2015 SBAC ACCOMPLISHMENTS

2015 SBAC ACCOMPLISHMENTS. General Re-organization of the SBAC along 6 E's allowing us to get more done (AE, CD, KC, IW, EK, TB) Sustained advocacy for

Embed Size (px)

Citation preview

Page 1: 2015 SBAC ACCOMPLISHMENTS. General Re-organization of the SBAC along 6 E's allowing us to get more done (AE, CD, KC, IW, EK, TB) Sustained advocacy for

2015 SBAC ACCOMPLISHMENTS

Page 2: 2015 SBAC ACCOMPLISHMENTS. General Re-organization of the SBAC along 6 E's allowing us to get more done (AE, CD, KC, IW, EK, TB) Sustained advocacy for

General• Re-organization of the SBAC along 6 E's allowing us to get more done (AE, CD, KC, IW, EK, TB)• Sustained advocacy for Beacon St re-surfacing and re-striping (EK, TB, KC, CD)• Improved connectivity and communication with OSPCD, SPD and Aldermen (CD, IW, KC)•Moving SBAC file sharing/storage to Box (KC)

Education• Bike Box education campaign (KC, IW, AH)• Beacon Street interim bicycle route (AE, CD)

Encouragement• Expanded outreach to community through Bike Talk Series (AA, KC)• Bay State Bike Week events including Rush Hour Race Event (TT, KC)• Expanded community outreach in general (AH)

Enforcement• Encouragement of Electronic Message Boards to promote bicycle safety messaging (EK, KC)• Greatly improved coordination with the SPD, including adding Deputy Chief Carrabino as

liasion (TB, KC)• Safety outreach, particularly to cyclists who have been in crashes (EK)

Page 3: 2015 SBAC ACCOMPLISHMENTS. General Re-organization of the SBAC along 6 E's allowing us to get more done (AE, CD, KC, IW, EK, TB) Sustained advocacy for

Engineering•Ongoing review of design plans for Union and Davis Squares (TB)• Recommended intersection improvement for Community path terminus on Lowell St (KC)

Equity• Initiated outreach to disadvantaged neighborhoods, including meeting with Ward 1

Aldermen McLaughlin (AH)

Evaluation and Planning• Excellent coordination/communication with City on Bike Box placement (TT, AA, KC)• Close coordination on Broadland Path with Powder School developers (KC, TB)• Expanded biked/ped counting (EK)• Inclusion of recommended bike parking requirements in proposed overhaul of zoning

ordinance (TT)