evaluation of existing bridge

Page 8: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 9: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 10: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 11: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

• Evidence of ponding on the deck at the pier

Evaluation of existing bridge

Page 12: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 13: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 14: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 15: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

• Various pot holes and cracking of the asphalt wearing surface

Evaluation of existing bridge

Page 16: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 17: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

• 6 concrete deck cores

Evaluation of existing bridge

Page 18: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 19: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 20: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 21: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Modeling the bridge

Page 22: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 23: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 24: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 25: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Defining the Alternative

• Project originally scoped as a rehab including deck replacement• Evaluated and dismissed a deck repair with overlay

alternative• Removing the deck provides access to make steel repairs

• Full deck replacement accommodated Geometry and Structural improvements

Page 26: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Defining the Alternative

• Geometry improvements• Eliminated one of the seldom used sidewalks to widen

the roadway to include 5ft shoulders to accommodate cyclists

Page 27: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 28: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Defining the Alternative

• Structural improvements• Originally intended to simply fix the deterioration by

plating the beam webs individually

• Completed steel repairs by retrofitting the beams to be continuous for deck dead load and live load

• Replaced all bearings and made the pier bearings fixed

• Eliminated joint at the pier

• Jointless abutment details

Page 29: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Design

• Create new AASHTOware models to assess both stages of construction and the final condition• Stage 1 – keep traffic on the existing deck supported

by 3 girders

• Stage 2 – move traffic to new deck supported by 2 retrofit girders made continuous for deck dead load and live load

• 2 Girder section required balance, stability, and torsional analysis

Stage IStage 2

Page 30: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Design

• Beam splices• Splices designed for stresses caused by non-composite

deck dead load, composite superimposed dead load, and live load

• Splices are not designed for steel dead load because those stresses are already “locked in” to the girders for the erected simple spans

Page 31: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Design

• Check pier for seismic considerations and longitudinal load• FHWA Seismic Retrofitting Manual for Highway

Structures

• Existing reinforcement at pier footing and stem interface sufficient to resist seismic load

Page 32: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Design

• Deck haunch calculations to set roadway profile• Used original AASHTOware model to calculate

theoretical dead load deflections

• Used roadway profile from topographical survey to determine the original over-camber of the beams

• Used new AASHTOware model to calculate the anticipated dead load deflections for the proposed bridge

• Applied new deflections to over-cambered beams

• Set the proposed roadway profile to ensure a minimum 2” haunch

• Also used the calculations to provide reinforced haunch limits in the plans

Page 33: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 34: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Design

• Bearings• Steel laminated elastomeric

• Changed configuration to fix the continuous beams at the pier

Page 35: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Construction

• Temporary traffic signal

Page 36: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 37: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Construction

• Stage 1 deck removal

Page 38: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 39: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 40: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 41: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 42: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 43: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 44: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 45: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 46: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Construction

• Substructure modifications

Page 47: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Construction

• Steel repair and girder retrofit

Page 48: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 49: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 50: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 51: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 52: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 53: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 54: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 55: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 56: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Construction

• Anticipated tall haunches to obtain desired profile due to excess camber in the girders discovered during design

• Haunches up to 9”

Page 57: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Construction

• Pouring the deck

Page 58: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 59: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager
Page 60: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Project wrap-up

• Engineer’s Estimate: $1.94M

• Contractors bid: $2.294M

• Final construction cost: $2.322M

• Began construction: May 2015

• Construction Complete: November 2015

Page 61: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Lessons Learned

• Do not underestimate effort and cost to make girders continuous; requires as-built geometry to be near perfect to be cost effective

• Superstructure replacement would have been a better value given final construction cost; project was under funded because it began as a simple deck replacement with minor steel repairs

Page 62: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

Recommendations for Rehabs

• Include additional quantity for unanticipated deterioration (steel, field drilling, etc)

• If possible, EIC or one of the inspectors should be experienced in bridge rehabs

• Include enough Construction Support hours to allow the design engineer to go to the site and assess unanticipated conditions

Page 63: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

PDH Question #1

The yield Strength of ASTM A441 steel is:

a) 40ksi

b) 42ksi

c) 46ksi

d) 50ksi

e) Can be any of the above depending on the structure steel shape and/or thickness

Page 64: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

PDH Question #2

The difference between the design for a retrofit to make two simple spans continuous for deck dead load and live load and a conventional continuous beam design is that the steel dead load stresses are calculated for the simple span configuration.

a) True

b) False

Page 65: 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES · STAFFORD BRIDGE REHABILITATION October 23-25, 2018 2018 STATEWIDE CONFERENCE ON LOCAL BRIDGES Matt Hunt, PE, Associate, Project Manager

PDH Question #3

To eliminate the “double hump” caused by over-cambering the original beams, the design team:

a) Relied on the contractor to propose a solution during construction

b) Made an assumption and hoped for the best

c) Calculated the theoretical camber of the original beams based on the topographical survey and AASHTOware model and set the proposed profile to ensure a minimum 2” haunch in consideration of the proposed deflections