Paraffin Blockage Remediation In A Flexible Flowline
Robert JamesProduction Engineer
2
Outline
• Background • Remediation• Execution• Lessons Learned
3
Background
4
Medusa SS#5 Infrastructure
5
Flow Assurance Challenges
• Uninsulated flowline• Pigging operations unavailable• Water injection tree
– Limited chemical injection points• Assumed similar fluid characteristics to offset well
– No down-hole samples obtained
6
Medusa SS#5 HistoricalInitial Production
Snubbing Clean-out Operation
Paraffin Plug In Flowline
7
Flowline Deposition
Bottom-hole Pressure
Boarding Pressure
Tubing Pressure
Subsea Flowline Pressure
Time Period Shown: 4 Years
8
Remediation
9
Remediation Options
Paraffin Deposition
Bullhead Solvent
Coil Tubing Cleanout
Snubbing Unit Cleanout
10
Bullhead Operation
• Pumped 1000 gals of Xylene down flowline from platform• Impermeable paraffin blockage formed
Subsea Flowline Pressure
Boarding Pressure
Time Period Shown: 5 Months
11
Remediation Options
Paraffin Deposition
Bullhead Solvent
Paraffin Blockage Formed
Coil Tubing Cleanout
Snubbing Unit Cleanout
12
Coil Tubing
• Advantages– Circulation– Direct solvent
application to blockage• Disadvantages
– Potential for stuck work string
• Tractoring technology in horizontal section risky
13
Remediation Options
Paraffin Deposition
Bullhead Solvent
Paraffin Blockage Formed
Coil Tubing Cleanout
High Potential For Stuck
Work String
Snubbing Unit Cleanout
14
Snubbing Unit
• Advantages– Rotation capability– Circulation– Direct solvent
application to blockage– Proven industry method
• Risks– Flexible flowline integrity– Maneuverability of
curvature in flowline
15
Flowline Curvature Risk - Mitigation
• Torque and drag modeling shows snubbing unit capable of operating through bend in flowline.
• Provided parameters while running in hole with work string.
16
Solvent Selection• Solvent Selection:
– Diesel• HSE • Disposal• Cost Effective
– Effectiveness of diesel circulation in question at lower temperatures
17
Mechanical Remediation
• Pipe in pipe modeling completed– Significant heat loss
expected • Removal of paraffin
using 3” O.D. brass nozzle
18
Remediation Options
Paraffin Deposition
Bullhead Solvent
Paraffin Blockage Formed
Coil Tubing Cleanout
High Potential For Stuck Work
String
Snubbing Unit Cleanout
Execution
19
Execution
20
Operations SpreadSnubbing Unit
Circulation/Flowback
Heated Tanks
21
Continuous Monitoring
• Snubbing parameters:– Pick Up and Slack Off Weights– Torque
• Diesel parameters:– Pour Point– Viscosity– Density
22
Operational Results
Subsea Flowline Pressure
Tubing Pressure
Boarding Pressure
Time Period Shown: 3 Months
23
Operational Results
• Well Test Recorded After Clean-Out• 1381 BOPD, 1223 MCFD, 213 BWPD
24
Lessons Learned
• Job Execution – Accurate modeling– Multiple remediation options– Real-time monitoring
• Field Development– Accurate data acquisition– Appropriate infrastructure
• Insulation Requirements• Chemical application
25
Acknowledgements
• David Mayfield• Alyce Anfang
Contact Information
• Robert James• Murphy Oil Corporation• [email protected]• 832-319-5443
Questions?