49
2014 Sector Baltimore Workshops Navigation Systems Tim Pannone Tim Pannone ADSO-NS (SBA) D5SR ADSO-NS (SBA) D5SR WELCOME WELCOME

2014 Sector Baltimore Workshops Navigation Systems

  • Upload
    lieu

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

2014 Sector Baltimore Workshops Navigation Systems. WELCOME. Tim Pannone ADSO-NS (SBA) D5SR. What’s New in the NS Program for 2014. D5 Adopts Aux 7054 and 7055 Forms New National ATON Training Guide. What are we focusing on from 2013. Navigation Systems Forms - PowerPoint PPT Presentation

Citation preview

Page 1: 2014 Sector Baltimore Workshops Navigation Systems

2014 Sector Baltimore Workshops

Navigation Systems

2014 Sector Baltimore Workshops

Navigation Systems

Tim PannoneTim PannoneADSO-NS (SBA) D5SRADSO-NS (SBA) D5SR

WELCOMEWELCOMEWELCOMEWELCOME

Page 2: 2014 Sector Baltimore Workshops Navigation Systems

What’s New in the NS Program for What’s New in the NS Program for 20142014

D5 Adopts Aux 7054 and 7055 FormsD5 Adopts Aux 7054 and 7055 Forms

New National ATON Training GuideNew National ATON Training Guide

Page 3: 2014 Sector Baltimore Workshops Navigation Systems

What are we focusing on from 2013What are we focusing on from 2013

• Navigation Systems FormsNavigation Systems Forms

• Form Submission RequirementsForm Submission Requirements

• Sector Reporting RequirementsSector Reporting Requirements

• D5SR Policy RequirementsD5SR Policy Requirements

• Aids Verifier PQSAids Verifier PQS

Page 4: 2014 Sector Baltimore Workshops Navigation Systems

Navigation Systems FormsNavigation Systems Forms

Page 5: 2014 Sector Baltimore Workshops Navigation Systems

Navigation Systems FormsNavigation Systems Formshttp://www.uscg.mil/d5/waterways/PATON.asp

• D5-7054 P-ATON ReportD5-7054 P-ATON Report

Page 6: 2014 Sector Baltimore Workshops Navigation Systems
Page 7: 2014 Sector Baltimore Workshops Navigation Systems

Navigation Systems FormsNavigation Systems Formshttp://www.uscg.mil/d5/waterways/PATON.asp

• D5-7054 P-ATON ReportD5-7054 P-ATON Report

• D5-7055 Bridge ReportD5-7055 Bridge Report

Page 8: 2014 Sector Baltimore Workshops Navigation Systems
Page 9: 2014 Sector Baltimore Workshops Navigation Systems

Navigation Systems FormsNavigation Systems Formshttp://www.uscg.mil/d5/waterways/PATON.asp

• D5-7054 P-ATON ReportD5-7054 P-ATON Report

• D5-7055 Bridge ReportD5-7055 Bridge Report

http://wow.uscgaux.info/content.php?unit=P-http://wow.uscgaux.info/content.php?unit=P-DEPT&category=ns-forms-and-manualsDEPT&category=ns-forms-and-manuals

• NOAA 77-5a Chart Update ReportNOAA 77-5a Chart Update Report

Page 10: 2014 Sector Baltimore Workshops Navigation Systems
Page 11: 2014 Sector Baltimore Workshops Navigation Systems

Navigation Systems FormsNavigation Systems Formshttp://www.uscg.mil/d5/waterways/PATON.asphttp://www.uscg.mil/d5/waterways/PATON.asp

• D5-7054 P-ATON ReportD5-7054 P-ATON Report

• D5-7055 Bridge ReportD5-7055 Bridge Report

http://wow.uscgaux.info/content.php?unit=P-http://wow.uscgaux.info/content.php?unit=P-DEPT&category=ns-forms-and-manualsDEPT&category=ns-forms-and-manuals

• NOAA 77-5a Chart Update ReportNOAA 77-5a Chart Update Report

• NOAA 77-5a Supplemental FormsNOAA 77-5a Supplemental Forms

Page 12: 2014 Sector Baltimore Workshops Navigation Systems
Page 13: 2014 Sector Baltimore Workshops Navigation Systems
Page 14: 2014 Sector Baltimore Workshops Navigation Systems
Page 15: 2014 Sector Baltimore Workshops Navigation Systems

Form Submission RequirementsForm Submission Requirements

CGDFIVEINST 16790.DCGDFIVEINST 16790.D12.B.1.a. 12.B.1.a. Private Aids to Navigation (PATON) VerificationPrivate Aids to Navigation (PATON) Verification

(3) NS-7054 reporting requirements:(3) NS-7054 reporting requirements:(a) When possible, (a) When possible, NS-7054 discrepancy reportsNS-7054 discrepancy reports for ATONs for ATONs and PATONs will be submitted to the Auxiliary NS chain within and PATONs will be submitted to the Auxiliary NS chain within 48 hours of the observation.48 hours of the observation.(b) (b) NS-7054 verification reportsNS-7054 verification reports for PATONs will be for PATONs will be submitted to the Auxiliary NS chain within 14 days of the submitted to the Auxiliary NS chain within 14 days of the observation.observation.(c) Verification of federal ATONs is not performed without the (c) Verification of federal ATONs is not performed without the express authorization of proper active duty Coast Guard express authorization of proper active duty Coast Guard authorities. NS-7054 verification reports for federalauthorities. NS-7054 verification reports for federalATONs must contain the name of the active-duty Coast Guard ATONs must contain the name of the active-duty Coast Guard person requesting the verification.person requesting the verification.

Page 16: 2014 Sector Baltimore Workshops Navigation Systems

Form Submission RequirementsForm Submission Requirements

CGDFIVEINST 16790.DCGDFIVEINST 16790.D12.B.1.c. 12.B.1.c. Bridge Administration Program SupportBridge Administration Program Support

(3) NS-7055 reporting requirements:(3) NS-7055 reporting requirements:(a) When possible, (a) When possible, NS-7055 discrepancy reportsNS-7055 discrepancy reports for bridges for bridges will be submitted to the Auxiliary NS chain within 48 hours of will be submitted to the Auxiliary NS chain within 48 hours of the observation.the observation.(b) Verification of bridges is not performed without the express (b) Verification of bridges is not performed without the express authorization of proper active duty Coast Guard authorities. authorization of proper active duty Coast Guard authorities. NS-7055 verification reports for bridges must contain the name NS-7055 verification reports for bridges must contain the name of the active-duty Coast Guard person requesting the of the active-duty Coast Guard person requesting the verification.verification.

Page 17: 2014 Sector Baltimore Workshops Navigation Systems

Form Submission RequirementsForm Submission Requirements

Since forms are now to be submitted electronically and in order Since forms are now to be submitted electronically and in order to speed up the notification process, forms are submitted to the to speed up the notification process, forms are submitted to the FSO, SO, ADSO and DSO-NS FSO, SO, ADSO and DSO-NS at the same timeat the same time. The . The submitter will also send the D5-7054 report to the appropriate submitter will also send the D5-7054 report to the appropriate Coast Guard ANT.Coast Guard ANT.

NS-7055 bridge discrepancy reports NS-7055 bridge discrepancy reports do notdo not get sent to the get sent to the Coast Guard ANT. The DSO-NS sends them directly to Coast Guard ANT. The DSO-NS sends them directly to D5(dpb) for action.D5(dpb) for action.

Page 18: 2014 Sector Baltimore Workshops Navigation Systems

Sector Reporting RequirementsSector Reporting Requirements

OLD – The practice while on patrol is to radio or telephone the OLD – The practice while on patrol is to radio or telephone the controlling CG Station or ANT (if weekday) to report a critical or controlling CG Station or ANT (if weekday) to report a critical or urgent ATON or PATON discrepancy. Routine PATON urgent ATON or PATON discrepancy. Routine PATON discrepancies are reported to the ANT by emaildiscrepancies are reported to the ANT by email.

CURRENT - The goal of the CG is to notify the boating public CURRENT - The goal of the CG is to notify the boating public of discrepancies in the aids to navigation system as quickly as of discrepancies in the aids to navigation system as quickly as possible. possible. When on patrol, notify the Sector Command Center When on patrol, notify the Sector Command Center (SCC) via radio or telephone to report any ATON or PATON (SCC) via radio or telephone to report any ATON or PATON discrepancy.discrepancy. SCC personnel will generate the discrepancy SCC personnel will generate the discrepancy message and the Broadcast Notice to Mariners. Follow-up message and the Broadcast Notice to Mariners. Follow-up with NS-7054 reports in accordance with published policy.with NS-7054 reports in accordance with published policy.

Page 19: 2014 Sector Baltimore Workshops Navigation Systems

Sector Reporting RequirementsSector Reporting Requirements

Notifications can also be made to SCC via email after returning Notifications can also be made to SCC via email after returning home from patrol.home from patrol.

The notification email message should include:The notification email message should include:1.1. Name of ATON or PATON.  Use the Light List for the proper name Name of ATON or PATON.  Use the Light List for the proper name

including the body of water.  Example:  South River Daybeacon 4including the body of water.  Example:  South River Daybeacon 42.2. If a PATON, identify it as a "Private Aid to Navigation"If a PATON, identify it as a "Private Aid to Navigation"3.3. Light List Number (LLNR).  If it is a Class III PATON that has no Light List Number (LLNR).  If it is a Class III PATON that has no

LLNR, use the Legacy Aid Number from the PATON list.LLNR, use the Legacy Aid Number from the PATON list.4.4. Description of the discrepancy.Description of the discrepancy.5.5. Date and time of observation.Date and time of observation.6.6. Your name and telephone number so someone can contact you for Your name and telephone number so someone can contact you for

additional information if necessaryadditional information if necessary..

SCC email address: SCC email address: [email protected]@uscg.mil

Page 20: 2014 Sector Baltimore Workshops Navigation Systems
Page 21: 2014 Sector Baltimore Workshops Navigation Systems
Page 22: 2014 Sector Baltimore Workshops Navigation Systems

Sector Reporting RequirementsSector Reporting Requirements

Make yourselves aware of any ATON and PATON Make yourselves aware of any ATON and PATON discrepancies for your patrol area using the current Local discrepancies for your patrol area using the current Local Notice to Mariners (LNM) Notice to Mariners (LNM) beforebefore getting underway. Do not getting underway. Do not notify SCC about a discrepancy that is already listed in the notify SCC about a discrepancy that is already listed in the LNMLNM

Page 23: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

Page 24: 2014 Sector Baltimore Workshops Navigation Systems
Page 25: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

Page 26: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.B.1.a. 12.B.1.a. Private Aids to Navigation (PATON) VerificationPrivate Aids to Navigation (PATON) Verification

(2) When engaged in PATON verification:(2) When engaged in PATON verification:(d) AVs must be under orders operating at the request of the (d) AVs must be under orders operating at the request of the Local Coast Guard ATON unit.Local Coast Guard ATON unit.

DIRAUX has determined that the annual PATON list provided DIRAUX has determined that the annual PATON list provided to the Auxiliary by D5(dpw) constitutes Assignment to Duty to the Auxiliary by D5(dpw) constitutes Assignment to Duty authority for NS staff officers to assign AVs to perform PATON authority for NS staff officers to assign AVs to perform PATON verifications.verifications.

Page 27: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.A.3.b. 12.A.3.b. Individual/Unit NS Mission Codes.Individual/Unit NS Mission Codes.

(1) Code 30 – Federal ATON Missions: Verification upon (1) Code 30 – Federal ATON Missions: Verification upon request, discrepancy reporting, & NE Technician activity.request, discrepancy reporting, & NE Technician activity.

(2) Code 31 – Private ATON Missions: Verification by Aids (2) Code 31 – Private ATON Missions: Verification by Aids Verifiers upon request, and discrepancy reporting.Verifiers upon request, and discrepancy reporting.

(3) Code 32 – Bridge Administration: Observing and reporting (3) Code 32 – Bridge Administration: Observing and reporting bridge discrepancies.bridge discrepancies.

(4) Code 41 – Federal Support Missions: Operational and non-(4) Code 41 – Federal Support Missions: Operational and non-operational support to other federal agencies requested and operational support to other federal agencies requested and authorized by the Coast Guard (Not NS specific).authorized by the Coast Guard (Not NS specific).

Page 28: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.A.3.b. 12.A.3.b. Boat NS Mission Codes.Boat NS Mission Codes.

(1) Code 01A – Most used code. Code covers all missions (1) Code 01A – Most used code. Code covers all missions except SAR and regatta patrols.except SAR and regatta patrols.

(2) Code 03 – Code covers ANT request to perform federal (2) Code 03 – Code covers ANT request to perform federal ATON verifications. It is primarily used for post-storm ATON verifications. It is primarily used for post-storm verifications. It also covers District assigned PATON verifications. It also covers District assigned PATON verificationsverifications

Page 29: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.A.3.d. 12.A.3.d. AV patrol reporting requirements:AV patrol reporting requirements:

(1) Aids Verifiers report NS activity during a patrol on a second (1) Aids Verifiers report NS activity during a patrol on a second ANSC-7030 checking Individual/Unit as the type of resource.ANSC-7030 checking Individual/Unit as the type of resource.

(2) Following National Auxiliary guidelines, Aids Verifiers are (2) Following National Auxiliary guidelines, Aids Verifiers are allowed one hour for the completion of NS-7054 and NS-7055 allowed one hour for the completion of NS-7054 and NS-7055 forms. The underway time for the patrol is covered on the forms. The underway time for the patrol is covered on the coxswain’s ANSC-7030 form.coxswain’s ANSC-7030 form.

(3) A combination of mission codes 30, 31, 32, and 41 may be (3) A combination of mission codes 30, 31, 32, and 41 may be reported on the ANSC-7030 not to exceed one hour in reported on the ANSC-7030 not to exceed one hour in duration.duration.

Page 30: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.A.3.e. 12.A.3.e. Member Activity Reporting (ANSC-7029)Member Activity Reporting (ANSC-7029)

(1) From the ANSC-7030 Mission Activity form, hours in excess (1) From the ANSC-7030 Mission Activity form, hours in excess of one hour for mission codes 30, 31, and 32 are reported on of one hour for mission codes 30, 31, and 32 are reported on the ANSC-7029 Member Activity form using mission code 99B the ANSC-7029 Member Activity form using mission code 99B for Recreational Boating Safety (RBS) Support. Hours in for Recreational Boating Safety (RBS) Support. Hours in excess of one hour for mission code 41 are reported on the excess of one hour for mission code 41 are reported on the ANSC-7029 Member Activity form using code 99E for ANSC-7029 Member Activity form using code 99E for Administrative/Logistical Support.Administrative/Logistical Support.

Page 31: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.A.3.e. 12.A.3.e. Member Activity Reporting (ANSC-7029) (cont.)Member Activity Reporting (ANSC-7029) (cont.)

(2) Any other reportable NS activity that cannot be categorized (2) Any other reportable NS activity that cannot be categorized as mission code 30, 31, or 32 is reported on the ANSC-7029 as mission code 30, 31, or 32 is reported on the ANSC-7029 under mission code 99B. Any other reportable activity under mission code 99B. Any other reportable activity performed for NOAA or other federal agency that cannot be performed for NOAA or other federal agency that cannot be categorized as mission code 41 is reported on the ANSC -7029 categorized as mission code 41 is reported on the ANSC -7029 under mission code 99E.under mission code 99E.

Page 32: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.C.1.c. 12.C.1.c. Aids Verifier Qualification MaintenanceAids Verifier Qualification Maintenance

Aids Verifier qualification maintenance requires each Aids Aids Verifier qualification maintenance requires each Aids Verifier, annually, to complete at least one acceptable Aids to Verifier, annually, to complete at least one acceptable Aids to Navigation Report, form NS-7054. It is recommended that at Navigation Report, form NS-7054. It is recommended that at least one acceptable night time PATON report and one least one acceptable night time PATON report and one acceptable bridge discrepancy report (NS-7055) also be acceptable bridge discrepancy report (NS-7055) also be accomplished. Attendance at an NS workshop at the flotilla, accomplished. Attendance at an NS workshop at the flotilla, division, sector, or district level, or an Aids Verifier class as a division, sector, or district level, or an Aids Verifier class as a refresher will be completed when provided.refresher will be completed when provided.

Page 33: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.C.1.d. 12.C.1.d. Qualification Loss and Re-qualificationQualification Loss and Re-qualification

Reports not completed in a given year will be added to the Reports not completed in a given year will be added to the requirement for the next year. Failure to complete the total requirement for the next year. Failure to complete the total reports required in two consecutive years will result in loss of reports required in two consecutive years will result in loss of the Aids Verifier qualification. Requalification will require the Aids Verifier qualification. Requalification will require successful completion of Aids Verifier qualification process successful completion of Aids Verifier qualification process stipulated in paragraph 12.C.1.b., above. The DSO-NS is stipulated in paragraph 12.C.1.b., above. The DSO-NS is responsible for maintaining appropriate records to determine responsible for maintaining appropriate records to determine an AV’s qualification status and will report to the Director when an AV’s qualification status and will report to the Director when an AV fails to maintain qualification.an AV fails to maintain qualification.

Page 34: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.C.1.d. 12.C.1.d. Qualification Loss and Re-qualificationQualification Loss and Re-qualification

Reports not completed in a given year will be added to the Reports not completed in a given year will be added to the requirement for the next year. Failure to complete the total requirement for the next year. Failure to complete the total reports required in two consecutive years will result in loss of reports required in two consecutive years will result in loss of the Aids Verifier qualification. Requalification will require the Aids Verifier qualification. Requalification will require successful completion of Aids Verifier qualification process successful completion of Aids Verifier qualification process stipulated in paragraph 12.C.1.b., above. The DSO-NS is stipulated in paragraph 12.C.1.b., above. The DSO-NS is responsible for maintaining appropriate records to determine responsible for maintaining appropriate records to determine an AV’s qualification status and will report to the Director when an AV’s qualification status and will report to the Director when an AV fails to maintain qualification.an AV fails to maintain qualification.

In other words, once in REYR, the member retakes the 8-hour In other words, once in REYR, the member retakes the 8-hour AV Training class and completes the AV PQS.AV Training class and completes the AV PQS.

Page 35: 2014 Sector Baltimore Workshops Navigation Systems

D5SR Policy RequirementsD5SR Policy Requirements

12.C.1.e. 12.C.1.e. Certification LossCertification Loss

Failure to complete the requalification requirements after two Failure to complete the requalification requirements after two years will result in loss of AV certification. The DSO-NS will years will result in loss of AV certification. The DSO-NS will monitor and report the AV certification status to the Director.monitor and report the AV certification status to the Director.

Page 36: 2014 Sector Baltimore Workshops Navigation Systems

Aids Verifier PQSAids Verifier PQS

The Auxiliary Aids to Navigation Verifier Performance The Auxiliary Aids to Navigation Verifier Performance Qualification Standard (PQS) was approved on 14 Jul 2011.Qualification Standard (PQS) was approved on 14 Jul 2011.

http://wow.uscgaux.info/content.php?unit=P-http://wow.uscgaux.info/content.php?unit=P-DEPT&category=aids-verifier-pqsDEPT&category=aids-verifier-pqs

http://pdept.cgaux.org/Documents/Active/NS/Master_NShttp://pdept.cgaux.org/Documents/Active/NS/Master_NS%20Aid_Verifier_PQS_14JULY2011.pdf%20Aid_Verifier_PQS_14JULY2011.pdf

Page 37: 2014 Sector Baltimore Workshops Navigation Systems
Page 38: 2014 Sector Baltimore Workshops Navigation Systems
Page 39: 2014 Sector Baltimore Workshops Navigation Systems
Page 40: 2014 Sector Baltimore Workshops Navigation Systems
Page 41: 2014 Sector Baltimore Workshops Navigation Systems

Aids Verifier PQSAids Verifier PQS

CGDFIVEINST 16790.D Chapter 12.C.2.a. CGDFIVEINST 16790.D Chapter 12.C.2.a. Aids Verifier Aids Verifier Examiner - General.Examiner - General.

Aids Verifier classes and task sign-offs are conducted by Aids Aids Verifier classes and task sign-offs are conducted by Aids Verifier Examiners. Aids Verifier Examiners (AVE) are Verifier Examiners. Aids Verifier Examiners (AVE) are appointed via letter by the Director. AVEs may also serve as appointed via letter by the Director. AVEs may also serve as Verifying Officers (VO) for administering PQS in the NS Verifying Officers (VO) for administering PQS in the NS program. Designation as VOs is managed by the DSO-NS.program. Designation as VOs is managed by the DSO-NS.The DSO-NS shall manage an authorized listing of all The DSO-NS shall manage an authorized listing of all AVE/VOs for the various NS qualifications.AVE/VOs for the various NS qualifications.

We need Verifying Officers in Sector Baltimore to sign-off PQS We need Verifying Officers in Sector Baltimore to sign-off PQS tasks.tasks.

Page 42: 2014 Sector Baltimore Workshops Navigation Systems

New in the NS Program for New in the NS Program for 20142014

Page 43: 2014 Sector Baltimore Workshops Navigation Systems

Auxiliary National Short Range Aids Auxiliary National Short Range Aids to Navigation Training Guideto Navigation Training Guide

http://wow.uscgaux.info/content.php?unit=P-http://wow.uscgaux.info/content.php?unit=P-DEPT&category=ns-forms-and-manualsDEPT&category=ns-forms-and-manuals

• Revision date: 29 Oct 2013 Promulgation date: 19 Dec 2013 Revision date: 29 Oct 2013 Promulgation date: 19 Dec 2013 • Used in conjunction with the AV PQSUsed in conjunction with the AV PQS• Full of color photographs and diagramsFull of color photographs and diagrams• Focus on using electronic tools such as GPS (i.e. no sextant)Focus on using electronic tools such as GPS (i.e. no sextant)• Contains 33 CFR Part 66 – Private Aids to NavigationContains 33 CFR Part 66 – Private Aids to Navigation

Page 44: 2014 Sector Baltimore Workshops Navigation Systems
Page 45: 2014 Sector Baltimore Workshops Navigation Systems
Page 46: 2014 Sector Baltimore Workshops Navigation Systems
Page 47: 2014 Sector Baltimore Workshops Navigation Systems
Page 48: 2014 Sector Baltimore Workshops Navigation Systems
Page 49: 2014 Sector Baltimore Workshops Navigation Systems

2014 Sector Baltimore 2014 Sector Baltimore WorkshopsWorkshops

Navigation SystemsNavigation Systems

2014 Sector Baltimore 2014 Sector Baltimore WorkshopsWorkshops

Navigation SystemsNavigation Systems

QuestionsQuestions??

QuestionsQuestions??