81
Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING Richard De La Cruz, P.E. DIRECTOR OF ENGINEERING 2014 CITIZENSBOND ADVISORY COMMITTEE Engineering Services NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2014 Bond March 2017 Update

2014 CITIZENS BOND ADVISORY COMMITTEE … · Engineering Firm – DBR Engineering Consultants, Inc. ... HVAC Mechanical Upgrades & Chiller Replacement at Cable ES

  • Upload
    vuhanh

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

0

Leroy San Miguel

ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS

Henry Acosta

EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

Richard De La Cruz, P.E.

DIRECTOR OF ENGINEERING

2014 CITIZENS’ BOND ADVISORY COMMITTEE

Engineering Services

NORTHSIDE INDEPENDENT SCHOOL DISTRICT

2014 Bond

March 2017 Update

1

PROJECTS IN CONSTRUCTION

e006288
Rectangle

2

CHILLER REPLACEMENTS

Chiller Water Pump

PE/Athletics Dressing/Locker Room AC Installation and Chiller Replacement at

Marshall HS

Engineering Firm – Clearly Zimmermann Engineers

NISD Project Manager – Rob Ibarra

Contract Amount - $1,795,700

Contractor – International Mechanical Services, Inc.

Construction Period – June 2016 – March 2017

Construction Status: 97%

Project Scope – Replace chiller plant and A/C installation in boys’ and girls’

locker room.

e006288
Rectangle

3

Pad Site for the New Chiller

= Chiller Replacement & Lighting Upgrades at Reddix Center

Engineering Firm – Clearly Zimmermann Engineers

NISD Project Manager – Carlos Rodriguez

Contract Amount - $418,000

Contractor – Gillette Air Conditioning Co, Inc.

Construction Period – January 2017 – March 2017

Construction Status: 50%

Project Scope – Replace two chillers and upgrade lighting fixtures to LED

lighting.

e006288
Rectangle

4

FIRE ALARM SYSTEM REPLACEMENTS

Typical Fire Alarm Panel

Fire Alarm Systems & Plumbing Upgrades at NW Crossing ES

Engineering Firm – TLC Engineering for Architecture

NISD Project Manager – Ramiro Guerrero

Contract Amount - $273,340

Contractor – Quinney Electric, Inc.

Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Replace total fire alarm system and walk-in freezer and cooler in

the Cafeteria.

e006288
Rectangle

5

HVAC RENOVATION

HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC

Installation at

HS

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Richard De La Cruz, P.E., Rob Ibarra

Contract Amount - $16,200,000

Contractor – Bartlett-Cocke General Contractors

Construction Period – June 2016 – August 2018

Construction Status: 40% Construction Overall (Phase IV of IX in Progress)

Project Scope – Replace entire HVAC system including boiler and piping; install

air conditioning and heating in boys’ and girls’ locker rooms. Phase IV began

February 27, 2017.

Existing Job Site

HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC

Installation at Clark HS

New Installed Chillers

e006288
Rectangle

6

LIGHTING UPGRADES

Lighting Upgrades at Child Nutrition Warehouse

Engineering Firm – TTG Engineers, Inc.

NISD Project Manager – Carlos Rodriguez

Contract Amount - $125,517

Contractor – HJD Capital Electric, Inc.

Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Replace ballast and 32 watt lamps in office area with 28 watt

lamps. Replace existing lamps with high output lamps in dry storage area.

e006288
Rectangle

7

MECHANICAL UPGRADES

Engineering Firm – Clearly Zimmermann Engineers

NISD Project Manager – Rob Ibarra

Contract Amount - $2,977,400

Contractor – International Mechanical Services, Inc.

Construction Period – June 2016 – August 2017

Construction Status: 75% Construction Overall

Project Scope – Evers ES: Replace unit ventilators with fan powered boxes.

Leon Springs ES: Replace air handler for Admin, Library and Cafeteria.

Mechanical Upgrades at Evers ES & Leon Springs ES

Evers ES

e006288
Rectangle

8

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero

Contract Amount - $2,345,820

Contractor – Comfort-Air Engineering, Inc.

Construction Period – June 2017 – August 2018

Construction Status: 0%

Project Scope – Replace unit ventilators throughout the campus with VAV

systems, replace two chillers and HVAC controls throughout.

HVAC Renovation/Boiler Replacement/PE/Athletics Dressing/Locker Room AC

Installation at

HS

Mechanical Upgrade & Energy Controls Upgrade at Elrod ES

Elrod ES – Phasing Plan

e006288
Rectangle

9

Mechanical Upgrades at Glass ES

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Rob Ibarra

Contract Amount - $201,000

Contractor – Tezel & Cotter A/C, L.P.

Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Replace existing rooftop units at the Cafeteria; replace existing

ductwork and air devices.

e006288
Rectangle

10

Mechanical Upgrades & PE/Athletics Dressing/Locker Room AC Installation at John

Jay HS

Engineering Firm – Silber & Associates Consulting Engineers, Inc.

NISD Project Manager – Rob Ibarra

Contract Amount - $788,189

Contractor – Flo-Aire Service, Inc.

Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Mechanical upgrades and AC installation in the PE and Athletic

areas.

e006288
Rectangle

11

Mechanical Upgrades & PE/Athletics Dressing/Locker Room AC Installation at Neff

MS

Engineering Firm – DBR Engineering Consultants, Inc.

NISD Project Manager – Ramiro Guerrero

Contract Amount - $748,505

Contractor – Flo-Aire Service, Inc.

Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Mechanical upgrades and AC installation in the PE and Athletic

areas. Replace two rooftop units at Coach’s offices.

e006288
Rectangle

12

P.A. INTERCOM SYSTEM

P.A. Intercom Systems, Lighting Upgrades & Electrical Upgrades at Michael ES,

Meadow Village ES & Ward ES

Engineering Firm – TLC Engineering for Architecture

NISD Project Manager – Ramiro Guerrero Contract Amount – $235,687 Contractor – Quinney Electric, Inc. Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Meadow Village ES – Main power for portables will be upgraded. Ward ES & Michael ES – Replace PA System to include the callback

feature; lighting upgrades at both campuses.

e006288
Rectangle

13

PAVING / DRAINAGE UPGRADES

Paving & Drainage Upgrades at Braun Station ES & Sul Ross MS

Engineering Firm – MTR Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $425,200 Contractor – Pronto Sandblasting & Coating & Oil Field Services Co., Inc. Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Upgrade paving for staff parking and bus loop at both campuses.

e006288
Rectangle

14

P.E./ATHLETICS DRESSING/LOCKER ROOM AC INSTALLATION

P.E./Athletics Dressing/Locker Room AC Installation at Rawlinson MS

Engineering Firm – Alderson & Associates, Inc. NISD Project Manager – Troy Spear Contract Amount – $265,000 Contractor – Flo-Aire Service, Inc. Construction Period – June 2017 – August 2017

Construction – 0%

Project Scope – AC installation in the PE and Athletic areas.

e006288
Rectangle

15

PLAYGROUND UPGRADES

Playground Upgrades at Beard ES, Blattman ES, Braun Station ES, Elrod ES, Glass

ES, Leon Valley ES, Oak Hills Terrace ES & Raba ES

Engineering Firm – MTR Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $535,790 Contractor – R.L. Rhode General Contracting, Inc. Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Geodesic dome replacement at eight campuses and full upper

replacement at Blattman ES.

Typical Playscape

e006288
Rectangle

16

Playground Upgrades at Fernandez ES, Fisher ES, Galm ES, Rhodes ES,

Scarborough ES, Thornton ES & Timberwilde ES

Engineering Firm – CDS Muery Engineering

NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $219,600 Contractor – Pronto Sandblasting & Coating & Oil Field Service, Co. Inc. Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Geodesic dome replacement at seven campuses.

e006288
Rectangle

17

Playground Upgrades at Henderson ES, Knowlton ES, Kuentz ES, Lewis ES, Linton ES & Myers ES

Engineering Firm – Cude Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E. Contract Amount – $209,000 Contractor – R.L. Rhode General Contracting, Inc. Construction Period – June 2017 – August 2017

Construction Status: 0%

Project Scope – Geodesic dome replacement at six campuses.

e006288
Rectangle

18

TENNIS COURT UPGRADES

Tennis Court Resurfacing at Luna MS

Engineering Firm – Cude Engineers, LLC

NISD Project Manager – Troy Spear Contract Amount – $35,000 Contractor – Premier Courts Limited Company Construction Period – June 2017 – June 2017

Construction Status: 0%

Project Scope – Tennis court resurfacing.

Typical Resurfaced Court

e006288
Rectangle

19

PROJECTS IN DESIGN/PLANNING

e006288
Rectangle

20

ATHLETICS UPGRADES

Engineering Firm – MTR Engineers, LLC

NISD Project Manager – Troy Spear Budget Amount – $105,000 Contractor - TBD Construction Period – April 2017 – August 2017

(95% Design)

Project Scope – Upgrade tennis courts at both campuses.

Tennis Court Upgrades at Sul Ross MS & Stevens HS

Track & Field Upgrades at Jay HS

Engineering Firm – Cude Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E.

Budget Amount – $1,700,000

Contractor - TBD

Construction Period – April 2017 – August 2017

(100% Design)

Project Scope – Full replacement of track and football field with synthetic turf and synthetic track surfacing. (2007/2014 Bond Funds).

e006288
Rectangle

21

LIGHTING UPGRADES

Lighting Upgrades at Galm ES, Timberwilde ES & Alternative HS

Engineering Firm – TLC Engineering for Architecture

NISD Project Manager – Ramiro Guerrero Budget Amount – $165,000 Contractor - TBD Construction Period – June 2017 – August 2017

(100% Design)

Project Scope – Lighting upgrades at three campuses.

Lighting Upgrades at Rhodes ES

Engineering Firm – MS2 Inc. Consulting Engineers NISD Project Manager – Carlos Rodriguez Budget Amount – $70,000 Contractor - TBD Construction Period - June 2017 – August 2017

(100% Design)

Project Scope – Lighting upgrades.

e006288
Rectangle

22

FIRE ALARM SYSTEM REPLACEMENTS

Engineering Firm – CNG Engineering, PLLC

NISD Project Manager – Carlos Rodriguez

Budget Amount – $270,000

Contractor - TBD

Construction Period – June 2017 – August 2017

(100% Design)

Project Scope –

Raba ES: Fire alarm and lighting upgrades.

Central Office: Electrical upgrades.

at Central Office.

Fire Alarm & Lighting Upgrades at Raba ES & Electrical Upgrades at Central Office

e006288
Rectangle

23

MECHANICAL UPGRADES

Engineering Firm – Wallis Engineering Group, Inc.

NISD Project Manager – Rob Ibarra Budget Amount – $6,700,000 Contractor - TBD

Construction Period – June 2018 – August 2020

(95% Design)

Project Scope – Mechanical upgrades and chiller replacement.

Mechanical Upgrades at Jordan MS

HVAC Mechanical Upgrades & Chiller Replacement at Cable ES

Engineering Firm – Silber & Associates Consulting Engineers, Inc.

NISD Project Manager – Jacob Villarreal, P.E.

Budget Amount – $900,000 Contractor - TBD Construction Period – May 2017 – August 2017

(100% Design)

Project Scope – Mechanical upgrades and chiller replacement.

e006288
Rectangle

24

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Carlos Rodriguez Budget Amount – $75,000 Contractor - TBD Construction Period – June 2017 – August 2017

(100% Design)

Project Scope – Mechanical upgrades.

Mechanical Upgrades at Oak Hills Terrace ES

e006288
Rectangle

25

PAVING / DRAINAGE UPGRADES

Engineering Firm – CDS Muery Engineers

NISD Project Manager – Jacob Villarreal, P.E.

Budget Amount – $455,000

Contractor - TBD Construction Period – June 2017 – August 2017

(100% Design)

Project Scope – Upgrade paving at bus loop and staff parking lot.

Paving & Drainage Upgrades at Howsman ES & Zachry MS

Paving & Drainage Upgrades at Marshall HS & O’Connor HS

Engineering Firm – Cude Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E.

Budget Amount – $419,000

Contractor - TBD Construction Period – June 2017 – August 2017

(100% Design)

Project Scope – Marshall HS: Upgrade paving and drainage.

O’Connor HS: Upgrade drainage.

e006288
Rectangle

26

P.E. / ATHLETICS DRESSING / LOCKER ROOM AC INSTALLATION

Engineering Firm – Cleary Zimmermann Engineers

NISD Project Manager – Rob Ibarra Budget Amount – $1,080,000 Contractor - TBD

Construction Period – June 2017 – August 2017

(100% Design)

Project Scope – AC installation in the PE and Athletic areas and fire alarm

upgrade.

PE/Athletics Dressing/Locker Room AC Installation & Fire Alarm Upgrades at O’Connor HS

e006288
Rectangle

SCHOOL FLASHERS

School Flashers at Harlan HS & Kallison ES

Engineering Firm – Cude Engineers, LLC

NISD Project Manager – Jacob Villarreal, P.E.

Budget Amount – $300,000

Contractor - TBD Construction Period – May 2017 – July 2017

(100% Design)

Project Scope – Installation of school flashers at both campuses.

Harlan High School

Facilities Construction

NNOORRTTHHSSIIDDEE IINNDDEEPPEENNDDEENNTT SSCCHHOOOOLL DDIISSTTRRIICCTT

Leroy San Miguel

ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS

Henry Acosta

EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING

Jim Berg

DIRECTOR OF FACILITIES CONSTRUCTION

2014 CITIZENS’ BOND ADVISORY COMMITTEE

2014 Bond

March 2017 Update

NEW PROJECTS IN CONSTRUCTION

HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL)

Architect – Garza Bomberger & Associates

Project Architect – Roy Lewis

NISD Project Manager – Jim Berg

Contractor – Joeris General Contractor

GMP - $110,800,000

Construction Period – October 2014 – Summer 2017

Construction Status: 93% Complete

Project Scope – New 2800 Student High School

Site grading, utilities, landscaping.

Interior CMU walls, drywall framing.

Interior painting.

MPE / Tech systems.

Concrete drives and parking areas in progress.

Final Punch in progress.

HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL) Aerial (Feb. 20, 2017)

Aerial looking from West

HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL) Front Entrance

Front Entry Rendering

HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL) (February 28, 2017)

Cafeteria

Auditorium Seating

HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL) (March 22, 2017)

Stage at Auditorium

HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL) (March 22, 2017)

View of Stage

HARLAN HIGH SCHOOL (Formerly KALLISON RANCH HIGH SCHOOL) (March 22, 2017)

KALLISON ELEMENTARY SCHOOL (KALLISON RANCH #2 ELEMENTARY)

Architect – Garza Bomberger

Project Architect – Roy Lewis

NISD Project Manager – Marilyn Sevedge

Contractor – Guido Construction

GMP - $24,640,000

Construction Period – March 2016 – July 2017

Construction Status: 60% Complete

Project Scope – New 800 Student Elementary School

Masonry, brick, MPE / Tech Systems and roofing in progress.

KALLISON ELEMENTARY SCHOOL Front Entrance

Front Entry Rendering

KALLISON ELEMENTARY SCHOOL Aerial (February 24, 2017)

Aerial Image

KALLISON ELEMENTARY SCHOOL Aerial (February 24, 2017)

Aerial Image

KALLISON ELEMENTARY SCHOOL (February 28, 2017)

Classroom Wing

KALLISON ELEMENTARY SCHOOL (March 1, 2017)

Interior Corridor

ADDITIONS AND RENOVATION

PROJECTS IN CONSTRUCTION

GLENOAKS ELEMENTARY - Administration Upgrades/Security Lobby

Architect – NextGen Architects

Project Architect – Joel Hernandez

NISD Project Manager – Marilyn Sevedge

Contractor – McGoldrick Construction Co.

Construction Amount - $3,750,000

Construction Period – June 2016 – June 2017

Construction Status: 50% Complete

Project Scope – New Administration Building

Roofing, interior walls, MPE / Tech Systems in progress.

GLENOAKS ELEMENTARY (Rendering of Front Elevation)

Front Entry Rendering

GLENOAKS ELEMENTARY Administration Upgrades (February 2017)

Front Entry Image

HOLMES HS FINE ARTS BUILDING

Architect – Alamo Architects

Project Architect – Jerry Lammers

NISD Project Manager – Jim Berg

Contractor – Bartlett Cocke

Construction Budget - $27,000,000

Construction Period – June 2017 – December 2018

Construction Status – 1% Complete

Project Scope – Fine Arts Building Replacement

Status

Phase 1 – Portables Complete 2 – MDF Relocate in Progress 3 – Demolition / Abatement in Progress (Spring to Summer 2017)

4 – Building Design / Construction (Summer 2017 to Fall 2018)

View of Portable Village

HOLMES HS FINE ARTS BUILDING Portable Village

View of Existing Auditorium

HOLMES HS FINE ARTS BUILDING Existing Auditorium

CHILD NUTRITION CENTER Renovation

Architect – Shawn Kaarlsen & Associates

Project Architect – Shawn Kaarlsen

NISD Project Manager – Henry Acosta

Contractor – Workman Commercial

Contract Amount - $5,726,500

Construction Period – July 2016 – January 2017

Construction Status: 70% Complete

Project Scope – Warehouse Renovation

Contract in progress. Renovation funded from Child Nutrition 2016 Growth

& Improvement funds and 2010 Bond Savings.

Demo complete, rough-ins in progress.

Walk in cooler/freezer floor complete.

Office area drywall complete, tape & float (finishes in progress), new

switch gear being installed, new CPS transformer on its way.

Walk-in cooler/freezers, walls, racks and ceilings being installed.

Condensers set.

CHILD NUTRITION CENTER Renovation (March 3, 2017)

Paving

CHILD NUTRITION CENTER Renovation (Feb 16, 2017)

Corridor

CHILD NUTRITION CENTER Renovation (Feb 16, 2017)

Freezer Area

PAUL TAYLOR FIELD HOUSE RENOVATIONS

Architect – Garza Bomberger Architects

Project Architect – Roy Lewis

NISD Project Manager – Thomas Curiel

Contractor – Stoddard Construction Management, Inc.

Construction Amount - $3,400,000

Construction Period – February 2017 – August 2017

Construction Status – 2% Complete

Project Scope – ADA Interior/Exterior Renovations

Site Mobilization and Demolition in Progress.

PAUL TAYLOR FIELD HOUSE RENOVATIONS (March 1, 2017)

Wood Gym Floor - Protected

PAUL TAYLOR FIELD HOUSE RENOVATIONS (March 1, 2017)

Demolition in Progress

PAUL TAYLOR FIELD HOUSE RENOVATIONS (March 1, 2017)

Northeast View

NORTHSIDE ACTIVITY CENTER RENOVATIONS

Architect – Richard Sanchez Architects, Inc.

Project Architect – Richard Sanchez

NISD Project Manager – Thomas Curiel

Contractor – O’Haver Contractors Co.

Construction Budget - $4,000,000

Construction Period – February 2017 – January 2018

Construction Status – 1% Complete

Project Scope – Addition and Renovation of Meeting Rooms

Mobilization and Demolition in progress.

PROJECTS IN BID/DESIGN PHASE

GROSENBACHER AREA ELEMENTARY (Prototype of Boldt ES and Cole ES)

Architect – Noonan Rittiman

Project Architect – John Rittiman

NISD Project Manager – Tom Curiel

Contractor – DL Bandy

Construction Amount - $22,465,000

Construction Period – March 2017 – May 2018

Construction Status – 0% Complete

Project Scope – New 800 Student Elementary School

Notice to Proceed Issued.

2017 SECURITY LOBBIES at (9) ELEMENTARY SCHOOLS

Architect – NextGen Architects

Project Architect – Joel Hernandez

NISD Project Manager – Marilyn Sevedge

Contractor – CGC General Contractors

Construction Amount - $1,293,000

Construction Period – June 2017 – August 2017

Construction Status – 0% Complete

Project Scope – New Security Lobby for (9) Elementary Schools:

Adams Hill ES, Allen ES, Beard ES, Braun Station ES, Forester ES, Hoffmann

ES, Knowlton ES, Timberwilde ES, and Villarreal ES

Notice to Proceed Issued.

GLENOAKS ELEMENTARY - Window Upgrades / ADA Work

Architect – NextGen Architects

Project Architect – Joel Hernandez

NISD Project Manager – Marilyn Sevedge

Contractor – TBD

Construction Budget - $1,100,000

Construction Period – June 2017 – December 2017

Construction Status – 0% Complete

Project Scope – Window Upgrades and ADA Work

Bids to be received March 29, 2017.

BOONE ELEMENTARY - Administration Upgrades, Bus/Student Canopy & Security Lobby

Architect – Garza Architects

Project Architect – Jesse Garza

NISD Project Manager – Jim Berg

Contractor – TBD

Construction Budget - $4,040,000

Construction Period – June 2017 – May 2018

Construction Status – 0% Complete

Project Scope – Administration Upgrades, Bus/Student Walkway Canopy

Modifications

Construction Documents in progress.

COLONIES NORTH ELEMENTARY Window Upgrades / ADA Work

Architect – Huckabee Architects

Project Architect – Jeff Rodriquez

NISD Project Manager – Chris Parker

Contractor – TBD

Construction Budget - $2,000,000

Construction Period – June 2017 – October 2017

Construction Status – 0% Complete

Project Scope – Window Upgrades and ADA Work

Contractor submitted for March Board Approval.

GLASS ELEMENTARY Window Upgrades / ADA Work

Architect – Marmon Mok

Project Architect – Monty Howard

NISD Project Manager – Chris Parker

Contractor – TBD

Construction Budget - $1,500,000

Construction Period – June 2017 – August 2017

Construction Status – 0% Complete

Project Scope – Window Upgrades and ADA Work

Master Plan in progress.

HELOTES ELEMENTARY Window Upgrades / ADA Work

Architect – Shawn Kaarlsen & Associates

Project Architect – Shawn Kaarlsen

NISD Project Manager – Marilyn Sevedge

Contractor – TBD

Construction Budget - $700,000

Construction Period – June 2017 – November 2017

Construction Status – 0% Complete

Project Scope – Window Upgrades and ADA Work

Master Plan in progress.

POWELL ELEMENTARY Window Upgrades / ADA Work

Architect – Shawn Kaarlsen & Associates

Project Architect – Shawn Kaarlsen

NISD Project Manager – Marilyn Sevedge

Contractor – TBD

Construction Budget - $700,000

Construction Period – June 2017 – August 2017

Construction Status – 0% Complete

Project Scope – Window Upgrades and ADA Work

Master Plan in progress.

GLENN ELEMENTARY School Building Replacements / Security Lobby

Architect – LPA

Project Architect – Mark Oppelt / Lowell Tacker

NISD Project Manager – Jim Berg

Contractor – TBD

Construction Budget - $4,800,000

Construction Period – June 2017 – August 2018

Construction Status – 0% Complete

Project Scope – Replacement of Buildings

Bids to be received March 23, 2017.

KNOWLTON ELEMENTARY Cafeteria / Kitchen Renovations / Library Addition

Architect – Pfluger

Project Architect – Carr Hornbuckle

NISD Project Manager – Chris Parker

Contractor – TBD

Construction Budget – $2,200,000

Construction Period – June 2017 – November 2017

Construction Status – 0% Complete

Project Scope – Renovations and Additions to Cafeteria, Kitchen & Library

Contractor submitted for March Board Approval.

TIMBERWILDE ELEMENTARY Cafeteria/Kitchen Renovations/Library Addition

Architect – Shawn Kaarlsen & Associates

Project Architect – Shawn Kaarlsen

NISD Project Manager – Chris Parker

Contractor – TBD

Construction Budget – $2,200,000

Construction Period – June 2017 – November 2017

Construction Status – 0% Complete

Project Scope – Renovations and Additions to Cafeteria, Kitchen & Library

Bids to be received March 22, 2017.

2017 DOOR HARDWARE Glass ES, Westwood Terrace ES and Holmes HS

Architect – Chesney Morales

Project Architect – Richard Morales

NISD Project Manager – James Evans

Contractor – TBD

Construction Budget – $117,000

Construction Period – June 2017 – August 2017

Construction Status – 0% Complete

Project Scope – Replacement of Door Hardware for Accessibility

Construction Documents in progress.

2017 FLOORING REPLACEMENTS Elrod, Glenn, Glenoaks, & Michael Elementary

Architect – CWS Architect

Project Architect – Robert Watts

NISD Project Manager – Chris Parker

Contractor – TBD

Construction Budget – $230,000

Construction Period – June 2017 – August 2017

Construction Status – 0% Complete

Project Scope – Replacement of Flooring

Proposal opening March 22, 2017.

2017 SUMMER FLOORING REPLACEMENTS Carson ES, Neff MS, & Warren HS

Architect – Huckabee Architects

Project Architect – Jeff Rodriguez

NISD Project Manager – Chris Parker

Contractor – TBD

Construction Budget – $325,000

Construction Period – June 2017 – August 2017

Construction Status – 0% Complete

Project Scope – Replacement of Flooring

Contractor submitted for March Board Approval.

NEFF MS COMPETITION GYM FLOORING AND BLEACHERS

Architect – Garza Architects

Project Architect – Jesse Garza

NISD Project Manager – Chris Parker

Contractor – TBD

Construction Budget – $200,000

Construction Period – June 2017 – August 2017

Construction Status – 0% Complete

Project Scope – Replacement of Flooring and Bleachers

Contractor submitted for March Board Approval.

MARSHALL HIGH SCHOOL Cafeteria / Kitchen Renovations

Architect – Garza Bomberger Architects

Project Architect – Roy Lewis

NISD Project Manager – Tom Curiel

Contractor – TBD

Construction Budget – $4,400,000

Construction Period – June 2017 – March 2018

Construction Status – 0% Complete

Project Scope – Renovations and Additions

Master Plan in progress.

SCIENCE LAB ADDITIONS/RENOVATIONS Alternative North MS

Architect – C.J. Lammers & Associates

Project Architect – Chris Lammers

NISD Project Manager – Marilyn Sevedge

Contractor – TBD

Construction Budget – $600,000

Construction Period – June 2017 – December 2017

Construction Status – 0% Complete

Project Scope – Renovation of Science Labs

2016 HAIL DAMAGE ROOFING

PROJECTS

LIST OF SCHOOLS

Hail Damage Roofing Projects

Phase I

Carnahan Elementary School

Beard Elementary School

Clark High School

South Transportation

Stevenson Middle School

Carlos Coon Elementary School

Elrod Elementary School

Fernandez Elementary School

Phase II

Esparza Elementary School

Nichols Elementary School

Connally Middle School

Howsman Elementary School

Leon Valley Elementary School

Scarborough Elementary School

Alternative ES & MS - North

Burke Elementary School

Brauchle Elementary School

Leon Springs Elementary School

Raba Elementary School

Thank you Citizens’ Bond

Advisory Committee!