Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Whatneedstobedone
Apersonorcompanythatadoptsatrail(asponsor)would be responsible for keeping the trail in goodcondition. The twomain tasks involved include theremoval of foliage that is blocking the trail (trailbrushing) and re-grading sections of a trail topreventwatererosion.
WhattoExpect
Atypicaltrailmightrequireabout10to20man-hoursofwork per year. The entire trail does not need to bebrushed each year and not all erosion control projectsneed to be completed in any one year. A trail that hasbeen brushed completely and has had the erosioncontrol work completed may not require furtherattentionfor1-2years.
FriendsoftheSouthSlopesSociety(FOSS)
FOSSwill provide each sponsorwill an assessmentof theworkhisorher trail requires. FOSSwill alsoprovideinstructionsonhowtocompletethetasksifrequested. FOSSwillprovideagaspoweredbrushcutter (and instructions on how to use it) ifrequested.Anyotherspecialized trailbuilding toolswillbeloanedtothesponsorbyFOSSifrequested.
SilverSponsor
Asilversponsorwillhavetheirnamepostedonthetrailhead signpost. The cost is $150 for a 3-yeartermor$50.00annuallyfor3years.
GoldSponsor
Agoldsponsorwillhavetheirnamepostedonthetrailhead signpost. Also included is an ad on thetrail maps that are sold throughout Kelowna. Thecost is$300fora3-year termor$100.00annuallyfor3years.
PlatinumSponsor
Aplatinumsponsorwillhavetheirnamepostedonthe trailhead signpost, on a signpost, and at thetrail end as well. An ad is included on the trailmaps that are sold throughout Kelowna. Anappreciation plaque is presented to Platinumsponsors.Sponsorshipis$500fora3-yeartermor$167 annually and for a largebusiness/corporation it is $990 for a 3-year termor$330annually.
Myra-BellevuePark(CrawfordTrails)&OkanaganMtProvincialPark
Adopt-A-TrailSponsorshipProgram
AppreciationPlaque(9”x12”)
TrailMapFrontCover