2
HUSSAM ISKANDER 26 William Berczy, Markham, ON. L6C0R7 Tel.: (647) 229-0940, (714) 512-5448, (647) 693-0640 Distinguishing Qualification: Hussam has over twenty years of experience in the fields of mechanical engineering and Project Management, on a wide variety of international projects. Hussam has extensive experience in fire protection systems, gaseous systems, sprinkler systems, water spray systems, foam systems and pump stations. Hussam has excellent written and verbal communication skills, conscientious, hardworking, well-organized, quick learner and detailed oriented individual. Highlights: - 13 years of experience in design and construction of electromechanical systems, especially in fire protection - 7 years of experience in project management. - A recognized industry leader, creative technical expert and collaborator, who thrives on challenging roles within large or complex multi-disciplinary projects. Work Experience: 2015 - Present Jensen Hughes, Toronto, ON, Canada. Project Consultant - Fire protection (sprinkler) systems design (using NFPA), drawing, site inspection and technical support. Established effective and productive alternative solutions for fire sprinkler projects design for major construction and retrofit projects including industrial, public, high rise building, residential and commercial projects. Sample of the projects are listed below: - Canadian tire - Industrial - Overwaitea - Industrial - The Clearance, centre point- Residential - Bridgewater - High Rise - Residential - Garrison point - High Rise - Residential 2010 - 2015 Unatrac / Mantrac Group, HQ-UK Projects Manager - managed project procurement (material submittals & drawings), distributing sources, controlling budgets, sites progress reports, time schedule "Gantt charts", work scope, project overall cost, risk management, subcontractors and logistics. Established effective and productive contacts with Government and Non-governmental Organizations at several countries including: Russia: Managed projects including Gas Genset connections design (cooling, air intake, cooling, exhaust, fuel, ... etc.) with budgets up to $$130 Million such as power houses, crude oil pump stations, commercial buildings and fire protection systems for various types of buildings. - RCC 1 Varna Copper mine project–92 MW (23 x CG-260-16, 8 with CHP c\w SWG) budget of $$ 58 Million. - RCC 2 Karabash Copper mine project–16 MW (4 x CG-260-16, with CHP c\w SWG) budget of $$ 12 Million. - RCC 3 Kyshtem Copper mine project–8 MW (2 x CG-260-16, with CHP c\w SWG) budget of $$ 6 Million. - RCC 4 ORSK Copper mine project – 8 MW (4 x G3520E, with CHP & EMCP 4 series c\w SWG packaged) budget of $$ 6 Million. - UGC Gold mine project – 16 MW (8 x G3520E, with CHP c\w SWG packaged) budget of $$ 9 Million. - CHKBZ project – 8 MW (4 x G3520E, with CHP c\w SWG packaged) budget of $$ 6 Million. East Africa (Tanzania and Kenya): Project Manager. - East Africa Breweries project 8 MW (4 x 3516, EMCP 4 series c\w SWG packaged) budget of $$ 5 Million. - Tazama Crude oil pump stations 1 project (4 x 3508 mechanical, 4 x Voith geared coupling & PLC) – budget of $$ 5 Million. - Tazama Crude oil pump stations 2 project (4 x 3508 mechanical, 4 x Voith geared coupling & PLC) – budget of $$ 5 Million.

2017-01-01 Hussam Iskander - short Resume

Embed Size (px)

Citation preview

Page 1: 2017-01-01 Hussam Iskander - short  Resume

HUSSAM ISKANDER 26 William Berczy, Markham, ON. L6C0R7

Tel.: (647) 229-0940, (714) 512-5448, (647) 693-0640

Distinguishing Qualification:

Hussam has over twenty years of experience in the fields of mechanical engineering and Project Management, on a wide variety of international projects. Hussam has extensive experience in fire protection systems, gaseous systems, sprinkler systems, water spray systems, foam systems and pump stations. Hussam has excellent written and verbal communication skills, conscientious, hardworking, well-organized, quick learner and detailed oriented individual.

Highlights:

- 13 years of experience in design and construction of electromechanical systems, especially in fire protection - 7 years of experience in project management. - A recognized industry leader, creative technical expert and collaborator, who thrives on challenging roles

within large or complex multi-disciplinary projects.

Work Experience:

2015 - Present Jensen Hughes, Toronto, ON, Canada.

Project Consultant - Fire protection (sprinkler) systems design (using NFPA), drawing, site inspection and technical support. Established effective and productive alternative solutions for fire sprinkler projects design for major construction and retrofit projects including industrial, public, high rise building, residential and commercial projects. Sample of the projects are listed below: - Canadian tire - Industrial - Overwaitea - Industrial - The Clearance, centre point- Residential - Bridgewater - High Rise - Residential - Garrison point - High Rise - Residential

2010 - 2015 Unatrac / Mantrac Group, HQ-UK

Projects Manager - managed project procurement (material submittals & drawings), distributing sources, controlling budgets, sites progress reports, time schedule "Gantt charts", work scope, project overall cost, risk management, subcontractors and logistics. Established effective and productive contacts with Government and Non-governmental Organizations at several countries including:

Russia: Managed projects including Gas Genset connections design (cooling, air intake, cooling, exhaust, fuel, ... etc.) with budgets up to $$130 Million such as power houses, crude oil pump stations, commercial buildings and fire protection systems for various types of buildings. - RCC 1 Varna Copper mine project–92 MW (23 x CG-260-16, 8 with CHP c\w SWG) budget of $$ 58 Million. - RCC 2 Karabash Copper mine project–16 MW (4 x CG-260-16, with CHP c\w SWG) budget of $$ 12 Million. - RCC 3 Kyshtem Copper mine project–8 MW (2 x CG-260-16, with CHP c\w SWG) budget of $$ 6 Million. - RCC 4 ORSK Copper mine project – 8 MW (4 x G3520E, with CHP & EMCP 4 series c\w SWG packaged)

budget of $$ 6 Million. - UGC Gold mine project – 16 MW (8 x G3520E, with CHP c\w SWG packaged) budget of $$ 9 Million. - CHKBZ project – 8 MW (4 x G3520E, with CHP c\w SWG packaged) budget of $$ 6 Million.

East Africa (Tanzania and Kenya): Project Manager.

- East Africa Breweries project 8 MW (4 x 3516, EMCP 4 series c\w SWG packaged) budget of $$ 5 Million. - Tazama Crude oil pump stations 1 project (4 x 3508 mechanical, 4 x Voith geared coupling & PLC) – budget of

$$ 5 Million. - Tazama Crude oil pump stations 2 project (4 x 3508 mechanical, 4 x Voith geared coupling & PLC) – budget of

$$ 5 Million.

Page 2: 2017-01-01 Hussam Iskander - short  Resume

Namibia: Mechanical Manager of Nampower HFO Electric Power Station.

- Mechanical Manager of Nam-power HFO Electric power station (3 x CM 32 Genset c\w SWG, SCADA and PLC) – budget of $$ 22 Million.

1998 - 2010 Bavaria Alarm Ltd., Cairo, Egypt.

Senior Project Manager - Fire protection systems designing, supplying and installing

Design (using NFPA) team leader, project manager, project engineer, and code consultant for fire protection of over 30 major construction and retrofit projects including industrial, defense facilities, public, high rise building, high-tech electronics manufacturing, hospital and commercial projects. Sample of the projects are listed below:

- Egyptian State Council for archives and libraries Addressable fire alarm & FM200 systems. - Vegetable Oil Extraction Factories in Egypt & Tunis

1997 – 1998 Tankline Ltd., Abu Dhabi, UAE

Project Engineer

- Design of plumbing, pump station and fire protection systems for Abu Dhabi Naval Base. - Design and installation of fire and water lines (12 km long) for Abu Dhabi Naval Base.

1996 – 1997 Al Araby Factory Ltd., 10th Ramadan City, Egypt. – Steel Factory construction.

Project Engineer

- Continuous casting machine installation including overhead cranes. - Cooling tower design, installation and testing.

1995 – 1996 Alray Ltd., Cairo, Egypt

Project Engineer

- Marriott Hurghada Boilers room design and installation. - Marriott Hurghada Laundry room steam lines design and installation.

EDUCATION

Eligible for PEO experience requirements committee (ERC). 2015 Member of (EIT) program. 2015 PMP Diploma 2009 Bachelor of Mechanical Engineering HTI, Cairo, Egypt 1995

Training & Certifications:

- Gas Engines product support, Unatrac, Alex., Egypt, May 2014. - CSI 2130 Machinery Health Analyzer, Unatrac, Alex., Egypt, February 2014. - PLC design & programming, Unatrac, Alex., Egypt, November 2012. - Project Management Diploma, RITI institute, Authorized by PMI, Cairo, Egypt, May 2009. - Designing, Programming & installation for fire protection systems, Mircom Company, Toronto, Canada,

August 2008. - Management skills, American University, Cairo, Egypt, November 2007. - Flow hydraulic calculation and installation for extinguishing gases systems, Safety Hi-Tech, Rome, Italy,

March 2007. - Calculation, installation and maintenance for Fire trace extinguishing systems, Ceodeux Co., Luxemburg,

May 2001. - NFPA 13 Sprinkler system design and installation,NFPA, Cairo, Egypt, August 2000.

Computer Skill:

Strong Computer skills (AutoCAD – Cadworx – MSProject – Outlook – Excel – Word – MSOffice). REFERENCES AVAILABLE UPON REQUEST