17
CARY B. DELA CRUZ QA/QC MANAGER [email protected] +966504465277 “ BROAD EXPERINCES IN ALL ASPECTS OF WORKS INCLUDING HORIZONTAL & VERTICAL CONSTRUCTION (BUILDING, ROADS, DAMS, BRIDGES) AND HAVE ALL THE DIRECT KNOWLEDGE RELATED TO SEVERAL DISCIPLINES SUCH AS QUALITY, CONSTRUCTION, ENGINEERING, PLANNING, SAFETY. I AM PERSONALLY HANDLING AUDIT & COMMISSIONING”. OBJECTIVE: To implement Quality Assurance and Quality Control Management that is acceptable to the client based on quality requirements of ISO 900:2008 series. To define and approved project quality plan and adhere to specific Schedule Q of the project. TRAININGS & CERTIFICATION RECEIVED: 12 May 2016 to 27 May 2016 S-PAGE Training & Consultancy Center – Alkhobar, KSA Occupational Safety and Health Association (OSHA) - General Industry 28 Sept. 2014 to 02 Oct. 2014 Resource Inspections Canada Incorporated (RICI) -KSA Lead Auditor Training Course for ISO 9001:2008 System Auditor – IRCA Certification 07 Nov. 2014 to 07 Dec. 2014 International Information Technology -KSA Internal Auditor Training Course for ISO 9001:2008 20 Jun. 2014 International Information Technology -KSA Quality Management Training Course for ISO 9001:2008 30 Apr. 2012 Certified NRMCA’s Concrete Technologist National Ready Mixed Concrete Association Middle East Certification (CTME) held at Doha, Qatar. 24 May 2011 Certified American Concrete Institute (ACI) Concrete Field Testing Technician–Grade 1 American Concrete Institute (ACI) held at Doha, Qatar

2015 Resume Cary B. Dela Cruz.pdf

Embed Size (px)

Citation preview

Page 1: 2015 Resume Cary B. Dela Cruz.pdf

CARY B. DELA CRUZ

QA/QC MANAGER

[email protected]

+966504465277

“ BROAD EXPERINCES IN ALL ASPECTS OF WORKS INCLUDING HORIZONTAL & VERTICALCONSTRUCTION (BUILDING, ROADS, DAMS, BRIDGES) AND HAVE ALL THE DIRECT KNOWLEDGE RELATEDTO SEVERAL DISCIPLINES SUCH AS QUALITY, CONSTRUCTION, ENGINEERING, PLANNING, SAFETY. I AMPERSONALLY HANDLING AUDIT & COMMISSIONING”.

OBJECTIVE: To implement Quality Assurance and Quality Control Managementthat is acceptable to the client based on quality requirements of ISO 900:2008 series. To defineand approved project quality plan and adhere to specific Schedule Q of the project.

TRAININGS & CERTIFICATION RECEIVED:

12 May 2016 to 27 May 2016 S-PAGE Training & Consultancy Center – Alkhobar, KSAOccupational Safety and Health Association (OSHA) - General Industry

▪ 28 Sept. 2014 to 02 Oct. 2014 Resource Inspections Canada Incorporated (RICI) -KSALead Auditor Training Course for ISO 9001:2008 System Auditor – IRCA Certification

07 Nov. 2014 to 07 Dec. 2014 International Information Technology -KSAInternal Auditor Training Course for ISO 9001:2008

20 Jun. 2014 International Information Technology -KSAQuality Management Training Course for ISO 9001:2008

30 Apr. 2012 Certified NRMCA’s Concrete Technologist

National Ready Mixed Concrete Association Middle East Certification (CTME)

held at Doha, Qatar.

24 May 2011 Certified American Concrete Institute (ACI) Concrete Field Testing Technician–Grade 1American Concrete Institute (ACI) held at Doha, Qatar

Page 2: 2015 Resume Cary B. Dela Cruz.pdf

EXPERIENCES:

Project Location: Kingdom Of Saudi Arabia

18 Feb. 2015– till present timeEastern Trading & Cont. Co. (ETE)Construction Division

QA/QC MANAGER – CIVIL, MECHANICAL, ELECTRICAL

Prepare the company Quality Plans, ITP, PQR, RMR MST & their approvals.

Prepare the Two-Weeks Look-ahead for all inspection activities as per on-going and in-coming construction activities within two weeks.

Review & approval, monitoring of the QC Inspectors for their specific location &assignments.

Approval of the mobilization/demobilization of QC personnel monitor theSchedule Q Attachment VI Table VI-1 requirements.

Review s t a t u s o f i s s u e d S u r v e i l l a n c e s , L B E s , N C R ’ s ,implementationofcorrective actions and its closure.

Review test reports that must comply with the Engineering standards andInternational Standards applicable to the existing project.

Attend the Weekly Progress and Quality Meeting.

Check the implementation of corrective and preventive actions as per reply inthe Surveillance, LBE’s & NCRs.

Monitor & initiate the implementation & closure of all open Surveillances, LBE’s& NCRs.

Recommend other quality related solution to the management as part of continuousimprovement.

Page 3: 2015 Resume Cary B. Dela Cruz.pdf

27 Dec. 2012 – February 16, 2015Eastern Trading & Cont. Est. (ETE)Construction Division

QA/QC SUPERVISOR - CIVIL

Assist the QC Manager to implement the quality control of the project.

Review the quality reports from Third Party Agency and make recommendation to the QCManager.

Prepare the Two-Weeks Look-ahead for all inspection activities as per on-going and in-coming construction activities within two weeks.

Assigned the QC Inspectors for their specific location assignment on a daily basis. Recommend to the QC Manager the mobil ization/demobilization of QC

Personnel and monitor the Schedule Q Attachment VI Table VI-1 requirements.

Verify the equipment calibration log and the status of calibration of equipment.

Monitor the status of all RFIs and instruct the QC Discipline Inspector for the closure of theRFIs the QMIS.

Review status of issued Surveillances, LBEs & NCR’s the implementation of correctiveactions, tool box meeting and its closure.

Review test reports if it complies the Saudi Aramco Engineering standards andInternational Standards.

Attend the Weekly Progress and Quality Meeting with SAPMT and SAPID.

Check the implementation of corrective and preventive actions as per reply in the NCRs.

Initiate the implementation of closure of all open NCRs.

Assist the QC Manager in Quality Awareness Session to all staff of the company.

Recommend other quality related solution to the QC manager to improve the process as partof continuous improvement.

Page 4: 2015 Resume Cary B. Dela Cruz.pdf

PROJECT LOCATION: DOHA, QATAR

13 June 2010–Mar. 19, 2012Al Ali Engineering Trading & Cont. Co. (W.L.L.) Ready-MixConcrete Division

QC Supervisor

Assist the Plant QC Manager to implement the approved quality control plan.

Assist the Plant QC Manager in reviewing the quality reports prepared by in house testing &Third Party.

Assist the Plant QC Manager in identifying requirements in the QC Organization of the project.

Monitor & verify the equipment calibration log, the status of calibrations.

Review test reports & its applicability to client’s standards.

Attend the Weekly Progress and Quality Meeting with the client.

Initiate the closure of closure for Surveillance, Log Book entries & NCR’s.

Project Location: Saudi Arabia

11 Dec. 2007 – 20 Mar. 2010Eastern Trading & Cont. Est. (ETE) Ready-MixConcrete Division

QC Civil Engineer - Ready-mix Concrete Batching Plant

Assist the Plant QC Manager to implement the approved quality control plan.

Assist the Plant QC Manager in reviewing the quality reports prepared by in house testing& Third Party.

Assist the Plant QC Manager in identifying requirements in the QC Organization of the project.

Monitor & verify the equipment calibration log, the status of calibrations.

Review test reports & its applicability to client’s standards.

Attend the Weekly Progress and Quality Meeting with the client.

Initiate the closure of closure for Surveillance, Log Book entries & NCR’s.

Page 5: 2015 Resume Cary B. Dela Cruz.pdf

PROJECT LOCATION: Manila, Philippines

15 Jun. 2001– 01 Nov. 2007Toyo/Tobishima Joint Venture (Manila Base project)Bridge, River Control and Road Projects (100 Million USD project)

QC Inspector - Civil

Involved in material inspection and checked quality assurance/control of the project.

Prepare the quality assurance reports and submit to the QC Supervisor.

Monitoring the daily inspection activities in the field.

Implement the ITP and Inspection Checklist against activities at site.

Assist the Procurement for the Pre-Inspection activities and coordinate withThird Party QC Inspectors.

Check all material delivery and raising of material receiving of the material at site.

Close and provide the implementation of corrective and preventive actions as per reply in theSurveillances, Log Book Entries & NCRs.

Responsible of keeping all quality records related to civil inspection activities.

27 Nov. 1997 – 30 Nov. 2000China International Water & Electric Coop. (Manila Base project) Bridge, Roadsand Dike Protection Project (500 Million USD project)

Quality Control Material Engineering

Assigned to monitor the construction activities for the project.

Coordinate with QC Department for RFIs on a daily basis.

Review the Two-Weeks Look ahead for Construction and prepared by resources for eachactivities reflected to this.

Review and check the ITP and coordinated with various QC discipline for inspectionactivities.

Check all material release records prior to delivery and raising of material receiving of thematerial at site.

Attend the weekly progress meeting and make recommendations.

Page 6: 2015 Resume Cary B. Dela Cruz.pdf

30 Oct. 1993 – 01 Jan. 1995Dept. Public Works and Highways – Calapan City, Oriental MindoroRegion IV B, Philippine Government Projects

Senior Laboratory Technician

Review the material test result and its parameters pertaining to; Soil, Concrete, Asphaltspecification limits.

Responsible for assigning material testing in the laboratory and field.

Catalogue recordings and making them available when requested.

Ensure that all health and safety procedures while conducting testing, trail mixtures areunderstood and followed.

Review the material test result and its parameters pertaining to; Soil, Concrete, Asphaltspecification limits.

Responsible for assigning material testing in the laboratory and field.

Catalogue recordings and making them available when requested.

Ensure that all health and safety procedures while conducting testing, trail mixtures areunderstood and followed.

01 Apr. 1992 –30 Jul. 1993Sanlahi Group of ContractorsGovernment, Municipal, Provincial and Dept. ofEducation Projects – Philippines

Laboratory Technician

Design Concrete mixtures and perform trial test prior to its usage in the project.

Review the material test result and its parameters pertaining to; Soil, Concrete, Asphaltspecification limits.

Responsible for assigning manpower scheduling in the laboratory and field.

Catalogue recordings and making them available when requested.

Ensure that all health and safety procedures while conducting testing, trail mixtures areunderstood and followed.

Responsible for assigning material testing in the laboratory and field.

Catalogue recordings and making them available when requested.

Ensure that all health and safety procedures while conducting testing, trail mixtures areunderstood and followed.

Page 7: 2015 Resume Cary B. Dela Cruz.pdf

01 Jun. 1991 –03 Mar. 1992Barman Construction Co.Gov’t, Municipal, Provincial Projects - Philippines

Laboratory Technician

Performed various laboratory and field tests including sand-cone density testing, freshly mixedconcrete sampling and testing, compressive strength testing of cured concrete cylinders andlaboratory testing of fine and coarse aggregates including asphalt.

Conducted soil compaction testing, including the establishment of a moisture density curve,concrete testing including field and laboratory testing.

Maintaining test result charts, assisting in a day to day operations of the materials testinglaboratory and reporting test results to QC Manager via appropriate test report forms.

EDUCATION

1984–1988 Divine Word College of Calapan, Mindoro, Philippines

B.S. Civil Engineering (undergraduate 4th year Level)

INTERESTS

Application of Civil Testing Technologies

COMPUTER SKILLS

Microsoft Office 2014 (Word, Excel, Power-point) Microsoft

Project 2014

Auto Cad 2014

Primavera

PERSONAL INFORMATION

Age: 45 years old

Nationality: Filipino Height: 5’ 6”

Weight: 65 Kg.

Status: Married

Page 8: 2015 Resume Cary B. Dela Cruz.pdf
Page 9: 2015 Resume Cary B. Dela Cruz.pdf
Page 10: 2015 Resume Cary B. Dela Cruz.pdf
Page 11: 2015 Resume Cary B. Dela Cruz.pdf
Page 12: 2015 Resume Cary B. Dela Cruz.pdf
Page 13: 2015 Resume Cary B. Dela Cruz.pdf
Page 14: 2015 Resume Cary B. Dela Cruz.pdf
Page 15: 2015 Resume Cary B. Dela Cruz.pdf
Page 16: 2015 Resume Cary B. Dela Cruz.pdf
Page 17: 2015 Resume Cary B. Dela Cruz.pdf

Filename: 2015 Resume Cary B. Dela Cruz - word document - Copy_13D9C25Directory: C:\Users\Mubeen\AppData\Local\TempTemplate:

C:\Users\Mubeen\AppData\Roaming\Microsoft\Templates\Normal.dotm

Title:Subject:Author: MubeenKeywords:Comments:Creation Date: 5/19/2016 9:24:00 AMChange Number: 10Last Saved On: 6/1/2016 12:31:00 PMLast Saved By: MubeenTotal Editing Time: 70 MinutesLast Printed On: 6/1/2016 12:34:00 PMAs of Last Complete Printing

Number of Pages: 16Number of Words: 1,535Number of Characters: 9,656 (approx.)