2017/2018 Budget Development
May 10, 2017 (Updated May 11, 2017)
1 May 10, 2017
Agenda
Budget Objectives
Status of Budget Development Process/Schedule
Review of Key Budget Components
Enrolment, Revenues, and Expenditures
Status of Operating Budget as at May 10, 2017
Resources to Support Multi-Year Plan
Capital Budget
2016/2017 Projection
Communication/Stakeholder Input
2017/2018 Budget Development
2 May 10, 2017
Key Objectives of Budget
Development Process
2017/2018 Budget Development
3 May 10, 2017
Key Objectives:
Alignment of financial resources
Multi-Year plan
Annual Operational Plan
Special Education Plan
System and Corporate Responsibility
Identify key assumptions used to prepare the budget
Identify timelines for budget discussions
Develop key messages to be included in the communication
plan
2017/2018 Budget Development
4 May 10, 2017
2017/2018 Budget Development
5
Budget Development
Schedule
May 10, 2017
2017/2018 Budget Development
Schedule
6
Committee of the Whole – April/May 2017
Discussion re: Alignment of Financial Resources
Multi-Year Plan
Annual Operational Plan
Special Education Plan
System and Corporate Responsibility
Review of Budget Parameters
Preliminary Enrolment 2017/2018
Revenue Assumptions
Expenditure Assumptions
Staffing Assumptions
Review of Accountability and Reporting Requirements
Review Trustee Issues/Input
Review/Implement Process for Stakeholder Input
May 10, 2017
2017/2018 Budget Development
Schedule
7
Committee of the Whole – April/May 2017
Review details of 2017/2018 GSN
Overview of Grant Revenue Calculation (based on GSN
release)
Update on Administrative Council Discussions
Update on Trustee Input
Update on Stakeholder Input
Review Communication Plan
May 10, 2017
2017/2018 Budget Development
Schedule
8
Committee of the Whole – May 2017
Review Draft Budget
• Update on Enrolment/Revenue/Expenditure Assumptions
• Update on Staffing
Update on Administrative Council Discussions
Update on Trustee Input
Update on Other Stakeholder Input
Review Initiatives/Financial Constraints
Update on Communication Plan
May 10, 2017
2017/2018 Budget Development
Schedule
9
May/June Board Meeting
Presentation of Preliminary Draft Budget
May/June Board Meeting
Budget Approval
June 30, 2017
Budget filed with Ministry
May 10, 2017
2017/2018 Budget Development
Reporting Timelines
10
Estimates – June 30, 2017
Approved Budget
Projected Oct 31/17 and Projected Mar 31/18 Enrolment
Revised Estimates – December 15, 2017
Revised Budget
Actual Oct 31/17 Enrolment and Revised Mar 31/18 Projected
Enrolment
Financial Statements – November 15, 2018
Actual Expenditures and Revenues
Actual Oct 31/17 Enrolment and Actual Mar 31/18 Enrolment
Audited by External Audit Firm
May 10, 2017
2017/2018 Budget Development
Review of Key Budget Components
11
Enrolment
Expenditures Revenues
May 10, 2017
Enrolment
2017/2018 Budget Development
12 May 10, 2017
Review of Budget Components – Enrolment Projections:
Enrolment projections form the basis for GSN calculations
and staffing
Enrolment is defined in terms of full-time equivalency
(FTE) and average daily enrolment (ADE)
FTE: # of minutes of instruction per day / 300
ADE calculations are based on 50% of the FTE as of October
31 and March 31
Enrolment Projections based on:
Birth rates, migrations rates, impact of new housing starts and pupil
yield rates
Catchment population, participation rates
District program offerings, retention rates
2017/2018 Budget Development
13
2017/2018 Budget Development
Key Assumptions - HDSB Enrolment Summary
14 May 10, 2017
2016/17 Enrolment %
2017/18 Revised Increase Increase
Projection Estimates* (Decrease) (Decrease)
Elementary 45,546.00 45,109.00 437.00 0.97%
Secondary 18,692.00 18,273.82 418.18 2.29%
64,238.00 63,382.82 855.18 1.35%
2016/17 Enrolment %
2017/18 Original Increase Increase
Projection Budget** (Decrease) (Decrease)
Elementary 45,546.00 44,575.00 971.00 2.18%
Secondary 18,692.00 18,353.04 338.96 1.85%
64,238.00 62,928.04 1,309.96 2.08%
* Enrolment based on Actual October 31/16 and Projected March 31/17
** Enrolment based on Projected October 31/16 and Projected March 31/17
2017/2018 Budget Development
Key Assumptions - HDSB Enrolment Summary
15 May 10, 2017
2017/2018 Budget Development
Key Assumptions - HDSB Enrolment Summary
16 May 10, 2017
Elementary
2016/17 Enrolment %
2017/18 Revised Increase Increase
Projection Estimates (Decrease) (Decrease)
Burlington 12,914.00 13,089.00 (175.00) (1.34%)
Oakville 15,586.00 15,428.00 158.00 1.02%
Milton 12,443.00 11,954.00 489.00 4.09%
Halton Hills 4,603.00 4,638.00 (35.00) (0.75%)
45,546.00 45,109.00 437.00 0.97%
Secondary
2016/17 Enrolment %
2017/18 Revised Increase Increase
Projection Estimates (Decrease) (Decrease)
Burlington 5,844.28 5,800.64 43.64 0.75%
Oakville 8,303.27 8,004.08 299.19 3.74%
Milton 2,639.64 2,483.02 156.62 6.31%
Halton Hills 1,904.81 1,986.08 (81.27) (4.09%)
18,692.00 18,273.82 418.18 2.29%
2017/2018 Budget Development
17
Revenues
May 10, 2017
Review of Key Budget Components - Revenues:
Revenues
Ministry Funding
Grants for Student Needs (GSN)
Education Program Other (EPO)
Other Revenues
Other Government Funding
Tuition Fees
Cafeteria/Rental Income
Investment Income
Other
Transfer to (from) Accumulated Surplus
School Generated Funds (school level)
2017/2018 Budget Development
18 May 10, 2017
2017/2018 Budget Development Key Budget Components – Revenues ( HDSB Budget)
19 May 10, 2017
Provincial Grants - Grants for Student
Needs 90.6%
Provincial Grants - Other 0.3%
School Generated Funds 2.7%
Investment Income 0.2%
Other Fees & Revenues
2.4%
Amortization of Deferred Capital
Contributions 3.8%
2017/2018 Budget Development
Grants for Student Needs (GSN) - HDSB
20
Pupil Foundation
School Foundation
Special Education
Language
Qualifications & Experience
Transportation
Administration and Governance
School Operations
School Renewal
Other Grants
Capital Interest
Total Provincial Grants - GSN $677M
May 10, 2017
2017/2018 Budget Development
Projected Revenues
21
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Total Revenue
Grants for Student Needs $ 677,451,604 645,324,505 32,127,099
Provincial Grants - Other 2,122,327 1,837,374 284,953
Federal Grants 283,393 263,992 19,401
School Generated Funds 19,000,000 19,000,000 -
Investment Income 1,250,000 1,250,000 -
Other Fees & Revenues 20,597,061 17,281,707 3,315,354
Amortization of Deferred Capital Contributions 28,211,674 27,089,003 1,122,671
Total Revenue 748,916,059 712,046,581 36,869,478
Less Transfer To (From) Accumulated Surplus - Per Ministry Compliance 6,301,946 7,224,267 (922,321)
Revenue Net of Transfer To (From) Accumulated Surplus $ 742,614,113 704,822,314 37,791,799
2017/2018 Budget Development
Projected Revenues – Grants for Student Needs
22
May 10, 2017
2017/2018 2016/2017 Increase/
Draft Budget Budget (Decrease)
General Operating Allocation
Pupil Foundation 346,969,307 334,487,970 12,481,337
School Foundation 41,850,587 40,766,548 1,084,039
Special Education 84,068,552 83,752,730 315,822
Language 19,222,751 17,804,051 1,418,700
Learning Opportunity 13,372,880 7,075,651 6,297,229
Adult and Continuing Education and Summer School 3,200,805 3,113,001 87,804
Qualification and Experience 49,317,395 40,688,038 8,629,357
Early Childhood Educator Qualification and Experience 4,245,570 4,042,190 203,380
New Teacher Induction Program (NTIP) 561,983 657,759 (95,776)
Transportation 15,958,383 15,489,595 468,788
Administration and Governance 16,914,166 15,934,338 979,828
School Operations 60,607,003 58,911,857 1,695,146
Community Use of Schools 845,732 799,363 46,369
First Nation, Métis and Inuit Education 881,290 935,187 (53,897)
Safe Schools 1,027,558 992,127 35,431
Temporary Accommodation * 2,384,534 3,376,475 (991,941)
School Renewal 9,861,952 8,651,685 1,210,267
Capital Interest (Debt and Short Term) 12,629,926 13,004,443 (374,517)
Capital Grant Land - 100,000 (100,000)
Other 276,728 276,728 -
Transferred to Deferred Capital Contribution (6,745,498) (5,535,231) (1,210,267)
Total Draft Grants for Student Needs (GSN) 677,451,604 645,324,505 32,127,099
* Pending Ministry confirmation
2017/2018 Budget Development
Projected Revenues – Grants for Student Needs
23
May 10, 2017
2017/2018 Budget Development
Projected Revenues – Grants for Student Needs
24
May 10, 2017
Per Pupil Per Pupil
Provincial HDSB
Average* Average* Difference
2017/18 Projections $ 12,100 $ 10,809 $ (1,291)
2016/17 Actuals 11,530 10,441 (1,089)
2015/16 Actuals 11,553 10,340 (1,213)
2014/15 Actuals 11,361 10,152 (1,209)
2013/14 Actuals 11,255 9,950 (1,305)
2012/13 Actuals 11,244 9,930 (1,313)
2011/12 Actuals 11,165 9,861 (1,303)
2010/11 Actuals 10,716 9,488 (1,227)
2009/10 Actuals 10,265 9,108 (1,157)
2008/09 Actuals 9,866 8,767 (1,098)
2007/08 Actuals 9,343 8,388 (955)
2006/07 Actuals 8,809 7,998 (811)
2005/06 Actuals 8,475 7,684 (791)
2004/05 Actuals 8,088 7,292 (796)
* Source: Ministry of Education School Board Funding
Projections for the 2017-18 School Year (Spring 2017)
2017/2018 Budget Development
Projected Revenues – Grants for Student Needs
Special Education Grant
25
May 10, 2017
Increase
(Decrease)
2017/2018
2017/2018 2016/2017 From
Budget Budget 2016/2017
Special Education Per Pupil Amount (SEPPA) $ 47,813,202 45,755,106 2,058,096
Special Education Equipment Amount (SEA) 2,832,843 2,774,307 58,536
Differentiated Special Education Needs Per Pupil Amount* 28,995,658 31,134,055 (2,138,397)
Special Incidence Portion (SIP) 1,079,998 850,500 229,498
Facilities Amount) Care, Treatment, Custody and Corrections 3,075,759 2,975,532 100,227
Behaviour Expertise Amount 271,092 263,230 7,862
$ 84,068,552 83,752,730 315,822
Enrolment**
Elementary 45,503 44,538 965
Secondary 18,185 17,989 196
63,688 62,527 1,161
* formerly High Needs Allocation
**Per Ministry Average Daily Enrolment and excluding Non Resident Students
2017/2018 Budget Development
Projected Revenues – Grants for Student Needs
Special Education Grant
HDSB Projection of Impact of Four Year Implementation of Revised Special
Education Funding Model
26
May 10, 2017
Revised
(Current)
Model
(A)
Annual
Change
From
Prior
Year
Projected
Allocation
Based on
Previous
Model
(B)
Variance due to
Revised Model
(A)-(B) Year Enrolment Total Total Total
2017-2018* 64,238 28,995,658 (2,138,397) 38,224,149 (9,228,491)
2016-2017* 63,383 31,134,055 (2,136,510) 37,735,895 (6,601,840)
2015-2016** 62,012 33,270,565 (1,843,555) 36,952,976 (3,682,411)
2014-2015** 61,173 35,114,120 (204,489) 36,473,858 (1,359,738)
2013-2014** 59,150 35,318,609 35,318,609 -
(20,872,480)
* Budget
**Actual
2017/2018 Budget Development Revenues
EPO (Education Program Other) and Federal
27
May 10, 2017
2017/2018
Draft
Provincial - Education Program Other (EPO) Budget
Autism Supports and Training $ 95,433
Autism: Supporting Transition to the New Ontario Autism Program 202,413
Early Years Lead 180,720
Outreach Coordinators 108,000
Professional Development - DECE's 220,299
Renewed Math Strategy 772,099
Safe Accepting and Healthy Schools and Mental Health 158,509
Specialist High Skills Major 216,210
Ontario Youth Apprenticeship Program 168,644
2,122,327
Federal
Citizenship and Immigration Canada $ 283,393
2017/2018 Budget Development
Revenues – Other Fees and Revenues
28
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Operating Revenue
Tuition Fees $ 6,583,000 6,086,720 496,280
Rental Income 1,522,725 1,439,545 83,180
Cafeteria Income 90,000 60,000 30,000
Miscellaneous Income 401,336 95,442 305,894
Education Development Charges (EDC) 12,000,000 9,600,000 2,400,000
Total Other Fees & Revenues $ 20,597,061 17,281,707 3,315,354
2017/2018 Budget Development
Revenues – International Students
29
May 10, 2017
2017/18
Draft 2016/17 2015/2016 2014/2015 2013/2014
Budget Budget Actual Actual Actual
Enrolment
Elementary 43.00 37.00 32.00 29.00 29.50
Secondary 421.00 413.00 256.50 157.50 165.63
Total 464.00 450.00 288.50 186.50 195.13
Tuition Fees
Elementary 13,000$ 12,500$ 12,500$ 12,500$ 12,500$
Secondary 14,000$ 13,500$ 13,500$ 13,500$ 13,500$
* 2016/2017 Actual Enrolment 464.00
2017/2018 Budget Development Revenues – Transfer To (From) Accumulated Surplus - Draft Budget
Per Ministry Compliance
30
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Available for Compliance - Unappropriated (2,946,331) (3,543,796) 597,465
Available for Compliance - Internally Appropriated
Operating: Retirement Gratuities (1,133,000) (1,133,000) -
Full Day Kindergarten - (325,000) 325,000
Records Management (200,000) (200,000) -
Student Achievement (97,000) - (97,000)
Technology - (200,000) 200,000
Closing The Gap (2,818,238) - (2,818,238)
Temporary Accommodation (1,615,466) - (1,615,466)
Other Accommodation - (193,799) 193,799
Capital: Committed Capital Projects - Non-Ministry Funded (335,942) (155,518) (180,424)
Committed Sinking fund interest earned (222,591) (222,591) -
Total Internally Appropriated (6,422,237) (2,429,908) (3,992,329)
Unavailable for Compliance - Externally Appropriated
Employee Future Benefits - Retirement Gratuities 4,331,510 4,546,157 (214,647)
Retirement Health, Dental 56,102 56,102 -
Employee Future Benefits - Other - - -
Interest to be Accrued 144,702 134,494 10,208
Revenues recognized for land - EDC 11,138,200 8,361,218 2,776,982
Revenues recognized for land - site prep - non EDC - 100,000 (100,000)
Total Unavailable for Compliance - Externally Appropriated 15,670,514 13,197,971 2,472,543
Total Transfer To (From) Accumulated Surplus - Per Ministry Compliance 6,301,946 7,224,267 (922,321)
2017/2018 Budget Development
31
Expenditures
May 10, 2017
2017/2018 Budget Development Salary, Benefits and Non-Salary Expenditures
32 May 10, 2017
Salaries 68%
Benefits 11%
Non-salary 21%
2017/2018 Budget Development Expenditure Budget by Ministry Expenditure Category
33 May 10, 2017
Instruction 78.1%
Administration 2.1%
Transportation 2.2%
Pupil Accommodation 14.6%
Other 3.0%
2017/2018 Budget Development Expenditure Budget by Ministry Expenditure Category
34
Classroom Teachers & Consultants
Occasional Teachers
Educational Assistants
Professional & Paraprofessionals
Class Texts, Instructional Supplies
Instructional Computers
Staff Development
School Administration
Board Administration & Governance
School Operations
Continuing Education
Transportation
School Renewal Debentures &
Other Capital
Contingency
May 10, 2017
2017/2018 Budget Development
35 May 10, 2017
2017/2018 Budget Development Staffing Full-Time Equivalents
36
Teachers, Library, Guidance
Co-ordinators & Consultants
Principals Vice-Principals
Educational Assistants
Early Childhood Educators
Professionals, Para-professionals,
Technical
Pupil Accommodation
School Office
Staff Development
Director & Supervisory Officers
Board Administration
Continuing Education
Trustees
May 10, 2017
2017/2018 Budget Development
Key Assumptions - Expenditures
37
Overall:
Impact of Enrolment Growth
Alignment of Financial Resources to Multi-Year Plan and Special
Education Plan
Programs and Supports Continuing into 2017/2018
One-time 2016/2017 Initiatives/Expenditures not automatically
carried forward
Ministry Compliance
Balanced Budget (per Ministry definition)
Ministry Average Class Size Compliance
Ministry Enveloping
Special Education
School Renewal
Board Administration and Governance
May 10, 2017
2017/2018 Budget Development
Key Assumptions - Expenditures
38
The Following Assumptions are Used to Determine the 2017/2018 Draft Budget:
Staffing, Salaries and Benefits
Board Approved Parameters and/or Central Labour Agreements
Increase in Enrolment – Teacher & Support Staff
Formula Based Adjustments Due to Enrolment and/or New Schools
Statutory Benefit Rates to Reflect Projected Rates
Implementation and Transition to Employee Life Health Trusts (ELHT)
Non-Salary Operational Changes
Increase/Decrease in Existing Contracts and Fees
Maintenance
Cleaning
Insurance
Contractual Services
Transportation
Increase/Decrease in Utilities
Hydro, Natural Gas, Water
Increase in School Budgets to Reflect Enrolment Growth and New Class Start-up
Determine Need to Budget For Contingency
May 10, 2017
2017/2018 Budget Development
Expenditures – Ministry Expenditure Categories
Expenditures are reported based on the categories
consistent with Ministry financial reporting parameters:
Instruction
Administration
Transportation
Pupil Accommodation
School Generated Funds
Other
39
May 10, 2017
2017/2018 Budget Development
Expenditures – Ministry Expenditure Categories
Instruction:
Classroom teachers
Library & Guidance teachers
Occasional teachers
Educational Assistants
Early Childhood Educators
Professionals & Para-professionals
staff that provide support services to students &
teachers, such as social workers, child/youth workers,
computer technicians, psychologists, psychometrists,
speech pathologists, attendance counselors
continued
40
May 10, 2017
2017/2018 Budget Development
Expenditures – Ministry Expenditure Categories
Instruction (continued):
• Staff Development
• Textbooks & Instructional Supplies
• Instructional Computers
• School Principals & Vice-principals
• School Office (secretarial & Business Managers at
secondary schools)
• Co-ordinators & Consultants, System Principals and
support staff
• Department Heads
• Continuing Education
41
May 10, 2017
2017/2018 Budget Development
Expenditures – Ministry Expenditure Categories
Board Administration & Governance:
Trustees
Director and Supervisory Officers
Board Administration
Staff to support corporate responsibilities including
Business Services, Planning, Human Resources,
Executive Assistants, Communications, JWS
Caretakers, Information Technology Management
Costs of operating and maintaining board offices
Costs of corporate functions such as external audit,
legal fees, interest expense, etc.
42
May 10, 2017
2017/2018 Budget Development
Expenditures – Ministry Expenditure Categories
Transportation:
Transporting students to and from home and school,
including students with special needs
Pupil Accommodation: School Operations
Heating, Lighting, Maintaining, Cleaning
Other Pupil Accommodation
Principal and Interest payments on capital debt
School Renewal
Major repairs and renovations
Amortization
Asset write-off over estimated useful life
43
May 10, 2017
2017/2018 Budget Development
Draft Operating Expenditures
44
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Salary $ 502,749,052 477,981,368 24,767,684
Benefits 84,241,780 77,070,223 7,171,557
Sub-Total 586,990,832 555,051,591 31,939,241
Non-salary 155,623,281 149,770,723 5,852,558
Total Expenditures $ 742,614,113 704,822,314 37,791,799
2017/2018 Budget Development
Draft Operating Expenditures
Increase (Decrease) in Salaries & Benefits
45
May 10, 2017
Step increments $ 7,967,954
Across the Board 1.5% increase (1) 7,238,719
Lump sum payment 0.5% of 2016/2017 salary (1) 2,216,241
Increase in Staff (137.8 FTE) - Including Benefits 10,726,620
Increase in Statutory Benefit Rates (CPP,EI)
and Transition to Employee Life, Health Trusts 4,694,877
Increase in other benefits (Retirement Gratuity and WSIB) 533,926
Increase in Supply Teachers 1,047,860
Teacher Retirements (1,957,011)
Staff turnover, leaves etc. (529,945)
$ 31,939,241
(1) Per Contract Extension Agreements
2017/2018 Budget Development
Draft Expenditures – Staffing Positions in Draft Budget
46
May 10, 2017
A B=C+D C D A-B
2017/2018 2016/2017 2016/2017 2016/2017
Budget Revised Inc (Dec) Budget Variance
INSTRUCTION
Teachers 3,984.3 3,880.5 17.2 3,863.3 103.8 (E)(G)
Early Childhood Educators 288.0 279.0 1.0 278.0 9.0 (F)
Educational Assistants 831.5 831.5 17.0 814.5 -
Professionals, Paraprofessionals and Technical 297.9 295.9 - 295.9 2.0 (F)(G)
Library and Guidance 151.2 151.3 - 151.3 (0.1) (F)
Principals and Vice-Principals 208.5 208.0 2.0 206.0 0.5 (F)
School Office 283.1 275.0 1.8 273.2 8.1 (E)(G)
Coordinators and Consultants 69.4 66.4 (1.0) 67.4 3.0 (G)
Continuing Education 4.0 4.0 - 4.0 -
INSTRUCTION TOTAL 6,117.9 5,991.6 38.0 5,953.6 126.3
ADMINISTRATION
Trustees (including Student Trustees) 13.0 13.0 2.0 11.0 - (H)
Director and Supervisory Officers 12.0 12.0 - 12.0 -
Board Administration 96.5 96.5 1.0 95.5 -
ADMINISTRATION TOTAL 121.5 121.5 3.0 118.5 -
PUPIL ACCOMMODATION
School Operations and Maintenance 375.5 364.0 - 364.0 11.5 (E)(F)
GRAND TOTAL 6,614.9 6,477.1 41.0 6,436.1 137.8
(E) Average class size and/or contractual compliance
(F) Formula based adjustments due to enrolment and/or new schools
(G) Resources to support Multi-Year Plan
(H) Student Trustees were not previously included in the staffing report although they have been part of the Board for
several years
2017/2018 Budget Development
Draft Operating Expenditures
Increase/(Decrease) in Non-Salary Expenditures
47
May 10, 2017
One-time 2016/2017 Expenditures Removed:
School Connects / EDSBY Support $ (73,000)
Professional Development (300,000)
Special Education Contingency (500,000)
Financial Information Software (200,000)
Full Day Kindergarten Transition (325,000) (1,398,000)
Operational Increases 2017/2018:
Decentralized School Budgets 127,886
Contractual Fees & Maintenance 251,553
Professional Development 314,280
Transportation 1,232,496
Contract Cleaning 112,335
Utilities 799,129
Amortization of Capital and Capital Interest 347,481
Other 327,771 3,512,931
Increase in EPO Projects announced to date: 1,068,977
Multi-Year Plan Resources (details on subsequent slides) 2,668,650
Total Increase (Decrease) in Non-Salary Expenditures $ 5,852,558
2017/2018 Budget Development
Draft Operating Expenditures
Ministry Expenditure Category
48
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Instruction $ 582,831,594 550,318,426 32,513,168
Administration 15,575,466 14,850,404 725,062
Transportation 16,889,885 15,657,389 1,232,496
Pupil Accommodation 105,372,989 102,620,893 2,752,096
School Generated Funds 19,000,000 19,000,000 -
Other 2,944,179 2,375,202 568,977
Total Expenditures $ 742,614,113 704,822,314 37,791,799
2017/2018 Budget Development
Draft Operating Expenditures
Instruction
49
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Instruction
Classroom Teachers $ 382,605,591 363,410,104 19,195,487
Supply Teachers 18,125,698 14,456,564 3,669,134
Educational Assistants 43,851,263 41,273,523 2,577,740
Early Childhood Educators 14,998,827 14,095,366 903,461
Textbooks and Supplies 20,436,447 20,280,923 155,524
Computers 5,710,279 3,701,518 2,008,761
Professionals, Para-professionals & Technical 22,675,157 22,081,656 593,501
Library and Guidance 13,794,594 13,479,128 315,466
Staff Development 4,201,840 3,697,530 504,310
Department Heads 823,271 797,720 25,551
Principals and Vice-Principals 27,877,801 26,800,826 1,076,975
School Office 17,639,166 16,704,132 935,034
Coordinators and Consultants 7,761,286 7,257,473 503,813
Continuing Education 2,330,374 2,281,963 48,411
Instruction Total $ 582,831,594 550,318,426 32,513,168
2017/2018 Budget Development
Draft Operating Expenditures
Board Administration & Governance
50
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Administration & Governance
Trustees $ 324,651 324,263 388
Director and Supervisory Officers 2,777,608 2,618,484 159,124
Board Administration 12,347,519 11,782,076 565,443
Amortization - Administration 125,688 125,581 107
Total $ 15,575,466 14,850,404 725,062
Increase reflects impact of compensation agreements; removal of transfer from
Accumulated Surplus for Financial Information software (2016/2017); increase in
service fees and contractual expenditures.
2017/2018 Budget Development
Draft Operating Expenditures
Transportation
51
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Transportation
Pupil Transportation $ 16,669,735 15,454,025 1,215,710
Transportation - Provincial Schools 220,150 203,364 16,786
Transportation Total $ 16,889,885 15,657,389 1,232,496
Increase reflects an increase in operator costs per contractual agreements and
projected service delivery for 2017/2018.
2017/2018 Budget Development
Draft Operating Expenditures
Pupil Accommodation
52
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
Pupil Accommodation
School Operations and Maintenance $ 60,264,992 57,860,377 2,404,615
School Renewal 3,116,454 3,116,454 -
Amortization - Pupil Accommodation 28,644,519 27,535,330 1,109,189
Other Pupil Accommodation (Interest) 13,347,024 14,108,732 (761,708)
Pupil Accommodation Total $ 105,372,989 102,620,893 2,752,096
Increase reflects the addition of 11.5 FTE Caretakers ; impact of contract extension
agreements; projected increase in utilities; amortization; and contract cleaning. This
increase is partially offset by the reduction in capital interest.
2017/2018 Budget Development
Draft Operating Expenditures
School Generated Funds and Other Expense
53
May 10, 2017
2017/2018 $
Draft 2016/2017 Increase
Budget Budget (Decrease)
School Generated Funds $ 19,000,000 19,000,000 -
Other Expense
Education Program Other Projects (EPO)* 1,900,790 831,813 1,068,977
Financing Cost (Not Permanently Financed Capital Projects) 543,389 543,389 -
Provision for Contingencies 500,000 1,000,000 (500,000)
Other Expense Total $ 2,944,179 2,375,202 568,977
54
May 10, 2017
2017/2018 Budget Development
55 May 10, 2017
2017/2018 Budget Development
Resources to Support Multi-Year Plan
(Included in Draft Budget)
56
May 10, 2017
2017/2018 Budget Development Resources to Support Multi-Year Plan (Recommended by Administrative Council)
(Additional Details Provided on Subsequent Slides)
57
May 10, 2017
Multi-Year Plan Staff/ Non-Salary FTE
Estimated
(Savings)
Cost $
Engagement & Achievement Elementary Instructional Program Leader - School Programs Staff 1.0 100,000
Engagement & Achievement Elementary System Vice Principal - School Programs Staff 1.0 110,000
Equity & Well-Being System Principal - Welcome Centre and International Students Staff 1.0 130,000
Engagement & Achievement Secondary Teacher - Innovations Staff 1.0 85,000
Engagement & Achievement Elementary Autism Class Pilot Teachers Staff 2.0 170,000
Engagement & Achievement Early Childhood Educator Program Lead Staff 1.0 64,000
Engagement & Achievement Special Education Senior Manager Staff 1.0 135,000
Stewardship & Resources Financial Manager Staff 1.0 118,000
Engagement & Achievement Special Education Review Non-Salary - 20,000
Engagement & Achievement Stakeholder Engagement Non-Salary - 20,000
Engagement & Achievement Primary Literacy Teacher Training Non-Salary - 234,000
Stewardship & Resources Program Viability Committee - Recommendation Implementation Non-Salary - 242,650
Engagement & Achievement "All About Me" K-6 Licensing and Teacher Training Non-Salary - 75,000
Stewardship & Resources School Technology Non-Salary - 818,238
Stewardship & Resources Network Infrastructure - Wireless Access Point Enhancement Non-Salary - 2,000,000
Engagement & Achievement Videographer Co-ordinator Staff 1.0 77,000
Engagement & Achievement Contract Communications Assistant Non-Salary - 57,000
Equity & Well-Being Respectful Workplace Initiative Non-Salary - 20,000
Total 10.0 4,475,888
2017/2018 Budget Development
Resources to Support Multi-Year Plan
58
May 10, 2017
Engagement & Achievement FTE
Estimated
(Savings)
or Cost
Elementary Instructional Program Leader - School Programs 1.0 100,000
Elementary System Vice Principal - School Programs 1.0 110,000
To provide support in math and literacy (and other subject areas as
required), all system professional learning (including New Teacher
Induction Program) and special projects (e.g. Innovations, Outdoor
Education, Early Years, Renewed Math Strategy, French Immersion
Program Implementation, Information Communication Technology).
Secondary Teachers - Innovation & Ingenuity 1.0 85,000
To support the existing blog and podcast of The SHIFT: demonstrating a
shared culture of innovative thinking. Two teachers are seconded for 2
sections each to promote the sharing of the learning of HDSB students and
staff as innovative strategies for engagement are realized.
2017/2018 Budget Development
Resources to Support Multi-Year Plan
59
May 10, 2017
Engagement & Achievement FTE
Estimated
(Savings)
or Cost
Elementary Autism Class Pilot - Teachers 2.0 170,000
In recognition of the growing number and complexity of students with
autism in our system, the Board will initiate an Elementary Autism Self-
Contained Class pilot program. This pilot will involve two classes, located
in the north and south areas, which will also be supported by ABA
Facilitators and Speech Language Pathologists from within our existing
staff complement. This two year pilot will be evaluated to determine the
effectiveness of this program in meeting the needs of a specific profile of
students with autism.
Program Lead - Early Childhood Education 1.0 64,000
This is an existing role that will no longer be funded by the Ministry through
the Early Years funding. This role is crucial for building relationships
between Ontario College of Teachers and Early Childhood Educator
partners and ensuring that both groups are providing leadership and
learning for the system.
2017/2018 Budget Development
Resources to Support Multi-Year Plan
60
May 10, 2017
Engagement & Achievement FTE
Estimated
(Savings)
or Cost
Senior Manager - Special Education 1.0 135,000
Senior Managers are responsible for the supervision and coordination of
Social Workers, Speech Language Pathologists, Child and Youth
Counsellors, Psycho-educational Consultants, and ABA Facilitators. They
perform case coordination to support school staff in addressing students
with complex socio-emotional, behavioural, and/or mental health needs.
They also liaise with community agencies to coordinate support for
students and families. The Senior Manager complement was last
increased in 2010 and since that time there has been considerable growth
in the number of students, schools and staff in our system.
2017/2018 Budget Development
Resources to Support Multi-Year Plan
61
May 10, 2017
Engagement & Achievement FTE
Estimated
(Savings)
or Cost
Special Education Review - 20,000
Phase One of the Special Education Review was completed in 2016/2017.
These funds will continue with Phase Two of the review in order to proceed
with the implementation of the recommendations.
Stakeholder Engagement - 20,000
Costs for continued implementation of stakeholder engagement process for
year 2 of the Multi-Year Plan. This includes communication,
implementation and analysis associated with "Have Your Say" engagement
survey.
Primary Literacy Teacher Training - 234,000
Continue with the professional learning that began in 2016/2017 in order to
develop teacher confidence and competence in using data to guide
instructional practices and deepen their learning of effective assessment
and instructional strategies.
2017/2018 Budget Development
Resources to Support Multi-Year Plan
62
May 10, 2017
Engagement & Achievement FTE
Estimated
(Savings)
or Cost
Communications Assistant - Contract - 57,000
This contract position will be responsible for a variety of administrative
tasks including production of high quality communications materials,
organization of events, contribute to online communications, act as a
media liaison as required, and overall support for the Communications
Department.
Videographer Co-ordinator - 77,000
This position will provide support in the streaming of online meetings and
presentations including Board meetings, Special Education Advisory
Committee, Committee of the Whole, and Student Senate; using video to
promote and foster innovation and partnerships through the promotion of
HDSB; and provide support for professional development opportunities.
"All About Me" (K - 6) Licensing and Teacher Training - 75,000
Continue training K - 6 teachers in the use of "All About Me" as a
mechanism to document student learning, set goals and reflect on their
successes and next steps.
2017/2018 Budget Development
Resources to Support Multi-Year Plan
63
May 10, 2017
Stewardship & Resources FTE
Estimated
(Savings)
or Cost
Financial Manager (Business Services) 1.0 118,000
Implementation of a dual reporting model for the Managers of School
Administrative Operations (MOSAO) that have responsibility for school
generated funds at the secondary schools. This dual model would
establish direct (solid-line) reporting, authority and supervision over the
MOSAO position by the newly created Financial Manager (Business
Services) and an indirect (dotted-line) reporting relationship with the
Principal, who would provide additional guidance to the MOSAO and
have a level of influence and authority to direct their work. By
establishing this dual reporting structure, the principal would continue to
have control over budget allocation and spending decisions, but the
MOSAO would have the responsibility and authority to ensure that
spending is done in accordance to Board policies and procedures under
the supervision of the Financial Manager (Business Services).
Program Viability Committee - Implementation of Recommendations - 242,650
Professional training for teachers (previously French Immersion teachers)
new to teaching math and literacy in English and providing instructional and
assessment strategies; continue strategy for recruitment and staffing of
French teachers.
2017/2018 Budget Development
Resources to Support Multi-Year Plan
64
May 10, 2017
Stewardship & Resources FTE
Estimated
(Savings)
or Cost
School Technology - 818,238
Funding to support the on-going rollout of technology to schools.
Network Infrastructure - Wireless Access Point Enhancement - 2,000,000
Increase in school wireless access points (access points allow our
devices to connect to the internet and our network wirelessly) due to the
increase in the number of personal devices that staff/students are
bringing to schools; and replacement of access points that are at end of
life.
2017/2018 Budget Development
Resource to Support Multi-Year Plan
65
May 10, 2017
Equity & Well-Being FTE
Estimated
(Savings)
or Cost
System Principal - Welcome Centre and International Students 1.0 110,000
To provide leadership within the HDSB community to translate the initial
vision into action plans; develop clear organizational structure and role
mandates; create a shared culture and co-ordination of services and
supervision of staff across multiple areas (Welcome Centre, Interantional
Students, Settlement Services, etc.); build networks and connections
within and across schools/boards; provide training opportunities and
development of learning networks in order to build capacity across the
system; develop a stratgic plan to provide an inclusionary atmosphere
for newcomers and international students.
Respectful Workplace Initiative - 20,000
Continue with this initiative which began in 2016/2017 and allocate these
funds for costs associated with the pre and post survey, communication,
marketing and branding material, and training as required.
2017/2018 Budget Development
Status of Draft Operating Budget as at May 10, 2017
66
May 10, 2017
2017/2018
Draft
Draft Operating Budget Budget
Total Revenue Net of Transfer To (From) Accumulated Surplus $ 742,614,113
Transfer from Accumulated Surplus* (5,764,569)
736,849,544
Total Expenditures 742,614,113
Operating Budget Surplus (Deficit) (5,764,569)
Transfer from Accumulated Surplus*
Transfer From Closing The Gap**- School Technology 818,238
Transfer From Closing The Gap** - Wireless Access Point Enhancement 2,000,000
Operating Accumulated Surplus (Unappropriated and Available For Compliance) 2,946,331
5,764,569
Operating Budget Surplus (Deficit) as of May 10, 2017 $ -
*Transfers requiring Board approval (not previously approved by the Board).
** Expenditures to meet program delivery needs. Balance available from Closing the Gap - Accumulated
Surplus is $4.3 million.
2017/2018 Budget Development
67
2016/2017 Year-End Projection
May 10, 2017
2017/2018 Budget Development
2016/2017 Year End Projection – Enrolment
68
May 10, 2017
Projection Estimates %
Description 2016/2017 2016/2017 Growth Change
Elementary
Burlington 13,092.00 13,083.00 9.00 0.1%
Oakville 15,445.00 15,118.00 327.00 2.2%
Milton 11,911.50 11,756.00 155.50 1.3%
Halton Hills 4,624.00 4,618.00 6.00 0.1%
Elementary ADE 45,072.50 44,575.00 497.50 1.1%
Secondary - pupils less than 21 years
Burlington 5,759.99 5,862.53 (102.54) (1.8%)
Oakville 8,006.25 7,886.19 120.06 1.5%
Milton 2,485.00 2,579.69 (94.69) (3.7%)
Halton Hills 1,976.38 2,024.63 (48.25) (2.4%)
Secondary - pupils less than 21 years ADE 18,227.62 18,353.04 (125.42) (0.7%)
Total Day School
Burlington 18,851.99 18,945.53 (93.54) (0.5%)
Oakville 23,451.25 23,004.19 447.06 1.9%
Milton 14,396.50 14,335.69 60.81 0.4%
Halton Hills 6,600.38 6,642.63 (42.25) (0.6%)
Total Day School ADE 63,300.12 62,928.04 372.08 0.6%
Students 21 years and over - ADE 219.00 219.00 - -
Notes:
ADE calculations are based on 50% of the October 31 Full Time Equivalent and 50% of the
March 31 Full Time Equivalent
Full Day Kindergarten (FDK) students are counted as 1.0 FTE.
Secondary includes ADE for those students exceeding 34 credits
2017/2018 Budget Development
2016/2017 Year End Projection – Revenue
69
May 10, 2017
2016/2017 2016/2017 Less Offseting Increase
Projection Budget Expense/Equity (Decrease)
Total Revenue
Grants for Student Needs $ 654,982,614 645,324,505 (3,450,497) 6,207,612
Provincial Grants - Other 3,627,400 1,837,374 (1,790,026) -
Federal Grants 361,007 263,992 (97,015) -
School Generated Funds 19,000,000 19,000,000 -
Investment Income 1,250,000 1,250,000 -
Other Fees & Revenues 23,301,931 17,281,707 (5,961,702) 58,522
Amortization of Deferred Capital Contributions 27,102,315 27,089,003 (13,312) -
Total Revenue 729,625,267 712,046,581 (11,312,552) 6,266,134
Less Transfer To (From) Accumulated Surplus - Per Ministry Compliance 12,480,908 7,224,267 2,310,310 2,946,331
Revenue Net of Transfer To (From) Accumulated Surplus $ 717,144,359 704,822,314 (9,002,242) 3,319,803
2017/2018 Budget Development
2016/2017 Year End Projection – Expenditures
70
May 10, 2017
2017/2018 $
Draft 2016/2017 Less Offseting Increase
Budget Budget Revenue/Equity (Decrease)
Instruction $ 559,613,927 550,318,425 6,458,311 2,837,191
Administration 15,015,580 14,850,404 149,506 15,670
Transportation 15,821,008 15,657,389 13,000 150,619
Pupil Accommodation 103,923,514 102,620,894 (13,703) 1,316,323
School Generated Funds 19,000,000 19,000,000 - -
Other 3,770,330 2,375,202 2,395,128 (1,000,000)
Total Expenditures $ 717,144,359 704,822,314 9,002,242 3,319,803
2017/2018 Budget Development
2016/2017 Year End Projection – Accumulated Surplus
71
May 10, 2017
ANNUAL SURPLUS/(DEFICIT)
2016/2017
Projection
2016/2017
Revised
Estimates
Less:
Offsetting
Expense/
Equity
2016/2017
Net
Variance
Available For Compliance -
Unappropriated $ (597,465) (3,543,796) - 2,946,331
Internally Appropriated: -
Operating (5,544,279) (2,051,799) (3,492,480) -
Capital (558,596) (378,109) (180,487) -
Unavailable For Compliance -
Externally Appropriated 19,181,248 13,197,971 5,983,277 -
TOTAL ANNUAL SURPLUS/(DEFICIT) $ 12,480,908 7,224,267 2,310,310 2,946,331
2017/2018 Budget Development
72
Capital Budget
May 10, 2017
2017/2018 Budget Development
Capital Budget
73
May 10, 2017
Board Allocated
Capital Funding
Ministry
Funded
Education
Development
Charges
Proceeds
of
Disposition
Total Financing
per EFIS
Accumulated
Surplus
New Schools - Land 1,085,000 - 1,085,000 - 1,085,000 - 1,085,000 Existing Schools
(Additions)
Building,
Equipment and 28,016,382 27,516,382 - 500,000 28,016,382 - 28,016,382
Child Care/Child
and Family Centre ** 3,529,190 3,529,190 - - 3,529,190 - 3,529,190
School Renewal 6,717,757 6,717,757 - - 6,717,757 - 6,717,757
School Condition
Improvement 12,175,500 12,175,500 - - 12,175,500 - 12,175,500
51,523,829 49,938,829 1,085,000 500,000 51,523,829 - 51,523,829
* Includes expenditures for Ministry approved projects - New Martin Street P.S., Craig Kielburger S.S. addition, Milton #10
Elementary and Milton SW #1 Secondary.
** This represents the Ministry funding provided for both a Child Care Program and Child and Family Program at Milton #10
Elementary
Capital
Expense
Ministry Approved Capital Financing
Total
Financing
Trustee Input:
Incorporate elements of technology (shop) & family studies (home
economics) in elementary schools
Review elementary wide testing (shift from grade 4 gifted to a test that
examines all needs of students)
Vehicle to share best practices at and between schools
Review grade level at which students make choices for their pathways
(grade 10 instead of grade 8)
Improve/expand current primary gifted screening; counsel families with
gifted children on the merits of remaining in their community school
Review model for self-contained classes
Raise profile/marketing of our schools and program offerings; initiatives to
promote innovations and positive image
Dedicate specific resources to consultation
Explore additional partnerships regarding public transit
2017/2018 Budget Development
74 May 10, 2017
Trustee Input:
Roll out of safe use of technology throughout the system; review digital
citizenship
Continue to review opportunities for partnerships
Review opportunities to incorporate initiatives regarding FNMI/Truth and
Reconciliation into the Canada 150 grant related initiative
Training for staff and students on social media
2017/2018 Budget Development
75 May 10, 2017
Communication/Stakeholder Input: Budget discussions with Trustees (April/May/June)
Meetings with Principals/Managers, Special Education Advisory Committee
Post following on Board website:
2017/2018 Budget Development Information
Update website as additional information becomes available
Ministry Updates/Release of 2017/2018 Funding (Grants for Student Needs)
available on Ministry website
Information/consultation via HDSB website
Invite all stakeholders to provide input concerning 2017/2018 Budget
Send out news release to school community to direct them to website to
provide input
Send out news release to direct parents to website to provide input
Place newspaper advertisements in all local papers directing
parents/community to the website to provide input
2017/2018 Budget Development
76 May 10, 2017
What suggestions do you have for aligning and/or realigning
the HDSB financial resources to the board’s priorities to
continue promoting excellence in our programs for students?
2017/2018 Budget Development
Stakeholder Input
77 May 10, 2017
2017/2018 Budget Development Stakeholder Input – Website Survey Results
Theme of Responses*
78
Special Education staffing, resources and program delivery
Resources to support mental, physical and emotional health
Resources to enrich learning in the arts, music, physical
education/sport programs, and outdoor education
Resources for robotics, technology and library
Resources to support smaller class sizes and/or small group learning
opportunities
Resources to address school facilities, accommodation and additional
green space
Resources to address technology infrastructure, communication and
professional development
* Identifies responses (themes) identified more than 3 times in the survey. Total of 39 responses received.
May 10, 2017
Questions ?
2017/2018 Budget Development
79 May 10, 2017