China Power China Power International Development Limited ( code: 2380 ) March 2015 2014 Annual Results Presentation

2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

China Power International Development Limited

( code: 2380 )

March 2015

2014 Annual Results Presentation

Page 2: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Agenda

2014 Annual Results Highlights

Business Review

Development and Prospects

Financial Statements and Appendices

1China Power

Page 3: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Section 1 2014 Annual Results Highlights

2China Power

Page 4: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Annual Results Highlights

3

2014 2013 Change

Revenue (RMB’000) 20,447,151 18,826,728 8.61%

Operating Profit (RMB’000) 5,889,793 5,181,565 13.67%

Profit Attributable to Owners

of The Company (RMB’000)2,765,886 2,289,888 20.79%

Basic EPS (RMB) 0.42 0.4 5.00%

DPS (RMB) 0.168 0.16 5.00%

Net Debt to Equity (%) 197.33 236.10 -38.77

China Power

Page 5: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Section 2 Business Review

4

Page 6: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Coal-fired Clean EnergyCoal-fired Clean Energy

5

RevenueProfit Attributable to Owners

of the Company

Revenue & Profit Structure

32%

68%

25%

75%

RMB20,447,151,000 RMB2,765,886,000

Page 7: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Hydro

Wind

Coal-fired

Hydro

Wind

Coal-fired

Capacity

Consolidated Capacity : 14,903MW

31.93%

Capacity ChangeMW

67.17%

Capacity Change (MW)

Addition

Tuokou +830 ×95%×63% Hydro Mar. 2014

Yaoposhan +36 ×100%×63% Wind Dec.2014

Reduction

Shentou I -400 ×100% Coal-fired Jan. 2014

6

0.91%

19.38%

Attributable Capacity : 15,028MW

80.05%

0.57%

14,822 14,43715,028 14,903

10,000

12,000

14,000

16,000

Attributable Capacity

Consolidated Capacity

2013 2014

Page 8: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

39,852 41,910

12,94317,047

0

15,000

30,000

45,000

60,000

2013 2014

Coal-fired Clean energy

Power Generation and Utilization Hours

Net Power Generation

GWhHours

Average Utilization Hours

7

4,998

3,436

4,4313,734

0

2,000

4,000

6,000

Coal-fired Hydro

2013 2014

1.Weak nationwide power demand negatively affect power plant

utilization.

2. The strong growth of hydro power was driven by the amply

rainfall and the optimized all river cascade dispatching.

Page 9: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Hydrologic Data of Yuanjiang River

m³/s

1925-2014 Yearly Basis

Average line:1,971 m³/s2014: 2,276 m³/s

8

500

1,000

1,500

2,000

2,500

3,000

3,500

1925

1935

1945

1955

1965

1975

1985

1995

2005

2013

2014

Page 10: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Cascade Dispatching of Wuling Power

9

YuanjiangRiver

HydropowerStations

Capacity(MW)

Upstream

Sanbanxi 1,000

Guazhi 150

Baishi 420

Tuokou 830

Midstream Hongjiang 270

DownstreamWuqiangxi 1,200

Lingjintan 270

Hunan

Optimize the all river cascade dispatching management

Achieve strong power generation growth and high utilization

of existing hydropower plants

Page 11: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

254.6

226

189.5

160

200

240

280

2012 2013 2014

377.61 373.51 366.66

278.87 288.56 295.95

200

250

300

350

400

2012 2013 2014 2012 2013 2014

123.01147.51

177.16

50

100

150

200

2012 2013 2014

Tariffs and Unit Fuel Cost

RMB / MWhAverage Realized Tariffs

Unit Fuel Cost

Coal-fired Hydro

Dark Spread

10

RMB / MWh RMB / MWh

Page 12: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Net Coal Consumption Rate

Energy Saving and Emission Reduction

g/KWh

Pollutant Emissions Reduction

(2014,Coal-fired)

11

324.51

319.34316.7 314.84

310.91

300

310

320

330

2010 2011 2012 2013 2014

1.Strengthen environmental

protection management ;

2.Reduce pollutant emissions

such as dusts, SO2 and NOx.

0.345

1.127

0.1890.283 0.3890.118

0

0.5

1

1.5

SO2 NOx Dust

2013 2014g/KWh

Page 13: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

3.73 4.02

4.04

2.18

0

2.5

5

7.5

10

2014 2015E

Coal-fired Clean energy

Financial Control

Net Gearing Ratio

%

Capital Expenditures

Billion RMB

7.77

12

236.1

197.33

170

180

190

200

210

220

230

240

2013 2014

6.2

Page 14: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Section 3 Development and Prospects

13

Page 15: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power 14

Capitalize on Our Strategic Advantages

Capitalize on our strategic advantages in a more

liberalized power market

Strong support from parent companies

(3)

Low-tariff clean energy

(1)

Low-cost high efficiency coal-fired

(2)

Flagship listco within CPI Group and preferential rights of acquistions

Higher percentage of hydro power capacity

Mine-mouth and along UHV transmission lines

Page 16: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

0

5,000

10,000

15,000

20,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014E

15

0%

20%

Coal-fired Clean energy

2004 2014 2020I

II Upward trend of hydro power tariffs

III Achieving growth through construction and acquisitions

30,000

15,000

Attributable Capacity (MW)

0

Promote the Development of Clean Energy

Higher percentage of hydro power capacity

Build up Cleaner Fuel Mix

Over 30%

Page 17: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Low Cost and Locations of Coal-fired Power Plants

16

Shanxi

Power Plants Mine-mouth

CP Shentou

2×600MW

China CoalCP Shentou Ⅱ2×1,000MW

(Preliminary Approval )

Jiangsu

Changshu

2×1,000MW

Located in Areas

with high margin

Anhui

Power Plants Mine-mouth

Pingwei Ⅱ2×640MW

Huainan Coal MiningPingwei Ⅲ2×1,000MW

(Under Construction)

Guizhou

Pu’an

2×660MW(Approval )Coal-power venture

Henan

Yaomeng Ⅱ2,470MW

Mine-mouth

Page 18: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Along UHV and Coal Transmission Lines

17

Shanxi

Power Plants Along UHV Lines

CP Shentou

2×600MW

Inner Mongolia West -

-- Tianjin South

CP Shentou Ⅱ2×1,000MW

(Preliminary Approval )

Shanxi North---

Jiangsu

Anhui

Power Plants Along UHV Lines

Pingwei Ⅱ2×640MW

Anhui --- ShanghaiPingwei Ⅲ2×1,000MW

(Under Construction)

Hubei

Power PlantsAlong coal transport

railway

Dabieshan

2×640MW Inner Mongolia ---

Central China RailwayDabieshan Ⅱ2×660MW (New)

Page 19: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power 18

Strong Support from Parent Company

CPI Group

Coal-fired Hydro NuclearOther Clean

Energy

Large-scale coal-

fired power plants in

Central, Southwest

and Northeast of

China.

Large-scale

hydropower

plants.

Owns one of three

nuclear power

operating licenses in

China.

Solar, wind

farms and

other clean

energy.

Unlisted Assets

Page 20: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015E 2020E

Coal-fired Clean energy

16,300

Capacity Growth

MW

3,010

Attributable Capacity Growth

19

30,000

15,028

Page 21: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Section 4 Financial Statements and Appendices

20

Page 22: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power 21

Operating Highlights

2014 2013 Change

Attributable capacity (MW) 15,028 14,822 1.39%

Consolidated capacity (MW) 14,903 14,437 3.23%

——coal-fired 10,010 10,410 -3.84%

——clean-energy 4,893 4,027 21.50%

Net generation (MWh) 58,957,127 52,795,155 11.67%

——coal-fired 41,909,640 39,852,279 5.16%

——clean energy 17,047,487 12,942,876 31.71%

Average utilization hours

——coal-fired 4,431 4,998 -567.00

——hydro 3,734 3,436 298.00

Average realized tariffs (RMB/MWh)

——coal-fired 366.66 373.51 -1.83%

——hydro 295.95 288.56 2.56%

Net coal consumption rate(g/KWh) 310.91 314.84 -3.93

Page 23: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power 22

(RMB ‘000) 2014 2013 Change

Turnover and other income 20,844,136 19,054,873 9.39%

Fuel costs (7,941,928) (9,006,559) -11.82%

Other operating costs (net) (7,012,415) (4,866,749) 44.09%

Operating profit 5,889,793 5,181,565 13.67%

Finance income 52,430 64,480 -18.69%

Finance costs (2,366,120) (1,511,774) 56.51%

Share of profits from associates 640,374 435,704 46.97%

Share of profits/(losses) of jointly-controlled entities

86,270 64,083 34.62%

Pre-tax profit 4,302,747 4,234,058 1.62%

Taxation (660,215) (958,666) -31.13%

Profit for the year 3,642,532 3,275,392 11.21%

Profit attributable to owners of the Company

2,765,886 2,289,888 20.79%

EPS (RMB)-basic 0.42 0.40 5.00%

Income Statement

Page 24: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power 23

2014 2013 Change

Total Assets (RMB Million) 81,796 76,739 6.59%

Total Liabilities( RMB Million) 54,546 53,452 2.05%

——long-term debts 31,800 34,467 -7.74%

——short-term debts 12,472 10,667 16.92%

Total Equity(RMB Million)

(including minority interest)27,250 23,287 17.02%

Net Gearing Ratio(%) 197.33 236.10 -38.77

Balance Sheet

Page 25: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Corporate Structure

24

CPI Group

(PRC)

58.95%

7 large-scale coal-

fired power plants

China Power

(2380.HK)

Wuling Power2 associate coal-

fired power plants

63% 18.86%51-100% 50%

Consolidated

capacity:

10,010MW

Attributable

capacity:

8,932MW

Total capacity:

3,920MW

CPI Group:

One of the 5 national Gencos with

nearly 97GW total installed capacity .

Well balanced power asset

portfolio , high percentage of clean

energy capacity

One of the three approved nuclear

power developers in China

China Power:

Flagship of CPI Group, platform for

overseas financing

Only Hong Kong based among 5

national Gencos

Highest percentage of hydropower

capacity among the Chinese IPPs listed

in the Stock Exchange.

Power Assets

SEP

(600021.SH)

Attributable capacity:

Hydro:4,623MW;Wind :135MW;

Coal-fired:240MW.

As at Dec.31 2014

Page 26: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Locations of coal-fired assets

Shanxi

HenanJiangsu

Shanghai

AnhuiHubei

Sichuan

Plants under construction

Guangdong

Holding coal-fired plants

Pingwei: 2×630 100% Anhui

Pingwei II : 2×640 75% Anhui

Yaomeng II :3×300+1×310+2×630 100% Henan

Dabieshan: 2×640 51% Hubei

Fuxi: 2×600 51% Sichuan

CP Shentou: 2×600 80% Shanxi

Wuhu: 2×660 100% Anhui

SEP: 8,932 18.86% East China

Shanghai Electric Power

Plants under construction

Pingwei Ⅲ : 2×1,000 100% Anhui

25

SEP

Associate coal-fired power plants

Changshu: 2×1,000+4×330 50% Jiangsu

Xintang: 2×300 50% Guangdong

Capacity(MW)Plants Equity Location

Coal-fired Asset Distribution

Page 27: 2014 Annual Results Presentation - irasia.comfile.irasia.com/listco/hk/chinapower/cpresent/pre150319.pdf2014 Annual Results Presentation. ... 2×640MW Inner Mongolia ---Dabieshan Ⅱ

China Power

Clean-Energy Asset Distribution of Wuling Power

Xinjiang

Hunan

Sichuan

Holding hydro power plants

Wuqiangxi: 1,200 100% Hunan

Sanbanxi: 1,000 100% Guizhou

Tuokou: 830 95% Hunan

Baishi: 420 95% Guizhou

Lingjintan: 270 100% Hunan

Hongjiang: 270 95% Hunan

Wanmipo: 240 100% Hunan

Guazhi: 150 95% Guizhou

Others: 378 91-100% Hunan/Sichuan

Associate coal-fired power plants

Liyujiang: 2×300 40% Hunan

26

Holding wind farms

Tuokexun: 49.5 100% Xinjiang

Buerjin: 49.5 100% Xinjiang

Yaoposhan: 36 100% Hunan

Capacity(MW)Plants Equity Location

Guizhou

Locations of clean energy

Associate coal-fired power plants