37
ALBERTA TRANSPORTATION 2016-19 Major Construction Projects Provincial Highway and Water Management Projects Major Provincial Highway Water Management The attached three-year provincial construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2016-17 and 2018-19, subject to provincial funding and priorities. This list is tentative: Projects that are under contract or tendered are identified stating the year of construction. Other projects are being designed, right-of-way being negotiated and the acquisition of permits underway. These projects will commence as planned in the provincial program dependent upon the timely completion of the design and availability of funding. Minor changes to the program may be required as newer information becomes available. In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year. Not identified in the program are some of the bridge rehabilitation projects and local improvements, such as: minor slide repairs and intersection upgrades; small carry-over projects from 2015-16; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects.

2016 Published Program...Hwy Highway Incl Includes Imp Improvement Int Intersection Intch Interchange IR Indian Reserve Jct Junction LR Local Road (N) North Junction N North NB or

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

  • ALBERTA TRANSPORTATION

    2016-19 Major Construction Projects

    Provincial Highway and Water Management Projects � Major Provincial Highway � Water Management

    The attached three-year provincial construction and rehabilitation program lists the major projects where substantive work is anticipated to be complete or undertaken between 2016-17 and 2018-19, subject to provincial funding and priorities. This list is tentative:

    • Projects that are under contract or tendered are identified stating the year of construction.

    • Other projects are being designed, right-of-way being negotiated and the acquisition of permits underway. These projects will commence as planned in the provincial program dependent upon the timely completion of the design and availability of funding.

    • Minor changes to the program may be required as newer information becomes available. In particular, final paving, pavement overlays and bridge rehabilitation may be added and/or deleted from the program depending on how the roadway or bridge condition changes throughout the year.

    Not identified in the program are some of the bridge rehabilitation projects and local improvements, such as: minor slide repairs and intersection upgrades; small carry-over projects from 2015-16; and general expenditures such as chip seal coats, lighting, preliminary (consultant) engineering and future right-of-way. Additionally, minor safety-related improvements might be added as identified, generally in conjunction with larger projects.

  • GLOSSARYThis is a listing of abbreviations used in the following document

    @ AtAve AvenueBdry BoundaryBF 74817 or (74817-02) Bridge File NumberCNR Canadian National RailwayCr CreekCty County(E) East JunctionE EastEB or EBL East Bound LaneECL East Corporate (or City) LimitEID Eastern Irrigation DistrictG/S Grade Separation StructureHwy HighwayIncl IncludesImp ImprovementInt IntersectionIntch InterchangeIR Indian ReserveJct JunctionLR Local Road(N) North JunctionN NorthNB or NBL North Bound LaneNCL North Corporate (or City) LimitR or Riv RiverRge RangeRd or Rds Road or Roads(S) South JunctionS SouthSB or SBL South Bound LaneSCL South Corporate (or City) Limitsel selectiveSMRID St Mary's River Irrigation DistrictSRA Safety Rest AreaSt StreetSV Summer VillageTr TrailTwp TownshipUAR Urban Approach RoadVIS Vehicle Inspection Station(W) West JunctionW WestWB or WBL West Bound LaneWCL West Corporate (or City) LimitWID Western Irrigation District

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    1 Structure ReplacementTributary to Bow River Culvert on Highway 1, 2 km S of Exshaw (74661-1)

    1 Structure ReplacementBow River Culvert on Highway 1, at Canmore (74364-1)

    1 Flood MitigationPigeon Creek flood mitigation on Hwy 1

    1 Flood MitigationCougar Creek flood mitigation works on Hwys 1 and 1A

    1 Structure ReplacementHighway 1 over Cheneka Railway Station Access Interchange, 7 km E of Morley (Cheneka Underpass) (74600-2)

    1 Flood MitigationKananaskis River Bridge on Provincial Highway 1, 2 km S of Seebe (74354-1)

    1 Preservation/Overlay 32Contract for 2015 & 2016 Construction

    East Boundary Stony Indian Reserve - W of Hwy 22 (EBL & WBL)

    1 Flood MitigationJumpingpound Creek Bridge on Provincial Highway 1, 16 km SW of Cochrane (74355-1)

    1 Bridge Deck ReplacementHighway 563 over Highway 1 Interchange, 2 km W of Calgary (75933-1)

    1 Preservation/Overlay 21Contract for 2016 Construction

    Hwy 797 - Town of Strathmore (WBL)

    1 Structure ReplacementWID Irrigation Canal Bridge on Provincial Highway 1 near Strathmore (79535-1)

    1 Structure ReplacementWID Canal Culvert on Highway 1, 11 km E of Gleichen (73820-1)

    1A Preservation/Overlay 21Contract for 2016 Construction

    6 km E of Hwy 22 - 18 km W of Hwy 201 (selective)

    2 Preservation/Overlay 17Hwy 5 - 1 km N of Hwy 505

    2 Preservation/Overlay 232 km N of Hwy 527 - 1 km N of Hwy 533 (Nanton)

    Friday, April 15, 2016 Page 1 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    2 Flood MitigationSheep River Bridge on Highway 2, 5 km N of Aldersyde (74031-1)

    2 Bridge Substructure RepairsContract for 2015 & 2016 Construction

    Bow River Ivor Strong Bridge on Highway 2/Deerfoot Trail, at Calgary (79210-1)

    2 Interchange UpgradingHighway 2 and 2A and 72 Roundabout Diamond Interchange

    2 6 Laning - Grade, Base, Pave 13Hwy 567 (Airdrie) - N of Hwy 2A (Crossfield)

    2 Intersection ImprovementHighway 2 and Yankee Valley Boulevard

    2 Preservation/Overlay 18Hwy 27 - 2 km S of Town of Bowden

    2 Structure ReplacementHighway 2 Mainline SB structure over Hwy 2A ,Red Deer (75332-S6)

    2 Structure ReplacementHighway 2 Mainline NB Structure over Hwy 2A, Red Deer (75332-N5)

    2 Structure ReplacementWaskasoo Creek Culvert, SW Boundary of Red Deer (75333-1)

    2 Interchange - Bridge StructureLocal Road Over Highway 2 Interchange, at S Boundary of Red Deer (75331-1)

    2 Grading, Base, Full Paving 7Hwy 2 Interchange Upgrades: Gaetz Avenue/Taylor Drive (Roadwork)

    2 Preservation/Overlay 141 km N of Hwy 2A (S) - 4 km S of Hwy 53

    2 Preservation/Overlay 32Hwy 53 - Hwy 13 (NBL & SBL selective)

    2 Preservation/Overlay 4City of Edmonton - 1 km N of Hwy 216

    2 Grading, Base, Full Paving 6Hwy 19 - 4 km S of Ellerslie Road

    2 Preservation/Overlay 83 km N of Hwy 633 - Hwy 37 (selective)

    2 Preservation/Overlay 9Contract for 2016 Construction

    Vimy Approach Road - Hwy 18

    Friday, April 15, 2016 Page 2 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    2 Preservation/Overlay 12Hwy 37 - 2 km N of Hwy 642

    2 Preservation/Overlay 12Contract for 2016 Construction

    Hwy 37 - Town Morinville (NBL)

    2 Preservation/Overlay 22Contract for 2016 Construction

    Morinville - N of Hwy 18 (selective)

    2 Preservation/Overlay 31Hwy 661 - Hwy 55 (Athabasca) (selective)

    2 Preservation/Overlay 3225 km N of Hwy 812 - 1 km E of Hwy 44

    2 Preservation/Overlay 40Contract for 2016 Construction

    1 km E of Hwy 44 - 15 km S of Town of Slave Lake

    2 Flood MitigationSawridge Creek Bridge on Highway 2, at Slave Lake (13824-1)

    2 Structure ReplacementContract for 2016 Construction

    Little Sucker Culvert on Provincial Highway 2 near Joussard (76479-1)

    2 Preservation/Overlay 342 km E of Faust Urban Approach Access - 9 km W of Joussard Urban Approach Access

    2 Bridge Deck RehabilitationDriftpile River Bridge on Highway 2, 14 km NW of Faust (13838-1)

    2 Structure ReplacementContract for 2016 Construction

    Sucker Creek (Arcadia Creek Bridge ) on Highway 2, 12 km E of Enilda (76478-1)

    2 Preservation/Overlay 369 km W of Joussard Urban Approach Road - Hwy 2A

    2 Structure ReplacementContract for 2016 Construction

    Winagami - Girouxville Canal on Hwy 2, near Mclennan (77551-1)

    2 Bridge Deck RehabilitationHighway 2 over 100 Street Interchange, at Peace River (76057-1)

    2 Bridge Deck RehabilitationHighway 2 over Grouard Trail Flyover, at Peace River (76056-1)

    2 Reconstruct/Re-Alignment 290th Street Reconstruction to accommodate twinned structure over the Peace River

    Friday, April 15, 2016 Page 3 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    2 Structure ReplacementHighway 2 Over 98 Street Interchange, at Peace River (76059-2), to accommodate new twinned bridge over the Peace River

    2 Structure ReplacementProvincial Highway 2 Over Pedestrian Underpass near Peace River (81649-1)

    2 Reconstruct/Re-AlignmentEastside Road Reconstruction to accommodate new twinned structure over the Peace River

    2 Preservation/Overlay 86 km S of Hwy 688 - 1 km N of Hwy 688 (selective)

    2 MiscellaneousPeace River E Hill Retaining Wall Site - Foundation/Retaining Structure

    2 Construct New BridgePeace River Bridge, Hwy 2, (new structure for twinning at existing site)

    2 Structure ReplacementCNR Overpass on Highway 2, at Peace River (76061-1) (to accommodate new twinned structure, both EB & WB lanes)

    2 Reconstruct/Re-Alignment 1Westside Road Reconstruction to accommodate new twinned structure over the Peace River

    2 Preservation/Overlay 12Contract for 2016 Construction

    W End of Peace River bridge to Hwy 2A

    2 Passing/Climbing Lane 3Contract for 2016 Construction

    Climbing Lanes, West End of Peace River Bridge, W of Rge Rd 222 to W of Rge Rd 224

    2 Construct New BridgeCNR Overpass on Highway 2, at Peace River (WBL traffic only)

    2 Structure ReplacementWatercourse Culvert on Provincial Highway 2 near Bluesky (71676-1)

    2 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Hwy 2 near Rycroft (86265-1)

    2 Preservation/Overlay 1414 km S of Hwy 49 - Hwy 49

    2 Slide MitigationContract for 2015 & 2016 Construction

    Highway 2 Dunvegan North Slide Repair (PH 52)

    Friday, April 15, 2016 Page 4 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    2A Preservation/Overlay 32 km S of Hwy 582 - Hwy 582

    2A Preservation/Overlay 112 km N of Twp Road 292 - Town of Carstairs

    2A Preservation/Overlay 0.45E of Hwy 587 to Hwy 587

    2A Interchange - Bridge StructureCollector / Distributor Road structure over Hwy 2A, Red Deer (75332-SCD4)

    2A Interchange - Bridge StructureCollector / Distributor Road over Hwy 2A, Red Deer (75332-NCD3)

    2A Preservation/Overlay 5N of McKenzie Road - City of Red Deer

    2A Preservation/Overlay 6Hwy 11A - S of Hwy 597

    2A Preservation/Overlay 4Contract for 2016 Construction

    City of Lacombe - N of City of Lacombe

    2A Preservation/Overlay 10Contract for 2016 Construction

    Hwy 2 - S of Hwy 53

    2A Preservation/Overlay 1Contract for 2016 Construction

    1 km S of Hwy 2 - Hwy 2

    2A Structure ReplacementNoon Creek Bridge on Provincial Highway 2A near High Prairie (73781-1)

    2A Flood MitigationContract for 2016 Construction

    Geotechnical / Erosion Control Issues near Gunns Creek, E of Hwy 49 (Site # SH26)

    3 Bridge Deck RehabilitationCrowsnest River Bridge on Highway 3, at Frank (395-1)

    3 Flood MitigationMcgillivray Culvert on Provincial Highway 3 near Coleman (13634-1)

    3 Flood MitigationContract for 2016 Construction

    Rock Fall Barrier Wall @ Crowsnest Lake Rockfall, W of Crowsnest Pass (site # S15)

    3 Structure ReplacementWatercourse Culvert on Provincial Highway 3 near Lundbrecreek (76457-1)

    3 Structure ReplacementSMIRD Main Canal Bridge on Highway 3, 10 km E of Coaldale (Chin Coulee) (6780-1)

    Friday, April 15, 2016 Page 5 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    3 Preservation/Overlay 141 km W of Hwy 3A - Town of Taber (selective)

    3 Preservation/Overlay 361 km E of Hwy 36 - 5 km E of Hwy 877

    3 Structure ReplacementSMRID Canal Bridge on Highway 3, 5 km W of Seven Persons (75062-1)

    4 Preservation/Overlay 132 km N of Town of Milk River - Hwy 36

    5 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Provincial Highway 5 near Cardston (801-1)

    5 Structure ReplacementContract for 2016 Construction

    Tributary to St Mary River Culvert on Hwy 5, near Cardston (241-1)

    5 Structure ReplacementCattle Pass on Highway 5 near Lethbridge (76160-1)

    6 Structure ReplacementTributary to Kettles Creek Culvert on Highway 6, 2 km S of Pincher Creek (13814-1)

    6 Structure ReplacementWatercourse Culvert on Provincial Highway 6 near Twin Butte (73672-1)

    7 Signalization / LightingIntersection of Hwy 7 & 22 (Black Diamond)

    9 Structure ReplacementWatercourse Culvert on Provincial Highway 9 near Beiseker (80725-1)

    9 Preservation/Overlay 19Contract for 2016 Construction

    Hwy 838 - Hwy 27

    9 Bridge Deck RehabilitationBullpound Creek Bridge on Highway 9, 13 km W of Hanna (71613-1)

    11 Bridge Deck RehabilitationContract for 2016 Construction

    Cline River Bridge on Highway 11, 45 km SW of Nordegg (73429-1)

    11 Preservation/Overlay 4Contract for 2016 Construction

    1 km N of Hwy 598 - S of Town of Rocky Mountain House

    12 Reconstruct/Re-Alignment 12Contract for 2016 Construction

    Hwy 20 - Hwy 792 (Phase 2)

    12 Preservation/Overlay 46Hwy 50 - Town of Stettler

    Friday, April 15, 2016 Page 6 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    12 Preservation/Overlay 221 km E of Hwy 855 - Hwy 36

    12 Preservation/Overlay 2310 km E of Hwy 36 - 2 km E of the Town of Coronation

    13 Preservation/Overlay 6Contract for 2016 Construction

    6 km W of City of Wetaskiwin - City of Wetaskiwin WCL

    13 Preservation/Overlay 21 km E of Hwy 21 - City of Camrose

    13 Preservation/Overlay 21Hwy 881 (Town of Hardisty) - Hwy 884

    13 Passing/Climbing Lane 23 km E of Hwy 881 - 3 km E of Hardisty (EB)

    13 Preservation/Overlay 1512 km E of Metiskow Urban Approach Access - Town of Provost

    14 Bridge Deck RehabilitationBattle River Bridge on Highway 14, 2 km NW of Fabyan (2233-1)

    15 Preservation/Overlay 5Contract for 2016 Construction

    City of Edmonton - City of Fort Saskatchewan

    15 Intersection ImprovementContract for 2016 Construction

    Intersection Improvement: @ Lamoureux Road

    15 Structure ReplacementContract for 2016 Construction

    Lamont Creek Culvert on Provincial Highway 15 near Lamont (70841-1)

    16 Preservation/Overlay 80Contract for 2015 & 2016 Construction

    Hinton to Town of Edson (EBL & WBL selective)

    16 Preservation/Overlay 1W of Hwy 753 - Hwy 753

    16 Preservation/Overlay 148 km E of Hwy 32 - 4 km W of Hwy 751

    16 Structure ReplacementWatercourse Culvert on Provincial Highway 16 near Wabamun (7408-1)

    16 Structure ReplacementPointe-Aux-Pins Culvert on Hwy 16, 3 km NW of Ardrossan (330-1)

    16 Preservation/Overlay 9Contract for 2015 & 2016 Construction

    1 km E of Hwy 21 - 1 km W of Hwy 830 (EBL)

    Friday, April 15, 2016 Page 7 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    16 Preservation/Overlay 15Contract for 2016 Construction

    2 km W of Hwy 834 - 7 km W of Town of Mundare (EBL)

    16 Preservation/Overlay 10Contract for 2016 Construction

    12 km W of Hwy 834 - 2 km W of Hwy 834 (EBL)

    16 Preservation/Overlay 9Contract for 2016 Construction

    E of Hwy 16A - W of Hwy 36 (WBL)

    16 Preservation/Overlay 30Contract for 2016 Construction

    2 km W of Hwy 870 - Minburn Access (EBL & WBL)

    16 Preservation/Overlay 19Contract for 2016 Construction

    Hwy 36 - 1 km W of Village of Innisfree (EBL)

    16A Structure ReplacementWatercourse Culvert on Provincial Highway 16A near Stony Plain (71097-1)

    17 Bridge Deck Rehabilitation(cost shared with Saskatchewan Government)

    Battle River Bridge on Highway 17, 19 km NE of Chauvin (233-1)

    17 Preservation/Overlay 11(cost shared with Saskatchewan Government)

    Hwy 45 - 11 km N of Hwy 45

    18 Preservation/Overlay 18Contract for 2016 Construction

    Thunder Lake Park Road - Hwy 33

    18 Preservation/Overlay 1Contract for 2016 Construction

    W of Hwy 2 - Hwy 2

    18 Intersection ImprovementContract for 2016 Construction

    Thorhild and Jct Hwy 18 and Hwy 827

    18 Preservation/Overlay 33Contract for 2016 Construction

    E of Clyde - Hwy 63 (selective)

    19 Structure ReplacementTributary to North Saskatchewan River Culvert on Highway 19, 2 km E of Devon (8958-1)

    19 Twinning - Grade, Base, Stage Paving 4West End at Hwy 60

    19 6 Laning - Grade, Base, Pave 22 km W of Hwy 2 - Hwy 2

    21 Bridge Deck RehabilitationCanadian Pacific Railway Overpass on Highway 21, 4 km W of Carbon (457-1)

    21 Preservation/Overlay 16Hwy 9 - 3 km N of Hwy 575

    21 Preservation/Overlay 16Hwy 13 - 2 km N of Hwy 616

    Friday, April 15, 2016 Page 8 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    21 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Provincial Highway 21 near Armena (74941-1)

    21 Signalization / LightingSignalization at Hwy 21 & 625

    21 Preservation/Overlay 2Contract for 2015 & 2016 Construction

    N of Hwy 16 - S of Fort Saskatchewan

    22 Slide Mitigation11 km N of Hwy 3 - 12 km N of Hwy 3

    22 Bridge Deck RehabilitationOldman River Bridge on Highway 22, 27 km N of Lundbreck (1153-1)

    22 Structure ReplacementCattle Pass on Highway 22 near Longview (1973-1)

    22 Preservation/Overlay 20Chain Lakes Park Road - 5 km S of Hwy 540

    22 Preservation/Overlay 13Contract for 2016 Construction

    Hwy 549 - Hwy 22X

    22 Flood Mitigation2 km E of Hwy 546

    22 Bridge Deck RehabilitationElbow River Bridge on Highway 22, 15 km S of Cochrane (13545-1)

    22 Preservation/Overlay 27Hwy 580 - Hwy 27

    22 Preservation/Overlay 27Contract for 2015 & 2016 Construction

    Hwy 587 - 10 km N of Hwy 54

    22 Preservation/Overlay 261 km N of Hwy 53 - Hwy 13

    22 Preservation/Overlay 15Hwy 13 - 5 km S of Hwy 616

    22 Reconstruct/Re-Alignment 8Contract for 2011,12,13,14,15, & 16 Construction

    West of Jct Hwy 22(S) to South of Drayton Valley (74381-1)

    22 Preservation/Overlay 2S of Hwy 16 - Hwy 16 (selective)

    22 Preservation/Overlay 37N of Drayton Valley - Hwy 16

    22 Passing/Climbing Lane 22 km N of Hwy 624 - 5 km N of Hwy 624

    Friday, April 15, 2016 Page 9 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    22 Passing/Climbing Lane 22 km N of Hwy 624 - 5 km N of Hwy 624

    22 Slide MitigationHighway Backslope Failures/Slides, South of Drayton Valley

    22 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Provincial Highway 22 near Mayerthorpe (77294-1)

    22 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Provincial Highway 22 near Mayerthorpe (77827-1)

    22 Preservation/Overlay 17Hwy 16 - S of Hwy 647

    22X Preservation/Overlay 9Contract for 2016 Construction

    7 km E of Hwy 791 - Hwy 24

    24 Bridge Deck RehabilitationContract for 2016 Construction

    Bow River Bridge on Highway 24, 5 km SE of Carseland (7870-1)

    26 Preservation/Overlay 166 km W of Hwy 855 - 3 km W of Hwy 857

    26 Structure ReplacementWatercourse Culvert on Provincial Highway 26 near Camrose (1800-1)

    27 Structure ReplacementContract for 2016 Construction

    Dogpound Creek Bridge on Highway 27, 15 km W of Olds (310-1)

    27 Preservation/Overlay 67 km E of Hwy 805 - 12 km W of Hwy 582

    27 Preservation/Overlay 89 km W of Hwy 21 - 1 km W of Hwy 21

    27 Structure ReplacementRed Deer River Bridge on Highway 27, 12 km SW of Morrin (9551-1)

    27 Reconstruct/Re-Alignment 2Red Deer River Bridge, near Morrin, Road re-alingment and Erosion Repairs

    28 Intersection ImprovementHighway 28 and 37

    28 Reconstruct/Re-Alignment 3Contract for 2015 & 2016 Construction

    Various Curve Revisions W of Redwater, Hwy 38, N of Redwater

    28 Preservation/Overlay 14Contract for 2016 Construction

    Hwy 651 - W of Hwy 827

    Friday, April 15, 2016 Page 10 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    28 Widen And Overlay 11Contract for 2015 & 2016 Construction

    N of Hwy 28A - Hwy 651

    28 Preservation/Overlay 92 km W of Hwy 827 - Hwy 63

    28 Preservation/Overlay 8E of Hwy 831 - W of Smoky Lake

    28 Structure ReplacementWaskatenau Creek Culvert on Provincial Highway 28 near Waskatenau (74300-1)

    28A Signalization / LightingSignals, lighting and minor geometric improvements @ intersection of Hwy 28A/Hwy 643, Gibbons (440-)

    29 Preservation/Overlay 33Contract for 2016 Construction

    Hwy 15 - Hwy 855

    29 Intersection ImprovementContract for 2016 Construction

    Jct Hwy 29 & 45

    31 Structure ReplacementWatercourse Bridge on Provincial Highway 31 near Seba Beach (70112-1)

    32 Preservation/Overlay 21Hwy 16 - 4 km N of Hwy 748

    32 Preservation/Overlay 21Contract for 2016 Construction

    15 km N of Hwy 748 - 17 km S of Hwy 43

    32 Structure ReplacementTributary to Judy Creek on Hwy 32 South of Swan Hills (86253-1)

    32 Preservation/Overlay 2111 km N of Carson - Pegasus Park Access Road to 22 km S of Town of Swan Hills

    32 Structure ReplacementContract for 2015 & 2016 Construction

    Tributary to Freeman River, South of Swan Hills

    32 Flood MitigationContract for 2016 Construction

    River Bank Protection / Repair at Judy Creek (site # SH27)

    33 Structure ReplacementContract for 2016 Construction

    Majeau Creek Culvert on Hwy 33 near Rich Valley (7450-1)

    33 Flood MitigationMorse River Culvert on Highway 33, 30 km SE of Swan Hills (75073-1)

    33 Structure ReplacementWatercourse Culvert on Hwy 33 (86266-1)

    Friday, April 15, 2016 Page 11 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    33 Structure ReplacementContract for 2015 & 2016 Construction

    Chalmers Creek Culvert on Highway 33, 30 km N of Swan Hills (76041-1)

    35 Preservation/Overlay 32Contract for 2016 Construction

    1 km S of Hwy 986 - 10 km N of Hwy 689

    35 Preservation/Overlay 28Contract for 2016 Construction

    Hwy 691 - 10 km S of Hwy 692

    35 Preservation/Overlay 3310 km N of Hwy 689 - Hwy 691

    35 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Provincial Highway 35 near High Level (73438-1)

    35 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Hwy 35 near High Level (73437-1)

    35 Structure ReplacementWatercourse Culvert on Hwy 35, 15 km N of High Level (73445-1)

    35 Structure ReplacementLoon Creek Culvert on Provincial Highway 35 near High Level (73444-1)

    35 Preservation/Overlay 37N of Slavey Creek - Steen River

    35 Structure ReplacementWatercourse Culvert on Provincial Highway 35 near Meander River (86163-1)

    35 Preservation/Overlay 20134 km N of High Level Airport to 154 km N High Level Airport

    35 Structure ReplacementSteen River Bridge on Highway 35, 3 km S of Steen River (73410-1)

    36 Preservation/Overlay 13S of Hwy 513 To Town of Taber

    36 Widen And Overlay 1Chin Coulee Surface Repair Due to Slide (10 km N of Hwy 61)

    36 Preservation/Overlay 35Hwy 3 - 35 km N of Hwy 3

    36 Preservation/Overlay 0.10Hwy 3 - Town of Taber (selective)

    36 Preservation/Overlay 20Contract for 2016 Construction

    2 km N of Hwy 556 - 10 km N of Hwy 561

    Friday, April 15, 2016 Page 12 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    36 Preservation/Overlay 207 km S of Hwy 577 - Hwy 9

    36 Preservation/Overlay 45 km S of Hwy 12 - 2 km S of Hwy 12

    36 Preservation/Overlay 19S of Hwy 16 - Hwy 16

    36 Preservation/Overlay 19Contract for 2016 Construction

    Hwy 619 - 18 km N of Town of Viking

    36 Preservation/Overlay 1Contract for 2016 Construction

    Town of Two Hills - Hwy 45

    36 Intersection ImprovementContract for 2016 Construction

    Jct Hwy 36 & 45

    36 Safety Rest AreaTruck Staging Area, North of Junction with Hwy 28 (near Vilna)

    37 Preservation/Overlay 31Hwy 43 - 1 km E of Hwy 44

    37 Intersection ImprovementMajor Intersection Improvement / Realignment at Hwys 37/825/15 (W of Ft Saskatchewan)

    37 Intersection ImprovementInterim intersection improvements, Jct Hwy 28A and 37

    38 Preservation/Overlay 20Contract for 2016 Construction

    Hwy 28 - 2 km E of Hwy 830 (Beaverhill Creek Bridge)

    38 Preservation/Overlay 51.7 km E of Hwy 830 - Hwy 45

    39 Intersection ImprovementHighway 39 and 60 (roundabout)

    40 Preservation/Overlay 50Peter Lougheed Park Access - Hwy 1A

    40 Flood MitigationContract for 2016 Construction

    Rock Fall Barrier Wall @ Galatea Cut Rockfall, S of Hwy 1 (site # S18)

    40 Flood MitigationContract for 2016 Construction

    Rock Fall Barrier Wall @ Mt Baldy Rockfall, S of Hwy 1 (site # S 17)

    40 Structure ReplacementWaiparous Creek Bridge on Provincial Highway 40 near Cochrane (73899-1)

    Friday, April 15, 2016 Page 13 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    40 2nd Stage Paving 19Contract for 2015 & 2016 Construction

    19 km S of Hwy 47 - Hwy 47

    40 Structure ReplacementContract for 2016 Construction

    Lost Creek Culvert, Hwy 40 near Coalspur (85218-1)

    40 Structure ReplacementContract for 2016 Construction

    Fred Creek Culvert, Hwy 40 N of Hinton (76754-1) (inc. roadwork/slide repair)

    40 Bridge Substructure RepairsContract for 2016 Construction

    Athabasca River Bridge on Highway 40, 6 km W of Hinton (70580-1)

    40 Preservation/Overlay 44Hwy 16 - 68 km N of William A. Switzer Park (selective)

    40 Preservation/Overlay 393 km N - 42 km N of William A. Switzer Park Road

    40 Structure ReplacementBerland River Bridge on Highway 40, 62 km N of Entrance (74710-1)

    40 Reconstruct/Re-Alignment 2Road Re-alignment for Berland River Bridge Replacement (BF 74710)

    40 Structure ReplacementShand Creek Culvert on Provincial Highway 40 near Muskeg River (77278-1)

    40 Preservation/Overlay 117 km S of Grande Cache - 5 km N of Grande Cache (selective)

    40 Preservation/Overlay 2Within Town of Grande Cache

    40 Structure ReplacementContract for 2016 Construction

    Susa Creek Culvert on Hwy 40, 11 km E of Grande Cache (76531-1)

    40 Structure ReplacementContract for 2016 Construction

    Washy Creek Culvert, near Grande Cache (76748-1)

    40 Structure ReplacementContract for 2016 Construction

    Sterne Creek Culvert on Hwy 40 near Grande Cache (76530-1)

    40 Flood MitigationContract for 2016 Construction

    Geohazard Site #GP32 - High Water Related Mitigation Work (S curves, E of Grande Cache)

    40 Structure ReplacementSmoky River Bridge on Highway 40, 1 km N of Grande Cache (76474-1)

    Friday, April 15, 2016 Page 14 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    40 Flood MitigationSheep Creek Bridge on Highway 40, 23 km N of Grande Cache (79710-1)

    40 Preservation/Overlay 32Contract for 2016 Construction

    Kakwa River - Cutbank River

    40 Flood MitigationKakwa River Bridge on Highway 40, 93 km S of Grande Prairie (79472-1)

    40 Bridge Deck RehabilitationCutbank River Bridge on Highway 40, 70 km South of Grande Prairie (79473-1)

    40 Bridge PaintingWapiti Bridge on Provincial Highway 40 near Grande Prairie (74228-1)

    40 Preservation/Overlay 61 km N of Hwy 666 - 2 km N of Hwy 668 (selective)

    41 Structure ReplacementDelmas Coule Culvert on Provincial Highway 41 near Elkwater (73016-1)

    41 Preservation/Overlay 25Hwy 570 - Hwy 9

    41 Structure ReplacementContract for 2016 Construction

    Sounding Creek Bridge on Provincial Highway 41 near Oyen (7683-1)

    41 Preservation/Overlay 23Hwy 13 - S Bdry CFB Wainwright

    41 Preservation/Overlay 16S of Vermilion - Hwy 16

    41 Preservation/Overlay 221 km S of Hwy 883 - 3 km N of Hwy 619

    41 Bridge Deck RehabilitationNorth Saskatchewan River, S of Elk Point

    41 Slide MitigationKehiwin Lake Slide Repair and Other Work (NC24C and NC24D)

    41 Preservation/Overlay 9Hwy 28 (Bonnyville) - N of Hwy 28

    43 Structure ReplacementCamp Creek (Harold Creek ) Culvert on Highway 43, 4 km SE of Beaverlodge (74295-1)

    43 Preservation/Overlay 197 km E of Hwy 670 - 2 km E of Hwy 736

    Friday, April 15, 2016 Page 15 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    43 Twinning - 2nd Stage Paving 17Contract for 2016 Construction

    E of Crooked Creek - W of Sturgeon Lake IR West Bdry

    43 Preservation/Overlay 10Contract for 2016 Construction

    2 km E of Hwy 736 - Young's Point Park Road (WBL)

    43 Twinning - 2nd Stage Paving 20Sturgeon Lake IR (W of W Bdry - E Bdry)

    43 Preservation/Overlay 105 km W of Hwy 49 - Hwy 49 (EBL & WBL)

    43 Preservation/Overlay 19W of Sturgeon Lake IR to E of Sturgeon Lake IR (W of Valleyview)

    43 Preservation/Overlay 24Contract for 2016 Construction

    Hwy 49 - 17 km S of Hwy 665 (SBL)

    43 Preservation/Overlay 519 km E of Hwy 947 - 23 km E of Hwy 947

    43 Preservation/Overlay 31Town of Fox Creek - 23 km E of Hwy 947 (selective)

    43 Preservation/Overlay 3Athabasca River E of Hwy 32(S) (EBL)

    43 Preservation/Overlay 4N of Athabasca River - E of Hwy 32(S) (WBL)

    43 Flood MitigationAthabasca River Bridge on Highway 43, at NW Boundary of Whitecourt (73810-1)

    43 Preservation/Overlay 2423 km E of Hwy 947 - 11 km W of Hwy 32

    43 Signalization / LightingHwy 43/32(S) in Whitecourt - includes minor geometric & lighting improvements

    43 Preservation/Overlay 101 km E of Hwy 22 - 3 km E of Rochfort Bridge

    43 Preservation/Overlay 131 km E of Rochfort Bridge - 3 km E of Hwy 757

    43 Intersection ImprovementIntersection Improvement at Jct Hwy 43/22

    43 Preservation/Overlay 11 km W of Hwy 33 - Hwy 33

    43 Preservation/Overlay 12W of Hwy 33 - N of Hwy 633

    Friday, April 15, 2016 Page 16 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    43 Intersection ImprovementHwy 43/Onoway Access Intersection Improvement

    43 Structure ReplacementKilini Creek Culvert on Provincial Highway 43 near Carvel (13905-1)

    43 Preservation/Overlay 122 km W of Hwy 633 - Hwy 770

    43X Twinning - StructureStructure: Hermit Lake (86139-01) Grande Prairie Bypass

    43X Twinning - Grade, Base, Stage Paving 11Richmond Hill(Hwy 43) - 116ST(Range Road 63) Grande Prairie ByPass

    43X Structure ReplacementTwp Road 715 Over Hwy 43x near Grande Prairie (86189-1)

    43X Structure ReplacementHermit Lake Outfall Culvert on Local Road near Grande Prairie (86262-1)

    43X Grading, Base, Stage PavingHwy 43 to 116 st (South Service Road for 43X)

    43X Bridge StructureBear River Bridge on Hwy 43 Bypass near Grande Prairie (86138-2)

    43X Bridge StructureBear River Bridge on Hwy 43 Bypass near Grande Prairie (86138-1)

    43X Bridge StructureStructure: Bear River Grande Prairie Bypass (EBL & WBL) (07301)

    44 Preservation/Overlay 26Contract for 2016 Construction

    1 km N of Hwy 16 - 1 km N of Hwy 642 (selective)

    44 Preservation/Overlay 381 km N of Hwy 642 - Town of Westlock

    44 Preservation/Overlay 21Hwy 18 (Westlock) - Hwy 661

    44 Structure ReplacementBear Creek Culvert on Provincial Highway 44 near Jarvie (9454-1)

    44 Preservation/Overlay 1Contract for 2016 Construction

    1 km S of Hwy 2 - Hwy 2

    45 Preservation/Overlay 21Hwy 36 - 2 km E of Hwy 870 (selective)

    Friday, April 15, 2016 Page 17 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    45 Preservation/Overlay 196 km E of Hwy 881 - Hwy 41

    47 Preservation/Overlay 13Contract for 2015 & 2016 Construction

    14 km S of Hwy 16 - 1 km S of Hwy 16

    47 Bridge Deck RehabilitationContract for 2016 Construction

    CNR Overpass on Highway 47, at Robb (78808-1)

    47 Structure ReplacementWatercourse Culvert on Highway 47, 34 km SW of Edson (73283-1)

    49 Structure ReplacementWatercourse Culvert on Provincial Highway 49 near Whitburn (72741-1)

    49 Structure ReplacementWatercourse Culvert on Hwy 49 (86288-1)

    49 Structure ReplacementTributary to Henderson Creek Culvert on Highway 49, 22 km E of Bay Tree (78868-1)

    49 Preservation/Overlay 2313 km W of Hwy 719 - 9 km E of Hwy 719

    49 Preservation/Overlay 3218 km W of Hwy 725 - 2 km W of Hwy 727

    49 Structure ReplacementRankins Creek Culvert on Provincial Highway 49 near Spirit River (73261-1)

    49 Flood MitigationWest Headslope of Little Smoky Bridge, Geohazard Site SH16

    53 Preservation/Overlay 6W of Hwy 2 - Hwy 2A

    54 Preservation/Overlay 21Hwy 22 - 3 km W of Hwy 766 (selective)

    55 Structure ReplacementWatercourse Culvert on Provincial Highway 55 near Lac La Biche (76877-1)

    55 Structure ReplacementWatercourse Culvert on Provincial Highway 55 near Lac La Biche (76878-1)

    55 Preservation/Overlay 17Hwy 892 - City of Cold Lake

    56 Preservation/Overlay 161 km S of Hwy 561 - 1 km S of Hwy 564

    Friday, April 15, 2016 Page 18 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    56 Preservation/Overlay 3Contract for 2016 Construction

    3 km S of Hwy 10 - Hwy 10

    56 Bridge Deck RehabilitationDriedmeat Creek Bridge on Highway 56, 14 km NE of Eckville (444-1)

    58 Reconstruct/Re-Alignment 2Hwy 35 intersection improvement and Hwy 58 realignment for 1.5 km to the east

    58 Bridge Deck RehabilitationContract for 2016 Construction

    Bushe River Bridge on Provincial Highway 58 near High Level (74194-1)

    58 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Hwy 58, 28 km N of Fort Vermilion (75715-1)

    60 Signalization / LightingSignalization at Hwy 60 & 628

    61 Widen And Overlay 15W of Etzikom - E of Etzikom

    63 Preservation/Overlay 491 km S of Hwy 663 - Hwy 55

    63 Twinning - 2nd Stage Paving 13N of Jct Hwy 55 - S of Lac La Biche River

    63 Twinning - 2nd Stage Paving 20S of the La Biche River to S of Wandering River

    63 Twinning - 2nd Stage Paving 28S of Wandering River to N of Wandering River

    63 Safety Rest AreaContract for 2016 Construction

    Median Rest Area / VIS Station, N of Hwy 55 (grading, base and paving)

    63 MiscellaneousAtmore Vehicle Inspection Station (construction of building on site)

    63 Twinning - 2nd Stage Paving 34S of House River to S of Mariana Lake

    63 Twinning - 2nd Stage Paving 25S of Mariana Lake to N of Mariana Lake

    63 Preservation/Overlay 38Contract for 2016 Construction

    S of Marianna Lake - N of Algar Tower

    63 Twinning - 2nd Stage Paving 33N of Mariana Lake to S of Horse Creek

    63 Twinning - 2nd Stage Paving 40S of Horse Creek to S of Jct Hwy 881

    Friday, April 15, 2016 Page 19 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    63 Miscellaneous 2Contract for 2015 & 2016 Construction

    Raise gradeline to accommodate construction of JACOS concrete box structure

    63 Structure ReplacementHangingstone River, 15 km S of Hwy 881 (75907-3), replacement of 2 bridge culverts

    63 Interchange - Grade, Base, Paving 13Contract for 2013, 2014, 2015 & 2016 Construction

    Parsons Creek Interchange

    63 Safety Rest AreaSafety Rest/Truck Staging Area NBL, 8.5 km South of Supertest Hill

    63 Preservation/Overlay 641 km N of Hwy 686 S of Peter Lougheed Bridge

    64 Slide MitigationHines Creek Slide (PH076-1)

    64 Structure ReplacementWatercourse Culvert on Provincial Highway 64 near Gage (78010-1)

    66 Structure ReplacementTributary to Elbow River Culvert on Highway 66, 14 km SW of Bragg Creek (79156-1)

    88 Preservation/Overlay 29S of Hwy 750 - Hwy 750

    88 Structure ReplacementWatercourse Culvert on Hwy 88, S of Red Earth (86187-1)

    88 2nd Stage Paving 21Contract for 2015 & 2016 Construction

    S of Hwy 686 - N of 23rd Baseline

    88 2nd Stage Paving 24Contract for 2016 Construction

    Willow Creek - N of Lafond Creek

    88 2nd Stage Paving 24Contract for 2015 & 2016 Construction

    N of Jct Hwy 686 - Willow Creek

    88 2nd Stage Paving 20Contract for 2016 Construction

    N of Lafond Creek - S of Wabasca River (S)

    88 2nd Stage Paving 48S of Wabasca River (S) - N of Senex Creek

    88 2nd Stage Paving 37Contract for 2016 Construction

    N of Senex Creek - Wadlin Lake Road

    88 Bridge Substructure RepairsContract for 2014, 2015, & 2016 Construction

    Peace River Bridge , 8 km NW of Fort Vermilion (74227-1) (slope stabilization)

    Friday, April 15, 2016 Page 20 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    201 Grading, Base, Full Paving 20Calgary South West Ring Road (Macleod Trail to Hwy 8)

    216 Grading, Base, Full Paving 20Contract for 2012, 13, 14, 15 & 2016 Construction

    Edmonton North East Ring Road (Manning Drive - S of Whitemud Drive Interchange) (includes various interchange upgrades on Hwy 16)

    501 Structure ReplacementIrrigation Canal Culvert on Provincial Highway 501 near Mountain View (71538-1)

    501 Structure ReplacementRobinson Coulee Culvert on Provincial Highway 501 near Cardston (800-1)

    501 Structure ReplacementWatercourse Culvert on Provincial Highway 501 near Taylorville (71462-1)

    501 Preservation/Overlay 16Contract for 2016 Construction

    24 km W of Town of Milk River - 12 km W of Hwy 4

    501 Preservation/Overlay 1210 km W of Town of Milk River - Hwy 4

    507 Structure ReplacementKettles Creek Bridge on Provincial Highway 507 near Pincher Creek (2298-1)

    509 Structure ReplacementWatercourse Culvert on Provincial Highway 509 near Stand Off (78858-1)

    515 Structure ReplacementMcalpine Creek Bridge on Provincial Highway 515 near Elkwater (9981-1)

    519 Preservation/Overlay 18Hwy 23 - Hwy 25

    523 Preservation/Overlay 1115 km W of Hwy 3 - City of Medicine Hat

    524 Preservation/Overlay 22 km W of Hwy 36 - Hwy 36

    532 Structure ReplacementStimson Creek Bridge on Provincial Highway 532 near Longview (73976-1)

    540 Structure ReplacementStimson Creek Bridge on Provincial Highway 540, 17 km SE of Longview (1308-1)

    541 Flood MitigationContract for 2016 Construction

    5 km E of Hwy 40

    Friday, April 15, 2016 Page 21 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    544 Preservation/Overlay 21Hwy 873 - 5 km E of Hwy 876

    544 Structure ReplacementLittle Sandhill Creek Culvert on Provincial Highway 544 near Patricia (72027-1)

    544 Preservation/Overlay 1515 km W of Hwy 884 - Hwy 884

    547 Preservation/Overlay 15Contract for 2016 Construction

    Hwy 799 - Hwy 24

    549 Structure ReplacementCattlepass Culvert on Highway 549 near Millarville (78878-1)

    549 Structure ReplacementSpring Coule Bridge on Provincial Highway 549 near Okotoks (1006-1)

    549 Preservation/Overlay 20Contract for 2016 Construction

    Hwy 22 - Hwy 552

    550 Structure ReplacementEID Irrigation Canal Culvert, near Rosemary (71400-1)

    550 Structure ReplacementWatercourse Culvert on Hwy 550, 9 km E of Bassano (71403-1)

    550 Preservation/Overlay 4Hwy 36 - Hwy 873

    563 Preservation/Overlay 7Contract for 2016 Construction

    Hwy 1 - City of Calgary

    567 Preservation/Overlay 15Contract for 2016 Construction

    Hwy 791 - Hwy 9

    575 Structure ReplacementWatercourse Culvert on Hwy 575 near Drumheller (83181-1)

    581 Structure ReplacementSheep Coulee Culvert on Hwy 581, 4 km E of Carstairs (721-1)

    581 Preservation/Overlay 1Hwy 2A - 1 km E of Hwy 2A

    582 Bridge Deck RehabilitationContract for 2016 Construction

    Kneehills Creek Bridge on Highway 582, 10 km NW of Linden (747-1)

    587 Preservation/Overlay 15Hwy 2 - Hwy 791 (inc Bowden to 2A)

    Friday, April 15, 2016 Page 22 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    587 Structure ReplacementContract for 2016 Construction

    Bowden Creek Bridge on Provincial Highway 587 near Bowden (257-1)

    587 Structure ReplacementContract for 2016 Construction

    Kneehills Creek Bridge on Provincial Highway 587 near Innisfail (2435-1)

    587 Structure ReplacementContract for 2016 Construction

    Watercourse Bridge on Provincial Highway 587 near Innisfail (77685-1)

    590 Structure ReplacementWaskasoo Creek Culvert on Provincial Highway 590 near Innisfail (775-1)

    590 Preservation/Overlay 81 km E of Hwy 2 - Hwy 791

    598 Preservation/Overlay 23Hwy 11A - Hwy 761 (selective)

    599 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Provincial Highway 599 near Bulwark (74518-1)

    599 Preservation/Overlay 1514 km E of Hwy 36 - Hwy 872

    616 Structure ReplacementContract for 2016 Construction

    Modeste Creek Bridge, 2 km W of Breton (71019-1)

    616 Reconstruct/Re-Alignment 1Contract for 2016 Construction

    West of Poplar Creek to East of Poplar Creek

    616 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Hwy 616 near Breton (85038-1)

    620 Preservation/Overlay 45Contract for 2016 Construction

    W of Hwy 753 - Hwy 22 (Drayton Valley)

    620 Preservation/Overlay 7Brazeau reservoir to W of Hwy 753

    625 Preservation/Overlay 173 km E of Hwy 2 - Hwy 21

    627 Signalization / LightingContract for 2016 Construction

    Signal Installation and Other Work - Intersection of Hwy 627 & 770

    627 Intersection Improvement Hwy 759 & Hwy 627

    627 Preservation/Overlay 55 km W of Hwy 770 - Hwy 770

    Friday, April 15, 2016 Page 23 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    628 Preservation/Overlay 6Hwy 779 to 6 km E of Hwy 779

    628 Preservation/Overlay 4Anthony Henday Drive to 3 km E of Anthony Henday Drive (selective)

    631 Preservation/Overlay 20Hwy 36 - Hwy 870(N)

    646 Preservation/Overlay 2714 km E of Hwy 41 - Hwy 897

    651 Preservation/Overlay 8Contract for 2016 Construction

    1 km W of Hwy 777 - 5 km E of Hwy 777

    651 Preservation/Overlay 9Contract for 2016 Construction

    Hwy 2 - 10 km E of Hwy 803 (selective)

    657 Preservation/Overlay 2019 km E of Hwy 41 - Hwy 659

    658 Slide MitigationBlue Ridge Bull Creek Culvert (NC076-1)

    660 Preservation/Overlay 0.31Hwy 882 - Hwy 882

    660 Intersection ImprovementHwy 660/882 Intersection Improvement

    661 Grading, Base, Staged Paving 16Hwy 769 - Hwy 776

    661 Preservation/Overlay 24Hwy 44 - Hwy 2

    663 Preservation/Overlay 233 km W of Hwy 827 - Hwy 63

    663 Structure ReplacementWatercourse Culvert on Provincial Highway 663 near Boyle (13796-1)

    666 Structure ReplacementWatercourse Culvert on Provincial Highway 666 near Grovedale (76333-1)

    668 Preservation/Overlay 3Hwy 40 - 2 km W of City of Grande Prairie

    671 Structure ReplacementWatercourse Culvert on Provincial Highway 671 near Goodfare (79252-1)

    672 Preservation/Overlay 48Hwy 43 - E of Hwy 2

    Friday, April 15, 2016 Page 24 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    672 Intersection ImprovementHwy 672 & Hwy 723 Intersection Improvement

    676 Structure ReplacementWatercourse Culvert on Provincial Highway 676 near Debolt (82114-1)

    677 Structure ReplacementWatercourse Culvert on Provincial Highway 677 near Woking (76959-1)

    681 Structure ReplacementWatercourse Bridge on Provincial Highway 681 near Blueberry Mountain (76439-1)

    682 2nd Stage Paving 110 km E of Hwy 729 - 11 km E of Hwy 729

    684 Structure ReplacementStrong Creek Bridge on Provincial Highway 684 near Peace River (7979-1)

    685 Preservation/Overlay 2Contract for 2016 Construction

    2 km W of Hwy 735 - Hwy 735

    686 Grading, Base, Stage Paving 5Contract for 2014,2015 & 2016 Construction

    W of Hwy 63 to Hwy 63

    688 Intersection ImprovementIntersection Improvement: @ St Isidore Access (RR204)

    688 Intersection ImprovementIntersection Improvement: @ Access on Curve (E of St Isidore)

    688 Widen And Overlay 21Hwy 2 - Hwy 986

    688 Intersection ImprovementHighway 986 and 688

    689 Preservation/Overlay 22W of Hwy 35 - Hwy 35

    689 Structure ReplacementContract for 2016 Construction

    Beaton Creek Bridge on Highway 689, 15 km W of Dixonville (71442-1)

    689 Structure ReplacementBeaton Creek Structure on Provincial Highway 689 near Dixonville (86050-1)

    689 Structure ReplacementBeaton Creek Bridge on Provincial Highway 689 near Dixonville (13891-1)

    Friday, April 15, 2016 Page 25 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    689 Structure ReplacementBeaton Creek Bridge on Provincial Highway 689 near Dixonville (13892-1)

    690 Preservation/Overlay 12Contract for 2015 & 2016 Construction

    Hwy 35 - 3 km W of Hwy 743 (includes Deadwood Slide)

    690 Structure ReplacementContract for 2015 & 2016 Construction

    Watercourse Culvert on Highway 690, 9 km W of Deadwood (73271-1)

    695 Preservation/Overlay 18Contract for 2015 & 2016 Construction

    W of Hwy 35 - Hwy 35

    717 Base, Staged Paving 10Contract for 2016 Construction

    Bear Canyon - Hwy 64

    732 Preservation/Overlay 11Hwy 2 - 6 km S of Hwy 685

    733 Structure ReplacementWatercourse Culvert on Provincial Highway 733 near Heart Valley (70358-1)

    734 Flood MitigationContract for 2016 Construction

    Flood Mitigation: Hwy 734 near James River, S of Hwy 584 (site # C30)

    734 Flood MitigationContract for 2016 Construction

    High Water Related Mitigation Work near James River, S of Hwy 584 (site # C37)

    734 Structure ReplacementContract for 2016 Construction

    Elk Creek Bridge, near Nordegg (77583-1)

    734 Structure ReplacementContract for 2015 & 2016 Construction

    Cripple Creek Bridge on Provincial Highway 734 near Nordegg (77591-1)

    741 Grading 34Subgrade rehab and regravel

    741 Structure ReplacementNorth Manning Drainage Creek Culvert on Hwy 741 near Manning (86171-1)

    742 Flood MitigationThree Sisters Creek flood mitigation works on Three Sisters Parkway (Hwy 742)

    743 Structure ReplacementWatercourse Culvert on Provincial Highway 743 near Peace River (8889-1)

    744 Widen And Overlay 4Hwy 49 - 4 km N of Hwy 49 (Village of Girouxville)

    Friday, April 15, 2016 Page 26 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    747 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Provincial Highway 747 near Sunset House (77835-1)

    749 Structure ReplacementContract for 2016 Construction

    Drainage Ditch Culvert on Provincial Highway 749 near High Prairie (70388-1)

    750 Preservation/Overlay 2Hwy 2 - 3 km E of Hilliards Bay (selective)

    752 Preservation/Overlay 18Contract for 2016 Construction

    17 km S of Hwy 11A - Hwy 11A

    753 Bridge Deck RehabilitationContract for 2016 Construction

    Pembina River Bridge on Highway 753, 4 km N of Lodgepole (74358-1)

    754 Preservation/Overlay 51Contract for 2015 & 2016 Construction

    45 km N of Hwy 88 - 6 km N of Hwy 813

    756 Preservation/Overlay 5Contract for 2016 Construction

    Hwy 11 - Crimson Lake Park Road

    758 Preservation/Overlay 5Contract for 2016 Construction

    Hwy 66 - Hwy 22

    759 Preservation/Overlay 18Contract for 2016 Construction

    Hwy 39 - Hwy 624

    759 Preservation/Overlay 7Hwy 624 - 3 km S of Hwy 627

    762 Preservation/Overlay 22Hwy 549 - Hwy 22

    762 Slide Mitigation Mystery Culvert Site (Geo-Hazard File Number S31)

    762 Slide MitigationFisher Creek Site (Geo-Hazard File Number S08)

    762 Slide Mitigation S Curve Site (Geo-Hazard File Number S22)

    762 Slide MitigationArchery Range Site (Geo-Hazard File Number S10A)

    766 Preservation/Overlay 11Hwy 1A - Hwy 567

    766 Structure ReplacementBridge Repacement for BF934 on Hwy 766 over Beaverdam Creek

    766 Preservation/Overlay 58 km S of Hwy 587 - 3 km S of Hwy 587

    Friday, April 15, 2016 Page 27 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    766 Preservation/Overlay 26Hwy 54 - Hwy 11

    770 Preservation/Overlay 14N of Hwy 627 - Hwy 16

    772 Preservation/Overlay 2Contract for 2016 Construction

    2 km S of Hwy 566 - Hwy 566

    772 Preservation/Overlay 20Hwy 567 - Hwy 574

    779 Reconstruct/Re-Alignment 3S of Hwy 628 - 47th Ave (Town of Stony Plain)

    785 Structure ReplacementContract for 2016 Construction

    Watercourse Culvert on Hwy 785 near Pincher Creek (1745-1)

    795 Preservation/Overlay 2Hwy 53 - 2 km N of Hwy 53

    795 Structure ReplacementPipestone Creek Bridge on Provincial Highway 795 near Mulhurst Bay (73124-1)

    803 Preservation/Overlay 2Hwy 28 - 2 km N of Hwy 28

    811 Bridge Deck ReplacementOldman River Bridge on Highway 811, at Fort Macleod (1097-1)

    814 Structure ReplacementContract for 2016 Construction

    Clearwater Creek Bridge on Hwy 814, 6 km S of Beaumont (1721-1)

    814 Preservation/Overlay 10Hwy 623 - Hwy 625

    815 Preservation/Overlay 203 km N of Hwy 12 - Hwy 53

    825 Widen BridgeWatercourse Culvert on Provincial Highway 825 near Fort Sask (559-1)

    825 Widen BridgeWatercourse Culvert Under Hwy 825 near Fort Saskatchewan (85149-1)

    825 Widen And Overlay 5Hwy 37 - Boysdale Rd (BF00559 & BF85149)

    825 Bridge Deck RehabilitationSturgeon River Bridge on Highway 825, 9 km SE of Gibbons (2301-1)

    Friday, April 15, 2016 Page 28 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    825 Preservation/Overlay 92 km N of City of Fort Saskatchewan - Hwy 643

    827 Preservation/Overlay 11Hwy 663 - Hwy 55

    831 Preservation/Overlay 5S of Lamont - Hwy 15

    831 Bridge Deck RehabilitationBeaverhill Creek Bridge on Highway 831, 3 km N of Lamont (2156-1)

    831 Preservation/Overlay 30Hwy 661 - Hwy 63

    834 Preservation/Overlay 4Hwy 13 - Hwy 26

    837 Miscellaneous1 km N of 575 - Erosion (C011-1)

    840 Preservation/Overlay 19Hwy 561 - Hwy 564

    842 Bridge Deck ReplacementBow River Bridge on Highway 842, 8 km S of Cluny (6754-1)

    851 Preservation/Overlay 28Contract for 2016 Construction

    Hwy 9 - Farrell Lake

    851 Preservation/Overlay 99 km S of Hwy 589 - Hwy 589

    852 Structure ReplacementWatercourse Culvert on Provincial Highway 852 near Gadsby (70870-1)

    855 Preservation/Overlay 18Contract for 2016 Construction

    Hwy 13 - Hwy 26

    855 Preservation/Overlay 3616 km N of Hwy 28 - 7 km S of Hwy 663

    855 Preservation/Overlay 13Hwy 28 - 13 km N of Hwy 28

    855 Preservation/Overlay 27 km S of Hwy 663 - 5 km S of Hwy 663

    855 Preservation/Overlay 55 km S of Hwy 663 - Hwy 663

    855 Structure ReplacementTributary to Plamondon Creek Culvert on Highway 855, 9 km SE of Atmore (78023-1)

    Friday, April 15, 2016 Page 29 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    857 Structure ReplacementWatercourse Culvert on Provincial Highway 857 near Vegreville (9953-1)

    858 Preservation/Overlay 13W of Poplar Point - Owl River

    858 Slide MitigationSlide Repair and Other Work, N of Lac La Biche

    872 Structure ReplacementContract for 2016 Construction

    Nelson Creek Culvert on Provincial Highway 872 near Coronation (8393-1)

    873 Preservation/Overlay 141 km N of Hwy 1 - Hwy 550

    876 Preservation/Overlay 55 km S of Hwy 1 - Hwy 1

    881 Preservation/Overlay 2Hwy 13 - Town of Hardisty

    881 Preservation/Overlay 16Contract for 2016 Construction

    Hwy 28 - 6 km N of Hwy 660

    883 Preservation/Overlay 20Hwy 14 - Hwy 41

    884 Preservation/Overlay 5Hwy 544 - 5 km S of Hwy 555

    885 Preservation/Overlay 3016 km N of Hwy 61 - Hwy 3

    887 Preservation/Overlay 1212 km S of Hwy 3 - Hwy 3

    893 Preservation/Overlay 22Hwy 45 - Hwy 646

    897 Intersection ImprovementTwp Rd 510

    897 Preservation/Overlay 18Hwy 45 - Hwy 646 (selective)

    901 Preservation/Overlay 0.33Contract for 2016 Construction

    Hwy 22X - E of Hwy 22X

    947 Preservation/Overlay 614 km S of Hwy 43 - 8 km S of Hwy 43

    986 Preservation/Overlay 18Hwy 743 - Hwy 688 (selective)

    986 Safety Rest AreaHwy 986 Roadside Turnout (WBL) W of Hwy 688

    Friday, April 15, 2016 Page 30 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    986 Safety Rest AreaHwy 986 Roadside Turnout (EBL) E of Hwy 743

    986 Widen And Overlay 14Hwy 688 - E of Hwy 688

    986 Slide MitigationContract for 2015 & 2016 Construction

    Daishowa West Hill Slide: Landslide Repair, Construct Pile Wall, and Other Work (site # PH71)

    986 Slide MitigationDiashowa Well and Retaining Wall Site Slide (Ph042-1, Ph043-1)

    986 Preservation/Overlay 1813 km E of Hwy 688 - 32 km E of Hwy 688

    986 Structure ReplacementCulvert on Tributary to Cadotte River on Highway 986 NE of Peace River (86227-1)

    UAR 68 Preservation/Overlay 1Hwy 43 - 1 km N of Hwy 43

    UAR 79 Preservation/Overlay 1Contract for 2016 Construction

    Hwy 2 - 1 km E of Hwy 2

    UAR 84 Preservation/Overlay 1Hwy 43 - Onoway

    UAR 104 Preservation/Overlay 1Hwy 28 - 1 km S of Hwy 28

    UAR 115 Preservation/Overlay 1Hwy 16 - Hwy 16A

    UAR 150 Preservation/Overlay 1Contract for 2016 Construction

    Hwy 29 - 1 km N of Hwy 29

    UAR 155 Preservation/Overlay 1Hwy 45 - 1 km N of Hwy 45

    UAR 158 Preservation/Overlay 1Hwy 28 - Radway

    UAR 166 Preservation/Overlay 2Hwy 2 - 2 km N of Hwy 2

    UAR 197 Preservation/Overlay 0.16Hwy 32 - E of Hwy 32

    LOCAL ROAD Structure ReplacementRanger Creek Bridge on Elbow River Ranger Station Service Road, at Kananaskis (84044-1)

    LOCAL ROAD Structure ReplacementWatercourse Culvert on Local Road near Bragg Creek (79293-1)

    Friday, April 15, 2016 Page 31 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Major Provincial Highway

    LOCAL ROAD Structure ReplacementContract for 2015 & 2016 Construction

    Irrigation Canal Culvert on Local Road near Mclennan (86072-1)

    LOCAL ROAD Structure ReplacementBenjamin Creek Culvert on Local Road near Cochrane (77236-1)

    Friday, April 15, 2016 Page 32 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Water Management

    CP 2007-00007

    Water ManagementAmbrose Flats Reservoir Dam Rehabilitation

    CP 2008-00010

    Water ManagementBens Lake Diversion Structure Rehabilitation

    CP 2006-00032

    Water ManagementBolloque Lake Stabilization - Outlet Rehabilitation

    CP 2010-00010

    Water ManagementBuffalo Lake - Rochon Sands Flood Protection Berm

    CP 2006-00022

    Water ManagementBuffalo Lake System - Pump House Control Upgrade

    CP 2007-00016

    Water ManagementBuffalo Lake Water Mamagement Project

    CP 2006-00021

    Water ManagementCarseland Bow River Headworks Control System Upgrade

    CP 2004-00045

    Water ManagementContract for 2013, 14, 15, & 2016 Construction

    Chain Lakes Flood Handling Upgrade

    CP 2006-00017

    Water ManagementDeadfish Water Supply System Controls Upgrade

    CP 2004-00001

    Water ManagementDickson Dam Capacity Enhancement Project

    CP 2004-0059 Water ManagementDickson Dam Capacity Enhancement Project - Service Spillway Upgrades

    CP2003- Water ManagementDickson Dam Service Spillway Gate Coating

    WOMEN'S COULEE

    Water ManagementFlood Mitigation Work - Construction at Women's Coulee

    CP 2006-00024

    Water ManagementGull Lake Stabilization Outlet - Fish Barrier

    Friday, April 15, 2016 Page 33 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Water Management

    CP 2006-00013

    Water ManagementLethbridge Northern Headworks - Supervisory Control and Data Aquisition (SCADA) System Upgrades

    CP 2003-00003

    Water ManagementLethbridge Northern Headworks - Division Weir and Fish Ladder Rehabilitation

    LITTLE BOW RESERVOIR

    Water ManagementContract for 2014, 2015, & 2016 Construction

    Little Bow Reservoir - Main Dam and Outlet Structure Rehabilitation

    CP 2006-00015

    Water ManagementContract for 2016 Construction

    Oldman River Dam - Supervisory Control and Data Aquisition (SCADA) System Upgrade

    CP 2004-00007

    Water ManagementPaddle River Dam - Upgrades for PMF Management

    CP 2008-00025

    Water ManagementPine Coulee - Monitoring Equipment Upgrades and Additions

    CP 2010-00007

    Water ManagementPine Coulee

    CP 2005-00011

    Water ManagementSheerness Water Supply System Blowdown Canal Rehabilitation

    CP 2008-00030

    Water ManagementSt Mary Dam - Irrigation Control Shaft - Stairway Replacement

    CP 2011-00001

    Water ManagementSt Mary Dam - Low Level Outlet (LLO) Valve Replacement - Isolation Barrier

    CP 2011-00001

    Water ManagementSt Mary Dam - Low Level Outlet (LLO) Valve Replacement - Valve Installation

    CP 2011-00001

    Water ManagementSt Mary Dam - Low Level Outlet (LLO) Valve Replacement - Valve Supply

    CP 2010-00004

    Water ManagementSt Mary Dam - Outlet and Drain Flow Monitoring Upgrades

    S2158-14 Water ManagementContract for 2015 , 2016, & 2017 Construction

    Travers Reservoir Structures Rehabilitation

    Friday, April 15, 2016 Page 34 of 35

  • Highway Location Type of WorkEstimatedLength (km)

    Government-Owned Transportation ProjectsNear Completion, Underway or Scheduled

    in 2016-2019Major Provincial Highway and Water Management Projects

    (Major Construction and Rehabilitation)

    Water Management

    CP 2010-00006

    Water ManagementTwin Valley Dam Electrical and Control System Upgrade

    CP 2006-00020

    Water ManagementWaterton Dam Irrigation Outlet - Supervisory Control and Data Aquisition (SCADA) System Upgrade

    CP 2006-00002

    Water ManagementWaterton Reservoir Aquifer Relief System Rehabilitation

    W18501-01 Water ManagementWaterton St. Mary's Headworks System Reach 12 - Jensen Dam

    CP 2008-00003

    Water ManagementWaterton St. Mary's Headworks System - Enclosures Over Gate Operators

    CP 2004-00015

    Water ManagementWaterton St. Mary's Headworks System Reach 12 - Mid Turnouts 1 and 2 - Supervisory Control and Data Acquisition (SCADA) Upgrades (50052-1)

    2004-00014 Water ManagementWaterton St. Mary's Headworks System Reach 13 (50053-1) - Taylor Wasteway Replacement

    CP 2008-00047

    Water ManagementWaterton St. Mary's Headworks System Reach 9 - Belly River Diversion Supervisory Control and Data Acquisition

    CP 2008-00009

    Water ManagementWhitford Rush Lakes Management Structure (53149-1)

    CP 2008-00015

    Water ManagementWomen's Coulee (Highwood Diversion) Control System

    CP 2008-00055

    Water ManagementWomen's Coulee (Highwood Diversion) River Diversion

    CP 2004-00010

    Water ManagementContract for 2015 & 2016 Construction

    Women's Coulee Canal and Reservoir Rehabilitation

    Friday, April 15, 2016 Page 35 of 35