14
2019 SPRING MAINTENANCE BOARD REPORT

2018 spring maintenance report - NSRAA

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2018 spring maintenance report - NSRAA

2019SPRING MAINTENANCE BOARD REPORT

Page 2: 2018 spring maintenance report - NSRAA

MEDVEJIE HATCHERY

Page 3: 2018 spring maintenance report - NSRAA

NEW PUMP CONTROL AND PLC ALARM SYSTEM UPGRADES

Worked with Dan at Cooper Marine Services

Remote access to alarm system

VFD level tracking

Programmable level set points

Page 4: 2018 spring maintenance report - NSRAA

PROGRAMABLE SET POINTS SCREEN

Page 5: 2018 spring maintenance report - NSRAA

ELECTRIC HYDRO’S FOR THE NET WASHER AREA

• Installed electric hydraulic pack to operate the

net washer and block

• Replaced gas hydraulic pack

• Installed by hatchery staff

Page 6: 2018 spring maintenance report - NSRAA

NEW GREEN LAKE BOAT CONSTRUCTION

• Specmar 18’ Outback kit

• This replaces our old roughneck

Skiff

• Being built by hatchery staff

Page 7: 2018 spring maintenance report - NSRAA
Page 8: 2018 spring maintenance report - NSRAA

SAWMILL CREEK HATCHERY

CONSTRUCTED AN INSULATED SHED OVER THE FIRE LINE CROSSOVER TAP

BUILT BY HATCHERY STAFF

Page 9: 2018 spring maintenance report - NSRAA

GUNNUK CREEK HATCHERY TEMPORARY HYDRO INSTALL

Page 10: 2018 spring maintenance report - NSRAA

PLUMBING IS CURRENTLY BEING INSTALLED BY HATCHERY STAFF

Page 11: 2018 spring maintenance report - NSRAA

HIDDEN FALLS DOMESTIC WATER SYSTEM / CHLORINATION PUMP RE PLUMB

Page 12: 2018 spring maintenance report - NSRAA

FABRICATING NEW JUMP OUT SCREENS AND CROWDERS FOR ADULT RACEWAYS

Page 13: 2018 spring maintenance report - NSRAA

NEW ELECTRICAL RUN INSTALLED TO SEPTIC TANK

Page 14: 2018 spring maintenance report - NSRAA

SHOP ORGANIZATION AND CLEAN UP