© 2014 The Williams Companies, Inc. All rights reserved.
Conference Call
May 18, 2016
2016 Transco 1Line User Forum
© 2014 The Williams Companies, Inc. All rights reserved.2 1Line User Forum Update | May 2016
Agenda
> Introduction
> Upcoming 1Line changes
> Review of requested enhancements
> Recent 1Line changes and enhancements
> Available Resources
© 2014 The Williams Companies, Inc. All rights reserved.3 1Line User Forum Update | May 2016
> Operational Challenges
– Demand Charge Credits
– Targeted OFO days
> 2016 1Line Changes
– NAESB 3.0 / Timelines
– Additional tools for Pipeline Control
– 1Line changes for 2016 expansion projects
> 2017 1Line Changes
– Expansion Projects
> 2018 and Beyond
– User Forum requests
Introduction
© 2014 The Williams Companies, Inc. All rights reserved.4 1Line User Forum Update | May 2016
Upcoming changes to 1Line
> Increase 1Line reliability
– Upgrade of 1Line’s Scheduling Engine to our common code base
> Manage operational challenges
– Make-up transactions
– Focused OFOs
> E-Contracting
– Firm transportation services in 2016
> Integrate pipeline expansion projects
– Gulf Trace
– Rock Springs
– Garden State
– Dalton
– Atlantic Sunrise
© 2014 The Williams Companies, Inc. All rights reserved.5 1Line User Forum Update | May 2016
Enhancement Requests-Review and Prioritize
> Cross contract ranking* (Ranked #1 in 2015)
> Post / Retro Pool Tolerance* (Ranked #2 in 2015)
> Master Accounts* (Ranked #3 in 2015)
> Update Balance Date After Retro Run (Ranked #4 in 2015)
> Link Dashboard to Review/Select Scheduling Run Page (Ranked #5 in 2015)
> Dashboard Alert for Capacity Release (Ranked #7 in 2015)
> Ability to IM Through 1Line (Ranked #8 in 2015)
> More Detailed Retro Information (Ranked #9 in 2015)
* Requires tariff filing
© 2014 The Williams Companies, Inc. All rights reserved.6 1Line User Forum Update | May 2016
Recent changes to 1Line – Q1 2016
> New Scheduling Timeline & NAESB 3.0
– No NAESB required deadlines missed.
– No issues with capacity release timeline changes.
– Gas day 3/31 confirmations for Post cycle were unavailable. Retro
nominations deadline extended to allow corrections before close of March
business.
– Confirmation issues related to NAESB 3.0 were isolated and mostly avoided
by using manual confirmations.
– Other administrative issues (emails, report titles and formatting, 1Line page
display) all corrected by April 12.
© 2014 The Williams Companies, Inc. All rights reserved.7 1Line User Forum Update | May 2016
> Auto System Disagg (Ranked #6 in 2015)
– Auto System Disagg nominations can now be submitted using ranks other
than 999.
– System Disagg nominations submitted with a higher numerical rank than
other disagg nominations will have a higher priority.
– Changes apply to the regular gas day only. Nominations for Post and Retro
cycles will continue to operate in the same manner as they do today.
> Upgrade to 1Line Maps (Ranked #8 in 2014)
– Allows users to pinpoint a specific location on the map
– Path information displayed based on receipt / delivery combination
– Zoom capability
– More detailed information
Recent changes to 1Line – Q1 2016 (cont.)
© 2014 The Williams Companies, Inc. All rights reserved.8 1Line User Forum Update | May 2016
Recent changes to 1Line – Q4 2015
> New Active Open Seasons Page and Form Link
– Displays current Open Season postings, excluding expansion projects.
– Page can be found under: Capacity>Active Open Seasons.
• Posting will also continue to be viewable under Non-Critical Notices.
• Postings will also have a link that will take the user directly to the Open Season bid
form.
• Users can submit the completed form directly from the page.
> Nomination Confirmation Status View (Ranked #7 in 2014)
– The current Post Nom Status View page has been redesigned and renamed
to Nomination Confirmation Status View.
• This new functionality will now include all cycles except Retro.
• Refresh of this page will provide an updated status as confirmations are made by
location operators.
© 2014 The Williams Companies, Inc. All rights reserved.9 1Line User Forum Update | May 2016
> EPSQ Phase 2 (Ranked #3 in 2013)
– Automation of Requests Below EPSQ for more locations
• Pooling
• Transfer
• Storage Transfer
– Further revisions were made in 1st Quarter 2016 based on customer
feedback.
Recent changes to 1Line – Q4 2015 (cont.)
© 2014 The Williams Companies, Inc. All rights reserved.10 1Line User Forum Update | May 2016
Implemented User Forum Items
1. Zero out nominations after capacity release recall. June 2015.
2. MDQ violation upon submit. June 2015.
3. Gas measured report available for subscription. April 2015.
4. Contact cross reference and new nominations contact role. April 2015.
5. Automation of requests below EPSQ. April 2015.
6. Improved pooling view and scheduling cut information. November 2014.
7. Streamlining of the post nomination process. November 2014.
8. Option to automatically create the nominations on FDLS contracts when the mainline
contract and FDLS contracts have the same shipper. November 2014.
9. A sixth working tab. September 2014.
10. Streamlining of the retro process. September 2014.
11. New report with SQR data in .csv format. September 2014.
12. Contract cross reference added all transportation contracts. September 2014.
© 2014 The Williams Companies, Inc. All rights reserved.11 1Line User Forum Update | May 2016
Available Resources
> 1Line Training
– Portal>1Line>Training
> Operations Presentations
– Portal>Customer Info>Presentations
• 2016 Customer Services Spring Update
• 2015 Winter Operations Meeting
> Weekend and evening Representatives now available until 9:30 p.m.
Mike DiCarlo
Supervisor, 1Line Support
713-215-4609
Eva Zubel
Senior Rep., 1Line Support
713-215-2993
© 2014 The Williams Companies, Inc. All rights reserved.12 1Line User Forum Update | May 2016