PROJECT32
201 6
PROJECT32
OUR MISSION
We have established Tek Yapı benefiting from the knowledge and experience that we have obtained in the construction sector for years and developed the company with the support provided by the young and dynamic staff. The goal of Tek Yapı is to create modern, high quality, economic and trustworthy solutions for investors. Tek Yapı aims at constructing buildings in line with the current construction technology, protecting both company employees and customers from potential occupational accidents and achieving the most appropriate and high quality solutions with our solution partners. Thus selecting the use of latest developments in the sector, quality, occupational safety and environmental standards as its goal, Tek Yapı offers turnkey services for investors.The “Quality Management System”, which turned into an Integrated Management System, has been certified by Bureau Veritas for the standards ISO-9001:2000, OHSAS-18001:2007, and ISO 14001:2004. The system and the Certificates cover all the operations performed in the headquarters and within the construction sites.Implementing ISO 9001 Quality Management System, OHSAS 18001 Occupational Health and Safety and 14001 Environmental Practices together, our system contributes to sustainable development and life quality, enables information to be used correctly, and minimizes every negative situation from planning to operation. We conduct our operations within this system and develop the system consistently. In order to support the solution of ecological problems faced with both globally and locally, it is aimed at constructing buildings with “Green Building” certificate, for which principles leading to a sustainable environment are utilized, and being one of the leading companies in this field.
PROJECT32
PROJECTSTR-PHARMPharmaceutical Plant
TÜRKİYE İŞ BANKASIData Center
KORDSA GLOBALResarch and Development Center
TURKCELLData Center
ANADOLU ISUZUResarch and Development Center
RECORDATIPharmaceutical Plant
3MÇorlu Manufacturing Plant
DOĞUŞ OTOMOTİVA Block Reinforcement, Roof Renovation
IFFGOSB Extension Project
SAUDI SNACK FOODS (PEPSI CO.)Potato Chips Production Plant and Office Building
CHIPITAIndustrial Food Production Complex
VOLVOTruck Service
DOĞUŞ OTOMOTİVLogistics Center
BOSCH (BU2)RBTR BU Block 310 Production Plant and Office Building
BOSCH (BU1)RBTR BU Block 113 Production Plant and Office Building
BSHWarehouse, Ring Roads, Container Yard, Railway Line, Creek Rehabilitation
CLARIANTOffice Building and Masterbatch Building
FRITO LAY (PEPSI CO.)Potato Warehouse
VODAFONEData Center
EREN ENERJİ 2x600 MW Turbine Cooling Water Pipes Installation
EREN ENERJİ600 MW Coal Fired Power Plant
KENT CUDBURRYChewing Gum and Confectionery Production Plant
MODKAR AMBALAJCardboard Manufacturing Plant (Kayseri)
KCCPaint Production Plant and Office Building
CANTAŞCooling Gas Charging Plant and Logistics Center
SIKAProduction Plant and Office Building
JOTUNÇerkezköy Production Plant Extension
IŞIK UNIVERSITY (YY1)Işık University Şile Campus Dormitory (YY1)
ABBTransformer Production Plant and Office Building
MODERN KARTONPM4 Paper Mill
IŞIK UNIVERSITY (YY2)Işık University Şile Campus Dormitory (YY2)
GRUNDFOSFactory and Office Building
MODKAR AMBALAJCardboard Manufacturing Plant (Çorlu)
KÜEHNE + NAGELLogistics Center and Office Building
DERİMSANLeather Processing Plant and Office Building
GÖKYILDIZWeaving Plant, Warehouse, Office Building and Showroom
FRANKEManufacturing Plant, Warehouse and Office Building
36
35
34
33
32
31
30
29
28
K.1
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
PROJECT36
CLIENT
TR Pharm İlaç Sanayi ve Ticaret A.Ş.
PROJECT NAME
Pharmaceutical Plant
LOCATION
Çerkezköy Industrial Zone, Tekirdag
JOB DESCRIPTION
Infrastructure and Civil Works
STRUCTURE
Reinforced Concrete
AREA
20,700 sq.m
CONTRACT DATE
March 2th, 2016
STARTING DATE
March 15th, 2016
FINISHING DATE
December 31st, 2017
DESIGN
Tekeli-Sisa Architecture
PROJECT35
CLIENT
Türkiye İş Bankası A.Ş.
PROJECT NAME
Data Center
LOCATION
Tuzla, İstanbul
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Data Centers : Structural SteelOffice Building : Reinforced Concrete
AREA
14,000 sq.m
CONTRACT DATE
March 04th, 2016
STARTING DATE
March 21st, 2016
FINISHING DATE
December 25th, 2016
DESIGN
Red Engineering
WHITE SPACE AREA
4,000 sq.m
TIER: IV (Design and Facility)LEED: Version 4 Gold Certificate
DESIGN
UPTIME INSTITUTE CERTIFICATED
FACILITY
UPTIME INSTITUTE CERTIFICATED
PROJECT34
CLIENT
KordSA Global Endüstriyel İplik ve Kord Bezi Sanayi ve Ticaret A.Ş.
PROJECT NAME
Teknopark Composite Technologies Research and Development Center
LOCATION
Teknopark Pendik, Istanbul
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Reinforced Concrete
AREA
14,000 sq.m
CONTRACT DATE
August 24th, 2015
STARTING DATE
August 31st, 2015
FINISHING DATE
May 31st, 2016
DESIGN
Turgut Toydemir(Piramit Architecture)
LEED: Version 3 Gold Certificate
PROJECT33
CLIENT
TURKCELL Gayrimenkul Hizmetleri A.Ş.
PROJECT NAME
Data Center
LOCATION
Gebze Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Reinforced Concrete
AREA
37,000 sq.m
CONTRACT DATE
February 16th, 2015
STARTING DATE
March 1st, 2015
FINISHING DATE
May 31st, 2016
DESIGN
Deerns International
WHITE SPACE AREA
10,000 sq.m
TIER: III (Design and Facility)LEED: Version 3 Gold Certificate
DESIGN
UPTIME INSTITUTE CERTIFICATED
FACILITY
UPTIME INSTITUTE CERTIFICATED
PROJECT32
CLIENT
ANADOLU ISUZU Otomotiv Sanayi ve Ticaret A.Ş.
PROJECT NAME
Research and Development Center
LOCATION
Şekerpınar, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Structural Steel
AREA
6,850 sq.m
CONTRACT DATE
November 14th, 2014
STARTING DATE
February 1st, 2015
FINISHING DATE
August 31st, 2015
DESIGN
TEM Engineering
PROJECT31
CLIENT
Recordati İlaç Sanayi ve Ticaret A.Ş.
PROJECT NAME
Pharmaceutical Plant
LOCATION
Çerkezköy Industrial Zone, Tekirdağ
JOB DESCRIPTION
Infrastructure and Civil Works
STRUCTURE
Reinforced Concrete
AREA
18,150 sq.m
CONTRACT DATE
April 17th, 2014
STARTING DATE
April 17th, 2014
FINISHING DATE
May 17th, 2015
DESIGN
Foster Wheeler Bimaş
PROJECT30
CLIENT
3M İnovasyon Ürünleri Sanayi ve Ticaret Ltd.Şti.
PROJECT NAME
Çorlu Manufacturing Plant
LOCATION
European Free Trade Zone, Çorlu
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Structural Steel
AREA
9,200 sq.m
CONTRACT DATE
August 1st, 2013
STARTING DATE
August 1st, 2013
FINISHING DATE
March 31st, 2014
DESIGN
Seyaş Sey Architecture, Engineering, Consulting / Alaz Albay
PROJECT28
CLIENT
IFF Internatıonal Flavors & Fragrances
PROJECT NAME
GOSB Extensıon Project
LOCATION
Gebze Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works, Process Installation, Clean Rooms
STRUCTURE
Reinforced Concrete
AREA
10,250 sq.m
CONTRACT DATE
April 29th, 2013
STARTING DATE
May 1st, 2013
FINISHING DATE
November 1st, 2014
DESIGN
SEY Architecture, Engineering, Consulty / Alaz Albay
PROJECTK.1
CLIENT
Saudi Snack Food Limited (Pepsi Co.)
PROJECT NAME
Potato Chips Production Plant and Office Building
LOCATION
Dammam, Kingdom of Saudi Arabia
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Steel Structure
AREA
16,000 sq.m
CONTRACT DATE
April 26th, 2013
STARTING DATE
April 26th, 2013
FINISHING DATE
September 30th, 2015
DESIGN
TEM Engineering
LEED: Version 3 Silver Certificate
PROJECT27
CLIENT
Chipita Gıda Üretim A.Ş.
PROJECT NAME
Industrial Food Production Complex
LOCATION
Gebze Plastikçiler Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Structural Steel
AREA
6,500 sq.m
CONTRACT DATE
March 08th, 2013
STARTING DATE
March 08th, 2013
FINISHING DATE
October 08th, 2013
DESIGN
Whitestone S.A. / TEM Engineering
PROJECT26
CLIENT
Volvo Otomotiv Türk Ltd. Şti.
PROJECT NAME
Truck Service
LOCATION
Hadımköy, İstanbul
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Reinforced Concrete, Space Truss System Roof
AREA
3,600 sq.m
CONTRACT DATE
June 07th, 2012
STARTING DATE
July 16th, 2012
FINISHING DATE
December 31st, 2012
DESIGN
ORC Mimarlık Hizmetleri Ltd. Şti.
PROJECT25
CLIENT
Doğuş Otomotiv Servis ve Ticaret A.Ş.
PROJECT NAME
Logistics Center
LOCATION
Şekerpınar, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Reinforced Concrete
AREA
45,125 sq.m
CONTRACT DATE
March 01, 2012
STARTING DATE
March 05, 2012
FINISHING DATE
November 05, 2012
DESIGN
Ateş Architecture and Engineering
PROJECT24
CLIENT
Bosch ve Ticaret A.Ş.
PROJECT NAME
RB TR BU2 Block 310 Production Plant and Office Building
LOCATION
Nilüfer O.S.B., Bursa
JOB DESCRIPTION
Infrastructure, Civil Works and Architectural Works
STRUCTURE
Precast Concrete Columns,Structural Steel Roof
AREA
7,994 sq.m
CONTRACT DATE
January 15th, 2012
STARTING DATE
February 01st, 2012
FINISHING DATE
January 18th, 2013
DESIGN
Ateş Architecture and Engineering
PROJECT23
CLIENT
Bosch ve Ticaret A.Ş.
PROJECT NAME
RBTR BU1 Block 113 Production Plant and Office Building
LOCATION
Nilüfer O.S.B., Bursa
JOB DESCRIPTION
Infrastructure, Civil Works and Architectural Works
STRUCTURE
Reinforced Concrete,Structural Steel Roof
AREA
14,157 sq.m
CONTRACT DATE
January 15th, 2012
STARTING DATE
February 01st, 2012
FINISHING DATE
January 18th, 2013
DESIGN
Ateş Architecture and Engineering
PROJECT22
CLIENT
BSH Ev Aletleri San. ve Tic. A.Ş.
PROJECT NAME
Warehouse, Ring Roads, Container Yard, Railway Line, Creek Rehabilitation
LOCATION
Çerkezköy Industrial Zone, Tekirdağ
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Precast Columns,Space Truss System Roof
AREA
44,120 sq.m
CONTRACT DATE
May 18th, 2011
STARTING DATE
May 23rd, 2011
FINISHING DATE
January 31st, 2012
DESIGN
Ateş Architecture, Engineering
PROJECT21
CLIENT
Clariant Türkiye Boya ve Kimyevi Maddeler San. ve Tic. A.Ş.
PROJECT NAME
Office Building and Masterbatch Building
LOCATION
Gebze Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Precast Columns,Space Truss System Roof
AREA
10,900 sq.m
CONTRACT DATE
March 03rd, 2011
STARTING DATE
March 21st, 2011
FINISHING DATE
October 02nd, 2011
DESIGN
LİM Architecture, EngineeringAlaz Albay
PROJECT32
PROJECT32
PROJECT20
CLIENT
Frito Lay Gıda Sanayi A.Ş.
PROJECT NAME
Potato Warehouse
LOCATION
Suadiye, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Reinforced Concrete,Structural Steel Roof
AREA
6,300 sq.m
CONTRACT DATE
December 23rd, 2010
STARTING DATE
December 23rd, 2010
FINISHING DATE
July 30th, 2011
DESIGN
TEM Engineering
PROJECT19
CLIENT
Vodafone Telekomünikasyon Altyapı Hizmetleir A.Ş.
PROJECT NAME
Data Center
LOCATION
Esenyurt, İstanbul
JOB DESCRIPTION
Turnkey: Earth Works, Piling Works, Construction and Architectural Works, Electromechonical Works
STRUCTURE
Structural Steel
AREA
11,200 sq.m
CONTRACT DATE
January 04th, 2010
STARTING DATE
January 07th, 2010
FINISHING DATE
April 30th, 2012
DESIGN
METSİS Architecture
WHITE SPACE AREA
2,800 sq.m
PROJECT18
CLIENT
Eren Enerji Elektrik Üretim A.Ş.
PROJECT NAME
2X600 MW Turbine Cooling Water Pipes Installation
LOCATION
Zonguldak
JOB DESCRIPTION
Pipe Installation / Pipe Supports / Motorway and Railway Passages
PIPELINE
4 X 3.500 m – ø 3.244 mm Pipeline
CONTRACT DATE
February 10th, 2009
STARTING DATE
February 15th, 2009
FINISHING DATE
October 31th, 2010
DESIGN
Scala / Modern Engineering
PROJECT17
CLIENT
Eren Enerji Elektrik Üretim A.Ş..
PROJECT NAME
600 MW Coal Fired Power Plant
LOCATION
Zonguldak
JOB DESCRIPTION
Infrastructure, Civil Works, Architectural Works
STRUCTURE
Reinforced Concrete, Structural Steel
AREA
62,500 sq.m
CONTRACT DATE
April 28th, 2008
STARTING DATE
May 1st, 2008
FINISHING DATE
April 30th, 2010
DESIGN
Modern Engineering
PROJECT16
CLIENT
Kent Gıda Maddeleri Sanayi ve Ticaret A.Ş.
PROJECT NAME
Chewing Gum and Confectionery Production Plant
LOCATION
Gebze, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Reinforced Concrete
AREA
15,600 sq.m
CONTRACT DATE
April 1st, 2008
STARTING DATE
April 3rd, 2008
FINISHING DATE
April 30th, 2009
DESIGN
Ateş Architecture, Engineering
PROJECT15
CLIENT
Modkar Ambalaj Sanayi ve Ticaret A.Ş.
PROJECT NAME
Cardboard Manufacturing Plant
LOCATION
Kayseri
JOB DESCRIPTION
Infrastructure, Civil Works and Architectural Works
STRUCTURE
Precast Concrete
AREA
21,764 sq.m
CONTRACT DATE
October 1, 2007
STARTING DATE
October 5, 2007
FINISHING DATE
May 31, 2008
DESIGN
Barka Engineering
PROJECT14
CLIENT
KCC Boya Sanayi ve Ticaret A.Ş.
PROJECT NAME
Paint Production Plant and Office Building
LOCATION
Gebze Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Reinforced Concrete
AREA
15,500 sq.m
CONTRACT DATE
July 16th, 2007
STARTING DATE
August 7th, 2007
FINISHING DATE
April 28th, 2008
DESIGN
Seyaş Architecture, EngineeringAlaz Albay
PROJECT13
CLIENT
Cantaş İç ve Dış Ticaret Soğutma Sistemleri A.Ş.
PROJECT NAME
Cooling Gas Charging Plant and Logistics Center
LOCATION
Gebze Güzeller Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Sector A: Precast ConcreteSector B and C: Reinforced Concrete
AREA
9,750 sq.m
CONTRACT DATE
March 23rd, 2007
STARTING DATE
April 15th, 2007
FINISHING DATE
October 10th, 2007
DESIGN
Seyaş Arch., EngineeringAlaz Albay
PROJECT12
CLIENT
SIKA Yapı Kimyasalları A.Ş.
PROJECT NAME
Production Plant and Office Building
LOCATION
Tuzla Industrial Zone, İstanbul
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Structural Steel
AREA
15,980 sq.m
CONTRACT DATE
June 1st, 2006
STARTING DATE
June 12nd, 2006
FINISHING DATE
April 11st, 2006
DESIGN
Ateş Architecture
PROJECT11
CLIENT
Jotun Boya Sanayi ve Ticaret A.Ş.
PROJECT NAME
Çerkezköy Production Plant Extension
LOCATION
Çerkezköy Industrial Zone, Tekirdağ
JOB DESCRIPTION
Infrastructure, Civil Works, Architectural Works
STRUCTURE
Warehouse: Precast ConcreteProduction Plant: Reinforced Concrete
AREA
2,912 sq.m
CONTRACT DATE
June 12nd, 2006
STARTING DATE
June 15th, 2006
FINISHING DATE
December 31st, 2006
DESIGN
UMO Architecture
PROJECT9
CLIENT
ABB Elektrik Sanayi A.Ş.
PROJECT NAME
Transformer Production Plant and Office Building
LOCATION
Dudullu Industrial Zone, İstanbul
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Precast Concrete
AREA
10,817 sq.m
CONTRACT DATE
September 28th, 2005
STARTING DATE
October 3rd, 2005
FINISHING DATE
July 26th, 2006
DESIGN
Ateş Architecture, Engineering
PROJECT8
CLIENT
Modern Karton Sanayi ve Ticaret A.Ş.
PROJECT NAME
PM4 Paper Mill
LOCATION
Çorlu, Tekirdağ
JOB DESCRIPTION
Infrastructure, Civil Works, Architectural Works
STRUCTURE
Precast Concrete
AREA
67,605 sq.m
CONTRACT DATE
January 26th, 2006
STARTING DATE
February 1st, 2006
FINISHING DATE
May 30th, 2008
DESIGN
Modern Architecture
PROJECT6
CLIENT
Grundfos Pompa Sanayi ve Ticaret A.Ş.
PROJECT NAME
Factory and Office Building
LOCATION
Gebze Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Factory.: Precast Concrete Columns, Steel Girders,Office Building.: Reinforced Concrete
AREA
6,600 sq.m
CONTRACT DATE
February 15th, 2005
STARTING DATE
February 25th, 2005
FINISHING DATE
September 5th, 2005
DESIGN
RambollAteş Architecture, Engineering
PROJECT5
CLIENT
Modkar Ambalaj Sanayi ve Ticaret A.Ş.
PROJECT NAME
Cardboard Manufacturing Plant
LOCATION
Çorlu, Tekirdağ
JOB DESCRIPTION
Infrastructure, Civil Works, Architectural Works
STRUCTURE
Precast Concrete
AREA
21,764 sq.m
CONTRACT DATE
January 15, 2005
STARTING DATE
February 1, 2005
FINISHING DATE
August 30, 2005
DESIGN
Foster Wheeler – Bimaş
PROJECT4
CLIENT
Küehne+Nagel Nakliyat Ltd. Şti.
PROJECT NAME
Logistics Center and Office Building
LOCATION
Gebze Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Precast Concrete
AREA
10,895 sq.m
CONTRACT DATE
July 28th, 2004
STARTING DATE
August 17th, 2004
FINISHING DATE
December 31st, 2004
DESIGN
Ateş Architecture, Engineering
PROJECT1
CLIENT
Franke Mutfak Sistemleri Ltd. Şti.
PROJECT NAME
Manufacturing Plant, Warehouse and Office Building
LOCATION
Gebze Industrial Zone, Kocaeli
JOB DESCRIPTION
Turnkey: Infrastructure, Civil Works, Architectural Works, Electrical and Mechanical Works
STRUCTURE
Factory and Warehouse: Structural Steel,Office Build.: Reinforced Concrete
AREA
7,400 sq.m
CONTRACT DATE
July 1st, 2003
STARTING DATE
July 1st, 2003
FINISHING DATE
December 31st, 2003
DESIGN
Onur Özsoy, Özsoy Architecture
PROJECT32
PROJECT32
PROJECT32
HEAD OFFICEEsentepe Mah. Koreşehitleri Cad.
Mithat Ulu Ünlü Sokak No:1634394 Sisli, Istanbul, Turkey
T : +90 212 275 [email protected]
SAUDI ARABIA OFFICEAl Jarbuo Building No:3580 Floor 8
Office No:802, Al Aqrabiyah Al Khobar 344466283 Saudi Arabia
T : +966 (03) 811 6812 / 6814/[email protected]