2014 CITIZENS BOND ADVISORY COMMITTEE .Engineering Firm – DBR Engineering Consultants, Inc.

  • View
    212

  • Download
    0

Embed Size (px)

Text of 2014 CITIZENS BOND ADVISORY COMMITTEE .Engineering Firm – DBR Engineering Consultants, Inc.

  • 0

    Leroy San Miguel

    ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS

    Henry Acosta

    EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

    Richard De La Cruz, P.E.

    DIRECTOR OF ENGINEERING

    2014 CITIZENS BOND ADVISORY COMMITTEE

    Engineering Services

    NORTHSIDE INDEPENDENT SCHOOL DISTRICT

    2014 Bond

    March 2017 Update

  • 1

    PROJECTS IN CONSTRUCTION

    e006288Rectangle

  • 2

    CHILLER REPLACEMENTS

    Chiller Water Pump

    PE/Athletics Dressing/Locker Room AC Installation and Chiller Replacement at

    Marshall HS

    Engineering Firm Clearly Zimmermann Engineers

    NISD Project Manager Rob Ibarra

    Contract Amount - $1,795,700

    Contractor International Mechanical Services, Inc.

    Construction Period June 2016 March 2017

    Construction Status: 97%

    Project Scope Replace chiller plant and A/C installation in boys and girls

    locker room.

    e006288Rectangle

  • 3

    Pad Site for the New Chiller

    = Chiller Replacement & Lighting Upgrades at Reddix Center

    Engineering Firm Clearly Zimmermann Engineers

    NISD Project Manager Carlos Rodriguez

    Contract Amount - $418,000

    Contractor Gillette Air Conditioning Co, Inc.

    Construction Period January 2017 March 2017

    Construction Status: 50%

    Project Scope Replace two chillers and upgrade lighting fixtures to LED

    lighting.

    e006288Rectangle

  • 4

    FIRE ALARM SYSTEM REPLACEMENTS

    Typical Fire Alarm Panel

    Fire Alarm Systems & Plumbing Upgrades at NW Crossing ES

    Engineering Firm TLC Engineering for Architecture

    NISD Project Manager Ramiro Guerrero

    Contract Amount - $273,340

    Contractor Quinney Electric, Inc.

    Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Replace total fire alarm system and walk-in freezer and cooler in

    the Cafeteria.

    e006288Rectangle

  • 5

    HVAC RENOVATION

    HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC

    Installation at

    HS

    Engineering Firm Wallis Engineering Group, Inc.

    NISD Project Manager Richard De La Cruz, P.E., Rob Ibarra

    Contract Amount - $16,200,000

    Contractor Bartlett-Cocke General Contractors

    Construction Period June 2016 August 2018

    Construction Status: 40% Construction Overall (Phase IV of IX in Progress)

    Project Scope Replace entire HVAC system including boiler and piping; install

    air conditioning and heating in boys and girls locker rooms. Phase IV began

    February 27, 2017.

    Existing Job Site

    HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC

    Installation at Clark HS

    New Installed Chillers

    e006288Rectangle

  • 6

    LIGHTING UPGRADES

    Lighting Upgrades at Child Nutrition Warehouse

    Engineering Firm TTG Engineers, Inc.

    NISD Project Manager Carlos Rodriguez

    Contract Amount - $125,517

    Contractor HJD Capital Electric, Inc.

    Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Replace ballast and 32 watt lamps in office area with 28 watt

    lamps. Replace existing lamps with high output lamps in dry storage area.

    e006288Rectangle

  • 7

    MECHANICAL UPGRADES

    Engineering Firm Clearly Zimmermann Engineers

    NISD Project Manager Rob Ibarra

    Contract Amount - $2,977,400

    Contractor International Mechanical Services, Inc.

    Construction Period June 2016 August 2017

    Construction Status: 75% Construction Overall

    Project Scope Evers ES: Replace unit ventilators with fan powered boxes.

    Leon Springs ES: Replace air handler for Admin, Library and Cafeteria.

    Mechanical Upgrades at Evers ES & Leon Springs ES

    Evers ES

    e006288Rectangle

  • 8

    Engineering Firm DBR Engineering Consultants, Inc.

    NISD Project Manager Ramiro Guerrero

    Contract Amount - $2,345,820

    Contractor Comfort-Air Engineering, Inc.

    Construction Period June 2017 August 2018

    Construction Status: 0%

    Project Scope Replace unit ventilators throughout the campus with VAV

    systems, replace two chillers and HVAC controls throughout.

    HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC

    Installation at

    HS

    Mechanical Upgrade & Energy Controls Upgrade at Elrod ES

    Elrod ES Phasing Plan

    e006288Rectangle

  • 9

    Mechanical Upgrades at Glass ES

    Engineering Firm Wallis Engineering Group, Inc.

    NISD Project Manager Rob Ibarra

    Contract Amount - $201,000

    Contractor Tezel & Cotter A/C, L.P.

    Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Replace existing rooftop units at the Cafeteria; replace existing

    ductwork and air devices.

    e006288Rectangle

  • 10

    Mechanical Upgrades & PE/Athletics Dressing/Locker Room AC Installation at John

    Jay HS

    Engineering Firm Silber & Associates Consulting Engineers, Inc.

    NISD Project Manager Rob Ibarra

    Contract Amount - $788,189

    Contractor Flo-Aire Service, Inc.

    Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Mechanical upgrades and AC installation in the PE and Athletic

    areas.

    e006288Rectangle

  • 11

    Mechanical Upgrades & PE/Athletics Dressing/Locker Room AC Installation at Neff

    MS

    Engineering Firm DBR Engineering Consultants, Inc.

    NISD Project Manager Ramiro Guerrero

    Contract Amount - $748,505

    Contractor Flo-Aire Service, Inc.

    Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Mechanical upgrades and AC installation in the PE and Athletic

    areas. Replace two rooftop units at Coachs offices.

    e006288Rectangle

  • 12

    P.A. INTERCOM SYSTEM

    P.A. Intercom Systems, Lighting Upgrades & Electrical Upgrades at Michael ES,

    Meadow Village ES & Ward ES

    Engineering Firm TLC Engineering for Architecture

    NISD Project Manager Ramiro Guerrero Contract Amount $235,687 Contractor Quinney Electric, Inc. Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Meadow Village ES Main power for portables will be upgraded. Ward ES & Michael ES Replace PA System to include the callback

    feature; lighting upgrades at both campuses.

    e006288Rectangle

  • 13

    PAVING / DRAINAGE UPGRADES

    Paving & Drainage Upgrades at Braun Station ES & Sul Ross MS

    Engineering Firm MTR Engineers, LLC

    NISD Project Manager Jacob Villarreal, P.E. Contract Amount $425,200 Contractor Pronto Sandblasting & Coating & Oil Field Services Co., Inc. Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Upgrade paving for staff parking and bus loop at both campuses.

    e006288Rectangle

  • 14

    P.E./ATHLETICS DRESSING/LOCKER ROOM AC INSTALLATION

    P.E./Athletics Dressing/Locker Room AC Installation at Rawlinson MS

    Engineering Firm Alderson & Associates, Inc. NISD Project Manager Troy Spear Contract Amount $265,000 Contractor Flo-Aire Service, Inc. Construction Period June 2017 August 2017

    Construction 0%

    Project Scope AC installation in the PE and Athletic areas.

    e006288Rectangle

  • 15

    PLAYGROUND UPGRADES

    Playground Upgrades at Beard ES, Blattman ES, Braun Station ES, Elrod ES, Glass

    ES, Leon Valley ES, Oak Hills Terrace ES & Raba ES

    Engineering Firm MTR Engineers, LLC

    NISD Project Manager Jacob Villarreal, P.E. Contract Amount $535,790 Contractor R.L. Rhode General Contracting, Inc. Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Geodesic dome replacement at eight campuses and full upper

    replacement at Blattman ES.

    Typical Playscape

    e006288Rectangle

  • 16

    Playground Upgrades at Fernandez ES, Fisher ES, Galm ES, Rhodes ES,

    Scarborough ES, Thornton ES & Timberwilde ES

    Engineering Firm CDS Muery Engineering

    NISD Project Manager Jacob Villarreal, P.E. Contract Amount $219,600 Contractor Pronto Sandblasting & Coating & Oil Field Service, Co. Inc. Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Geodesic dome replacement at seven campuses.

    e006288Rectangle

  • 17

    Playground Upgrades at Henderson ES, Knowlton ES, Kuentz ES, Lewis ES, Linton ES & Myers ES

    Engineering Firm Cude Engineers, LLC

    NISD Project Manager Jacob Villarreal, P.E. Contract Amount $209,000 Contractor R.L. Rhode General Contracting, Inc. Construction Period June 2017 August 2017

    Construction Status: 0%

    Project Scope Geodesic dome replacement at six campuses.

    e006288Rectangle

  • 18

    TENNIS COURT UPGRADES

    Tennis Court Resurfaci