23
2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459- 4791

2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

Embed Size (px)

Citation preview

Page 1: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

2014 NCR Construction Conference Materials Presentation

John Brophy 715-493-3085Jeff Michalski 715-459-4791

Page 2: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

(Materials) Finals Review• Finals process, 6 months start

to substantially complete.• After conditional final

acceptance the project staff has 60 calendar days to compile materials records for review.

• Materials section has 30 calendar days to review.

• Project engineer and materials section have 15 days to resolve any materials issues and to sign DT1310 form.

Page 3: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

(Materials) Finals Review

• 30 / 60 / final materials review.

• Materials Reporting System – 905’s

• QMP summaries – 155’s Pantry Software

Page 4: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

(Materials) Finals Review• Regional Certification of Materials (DT1310). • 1) PL forwards final materials records to Jeff Michalski / John • Brophy for initial review. Included is the DT1310 signed• and dated by the PL. _____________________• • 2) Upon completion of initial review the PL will correct exceptions• (if needed), sign the revised DT1310 and resubmit final materials• records to Jeff Michalski / John Brophy for final review.

_____________________• • 3) Upon concurrence of the disposition -- Jeff Michalski / • John Brophy signs the DT1310. _____________________• • 4) PM gives final approval by signing DT1310. _____________________• (This date tracked on Finals Tracking Report.)•

Page 5: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

IA Reviews

• Independent Assurance (IA) is unbiased testing and review of DOT, consultant, and contractor personnel who sample and test on our DOT projects.

• IA goals is review 90% of the samplers and testers on our projects.

Page 6: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

IA Reviews

• If a QV technician samples or tests on your project we would conduct an IA review.

• We will check with PE and MTS through out the project to meet compliance.

Page 7: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

IA Reviews

• Problem areas (past)• QV testing on small

bridge projects.• Last minute QV base

course samples.

Page 8: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

IA Reviews

• QC testers (contractors)• Coordination between

offices.• Help from project staff.

Page 9: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

Alkali-Silica Reactivity

• Marathon County• Quarries containing –

rhyolite, diorite, gniess, and quartzite.

• Hanz, 3M, and Weisenberger Quarries.

Page 10: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

Alkali-Silica Reactivity

• A process in which silica in the presence of moisture, is broken down by alkalis produces an expansive gel.

• The expanding gel creates internal forces that causes the concrete to crack.

Page 11: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

Alkali-Silica Reactivity

• Concrete coarse aggregate needs to meet ASTM C1260 (every 3 years).

• Special Provision for 2014 –

• Spec Book in 2015.

Page 12: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

Alkali-Silica Reactivity

• If fails…• 1. Use 35% slag grade

120.• 2. Class “F” fly ash• 3. Mix specific test

ASTM C1567 (every 3 years).

• Cement / fly ash • Blend (percentages) and

sources.

Page 13: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

Alkali-Silica Reactivity

• Weisenberger Quarry has two approved C1567 mixes (County Materials – Marathon City and Rothschild plants).

Page 14: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

QMP Base Compaction

• Criteria: Projects with• 30,000 tons or more of

1.25” BAD with sub grade improvement.

• 40,000 SY of Mill / Pulverize and Relay.

• Cost: $0.40 / ton (average).

Page 15: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

QMP Base Compaction

• NCR projects:• 1430-00-74/76/84 STH

23, Green Lake County• 1430-08-86, 1431-02-72

& 1431-02-74.• 1174-10-72 / 73

USH 51, Oneida County

Page 16: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

QMP Base Compaction

• 1500 ton / lots.• Minimum of 93% of the

material target density.• Material includes: • Virgin base course• Reclaimed Asph. Pav’t• Crushed Concrete

Page 17: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

QMP Base Compaction

• QV testing:• Proctor testing –

provided by Regional labs. Project staff needs to take sample.

• Density testing – responsibility of the project staff.

Page 18: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

New Beam Guard Acceptance

• Annually beam guard manufacturer will be put on the pre-approved list.

• “Buy America” certifications will be supplied to project by the beam guard vendor.

Page 19: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

New Beam Guard Acceptance

• Certification of Compliance for each shipment.

• Field verification for projects over 500 LF, optional under 500 LF.

Page 20: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

2013 Beam Guard 155 QV Summary Data Sheet Project Quantity of Beam Guard: (in LF) Manufacturer Name: Certification of Compliance Received? Yes / No QV Test Information Heat Number: Panel Length (in FT): Product Identification Number or Panel Type: Markings Stamped on Beam: Invoice/Order/Lading #: Tested By: Date Tested: Average Reading: Remarks:

Page 21: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

Dropping off samples

• Security codes, Available on request.• Central Office samples – Stores Truck (2 week

cycle).• QMP samples – 2 day turnaround.

Page 22: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791

HMA Sampling

• Dean Gritzmacher – Rhinelander office 715-493-6184.

• Pat Shuda – Wisconsin Rapids office 715-421-8060.

• Project level picking up samples (HTCP certification).

Page 23: 2014 NCR Construction Conference Materials Presentation John Brophy 715-493-3085 Jeff Michalski 715-459-4791