28
2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Embed Size (px)

DESCRIPTION

Indicator Assessment & Intensity Level Assessment level w/ a proposed national minimum:  Full, Moderate, Rapid Sampling intensity w/ a proposed national minimum:  Expansions of the P3 grid: 1/16 th, 1/8 th, 3/16 th, 1/4 th to all P2 plots

Citation preview

Page 1: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

2015 Regional Management Team

MeetingAlbany, New York

Group Leader Update Bob Ilgenfritz

Data Collection

Page 2: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Down Woody MaterialVegCrownsSoilsLichens and Ozone

Enhanced Forest Indicators

Page 3: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Indicator Assessment & Intensity Level

• Assessment level w/ a proposed national minimum: Full, Moderate, Rapid

• Sampling intensity w/ a proposed national minimum: Expansions of the P3 grid:

1/16th, 1/8th, 3/16th, 1/4th to all P2 plots

Page 4: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

National Proposed Core Minimum - DWM

Moderate Assessment• Current P2+ protocol• 2 transects / subplot

Proposed 1/4th intensity from current 1/8th for P2+

Page 5: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

National Proposed Core Minimum - VEG

Moderate Assessment• More than Rapid or current

P2+ assessment but not the full - P3 assessment

• Cover of 4 most abundant species by growth habit/height class

Proposed 3/16th intensity from current 1/8th for P2+

Page 6: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Proposed Core Minimum - Crowns

Rapid Assessment• Current P2+ protocols• Crown variables reduced from

six P3 to two:– Dieback– Uncompacted Live Crown Ratio

Proposed 3/16th intensity from current 1/8th P2+

Page 7: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

National Proposed Core Minimum - Soils

Rapid assessment

• Not current P2+ protocol – Current is the “Full” assessment or

old P3• One forest floor and soil core.

Proposed 1/8th plot intensity from current 1/16th P2+

Page 8: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Lichens & Ozone

• core optional – no proposed minimums

• Special projects - targeting special study areas of high concern.

• Not currently part of NRS P2+ effort so this would need $$$$$$ to implement.

Page 9: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Next Steps

• Additional funding necessary to support any effort more than current P2+

• AB, DAB, IMB work together: • Change proposals

• Melissa Powers state rep on DAB• 218-322-2516• [email protected]

• Field guide• Specify IM requirements -

Programming, database…

Page 10: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

INDICATORASSESSMENT LEVEL

PLOT INTENSITY

DWM Moderate 1/4th

VEG Moderate 3/16th

CROWNS Rapid 3/16th

SOIL Rapid 1/8th LICHEN & OZONE Special Projects

*not necessarily collected on the same plot

PROPOSED NATIONAL CORE MINIMUMS

Page 11: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Image-based Change Estimation (ICE)

Page 12: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Overview

• National Project to Define Land Use (LU), Land Cover (LC), and Change for the two most recent sets of NAIP Imagery using FIA plot locations

• New NAIP Imagery every 2-3 years vs plot visits every 5 to 7 years.

– Why ICE?– Quick Glance at Procedures– NRS Implementation

Page 13: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Why Measure LU, LC, and Change?• 2014 Farm Bill: # 9 of 11 provisions for FIA• (9) Understand and report on changes in land use

and cover– Human change– Nonhuman/natural change– Support estimation strategies for the entire CONUS

• Carbon• Biomass/bioenergy• Landscape health

– Support Land Management• Risk assessments• Mitigation efforts

Page 14: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

ProceduresICE Plot Layout

GPS coordinate

Page 15: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

ICE Plot – No change

NAIP Imagery Time 1nate NAIP Imagery Time 2nate

Page 16: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

ICE Plot - Change

GPS coordinate

NAIP Imagery Time 1nate NAIP Imagery Time 2nate

Page 17: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Land Cover: Identify Cover ChangeNAIP Imagery – Time 1 NAIP Imagery – Time 2

Page 18: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Land Use: Identify Use ChangeNAIP Imagery – Time 1 NAIP Imagery – Time 2

Page 19: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

NRS Implementation

• Calendar year 2015 – MD, NE, NH, and VT

• Future implementation based on NAIP Imagery Schedule:

– New Imagery Available Calendar Year 2016:• 12 States:

–DE, IL, IA, KS, ME, MN, ND, NJ, NY, OH, PA, WI

Page 20: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Summary

The ICE project gives us the means to report Land Use, Land Cover and Change across all lands in a shorter cycle length

than FIA plots alone.

Page 21: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Scanning current paper plot sheets

Allegro PDR replacement

Less Paper More Digital FIA

Page 22: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Digital Plot Sheets

• Update from Last year:

– All FY 2016 plots will have current plot sheets scanned and loaded to MIDAS with the plot data files.

– Next remeasurement will have digital files available for use on the next generation tablet PDRs

Page 23: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

PDR replacementsPlans to replace our aging PDR inventory over the next 3 years.

Currently two viable options:

• Dell Latitude 12 Rugged 7202:– Test units this winter

• Allegro 2– Similar to the current Allegro – test not needed

Page 24: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Dell Latitude 12 Rugged 7202:

Pros:• Large screen 12”X8” for displaying

imagery and drawing digital plot maps• Greater capabilities – potentially replace

FS laptops• Price - $1800Cons:• Heavy at 3.5 lbs.• Touch screen vs key pad • Size - GPS navigation is cumbersome

Page 25: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Allegro 2

Pros:• Key pad with opposing thumbs entry• Lightweight – 2 lbs.• Ergonomic design – GPS navigation

Cons:• Small screen – limited imagery display, no

digital drawing capability• Price - $2,600

Page 26: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Questions

USDA Forest Service, Remote Sensing Applications Center, http://fsweb.rsac.fs.fed.us

Page 27: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Data collection efforts in FY 2016

Urban FIA

Page 28: 2015 Regional Management Team Meeting Albany, New York Group Leader Update Bob Ilgenfritz Data Collection

Urban FIA Status12-01-2015

16

16

16

16

1616

16