108
Objective -The objective of the cost report is to report the cost value (suggested retail price) of the items selected to build the car. The objective is not to report the cheapest price that an item can be purchased. For example, if two schools are using the same CVT they both should be reporting the same price, even though they might have purchased them for different prices, since both schools get the same value from the CVT. -The cost report should serve as two functions, (1) a bill of materials for the car, and (2) it should help equalize teams that choose to use items of high value with teams that use items of low value. -In industry it is very important to look at design and performance, as well as cost. Cost is the key driving force to many design decisions. If shocks are selected that cost $4000, the team should understand it will loose points in cost, but it might improve the score in the dynamic events. During design presentations these cost decisions should be discussed. Common Mistakes - Teams did not use the correct template; the only template that is allowed is the template which posted for that year. If you submit an older template you will receive a score of 0. - Teams found prices at discount companies that were not suggested retail prices. Remember to use the current retail price of all Polaris parts. - Teams did not get signatures on the summary cost page. It is required that you print out the summary cost with captain and advisor approval signatures. This must be scanned and placed in the PDF as page #1. - Reports were not labeled correctly. - Make sure everything is filled out. Don't leave anything blank (quantities, descriptions, sub-assembly times, etc). - Bring a printed copy of the cost report with you to competition. It also would be helpful to bring drawings of any components that are hidden or enclosed. For example, a exploded view of a transmission or the component drawings. This would help speed up any verification process. Submission of reports All reports MUST be done using that year's template. Only one electronic copy will need to be submitted by each team and this will be for all competitions in which the team is competing. The template must be submitted as an Excel file (.xls or .xlsx) with a maximum size of 1.0 Mb. Do not add pictures, drawings or other things that make this file larger than 1.0 Mb. All supporting documents (i.e.: receipts, drawings, cost overview, pictures, scanned copy of the summary cost sheet with signature) should be included in the .PDF file. Only .PDF file will be scored. The maximum size for the .PDF is 4.0 Mb. These files must be titled as specified in the rules. If the cost of your vehicle changes after you have submitted your cost report, then at registration you must submit a "Cost Adjustment Form". When submitting this form you must have receipts or form "B" attached for each changed item. See the rules for more details on the Cost Adjustment form.

2014_costreporttemplate

Embed Size (px)

DESCRIPTION

cost report

Citation preview

Page 1: 2014_costreporttemplate

Objective-The objective of the cost report is to report the cost value (suggested retail price) of the items selected

to build the car. The objective is not to report the cheapest price that an item can be purchased. For

example, if two schools are using the same CVT they both should be reporting the same price, even

though they might have purchased them for different prices, since both schools get the same value from

the CVT.

-The cost report should serve as two functions, (1) a bill of materials for the car, and (2) it should help

equalize teams that choose to use items of high value with teams that use items of low value.

-In industry it is very important to look at design and performance, as well as cost. Cost is the key

driving force to many design decisions. If shocks are selected that cost $4000, the team should

understand it will loose points in cost, but it might improve the score in the dynamic events. During

design presentations these cost decisions should be discussed.

Common Mistakes- Teams did not use the correct template; the only template that is allowed is the template which posted

for that year. If you submit an older template you will receive a score of 0.

- Teams found prices at discount companies that were not suggested retail prices. Remember to use

the current retail price of all Polaris parts.

- Teams did not get signatures on the summary cost page. It is required that you print out the summary

cost with captain and advisor approval signatures. This must be scanned and placed in the PDF as

page #1.

- Reports were not labeled correctly.

- Make sure everything is filled out. Don't leave anything blank (quantities, descriptions, sub-assembly

times, etc).

- Bring a printed copy of the cost report with you to competition.

It also would be helpful to bring drawings of any components that are hidden or enclosed. For

example, a exploded view of a transmission or the component drawings. This would help speed

up any verification process.

Submission of reportsAll reports MUST be done using that year's template. Only one electronic copy will need to be

submitted by each team and this will be for all competitions in which the team is competing. The

template must be submitted as an Excel file (.xls or .xlsx) with a maximum size of 1.0 Mb. Do not add

pictures, drawings or other things that make this file larger than 1.0 Mb.

All supporting documents (i.e.: receipts, drawings, cost overview, pictures, scanned copy of the

summary cost sheet with signature) should be included in the .PDF file. Only .PDF file will be scored.

The maximum size for the .PDF is 4.0 Mb.

These files must be titled as specified in the rules.

If the cost of your vehicle changes after you have submitted your cost report, then at registration you

must submit a "Cost Adjustment Form". When submitting this form you must have receipts or form

"B" attached for each changed item. See the rules for more details on the Cost Adjustment form.

Page 2: 2014_costreporttemplate

DO NOT SUBMIT REPORTS EMBEDDED WITH

MACROS IN THE FILE OR REPORTS WITH A .XLSM

EXTENSION. REPORTS SUBMITTED IN THIS

FORMAT WILL NOT BE GRADED.

Common PricesHere is a list of websites that we will be using for scoring to verify prices. If you do not have

documentation on all your items, use one of these sites for your documentation.

www.chassisshop.com www.mcmaster.com www.polarissuppliers.com/sae_team/SAE_parts.pdf

Foreign TeamsAll cost numbers are in US dollars at US cost. Non US teams must find the prices for each item they

are using in the US. If the exact item can not be found, then an item of similar use, function and

durability should be used. Foreign receipts are not acceptable.

Cost Reporting DataDefinition – “Retail List Price” is the full retail price either as quoted by the manufacturer or the retailer

for sales of the quantity that is purchased. For example: purchased seats are priced as a single unit;

four identical purchased shocks can be priced as a group of four; small bolts and nuts can be priced

singularly or based on the box price; however they were purchased. The Retail List Price is frequently

more than you actually paid for the item and is never less than you actually paid.

Retail List Prices should not include sales tax, VAT taxes or packaging and shipping costs from the

seller to the team's shop – provided such items are itemized separately and not built into the retail price.

Cost Documentation – “Cost Documentation” can be any of the following: (a) Receipts or

invoices for the items as purchased, (b) Catalog pages showing the items and price, (c) On-line

prices, (d) Quotations from a manufacturer or fabricator, or (e) Price tags provided that original

tag identifies the item to which it was affixed. All cost documentation must be dated either as part the document itself or, in the case of undated

references, e.g. catalog pages, price tags, by writing a date on the submission. As of January 1 of the

competition year, receipts are no more than three (3) years old. Polaris part prices must be current for

that year.

Purchased Items – Use the Retail List Price (Suggested Retail Price)

Contributed, Discounted and Sale Items – Use the Retail List Price. Even if you bought the part on

sale or at a discount use the Retail List Price - do not use the sale or discount price.

Custom Manufactured Items – Use a quotation showing the Retail List Price. Manufacturer’s

quotations must be based on the price the company would charge a typical customer - not on any

special price given to your team.

Reused, Salvaged Items or items purchased from auction sites – Use the current Retail List Price

for the item. If you are reusing a part that is no longer in production, then you must provide cost

documentation for the nearest equivalent item that is currently available. For example: if you are

reusing a brake light that’s no longer made, then you may substitute the price for an equivalent item

that’s available.

Page 3: 2014_costreporttemplate

Foreign Purchased Items – If the item or similar item is available in the United States use the retail

price published in the U.S. If the item is not available in the U.S. then find an item that is similar in

function, size and durability.

Important Note – Keep in mind that the cost report is based on retail list price and is therefore

somewhat artificial. The cost report total price is likely to be considerably higher than your actual

production budget.

***Make sure to read the cost guide which is included in this file on the next worksheet.***

FormatThis year's cost report will be a 3 level bill of materials with standardized summaries in the 13 major cost

areas. The 3 levels consist of:

-Level 1 is the "Summary Cost" worksheet

-Level 2 is the group of 13 Form "A" worksheets. Each of these sheets come preloaded with a

reasonable number of lines which may be adjusted as required.

-Level 3 is the group of 13 Form "B" worksheets. Note that each of these worksheets may have multiple

items.

DocumentationReceipts, catalog pages, or other documentation of cost must be included in the .PDF. To help make

the documentation clear and readable, each receipt must have the appropriate final cost circled. Each

receipt should also have the section title, Form A line number, and Form B (if needed) line number

clearly marked. All of these receipts must be included in the .PDF file. Documentation should be in the

same order as presented in the report. For example, all the engine documentation first, followed by the

transmission documentation, etc.

Receipts, as of January 1 of the competition year, are no more than three (3) years old. Polaris part

prices must be current for that year.

Editing the worksheetsThe worksheets have been designed to be used by most teams with little modification. The majority of

the teams will find that one or more of the worksheets is too short to cover all the components used in

one functional area (Form A), fabricated items must be linked from Form B to Form A, or there are more

fabrication items than shown (Form B). Therefore, it is expected that the spreadsheets will need to be

modified. Use the following guidelines:

-You MAY NOT change the column headings, the categories, or the summation methods.

-You MAY add additional lines to accommodate your particular design. You may also need to add

additional sections to a Form B (and the resulting line in the corresponding Form A) as required. Minor

changes to the formatting of cells (i.e. visible decimal places) is permitted when necessary to

communicate within Forms A and B. If you add lines, it is your responsibility to ensure that formulas

pick up all additional lines and carry through the forms properly.

Form A Issues and EditingYou may insert additional lines as required. As long as you insert the lines above the summation

Formulas, the spreadsheet will pick up the costs in the new lines. You may need to renumber the lines;

this has no effect on the cost rollup. Be careful that the line numbers match the appropriate Form B

items. It is good practice to put all the Form B items at the top of the sheet, purchased items below.

Page 4: 2014_costreporttemplate

Be careful not to 'CUT' items or drag and drop. Use 'COPY' functions. Failure to do so may lead to

dropped links to the final worksheet.

Form B Issues and EditingTo add an additional section for a fabricated item, highlight lines 2 through 27, 'COPY', highlight the

upper left corner below the last used section (Cell A106 to start with in most of the Form B's, cell A269

for the larger ones), and 'PASTE'. Be sure to add a page break above it and change the item number

appropriately. Next, you will need to add the three links to the appropriate Form B. Go to the appropriate

line on the appropriate Form B, highlight the 'Part Name' cell, enter an '=' to start a Formula, then

(without completing the Formula) switch to Form B, find and highlight the new Part Name cell, and hit

'enter'. This will transfer the location and send you back to Form A. Repeat with materials and labor cost

cells.

There are two ways to calculate part costs on Form B: you can enter Density, Amount, Weight, and

$/Unit, and the final cost will be calculated for you. Alternatively, you can leave the Density column blank

and the cost will be calculated on the basis of Amount, and $/Unit.

There may be some cases where the cost calculation does not fit your situation. Use your preferred

calculation method, highlight the calculation in light yellow, and provide an explanation at the bottom of

that page (Insert blank lines as required).

The Amount should be the gross amount of material you started with, not the finished amount of

material in the finished part. i.e. If you machine a full transmission case, use the weight of the starting

billet, not the final case.

Be careful not to 'CUT' items or drag and drop. Use 'COPY' functions. Failure to do so may lead to

dropped links to the matching Form A.

The Cost Report is a representation of the Actual Prototype Cost - consequently, manufacturing and

labor costs are intended to reflect the actual vehicle's manufacturing methods, not idealistic techniques.

If you have an innovative / non-standard method, come prepared to support it.

Cost Adjustment FormThis form is to be used only if you add something to your car after the submission of your report. This

must be submitted at registration during each competition.

Single item changes for subassembly can be shown on the cost adjustment form. Multiple changes,

please attach a separate spreadsheet showing each individual item changed and the corresponding

cost.

Form B and receipts must be submitted as required by the cost guide.

SampleThere is a sample pair of Form A and Form B at the end of the worksheets (last tab). They are identical

to the others with the exception that they do not roll up to the final worksheet.

Page 5: 2014_costreporttemplate

Cost Guide

Component Categories

Suspension: A Arms, Spindles, Shock, Rod Ends, Ball Joints

Frame: Structural Members, Roll Cage, Mounts, Firewall, Seat

Body: Outer Covering, Fenders, Skid Plates

Brakes: Mech/Hyd. Components, Pedals, Lines, Fittings, Fluid

Safety Equipment: Guards, Padding, Fire Extinguisher, Safety Harness

Electrical: Kill Switch, Battery, Cables, Wiring, Lights, Etc.

Page 6: 2014_costreporttemplate

Miscellaneous: Transponder, Paint, Trim, Etc

First Event: Tires/Rims, Flotation, and any other items that will be used at that event only

Second Event: Tires/Rims, Flotation, and any other items that will be used at that event only

Third Event: Tires/Rims, Flotation, and any other items that will be used at that event only

Page 7: 2014_costreporttemplate

Cost GuideThe cost should reflect the prototype vehicle brought to competition. Included in this amount is the

cost for the ten (10) horsepower Briggs & Stratton engine, but excluded are the costs of the required life

preserver, helmet, and face shield. Anything that is in the vehicle at the time of technical

inspection must be represented in the cost report. The prototype cost of the vehicle will be

determined as the sum of the following items:

1. All purchased parts at full retail cost (US dollars), even if it was actually acquired with a discount

or in a foreign country where the exchange rate would make it cheaper than it could be purchased in

the US. 2. Receipts for all components over $30 (US dollars) must be included.

(A) The receipts must be numbered and labeled, and included in the .PDF file.

(B) The full retail cost of parts must be used in the Cost Report. Discounted or wholesale prices are

not to be used. If a part is used,

donated or discounted, the full retail cost for the part must still be used (or a part of similar

specification).

(C) The supplier/retailer’s phone number must be included with each receipt.

(D) If the actual receipt for a part is not available, a photocopy of a page from a catalog of the part

in question will be acceptable.3. All modified purchased parts should use full retail cost, plus the cost of the modifications taken

from the Operations Cost Table.4. Fabricated/Manufactured parts use the cost for the basic material from the Materials Cost Table;

bearing in mind the weight must include any scrap from cutting or machining. If the material is not

listed in the table then a receipt for the material must be provided. The cost for making the part will

then be added using the rates from the Operations Cost Table.

5. Fabricated/Manufactured parts do not include design or setup time for your manufacturing, actual

6. Assembly labor is to be cost at $35.00 US per hour. (A) Assembly of a component is to be included in the cost of that component.

(B) Assembly of components into a sub-assembly is to be listed as Sub-System Assembly Time

(D30 on Form A) in the section

that sub-assembly appears.

(C) Assembly of a sub-assembly or assembly onto the vehicle is Vehicle Assembly Labor and

should be included on the summary

sheet in column F.

Component CategoriesEngine: Engine, Choke, Accelerator, Pedal Cables, Fuel Tank, Splash shields, Spill prevention

Transmission: Gearbox, Hydraulic Clutches, Torque Conv., Shift Mechanisms,

Drive Train: Belts, Gears, Chains, Drive Shafts, Bearings, Sprockets, Axles, Chain guards

Steering: Steering Wheel, Bearings, Shafts, Gears, Tie Rods, Bushings

Suspension: A Arms, Spindles, Shock, Rod Ends, Ball Joints

Frame: Structural Members, Roll Cage, Mounts, Firewall, Seat

Body: Outer Covering, Fenders, Skid Plates

Brakes: Mech/Hyd. Components, Pedals, Lines, Fittings, Fluid

Safety Equipment: Guards, Padding, Fire Extinguisher, Safety Harness

Electrical: Kill Switch, Battery, Cables, Wiring, Lights, Etc.

Fasteners: Nuts, Bolts, Rivets, Zip Ties, Etc (don't include fasteners in each subassembly, put the QTY of each various size in the fastener section)

Page 8: 2014_costreporttemplate

Miscellaneous: Transponder, Paint, Trim, Etc

First Event: Tires/Rims, Flotation, and any other items that will be used at that event only

Second Event: Tires/Rims, Flotation, and any other items that will be used at that event only

Third Event: Tires/Rims, Flotation, and any other items that will be used at that event only

Page 9: 2014_costreporttemplate

Fasteners: Nuts, Bolts, Rivets, Zip Ties, Etc (don't include fasteners in each subassembly, put the QTY of each various size in the fastener section)

Page 10: 2014_costreporttemplate

Baja SAE Cost Event Tables

Labor (all other activities) 35.00$ /hour Mild Steel, e.g. 1010, 1025 1.00$ /lb

CNC Machine (time) 70.00$ /hour Alloy Steel, e.g. 4130, ChroMoly 2.00$ /lb

Computer-aided labor (water jet cutting, etc) 70.00$ /hour Aluminum 5.00$ /lb

Welds 0.35$ /in Mag 9.00$ /lb

Saw/Tube Cuts 0.40$ /in Titanium 20.00$ /lb

Tube Bends 0.75$ /bend Non-graphite composites 40.00$ /lb

Non-metallic cutting 0.20$ /in Graphite-based composites 100.00$ /lb

Radiusing tube ends 0.75$ /end Lexan 15.00$ /lb

Drilled holes 0.35$ /hole Brass 10.00$ /lb

Reemed hole 0.35$ /hole Copper 10.00$ /lb

Tapping holes 0.35$ /hole Kevlar 50.00$ /lb

Sheet Metal Shearing 0.20$ /cut Plastic

Sheet Metal Punching 0.20$ /hole Fiberglass

Sheet Metal Bends 0.05$ /bend

Sheet metal stampings (process cost only) 0.05$ /sq in

Sand castings (process cost only) 3.00$ /lb

Die castings (process cost only) 4.00$ /lb

Investment Castings (process cost only) 8.00$ /lb

Thermal forming (process cost only) 4.00$ /lb

Plastic Injection (process cost only) 2.75$ /lb

provide cost documentation from mcmastercarr

provide cost documentation from mcmastercarr

Operations Cost Table Material Cost Table

Page 11: 2014_costreporttemplate

Density

0.284 lb/in³

0.284 lb/in³

0.0975 lb/in³

0.0648 lb/in³

0.160 lb/in³

-

-

0.043 lb/in³

0.316 lb/in³

0.324 lb/in³

0.0524 lb/in³

provide cost documentation from mcmastercarr

provide cost documentation from mcmastercarr

Page 12: 2014_costreporttemplate

ILL TEX KAN

Total Cost

Material Labor Material Labor

1 Engine

2 Transmission

3 Drive Train

4 Steering

5 Suspension

6 Frame

7 Body

8 Brakes

9 Safety Equipment

10 Electrical Equipment

11 Fasteners

12 Miscellaneous

13 ILL Event

14 TEX Event

15 KAN Event

-$ -$ -$ -$ -$

-$ -$ -$ -$ -$

-$ -$ -$ -$ -$

Team Captain: _________________________________ Date: ________________ __________

2014 Baja SAE Cost Adjustment Form

Item

Subassembly Costs

Sect #

Subtotal

Description of change

Sum of

Adj.

KAN Total:

TEX Total:

ILL Total:

Page 13: 2014_costreporttemplate

ILL TEX KAN

Car Number

Total Cost

Material Labor Time(min) Cost Material Labor

1 Engine $0.00 $0.00 $0.00 $0.00 $0.00

2 Transmission $0.00 $0.00 $0.00 $0.00 $0.00

3 Drive Train $0.00 $0.00 $0.00 $0.00 $0.00

4 Steering $0.00 $0.00 $0.00 $0.00 $0.00

5 Suspension $0.00 $0.00 $0.00 $0.00 $0.00

6 Frame $0.00 $0.00 $0.00 $0.00

7 Body $0.00 $0.00 $0.00 $0.00 $0.00

8 Brakes $0.00 $0.00 $0.00 $0.00 $0.00

9 Safety Equipment $0.00 $0.00 $0.00 $0.00 $0.00

10 Electrical Equipment $0.00 $0.00 $0.00 $0.00 $0.00

11 Fasteners $0.00 $0.00 $0.00 $0.00

12 Miscellaneous $0.00 $0.00 $0.00 $0.00 $0.00

13 ILL Event $0.00 $0.00 $0.00 $0.00 $0.00

14 TEX Event $0.00 $0.00 $0.00 $0.00 $0.00

15 KAN Event $0.00 $0.00 $0.00 $0.00 $0.00

ILL Total: -$ -$ -$ -$ -$

TEX Total: -$ -$ -$ -$ -$

KAN Total: -$ -$ -$ -$ -$

Team Captain: Date: __________ Approval:

Revision: 2014 Rev ALevel 1 Summary

Sect #

Subtotal

Vehicle Assembly

Labor

Date: _________

Item Description

Subassembly Costs

2014 Baja SAE Official Costing Sheet

Page 14: 2014_costreporttemplate

Page 14

Sample Subsystem Form A

Item Category Description Pu

rch

ased

Fab

ricate

d

Vendor Qty

Material

Cost

Labor

Cost Exte

nd

ed

Mate

rial C

ost

Lab

or

Co

st

Exte

nd

ed

To

tal

1 Shaft Input Shaft X 1 $3.69 $9.82 $3.69 $9.82 $13.50

2 A-Arm Front Lower A-arm X 4 $1.49 $25.35 $5.95 $101.40 $107.35

3 Bushings Bearings X MSC 6 $12.49 $0.00 $74.94 $0.00 $74.94

4 $0.00 $0.00 $0.00

5 $0.00 $0.00 $0.00

6 $0.00 $0.00 $0.00

7 $0.00 $0.00 $0.00

8 $0.00 $0.00 $0.00

9 $0.00 $0.00 $0.00

10 $0.00 $0.00 $0.00

11 $0.00 $0.00 $0.00

12 $0.00 $0.00 $0.00

13 $0.00 $0.00 $0.00

14 $0.00 $0.00 $0.00

15 $0.00 $0.00 $0.00

16 $0.00 $0.00 $0.00

17 $0.00 $0.00 $0.00

18 $0.00 $0.00 $0.00

19 $0.00 $0.00 $0.00

20 $0.00 $0.00 $0.00

21 $0.00 $0.00 $0.00

22 $0.00 $0.00 $0.00

23 $0.00 $0.00 $0.00

24 $0.00 $0.00 $0.00

25 $0.00 $0.00 $0.00

Subsystem Assembly Time (min) 10 Subsystem Assy Cost $5.83 $5.83

Totals $84.58 $117.05 $195.79

Total: $201.63

Page 15: 2014_costreporttemplate

Engine Subsystem

Form B

page15

Line 1 on Sample Subsytem Form A

Description: Input Shaft

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 Shaft Steel round 0.084 in^3 12 1.01 $0.30 $0.30

2 Key Keystock feet 0.1 0.00 $0.95 $0.10

3 Spacer Aluminum 0.0975 in^3 27 2.63 $1.25 $3.29

Subtotal: $3.69

Labor:

$/Unit Cost

4 0.40$ 1.60

5 0.35$ 0.70

6 0.35$ 0.35

7 35.00$ 3.50

8 75.00$ 2.50

9 35.00$ 1.17

10 0.00

Subtotal: 9.82

Material Total 3.69

Labor Total 9.82

To Form A Line 1 Subassembly Total 13.50

Sample Subsytem Form B

Item

Turn spacer (CNC) 0

holes

hour

Press spacer on shaft 0 hour

Mill slot for key (manual) 0 hour

1

holes

Manufacturing Process Amount Unit

Cut Shaft 4 inch

Center drill shaft 2

Tap end

Page 16: 2014_costreporttemplate

Engine Subsystem

Form B

page16

Line 2 on Sample Subsytem Form A

Description: Front Lower A-arm

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 Tubes 4130 tubing 0.084 in^3 25 2.10 $0.60 $1.26

2 Plug 1018 0.084 in^3 5 0.42 $0.30 $0.13

3 Tabs 4130 sheet 0.084 in^3 2 0.17 $0.60 $0.10

Subtotal: $1.49

Labor:

$/Unit Cost

4 0.40$ 4.00

5 0.40$ 1.60

6 0.70$ 2.10

7 0.75$ 4.50

8 0.35$ 10.50

9 75.00$ 1.25

10 0.35$ 1.40

Subtotal: 25.35

Material Total 1.49

Labor Total 25.35

To Form A Line 2 Subassembly Total 26.84

Item

3 holes

Weld tabs 4

inches

Cut Tubes 10 Inches

6 Qty

Cut Plugs 4 Inches

Drill plug & tap

Manufacturing Process Amount Unit

hours

Radius Tubes

inches

Weld plugs and tubes 30

Cut Tab (CNC) 0.02

Page 17: 2014_costreporttemplate

Engine Subsystem

Form B

page17

Line 3 on Sample Subsytem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 18: 2014_costreporttemplate

Engine Subsystem

Form B

page18

Line 4 on Sample Subsytem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Amount UnitManufacturing Process

Page 19: 2014_costreporttemplate

Page 19

Page 20: 2014_costreporttemplate

Page 20

Engine Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1 Engine X Briggs & Stratton 1 $0.00 $0.00 $0.00

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 21: 2014_costreporttemplate

Engine Subsystem

Form B

page21

Line 1 on Engine Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Engine Subsystem Form B

Item

Manufacturing Process Amount Unit

Page 22: 2014_costreporttemplate

Engine Subsystem

Form B

page22

Line 2 on Engine Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Item

0.10

Manufacturing Process Amount Unit

0.02

Page 23: 2014_costreporttemplate

Engine Subsystem

Form B

page23

Line 3 on Engine Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 24: 2014_costreporttemplate

Engine Subsystem

Form B

page24

Line 4 on Engine Subsystem Form A

Description: To Form A

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 25: 2014_costreporttemplate

Page 25

Transmission Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial C

ost

Lab

or

Co

st

Exte

nd

ed

Mate

rial

Co

st

Exte

nd

ed

Lab

or

Co

st

Exte

nd

ed

To

tal

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 26: 2014_costreporttemplate

Transmission Subsystem

Form B

page26

Line 1 on Transmission Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Transmission Subsystem Form B

Page 27: 2014_costreporttemplate

Transmission Subsystem

Form B

page27

Line 2 on Transmission Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 28: 2014_costreporttemplate

Transmission Subsystem

Form B

page28

Line 3 on Transmission Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Amount UnitManufacturing Process

Page 29: 2014_costreporttemplate

Transmission Subsystem

Form B

page29

Line 4 on Transmission Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 30: 2014_costreporttemplate

Page 30

Drive Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial C

ost

Lab

or

Co

st

Exte

nd

ed

Mate

rial

Co

st

Exte

nd

ed

Lab

or

Co

st

Exte

nd

ed

To

tal

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 31: 2014_costreporttemplate

Drive Subsystem

Form B

page31

Line 1 on Drive Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Drive Subsystem Form B

Page 32: 2014_costreporttemplate

Drive Subsystem

Form B

page32

Line 2 on Drive Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 33: 2014_costreporttemplate

Drive Subsystem

Form B

page33

Line 3 on Drive Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Amount UnitManufacturing Process

Page 34: 2014_costreporttemplate

Drive Subsystem

Form B

page34

Line 4 on Drive Subsystem Form A

Description: To Form A

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 35: 2014_costreporttemplate

Page 35

Steering Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 36: 2014_costreporttemplate

Steering Subsystem

Form B

page36

Line 1 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Steering Subsystem Form B

Page 37: 2014_costreporttemplate

Steering Subsystem

Form B

page37

Line 2 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 38: 2014_costreporttemplate

Steering Subsystem

Form B

page38

Line 3 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Amount UnitManufacturing Process

Page 39: 2014_costreporttemplate

Steering Subsystem

Form B

page39

Line 4 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 40: 2014_costreporttemplate

Steering Subsystem

Form B

page40

Line 5 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 5 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 41: 2014_costreporttemplate

Steering Subsystem

Form B

page41

Line 6 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 6 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 42: 2014_costreporttemplate

Steering Subsystem

Form B

page42

Line 7 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 7 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 43: 2014_costreporttemplate

Steering Subsystem

Form B

page43

Line 8 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 8 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 44: 2014_costreporttemplate

Steering Subsystem

Form B

page44

Line 9 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 9 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 45: 2014_costreporttemplate

Steering Subsystem

Form B

page45

Line 10 on Steering Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 10 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 46: 2014_costreporttemplate

Page 46

Suspension Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 47: 2014_costreporttemplate

Suspension Subsystem

Form B

page47

Line 1 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Steering Subsystem Form B

Manufacturing Process Amount Unit

Page 48: 2014_costreporttemplate

Suspension Subsystem

Form B

page48

Line 2 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 49: 2014_costreporttemplate

Suspension Subsystem

Form B

page49

Line 3 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 50: 2014_costreporttemplate

Suspension Subsystem

Form B

page50

Line 4 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 51: 2014_costreporttemplate

Suspension Subsystem

Form B

page51

Line 5 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 5 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 52: 2014_costreporttemplate

Suspension Subsystem

Form B

page52

Line 6 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 6 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 53: 2014_costreporttemplate

Suspension Subsystem

Form B

page53

Line 7 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 7 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 54: 2014_costreporttemplate

Suspension Subsystem

Form B

page54

Line 8 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 8 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 55: 2014_costreporttemplate

Suspension Subsystem

Form B

page55

Line 9 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 9 Subassembly Total 0.00

UnitManufacturing Process Amount

Item

Page 56: 2014_costreporttemplate

Suspension Subsystem

Form B

page56

Line 10 on Suspension Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 10 Subassembly Total 0.00

Unit

Item

Manufacturing Process Amount

Page 57: 2014_costreporttemplate

Page 57

Frame Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1 Complete Roll Cage X 1 $0.00 $0.00 $0.00 $0.00 $0.00

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 58: 2014_costreporttemplate

Frame Subsystem

Form B

page58

Line 1 on Frame Subsystem Form A

Description: Completed Roll Cage Tubes Only

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

4 0.00 $0.00

5 0.00 $0.00

6 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.35$ 0.00

5 0.40$ 0.00

6 0.40$ 0.00

7 0.75$ 0.00

8 0.75$ 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Frame Subsystem Form B

Inches

Inches

Manufacturing Process Amount Unit

Inches

Welding

Tube Cuts

Saw Cuts (cut to length)

Tube Bends Bends

Radiusing tube ends Ends

Page 59: 2014_costreporttemplate

Frame Subsystem

Form B

page59

Line 2 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 60: 2014_costreporttemplate

Frame Subsystem

Form B

page60

Line 3 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 61: 2014_costreporttemplate

Frame Subsystem

Form B

page61

Line 4 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 62: 2014_costreporttemplate

Frame Subsystem

Form B

page62

Line 5 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 5 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 63: 2014_costreporttemplate

Frame Subsystem

Form B

page63

Line 6 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 6 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 64: 2014_costreporttemplate

Frame Subsystem

Form B

page64

Line 7 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

Manufacturing Process Amount Unit $/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 7 Subassembly Total 0.00

Item

Page 65: 2014_costreporttemplate

Frame Subsystem

Form B

page65

Line 8 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

Manufacturing Process Amount Unit $/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 8 Subassembly Total 0.00

Item

Page 66: 2014_costreporttemplate

Frame Subsystem

Form B

page66

Line 9 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

Manufacturing Process Amount Unit $/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 9 Subassembly Total 0.00

Item

Page 67: 2014_costreporttemplate

Frame Subsystem

Form B

page67

Line 10 on Frame Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

Manufacturing Process Amount Unit $/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 10 Subassembly Total 0.00

Item

Page 68: 2014_costreporttemplate

Page 68

Body Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 69: 2014_costreporttemplate

Body Subsystem

Form B

page69

Line 1 on Body Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Amount Unit

Body Subsystem Form B

Item

Manufacturing Process

Page 70: 2014_costreporttemplate

Body Subsystem

Form B

page70

Line 2 on Body Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 71: 2014_costreporttemplate

Body Subsystem

Form B

page71

Line 3 on Body Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 72: 2014_costreporttemplate

Body Subsystem

Form B

page72

Line 4 on Body Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Amount UnitManufacturing Process

Page 73: 2014_costreporttemplate

Page 73

Brakes Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 74: 2014_costreporttemplate

Brakes Subsystem

Form B

page74

Line 1 on Brakes Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Amount Unit

Brakes Subsystem Form B

Item

Manufacturing Process

Page 75: 2014_costreporttemplate

Brakes Subsystem

Form B

page75

Line 2 on Brakes Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 76: 2014_costreporttemplate

Brakes Subsystem

Form B

page76

Line 3 on Brakes Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 77: 2014_costreporttemplate

Brakes Subsystem

Form B

page77

Line 4 on Brakes Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 78: 2014_costreporttemplate

Page 78

Safety Equipment Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 79: 2014_costreporttemplate

Safety Equipment Subsystem

Form B

page79

Line 1 on Safety Equipment Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Amount Unit

Safety Equipment Subsystem Form B

Item

Manufacturing Process

Page 80: 2014_costreporttemplate

Safety Equipment Subsystem

Form B

page80

Line 2 on Safety Equipment Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 81: 2014_costreporttemplate

Safety Equipment Subsystem

Form B

page81

Line 3 on Safety Equipment Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 82: 2014_costreporttemplate

Safety Equipment Subsystem

Form B

page82

Line 4 on Safety Equipment Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 83: 2014_costreporttemplate

Page 83

Electrical Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 84: 2014_costreporttemplate

Electrical Subsystem

Form B

page84

Line 1 on Electrical Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Amount Unit

Electrical Subsystem Form B

Item

Manufacturing Process

Page 85: 2014_costreporttemplate

Electrical Subsystem

Form B

page85

Line 2 on Electrical Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 86: 2014_costreporttemplate

Electrical Subsystem

Form B

page86

Line 3 on Electrical Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 87: 2014_costreporttemplate

Electrical Subsystem

Form B

page87

Line 4 on Electrical Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 88: 2014_costreporttemplate

Page 88

Fasteners Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 89: 2014_costreporttemplate

Page 89

Miscellaneous Items Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 90: 2014_costreporttemplate

Miscellanous Items

Form B

page90

Line 1 on Miscellanous Items Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Amount Unit

Miscellanous Items Form B

Item

Manufacturing Process

Page 91: 2014_costreporttemplate

Miscellanous Items

Form B

page91

Line 2 on Miscellanous Items Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 92: 2014_costreporttemplate

Miscellanous Items

Form B

page92

Line 3 on Miscellanous Items Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 93: 2014_costreporttemplate

Miscellanous Items

Form B

page93

Line 4 on Miscellanous Items Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 94: 2014_costreporttemplate

Page 94

ILL Event Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 95: 2014_costreporttemplate

TEN Event Subsystem

Form B

page95

Line 1 on ILL Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

First Event Subsystem Form B

Page 96: 2014_costreporttemplate

TEN Event Subsystem

Form B

page96

Line 2 on ILL Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 97: 2014_costreporttemplate

TEN Event Subsystem

Form B

page97

Line 3 on ILL Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Amount UnitManufacturing Process

Page 98: 2014_costreporttemplate

TEN Event Subsystem

Form B

page98

Line 4 on ILL Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 99: 2014_costreporttemplate

Page 99

TEX Event Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 100: 2014_costreporttemplate

WAS Event Subsystem

Form B

page100

Line 1 on TEX Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Second Event Subsystem Form B

Manufacturing Process Amount Unit

Page 101: 2014_costreporttemplate

WAS Event Subsystem

Form B

page101

Line 2 on TEX Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 102: 2014_costreporttemplate

WAS Event Subsystem

Form B

page102

Line 3 on TEX Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 103: 2014_costreporttemplate

WAS Event Subsystem

Form B

page103

Line 4 on TEX Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Page 104: 2014_costreporttemplate

Page 104

KAN Event Subsystem Form AIt

em

Cate

go

ry

Descri

pti

on

Pu

rch

ased

Fab

ricate

d

Ven

do

r

Qu

an

tity

Mate

rial

Co

st

Lab

or

Co

st

Exte

nd

ed

M

ate

rial

Co

st

Exte

nd

ed

L

ab

or

Co

st

Exte

nd

ed

T

ota

l

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

Subsystem Assembly Time (min) 0 Subsystem Assy Cost $0.00 $0.00

Totals $0.00 $0.00 $0.00

Total: $0.00

Page 105: 2014_costreporttemplate

ROC Event Subsystem

Form B

page105

Line 1 on KAN Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 1 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit

Third Event Subsystem Form B

Page 106: 2014_costreporttemplate

ROC Event Subsystem

Form B

page106

Line 2 on KAN Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 2 Subassembly Total 0.00

Manufacturing Process Amount Unit

Item

Page 107: 2014_costreporttemplate

ROC Event Subsystem

Form B

page107

Line 3 on KAN Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 3 Subassembly Total 0.00

Item

Amount UnitManufacturing Process

Page 108: 2014_costreporttemplate

ROC Event Subsystem

Form B

page108

Line 4 on KAN Event Subsystem Form A

Description:

Material:

Part Name Material Density Unit Amount Weight $/Unit Cost

1 0.00 $0.00

2 0.00 $0.00

3 0.00 $0.00

Subtotal: $0.00

Labor:

$/Unit Cost

4 0.00

5 0.00

6 0.00

7 0.00

8 0.00

9 0.00

10 0.00

Subtotal: 0.00

Material Total 0.00

Labor Total 0.00

To Form A Line 4 Subassembly Total 0.00

Item

Manufacturing Process Amount Unit