20140725 - Completion Dates of Core and Shell Packages

Embed Size (px)

Citation preview

  • 7/25/2019 20140725 - Completion Dates of Core and Shell Packages.

    1/1

    MilestoneDates Remarks MilestoneDates Remarks

    AboveTerraceFloor 30Apr15 30Apr15

    11monthsfromWO

    Date

    11monthsfromWO

    Date

    12th

    Slab TerraceFloor

    11th

    Slab EighthFloor

    10th

    Slab Seventh

    Floor

    28

    Feb

    15 31

    Mar

    15

    09monthsfromWO

    Date

    10monthsfromWO

    Date

    9th

    Slab SixthFloor

    8th

    Slab FifthFloor

    7th

    Slab FourthFloor

    6th

    Slab ThirdFloor

    5th

    Slab SecondFloor

    4th

    Slab FirstFloor 30Nov14 31Jan15

    06monthsfromWO

    Date

    08monthsfromWO

    Date

    3rd

    Slab MezzFloorSlab

    2nd

    Slab GroundFloorSlab

    01st

    Slab Lower

    Ground

    Floor

    Slab 30

    Sep

    14 30

    Nov

    14

    04monthsfromWO

    Date

    06monthsfromWO

    Date

    BasementFloorWorks

    AwardofWorks/Workorderdates 1Jun14 1Jun14

    Rightnow

    we

    are

    half

    way

    throught

    the

    basement

    Works.ATCLtocommentwhyitwilltake4

    monthstocompletebalancebasementworksand

    oneSlab(LowerGroundFloor)?

    ATCLtocommenthow6slabswillbecompleted

    injusttwomonths?

    ATCLtocommenthow2slabsandwholeofabove

    terraceworkswillbecompletedinjustone

    month?

    Floor

    Details

    Slab

    details

    .TAJGATEWAYKOCHI CORE&SHELLPACKAGECOMPLETIONDATES.

    Proposed

    by

    MPG

    ConcreteCompletionDates

    Requirement

    of

    ATCL

    Rightnowwearehalfwaythroughtthebasement

    Works.Itwilltake2monthstocompletethebalance

    basementworksandSlabofLowerGroundFloor.

    Considering thebaseslabcycleas15days,thesame

    needstobecompletedby15Nov2014butdueto

    extraworksinthemezzfloorofexistingblocktime

    periodisincreasedby15days.

    Considering thebaseslabcycleas15days,itwill

    take3monthstocomplete6slabs.

    Considering thebaseslabcycleas15days,itwill

    take1monthtocomplete2slabsandonemonthfor

    theSHR,LMRsandwatertanks.