404
Preliminary Budget Fiscal Year 2014 - 2015

2014 2015 Preliminary Budget

Embed Size (px)

DESCRIPTION

FY14 - FY15 Preliminary Budget

Citation preview

Page 1: 2014 2015 Preliminary Budget

Preliminary Budget Fiscal Year 2014 - 2015

Page 2: 2014 2015 Preliminary Budget

INTRODUCTION 

Page 3: 2014 2015 Preliminary Budget

City of

Office of the City Manager 390 Towne Centre Drive – Lathrop, CA 95330 Phone (209) 941-7220 – Fax (209) 941-7248

www.ci.lathrop.ca.us City Manager’s Budget Message   Honorable Mayor, Members of the City Council and Citizens of the City of Lathrop:    The City’s  Fiscal Year  (FY) 2014/2015 DRAFT budget has been prepared and  is presented  for  your  consideration.   As  in  the previous  year, we are continuing  to adjust  to  the  challenges presented by  fluctuating  revenues and ever  increasing  costs.   Although,  the City’s General  Fund  revenue  is expected to increase by 18 percent rising operating costs nearly depletes the gain by a 13 percent increase from FY 2013/2014 Adopted Budget.    The total expenditures budget proposed for FY 2014/2015  is $109 million.   This  includes $17.7 million for General Fund operations, $32.8 million for Enterprise Fund operations, $33.9 million for Special Revenue Fund operations, and $24.7 million for Capital Improvement Projects (see Illustration 1).  The DRAFT General Fund budget presented to Council  is balanced with an estimated Reserve of approximately $9.2 million  (51.7 percent of annual expenditures).  With the City approaching its 25th anniversary, the budget projections presented are intended to accomplish City Council’s Goals.  CITY COUNCIL GOALS  As an energetic and thriving organization, the City of Lathrop strives to provide a balanced living environment to its citizens focusing on safety, family, and growth.  Below are the approved City Council’s goals designed to advance the City’s mission:   A feeling of Safety:  Achieved by maintaining safe streets and financial solvency to weather expected and unforeseen economic conditions.  Economic Growth:  Achieved by attracting new businesses and fostering relationships with current business owners, creating stable “head of 

household” jobs, balancing tax collections with housing development, and continuing Capital Improvement Projects (CIPs).   Promote Community Values:  Achieved by preserving our Parks, Recreation, and Community Services, promoting community involvement and 

civic engagement, nurturing our children and youth, and seeking cost reductions for our citizens.  Team Work:   Achieved by strengthening relations with City Council members, engaging citizens  in the decision making process, maintaining 

fluid lines of communication, and nurturing a work environment where employees are given the tools to succeed.        

Page 4: 2014 2015 Preliminary Budget

 

Illustration 1               FISCAL CLIMATE  After  the mid 1990’s  and prior  to  FY 2008/2009,  revenues  trended upward  at  varying  rates  giving  the City  a period of  growth  and  rapid housing development.  With the onset of the Great Recession, the City launched a series of short term cost reduction strategies which achieved approximately $3.9 million in savings.  However, the work did not stop there.  The City’s leadership recognized these challenging times as an opportunity to develop a sustainable financial model that will help weather the financial risks associated with volatile revenues and constant rising expenditures.  As a result, the City implemented a 10‐Year Budget Forecast Model and committed to preserve a General Fund Reserve of 10‐50 percent of annual expenditures.  As the new  fiscal year approaches, revenues seem  favorable as  the market stabilizes and shows slight signs of growth; however,  the City continues  to manage its funding sources with caution and prudence.   BUDGET STRATEGY  Even during the economic slowdown, Lathrop continued to grow slightly.  The City’s estimated population, as of January 1, 2014 is 19,831, which is an increase of 2.7 percent.  Growth will continue this year, albeit at a moderate pace, as the recovery begins to launch.  The budget strategy crafted for this year maintains its conservative approach as prior years by carefully projecting tangible and measurable revenue sources and including critical and necessary expenditures while preserving a healthy General Fund Reserve.  This strategy will provide an opportunity for the City to continue to refine its processes, consolidate its gains, and prepare for more development in the future.     

General Fund16%

Enterprise Fund30%Capital 

Improvement Fund23%

Special Revenue31%

Proposed Budget FY 2014/2015Appropriations $109.0 (in millions)

General Fund

Enterprise Fund

Capital Improvement Fund

Special Revenue

Page 5: 2014 2015 Preliminary Budget

 

FISCAL OUTLOOK        Revenues The City’s  revenue  streams  are  composed of  three major  funds:   1. General  Fund, 2. Enterprise  Fund,  and 3. Other  Sources  Fund.   General  Fund supports all general government activities such as police, parks, and public works.   The major source of  funding  for  the General Fund derives  from property and sales taxes.  For FY 2014/2015 initial estimates of property tax revenues indicate that there will be a slight increase from FY 2013/2014.  Additionally, Sales Tax revenues are expected to grow at a moderate pace (See Illustration 2).  However, these revenue sources are strictly dependent on consumer’s confidence and market conditions yielding the risk for unpredictability.  Staff continues to monitor this situation with the San Joaquin County Assessor and the State Board of Equalization and will advise all of the City’s stakeholders if any significant changes are anticipated.  On November 6, 2012, over 77% of the City of Lathrop registered voters passed Measure C, a sales tax  increase of 1 percent for goods and services consumed within the City of Lathrop boundaries.  Within the first few months of inception, Measure C has surpassed the forecasted FY 13/14 revenue estimates by $320,000 or 16 percent.  In FY 13/14, the City is expected to carry forward any residual funds due to the unexpected savings derived from public safety vacancies.   However, reserves  from prior Fiscal Years are expected to be used  in FY 14/15. Measure C  funds have provided additional equipment and staffing to support the Lathrop Fire District, Lathrop Police Services and City operations for the Lathrop Generations Center.  Expenditures Through the budget process, all departments have thoroughly examined their expenditures  in order to maximize the efficient use of resources.   The City  continues  to monitor  contracts  and operations with  a  focus on  cost  savings wherever possible.   However,  the  rising  costs  in  retirement  and healthcare benefits present a  challenge  for  this  fiscal year and  future years  to  come.   City departments worked  together  to plan  for  these known challenges and will continue to update Council if any significant changes arise.  Illustration 2  

 

Taxes51%

Licenses and Permits4%

Intergovermental7%

Current Service Charges16%

Fines and Forfeitures

0%

Use of Property and Money

0%

Other Revenue2%

Other Financing Sources20%

General Fund ‐ RevenuesFY 2014/2015$17.7 million

Personnel35%

Contractual Services13%

Contractual Services (Inter‐governmental)

29%

Materials, Supplies, and Equipment

4%Dues, Meetings, 

Training, and Travel1%

Fixed Charges4%

Fixed Assets2%

Depreciation and Amortization

2%Debt Service

4%Transfers

6%

General Fund ‐ ExpendituresFY 2014/2015$17.7 million

Page 6: 2014 2015 Preliminary Budget

 

General Fund Reserve The General Fund  reserve  is  similar  to a  savings account  in which money  is  set aside  for unforeseen economic events.   Although,  staff expects an upswing in the economy for Fiscal Year 2014/2015; we will continue to make conservative decisions over the next couple of years to maintain healthy General Fund reserves.   The proposed DRAFT General Fund budget  is balanced which means that expenditures are covered by revenues without the use of General Fund Reserves.   The Proposed Budget FY 2014/2015 ends the year with a General Fund reserve of approximately $9.2 million which means the City’s General Fund reserves remain in healthy standing.  FUTURE FISCAL CHALLENGES  Other Post‐Employment Benefits (OPEB) The City holds $8.2 million in unfunded long‐term liabilities associated with the retiree medical benefit.  Although, the benefit is currently funded on a pay‐as‐you‐go basis (paying only the actual costs of the benefit in the current fiscal year); Financial Accounting Standards require the City to account for the benefit as if it were actuarially funded.  Under this method, the City holds an unfunded liability of $3.8 million for FY 2014/2015.  Currently, the City  is exploring different  strategies on how  to minimize  the  future  impact of  this benefit by  considering  funding  for an OPEB Trust  through  labor negotiations with all bargaining units.    Retirement and Healthcare Costs Thirty Six percent of  the City’s operating budget  is dedicated  for employee  services.   Despite efforts  to  reduce  costs,  the  city has no  control over pension and health care increases.  Based on preliminary actuarial information, the employer contribution rate for retirement is anticipated to increase by approximately 7 percent over  the next  two years or $34,100.   On  the other hand, health care costs show a steady  increase of 5 percent due  to negotiated agreements with  labor groups  set  to expire  June 30, 2014.   Forecasting and managing  these  costs  remain a  critical  issue  for  the City’s leadership team as future financial planning tools are developed.    Levee Upgrades In the wake of Hurricane Katrina, much attention by the state and federal governments has been placed on  levees.   In 2007, Senate Bill 5 (SB5) was passed by the voters of California and later amended by SB 1278.  SB5 requires the State to develop and adopt a comprehensive Central Valley Flood Protection Plan (CVFPP), which was approved by the Central Valley Flood Protection Board (CVFPB)  in June 2012.   As amended, SB5 also requires all cities and counties  in the Central Valley to  incorporate the CVFPP  into their general plans by July 1, 2015 and  into their zoning ordinances by July 1, 2016.  Finally, SB5 restricts development beyond July 1, 2016 unless a permitting agency can make a “finding of adequate progress” towards providing an Urban  Level  of  Flood  Protection  (ULOP)  for  the  200‐year  flood  event.    Currently,  Cities  across  the  Valley  are working  feverishly  to meet  the requirements of AB 5 and SB 5 for all development that falls within the 200 year flood mapping.  In the coming months and years, this issue will remain as a priority for staff resources as the City moves forward solving the challenges ahead.    

Page 7: 2014 2015 Preliminary Budget

 

COMMUNITY ENRICHMENT PROJECTS  Lathrop Generations Center The Lathrop Generations Center is part of the Central Lathrop Development Area, located on an approximately 6.8 acre site at 450 Spartan Way.  The project site is located diagonally across the street from the existing Lathrop High School.  The Lathrop Generations Center will provide a combination of recreational,  social,  cultural,  educational,  and  environmental,  elements,  features  and opportunities  for  the  community.   The primary  features  and elements of the Center include, but are not limited to: Library, Youth Center, Skate and BMX Park, Parkour Exercise Course, Meander Walkways, Ball Wall, Playground, Public Plaza, Computer Lab, Public Art Display, Amphitheater, and Community Garden.  The grand opening is scheduled for June 27, 2014.   Libby Park Improvements Libby Park  is within the Historic Park District,  located at 575 Libby Lane.  In FY 2013/2014, Council approved the following renovations to Libby Park: new playground equipment, park benches, picnic tables, barbecue pit, exercise area with bark surface, sidewalks around the picnic tables and fence surrounding the playground area.   Apolinar Sangalang Park Improvements Sangalang Park is in the Stonebridge Subdivision.   In FY 2013/2014, the park received the following renovations: solar lighting, park benches, a game table, large barbecue pit, garbage disposal containers, and rubberized surface around the playground area.   Lathrop Community Center Renovations The Lathrop Community Center is located at 15557 Fifth Street, next to Manuel Valverde Park and the Lathrop Senior Center.  The Community Center was constructed  in the early 1970s and no significant renovations other than minor repairs have been undertaken since that time.   The Community Center Renovation project was created to refurbish and upgrade the building to meet building codes, American Disabilities Act (ADA) compliance and user needs.    In 2013, Council accepted  the  following  renovations and  improvements  to  the Community Center: building exterior  (lights, drainage, signage), interior life safety (fire alarm & sprinkler systems), central interior courtyard (replace iron gate, new lighting), gym (retrofit lighting fixtures, recondition bleachers), kitchen (demo and replace cabinets, appliances, flooring), office (relocate entrance, new service counter, renovate work areas), multipurpose room and classroom  (new  lighting, paint and telephone/data outlets), and restrooms (clean, replace toilet seats, flush valves, repaint) and storage areas (convert generator room to storage, new shelving).  Lathrop Road / Union Pacific Railroad (UPRR) Westerly Grade Separation Project The project will  construct a 4‐lane grade  separated  crossing over  the UPRR between 5th Street and McKinley Avenue.   The project will  create an uninterrupted path of travel from I‐5 to Hwy 99 that will improve traffic flow and emergency vehicle response times.  The project includes acquisition of several parcels, construction of earthen embankments, a cast in place box girder bridge, water and storm drain improvements, signal modifications, and removal of the public at grade railroad crossing.   Funding sources for the construction of the project  include Measure K ($10.6 Million), Prop 1B Highway‐Railroad Crossing Safety Account (HRCSA) ($5 Million) and UPRR ($1 Million).  The total project duration is approximately 18 months with an estimated completion in the Summer of 2015.   

Page 8: 2014 2015 Preliminary Budget

 

Manthey Road Bridge Replacement Project The project will  replace  the bridge on Manthey Road over  the San  Joaquin River.   The design will  incorporate  items  including, but not  limited  to, sidewalks, bike  lanes, and other  improvements  to  the bridge and approaches as deemed necessary.   The 88 year old existing bridge  is  located on Manthey Road, approximately 0.3 miles northeast of Stewart Road.  The existing bridge was identified by Caltrans for rehabilitation or replacement to maintain public safety.  The City applied for funding under the Federal Highway Administration – Highway Bridge Program (FHWA‐ HBP) and received project approval of roughly $30M. Authorization of funds in the amount of $4.5M for Preliminary Engineering and Environmental Service related costs has been granted so far. Current estimate of completion is 2020.   BUSINESS DEVELOPMENT PROJECTS  Over  the past several years,  the City of Lathrop staff and Council have  taken steps  to prepare  itself  for a slow and uncertain market.   The City has largely  succeeded  in  stabilizing  its  finances  by  implementing  cost  reduction  measures.    However,  expenditure  reduction  and  financial  model projections do not increase long‐term revenues to the City.  The key to success going forward will be to establish goals and strategies to market and position the City in areas of business development opportunities.  The City plans to strengthen its partnerships with existing businesses and reach out to new businesses.   Specifically, the City needs to retain the viable operations of businesses (e.g.: Tesla, Target, In N Out Burger Distribution Center, Ghirardelli  Chocolate  Company,  Gordon  Trucking,  California  Natural  Products,  etc.)  and  explore  options  to  attract  new  businesses,  especially businesses that create “head of household” jobs and generate tax revenues.    The San Joaquin Partnership The  City  of  Lathrop  is  an  active member  of  the  San  Joaquin  County  Partnership.  The  Partnership  is  a  private,  non‐profit  economic  development corporation serving all of San Joaquin County. The Partnership has been instrumental in many of the City’s top projects. They have devoted countless hours on many projects securing business development opportunities.  Since 1993, the Partnership has brought in, retained, or helped build out many significant projects in the City of Lathrop.  In keeping with City Council’s Business Development Goals, the Partnership will provide resources that are exceptionally useful  in  the City’s quest  to attract businesses  that provide “head of household”  jobs and value  to  the community.  In FY 2013/2014, Council authorized staff to enter into an augmented participation agreement with the Partnership. The Partnership staff is very knowledgeable about available opportunities in the City and serves as a first‐rate liaison between potential business and the City.    Consolidated Treatment Facility Expansion  The City of Lathrop  is grateful  to have a  strong and productive  relationship with  its development community.   Currently,  staff  is working with  the development community  to create agreements  to  finance  the Consolidated Treatment Facility Expansion project.   The expansion project will aid  in obtaining additional sewer capacity needed for new development, specifically, rooftops to attract commercial development. For FY 2013/2014, recent accomplishments included funding services for project design, permitting, construction, California Environmental Quality Act compliance requests, and a recycled water master plan update.     

Page 9: 2014 2015 Preliminary Budget
Page 10: 2014 2015 Preliminary Budget

City Council & Commissions                      

Youth Advisory Commission Evelyn Arreola Gurpreet Atwal Puneet Bajwa 

Cameron Gazaway  Joy Hermosilla Amanjot Khinda Haley Nieves Aasin Ortiz Kultar Ram 

Nathaniel Schuler Mauricio Torres Nicholas Vaughn 

 

City Council  (top left to bottom right)  

Steve Dresser, Councilmember Martha Salcedo, Councilmember Paul Akinjo, Councilmember Omar Ornelas, Vice Mayor Sonny Dhaliwal, Mayor 

Parks & Recreation Commission  Romi Bhinder Brent Maynor  

Charles McGonegal Jennifer Torres‐O’Callaghan  

David Tostado 

Planning Commission Mark A. Elliott    Mac Freeman  Bennie Gatto Tosh Ishihara  Jose Perez 

Measure C Oversight  Committee  Rev. Lucius Davis, Jr. 

Francisco Diaz  Willie McDaniel  Debra L. Rock 

Jennifer Torres‐O’Callaghan  

Senior Advisory Committee Dennis “Buck” Bandy Gordon Deckelmeier 

Lena M. Evans George Jackson Nellie Zavala Frances Dixon 

Lavon Kay Tindell 

Page 11: 2014 2015 Preliminary Budget

City of Lathrop Organizational ChartFY 2014-15

Steve Dresser Omar Ornelas Paul AkinjoSonny DhaliwalMartha SalcedoC il b

Commissions City Manager City Attorney

Councilmember Vice Mayor CouncilmemberMayorCouncilmember

Commissions City Manager

City Clerk Administrative Services

Finance Department City Engineer Public Works Community

DevelopmentParks &

Recreation Police Services

City Attorney

Page 12: 2014 2015 Preliminary Budget

Lathrop 

 Located in Northern California, 70 miles east of San Francisco, 60 miles south of Sacramento, 10 miles south of Stockton, and 328 miles from Los Angeles.  The City of Lathrop was founded on August 1, 1887. Since it was located by the railroad, it initially came to be known as Wilsons Station. Leland Stanford is credited as the founder of this city. The city was later named after his brother‐in‐law, Charles Lathrop.  It was incorporated as a city in 1989.          From 1989 to 2014, Lathrop experienced  major growth and made the Top Ten Fastest Growing Cities list several years in a row.  Even with develop‐ment slowing down last few years, Lathrop still experienced a 2.74 per‐cent growth in population, bringing its total population to 19,831.  

Lathrop, California

Page 13: 2014 2015 Preliminary Budget

SUMMARIES 

Page 14: 2014 2015 Preliminary Budget

Budget for FIscal Year 2014‐2015

ESTIMATED ESTIMATEDFUND FUNDBALANCE OPERATING CAPITAL TRANSFER OPERATING CAPITAL REBUDGET DEBT EQUIPMENT TRANSFER FUNDBALANCE FUNDNO. FUNDNAME 7/1/2014 REVENUES REVENUES IN EXPENDITURES IMPROVEMENTS CAPIMPROVE SERVICE REPLACEMENT OUT 6/30/2015 NO.GENERAL1010 GENERAL 9,012,324.96$ 14,299,368 3,552,981 15,878,769 631,850 200,000 1,003,099 9,150,956$ 10101050 ECONOMICDEVELOPMENT 713,100.00$ 663,100 50,000 ‐$ 1050SPECIALREVENUE2010 MEASURE"C"‐LMFD ‐$ 928,000 928,000 ‐$ 20102030 GASTAX2105 803,818.26$ 281,941 3,675,185 4,229,447 531,497$ 20302070 TRAFFICSAFETY 53,725.69$ 32,000 47,820 4,554 33,352$ 20702080 STREETEXP. 61,477.00$ 600,000 554,856 106,512 109$ 20802090 PUBLICNUISANCE 1,270$ 25,000 25,000 1,270 ‐$ 20902100 ASSETFORFEITURE 97$ 97 ‐$ 21002110 MEASURE"K" 670,438.43$ 300,000 7,692,182 8,041,179 621,441$ 21102120 PUBLICTRANSIT 26,099.00$ 25,692 407 ‐$ 21202140 LTF‐STREETS&ROADAPPORT(COG) 505,945$ 1,011,389 1,094,008 423,326$ 21402150 FEDERALGRANT ‐$ 3,951,604 3,951,604 ‐$ 21502160 STIPAUGMENTATION 3,553$ 1,833,082 1,833,082 3,553$ 21602190 UNIVERSALHIRINGGRANT 3$ 118,421 118,421 3$ 21902220 STATECOPS ‐$ 100,000 100,000 ‐$ 22202240 HISTORICLATHROPLOANFUND 215,002$ 215,002$ 22402250 TRAFFICMITIGATION 499,523$ 1,042,656 499,000 1,043,179$ 22502260 CULTURELEISURE 3,027,164$ 972,360 3,999,524$ 22602270 CITYSERVICES 2,371,797$ 1,935,175 626,250 3,680,722$ 22702280 STORMDRAINCFF 285,446$ 4,236 289,682$ 22802290 ADMINISTRATION 85,549$ 185,685 271,234$ 22902310 ENVIRONMENTALMITIGATIONCFF ‐$ ‐$ 23102320 W/CLATHROPTRANS.CFF 1,040,811$ 782,320 207,350 1,615,781$ 23202330 WLSPREGIONALTRANS.CFF 162,494$ 78,080 57,350 183,224$ 23302340 RTIF‐LATHROPLOCALEAST 49,883$ 10,509 5,000 55,392$ 23402350 RTIF‐SANJOAQUINCOUNTY10% ‐$ 78,947 78,947 ‐$ 23502360 RTIF‐LATHROPLOCALWEST 1,090,532$ 569,748 5,000 57,350 1,597,930$ 23602370 RTIF‐SANJOAQUINCOG ‐$ 118,420 118,420 ‐$ 23702390 CLSPSERVICESCFD 285,996.46$ 200,000 ‐ ‐ 164,637 ‐ ‐ ‐ ‐ 42,117 279,242$ 23902400 RECYCLING‐3%‐AB939 285,692.75 75,000 46,320 7,578 306,795$ 24002420 NORTHLATHROPTRANSPORTATION ‐$ 745,208 745,208$ 24202430 STEWARTECNOMICDEVELOPMENTFEE ‐$ 800,000 800,000$ 24302440 CITYWIDEECNOMICDEVELOPMENTFEE ‐$ 200,000 200,000$ 24402490 XROADSSTORMDRAINCAPREPL 93,457.30$ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 93,457$ 24902500 CROSSROADSSTORMDRAIN 19,755.74$ 113,395 ‐ 14,379 111,480 ‐ ‐ ‐ ‐ 36,049 1$ 25002510 STORMDRAIN‐SPECBEN. 120,977.80$ 238,292 ‐ ‐ 206,974 ‐ ‐ ‐ ‐ 41,767 110,529$ 25102520 STREETLIGHTING 91,192.77$ 155,759 ‐ 17,566 141,444 ‐ ‐ ‐ ‐ 17,295 105,779$ 25202530 WOODFIELDLANDSCAPE 9,084.82$ 54,764 ‐ 11,170 61,777 ‐ ‐ ‐ ‐ 13,237 5$ 25302550 STONEBRIDGELANDSCAPE 233,562.90$ 206,680 ‐ 3,492 180,647 ‐ ‐ ‐ ‐ 29,802 233,286$ 25502560 STONEBRIDGEDRAIN/LIGHTING 563,914.99$ 203,004 ‐ 3,492 198,215 ‐ ‐ ‐ ‐ 45,237 526,959$ 25602570 MOSSDALECFD 483,485.64$ 1,978,882 114,564 ‐ 2,002,780 ‐ ‐ ‐ ‐ 318,219 255,933$ 25702580 MOSSDALELANDSCAPE&LIGHTING 211,892.85$ 432,863 ‐ ‐ 345,227 ‐ ‐ ‐ ‐ 56,721 242,808$ 25802590 MOSSDALECFDCAPITALREPLACE 59,205.64$ ‐ ‐ 5,000 ‐ ‐ ‐ ‐ ‐ ‐ 64,206$ 25902610 MOSSDALEL&LCAPREPLACE 40,623.10$ ‐ ‐ 5,000 ‐ ‐ ‐ ‐ ‐ ‐ 45,623$ 26102630 HISTORICLATHROPCFD 26,576.52 31,608 ‐ ‐ 26,809 ‐ ‐ ‐ ‐ 4,613 26,763$ 26302650 CDBG 2,325$ 2,325$ 26502660 MOSSDALESTANDBY2005‐1 140,501.53$ 367,738 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 458,000 50,240$ 26602700 SCHOLARSHIP 4,500$ 2,000 6,500 ‐$ 2700

SUMMARY OF ESTIMATED TRANSACTION‐ALL FUNDSREVENUES APPROPRIATIONS

Page 15: 2014 2015 Preliminary Budget

Budget for FIscal Year 2014‐2015

ESTIMATED ESTIMATEDFUND FUNDBALANCE OPERATING CAPITAL TRANSFER OPERATING CAPITAL REBUDGET DEBT EQUIPMENT TRANSFER FUNDBALANCE FUNDNO. FUNDNAME 7/1/2014 REVENUES REVENUES IN EXPENDITURES IMPROVEMENTS CAPIMPROVE SERVICE REPLACEMENT OUT 6/30/2015 NO.

SUMMARY OF ESTIMATED TRANSACTION‐ALL FUNDSREVENUES APPROPRIATIONS

2710 DEVELOPERPROJECTS 522$ 3,278,660 3,279,182 ‐$ 2710CAPITALPROJECTS3010 GENERAL 1,231,599$ 1,374,739 2,553,338 53,000 ‐$ 30103310 STREETS&ROADS 3,662,921$ 18,067,169 4,586,713 17,138,373 5,004 ‐$ 33103410 PARKSFUND(IN‐LIEUFEES) 256,376$ 256,376$ 34103910 STORMDRAIN 334,989$ 50,000 50,000 334,989 ‐$ 3910Development4010 SAYBROOKCLSPLLC ‐$ 1,724,000 1,150,472 573,528 ‐$ 40104020 GATEWAY ‐$ 50,000 50,000 ‐$ 40204030 WATT(LATHROPII) ‐$ 5,000 5,000 ‐$ 40304060 S.LATHROPRICHLAND ‐$ 30,000 30,000 ‐$ 40604080 CROSSROADSRICHLAND ‐$ 107,500 107,500 ‐$ 40804100 PACIFICUNIONHOMES ‐$ 1,000 1,000 ‐$ 41004130 PULTEHOMES ‐$ 1,000 1,000 ‐$ 41304140 FARMWORLDANDROBINSON ‐$ 1,000 1,000 ‐$ 41404150 RIVERISLANDS ‐$ 650,000 490,146 159,854 ‐$ 41504170 TCNPROPERTIES ‐$ 15,000 15,000 ‐$ 41704180 WATT(LATHROPI) ‐$ 6,500 6,500 ‐$ 41804200 PEGASUSDEVELOPMENT ‐$ 10,000 10,000 ‐$ 4200ENTERPRISEFUNDS5400 SURFACEWATERSUPPLY‐CSLP ‐$ 1,216,434 576,128 640,306$ 54005410 MOSSDALEVILLAGECFD2003‐1 1,784,869$ 592,780 35,353 2,206,211 136,085$ 54105600 WATERSYSTEMCAPITALREPL 2,340,047$ 390,431 427,217 2,303,261$ 56005610 WATERCONNECTIONFEE 408,777$ 202,349 611,126$ 56105620 WATER 3,461,945$ 5,974,412 581,219 1,704,092 3,201,637 2,978,706 2,007,764 3,533,561$ 56205640 SURFACEWATERSUPPLYCFF 253,436$ 30,317 253,435 30,318$ 56405690 WATERCIP 707,881$ 2,384,108 388,789 2,701,408 1,792 ‐$ 56906010 MWQCFCOLLECTIONSYSTEM 1,847,072$ 2,970,958 1,753,375 994,542 2,070,113$ 60106030 WASTEWATERCONNECTIONFEE 930,461$ 80,163 532 1,010,092$ 60306050 WATERRECYCLINGPLANT#1 920,707$ 1,193,258 806,906 345,865 961,194$ 60506060 WASTEWATERSYSTEMCAPREPL 3,179,078$ 408,066 190,040 3,397,104$ 60606070 WATERRECYCLINGPNT#1CAPREPL 725,453$ 163,976 122,463 766,966$ 60706080 WWRECYCLINGPLANT‐#1MBR 1,153,703$ 1,228,145 457,963 1,561,355 468,726 809,730$ 60806090 WASTEWATERCIP 7,577,795$ 3,832,544 3,402,500 8,006,319 1,520 ‐$ 60906100 MANTECAWWTPEXPANSION 4,713$ 4,713$ 61006110 WWRECYCLEDWATERCAPREPL 965,399$ 93,118 319,171 739,346$ 6110

55,100,540.48$ 30,558,488$ 34,384,272$ 34,092,286$ 31,261,579$ 8,428,002$ 30,734,427$ 4,343,938$ 200,000$ 34,092,286$ 45,075,354$TOTAL

Page 16: 2014 2015 Preliminary Budget

Amended Est. RevenuesFY 2013‐2014

Est RevenuesFY 2014‐2015

$2,878,936  $3,030,000 $6,529,303  $4,970,000 $340,000  $400,000 $667,000  $667,000 $440,196  $754,122 

$1,189,538  $1,185,000 $2,110,821  $2,760,914 

$70,000  $67,000 $68,692  $54,849 

$752,706  $410,483 $3,753,445  $3,552,981 

$18,800,637  $17,852,349 

FINES AND FORFEITURES

$634,796 $1,215,823 INTERGOVERNMENTAL

LICENSES AND PERMITS

Fund Total: General Fund $14,112,565 $3,293,884 TRANSFER IN

$4,931 $333,923 

USE OF MONEY AND PROPERTYOTHER

$1,451,260 $138,478 

$466,328 $667,509 

$2,776,751 $3,128,883 

CURRENT SERVICE CHARGES

PROPERTY TAXSALES TAXTRANSIENT OCCUPANCYFRANCHISE TAX

GENERAL FUND SUMMARY OF MAJOR SOURCES

ActualFY 2012‐2013

Page 17: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

1010‐11‐10‐371‐90‐00 $6,000  $0 1010‐11‐10‐372‐02‐07 $0  $0 

$6,000  $0 

341‐01‐01 $18,600  $30,000 $18,600  $30,000 

1010‐12‐10‐341‐01‐01 $0  $3,000 1010‐12‐10‐371‐06‐00 $5,000  $5,000 1010‐12‐10‐371‐90‐00 $0  $2,200 

$5,000  $10,200 

1010‐13‐10‐341‐01‐01 $30,000  $25,000 1010‐13‐10‐371‐90‐00 $500  $0 

$30,500  $25,000 

1010‐15‐10‐311‐01‐00 $2,798,936  $2,950,000 1010‐15‐10‐311‐03‐01 $15,000  $15,000 1010‐15‐10‐311‐04‐00 $65,000  $65,000 1010‐15‐10‐313‐01‐00 $1,850,000  $1,950,000 1010‐15‐10‐313‐01‐01 $1,732,303  $0 1010‐15‐10‐313‐02‐00 $627,000  $700,000 1010‐15‐10‐314‐01‐00 $340,000  $400,000 1010‐15‐10‐314‐01‐01 $0  $0 1010‐15‐10‐319‐05‐00 $0  $0 1010‐15‐10‐319‐05‐01 $250,000  $280,000 1010‐15‐10‐319‐05‐02 $150,000  $120,000 1010‐15‐10‐319‐05‐03 $62,000  $62,000 1010‐15‐10‐319‐05‐04 $150,000  $150,000 1010‐15‐10‐319‐05‐05 $40,000  $40,000 1010‐15‐10‐319‐05‐07 $15,000  $15,000 1010‐15‐10‐322‐01‐00 $80,000  $80,000 

Art Show $0 $11,529 

City ManagerCurrent Service Charges ‐ General $14,264 

GENERAL FUND REVENUE BY DEPARTMENT

DescriptionActual

FY 2012‐2013City Council

Miscellaneous Revenue $11,529 

Miscellaneous Revenue $2,099 $7,844 

City AttorneyCurrent Service Charges ‐ General $29,283 

$14,264 City Clerk

Current Service Charges ‐ General $0 Passports $5,745 

Supplemental SB813 Current $27,273 Other Property Taxes $73,195 Sales and Use Retail Sales Tax $1,990,041 

Miscellaneous Revenue $67 $29,350 

FinanceSecured Property Taxes $2,676,283 

Transient Occupancy Tax Late Fees $11,164 Franchises $0 Franchise Electric Tax $286,271 

SBOE Appeals $0 Sales Tax in Lieu $685,854 Transient Occupancy Tax $455,164 

Industrial Waste $35,800 Telecommunications $27,061 Business Licenses $83,626 

Gas Tax & Surcharge $101,740 Cable  $62,324 Solid Waste $154,313 

Page 18: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

GENERAL FUND REVENUE BY DEPARTMENT

DescriptionActual

FY 2012‐2013

1010‐15‐10‐324‐03‐00 $100  $50 1010‐15‐10‐331‐01‐00 $10,000  $10,000 1010‐15‐10‐331‐01‐02 $1,119,650  $1,120,000 1010‐15‐10‐331‐02‐00 $35,000  $35,000 1010‐15‐10‐341‐01‐01 $50,000  $50,000 1010‐15‐10‐341‐01‐03 $1,300  $1,000 1010‐15‐10‐361‐01‐00 $47,400  $25,000 1010‐15‐10‐371‐03‐00 $0  $0 1010‐15‐10‐371‐08‐00 $0  $0 1010‐15‐10‐371‐90‐00 $500  $500 1010‐15‐10‐374‐01‐00 $0  $0 1010‐15‐20‐341‐01‐01 $0  $9,600 1010‐15‐20‐379‐01‐00 $0  $63,000 

$9,439,189  $8,141,150 

1010‐14‐40‐331‐05‐00 $0  $20,000 1010‐14‐40‐363‐01‐00 $0  $6,000 1010‐14‐40‐371‐08‐00 $0  $0 1010‐16‐10‐321‐01‐00 $75,000  $65,000 1010‐16‐10‐321‐03‐00 $500  $500 1010‐16‐10‐341‐01‐01 $2,000  $2,000 1010‐16‐10‐341‐01‐20 $2,000  $2,000 1010‐16‐10‐371‐01‐00 $4,000  $4,000 1010‐16‐10‐371‐01‐01 $100  $100 1010‐16‐10‐371‐01‐02 $10,000  $10,000 1010‐16‐10‐371‐01‐03 $5,000  $5,000 1010‐16‐10‐371‐90‐00 $100  $0 1010‐16‐10‐372‐02‐00 $100  $100 

$98,800  $114,700 

1010‐19‐10‐313‐03‐00 $2,320,000  $2,320,000 $2,320,000  $2,320,000 

Home Owner Tax Relief $33,953 Current Service Charges ‐ General $92,045 Return Check Charge $780 

Finance (Continued)Garage Sale Permits $70 Vehicle License Fee $9,693 Vehicle License Fee in Lieu $1,066,317 

Miscellaneous Revenue $344 Late Charge Penalties $0 Current Service Charges ‐ General $0 

Investment Earnings $0 State Mandated Reimbursement $113 Settlement Proceeds $161,964 

Sale Surplus Property $0 Settlement Proceeds $9,000 Animal Licenses $73,136 

Equipment Replacement $0 $8,035,388 

Administrative ServicesIntergovernmental State ‐ Other State Grants $0 

Over the Counter Animal Shelter $8,908 Forfeited Spay/Neuter Deposit $0 Manteca Shelter Credits $13,011 

Dangerous Animal Permit $950 Current Service Charges ‐ General $2,110 Unaltered Impound Animal Fees $1,960 

$118,823 Measure C 

Taxes ‐ Sales & Use ‐ Measure C  $452,987 $452,987 

Petsmart $9,485 Miscellaneous Revenue $0 Contributions $263 

Page 19: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

GENERAL FUND REVENUE BY DEPARTMENT

DescriptionActual

FY 2012‐2013

1010‐20‐10‐324‐20‐00 $1,060  $1,060 1010‐20‐10‐341‐01‐01 $50,000  $75,000 1010‐20‐10‐341‐01‐02 $0  $0 1010‐20‐10‐341‐02‐01 $24,538  $39,453 1010‐20‐10‐341‐02‐04 $0  $0 1010‐20‐10‐371‐90‐00 $509,201  $240,000 1010‐20‐30‐323‐01‐00 $276,276  $599,052 1010‐20‐30‐341‐02‐02 $63,075  $138,297 1010‐20‐30‐341‐02‐03 $5,000  $5,000 1010‐20‐30‐341‐02‐04 $5,000  $5,000 1010‐20‐30‐371‐04‐00 $200  $200 1010‐20‐30‐371‐07‐00 $300  $300 1010‐20‐30‐371‐09‐00 $105  $500 1010‐20‐60‐341‐02‐03 $5,000  $1,000 1010‐20‐60‐341‐04‐00 $0  $0 1010‐20‐60‐351‐03‐00 $5,000  $2,000 

$944,755  $1,106,862 

1010‐30‐01‐371‐90‐00 $0  $0 1010‐30‐01‐372‐04‐00 $0  $0 1010‐30‐21‐341‐01‐04 $4,668  $3,610 1010‐30‐21‐362‐01‐00 $780  $780 1010‐30‐21‐372‐02‐00 $100  $100 1010‐30‐21‐372‐02‐09 $9,000  $8,900 1010‐30‐30‐341‐01‐04 $36,840  $38,215 1010‐30‐30‐362‐01‐00 $5,243  $7,800 1010‐30‐30‐372‐02‐00 $500  $0 1010‐30‐30‐372‐02‐02 $2,000  $2,000 1010‐30‐33‐341‐01‐04 $72,710  $76,750 1010‐30‐36‐341‐01‐04 $14,640  $16,989 1010‐30‐36‐372‐02‐00 $500  $0 

$146,981  $155,144 

Zoning Fees $23,468 Microfiche $0 Miscellaneous Revenue $80,197 

Community DevelopmentHome Occupation Permits $1,219 Current Service Charges ‐ General $60,928 Sales of Maps $22 

Microfiche $9,274 SMIP Education Fee $266 Building Standards Administration $211 

Construction Permits $467,897 Plan Check Fees $110,045 Inspection Fees $6,492 

Other Fines $25,397 $789,571 

Culture and Recreation Miscellaneous Revenue $1,050 

SB‐1186 Business License $138 Inspection Fees $3,517 Fireworks Permit $500 

Contributions $0 SAC Contributions $23,053 Parks and Recreation Fees $28,886 

East Lathrop Community Complex  $3,700 Parks and Recreation Fees $5,289 Rents and Concessions $1,393 

Parks and Recreation Fees $67,437 Parks and Recreation Fees $13,874 Contributions $102 

Rents and Concessions $6,083 Contributions $30 YAC Contributions $2,562 

$153,458 

Page 20: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

GENERAL FUND REVENUE BY DEPARTMENT

DescriptionActual

FY 2012‐2013

1010‐40‐10‐333‐09‐00 $24,888  $0 1010‐40‐10‐341‐01‐01 $273,700  $263,700 1010‐40‐10‐341‐01‐05 $700  $700 1010‐40‐10‐351‐02‐00 $30,000  $30,000 1010‐40‐10‐351‐03‐00 $20,000  $20,000 1010‐40‐10‐352‐02‐00 $15,000  $15,000 1010‐40‐10‐363‐01‐00 $5,000  $5,000 1010‐40‐10‐372‐02‐10 $55,000  $55,000 1010‐40‐10‐379‐01‐00 $90,000  $13,583 

$514,288  $402,983 

1010‐50‐01‐324‐01‐00 $2,400  $3,600 1010‐50‐01‐324‐02‐00 $4,860  $4,860 1010‐50‐01‐341‐01‐01 $3,000  $3,000 1010‐50‐01‐341‐02‐02 $0  $0 1010‐50‐01‐341‐02‐03 $0  $0 1010‐50‐01‐371‐90‐00 $0  $0 1010‐50‐03‐341‐02‐03 $747,295  $829,700 1010‐50‐04‐341‐01‐01 $104,100  $150,000 1010‐50‐04‐341‐02‐02 $594,655  $989,900 1010‐50‐05‐379‐01‐00 $5,000  $0 1010‐50‐06‐341‐01‐01 $2,000  $2,000 1010‐50‐70‐362‐01‐00 $10,269  $10,269 1010‐50‐70‐379‐01‐00 $34,000  $0 1010‐50‐80‐371‐90‐00 $0  $0 1010‐50‐80‐379‐01‐00 $15,500  $0 

$1,523,079  $1,993,329 

1010‐99‐00‐393‐00‐00 $3,753,445  $3,552,981 $3,753,445  $3,552,981 

$18,800,637  $17,852,349 

Cadet Academy $900 Parking Violations $74,167 Other Fines $23,274 

Public SafetyARRA $105,860 Current Service Charges ‐ General $25,227 

Equipment Replacement $0 $245,067 

Public WorksEncroachment Permit $3,600 

Impound Vehicle Fee $15,639 Sale Surplus Property $0 MUSD ‐ School Resource Officer $0 

Inspection Fees $2,170 Miscellaneous Revenue $63 Inspection Fees $286,366 

Transportation Permits $4,298 Current Service Charges ‐ General $142,894 Plan Check Fees $2,795 

Current Service Charges ‐ General $0 Rents and Concessions $21,830 Equipment Replacement $0 

Current Service Charges ‐ General $26,760 Current Service Charges ‐ Plan Check Fees $493,975 Equipment Replacement $0 

General Funds By Deparment Totals: $14,136,940 

Transfers InTransfers In $3,293,884 

$3,293,884 

Miscellaneous Revenue $26 Equipment Replacement $0 

$984,776 

Page 21: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

1050‐15‐10‐361‐01‐00 $0  $0 1050‐99‐00‐393‐00‐00 $0  $0 

$0  $0 

2010‐99‐00‐393‐00‐00 $928,000  $928,000 $928,000  $928,000 

2030‐15‐10‐361‐01‐00 $0  $0 2030‐50‐10‐331‐03‐01 $80,000  $90,836 2030‐50‐10‐331‐03‐02 $50,000  $75,492 2030‐50‐10‐331‐03‐03 $100,000  $111,613 2030‐50‐10‐331‐03‐04 $4,000  $4,000 2030‐50‐10‐331‐03‐05 $230,000  $197,659 2030‐50‐10‐331‐20‐00 $5,000,000  $3,477,526 

$5,464,000  $3,957,126 

2070‐15‐10‐361‐01‐00 $0  $0 2070‐40‐10‐351‐01‐00 $32,000  $32,000 2070‐40‐10‐379‐01‐00 $28,200  $0 

$60,200  $32,000 

2080‐15‐10‐361‐01‐00 $0  $0 2080‐50‐10‐371‐90‐00 $1,000  $0 2080‐50‐10‐379‐01‐00 $10,000  $0 2080‐99‐00‐393‐00‐00 $400,000  $600,000 

$411,000  $600,000 

2090‐15‐10361‐01‐00 $0  $0 2090‐20‐40‐351‐03‐00 $0  $0 2090‐99‐00‐393‐00‐00 $26,766  $25,000 

$26,766  $25,000 

2100‐15‐10‐361‐01‐00 $0  $0 

$25,993 Asset Forfeiture

Investment Earnings $4 

Public NuisanceInvestment Earnings $29 Other Fines $964 Transfers In $25,000 

Equipment Replacement $0 Transfers In $400,000 

$401,745 

$36,557 

Investment Earnings $878 Miscellaneous Revenue $868 

Traffic SafetyInvestment Earnings $290 Vehicle Code Fines $36,268 Equipment Replacement $0 

Streets

Gas Tax HUTA 2103 (Replace prop 42) $168,656 Prop 1B Street & Road Improvements $0 

$433,724 

Gas Tax 2106 $58,188 Gas Tax 2107 $124,810 Gas Tax 2107.5 $4,000 

Gas Tax 2105 $75,663 

Transfers In $116,400 $118,954 

LMFD Measure CTransfers In $0 

Gast Tax

OTHER FUNDS

DescriptionActual

FY 2012‐2013Economic Development

Investment Earnings $2,554 

$0 

Investment Earnings $2,406 

Page 22: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

2110‐15‐10‐361‐01‐00 $0  $0 2110‐80‐00‐332‐01‐01 $300,000  $300,000 2110‐80‐00‐332‐01‐03 $10,855,000  $7,692,182 

$11,155,000  $7,992,182 

2120‐15‐10‐361‐01‐00 $0  $0 $0  $0 

2140‐15‐10‐361‐01‐00 $0  $0 2140‐80‐00‐332‐05‐00 $834,229  $999,018 2140‐80‐00‐332‐07‐00 $11,870  $12,371 

$846,099  $1,011,389 

2150‐15‐10‐361‐01‐00 $0  $0 2150‐80‐00‐333‐05‐00 $1,250,000  $3,951,604 2150‐80‐00‐333‐09‐01 $0  $0 

$1,250,000  $3,951,604 

2160‐15‐10‐361‐01‐00 $0  $0 2160‐80‐00‐331‐05‐10 $4,394,176  $1,301,123 2160‐80‐00‐331‐06‐00 $1,317,325  $531,959 

$5,711,501  $1,833,082 

2190‐15‐10‐361‐01‐00 $0  $0 2190‐40‐10‐333‐05‐00 $26,652  $118,421 

$26,652  $118,421 

2220‐40‐16‐333‐02‐00 $100,000  $100,000 $100,000  $100,000 

2230‐15‐10‐361‐01‐00 $0  $0 $0  $0 

Investment Earnings $9 $9 

State COPS SB1913Intergovernmental Federal ‐ COPS $100,000 

$100,000 Regional Traffic

Universal Hiring GrantInvestment Earnings $8 Other Federal Grants $10,640 

$10,648 

State ‐ Prop 84 $747,908 STIP Augmentation Grant $2,053,095 

$2,801,442 

ARRA EECBG Program $51,175 $1,817,486 

STIP AugmentationInvestment Earnings $440 

$416,201 Federal Grant

Investment Earnings $0 Other Federal Grants $1,766,312 

Local Transportation Fund ‐Streets & Roads (COG)Investment Earnings $1,989 LTF ‐ Streets & Roads $400,804 Pedestrian & Bike Path $13,408 

$311,942 Public Transit

Investment Earnings $0 $0 

Measure KInvestment Earnings $1,032 Measure "K" Maintenance Improvements $300,000 Measure "K" Lathrop Road Grade $10,909 

Page 23: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

2240‐15‐10‐361‐01‐00 $0  $0 $0  $0 

2250‐15‐10‐361‐01‐00 $0  $0 2250‐50‐10‐318‐02‐00 $134,001  $1,042,656 

$134,001  $1,042,656 

2260‐15‐10‐361‐01‐00 $0  $0 2260‐30‐40‐318‐03‐00 $1,443,006  $972,360 

$1,443,006  $972,360 

2270‐15‐10‐318‐04‐01 $1,590,580  $1,935,175 227‐15‐10‐361‐01‐00 $0  $0 

$1,590,580  $1,935,175 

2280‐15‐10‐361‐01‐00 $0  $0 2280‐50‐20‐318‐04‐02 $5,021  $4,236 2280‐50‐90‐318‐04‐02 $0  $0 

$5,021  $4,236 

2290‐15‐10‐318‐04‐03 $133,019  $162,215 2290‐15‐10‐318‐04‐05 $18,442  $23,470 2290‐15‐10‐361‐01‐00 $0  $0 

$151,461  $185,685 

2310‐15‐10‐361‐01‐00 $0  $0 2310‐50‐10‐318‐04‐04 $0  $0 

$0  $0 

2320‐15‐10‐361‐01‐00 $0  $0 2320‐50‐10‐318‐02‐00 $720,788  $782,320 

$720,788  $782,320 

W/C Lathrop Local Trans CFFInvestment Earnings $2,157 CFF ‐ Local Trans $296,318 

$298,475 

Environmental Mitigation CFFInvestment Earnings $32 CFF ‐ Environmental Mitigation $0 

$32 

CFF ‐ RTIF Administration $6,371 Investment Earnings $167 

$70,941 

CFF ‐ Storm Drain West $0 $765 

AdministrationCFF ‐ City Administration $64,402 

$461,098 Storm Drain CFF

Investment Earnings $765 CFF ‐ Storm Drain East $0 

$792,474 City Services

CFF ‐ City Services $454,315 Investment Earnings $6,783 

$32,212 Culture & Leisure

Investment Earnings $5,396 CFF ‐ Culture and Leisure $787,078 

$539 Traffic Mitigation

Investment Earnings $21 CFF ‐ Construction Development Local Trans $32,192 

Historic Lathrop Loan Investment Earnings $539 

Page 24: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

2330‐15‐10‐361‐01‐00 $0  $0 2330‐50‐10‐318‐01‐00 $113,616  $78,080 

$113,616  $78,080 

2340‐15‐10‐361‐01‐00 $0  $0 2340‐50‐10‐318‐01‐00 $203,227  $10,509 

$203,227  $10,509 

2350‐15‐10‐361‐01‐00 $0  $0 2350‐50‐10‐318‐01‐00 $80,753  $78,947 

$80,753  $78,947 

2360‐15‐10‐361‐01‐00 $0  $0 2360‐50‐10‐318‐01‐00 $586,701  $569,748 

$586,701  $569,748 

2370‐15‐10‐361‐01‐00 $0  $0 2370‐50‐10‐318‐01‐00 $121,130  $118,420 

$121,130  $118,420 

2390‐15‐10‐361‐01‐00 $0  $0 2390‐50‐66‐355‐01‐24 $345,520  $200,000 

$345,520  $200,000 

2400‐15‐10‐361‐01‐00 $0  $0 2400‐50‐40‐319‐05‐06 $70,000  $70,000 2400‐50‐40‐331‐05‐09 $5,000  $5,000 

$75,000  $75,000 

2420‐50‐10‐318‐02‐01 $0  $745,208 $0  $745,208 

$79,987 North Lathrop Transportation

CFF ‐ N Lathrop Transportation $0 $0 

Recycling ‐ 3% AB 939Investment Earnings $597 Recycling AB939 $74,021 Beverage Recycling Grant $5,369 

CLSP Services CFDInvestment Earnings $1,019 CFD 2006‐2 CLSP Services  $228,627 

$229,646 

RTIF‐San Joaquin COG 15%Investment Earnings $68 CFF ‐ Regional Trans  $63,714 

$63,782 

RTIF‐Lathrop Local WestInvestment Earnings $3,615 CFF ‐ Regional Trans  $294,358 

$297,973 

RTIF‐San Joaquin County 10%Investment Earnings $45 CFF ‐ Regional Trans  $42,476 

$42,521 

RTIF‐Lathrop Local EastInvestment Earnings $1,178 CFF ‐ Regional Trans  $17,839 

$19,017 

WLSP Regional Trans CFFInvestment Earnings $320 CFF ‐ Regional Trans  $38,679 

$38,999 

Page 25: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

2430‐11‐30‐318‐18‐01 $0  $800,000 $0  $800,000 

2440‐11‐30‐318‐18‐02 $0  $200,000 $0  $200,000 

2490‐15‐10‐361‐01‐00 $0  $0 $0  $0 

2500‐15‐10‐361‐01‐00 $0  $0 2500‐50‐21‐355‐01‐01 $113,395  $113,395 2500‐50‐21‐379‐01‐00 $3,000  $0 2500‐99‐00‐393‐00‐00 $38,812  $14,379 

$155,207  $127,774 

2510‐15‐10‐361‐01‐00 $0  $0 2510‐50‐20‐355‐01‐02 $238,983  $238,292 2510‐50‐20‐379‐01‐00 $3,750  $0 

$242,733  $238,292 

2520‐15‐10‐361‐01‐00 $0  $0 2520‐50‐12‐355‐01‐10 $103,587  $106,163 2520‐50‐14‐355‐01‐11 $47,771  $49,596 2520‐99‐00‐393‐00‐00 $17,095  $17,566 

$168,453  $173,325 

2530‐15‐10‐361‐01‐00 $0  $0 2530‐50‐62‐355‐01‐15 $54,764  $54,764 2530‐99‐00‐393‐00‐00 $9,013  $11,170 

$63,777  $65,934 

2550‐15‐10‐361‐01‐00 $0  $0 2550‐50‐60‐355‐01‐18 $203,229  $203,230 

$54,827 Stonebridget Landscaping Maintenance District

Investment Earnings $509 Stonebridge‐Landscaping $231,656 

Woodfield LandscapeInvestment Earnings $63 Landscape Maint‐Woodfield $54,764 Transfers In $0 

Industrial ‐ Lighting Zone 2 $43,589 Transfers In $24,577 

$169,005 

$239,133 Streets Lighting

Investment Earnings $268 Residential ‐ Light District Fee Zone 2 $100,572 

Storm Drain City Zone 1Investment Earnings $267 Storm Drain Fee $238,866 Equipment Replacement $0 

Equipment Replacement $0 Transfers In $8,795 

$122,379 

$234 Crossroads Storm Drain Zone 1A

Investment Earnings $189 Special Assess XRoads Storm Drain Asess $113,394 

CFF ‐ Citywide 20% $0 $0 

XRoads Storm Drain Capital ReplacementInvestment Earnings $234 

Stewart Economic Dev Fee 80%CFF ‐ Stewart Tract 80% $0 

$0 Citywide Economic Dev Fee 20%

Page 26: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

2550‐50‐60‐362‐01‐00 $3,450  $3,450 2550‐50‐60‐379‐01‐00 $5,061  $0 2550‐99‐00‐393‐00‐00 $3,326  $3,492 

$215,066  $210,172 

2560‐15‐10‐361‐01‐00 $0  $0 2560‐50‐61‐355‐01‐20 $203,004  $203,004 2560‐50‐61‐379‐01‐00 $2,250  $0 2560‐99‐00‐393‐00‐00 $3,326  $3,492 

$208,580  $206,496 

2570‐15‐10‐361‐01‐00 $0  $0 2570‐50‐63‐318‐07‐00 $89,469  $114,564 2570‐50‐63‐355‐01‐13 $1,934,330  $1,973,882 2570‐50‐63‐362‐01‐00 $4,350  $5,000 2570‐99‐00‐393‐00‐00 $4,093  $0 

$2,032,242  $2,093,446 

2580‐15‐10‐361‐01‐00 $0  $0 2580‐50‐64‐355‐01‐14 $432,862  $432,863 2580‐50‐64‐379‐01‐00 $36  $0 2580‐99‐00‐393‐00‐00 $2,964  $0 

$435,862  $432,863 

2590‐15‐10‐361‐01‐00 $0  $0 2590‐99‐00‐393‐00‐00 $5,000  $5,000 

$5,000  $5,000 

2610‐99‐00‐393‐00‐00 $5,000  $5,000 $5,000  $5,000 

2630‐15‐10‐361‐01‐00 $0  $0 2630‐50‐65‐355‐01‐19 $17,748  $18,108 

$5,084 Historic Lathrop CFD 2005‐1

Investment Earnings $61 CFD 2005‐1 Historic Lathrop  $16,065 

Transfers In $37,422 $37,494 

Mossdale LLMD Cap ReplacementTransfers In $5,084 

Transfers In $0 $432,971 

Mossdale CFD Capital ReplacementInvestment Earnings $72 

Mossdale Landscape & LightingInvestment Earnings $332 Mossdale LLMD $432,639 Equipment Replacement $0 

Rents and Concessions $0 Transfers In $21,680 

$2,024,177 

Mossdale CFD 2004‐1 Investment Earnings $1,978 CFF ‐ Mossdale Maint District Fee $104,010 CFD 2004‐1 Mossdale Services $1,896,509 

Equipment Replacement $0 Transfers In $3,168 

$236,569 

$235,332 Stonebridge Drain/Lighting

Investment Earnings $2,002 Stonebridge Drainage and Lighting $231,399 

Stonebridget Landscaping Maintenance District (Continued)Rents and Concessions $0 Equipment Replacement $0 Transfers In $3,168 

Page 27: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

2630‐50‐65‐355‐01‐23 $13,500  $13,500 $31,248  $31,608 

2650‐15‐10‐361‐01‐00 $0  $0 2650‐20‐10‐333‐01‐00 $27,541  $0 

$27,541  $0 

2660‐15‐10‐361‐01‐00 $0  $0 2660‐50‐34‐344‐01‐36 $414,476  $367,738 

$414,476  $367,738 

2700‐15‐10‐361‐01‐00 $0  $0 2700‐30‐01‐333‐01‐02 $0  $1,000 2700‐30‐01‐372‐02‐00 $0  $1,000 

$0  $2,000 

2710‐15‐10‐361‐01‐00 $0  $0 2710‐80‐00‐372‐01‐00 $11,680,677  $3,278,660 

$11,680,677  $3,278,660 

3010‐15‐10‐361‐01‐00 $0  $0 3010‐99‐00‐393‐00‐00 $4,783,149  $1,374,739 

$4,783,149  $1,374,739 

3310‐15‐10‐361‐01‐00 $0  $0 3310‐99‐00‐393‐00‐00 $21,218,932  $18,067,169 

$21,218,932  $18,067,169 

3410‐15‐10‐361‐01‐00 $0  $0 $0  $0 

3910‐15‐10‐361‐01‐00 $0  $0 Storm Drain CIP

Investment Earnings $865 

$4,947,055 Park In‐Lieu

Investment Earnings $762 $762 

$513,961 Streets and Road

Investment Earnings $8,459 Transfers In $4,938,595 

$939,913 General CIP

Investment Earnings $12,573 Transfers In $501,387 

$3,093 Developer Projects

Investment Earnings $1,363 Developer Contribution $938,550 

ScholarshipInvestment Earnings $27 CDBG Community Center $1,000 Contributions $2,065 

Mossdale Standby 2005‐1Investment Earnings $563 Mossdale Standby 2005‐1 $569,083 

$569,646 

Investment Earnings $6 CDBG $0 

$6 

Historic Lathrop CFD 2005‐1 (Continued)Historic Lathrop CFD Zone ‐ 2 $13,500 

$29,627 CDBG

Page 28: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

3910‐99‐00‐393‐00‐00 $62,000  $50,000 $62,000  $50,000 

4010‐15‐10‐361‐01‐00 $0  $400 4010‐89‐99‐371‐91‐00 $1,849,000  $1,723,600 

$1,849,000  $1,724,000 

4020‐15‐10‐361‐01‐00 $0  $250 4020‐89‐99‐371‐91‐00 $70,000  $49,750 

$70,000  $50,000 

4030‐15‐10‐361‐01‐00 $0  $50 4030‐89‐99‐371‐91‐00 $7,500  $4,950 

$7,500  $5,000 

4040‐15‐10‐361‐01‐00 $0  $0 4040‐89‐99‐371‐91‐00 $100  $0 

$100  $0 

4060‐15‐10‐361‐01‐00 $0  $50 4060‐89‐99‐371‐91‐00 $120,000  $29,950 

$120,000  $30,000 

4080‐15‐10‐361‐01‐00 $0  $100 4080‐89‐99‐371‐91‐00 $1,303,666  $107,400 

$1,303,666  $107,500 

4100‐89‐99‐371‐91‐00 $10,000  $1,000 $10,000  $1,000 

4130‐15‐10‐361‐01‐00 $0  $700 4130‐89‐99‐371‐91‐00 $1,500  $300 

$1,500  $1,000 

Pulte HomesInvestment Earnings $614 Contribution from Development $0 

$614 

$20,813 Pacific Union Homes

Contribution from Development $0 $0 

$14,800 Xroads Richland

Investment Earnings $53 Contribution from Development $20,760 

$8 South Lathrop Richland

Investment Earnings $27 Contribution from Development $14,774 

$26 KB Homes

Investment Earnings $8 Contribution from Development $0 

$210 Watt Lathrop II

Investment Earnings $26 Contribution from Development $0 

$1,173,784 Gateway

Investment Earnings $210 Contribution from Development $0 

$865 Saybrook CLSP LLC

Investment Earnings $0 Contribution from Development $1,173,784 

Transfers In $0 Storm Drain CIP (Continued)

Page 29: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

4140‐15‐10‐361‐01‐00 $0  $0 4140‐89‐99‐371‐91‐00 $500  $500 

$500  $500 

4150‐15‐10‐361‐01‐00 $0  $4,500 4150‐89‐99‐371‐91‐00 $611,000  $645,500 

$611,000  $650,000 

4160‐15‐10‐361‐01‐00 $0  $50 4160‐89‐99‐371‐91‐00 $500  $450 

$500  $500 

4170‐89‐99‐371‐91‐00 $30,000  $15,000 $30,000  $15,000 

4180‐15‐10‐361‐01‐00 $0  $50 4180‐89‐99‐371‐91‐00 $9,000  $6,450 

$9,000  $6,500 

4200‐15‐10‐361‐01‐00 $0  $20 4200‐89‐99‐371‐91‐00 $10,000  $9,980 

$10,000  $10,000 

5400‐15‐10‐361‐01‐00 $0  $0 5400‐50‐90‐318‐04‐20 $1,213,945  $1,216,434 

$1,213,945  $1,216,434 

5410‐15‐10‐361‐01‐00 $0  $0 5410‐5050‐355‐01‐21 $652,430  $592,780 

$652,430  $592,780 

5600‐15‐10‐361‐01‐00 $0  $0 Water System Capital Replacement

Investment Earnings $5,269 

Mossdale Village CFD 2003‐1Investment Earnings $6,259 CFD 2003‐1 Mossdale Village  $523,161 

$529,420 

Surface Water Supply ‐ CLSPInvestment Earnings $475 CFF ‐ Water Connection $547,112 

$547,587 

Pegasus DevelopmentInvestment Earnings $2 Contribution from Development $759 

$761 

Investment Earnings $32 Contribution from Development $0 

$32 

TCN PropertiesContribution from Development $1,439 

$1,439 Watt Lathrop I

Robinson PropertyInvestment Earnings $46 Contribution from Development $0 

$46 

River IslandsInvestment Earnings $4,305 Contribution from Development $597,233 

$601,537 

FarmworldInvestment Earnings $2 Contribution from Development $0 

$2 

Page 30: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

5600‐99‐00‐393‐00‐00 $340,420  $390,431 $340,420  $390,431 

5610‐15‐10‐361‐01‐00 $0  $0 5610‐50‐50‐318‐04‐20 $29,870  $30,317 5610‐50‐90‐318‐04‐20 $107,605  $172,032 5610‐50‐90‐318‐04‐60 $0  $0 

$137,475  $202,349 

5620‐15‐10‐361‐01‐00 $10,400  $10,400 374‐01‐00 $63,000  $63,000 5620‐50‐50‐345‐01‐10 $3,982,478  $3,999,728 5620‐50‐50‐345‐01‐12 $60,000  $60,000 5620‐50‐50‐345‐01‐20 $7,000  $7,000 5620‐50‐50‐345‐01‐30 $193,301  $193,301 5620‐50‐50‐345‐01‐40 $557,362  $557,362 5620‐50‐50‐345‐01‐41 $900,000  $850,000 5620‐50‐50‐361‐02‐00 $0  $0 5620‐50‐50‐371‐90‐00 $0  $47,794 5620‐50‐50‐379‐01‐00 $14,000  $25,973 5620‐50‐90‐318‐04‐20 $0  $0 5620‐80‐00‐372‐01‐00 $159,854  $159,854 5620‐80‐00‐375‐01‐00 $581,219  $581,219 5620‐99‐00‐393‐00‐00 $1,914,593  $1,704,092 

$8,443,207  $8,259,723 

5640‐15‐10‐361‐01‐00 $0  $0 5640‐50‐50‐318‐04‐21 $16,310  $30,317 

$16,310  $30,317 

5650‐99‐00‐393‐00‐00 $0  $0 $0  $0 

$13,124 SFR Loan

Transfers In $597,573 $597,573 

$8,427,746 Surface Water Supply CFF

Investment Earnings $572 CFF ‐ Surface Water Supply $12,552 

Developer Contribution $159,854 Well 21 Construction $0 Transfers In $1,694,280 

Miscellaneous Revenue $150 Equipment Replacement $0 CFF ‐ Water Connection West $265,978 

Water SCSWSP Facilities Charge $559,826 Water SCSWSP Fixed Charges $895,475 Specific Investment Earnings $1,273 

Water Reconnection Fees $65,557 Water Construction $6,930 Water Fire Lines $265,957 

WaterInvestment Earnings $12,574 Late Charge Penalties $75,564 Water Service Charges $4,424,328 

CFF ‐ Water Connection West $85,252 CFF ‐ Merchant Builders West $0 

$137,047 

$329,778 Water Connection Fee

Investment Earnings $773 CFF ‐ Water Connection East $51,022 

Transfers In $324,509 Water System Capital Replacement (Continued)

Page 31: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

5690‐15‐10‐361‐01‐00 $0  $0 5690‐99‐00‐393‐00‐00 $2,766,759  $2,384,108 

$2,766,759  $2,384,108 

6010‐15‐10‐361‐01‐00 $5,000  $5,000 6010‐15‐10‐374‐01‐00 $50,000  $50,000 6010‐50‐30‐344‐01‐10 $2,713,038  $2,769,429 6010‐50‐30‐344‐01‐12 $1,200  $1,200 6010‐50‐30‐344‐01‐20 $135,821  $145,329 6010‐50‐30‐345‐01‐23 $0  $0 6010‐50‐30‐379‐01‐00 $5,500  $0 6010‐99‐00‐393‐00‐00 $0  $0 

$2,910,559  $2,970,958 

6030‐15‐10‐361‐01‐00 $0  $0 6030‐50‐30‐318‐04‐50 $97,712  $69,923 6030‐50‐30‐318‐04‐60 $0  $0 6030‐50‐90‐318‐04‐50 $6,549  $10,240 6030‐50‐90‐318‐04‐60 $0  $0 

$104,261  $80,163 

6050‐15‐10‐361‐01‐00 $5,000  $5,000 6050‐15‐10‐374‐01‐00 $0  $7,000 6050‐50‐31‐344‐01‐30 $1,140,913  $1,140,913 6050‐50‐31‐344‐01‐35 $30,345  $30,345 6050‐50‐31‐371‐90‐00 $0  $0 6050‐50‐32‐371‐90‐00 $10,000  $10,000 

$1,186,258  $1,193,258 

6060‐15‐10‐361‐01‐00 $0  $0 6060‐99‐00‐393‐00‐00 $398,840  $408,066 

$398,840  $408,066 Transfers In $390,854 

$397,489 

Miscellaneous Revenue $21,400 $1,198,808 

Wastewater Capital ReplacementInvestment Earnings $6,635 

XRoads Wastewater Charges $1,139,705 XRoads Standby $30,317 Miscellaneous Revenue $2,000 

$72,790 Water Recycling Plant #1

Investment Earnings $2,057 Late Charge Penalties $3,329 

CFF ‐ Merchant Builders East $0 CFF ‐ Sewer Construction West $5,079 CFF ‐ Merchant Builders West $0 

$2,951,287 Wastewater Connection Fee

Investment Earnings $1,388 CFF ‐ Sewer Construction East $66,323 

Water Repair and Maintenance $15,557 Equipment Replacement $0 Transfers In $95,123 

Wastewater Charges $2,622,318 Lot Segregation $0 Wastewater CO‐GEN $161,825 

$1,028,422 MWQCF Collection System

Investment Earnings $5,756 Late Charge Penalties $50,709 

Water CIPInvestment Earnings $4,681 Transfers In $1,023,741 

Page 32: 2014 2015 Preliminary Budget

Account Number

AmendedEst. RevenuesFY 2013‐2014

Est. Revenues FY 2014‐2015

OTHER FUNDS

DescriptionActual

FY 2012‐2013

6070‐15‐10‐361‐01‐00 $0  $0 6070‐99‐00‐393‐00‐00 $163,976  $163,976 

$163,976  $163,976 

6080‐15‐10‐361‐01‐00 $3,500  $3,500 6080‐15‐10‐374‐01‐00 $25,000  $28,000 6080‐50‐34‐344‐01‐10 $1,200,000  $1,184,225 6080‐50‐34‐371‐90‐00 $12,420  $12,420 6080‐50‐34‐379‐01‐00 $7,000  $0 6080‐99‐00‐393‐00‐00 $414,476  $457,963 

$1,662,396  $1,686,108 

6090‐15‐10‐361‐01‐00 $0  $0 6090‐99‐00‐393‐00‐00 $12,202,877  $3,832,544 

$12,202,877  $3,832,544 

6100‐15‐10‐361‐01‐00 $0  $0 $0  $0 

6110‐15‐10‐361‐01‐00 $0  $0 6110‐99‐00‐393‐00‐00 $108,568  $93,118 

$108,568  $93,118 

$109,631,012  $81,182,697 

$128,431,649  $99,035,046 Total Other Funds: $40,358,813 Grand Totals: $54,495,753 

Investment Earnings $3,057 Transfers In $0 

$3,057 

Manteca WWTP ExpansionInvestment Earnings $13 

$13 MBR Plant #1  Capital Replacement

Wastewater CIPInvestment Earnings $3,970 Transfers In $958,105 

$962,075 

Equipment Replacement $0 Transfers In $571,579 

$1,713,931 

Late Charge Penalties $23,963 Wastewater Charges $1,114,934 Miscellaneous Revenue $0 

Transfers In $168,088 $169,298 

MBR Plant #1 ‐ West SewerInvestment Earnings $3,455 

Water Recycling Plant #1 Capital ReplacementInvestment Earnings $1,210 

Page 33: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended$76,382  $58,875 

$551,128  $568,731 $901,763  $663,100 

$1,452,891  $1,231,831 

$184,907  $194,665 

$491,218  $448,095 

$1,331,773  $1,129,220 $976,990  $985,647 

$2,308,763  $2,114,867 

$196,285  $227,315 $574,400  $630,665 $330,469  $251,056 

$1,101,154  $1,109,036 

$1,200,000  $1,392,000 $925,662  $928,000 

$2,125,662  $2,320,000 

$990,325  $576,046 $619,382  $787,878 $121,122  $50,184 $25,000  $25,000 

$1,755,829  $1,439,108 

Lathrop Manteca Fire District  $0 

Economic Development $88,976 Total: City Manager

Public Nuisance $13,986 

Total: Measure C 

Community Development

Code Compliance $187,780 Building $461,956 Planning $478,048 

Total: Community Development $1,141,769 

City Manager $196,596 

$285,572 

City Manager

City Council $57,959 

City Attorney $456,586 

Central Services $418,086 Personnel $133,838 

Total: Finance $1,670,649 Information Technology

$0 

2013 Actual Amount

OPERATING EXPENDITURES BY DEPARTMENT

$841,768 Finance $828,881 

Measure C 

Total: Administrative Services $879,124 Animal Services $327,201 

Essential City Services $0 

Administrative Services

City Clerk $144,552 

Page 34: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended2013 Actual Amount

OPERATING EXPENDITURES BY DEPARTMENT

$511,274  $457,252 $179,205  $182,080 $201,451  $205,638 $296,247  $297,924 $68,831  $101,950 $10,936  $12,166 

$1,267,944  $1,257,010 

$4,523,568  $4,720,153 $77,795  $47,820 

$760  $0 $30,402  $118,421 

$100,000  $100,000 $4,732,525  $4,986,394 

$478,801  $544,011 $816,926  $533,186 $907,008  $548,574 $326,950  $234,326 $229,891  $248,538 $273,490  $237,294 $214,188  $255,300 $480,346  $524,657 $28,065  $30,199 $20,071  $25,692 $5,000  $5,000 

$80,753  $78,947 $354,676  $5,000 $121,130  $118,420 $307,007  $164,637 

Culture and Recreation $390,517 $167,617 

CFD 2006‐2 CLSP Services  $259,806 

Parks & Landscape Maintenance $173,817 

Traffic Safety $24,858 

Universal Hiring GrantState COPS Fund ‐ State AB1913 $100,000 

Kids Club & Day Camp $258,701 

Public Safety

$4,435,247 

Sports, Fitness & Outdoor Prgms $56,673 

$1,069,331 Library $9,727 Total: Culture & Recreation

Police Services $4,302,494 

Total: Public Safety

$176,589 

$433,199 

$290,359 

$80,498 

$210,153 

Adminstration $433,102 

$316,019 

$0 

$1,104 Asset Forefeiture$6,790 

Public Works

RTIF ‐ Lathrop Local EastRTIF ‐ San Joaquin County 10% $53,666 RTIF ‐ Lathrop Local West $0 RTIF ‐ San Joaquin COG

Senior CenterAdministration

$25,542 

Construction ManagementLand DevelopmentCity HallUtility EngineeringBuilding Maintenance $140,598 

StreetsStreet Trees & LandscapingPublic Transit $2,700 

Recreation Programs $186,096 

Page 35: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended2013 Actual Amount

OPERATING EXPENDITURES BY DEPARTMENT

$42,155  $46,320 $144,123  $111,480 $209,802  $206,974 $122,983  $87,877 $32,966  $53,567 $62,004  $61,777 

$176,188  $180,647 $197,918  $198,215 

$1,858,833  $2,002,780 $371,512  $345,227 $30,273  $26,809 

$7,893,059  $6,875,454 

$36,653  $35,353 $3,278,604  $3,201,637 $2,672,895  $1,753,375 $692,511  $667,763 $148,167  $139,143 

$1,719,940  $1,561,355 $8,548,770  $7,358,626 

$1,849,000  $1,150,472 $70,000  $50,000 $7,500  $5,000 $100  $0 

$120,000  $30,000 $1,303,666  $107,500 

$10,000  $1,000 $1,500  $1,000 $500  $500 

Water $2,915,645 MWQCF Collection System $1,109,507 Xroad Treatment Plant

$1,024,726 Xroads WW Collection System $98,564 

Total: UtilitiesMBR Plant #1 ‐ West Sewer

UtilitiesCFD 2003‐1 Mossdale Village $26,963 

Pulte Homes $0 Farmworld

$586,782 

Developer Projects$604,935 

CFD 2004‐1 Mossdale Services $1,743,903 

$5,337,046 $17,491 

$999 

$5,845 

$5,762,188 

Mossdale LLMD $250,762 CFD 2005‐1 Historic LathropTotal: Public Works

Saybrook CLSP LLC

$335 GatewayWatt Lathrop II

$0 

KB Homes $0 South Lathrop Richland $14,850 Xroads RichlandPacific Union Homes $362 

$68,718 $24,340 

$143,248 

Solid Waste $37,392 Public Works (Continued)

$142,474 

$47,610 

Crossroads Storm Drains $117,328 Storm DrainsResidential LMDIndustrial LMDWoodfield LMDStonebridge Landscaping Maintenance Dist $147,733 Stonebridge Drainage & Lighting District

Page 36: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended2013 Actual Amount

OPERATING EXPENDITURES BY DEPARTMENT

$451,146  $490,146 $0  $500 

$30,000  $15,000 $9,000  $6,500 

$10,000  $10,000 $3,862,412  $1,867,618 

$35,801,516  $31,261,579 $22,305,858 Grand Totals:

Total: Developer Projects $1,065,834 

Watt Lathrop I $116 Pegasus Development $1,547 

Developer Projects (Continued)River IslandsRobinson Property $253 TCN Properties $1,524 

$435,068 

Page 37: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended

$76,382  $58,875 $551,128  $568,731 $184,907  $194,665 $491,218  $448,095 

$1,331,773  $1,129,220 $976,990  $985,647 $196,285  $227,315 $574,400  $630,665 $330,469  $251,056 

$1,200,000  $1,392,000 $990,325  $576,046 $619,382  $787,878 $121,122  $50,184 $511,274  $457,252 $179,205  $182,080 $201,451  $205,638 $296,247  $297,924 $68,831  $101,950 $10,936  $12,166 

$4,523,568  $4,720,153 $478,801  $544,011 $816,926  $533,186 $907,008  $548,574 $326,950  $234,326 $229,891  $248,538 $273,490  $237,294 $214,188  $255,300 

$16,683,147  $15,878,769 

OPERATING EXPENDITURES BY FUND

2013 Actual Amount

City Council $57,959 

City Clerk $144,552 City Attorney $456,586 

City Manager $196,596 

Animal Services $327,201 

Personnel $133,838 Central Services $418,086 

Finance $828,881 Information Technology $841,768 

Measure C $0 

Code Compliance $187,780 

Planning $478,048 Building $461,956 

Recreation Programs $186,096 Kids Club & Day Camp $258,701 Sports, Fitness & Outdoor Prgms $56,673 

Parks and Recreation ‐ Administration $390,517 Senior Center $167,617 

Police Services $4,302,494 

$11,788,553 

Library $9,727 

Land Development $210,153 City Hall $176,589 Utility Engineering $316,019 

Public Works ‐ Adminstration $433,102 Construction Management $433,199 

Building Maintenance $140,598 Parks & Landscape Maintenance $173,817 Total: General Fund 

General Fund ‐ 1010

Page 38: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended

OPERATING EXPENDITURES BY FUND

2013 Actual Amount

$901,763  $663,100 

$925,662  $928,000 

$77,795  $47,820 

$508,411  $554,856 

$25,000  $25,000 

$760  $0 

$20,071  $25,692 

$30,402  $118,421 

$100,000  $100,000 

$5,000  $5,000 

$80,753  $78,947 

$354,676  $5,000 

$121,130  $118,420 

$307,007  $164,637 

$42,155  $46,320 

$144,123  $111,480 

Economic Development Fund ‐ 1050 $88,976 

Public Nuisance Fund ‐ 2090 $13,986 

LMFD ‐ Measure C Fund ‐ 2010  $0 

Traffic Safety Fund ‐ 2070 $24,858 

Asset Forefeiture Fund ‐ 2100 $1,104 

Public Transit Fund ‐ 2120 $2,700 

RTIF ‐ Lathrop Local East Fund ‐ 2340  $0 

Streets Fund ‐ 2080 $315,902 

Universal Hiring Grant Fund ‐ 2190 $6,790 

State COPS Fund ‐ 2220 $100,000 

$259,806 

Solid Waste Fund ‐ 2400 $37,392 

Crossroads Storm Drains Fund ‐ 2500 $117,328 

RTIF ‐ San Joaquin County 10% Fund ‐ 2350 $53,666 

RTIF ‐ Lathrop Local West Fund ‐ 2360 $0 

RTIF ‐ San Joaquin COG Fund ‐ 2370 $80,498 

Special Revenue Funds

CFD 2006‐2 CLSP Services Fund ‐2390

Page 39: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended

OPERATING EXPENDITURES BY FUND

2013 Actual Amount

$209,802  $206,974 

$155,949  $141,444 

$62,004  $61,777 

$176,188  $180,647 

$197,918  $198,215 

$1,858,833  $2,002,780 

$371,512  $345,227 

$30,273  $26,809 

$1,849,000  $1,150,472 

$70,000  $50,000 

$7,500  $5,000 

$100  $0 

$120,000  $30,000 

$1,303,666  $107,500 

$10,000  $1,000 

$1,500  $1,000 

CFD 2004‐1 Mossdale Services Fund ‐ 2570 $1,743,903 

Mossdale LLMD Fund ‐ 2580 $250,762 

CFD 2005‐1 Historic Lathrop Fund 2630 $17,491 

Saybrook CLSP LLC Fund ‐ 4010 $604,935 

Gateway Fund  Fund ‐ 4020 $999 

Pacific Union Homes Fund ‐ 4100 $362 

Pulte Homes Fund ‐  4130 $0 

Watt Lathrop II Fund ‐ 4030 $335 

KB Homes Fund ‐ 4040 $0 

South Lathrop Richland Fund ‐ 4050 $14,850 

Xroads Richland Fund ‐4080 $5,845 

Special Revenue Funds (Continued)

Woodfield LMD Fund ‐ 2530 $47,610 

Stonebridge Landscaping Maint. Dist. Fund ‐  2550 $147,733 

Stonebridge Drainage & Lighting District Fund ‐ 2560 $142,474 

Storm Drains Fund ‐ 2510 $143,248 

Street Lighting Fund ‐ 2520 $93,057 

Page 40: 2014 2015 Preliminary Budget

2014 Amended Budget

2015 City Manager 

Recommended

OPERATING EXPENDITURES BY FUND

2013 Actual Amount

$500  $500 

$451,146  $490,146 

$0  $500 

$30,000  $15,000 

$9,000  $6,500 

$10,000  $10,000 

$10,569,599  $8,024,184 

$36,653  $35,353 

$3,278,604  $3,201,637 

$2,672,895  $1,753,375 

$840,678  $806,906 

$1,719,940  $1,561,355 

$8,548,770  $7,358,626 

$35,801,516  $31,261,579 

CFD 2003‐1 Mossdale Village ‐ 5410 $26,963 

Grand Totals: $22,305,858 

TCN Properties Fund ‐ 4170 $1,524 

Watt Lathrop I Fund ‐ 4180 $116 

Pegasus Development Fund ‐ 4200 $1,547 

Farmworld Fund ‐ 4140 $0 

River Islands Fund ‐ 4150 $435,068 

Robinson Property ‐ 4160 $253 

Total: Enterprise Funds $5,762,188 

Special Revenue Funds (Continued)

Total: Special Revenue Funds $4,755,117 

Enterprise Funds

MBR Plant #1 ‐ West Sewer Fund ‐ 6080 $1,024,726 

Water Fund ‐ 5620 $2,915,645 

MWQCF Collection System Fund ‐ 6010 $1,109,507 

Xroad Plant Fund ‐ 6050 $685,346 

Page 41: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015

CITY MANAGERCity Manager 1.00 1.00 1.00Executive Assistant 1.00 1.00 1.00City Engineer 0.00 0.50 0.50

2.00 2.50 2.50

CITY CLERKCity Clerk 1.00 1.00 1.00Senior Administrative Assistant 0.50 0.50 0.20

1.50 1.50 1.20

CITY ATTORNEYCity Attorney 1.00 1.00 1.00Legal Secretary 1.00 1.00 1.00

2.00 2.00 2.00

FINANCEAccountant I/II 1.00 1.00 1.00Accounting Manager 1.00 1.00 1.00Accounting Specialist I/II/Technician 4.00 4.00 4.00Budget Manager 1.00 1.00 1.00Budget Analyst I/II 1.00 1.00 1.00Director of Finance 1.00 1.00 1.00Executive Assistant  1.00 1.00 1.00Information Technology Analyst 0.00 0.00 0.00Information Technology Manager 1.00 1.00 1.00Information Technology Technician 1.00 1.00 1.00Programmer Analyst 0.00 0.00 1.00Senior Accounting Technician 0.00 1.00 1.00Special Districts Manager 1.00 0.00 0.00

13.00 13.00 14.00

ADMINISTRATIVE SERVICESAnimal Services Assistant 1.00 1.00 0.00Animal Services Officer 2.00 2.00 2.00Director of Administrative Services 0.50 0.70 1.00Management Analyst I/II 0.20 0.20 0.00Senior Administrative Assistant 0.50 0.50 0.80

4.20 4.40 3.80

2015City Manager 

Recommended

AUTHORIZED REGULAR POSITIONS BY DEPARTMENT

2013 Actual2014 Amended 

Budget

Page 42: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015

2015City Manager 

Recommended

AUTHORIZED REGULAR POSITIONS BY DEPARTMENT

2013 Actual2014 Amended 

Budget

COMMUNITY DEVELOPMENT Administrative Assistant I/II 0.00 0.67 0.67Building Inspector I/II/III 1.00 1.00 1.00Chief Building Official 1.00 1.00 1.00Code Compliance Officer I/II/III 1.00 1.00 1.00Director of Community Development 1.00 1.00 1.00Management Analyst I/II 1.00 0.00 0.00Permit Technician 1.00 1.00 1.00Principal Planner 1.00 0.00 0.00Senior Administrative Assistant 1.00 0.50 0.50Senior Planner 1.00 1.00 1.00

9.00 7.17 7.17

CULTURE & RECREATIONAdministrative Assistant I/II 1.00 0.00 0.00Management Analyst I/II 0.80 0.80 1.00Director of Administrative Services 0.50 0.30 0.00Director of Parks and Recreation 0.00 1.00 1.00Facility Supervisor 0.66 0.66 0.66Parks and Recreation Administrator 1.00 1.00 1.00Projects and Programs Manager 1.00 1.00 0.50Recreation Coordinator 0.00 1.00 1.00Recreation Leaders 3.70 3.70 3.70Recreation Supervisor 2.00 2.00 2.00Senior Center Manager 1.00 1.00 1.00Senior Recreation Leaders 3.75 3.75 3.50

15.41 16.21 15.36

PUBLIC SAFETYAdministrative Assistant I/II 1.00 1.00 1.00Criminal Research Analyst 1.00 1.00 0.00Management Analyst I/II 0.00 1.00 1.00Police Office Supervisor 1.00 1.00 1.00

3.00 4.00 3.00

Contractual ServicesChief of Police 1.00 1.00 1.00Deputy Sheriff II for Community Resource Officer 1.00 1.00 1.00Deputy Sheriff II for School Resource Officer 1.00 1.00 1.00

Page 43: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015

2015City Manager 

Recommended

AUTHORIZED REGULAR POSITIONS BY DEPARTMENT

2013 Actual2014 Amended 

Budget

PUBLIC SAFETY (Continued)Deputy Sheriff II for Investigations 1.00 1.00 1.00Deputy Sheriff II for Patrol 15.00 15.00 15.00Lieutenant to serve as Supervisor 1.00 1.00 1.00Sergeant to serve as Supervisor 2.00 2.00 2.00

22.00 22.00 22.00

PUBLIC WORKSAdministrative Assistant I/II 1.00 1.33 1.33Budget Analyst I/II 1.00 0.00 0.00City Engineer 0.00 0.50 0.50Construction Inspector I/II 1.00 1.00 1.00Director of Public Works 1.00 1.00 1.00Junior Engineer 1.00 1.00 1.00Maintenance Services Supervisor Parks 1.00 1.00 1.00Maintenance Worker I/II 2.00 3.00 3.00Meter Reader 1.00 1.00 1.00Projects and Programs Manager 0.00 0.00 0.50Public Works Superintendent 1.00 1.00 1.00Senior Administrative Assistant 0.00 1.50 1.50Senior Engineer 2.00 2.00 2.00Senior Maintenance Worker Parks 1.00 1.00 1.00Senior Maintenance Worker 1.00 1.00 1.00Senior Management Analyst 0.00 1.00 1.00Solid Waste & Recycling Coordinator 1.00 0.00 0.00Utility Operator I/II/III 5.00 5.00 5.00

20.00 22.33 22.83

MEASURE CEssential City Services

(1) Office Assistant I/II 0.00 1.00 1.00(2) Facility Supervisor 0.00 1.20 1.20

0.00 2.20 2.20

Contractual ServicesDeputy Sheriff II for Community Impact Team 0.00 2.00 2.00Deputy Sheriff II for School Resource Officer 0.00 1.00 1.00Sergeant to serve as Supervisor 0.00 1.00 1.00

0.00 4.00 4.00

Page 44: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015

2015City Manager 

Recommended

AUTHORIZED REGULAR POSITIONS BY DEPARTMENT

2013 Actual2014 Amended 

Budget

MEASURE C (Continued)Lathrop Manteca Fire DistrictFirefighters/Engineers 0.00 2.00 6.00Battalion Chiefs 0.00 0.00 1.98

0.00 2.00 7.98

70.11 75.31 74.0622.00 28.00 33.9892.11 103.31 108.04

(1) 1.00 FTE Office Assistant I/II in Culture and Recreation Department

(2) 1.20 FTE Facility Supervisor in Culture and Recreation Department

TOTAL FUNDED POSITIONS

Total City Staff positionsTotal Contractual positions

Page 45: 2014 2015 Preliminary Budget

General Fund$17,713,718 

16%

Water Capital$6,590,333 

6%

Wastewater Operations ‐MWQCF$2,747,917 

3%

Wastewater Operations‐WPR$1,152,771 

1%

Wastewater Operations‐MBR $2,030,081 

2%

Wastewater Capital$12,042,545 

11%

General Fund

Special Revenue Funds

Construction Funds

Water Operations

Water Capital

Total City Budget by Fund Type Fiscal Year 2014‐2015

Special Revenue Funds$33,873,343 

31%

Construction Funds$24,721,417 

23%

Water Operations$8,188,107 

7%

6% Water Capital

Wastewater Operations ‐MWQCF

Wastewater Operations‐WPR

Wastewater Operations‐MBR 

Wastewater Capital

Page 46: 2014 2015 Preliminary Budget

Property Tax$3,030,000 

17%

S l & U TMotor Vehicle in Lieu

$1 185 000

Service Charges$2,760,914 

16%

Fines & Forfeitures$67,000 0%

Use of Money & Property$54,849 0%

Other  $410,483 

2%

General Fund Anticipated Revenues Fiscal Year 2014‐2015

Property Tax

Sales & Use Tax

Measure C ‐ Sales Tax

Operating Transfer In

Hotel Tax

Franchise Fees

Sales & Use Tax$2,650,000 

15%

Measure C ‐ Sales Tax$2,320,000 

13%Operating Transfer In

$3,552,981 20%

Hotel Tax$400,000 

2%

Franchise Fees$667,000 

4%

Licenses & Permits$754,122 

4%

$1,185,000 7% Licenses & Permits

Motor Vehicle in Lieu

Service Charges

Fines & Forfeitures

Use of Money & Property

Other  

Page 47: 2014 2015 Preliminary Budget

Culture and Recreation$1,257,010 

7%

Public Works $2,601,229 

15%Adminstrative Services

$1,109,036 

Measure C$2,320,000 

13%

Debt Service$631,850 

4%

Equipment Replacement $200,000 

1%

Public Nuisance$25,000 0%

Assessment Districts$50,099 0%

General Fund Expenditures Fiscal Year 2014‐2015Culture and Recreation

Public Works 

Community Development

Public Safety

General Government

Finance & InformationTechnology

Community Development$1,414,108 

8%

Public Safety$4,720,153 

27%General Government$1,270,366 

7%

Finance & InformationTechnology$2,114,867 

12%

6% Adminstrative Services

Measure C

Debt Service

Equipment Replacement

Public Nuisance

Assessment Districts

Page 48: 2014 2015 Preliminary Budget

GENERAL GOVERNMENT 

Page 49: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended$6,000.00 $0.00$76,382.00 $58,875.00

($70,382.00) ($58,875.00)

$6,000.00 $0.00$76,382.00 $58,875.00

($70,382.00) ($58,875.00)Net Grand Totals: ($46,430.70)

Revenue Grand Totals: $11,528.75Expense Grand Totals: $57,959.45

Expense Totals $57,959.45Fund Total: General Fund ($46,430.70)

City Council Department Budget Summary

Description 2013 Actual AmountRevenue Totals: $11,528.75

Page 50: 2014 2015 Preliminary Budget

 City Council 

Description of Division The Mayor and City Council consist of the Mayor and four Councilmembers and acts as the policy‐making body for the City of Lathrop. The goal of the Council is to govern the City in a manner that is both responsive to the needs and concerns of the City residents and is financially sound. The City Council enacts and enforces ordinances and regulations that concern municipal affairs, subject only to the limitations and restrictions of the State Constitution. The City Council, as a body, supervises and provides guidance for the activities of the City. The City Council members are the elected representatives of the citizens of Lathrop. 

 Accomplishments 2013/2014 

Financial  Solvency.    Implemented  a 10‐year budget model which projects  revenues  and  expenses  into  the  future.  The model is an essential aid in guiding the annual budget and ensuring financial sustainability. 

Promote Business Development. Due to the downturn in the economy in residential construction, considerable time has been  spent working on  solutions  to various challenges.  Including meeting with  the San  Joaquin Partnership and various potential businesses. 

Promote Community Values.   Create an environment where children and seniors are valued and nurtured, where the City values  civic  engagement  and  promotes  community  involvement.    Reinforce  a  sense  of  community  by  focusing  on community events and community safety. 

  

Work Plan 2014/2015 

Financial Solvency.  Continue to maintain the 10‐year survival plan to ensure the City’s sustainability.  Continue to ensure that the City’s budget reflects the community’s spending priorities and includes economic development and public safety. 

Promote Business Development.  Promote equitable and sustainable development in residential construction, commercial construction and industrial construction. Continue to work and the San Joaquin Partnership to  attract and retain business development. 

Promote Community Values.   Continue  to create an environment where children and seniors are valued and nurtured, where  the  City  values  civic  engagement  and  promotes  community  involvement.    Reinforce  a  sense  of  community  by focusing on community events. 

1.  Continue to explore resident cost reduction options  2.  Continue to maintain Parks, Recreation and Community Services  

Page 51: 2014 2015 Preliminary Budget

 City Council 

 Work Plan 2014/2015 (continued) 

  

Capital Improvement Program. Focus on projects that benefit the community as a whole, such as: the City Library, Lathrop’s Generation Center and Skate Park.   These projects work well with Council’s work plan to reinforce the sense of community theme by focusing on community projects and leisure programs for all age groups.  

 Capital Requests 

    None        Significant Operating Changes 

     None 

 

 

Page 52: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $18,000.00 $18,000.00410‐44‐00 $17,500.00 $19,250.00410‐46‐00 $1,382.00 $1,115.00410‐46‐01 $0.00 $260.00410‐47‐00 $0.00 $0.00

$36,882.00 $38,625.00

420‐01‐00 $15,000.00 $4,000.00420‐38‐00 $7,500.00 $1,500.00420‐42‐00 $0.00 $0.00420‐65‐00 $400.00 $500.00

$22,900.00 $6,000.00

430‐10‐00 $500.00 $500.00430‐20‐00 $500.00 $1,000.00430‐43‐00 $100.00 $250.00430‐47‐00 $500.00 $500.00

$1,600.00 $2,250.00

435‐10‐00 $7,000.00 $7,000.00435‐20‐00 $8,000.00 $5,000.00

$15,000.00 $12,000.00$76,382.00 $58,875.00Division Total: City Council $57,959.45

Training and Travel $5,095.49Total: Dues, Meetings, Training and Travel $17,071.69

Total: Materials, Supplies and Small Equipment $1,568.74Dues, Meetings, Training and Travel

Subscriptions $11,976.20

Badges and Name Plates $128.50Awards $196.71

Materials, Supplies and Small EquipmentOffice Supplies $44.32Materials and Supplies $1,199.21

Printing $600.74Total: Contractual Services $5,279.72

Community Promotions $4,150.00Lathrop Days $429.98

Total: Personnel Services $34,039.30Contractual Services

Professional Services $99.00

Medicare $0.00SUI $0.00

Workers Compensation Insurance $14,451.72FICA $1,392.58

Division 10 City Council

Personnel ServicesRegular Salaries $18,195.00

ExpensesDepartment 11 City Council

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 53: 2014 2015 Preliminary Budget

City Manager

Executive Assistant to the City Manager

City Engineer *Budgeted 50% CMO & 50%

PW Engineering

Economic Development

City of LathropCity Manager’s Office

FY 2014-2015

Page 54: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

$18,600.00 $30,000.00$551,128.00 $568,731.00

($532,528.00) ($538,731.00)

$0.00 $0.00$901,763.00 $713,100.00

($901,763.00) ($713,100.00)

$18,600.00 $30,000.00$1,452,891.00 $1,281,831.00

($1,434,291.00) ($1,251,831.00)

Departmental Staffing1.00 1.00 1.001.00 1.00 1.000.00 0.50 0.50

Total City Manager FTE 2.00 2.50 2.50City Engineer

City ManagerExecutive Assistant

Expense Totals $206,046.25Fund Total: Economic Development ($87,092.72)

Revenue Totals: $118,953.53

Net Grand Totals: ($415,900.67)

Revenue Grand Totals: $133,217.54Expense Grand Totals: $549,118.21 

Expense Totals $343,071.96 Fund Total: General Fund ($328,807.95)

City Manager Departmeent Budget Summary

Description 2013 Actual AmountRevenue Totals: $14,264.01

Page 55: 2014 2015 Preliminary Budget

   

City Manager 

Description of Division The City Manager’s Office administers City projects, programs, efficient and effective municipal services to the citizens of Lathrop. The City Manager provides policy recommendations to the City Council, leadership  and direction for the operation and management of all City departments except the City Attorney’s office.   The City Manager's Office provides strategic  leadership that supports the Mayor  and  the  City  Council  and  provides  for  the  effective  implementation  of  the Mayor  and  Council’s  policies  and  priorities.  Functions  of  the  City Manager’s Office  include:    Legislative  Affairs,  Project Management,  Economic  Development,  and  Business Development. 

Accomplishments 2013/2014 

Sustainable Budgeting.  The City has been monitoring both revenue and expenditures in all City funds and has developed a 10 year model that that  is  intended to keep the City on the path toward  long‐term sustainability. The focus has been  on maintaining a stable budget and strategically investing the City’s resources to keep our community safe, investing in our  future,  and maximizing  efficiency  and  productivity.    Staff  continues  to work  to  control  expenditures  and  reduce operating costs. The current estimated unassigned General Fund balance as of the end of FY 2018/2019 is estimated at $2.1 million.  

 

Work Plan 2014/2015 

The City’s focus for FY 14/15 and beyond is to promote the following  four (4) objectives important to the success of our City. These objectives will be the foundation to improve our community’s financial and social health: 

Managing  City  functions  using  sound  business  principles.  Being a well‐run  city  is due  in  large part  to our history of thoughtful, long‐range financial planning. For the 16th consecutive year, Lathrop has been awarded the highest form of recognition in governmental accounting for its Comprehensive Annual Financial Report (CAFR). We are a full service city that strives to be proactive and responsive to our community’s needs and that depends upon strong partnerships. Our ongoing  focus  is  to  maintain  a  balanced  budget  and  continue  to  focus  on  maintaining  service  levels  consistently throughout the recent recession.   

Providing  Exceptional  Service.  As  important  as  finding  fiscal  stability  and  strengthening  our  relationships  and partnerships is providing exceptional service . The most important asset the City has is its staff. Over the past few years our staff has become increasingly customer‐oriented, delivering better and more cost effective services to our residents, businesses and development  community.  In FY 14/15,  the City’s  focus will be on providing exceptional  service  to our residents,  businesses  and  development  community.  To  accomplish  this,  City  staff  will  need  to  continue  to  make improvements in the timeliness, quality and responsiveness of what they do, while also focusing on the business goals of efficiency and productivity.  

Page 56: 2014 2015 Preliminary Budget

City Manager   Work Plan 2014/2015 (continued) 

Deliver  sustainable development. We all know  that  the world has changed significantly  in  the  ten years since most of Lathrop’s  development  was  entitled.  Development  has  become  much  more  cost‐conscious,  much  more  difficult  to finance, and much more defined by near term market realities. Now economic conditions are starting to improve locally and  the  City  of  Lathrop  is  seeing  stable  property  tax,  increasing  sales  tax  receipts,  more  optimism  from  our  local businesses and development community, and some  increased  interest  from commercial,  industrial and even residential developers.  

Infrastructure.  A  key  component  of  assisting  Economic  Development  is  to  be  prepared  and  ready  to  go  when  the economy improves.  Staff’s priority; therefore, is focused on finding cost efficient options for wastewater capacity during FY 14/15,  such as creating  the MBR Wastewater Treatment Plant  Improvements, CIP WW 10‐15,  to provide additional sewer treatment capacity needed for additional development projects in the City.  

 

Capital Requests 

None  

Significant Operating Changes 

The City Engineer’s position is split equally between City Manager’s Office and Public Works Engineering.  

Staffing Summary FY 2014/2015 (in alphabetical order)    

  Position:  12/13  13/14  14/15 

Budget Analyst I/II  0.50  0.00  0.00 

City Manager  1.00  1.00  1.00 

Executive Assistant to the City Manager  0.00  1.00  1.00 

Senior Administrative Assistant  1.00  0.00  0.00 

Total Full Time Equivalents  2.50  2.50  2.50 

City Engineer  0.00  0.50  0.50 

Page 57: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $338,775.00 $332,796.00410‐12‐00 $0.00 $0.00410‐13‐00 $0.00 $0.00410‐14‐00 $0.00 $0.00410‐20‐00 $31,745.00 $44,641.00410‐21‐00 $8,901.00 $8,246.00410‐40‐00 $34,800.00 $45,840.00410‐41‐00 $0.00 $0.00410‐42‐00 $598.00 $886.00410‐43‐00 $0.00 $0.00410‐44‐00 $4,410.00 $6,825.00410‐45‐00 $5,400.00 $5,400.00410‐46‐00 $3,966.00 $0.00410‐46‐01 $0.00 $5,200.00410‐47‐00 $868.00 $1,085.00 410‐49‐00 $1,795.00 $2,313.00 

$431,258.00 $453,232.00 

420‐01‐00 $69,670.00 $70,000.00420‐60‐00 $14,400.00 $14,400.00420‐65‐00 $400.00 $500.00

$84,470.00 $84,900.00

430‐10‐00 $1,000.00 $1,000.00$1,000.00 $1,000.00

Materials, Supplies and Small EquipmentOffice Supplies $327.99

Total: Materials, Supplies and Small Equipment $327.99

Printing $40.59Total: Contractual Services $6,370.59

Contractual ServicesProfessional Services $330.00Advertising $6,000.00

SDI $1,908.16Total: Personnel Services $314,907.50 

Medicare $0.00SUI $1,085.01

Auto Allowance $4,077.00FICA $3,681.97

Vision Insurance $0.00Workers Compensation Insurance $4,445.61

Dental Insurance $0.00Life Insurance $566.99

Retirement ‐ Employee $12,096.95Health Insurance $37,879.85

Retirement ‐ Employer $28,152.24

Part‐time Salaries $0.00Overtime $450.77

Personnel ServicesRegular Salaries $220,562.95

Vacation/Sick Leave $0.00

ExpensesDepartment 11 City ManagerDivision 20 City Manager

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 58: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

ExpensesDepartment 11 City ManagerDivision 20 City Manager

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

435‐10‐00 $1,400.00 $2,000.00435‐20‐00 $15,000.00 $7,200.00

$16,400.00 $9,200.00

440‐90‐00 $18,000.00 $20,399.00$18,000.00 $20,399.00 

$551,128.00 $568,731.00Total: Fixed Charges $15,103.84Division Total: City Manager $343,071.96 

Total: Dues, Meetings, Training and Travel $6,362.04Fixed Charges

Compensated Absences $15,103.84

Dues, Meetings, Training and TravelSubscriptions $465.00Training and Travel $5,897.04

Page 59: 2014 2015 Preliminary Budget

Economic Development Description of Division The  Economic Development  division  is  a  newly  integrated  fund  responsible  for  administering  projects  that  create  an environment where jobs are created, to attract and retain wealth and income growth into the Lathrop Community.  The City’s focus is to attract development and business projects aimed to increase the City’s economic assets.  Functions of the Economic Development division  include:   Development Projects, Revitalization, and Community  Investments. Currently the City’s Development Group is serving as the Economic Development Team. 

Work Plan 2014/2015 

As  the economy slowly  recovers,  the City  remains committed  in providing  responsible and  fiscally sound development.  The  City Manager’s Office  is    dedicated  to  providing  the  best  possible  service  to  Lathrop’s  residents,  businesses  and development  community.    The  City will  continue  to  involve  pertinent  stakeholders  in  determining  the  best  course  of action to addressing the pressing matters and plans for Lathrop’s future. The City’s focus for FY 14/15 and beyond  is to promote the following  objectives important to the success of our City. These objectives will be the foundation to improve our community’s financial and social health: 

Develop  Strategies  to  support City’s utility  infrastructure projects.  The Development Group will play a key role in the City’s business efforts focused on building and developing utility resources for the promotion of City‐wide development and future growth. 

Work with  Federal, State and County advocacy  groups  to  identify economic  indicators, development and funding opportunities . As important as finding fiscal stability and strengthening the City’s utility infrastructure is leveraging partnerships with economic related organizations and agencies aimed towards the City’s financial growth. 

Continue  to work with  the San  Joaquin Partnership. The Partnership has been  instrumental  in many of the City’s top projects.    In keeping with the City Council’s Business Development Goals, the Partnership provides resources  that  are  exceptionally  useful  in  the  City’s  quest  to  attract  businesses  that  provide  “head  of household”  jobs  and  value  to  the  community.  In  2014,  the  City  approved  a  Augmented  Participation Agreement  with  the  San  Joaquin  Partnership  to  provide  essential  marketing  services  and  development opportunities that will instrumental in achieving the City’s Business Development Goals.  

 

Page 60: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $161,390.00 $110,000.00420‐01‐01 $200,000.00 $200,000.00420‐16‐00 $150,000.00 $150,000.00420‐60‐00 $68,000.00 $68,000.00420‐61‐00 $100,000.00 $100,000.00

$679,390.00 $628,000.00

435‐10‐00 $30,000.00 $30,000.00435‐20‐00 $5,125.00 $5,100.00

$35,125.00 $35,100.00

450‐35‐00 $187,248.00 $0.00$187,248.00 $0.00

990‐90‐10 $0.00 $50,000.00$0.00 $50,000.00

$901,763.00 $713,100.00 Division Total: Economic Development $206,046.25 

Fixed AssetsLand / Land Acquisition $0.00

Total: Fixed Assets $0.00Transfers

Transfers Out $117,070.00Total: Transfers $117,070.00

Training and Travel $0.00Total: Dues, Meetings, Training and Travel $0.00

Total: Contractual Services $88,976.25Dues, Meetings, Training and Travel

Subscriptions $0.00

Marketing $0.00

Economic Development $0.00Contracts ‐ Other $0.00

Contractual ServicesProfessional Services $88,976.25

Advertising $0.00

ExpensesDepartment 11 Economic DevelopmentDivision 30 Economic Development

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1050 Economic Development

Page 61: 2014 2015 Preliminary Budget

City Clerk

Sr. Administrative Assistant

(Budgeted 20% in CCO & 80% Administrative Services)

FY 2014-2015

City of LathropCity Clerk’s Office

Page 62: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

$5,000.00 $10,200.00$184,907.00 $194,665.00

($179,907.00) ($184,465.00)

$5,000.00 $10,200.00$184,907.00 $194,665.00

($179,907.00) ($184,465.00)

Departmental Staffing1.00 1.00 1.000.50 0.50 0.20

Total City Clerk FTE 1.50 1.50 1.20

Net Grand Totals: ($136,708.34)

City ClerkSenior Administrative Assistant

Revenue Grand Totals: $7,843.65Expense Grand Totals: $144,551.99

Expense Totals $144,551.99

Fund Total: General Fund ($136,708.34)

City Clerk Department Budget Summary

Description 2013 Actual AmountRevenue Totals: $7,843.65

Page 63: 2014 2015 Preliminary Budget

 City Clerk 

Description of Division 

The City Clerk’s Office is responsible for records management, legislative history, and elections. Some of the duties include: 

Coordinating City‐Wide Records Management Program, including creation, maintenance and disposition of records and maintenance of Municipal Code, City Council Handbook of Rules and Procedures and various logs and publications 

Preparing  legislative documentation  for Regular Meetings,  Special Meetings  and  Study  Sessions of  the City Council, including agendas, agenda packets, minutes, resolutions, ordinances and miscellaneous legal notices pursuant to State law

Conducting General and Special Municipal Elections called by the City Council and serving as the Elections Official

Administering campaign and economic interest reporting, maintaining Conflict of Interest Code and serving as the Filing Official / Officer, pursuant to State law

Managing contracts, bonds, bid openings, Board / Commission / Committee recruitments and legal noticing   

Serving as Public Information Officer 

Processing passports 

Providing notary services 

 

Accomplishments 2013/2014 

Continued to preserve all vital records of the City of Lathrop

Coordinated City‐wide records disposition

Continued organizing and streamlining processes of the City Clerk’s Office 

Provided passport services  

Page 64: 2014 2015 Preliminary Budget

 

City Clerk 

Work Plan 2014/2015 

Conduct 2014 General Municipal Election 

Conduct biennial review of the City of Lathrop Conflict of Interest Code 

Coordinate annual City‐Wide records disposition  

Continue to preserve all vital records of the City of Lathrop 

Implement Contract Management and Tracking Program 

Continue to provide passport services to the public 

Continue to provide notary services to the public 

Continue to organize and streamline processes of the City Clerk’s Office

Capital Requests 

None  

Significant Operating Changes 

None 

Page 65: 2014 2015 Preliminary Budget

 City Clerk 

  

Staffing  FY 2014/2015 (in alphabetical order) 

     Staffing Summary 

 

 

 

 

 

 

   

 

 

 

 

 

                             

 

 

Position:  12/13  13/14  14/15 

City Clerk  1.00  1.00  1.00 

Total Full Time Equivalents  1.50  1.50  1.20 

Senior Administrative Assistant  0.50  0.50  0.20 

Page 66: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $116,675.00 $100,078.00410‐13‐00 $250.00 $100.00410‐14‐00 $0.00 $0.00410‐20‐00 $14,644.00 $13,424.00410‐21‐00 $4,120.00 $2,488.00410‐40‐00 $26,100.00 $21,358.00410‐41‐00 $0.00 $481.00410‐42‐00 $289.00 $266.00410‐43‐00 $0.00 $85.00410‐44‐00 $3,955.00 $4,060.00410‐46‐00 $1,726.00 $0.00410‐46‐01 $0.00 $1,477.00410‐47‐00 $651.00 $1,019.00 410‐49‐00 $1,192.00 $521.00 

$169,602.00 $145,357.00 

420‐01‐00 $4,500.00 $14,500.00420‐57‐00 $0.00 $24,000.00420‐60‐00 $5,000.00 $5,000.00420‐65‐00 $305.00 $305.00

$9,805.00 $43,805.00

430‐10‐00 $1,650.00 $1,650.00430‐45‐00 $200.00 $200.00

$1,850.00 $1,850.00Total: Materials, Supplies and Small Equipment $1,268.12

Materials, Supplies and Small EquipmentOffice Supplies $1,268.12Reference Books $0.00

Printing $54.13Total: Contractual Services $17,777.05

Elections $11,074.11Advertising $3,471.88

Total: Personnel Services $123,494.11Contractual Services

Professional Services $3,176.93

SUI $434.00SDI $816.36

FICA $1,195.91Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $3,221.74

Dental Insurance $0.00Life Insurance $208.53

Retirement ‐ Employee $3,802.92Health Insurance $16,509.55

Vacation/Sick Leave $8,065.90Retirement ‐ Employer $9,993.77

Overtime $0.00

Division 10 City Clerk

Personnel ServicesRegular Salaries $79,245.43

ExpensesDepartment 12 City Clerk

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 67: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Division 10 City Clerk

ExpensesDepartment 12 City Clerk

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

435‐10‐00 $450.00 $450.00435‐20‐00 $1,500.00 $1,500.00

$1,950.00 $1,950.00

440‐90‐00 $1,700.00 $1,703.00$1,700.00 $1,703.00 

$184,907.00 $194,665.00Division Total: City Clerk $144,551.99

Fixed ChargesCompensated Absences $1,604.50

Total: Fixed Charges $1,604.50

Training and Travel $138.21Total: Dues, Meetings, Training and Travel $408.21

Dues, Meetings, Training and TravelSubscriptions $270.00

Page 68: 2014 2015 Preliminary Budget

City Attorney

Legal Secretary

City of LathropCity Attorney’s Office

FY 2014-2015

Page 69: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

$30,500.00 $25,000.00$491,218.00 $448,095.00

($460,718.00) ($423,095.00)

$30,500.00 $25,000.00$491,218.00 $448,095.00

($460,718.00) ($423,095.00)

Departmental Staffing1.00 1.00 1.001.00 1.00 1.00

Total City Attorney FTE 2.00 2.00 2.00

Expense Totals $456,586.49

Fund Total: General Fund ($427,236.05)

City Attorney Department Budget Summary

Description 2013 Actual AmountRevenue Totals: $29,350.44

Net Grand Totals: ($427,236.05)

City AttorneyLegal Secretary

Revenue Grand Totals: $29,350.44Expense Grand Totals: $456,586.49

Page 70: 2014 2015 Preliminary Budget

 

City Attorney 

Description of Division  

The City Attorney is appointed by and serves at the pleasure of the City Council. Under policy direction, the City Attorney is charged with the task of advising the City Council, City Manager, other Administrative Staff, and various boards and commissions of the City on  all  legal  aspects  of municipal  operations.    The  City  Attorney  represents  the  City  in  civil  and  criminal  actions;  prosecutes violations  of  City  ordinances;  and  drafts  necessary  legal  documents,  including  ordinances,  resolutions  and  contracts.    The  City Attorney attends all regular and special City Council meetings and Planning Commission meetings, and, when necessary, Council Committee meetings  and other  advisory body meetings. The  attorney‐client  relationship  is established  for  the City by  advising members of the City Council and Staff  in all city‐related matters.   The City Attorney also provides advice regarding relevant  laws and supervises the work of outside counsel representing the City in specific matters.  

Accomplishments 2013/2014 During the last year, the City Attorney’s Office has processed numerous public records requests, liability claims and Municipal Code violations.  The Office has also assisted the City in resolving several law suits and drafting several agreements including:      1.) UPRR agreement  to  contribute  approximately  $1.4 Million  to  Roth  Road/I‐5  Interchange,  2.)  County  reimbursement  to    the  City  of $161,964 on property tax administration overcharges and 3.) Sales Tax settlement resulting  in payment to City of approximately $1.7 Million.  In addition, the City Attorney’s office has worked with the City’s development team to implement ongoing projects as directed by Council.  

Work Plan 2014/2015 The City Attorney intends to continue to support development of Lathrop through necessary review, consideration, and analysis of adopted or currently proposed projects.  Such support will include representation of the City during proceedings and litigation.  The City Attorney also is committed to increasing the work output of the City Attorney’s Office and thereby limiting the cost of outside counsel.   

 

Page 71: 2014 2015 Preliminary Budget

City Attorney  

Staffing  FY 2014/2015 (in alphabetical order) 

   

  Staffing Summary 

 

 

 

 

 

 

   

Position:  12/13  13/14  14/15 

City Attorney  1.00  1.00  1.00 

Legal Secretary  1.00  1.00  1.00 

Total Full Time Equivalents  2.00  2.00  2.00 

Page 72: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $230,366.00 $232,646.00410‐12‐00 $0.00 $0.00410‐13‐00 $500.00 $500.00410‐14‐00 $0.00 $0.00410‐20‐00 $28,913.00 $31,207.00410‐21‐00 $8,111.00 $5,772.00410‐40‐00 $38,024.00 $38,582.00410‐41‐00 $0.00 $761.00410‐42‐00 $568.00 $621.00410‐43‐00 $0.00 $170.00410‐44‐00 $4,410.00 $4,900.00410‐45‐00 $5,400.00 $5,400.00410‐46‐00 $3,641.00 $0.00410‐46‐01 $0.00 $3,604.00410‐47‐00 $868.00 $868.00 410‐49‐00 $1,667.00 $1,672.00 

$322,468.00 $326,703.00 

420‐01‐00 $140,000.00 $100,000.00$140,000.00 $100,000.00

430‐10‐00 $1,000.00 $1,000.00430‐45‐00 $6,500.00 $6,500.00

$7,500.00 $7,500.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpensesDepartment 13 City AttorneyDivision 10 City Attorney

Personnel ServicesRegular Salaries $214,187.04

Vacation/Sick Leave $16,238.82Retirement ‐ Employer $26,958.02

Part‐time Salaries $4,611.31Overtime $0.00

Dental Insurance $0.00Life Insurance $561.33

Retirement ‐ Employee $10,261.17Health Insurance $38,033.18

Auto Allowance $5,427.00FICA $3,759.64

Vision Insurance $0.00Workers Compensation Insurance $4,433.91

SDI $1,612.14Total: Personnel Services $326,951.56

Medicare $0.00SUI $868.00

Contractual ServicesProfessional Services $93,753.59

Total: Contractual Services $93,753.59Materials, Supplies and Small Equipment

Office Supplies $500.58Reference Books $5,062.34

Total: Materials, Supplies and Small Equipment $5,562.92

Page 73: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpensesDepartment 13 City AttorneyDivision 10 City Attorney

435‐10‐00 $900.00 $900.00435‐20‐00 $3,000.00 $3,000.00

$3,900.00 $3,900.00

440‐90‐00 $17,350.00 $9,992.00$17,350.00 $9,992.00 

$491,218.00 $448,095.00

Training and Travel $2,889.70Total: Dues, Meetings, Training and Travel $3,698.70

Dues, Meetings, Training and TravelSubscriptions $809.00

Division Total: City Attorney $456,586.49

Fixed ChargesCompensated Absences $26,619.72

Total: Fixed Charges $26,619.72

Page 74: 2014 2015 Preliminary Budget

Director of Finance

Administration/ Customer Service

Executive Assistant

Sr. Accounting Technician

Accounting Technician (2)

Accounting Specialist I/II (2)

Accounting/Budget Division

Accounting Manager

Budget Manager

Budget Analyst II

Accountant

Information Technology

IT Manager

IT Technician

City of Lathrop - Finance Department

FY 2014-2015

Page 75: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended$9,439,189.00 $8,141,150.00$2,308,763.00 $2,114,867.00$7,130,426.00 $6,026,283.00

$9,439,189.00 $8,141,150.00$2,308,763.00 $2,114,867.00$7,130,426.00 $6,026,283.00

Departmental Staffing1.00 1.00 1.00

Accounting Manager 1.00 1.00 1.00Accounting Specialist I/II Technician 4.00 4.00 4.00Budget Manager 1.00 1.00 1.00Budget Analyst I/II 1.00 1.00 1.00Director of Finance 1.00 1.00 1.00Executive Assistant 1.00 1.00 1.00Senior Accounting Technician 0.00 1.00 1.00Special Districts Manager 1.00 0.00 0.00

Total Finance FTE 11.00 11.00 11.00

Net Grand Totals: $6,340,363.78

Accountant I/II

Revenue Grand Totals: $8,011,013.14Expense Grand Totals: $1,670,649.36

Expense Totals $1,670,649.36Fund Total: General Fund $6,340,363.78

Finance and Information Systems Department Budget 

Description 2013 Actual AmountRevenue Totals: $8,011,013.14

Page 76: 2014 2015 Preliminary Budget

 Finance 

Description of Division 

 The Finance Department — Accounting Division prepares utility bills, collects revenue, invests City funds, coordinates the City budget, issues financial reports, issues and administers debt, administers City procurement, processes City payroll, and pays City’s invoices in accordance with fiscal policies and internal controls.    Accomplishments 2013/2014  

Presented a 10‐Year Financial Model as a forecasting tool to assist with long range financial planning  Refinanced the 2003 Water Revenue Bonds to reduce debt service cost and assist with keeping water rate increases at a 

minimum  Closed Fiscal Year 2012‐2013 in a positive position returning approximately $1.0 million to reserves  Received “No Findings” in the Fiscal Year 2012‐2013 Financial Audit  Obtained  a  Certificate  of  Achievement  for  Excellence  in  Financial  Reporting  by  the  Government  Finance  Officers 

Association (GFOA) for timely submittal of the City’s Comprehensive Annual Financial Report (CAFR)   Successfully passed Measure C to provide increased public safety services to our residents  Collaborated with  the  Information Technology Team  to migrate  the City’s  financial data  to a new system – New World 

Systems (NWS)  

 Work Plan 2014/2015  

Water  and Wastewater  Rate  Studies.    Continue  to  explore  cost  reduction  opportunities  keeping  rate  increases  at  a minimum and operating utilities at a fiscally responsible level. 

Ten (10) Year Financial Model.   Continue to update and revise  the model as needed for long‐range financial planning.   Policies  and  Procedures.    Review,  update  and  create  financial  policies which  promote  financial  solvency  and  budget 

sustainability.     Special Financing Districts.  Manage the City’s debt and maintenance districts.  

Page 77: 2014 2015 Preliminary Budget

 Finance 

  Capital Requests 

 

None  

Significant Operating Changes  

None  

Staffing FY 2014/2015 (in alphabetical order)                Staffing Summary  

Position:  12/13  13/14  14/15 

Accountant I/II  1.00  1.00  1.00 

Accounting Manager  1.00  1.00  1.00 

Accounting Specialist I/II/Technician  1.00  1.00  1.00 

Administrative Assistant I/II  1.00  0.00  0.00 

Budget Analyst I/II (confidential)  1.00  1.00  1.00 

Budget Manager  1.00  1.00  1.00 

Director of Finance  1.00  1.00  1.00 

Executive Assistant  0.00  1.00  1.00 

Special Districts Manager  0.54  0.00  0.00 

Total Full Time Equivalents  7.54  7.00  7.00 

Page 78: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $636,800.00 $594,977.00410‐12‐00 $0.00 $0.00410‐13‐00 $1,600.00 $1,610.00410‐14‐00 $0.00 $0.00410‐20‐00 $79,924.00 $69,332.00410‐21‐00 $22,471.00 $13,223.00410‐40‐00 $121,933.00 $113,862.00410‐41‐00 $0.00 $3,948.00410‐42‐00 $1,540.00 $1,509.00410‐43‐00 $0.00 $815.00410‐44‐00 $16,030.00 $15,750.00410‐46‐00 $9,105.00 $0.00410‐46‐01 $0.00 $8,921.00410‐47‐00 $3,272.00 $3,038.00 410‐48‐00 $200.00 $0.00410‐49‐00 $3,120.00 $4,384.00 

$895,995.00 $831,369.00 

420‐01‐00 $273,318.00 $84,800.00420‐20‐00 $24,000.00 $24,000.00420‐60‐00 $100.00 $100.00420‐65‐00 $11,000.00 $11,000.00420‐69‐00 $380.00 $380.00420‐75‐00 $500.00 $500.00

$309,298.00 $120,780.00Total: Contractual Services $115,402.93

Office Equipment & Repair $0.00Other Maintenance & Repair $49.95

Advertising $0.00Printing $9,266.53

Contractual ServicesProfessional Services $92,739.63Sales Tax Audit $13,346.82

SDI $2,377.44Total: Personnel Services $556,981.81

SUI $2,593.70Bilingual Pay $173.66

FICA $5,764.32Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $14,477.89

Dental Insurance $0.00Life Insurance $945.56

Retirement ‐ Employee $17,307.01Health Insurance $78,898.96

Retirement ‐ Employer $46,472.81

Part‐time Salaries $0.00Overtime $6,819.98

Personnel ServicesRegular Salaries $367,031.95

Vacation/Sick Leave $14,118.53

ExpensesDepartment 15 FinanceDivision 10 Finance

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 79: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 15 FinanceDivision 10 Finance

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐10‐00 $9,000.00 $9,000.00430‐11‐00 $0.00 $0.00430‐15‐00 $0.00 $0.00430‐20‐00 $0.00 $0.00430‐33‐00 $300.00 $300.00430‐37‐00 $2,158.00 $0.00430‐45‐00 $500.00 $500.00

$11,958.00 $9,800.00

435‐10‐00 $1,950.00 $1,950.00435‐20‐00 $6,600.00 $6,600.00

$8,550.00 $8,550.00

440‐10‐00 $90,000.00 $140,000.00440‐80‐00 $0.00 $0.00440‐90‐00 $15,972.00 $18,721.00

$105,972.00 $158,721.00 $1,331,773.00 $1,129,220.00Division Total: Finance $828,881.01

Compensated Absences $25,299.08Total: Fixed Charges $142,434.49

Fixed ChargesFixed Charges $117,105.41Bad Debt $30.00

Training and Travel $2,267.74Total: Dues, Meetings, Training and Travel $3,524.74

Total: Materials, Supplies and Small Equipment $10,537.04Dues, Meetings, Training and Travel

Subscriptions $1,257.00

Miscellaneous Equipment $1,445.88Reference Books $180.13

Materials and Supplies $114.95Gas/Diesel/Oil/Lubricants $53.85

Postage $11.45Duplicating Costs $482.39

Materials, Supplies and Small EquipmentOffice Supplies $8,248.39

Page 80: 2014 2015 Preliminary Budget

 Information Technology 

 

Description of Division  The  Information  Technology  Division  (IT)  provides  information  technology  services  to  the  public,  City  Council,  and  all  City departments.  IT provides the support and leadership required to ensure that the full benefit of the City’s investments in technology is realized. The division supports approximately 150 users who depend on 130 computers, 40 servers, 100 telephones,  10 Routers, 20 Data Switches, internal and external network security, 10 voice/data circuits and a number of information systems located across the city.  Additionally, IT supports the public facing information systems including Channel 97 and the City’s website which receives an average of approximately   210 visits each day and  in FY 13/14, began to support the Lathrop‐Manteca Fire District technology systems.  Accomplishments 2013/2014  

Completed 4,800 Help Desk support requests.  Deployed 15 tablets to Reduce costs of printing agendas & budgets.  Deployed 30 desktops to replace Windows XP machines.  Deployed the New Generations Center surveillance system, Local & Wide Area Network and all other technology.  Performed a security audit with the aid of an external technology company.  Implemented the ERP (Enterprise Resource Plan) system.  Implemented Wi‐Fi at  Generations Center.   Implemented Second phase of Disaster Recovery Plan infrastructure to leverage the New Corp Yard site.  Continued implementation of Virtual system to reduce energy and support costs.  Continued maintenance of the City’s website.  Implemented  half of the Wide Area Network Wireless System to create a ring around the city for redundancy.  Migrated the GIS system to new infrastructure—Phase I.  Upgraded and cleaned up old technology for Police Services Data Center.   Implemented a new Evidence video system for Police Services.  Completed Phase I of SCADA system migration into the network. 

Page 81: 2014 2015 Preliminary Budget

 

Information Technology 

 Work Plan 2014/2015 

 The highest priority of the Information Technology Division:  

Continue the annual security audit   Implement the security audit recommendations  Continue maintenance of the City’s website  Consolidation of servers into new technology to reduce cost   Phase II of the DRP (Disaster Recovery Plan) at the new Corp Yard   Migration of the email system to new software to accommodate the DRP and  meet records retention requirements   Development and support of GIS (Geographic Information Systems) infrastructure    Implementation of Wireless to replace carriers circuits to reduce approximately $24,000 annually   Continue system refresh to reduce costs and labor  Design and Implementation of Wireless Wide Area Network  Continue implementation of Enterprise Resource Program (ERP)  Continue implementation and maintenance of Generations Center technology surveillance and Wi‐Fi 

 Work Plan Maintenance Contracts  Chameleon   $8,500 Chameleon  is  the case management system software  for  the Animal Services Department which  tracks both service  requests and registered animals in Lathrop. Additionally Chameleon ties to Pet Harbor, an online animal shelter that allows people to view lost or adoptable animals. This is the annual software license and support renewal.   New World System  $50,000 The City utilizes the NWS system for general financial operations, utility billing, human resources functions, permitting, work orders and budgeting. NWS costs include the yearly software license renewal, as well as the maintenance and technical support agreement.   

Page 82: 2014 2015 Preliminary Budget

  

Information Technology 

Work Plan 2014/2015 (continued)  

 Various Contract Renewals      $163,000  Software & Hardware contract renewals to maintain systems functionality and cost reduction for the following:  

Service Desk Maintenance     $5,000  — Software licensing compliance    Email spam Maintenance      $7,000  — Software licensing compliance    Server Maintenance     $10,000  AutoCad Civil 3D license renewal     $4,000   —every other year  GIS (Geographic Information Systems) Maintenance   $15,000    Imaging Laser Fiche system      $18,000 —Software licensing and replacement of system   Microsoft License      $25,000 —Software licensing compliance   

Internet DNS Maintenance      $1,000  ASCAP‐Music fees     $2,000   — Software licensing compliance    Phone Switch/Firewall/Router/Switches Maintenance   $21,000 — Software licensing compliance    Email System Archiver & OS     $15,000 — Software licensing compliance    Offsite Data Backup—Barracuda     $15,000  Telephone maintenance     $15,000  Virus Protection    $10,000  

Professional Services  

External Security Audits        $15,000 An  external  security  audit  is  planned  for  the  2014‐2015  budget  cycle.  This  audit  covers  the  labor  of  an  independent  outside consultant  to  test  internal  and  external  Network,  Email  and  Active  Directory  security  of  the  City’s  computing  systems  and recommend necessary changes as well as a design of the recommendations. This  approach is considered to be a best practice in the industry because of the costs associated to own the tools as well as the experience necessary to evaluate the data, and compliance with the Grand Jury report.    

Page 83: 2014 2015 Preliminary Budget

 

Information Technology 

Work Plan 2014/2015 (continued) 

 

Exchange and A.D. Upgrade                $23,500 The Current  servicer  software  is  “end of  life”  and  for  security purposes  it needs  to be  replaced.  This    cost  includes  software licenses and the migration of current system.  Printer Maintenance Support         $25,000 The  Information  Technology  department  performed  a  four month  study  of  all  the  printers  and  copiers  in  the  City. After  this evaluation,  the  three companies  that were currently providing  the  support   of  the devices were  invited    to  submit a one year contract proposal to provide supplies (paper not included), maintenance and support. After evaluation of the submitted costs, the company that would provide the best service with the best price to the City was selected. With the maintenance contract, the City has reduced costs by approximately $15,000 annually and a significant amount of labor from staff to repair the devices including the ordering process of supplies (paper not included).  Maintenance and Repair requests. Emergency Hardware / Software        $47,500 Emergency hardware and software covers unanticipated but necessary purchases of equipment or repairs to equipment. Most of the network infrastructure are out of warranty for fiscal year 14/15  Telecommunication  Voice and Data          $125,000 The  City  has  data  circuits  and  voice  circuits.  The  data  circuits  are  used  to  connect  all  the  sites  to  give  the  users  access  to functionality  such as email, internet, Finance System, phone system, and many others.  The above amount also includes costs for 60 cellular phones, internet circuit, and a multitude of dedicated phone lines for alarms, water pumps and other systems.   

Page 84: 2014 2015 Preliminary Budget

Information Technology 

 

Capital Requests  

Equipment Replacement  Replacement of systems     $123,000 Currently the City   expends approximately $25,000 a year for data connections between sites. The proposed  infrastructure will replace these connections and have a return on  investment within two years. After completion, the City will reduce  its annual telecommunication  charges  by  $25,000. Additionally,  in  FY  14/15  the  City will  be  implementing  three  additional New World System modules; contracts, GIS, and CD e‐permits.   Significant Operating Changes    

Programmer Analyst.  This years budget includes $115,300 for additional staff member to assist the department with ongoing maintenance and management of the City’s Information Systems. 

 

 Staffing  FY 2014/2015  (in alphabetical order) 

  Staffing Summary 

 Position:  12/13  13/14  14/15 

Information Technology Manager  1.00  1.00  1.00 

Information Technology Technician  1.00  1.00  1.00 

Programmer Analyst  0.00  0.00  1.00 

Total Full Time Equivalents  2.00  2.00  3.00 

Page 85: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $163,901.00 $249,090.00410‐12‐00 $0.00 $0.00410‐13‐00 $500.00 $500.00410‐14‐00 $0.00 $0.00410‐20‐00 $20,571.00 $27,432.00410‐21‐00 $5,785.00 $4,140.00410‐40‐00 $34,800.00 $55,008.00410‐41‐00 $0.00 $0.00410‐42‐00 $408.00 $671.00410‐43‐00 $0.00 $0.00410‐44‐00 $4,410.00 $8,750.00410‐46‐00 $2,331.00 $0.00410‐46‐01 $0.00 $3,814.00410‐47‐00 $868.00 $1,302.00 410‐49‐00 $967.00 $1,867.00 

$234,541.00 $352,574.00 

420‐01‐00 $38,300.00 $40,000.00420‐58‐00 $352,263.00 $221,500.00420‐65‐00 $250.00 $250.00420‐67‐00 $0.00 $2,000.00420‐75‐00 $23,500.00 $23,500.00

$414,313.00 $287,250.00

Expenses

Other Maintenance & Repair $47,676.01Total: Contractual Services $318,968.41

Printing $0.00Equipment Rental $0.00

Contractual ServicesProfessional Services $30,093.73Computer Tech Support $241,198.67

SDI $1,071.38Total: Personnel Services $249,655.89

Medicare $0.00SUI $868.00

Workers Compensation Insurance $4,433.91FICA $2,453.06

Life Insurance $412.02Vision Insurance $0.00

Health Insurance $33,398.12Dental Insurance $0.00

Retirement ‐ Employer $19,884.41Retirement ‐ Employee $7,319.92

Overtime $651.80Vacation/Sick Leave $10,852.35

Personnel ServicesRegular Salaries $168,310.92Part‐time Salaries $0.00

Department 15 FinanceDivision 20 Information Technology

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 86: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 15 FinanceDivision 20 Information Technology

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐10‐00 $400.00 $500.00430‐15‐00 $22,000.00 $25,000.00430‐20‐00 $200.00 $200.00430‐33‐00 $500.00 $500.00430‐37‐00 $34,437.00 $25,000.00430‐53‐00 $121,900.00 $125,000.00

$179,437.00 $176,200.00

435‐10‐00 $200.00 $200.00435‐20‐00 $16,500.00 $5,000.00

$16,700.00 $5,200.00

440‐41‐00 $28,000.00 $28,000.00440‐90‐00 $6,650.00 $13,423.00

$34,650.00 $41,423.00 

450‐12‐00 $97,349.00 $123,000.00$97,349.00 $123,000.00

$976,990.00 $985,647.00Total: Fixed Assets $41,574.19Division Total: Information Technology $841,768.35

Total: Fixed Charges $36,724.38Fixed Assets

Computer and Equipment $41,574.19

Fixed ChargesRents $32,385.59Compensated Absences $4,338.79

Training and Travel $0.00Total: Dues, Meetings, Training and Travel $160.00

Total: Materials, Supplies and Small Equipment $194,685.48Dues, Meetings, Training and Travel

Subscriptions $160.00

Miscellaneous Equipment $42,923.55Phones Services $123,940.45

Materials and Supplies $0.00Gas/Diesel/Oil/Lubricants $140.88

Materials, Supplies and Small EquipmentOffice Supplies $954.72Duplicating Costs $26,725.88

Page 87: 2014 2015 Preliminary Budget

ADMINISTRATIVE SERVICES 

Page 88: 2014 2015 Preliminary Budget

Director of Administrative Services

Sr. Administrative Assistant *Budgeted 20% in CCO & 80%

Administrative Services

Animal Services

Animal Services

Officer (2)

Human Resources

Central Services

Risk Management

Emergency Services

FY 2014-2015

City of LathropAdministrative Services

Page 89: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended$98,800.00 $114,700.00

$1,727,404.00 $1,735,286.00($1,628,604.00) ($1,620,586.00)

$98,800.00 $114,700.00$1,727,404.00 $1,735,286.00

($1,628,604.00) ($1,620,586.00)

Departmental Staffing1.00 1.00 0.00

Animal Services Officer 2.00 2.00 2.00Director of Administrative Services 0.50 0.70 1.00Management Analyst I/ II 0.20 0.20 0.00Senior Administrative Assistant 0.50 0.50 0.80

Total Administrative Services FTE 4.20 4.40 3.80

Net Grand Totals: ($1,389,558.59)

Animal Services Assistant

Revenue Grand Totals: $118,822.64Expense Grand Totals: $1,505,368.43

Expense Totals $1,508,381.23 Fund Total: General Fund ($1,389,558.59)

Administrative Services Department Budget Summary

Description 2013 Actual AmountRevenue Totals: $118,822.64

Page 90: 2014 2015 Preliminary Budget

 Human Resources 

Description of Division 

The Human Resources Division  includes  the duties normally  assigned  to  Personnel, Risk Management,  and  Safety Coordinator.    This division  handles  all  recruitment,  examination  and  selection  of  employees;  all  employee  personnel  records,  employee  training,  and coordinating with CSJVRMA for risk management, safety programs, EAP, liability, property, vehicles, and worker’s compensation. 

 Accomplishments 2013/2014 

Assist in coordination and participation of National Night Out.  Coordinated  City‐wide  Grant  training with  representatives  from  Public Works,  Finance,  Administrative  Services,  Parks & 

Recreation and Police Services.    Provided Management Leadership workshops and provided training opportunities to all City staff to assist with professional 

development and advancement.  Maintained operations cost control measures.  Coordinate and participate in Labor relations, cost analysis of negotiation proposals, provide technical support and guidance 

to management team.  Assist  Departments  with  inquiries  involving  City  Risk Management  Authority:    certificates  of  insurance,  transfer  of  risk 

associated with deeds, contracts, etc.  Coordinate  recruitments  required  to  support  increased demand on  staff  resources  resulting  from overall  growth  of City, 

vacated or newly created positions.  Establish department goals in concert with Council Goals and integrate into department protocol.  Keep Council informed on a variety of City functions, programs and events.  Coordinate monthly newsletter and newspaper article submission for all departments.  Coordinate Annual Employee Recognition Luncheon and Quarterly All Staff Meetings.   Coordinate Workers Compensation claims with our Risk Management Authority.  Processed auto claims and City property damage claims; coordination with City Attorney in claims processing.  Processed updates and renewals of risk and liability program policies; coordination with departments.   Provided assistance and guidance to all departments in the use of and appropriate procedures in employee relations matters.      

Page 91: 2014 2015 Preliminary Budget

 

 

Work Plan 2014/2015 

Continue to coordinate and track training for staff citywide.  Assist all departments in coordinating participation in National Night Out.  Continue to maintain operations cost control measures.  Continue  oversight  of  City‐wide Grant Writing Group  and  develop  reporting  structure  resulting  from  researched  grant 

opportunities.  Assist Departments with  inquiries  involving City Risk Management Authority:    certificates of  insurance,  transfer of  risk 

associated with deeds, contracts, etc.  Coordinate recruitments required  to support  increased demand on staff resources resulting  from overall growth of City, 

vacated or newly created positions.  Participate in union negotiation with bargaining units.  Continue to establish department goals in concert with Council Goals and integrate into department protocol.  Keep Council informed on a variety of City functions, programs and events.  Continue to coordinate monthly newsletter and newspaper article submission for all departments.  Continue to provide notification, coordination and tracking of training for all departments.     Coordinate Annual Employee Recognition Luncheon and Quarterly All Staff Meetings.   Provide  annual  required  harassment  prevention  training,  safety  and  customer  service  training,  ergonomic  worksite 

evaluations.  Coordinate Workers Compensation claims with our Risk Management Authority.  Process auto claims and City property damage claims; coordination with City Attorney in claims processing.  Process updates and renewals of risk and liability program policies; coordination with departments.  Provide management leadership workshops and provided training opportunities to all City staff to assist with professional 

development and advancement.   Update City Administrative Policies, Personnel Rules & Regulations.  Provide  assistance  and  guidance  to  all  departments  in  the  use  of  and  appropriate  procedures  in  employee  relations 

matters.   

 

 

 

Human Resources 

Page 92: 2014 2015 Preliminary Budget

 

Position:  12/13  13/14  14/15 

Dir of Administrative Services  0.40  0.50  0.80 

Sr. Administrative Assistant  0.50  0.50  0.60 

Total Full Time Equivalents  0.90  1.00  1.40 

Capital Requests   None 

Significant Operating Changes 

Director of Administrative Services.   With  the hiring of  the Parks and Recreation Director,  the Administrative Services Director position is no longer budgeted with any allocations to Culture and Leisure.

The departmental budget will be handled by staff  in Administrative Services.   Pension and Benefits will remain with the Finance Department.   

Allocations for Sr. Administrative Assistant has  increased to department to more accurately reflect the amount of  time  this position  supports  the department.   This position  is  split between Administrative Services, Animal Services and City Clerk. 

   Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

Human Resources 

Page 93: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $97,657.00 $146,533.00410‐12‐00 $0.00 $0.00410‐13‐00 $250.00 $301.00410‐14‐00 $0.00 $0.00410‐20‐00 $12,257.00 $19,655.00410‐21‐00 $3,442.00 $3,634.00410‐25‐00 $0.00 $0.00410‐40‐00 $17,400.00 $14,201.00410‐41‐00 $0.00 $2,052.00410‐42‐00 $219.00 $388.00410‐43‐00 $0.00 $391.00410‐44‐00 $2,205.00 $3,710.00410‐45‐00 $0.00 $0.00410‐46‐00 $1,530.00 $0.00410‐46‐01 $0.00 $2,240.00410‐47‐00 $434.00 $607.00 410‐49‐00 $816.00 $1,188.00 

$136,210.00 $194,900.00 

420‐01‐00 $35,900.00 $2,000.00420‐60‐00 $6,000.00 $6,000.00420‐62‐00 $2,000.00 $2,000.00420‐65‐00 $400.00 $400.00420‐69‐00 $100.00 $100.00420‐75‐00 $100.00 $100.00

$44,500.00 $10,600.00Other Maintenance & Repair $0.00

Total: Contractual Services $14,886.39

Printing $0.00Office Equipment & Repair $0.00

Advertising $6,266.19Pre‐employment Physicals $2,031.00

Total: Personnel Services $114,183.21 Contractual Services

Professional Services $6,589.20

SUI $390.59SDI $805.83

FICA $1,309.30Medicare $0.00

Workers Compensation Insurance $2,405.94Auto Allowance $0.00

Life Insurance $203.09Vision Insurance $0.00

Health Insurance $14,527.81Dental Insurance $0.00

Retirement ‐ Employee $3,930.04Retiree ‐ Employer‐Funded Health Insurance $0.00

Vacation/Sick Leave $0.00Retirement ‐ Employer $10,367.64

Part‐time Salaries $0.00Overtime $450.76

Division 10 Personnel

Personnel ServicesRegular Salaries $79,792.21

ExpensesDepartment 14 Personnel

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 94: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 10 Personnel

ExpensesDepartment 14 Personnel

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐10‐00 $1,000.00 $1,000.00430‐20‐00 $250.00 $250.00430‐45‐00 $1,800.00 $2,800.00430‐47‐00 $4,500.00 $4,500.00

$7,550.00 $8,550.00

435‐10‐00 $1,000.00 $1,000.00435‐20‐00 $3,600.00 $4,600.00

$4,600.00 $5,600.00

440‐41‐00 $0.00 $0.00440‐90‐00 $3,425.00 $7,665.00

$3,425.00 $7,665.00 $196,285.00 $227,315.00

Total: Fixed Charges $1,823.85Division Total: Personnel $136,850.56 

Fixed ChargesRents $0.00Compensated Absences $1,823.85

Training and Travel $881.57Total: Dues, Meetings, Training and Travel $1,460.57

Total: Materials, Supplies and Small Equipment $4,496.54Dues, Meetings, Training and Travel

Subscriptions $579.00

Reference Books $584.46Awards $3,567.00

Materials, Supplies and Small EquipmentOffice Supplies $151.47Materials and Supplies $193.61

Page 95: 2014 2015 Preliminary Budget

 Central Services 

Description of Division 

The Central Services Division provides a focal point for expenses that overlap one or more departments.  It is more cost‐effective to budget  in a single area than  in each department. This division does not  include direct services to the public, nor does  it  include any staff that is dedicated to this function only.   

 

Included in this budget are the following expenditures: 

City share of retiree medical insurance premiums 

Employee educational assistance program 

City Staff trainings 

Postage and express mail delivery services 

Annual payment  to CSJVRMA  for administration, risk management,  liability, property, vehicle and employee assistance insurance coverage 

Annual lease payments for City Hall 

Accomplishments 2013/2014 

As outlined above 

Work Plan 2014/2015 

As outlined above 

Capital Requests Electric Car     $   42,525 

Significant Operating Changes 

Increase in Training and Travel.  Increase is to promote training opportunities citywide. 

 

 

Page 96: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐25‐00 $112,300.00 $162,857.00410‐26‐00 $0.00 $0.00410‐40‐00 $0.00 $0.00

$112,300.00 $162,857.00 

420‐01‐00 $7,900.00 $1,900.00420‐65‐00 $1,000.00 $1,000.00420‐75‐00 $0.00 $9,000.00

$8,900.00 $11,900.00

430‐10‐00 $9,000.00 $9,000.00430‐11‐00 $54,200.00 $57,200.00430‐20‐00 $300.00 $300.00430‐37‐00 $0.00 $0.00

$63,500.00 $66,500.00

435‐10‐00 $800.00 $650.00435‐20‐00 $15,700.00 $28,700.00

$16,500.00 $29,350.00

440‐10‐00 $0.00 $0.00440‐31‐00 $342,700.00 $311,033.00440‐40‐00 $0.00 $0.00440‐41‐00 $30,500.00 $6,500.00

$373,200.00 $317,533.00 

Expenses

Total: Fixed Charges $257,338.74

Special Fees $0.00Rents $30,044.74

Fixed ChargesFixed Charges $0.00General Liability Insurance $227,294.00

Training and Travel $2,219.17Total: Dues, Meetings, Training and Travel $2,902.98

Total: Materials, Supplies and Small Equipment $55,846.96Dues, Meetings, Training and Travel

Subscriptions $683.81

Materials and Supplies $0.00Miscellaneous Equipment $0.00

Materials, Supplies and Small EquipmentOffice Supplies $6,620.08Postage $49,226.88

Other Maintenance & Repair $0.00Total: Contractual Services $2,197.47

Contractual ServicesProfessional Services $1,275.00Printing $922.47

Health Insurance $0.00Total: Personnel Services $99,799.41

Personnel ServicesRetiree ‐ Employer‐Funded Health Insurance $98,364.85Cobra Insurance Payments $1,434.56

Department 14 PersonnelDivision 40 Central Services

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 97: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 14 PersonnelDivision 40 Central Services

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

450‐30‐00 $0.00 $42,525.00$0.00 $42,525.00

480‐01‐00 $626,250.00 $626,250.00480‐02‐00 $0.00 $0.00

$626,250.00 $626,250.00$1,200,650.00 $1,256,915.00Division Total: Central Services $1,044,329.56

Interest $264,970.91Total: Debt Service $626,244.00

Total: Fixed Assets $0.00Debt Service

Principal $361,273.09

Fixed AssetsVehicles $0.00

Page 98: 2014 2015 Preliminary Budget

 Animal Services 

Description of Division  

Animal Services is comprised of three major program areas: Field, Shelter and Administrative services, responsible for the efficient and effective enforcement of all Federal, State and Local laws regulating animals and ownership, including, but not limited to, licensing, care and control of animals, sheltering of stray, unwanted, injured, or sick animals, nuisance abatement, humane investigations and public education.  Animal Services administers the State‐mandated rabies program including vaccine clinics, reporting bites and the quarantine of animals.  Additionally, Animal Services is responsible for maintaining compliance with all Federal and State laws regulating the animal welfare industry.  Accomplishments 2013/2014 

Successful Dangerous Animal/Vicious Animal program  Bite Quarantine process effective and well‐documented  Public Safety hazards first priority with good response time   Collaboration with City Attorney for successful prosecution of Humane cases and Dangerous Animal violations  Maintained operations cost control measures  Received donations from community partners such as:  PetSmart, Tractor Supply Company and citizens;  partnered 

with PetSmart Adoption Partner Charities and Tractor Supply for adoption events  Purchase and use of professional services and supplies from local businesses   Civic involvement including participation in:  Citizen’s Police Academy and Jr. Police Academy, National Night Out, 

Lathrop Celebration, Lathrop BBQ, Dog Park Grand Re‐opening, etc.  Active recruitment for foster/volunteer programs  Continued relationship with local animal rescues and trainers to provide citizens with an alternative to surrendering/

returning their animals to the shelter  Educated citizens on low cost spay and neutering services available and low cost vaccination clinics.  Increased education of citizens regarding senior discounts available for licensing and impound fees.  Post articles that educate citizens regarding seasonal issues on website and in City Newsletter  Maintain lost/found/adopt portals via website    

 

Page 99: 2014 2015 Preliminary Budget

 Animal Services 

Work Plan 2014/2015 

The highest priorities for the Animal Services Department are to continue and enhance: 

Con nue:   

Dangerous Animal/Vicious Animal program  Bite Quarantine process effective and well‐documented  Public Safety hazards first priority with good response time   Collaboration with City Attorney for successful prosecution of Humane cases and Dangerous Animal violations  Participation in Citizen's Police Academy/Jr. Police Academy and Neighborhood Watch meetings   Maintaining operations cost control measures  Collaboration with community partners such as PetSmart, Target, Tractor Supply Company and citizens to receive 

donations and  adoption events  Department representation in City‐wide Grant Writing Group and researching grant opportunities   Use Lathrop Veterinary for veterinary services  Purchase supplies from local businesses  Provide low cost Rabies Vaccine clinic  Provide Spay/Neuter Voucher incentives  Continue involvement and participation in City events   Continue adoption events for the community   Continue active recruitment for foster/volunteer programs  Continue relationship with local animal rescues and trainers to provide citizens with an alternative to surrendering/

returning their animals  Capital Requests  

None 

Page 100: 2014 2015 Preliminary Budget

Position:  12/13  13/14  14/15 

Administrative Services Director  0.10  0.20  0.20 

Animal Services Assistant  1.00  1.00  0.00 

Animal Services Officer  1.00  1.00  1.00 

Budget Analyst I/II  0.10  0.00  0.00 

Management Analyst I/II  0.00  0.20  0.00 

Total Full Time Equivalents  2.20  2.40  1.40 

Sr. Administrative Assistant  0.00  0.00  0.20 

Animal Services 

 

   Significant Operating Changes 

The Animal Services Assistant position has been unfunded.  Funding for the two Animal Services Officers will be 50% in the Animal Services budget and 50% in the Mossdale CFD budget.  Functions of the Assistant will be absorbed within Administrative Services Department and the Animal Services Officers.   

Sr. Administrative Assistant for Administrative Services Department to provide assistance with administrative duties of Animal Services. 

 

    Staffing  FY 2014/2015 (in alphabetical order) 

   Staffing Summary 

  

 

Page 101: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $139,127.00 $93,236.00410‐12‐00 $0.00 $0.00410‐13‐00 $1,400.00 $1,144.00410‐14‐00 $0.00 $0.00410‐15‐00 $10,000.00 $10,002.00410‐20‐00 $17,462.00 $12,547.00410‐21‐00 $4,928.00 $2,333.00410‐40‐00 $41,760.00 $22,643.00410‐41‐00 $0.00 $633.00410‐42‐00 $336.00 $247.00410‐43‐00 $0.00 $119.00410‐44‐00 $18,982.00 $10,880.00410‐45‐00 $0.00 $0.00410‐46‐00 $2,115.00 $0.00410‐46‐01 $0.00 $1,542.00410‐47‐00 $1,042.00 $608.00 410‐48‐00 $0.00 $0.00410‐49‐00 $331.00 $328.00 

$237,483.00 $156,262.00 

420‐01‐00 $10,000.00 $10,000.00420‐58‐00 $0.00 $0.00420‐60‐00 $50.00 $50.00420‐65‐00 $2,000.00 $2,000.00420‐70‐00 $2,606.00 $4,300.00420‐75‐00 $150.00 $150.00

$14,806.00 $16,500.00Other Maintenance & Repair $0.00

Total: Contractual Services $15,305.86

Printing $2,070.61Auto/Heavy Equipment Maintenance/Repair $583.03

Computer Tech Support $522.59Advertising $0.00

Total: Personnel Services $197,443.19Contractual Services

Professional Services $12,129.63

Bilingual Pay $123.65SDI $176.57

Medicare $0.00SUI $954.79

Auto Allowance $0.00FICA $1,744.79

Vision Insurance $0.00Workers Compensation Insurance $16,638.04

Dental Insurance $0.00Life Insurance $281.07

Retirement ‐ Employee $5,176.20Health Insurance $36,283.63

Standby $8,411.61Retirement ‐ Employer $13,545.96

Overtime $1,049.49Vacation/Sick Leave $8,726.83

Personnel ServicesRegular Salaries $104,330.56Part‐time Salaries $0.00

Department 16 Animal ServicesDivision 10 Animal Services

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpenses

Page 102: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Department 16 Animal ServicesDivision 10 Animal Services

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpenses

425‐12‐00 $51,500.00 $51,500.00$51,500.00 $51,500.00

430‐10‐00 $1,000.00 $1,000.00430‐20‐00 $2,600.00 $5,100.00430‐24‐00 $250.00 $250.00430‐26‐00 $200.00 $200.00430‐33‐00 $5,000.00 $4,000.00430‐35‐00 $200.00 $200.00430‐37‐00 $400.00 $850.00430‐40‐00 $3,031.00 $2,850.00430‐45‐00 $225.00 $180.00430‐54‐00 $1,000.00 $0.00430‐55‐00 $4,000.00 $4,648.00430‐56‐00 $2,000.00 $0.00

$19,906.00 $19,278.00

435‐10‐00 $404.00 $600.00435‐20‐00 $5,000.00 $5,000.00

$5,404.00 $5,600.00

440‐80‐00 $0.00 $0.00440‐90‐00 $1,370.00 $1,916.00

$1,370.00 $1,916.00 

450‐30‐00 $0.00 $0.00$0.00 $0.00

$330,469.00 $251,056.00

Total: Materials, Supplies and Small Equipment $15,918.78Dues, Meetings, Training and Travel

Subscriptions $170.00

Fixed ChargesBad Debt $495.00Compensated Absences $1,426.21

Training and Travel $1,171.74Total: Dues, Meetings, Training and Travel $1,341.74

Total: Fixed Assets $45,068.72Division Total: Animal Services $327,201.11

Total: Fixed Charges $1,921.21Fixed Assets

Vehicles $45,068.72

PetSmart Spay/Neuter Expense $6,442.86Forfeited Spay Neuter $0.00

Reference Books $168.00Unaltered Impound Animal $105.00

Miscellaneous Equipment $1,125.81Uniforms and Protective Clothing $969.18

Gas/Diesel/Oil/Lubricants $3,898.53Shop Tools $200.00

Auto/Heavy Equipment Parts $0.00Other Maintenance & Repair $2.48

Materials, Supplies and Small EquipmentOffice Supplies $394.34Materials and Supplies $2,612.58

Contractual Services (Intergovernmental)Animal Shelter $50,201.61

Total: Contractual Services (Intergovernmental) $50,201.61

Page 103: 2014 2015 Preliminary Budget

COMMUNITY DEVELOPMENT  

Page 104: 2014 2015 Preliminary Budget

Director of Community Development

Administration

Sr. Administrative Assistant

Administrative Assistant II – Front Counter Support

(Position budgeted 66.5% in CDD and

33.5% in PW)

Planning Division

Senior Planner

Building Division

Chief Building Official

Building Inspector III

Building Inspector II

(Position budgeted 50% in Building &

50% Code)

Permit Technician

Code Compliance

Code Inspector II (Position budgeted 50%

in Building & 50% Code)

City of Lathrop Community Development

FY 2014-2015

Page 105: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended$944,755.00 $1,106,862.00

$1,730,829.00 $1,414,108.00($786,074.00) ($307,246.00)

$26,766.00 $25,000.00$26,766.00 $26,270.00

$0.00 ($1,270.00)

$971,521.00 $1,131,862.00$1,757,595.00 $1,440,378.00($786,074.00) ($308,516.00)

Departmental Staffing0.00 0.67 0.67

Building Inspector I/II/III 1.00 1.00 1.00Chief Building Official 1.00 1.00 1.00Code Compliance Officer Development 1.00 1.00 1.00Director of Community Development 1.00 1.00 1.00Management Analyst I/II 1.00 0.00 0.00Prermit Technician 1.00 1.00 1.00Principal Planner 1.00 0.00 0.00Senior Administrative Assistant 1.00 0.50 0.50Senior Planner 1.00 1.00 1.00

Total Community Development FTE 9.00 7.17 7.17

Expense Totals $1,127,783.77Fund Total: General Fund ($338,212.94)

Community Development Budget Summary

Description 2013 Actual AmountRevenue Totals: $789,570.83

Revenue Totals: $25,993.26

Net Grand Totals: ($327,311.35)

Revenue Grand Totals: $815,564.09Expense Grand Totals: $1,142,875.44

Administrative Assistant I/II

Expense Totals $15,091.67Fund Total: Public Nuisance $10,901.59

Page 106: 2014 2015 Preliminary Budget

 Community Development—Planning 

 

Description of Division The Planning Division  is responsible  for promoting  the City’s development, encouraging new business and business expansion and retention,  residential  and  other  appropriate  growth,  preparing  and  implementing  the  General  Plan,  Zoning  and  Subdivision Ordinances, and processing Specific Plans, Plan Amendments, Urban Design Concepts, Conditional Use Permits, Site Plan Reviews, Home Occupation Permits, Administrative Permits and other discretionary and non‐discretionary applications.  The  Planning Division  provides  assistance  to  the  Code  Compliance  program  including  code  interpretations with  the  objective  of improving  and  enhancing  the  existing  community.    The  Planning Division  is  responsible  for  implementing  and  administering  the Community Development Block Grant Program.  Accomplishments 2013/2014 

 Central  Lathrop  Specific  Plan:    The  master  planned  community  began  in  2006.    Project  consists  of  6,800  dwelling  units, approximately  5  million  square  feet  of  new  retail/office  space,  the  Lathrop  Generations  Center,  Lathrop  High  School  and proposed K‐8 schools, parks, and open space.  A large lot subdivision was recorded in 2006 and a tentative map for 1,040 single‐family  lots within 10 villages was approved  in early 2007.   Manteca Unified School District completed construction of Lathrop High School which opened the fall of 2008.   In January of 2014, the City Council approved the Stanford Crossing tentative map adjacent to the Generation Center and High School for 430 residential lots on 94 acre site.  In April of 2014, the City approved the temporary ponds and spray fields to serve CLSP. 

 River  Islands:  Phase  1  began  in  2007.      The  Phase  1  tentative  subdivision  map  comprised  of  1,350  net  acres  and  created approximately  4,200  residential  parcels,  as  well  as  commercial  and  office  space,  parks,  and  public  facilities.      The  project developer  completed  improvements  to  Stewart  Road  to  provide  access  to  the  new  Charter  School  and  facilitate  the  first residential and commercial construction.   The Bradshaw/River  Islands Parkway Bridge was constructed, but not yet connected. The Charter School opened in August 2013.  In 2013, the City approved numerous documents to guide the development of River Islands,  including  the  Parks  and  Open  Space  Plan,  Neighborhood  Design  Plan,  Architectural  Design  Guidelines,  and  the  3rd Amendment  to  the Development Agreement.    Five  final maps were  approved.      Three model home  complexes  and over  20 production homes are under construction, with home sales expected to begin in late May 2014 

 

Page 107: 2014 2015 Preliminary Budget

 Community Development—Planning 

 

 Mossdale Landing and Valley Crossing:   Mossdale Landing development projects continue to grow.  To date, approximately 1,940 residential building permits have been issued; 5 in 03/04, 582 in 04/05, 626 in 05/06, 260 in 06/07, 23 in 07/08, 25 in 08/09, 166 in 09/10, 91 in 10/11, 63 in 11/12 and 140 in 12/13.  The City experienced  an increase in new residential building permits over the previous FY.   So far in 13/14, Legacy Homes constructed 24 homes  in Mossdale.   Woodside Homes has acquired 80 single family  lots  in Mossdale Landing, 50 single family  lots  in Mossdale Village, and 17 single family  lots  in Valley Crossings.  Woodside Homes has completed construction of over 35 homes and continue to pull building permits for their  inventory of  infill lots in Lathrop. 

 Lathrop Gateway Business Park Specific Plan:  The project EIR and limited entitlements were approved by  the City for a 384‐acre specific plan area with approximately 57 acres of commercial office uses, 168 acres of limited industrial uses, 83 acres of ser‐vice commercial uses and the remaining 77 acres in roads, and public facility sites.  On January 23, 2012 the City Council ap‐proved partial Annexation of the specific plan area which was approved by LAFCO  on  June 1, 2012.  In 2013, the City received a vesting tentative map for industrial uses, which is currently being reviewed and processed. 

 South Lathrop Specific Plan—Richland Development submitted a Specific Plan and associated applications for approximately 300 acres of land south of Highway 120 to develop as a business/industrial park.  The City released a Draft EIR for South Lathrop Spe‐cific Plan on October 2013 and received numerous comment  letters from various agencies and  interested parties.   The City  is working with our environmental consultant team on preparing the responses to comments and final EIR. 

 Commercial and Industrial Opportunities:   The City worked collaboratively with our economic development partners to recruit, facilitate, and welcome new businesses in the City, including but not limited to: 

Tesla Motors is relocating one of its manufacturing plants to the former Daimler Chrysler building. 

O’Reilly Auto Parts is under construction.  Papa Murphys, Flying Dogs, Sienna Italian Restaurant, and Dickey’s BBQ have opened new restaurants.  In & Out Burgers, California Natural Products, Simplot, and Antonini Trucking have expanded their current operations. 

 

Page 108: 2014 2015 Preliminary Budget

 Community Development—Planning 

 

WORK PLAN 2013/2014 

City wide:  Continue to work with the Management Team for SB‐5 Implementation Measures (Flood Protection)    River Islands:  Continue the processing of final maps, production home permits, and mitigation monitoring programs 

  Central Lathrop:  Continue the processing of entitlements and restructuring of the CFD 

  Mossdale and Valley Crossings:  Continue the issuance of permits and inspections of production homes 

  Commercial and Industrial development:   

Continue to work with applicants interested in expanding existing or locating new businesses in the City.  Continue to work with the San Joaquin Partnership in efforts to recruit large employers and provide adaptive re‐use of   industrial sites.    Continue to work with federal agencies regarding the disposition of the Sharpe Army Depot.    

Parks, Recreation and Community Services:    Provide for parks and trails as part of new development.  Process temporary use permits in a timely manner for special events and fundraisers.  

  Cost Reduction to Residents:  Continue to streamline the approval and permit process.     Capital Requests 

None             

Significant Operating Changes 

 The Planning Division has been reorganized in response to the positive changes in the market conditions and the significant  in‐crease  in development activity and  land use  issues.   In 2013, a full‐time Community Development Director and Senior Planner were hired, and  the department  is currently  recruiting  for a Senior Administrative Assistant  that will be  shared between  the Community Development Director and City Engineer.   

  

Page 109: 2014 2015 Preliminary Budget

 Community Development—Planning 

 

Staffing FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

    

    

 

  

 

  

 

 

Position:  12/13  13/14  14/15 

Administrative Assistant  0.00  0.00  0.34 

Community Development Director  0.30  0.45  0.60 

Management Analyst I/II  0.45  0.00  0.00 

Senior Administrative Assistant  0.34  0.84  0.50 

Total Full Time Equivalents  3.09  2.29  2.44 

Principal Planner  1.00  0.00  0.00 

Senior Planner  1.00  1.00  1.00 

Page 110: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $162,571.00 $215,196.00410‐12‐00 $0.00 $0.00410‐13‐00 $450.00 $0.00410‐14‐00 $0.00 $0.00410‐20‐00 $35,528.00 $16,733.00410‐21‐00 $9,983.00 $4,654.00410‐40‐00 $50,797.00 $42,118.00410‐41‐00 $0.00 $259.00410‐42‐00 $699.00 $555.00410‐43‐00 $0.00 $58.00410‐44‐00 $8,769.00 $7,042.00410‐45‐00 $0.00 $0.00410‐46‐00 $3,929.00 $0.00410‐46‐01 $0.00 $3,168.00410‐47‐00 $1,341.00 $1,059.00 410‐49‐00 $1,754.00 $1,721.00 

$275,821.00 $292,563.00 

420‐01‐00 $618,090.00 $260,000.00420‐02‐00 $2,000.00 $2,000.00420‐04‐00 $5,000.00 $0.00420‐16‐00 $60,000.00 $0.00420‐60‐00 $7,000.00 $3,000.00420‐65‐00 $500.00 $500.00

$692,590.00 $265,500.00

ExpensesDepartment 20 Community Development

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Division 10 Planning

Personnel ServicesRegular Salaries $166,240.57

Vacation/Sick Leave $6,140.61Retirement ‐ Employer $20,700.73

Part‐time Salaries $0.00Overtime $863.42

Dental Insurance $0.00Life Insurance $446.02

Retirement ‐ Employee $6,536.56Health Insurance $29,959.34

Auto Allowance $89.71FICA $2,756.62

Vision Insurance $0.00Workers Compensation Insurance $5,249.90

SDI $1,801.04Total: Personnel Services $242,100.21

Medicare $0.00SUI $1,315.69

Contractual ServicesProfessional Services $144,775.83Planning Commission $460.00

Advertising $849.12Printing $198.75

Personnel $0.00Contracts ‐ Other $55,688.94

Total: Contractual Services $201,972.64

Page 111: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 20 Community Development

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Division 10 Planning

430‐10‐00 $1,000.00 $2,000.00430‐20‐00 $100.00 $100.00430‐43‐00 $50.00 $50.00430‐45‐00 $50.00 $450.00

$1,200.00 $2,600.00

435‐10‐00 $490.00 $1,100.00435‐20‐00 $8,614.00 $2,800.00

$9,104.00 $3,900.00

440‐40‐00 $7,200.00 $7,200.00440‐41‐00 $1,000.00 $1,020.00440‐90‐00 $3,410.00 $3,263.00

$11,610.00 $11,483.00 $990,325.00 $576,046.00

Materials, Supplies and Small EquipmentOffice Supplies $725.50

Reference Books $0.00Total: Materials, Supplies and Small Equipment $741.58

Materials and Supplies $16.08Badges and Name Plates $0.00

Dues, Meetings, Training and TravelSubscriptions $734.50Training and Travel $785.33

Total: Dues, Meetings, Training and Travel $1,519.83Fixed Charges

Special Fees $7,296.00

Total: Fixed Charges $31,713.53Division Total: Planning $478,047.79

Rents $984.50Compensated Absences $23,433.03

Page 112: 2014 2015 Preliminary Budget

 Community Development—Building 

Description of Division 

The Building Division  is responsible for serving the public by ensuring that the safety depicted by the current adopted California Codes and the Lathrop Municipal Code   are enforced during the construction, use, occupancy and maintenance of buildings and structures,  and  all  of  their  various  components.    This  is  accomplished  by  providing  examination  of  plans,  calculations  and specifications,  inspections of all aspects of on‐site construction and providing staff  to perform and manage  the building permit process.   The staff carries on  this service after permits are  issued and  finalized by maintaining plans and documents  for  future inquires.   

Accomplishments 2013/2014 

Processed permit applications, performed a variety of plan reviews and issued over 353 permits as of the beginning of May 2014. 

103 New Residential  

124 Miscellaneous (HVAC, plumbing, electrical, reroof, etc.) 

44 Change of Occupancy / Tenant Improvements 

2 Commercial (Sales Trailer for River Islands) 

3 Industrial (CNP, Simplot,  Antonini, Superstores) 

17 Master Plan (Residential) Single Family Dwellings 

7 Pools 

53 Roof Mount Solars 

Processed an additional 19 Building Permit applications for New Residential  production homes, waiting to be issued. 

Approved  and  issued  building  permits  and  tenant  improvements  for  businesses  in  the  D’Arcy  Business  Park, Crossroads Business Park, Savemart Shopping Center, High Five Plaza and the Lathrop Crossing Plaza. 

Performed in‐house  plans examination saving in excess of $65,000 to date and provided building inspection services to ensure that building and structures are built to meet all  life safety and structural requirements of the applicable Building and Safety Codes. 

Page 113: 2014 2015 Preliminary Budget

 

Community Development—Building 

Accomplishments 2013/14 (continued) 

Provided training for the Building Inspectors to continue their education on the newly adopted California Codes. 

Worked with the IT Department on the implementation of the New World computer software 

 Work Plan 2014/2015 

The Building Division will continue to explore ways to streamline and create more effective efficiencies within the department. This would include, but not be limited to: 

Continue  to provide  technical and educational  training  for all Building Staff  in all areas of  the New 2013 California Code of Regulations, Title 24, and all other related codes and programs.  Building will be looking at training offered by different jurisdictions that is free or reasonably priced. 

Use best mix of staffing resources for plan review and inspection services. 

Maintain and improve the portion of the City website pertaining to the Building Division which would include but not be limited to: 

Providing informational handouts to educate the general public on building code issues. 

Providing information on obtaining a permit (i.e. application, required plan check submittals and licensing verification). 

Continue to monitor and maintain the cost level of supplies, office equipment, and training and travel to reflect the temporary increase in permitting, plan checking and inspections. 

Page 114: 2014 2015 Preliminary Budget

 

Community Development—Building 

Capital Requests 

  NONE 

Significant Operating Changes 

The State of California has seen a slight increase in residential building.  This has led to an increase of residential home productions in the City of Lathrop.   

The sum of $108,300 has been budgeted in Personnel Services fund for temporary inspection services.    

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary: 

Position:  12/13  13/14  14/15 

Building Inspector I/II/III  1.00  1.00  1.00 

Chief Building Official  1.00  1.00  1.00 

Code Compliance Officer  0.00  0.50  0.80 

Director of CDD  0.30  0.45  0.30 

Management Analyst I/II  0.50  0.00  0.00 

Administrative Assistant I/II  0.00  0.00  0.33 

Total Full Time Equivalents  3.63  4.28  4.93 

Permit Technician  0.50  0.50  1.00 

Senior Administrative Assistant  0.33  0.83  0.50 

Page 115: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $375,654.00 $385,724.00410‐12‐00 $0.00 $0.00410‐13‐00 $1,250.00 $939.00410‐14‐00 $0.00 $0.00410‐20‐00 $42,602.00 $43,805.00410‐21‐00 $11,565.00 $8,904.00410‐40‐00 $66,624.00 $86,218.00410‐41‐00 $0.00 $251.00410‐42‐00 $865.00 $1,008.00410‐43‐00 $0.00 $56.00410‐44‐00 $11,010.00 $13,857.00410‐45‐00 $0.00 $0.00410‐46‐00 $5,047.00 $0.00410‐46‐01 $0.00 $5,658.00410‐47‐00 $1,792.00 $2,139.00 410‐49‐00 $1,794.00 $1,602.00 

$518,203.00 $550,161.00 

420‐01‐00 $63,075.00 $108,300.00420‐04‐00 $15,000.00 $108,600.00420‐65‐00 $500.00 $500.00420‐70‐00 $1,900.00 $2,000.00420‐75‐00 $100.00 $0.00

$80,575.00 $219,400.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 20 Community DevelopmentDivision 30 Building

Overtime $959.38Vacation/Sick Leave $21,908.12

Personnel ServicesRegular Salaries $258,614.72Part‐time Salaries $0.00

Health Insurance $50,528.20Dental Insurance $0.00

Retirement ‐ Employer $33,763.11Retirement ‐ Employee $12,622.18

Workers Compensation Insurance $9,383.14Auto Allowance $67.50

Life Insurance $719.11Vision Insurance $0.00

SUI $1,950.05SDI $1,696.69

FICA $4,333.88Medicare $0.00

Total: Personnel Services $396,546.08Contractual Services

Professional Services $39,095.95

Auto/Heavy Equipment Maintenance/Repair $2,000.00Other Maintenance & Repair $86.62

Personnel $0.00Printing $62.31

Total: Contractual Services $41,244.88

Expenses

Page 116: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 20 Community DevelopmentDivision 30 Building

Expenses

430‐10‐00 $1,200.00 $1,800.00430‐20‐00 $200.00 $400.00430‐33‐00 $1,800.00 $2,000.00430‐35‐00 $200.00 $300.00430‐40‐00 $800.00 $1,120.00430‐45‐00 $2,500.00 $2,800.00

$6,700.00 $8,420.00

435‐10‐00 $960.00 $1,000.00435‐20‐00 $5,434.00 $4,325.00

$6,394.00 $5,325.00

440‐41‐00 $1,100.00 $990.00440‐90‐00 $6,410.00 $3,582.00

$7,510.00 $4,572.00 $619,382.00 $787,878.00

Materials, Supplies and Small EquipmentOffice Supplies $929.38

Shop Tools $100.00Uniforms and Protective Clothing $471.53

Materials and Supplies $100.00Gas/Diesel/Oil/Lubricants $1,767.20

$4,925.48

Reference Books $1,472.36Total: Materials, Supplies and Small Equipment $4,840.47

Division Total: Building $461,955.82

Compensated Absences $12,270.26Total: Fixed Charges $13,254.76

Total: Dues, Meetings, Training and Travel $6,069.63Fixed Charges

Rents $984.50

Dues, Meetings, Training and TravelSubscriptions $1,144.15Training and Travel

Page 117: 2014 2015 Preliminary Budget

 Code Compliance 

 

Description of Division 

The Code Compliance Division is responsible for the City of Lathrop’s code enforcement operations.  The Division conducts inspec‐tions of residential, commercial, and industrial properties to determine compliance with applicable local and state codes, laws, regu‐lations and ordinances relating to maintenance of properties and structures.  The Division initiates enforcement actions and issues citations and notices.  Code Compliance is vital to the protection of the public health, safety, and quality of life for the citizens of Lathrop.  

Accomplishments 2013/2014 

Provided Code Compliance services for the department.  Staff conducted 153 inspections and closed 57 cases to date. 

Business Licensing        3   Health & Safety—Garbage  Service    5  Health & Safety—Property Nuisance    101  Health & Safety—Vacant & Abandoned 

  Residential          10  Housing (Heating, Ventilation, Structural, 

  Sanitation)          14   Encroachment (Streets, Sidewalks)    2  Vehicles (Abandoned, In‐Op)      11  Zoning           7  

Continued implementation of Property Nuisance Compliance. 

Attended National Night Out and provided  information to the public regarding code compliance, complaint procedures and policies. 

 

Page 118: 2014 2015 Preliminary Budget

Code Compliance 

 Accomplishments 2013/2014 Continued 

Performed several successful weed abatements for abandoned properties. 

Performed and encouraged weed abatement throughout the City.  

Work Plan 2014/2015 

Continue monitoring and updating existing Municipal Codes. 

Continue implementation of Council priorities for code issues such as prioritizing life and safety issues, neighborhood preservations and no longer accepting anonymous reports of assumed code violations. 

Transition the weed abatement program to LMFD, if approved by Council, including  

Maintain a contractor abatement list,  Educate property owners,  Conduct inspections,  Issuing notices and citations as necessary,  Abating property, if needed 

Continue to provide educational material regarding code compliance and the importance of keeping their community safe and clean.  

Attend public forums and events to provide educational tools and awareness to the public.  

Continue to keep the neighborhoods free of blight by abating unsafe structures, removing abandoned vehicles, and removing other items declared a public nuisance. 

Continue to issue inspection notices and administrative citations for violations of health and public safety. 

Capital Requests   

  None   

Significant Operating Changes  Due to the upswing of building permit issuance and inspection, personnel for Code has been reduced to 25%. 

Page 119: 2014 2015 Preliminary Budget

 

Code Compliance 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

Position:  12/13  13/14  14/15 

Budget Analyst I/II  0.10  0.00  0.00 

Code Compliance Officer I/II/III  1.00  0.50  0.20 

Dir. of Neighborhood & Com Services  0.10  0.00  0.00 

Management Analyst I/II  0.00  0.00  0.00 

Permit Technician  1.00  0.50  0.00 

Total Full Time Equivalents  2.20  1.10  0.30 

Dir. of Com Dev  0.00  0.10  0.10 

Office Assistant I/II  1.00  0.00  0.00 

Page 120: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $76,495.00 $28,405.00410‐12‐00 $0.00 $0.00410‐13‐00 $300.00 $100.00410‐14‐00 $0.00 $0.00410‐20‐00 $8,099.00 $3,016.00410‐21‐00 $1,871.00 $705.00410‐40‐00 $19,329.00 $5,503.00410‐41‐00 $0.00 $0.00410‐42‐00 $190.00 $75.00410‐43‐00 $0.00 $0.00410‐44‐00 $2,601.00 $1,155.00410‐46‐00 $1,039.00 $0.00410‐46‐01 $0.00 $418.00410‐47‐00 $499.00 $130.00 410‐49‐00 $129.00 $102.00 

$110,552.00 $39,609.00 

420‐01‐00 $1,000.00 $1,000.00420‐60‐00 $200.00 $200.00420‐65‐00 $1,000.00 $1,000.00420‐70‐00 $1,150.00 $1,400.00420‐75‐00 $100.00 $100.00

$3,450.00 $3,700.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 20 Community DevelopmentDivision 60 Code Compliance

Overtime $113.04Vacation/Sick Leave $10,057.96

Personnel ServicesRegular Salaries $115,690.45Part‐time Salaries $0.00

Health Insurance $28,762.74Dental Insurance $0.00

Retirement ‐ Employer $13,370.82Retirement ‐ Employee $5,729.36

Workers Compensation Insurance $4,252.48FICA $1,757.13

Life Insurance $296.48Vision Insurance $0.00

SDI $132.35Total: Personnel Services $181,396.64

Medicare $0.00SUI $1,233.83

Contractual ServicesProfessional Services $192.00Advertising $0.00

Other Maintenance & Repair $0.00Total: Contractual Services $1,699.93

Printing $65.00Auto/Heavy Equipment Maintenance/Repair $1,442.93

Expenses

Page 121: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 20 Community DevelopmentDivision 60 Code Compliance

Expenses

430‐10‐00 $800.00 $800.00430‐20‐00 $400.00 $400.00430‐33‐00 $2,200.00 $2,500.00430‐35‐00 $50.00 $200.00430‐40‐00 $400.00 $80.00430‐45‐00 $100.00 $100.00

$3,950.00 $4,080.00

435‐10‐00 $350.00 $350.00435‐20‐00 $800.00 $675.00

$1,150.00 $1,025.00

440‐10‐00 $300.00 $500.00440‐41‐00 $1,250.00 $990.00440‐90‐00 $470.00 $280.00

$2,020.00 $1,770.00 $121,122.00 $50,184.00

Materials, Supplies and Small EquipmentOffice Supplies $506.57Materials and Supplies $324.42

Uniforms and Protective Clothing $362.58Reference Books $0.00

Gas/Diesel/Oil/Lubricants $2,130.50Shop Tools $0.00

Total: Materials, Supplies and Small Equipment $3,324.07Dues, Meetings, Training and Travel

Subscriptions $75.00

Division Total: Code Compliance $187,780.16

Compensated Absences $446.68Total: Fixed Charges $621.68

Fixed ChargesFixed Charges $175.00Rents $0.00

Training and Travel $662.84Total: Dues, Meetings, Training and Travel $737.84

Page 122: 2014 2015 Preliminary Budget

 Public Nuisance 

Description of Division 

The Public Nuisance Division activities are performed by the Code Compliance staff, in conjunction with the Planning Division and the  City  Attorney’s  Office.    The  activity  is  focused  on  the  abatement  of  dilapidated  and  unsafe  structures,  the  removal  of abandoned vehicles, and other violations that have been declared a Public Nuisance.   The monies from the Public Nuisance fund are used when all other legal collection avenues have been exhausted and the violation remains.  The fund is intended to be self‐renewing by reimbursement.   

 

Accomplishments 2013/2014  

Provided Code Compliance services for the City, including the processing and abatement of approximately: 

125 property maintenance and public nuisance violations and abatements thereof 

21 Housing and Zoning violations and abatements thereof 

11 Vehicle Cases 

17 Weed Violation cases and abatements thereof 

 

Work Plan 2014/2015 

 

This fund provides the fiscal resources for Code Compliance activities, such as demolitions, abatements, boarding‐up houses, etc.  A lien is placed on the property to recover the costs, and the money is recovered through property taxes. 

Staff  will  continue  to  respond  on  nights  and  weekends  for  emergency  services  assistance  for  fire  and  damaged properties.   

 

Significant Operating Changes 

  Due to the upswing of Building Permit Issuance and Inspection, Code has been reduced to 25%.  

Page 123: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

420‐16‐00 $25,000.00 $25,000.00$25,000.00 $25,000.00

990‐90‐10 $1,766.00 $1,270.00$1,766.00 $1,270.00

$26,766.00  $26,270.00 

ExpensesDepartment 20 Community Development

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2090 Public Nuisance

Total: Contractual Services $13,985.67

Division Total: CD Public Nuisance $15,091.67 

Division 40 CD Public Nuisance

Contractual ServicesContracts ‐ Other $13,985.67

TransfersTransfers Out $1,106.00

Total: Transfers $1,106.00

Page 124: 2014 2015 Preliminary Budget

PARKS AND RECREATION 

Page 125: 2014 2015 Preliminary Budget

Director of Parks & Recreation

Programs & Projects Manager (Budgeted 50% in PW & 50% in Park & Rec.)

Parks & Recreation Administrator

Generations Center

Office Assistant

Facility Supervisor

Facility Supervisor PT

Community Center

Recreation Supervisor (2- vacant)

Recreation Coordinator (2)

KIDS CLUB – Sr. Recreation Leader (3)

Recreation Leader PT (9)

SPORTS PROGRAMS -Facility Supervisor PT

(2)

Recreation Leader PT (2)

Senior Center

Senior Center Manager

Sr. Recreation Leader (1)

Budget/Fiscal Division

Management Analyst I/II

City of Lathrop - Parks & Recreation

FY 2014-2015

Page 126: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

$146,981.00 $155,144.00$1,267,944.00 $1,257,010.00

($1,120,963.00) ($1,101,866.00)

$146,981.00 $155,144.00$1,267,944.00 $1,257,010.00

($1,120,963.00) ($1,101,866.00)

Departmental Staffing1.00 0.00 0.00

Management Analyst I/II 0.80 0.80 1.00Director of Administrative Services 0.50 0.30 0.00Director of Parks and Recreation 0.00 1.00 1.00Facility Supervisor 0.66 0.66 0.66Parks and Recreation Administrator 1.00 1.00 1.00Projects and Programs Manager 1.00 1.00 0.50Recreation Coordinator 0.00 1.00 1.00Recreation Leaders 3.70 3.70 3.70Recreation Supervisor 2.00 2.00 2.00Senior Center Manager 1.00 1.00 1.00Senior Recreation Leaders 3.75 3.75 3.50

Total Culture and Recreation FTE 15.41 16.21 15.36

Expense Totals $1,069,330.67Fund Total: General Fund ($915,873.06)

Culture and Recreation Department Budget Summary

Description 2013 Actual AmountRevenue Totals: $153,457.61

Net Grand Totals: ($915,873.06)

Administrative Assistant I/II

Revenue Grand Totals: $153,457.61Expense Grand Totals: $1,069,330.67

Page 127: 2014 2015 Preliminary Budget

 Culture and Recreation—Administration 

 

Description of Division 

The Administration Division provides direct administration and supervision of other Divisions in the Department including personnel functions, budget monitoring, and the development and implementation of Department policies and procedures.  This Division also provides management support for the planning and construction of parks and recreation facilities.  Additionally, this Division helps support three City Council appointed Commissions and Citizen Committees.  The Division also produces the seasonal activity guide, processes program registration and facility bookings.  Accomplishments 2013/2014 

Provided Staff support to Parks and Recreation Commission, Senior Advisory Commission, Youth Advisory Commission, Veteran’s  Memorial  Committee,  Lathrop  Celebration  Committee,  Mayor’s  Art  Show  Committee,  Holiday  Parade Committee, Lathrop Run Committee and Beautification Day Committee. 

Updated the Mayor’s Committee Handbook for the 2014 Mayor’s Committee Members. 

Assisted  the Youth Advisory Commission  sub‐committees  in preparation of  the  Lathrop Community Complex Project (fundraising, policies/rules, etc.). 

Continued development of department Policy & Procedures Manual. 

Completed development of Field Policy and Procedures  for  rental  reservations and  received  input  from  the Parks & Recreation Commission as well as local leagues that rent City facilities. 

Assisted with the development of design and construction documents for the Lathrop Generations Center project.  Bids were received for the project in April 2013 and construction started in June 2013 with an anticipated completion of June 2014. 

Continue to utilize and train staff on the use of  WebTrac (online activity registration).   

Recruited and hired a Parks and Recreation Director. 

 

 

Page 128: 2014 2015 Preliminary Budget

  

Culture and Recreation—Administration 

Work Plan 2014/2015 

Manage Parks & Recreation Capital Improvement Projects, including: 

Lathrop Generations Center GG 04‐01 

Continue to review park plans to ensure comopliance with the design standards set forth in the UDC for each perspective development area. 

Continue  to  review  the department’s budget, manage  the RecTrac  software program and  finalize department policies and procedures (i.e. facility rental & special event policies). 

Review and implement Field and Facility use policies 

Evaluate master fee schedule  

 

Capital Requests 

None       

 

Significant Operating Changes 

Addition of a Parks  and Recreation Director.   

Parks and Programs Manager position is now split with Public Works resulting in decreased budget in personnel. 

Reclassification of Budget Analyst to Management Analyst.  This position is now 100% in Parks and Recreation.  In FY13/14 the position was budgeted as 20% under  Administrative Services. 

 

Page 129: 2014 2015 Preliminary Budget

 

Culture and Recreation—Administration 

Staffing  FY 2014/2015 

(in alphabetical order) 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

        

 

 

Position:  12/13  13/14  14/15 

Administrative Assistant I/II  0.50  0.00  0.00 

Budget Analyst I/II  0.80  0.00  0.00 

Management Analyst II  0.00  0.80  1.00 

Parks & Recreation Administrator  0.50  1.00  1.00 

Total Full Time Equivalents  1.80  4.10  3.50 

Parks Project Manager  0.00  1.00  0.50 

Director of Parks and Recreation  0.00  1.00  1.00 

Administrative Services Director  0.50  0.30  0.00 

Page 130: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $373,566.00 $325,395.00410‐12‐00 $0.00 $0.00410‐13‐00 $650.00 $0.00410‐14‐00 $0.00 $0.00410‐20‐00 $32,627.00 $26,335.00410‐21‐00 $10,537.00 $3,157.00410‐40‐00 $55,574.00 $59,977.00410‐41‐00 $0.00 $1,142.00410‐42‐00 $723.00 $872.00410‐43‐00 $0.00 $255.00410‐44‐00 $9,233.00 $10,675.00410‐45‐00 $0.00 $0.00410‐46‐00 $4,370.00 $0.00410‐46‐01 $0.00 $4,791.00410‐47‐00 $1,562.00 $1,519.00 410‐49‐00 $2,492.00 $2,944.00 

$491,334.00 $437,062.00 

420‐01‐00 $500.00 $500.00420‐04‐00 $500.00 $500.00420‐60‐00 $300.00 $300.00420‐65‐00 $4,700.00 $4,400.00420‐69‐00 $400.00 $0.00420‐70‐00 $1,500.00 $3,000.00420‐75‐00 $300.00 $300.00

$8,200.00 $9,000.00

Budget for Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpensesDepartment 30 Culture & RecreationDivision 01 Culture & Recreation Admin

Personnel ServicesRegular Salaries $253,046.85

Vacation/Sick Leave $7,150.74Retirement ‐ Employer $28,991.67

Part‐time Salaries $0.00Overtime $450.60

Dental Insurance $0.00Life Insurance $587.18

Retirement ‐ Employee $11,697.33Health Insurance $54,961.99

Auto Allowance $0.00FICA $3,964.10

Vision Insurance $0.00Workers Compensation Insurance $3,417.81

SDI $2,409.80Total: Personnel Services $368,563.26

Medicare $0.00SUI $1,885.19

Advertising $0.00Printing $3,988.83

Contractual ServicesProfessional Services $78.00Personnel $412.00

Other Maintenance & Repair $0.00Total: Contractual Services $5,226.27

Office Equipment & Repair $0.00Auto/Heavy Equipment Maintenance/Repair $747.44

Page 131: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Budget for Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpensesDepartment 30 Culture & RecreationDivision 01 Culture & Recreation Admin

430‐10‐00 $900.00 $900.00430‐11‐00 $720.00 $720.00430‐20‐00 $200.00 $200.00430‐33‐00 $2,000.00 $2,500.00430‐37‐00 $300.00 $0.00430‐43‐00 $75.00 $75.00430‐45‐00 $100.00 $100.00430‐47‐00 $100.00 $100.00

$4,395.00 $4,595.00

435‐10‐00 $640.00 $640.00435‐20‐00 $1,000.00 $1,000.00

$1,640.00 $1,640.00

440‐90‐00 $5,705.00 $4,955.00$5,705.00 $4,955.00 

$511,274.00 $457,252.00

Materials and Supplies $193.30Gas/Diesel/Oil/Lubricants $1,461.35

Materials, Supplies and Small EquipmentOffice Supplies $809.74Postage $703.05

Reference Books $0.00Awards $63.31

Miscellaneous Equipment $284.20Badges and Name Plates $27.02

Training and Travel $886.42Total: Dues, Meetings, Training and Travel $886.42

Total: Materials, Supplies and Small Equipment $3,541.97Dues, Meetings, Training and Travel

Subscriptions $0.00

Division Total: Culture & Recreation Admin $390,517.03

Fixed ChargesCompensated Absences $12,299.11

Total: Fixed Charges $12,299.11

Page 132: 2014 2015 Preliminary Budget

 Culture and Recreation—Senior Center 

 Description of Division  The Senior Center Division is responsible to meet the recreational, educational, physical and social needs for adults ages 50 or older.  The  budget  provides  funding  for  two  positions,  Senior  Center Manager  and  Senior  Recreation  Leader,  to manage  the  facility, implement  a  variety  of  programs  (activities  and  food  programs),  assist  the  Senior  Advisory  Commission,  produce  a  monthly newsletter and coordinate volunteers.  The Division monitors the Senior Advisory Commission (SAC) Fund. 

 Accomplishments 2013/2014  

Offered the following programs: 

AARP Tax Preparation Service (record number of participants) 

Medicare Insurance Seminars 

Senior Legal Services (Council for Spanish Speaking) 

Flu Shots (Walgreens Drug Store) 

Brown Bag, Commodities and Farmer’s Market (1200 Bags of food) 

Bread & Pastries Program (10,000 pastries & 3.500 lbs of bread)  

Super Senior Karaoke (doubled participation) 

Country Breakfast (50‐60 guests each month) 

Weekly Afternoon Movies 

Trips & Tours (added new destinations such as Monterey and Feather Falls) 

Cooking Class (redeveloped class for more participation) 

Computer Class (addition of new instructor and expanded class to include advice on wireless devices such as cell phones, iPads and Kindles) 

Organized 2013 5th Annual SAC BBQ Event with the Senior Advisory Commission (July 2013) 

Assisted Senior Advisory Commission with Annual Dinner/Jazz Dance Fundraiser 

Page 133: 2014 2015 Preliminary Budget

 

Culture and Recreation—Senior Center 

 Accomplishments 2013/2014 (continued) 

We continue to redesign our Senior Center Newsletter for easier reading and  printing in‐house for cost savings. 

Assisted the Senior Advisory Commission with the development of a LED sales booth at the 2013 Lathrop Celebration Event. 

Hosted the following holiday/special events:    Holiday Boutique, Mid‐day Black & White Bash, Bunny Breakfast, Parking Lot Sale, Saint Patrick's Day Breakfast, Mother’s Day Luncheon & Father’s Day Luncheon. 

 

Work Plan 2014/2015 

Maintain close communication with seniors and the Senior Advisory Commission (SAC).   This  includes assisting SAC to prepare event budgets and develop a more sophisticated approach towards event planning and management. 

Expand the  BBQ  to over 3,000 participation 

Introduce new programming ideas in consultation with SAC and the seniors.   

Explore opportunities  to  increase  self‐sustaining programs  such  as  fee‐for‐service opportunities  and  Senior Advisory Commission (SAC) fundraising.   

 

Capital Requests 

None. 

Significant Operating Changes  

None. 

 

             

  

Page 134: 2014 2015 Preliminary Budget

 

Culture and Recreation—Senior Center 

 

  

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

  

 

Position:  12/13  13/14  14/15 

Senior Center Manager  1.00  1.00  1.00 

Senior Recreation Leader  1.00  1.00  0.85 

Total Full Time Equivalents  2.00  2.00  1.85 

Page 135: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $91,204.00 $89,120.00410‐12‐00 $0.00 $0.00410‐13‐00 $0.00 $0.00410‐14‐00 $0.00 $0.00410‐20‐00 $11,447.00 $11,954.00410‐21‐00 $3,241.00 $2,235.00410‐40‐00 $15,765.00 $15,804.00410‐41‐00 $0.00 $761.00410‐42‐00 $228.00 $237.00410‐43‐00 $0.00 $170.00410‐44‐00 $4,410.00 $4,743.00410‐46‐00 $1,404.00 $0.00410‐46‐01 $0.00 $1,312.00410‐47‐00 $868.00 $803.00 410‐49‐00 $734.00 $698.00 

$129,301.00 $127,837.00 

420‐01‐00 $1,900.00 $1,900.00420‐03‐00 $1,714.00 $1,714.00420‐60‐00 $200.00 $200.00420‐65‐00 $5,180.00 $4,880.00420‐69‐00 $300.00 $300.00420‐75‐00 $0.00 $500.00

$9,294.00 $9,494.00

Department 30 Culture & RecreationDivision 21 Senior Center

Budget for Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Overtime $110.67Vacation/Sick Leave $4,029.51

Personnel ServicesRegular Salaries $85,323.68Part‐time Salaries $0.00

Life Insurance $222.39Vision Insurance $0.00

Health Insurance $14,391.04Dental Insurance $0.00

Retirement ‐ Employer $10,574.85Retirement ‐ Employee $4,046.83

SDI $713.79Total: Personnel Services $124,882.60

Medicare $0.00SUI $868.00

Workers Compensation Insurance $3,221.74FICA $1,380.10

Office Equipment & Repair $0.00Other Maintenance & Repair $1,408.91

Advertising $0.00Printing $5,205.61

Contractual ServicesProfessional Services $0.00Recreation $1,129.80

Total: Contractual Services $7,744.32

Expenses

Page 136: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Department 30 Culture & RecreationDivision 21 Senior Center

Budget for Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpenses

430‐10‐00 $1,100.00 $1,100.00430‐11‐00 $2,000.00 $2,060.00430‐20‐00 $4,500.00 $4,500.00430‐26‐00 $700.00 $700.00430‐37‐00 $1,800.00 $2,800.00430‐40‐00 $120.00 $120.00430‐43‐00 $100.00 $100.00430‐47‐00 $150.00 $150.00430‐60‐00 $28,000.00 $31,000.00

$38,470.00 $42,530.00

435‐10‐00 $0.00 $100.00435‐20‐00 $790.00 $790.00

$790.00 $890.00

440‐90‐00 $1,350.00 $1,329.00$1,350.00 $1,329.00 

450‐11‐00 $0.00 $0.00$0.00 $0.00

$179,205.00 $182,080.00

Postage $1,665.11Materials and Supplies $4,011.14

Materials, Supplies and Small EquipmentOffice Supplies $700.54

Awards $12.83Contribution M & O $15,406.07

Uniforms and Protective Clothing $0.00Badges and Name Plates $38.59

Other Maintenance & Repair $18.43Miscellaneous Equipment $11,249.94

Division Total: Senior Center $167,616.66

Fixed AssetsFurniture $0.00

Total: Fixed Assets $0.00

Fixed ChargesCompensated Absences $1,252.68

Total: Fixed Charges $1,252.68

Training and Travel $634.41Total: Dues, Meetings, Training and Travel $634.41

Total: Materials, Supplies and Small Equipment $33,102.65Dues, Meetings, Training and Travel

Subscriptions $0.00

Page 137: 2014 2015 Preliminary Budget

 Culture and Recreation—Recreation Programs 

 Description of Division  The Recreation Division is responsible for a variety of recreation programs, events, and services.  Programs include:  special interest classes, special events, teen program and pre‐school programs.  Additionally, the Division assists with program registration, facility bookings, and after hours  facility monitoring  including:   Valverde Park, Mossdale Park, Sangalang Park, Park West, Lathrop Skate Park, Senior Center and Lathrop One Building and all other Parks & Recreation facilities.   The Division advises the Youth Advisory Commission (YAC) and manages the YAC fund. 

 Accomplishments 2012/2013  

Held the 2013 Annual Tree lighting event with the Lathrop High School Choir and Band, the Lathrop Area Music Program (LAMP) Choir and the Lathrop Elementary School Choir participation.   

The Lathrop Youth Advisory Commission/teen volunteers donated over 2,580 hours assisting with City Special Events, teen activities and other recreation programs; an increase of 430 hours from FY 2013/2014. 

   The Lathrop Youth Advisory Commission/teen volunteers continued to provide input to city staff and consultants in the development  of  the  Lathrop  Generations  Center.  The  Youth  Advisory  Commission  held  6  Special  Youth  Advisory Commission Meetings to accomplish this. 

     Established  several  new  classes  to  the  Recreation  Division  (i.e.  Basic  Dog  Obedience/Puppy  Pre‐School,  Tiny  Toes Gymnastics, Step N Sweat, D.R.E.A.M. Dance, Piano Lessons, Pre‐5k run class, and Painting with Patty classes) 

Assisted the Beautification Day / Love Lathrop Committee, Mayor’s Art Show, Run Committee, Memorial/Veteran’s Day Committee, Christmas Parade Committee,  and Lathrop Celebration Committee with budget and program details. 

Lathrop Youth Advisory Commission, alongside City Staff, began the implementation of the donor brick program for the Lathrop Generations Center. 

Implementation of the new WebTrac online registration program.  

Page 138: 2014 2015 Preliminary Budget

 Culture and Recreation—Recreation Programs  Work Plan 2014/2015 

Continue to maintain and expand existing programs and services.  Continue  in‐house  training  in  RecTrac  (the  Department’s  facility  &  activity  registration  program)  to  improve  and 

streamline class and facility organization.  Assist with Parks & Recreation Capital Improvement Projects, including the Lathrop Generations Center. 

 Capital Requests 

  None      

Significant Operating Changes  

None 

  

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary  

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Administrative Assistant I/II  0.20  0.00  0.00 

Facility Supervisor  1.66  0.66  0.66 

Recreation Coordinator  0.00  0.50  0.45 

Recreation Leader  0.29  0.36  0.36 

Recreation Supervisor  1.00  1.00  0.90 

Total Full Time Equivalents  3.15  2.52  2.42 

Senior Recreation Leader  0.00  0.00  0.05 

Page 139: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $75,521.00 $72,161.00 410‐12‐00 $22,669.00 $23,221.00 410‐13‐00 $600.00 $675.00410‐14‐00 $0.00 $0.00410‐20‐00 $9,527.00 $9,728.00410‐21‐00 $2,687.00 $1,820.00410‐40‐00 $19,663.00 $21,245.00410‐41‐00 $0.00 $343.00410‐42‐00 $188.00 $217.00410‐43‐00 $0.00 $77.00410‐44‐00 $4,186.00 $5,044.00410‐46‐00 $2,755.00 $1,418.00410‐46‐01 $0.00 $1,396.00410‐47‐00 $1,877.00 $1,884.00410‐49‐00 $0.00 $0.00

$139,673.00 $139,229.00

420‐01‐00 $4,250.00 $4,250.00420‐03‐00 $23,973.00 $28,179.00420‐55‐00 $1,900.00 $1,900.00420‐60‐00 $500.00 $500.00420‐65‐00 $8,100.00 $7,400.00420‐67‐00 $1,200.00 $1,200.00

$39,923.00 $43,429.00

Budget for Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 30 Culture & RecreationDivision 30 Recreation Programs

Overtime $690.33Vacation/Sick Leave $10,207.63

Personnel ServicesRegular Salaries $66,472.72Part‐time Salaries $20,315.03

Health Insurance $19,114.55Dental Insurance $0.00

Retirement ‐ Employer $8,986.08Retirement ‐ Employee $3,442.85

Workers Compensation Insurance $2,950.41FICA $2,594.39

Life Insurance $192.57Vision Insurance $0.00

SDI $0.00Total: Personnel Services $136,745.42

Medicare $0.00SUI $1,778.86

Contractual ServicesProfessional Services $2,463.80Recreation $18,906.30

Printing $6,736.18Equipment Rental $0.00

Youth/Adult Activity $0.00Advertising $0.00

Total: Contractual Services $28,106.28

Expenses

Page 140: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Budget for Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 30 Culture & RecreationDivision 30 Recreation Programs

Expenses

430‐10‐00 $1,100.00 $1,100.00430‐11‐00 $1,260.00 $1,260.00430‐20‐00 $2,500.00 $5,000.00430‐37‐00 $2,500.00 $2,500.00430‐40‐00 $250.00 $250.00430‐47‐00 $600.00 $600.00430‐60‐00 $8,900.00 $7,525.00

$17,110.00 $18,235.00

435‐10‐00 $0.00 $0.00435‐20‐00 $1,225.00 $1,225.00

$1,225.00 $1,225.00

440‐41‐00 $3,520.00 $3,520.00$3,520.00 $3,520.00

$201,451.00 $205,638.00

Materials, Supplies and Small EquipmentOffice Supplies $660.64

Miscellaneous Equipment $8,371.35Uniforms and Protective Clothing $0.00

Postage $1,230.33Materials and Supplies $3,334.82

Dues, Meetings, Training and TravelSubscriptions $160.00

Awards $796.66Contribution M & O $3,173.42

Division Total: Recreation Programs $186,095.83

Fixed ChargesRents $2,605.91

Total: Fixed Charges $2,605.91

Training and Travel $911.00Total: Dues, Meetings, Training and Travel $1,071.00

Total: Materials, Supplies and Small Equipment $17,567.22

Page 141: 2014 2015 Preliminary Budget

 Culture and Recreation—Kid Club & Day Camp 

Description of Division  The Kid Club & Day Camp Division provides quality recreational and educational programs for children of local residents.  The budget includes  appropriations  for  staffing, materials  and  supplies necessary  to provide before  school programs,  after  school programs, summer camps with educational activities and programs and field trips for school age children.  Accomplishments 2013/2014 

Program Average Daily Attendance for the last three fiscal years is as follows: 

                11/12    12/13    13/14 

  Before School  ‐  Community Center          15       8       15              Before School  ‐  Joseph Widmer School       10       8       20   Before School  ‐  Mossdale School       10       8       20   After School  ‐  Community Center         20       15       23   After School  ‐  Joseph Widmer School       20       20       25        After School  ‐  Mossdale School       20       20        25   Camp Themed Weeks             20       25        35 

2nd year working with Lathrop High School ROP students to train for the  Before and After School programs. 

6th year working closely with San Joaquin County WorkNet to train personnel for our program. 

5th year for the program “Green Machine” that maintains the removal of trash and debris in Valverde Park and teaches Kid Club participants the importance of taking care of our planet.  Approximately 15 children from the Community Center Kid Club site participate.   “Green Machine” programs were also added at the Mossdale School and Joseph Widmer, Jr. School Kid Club sites. 

6th  year  to  provide  a  facility  for  the  federally  funded USDA  Snack  Program  at  the  Lathrop  Community  Center;  this program serves children daily during the school year.  Snacks were also served for the second year at the Joseph Widmer, Jr. School Kid Club sites. 

1st year working with 4‐H to implement  leadership class with in the Kids Club program  

 

Page 142: 2014 2015 Preliminary Budget

 Culture and Recreation—Kid Club & Day Camp 

 Accomplishments 2013/2014 (continued) 

USDA  Summer  Food  Program  also was  utilized  by  the  Kid  Club  program  and  local  community  during  the  summer months.  Summer Food Program sites were located at the Lathrop Community Center and at Sangalang Park.  Average Daily Attendance for summer 2013 was: 

    Breakfast Served Daily    30     Lunch Served Daily    40     Work Plan 2014/2015 

Continue to improve customer service and maintain high quality children’s programs for Lathrop residents. 

Continue to encourage our participants to make healthy activity choices through our summer camp themes. 

Continue  to encourage our participants  to make healthy diet  choices  through our educational programming  in after school programs. 

Continue to teach the children in the community to take pride in their surroundings and environment. 

Continue  to offer  the  community educational and entertaining programming  through our  camp  settings and before/ after school program settings. 

Work with Manteca Unified School District to add an additional site for the USDA Summer Food Program. 

Capital Requests 

  None 

Significant Operating Changes 

None 

 

             

  

Page 143: 2014 2015 Preliminary Budget

 Culture and Recreation—Kid Club & Day Camp 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary: 

 

 

 

 

 

 

 

 

    

 

Position:  12/13  13/14  14/15 

Recreation Supervisor  0.60  0.60  0.65 

Senior Recreation Leader  2.75  2.75  2.55 

Total Full Time Equivalents  6.56  6.21  6.16 

Administrative Assistant I/II  0.20  0.00  0.00 

Recreation Leader  3.01  2.86  2.86 

Recreation Coordinator  0.00  0.00  0.10 

Page 144: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $77,668.00 $78,343.00 410‐12‐00 $103,142.00 $100,682.00 410‐13‐00 $400.00 $375.00410‐14‐00 $0.00 $0.00410‐20‐00 $15,534.00 $16,067.00410‐21‐00 $4,425.00 $3,035.00410‐40‐00 $55,926.00 $55,508.00410‐41‐00 $0.00 $2,016.00410‐42‐00 $296.00 $322.00410‐43‐00 $0.00 $361.00410‐44‐00 $10,920.00 $12,549.00410‐46‐00 $5,908.00 $3,675.00410‐46‐01 $0.00 $2,602.00410‐47‐00 $5,088.00 $4,999.00

$279,307.00 $280,534.00

420‐55‐00 $8,100.00 $8,100.00420‐65‐00 $3,030.00 $2,880.00

$11,130.00 $10,980.00

430‐10‐00 $500.00 $500.00430‐11‐00 $540.00 $540.00430‐20‐00 $2,500.00 $3,100.00430‐37‐00 $200.00 $200.00430‐40‐00 $550.00 $550.00

$4,290.00 $4,890.00

Budget ofr Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 30 Culture & RecreationDivision 33 Kids Club & Day Camp

Overtime $428.32Vacation/Sick Leave $11,668.60

Personnel ServicesRegular Salaries $64,429.46Part‐time Salaries $79,446.69

Health Insurance $51,233.48Dental Insurance $0.00

Retirement ‐ Employer $13,196.08Retirement ‐ Employee $5,096.43

Workers Compensation Insurance $9,824.95FICA $4,603.79

Life Insurance $287.35Vision Insurance $0.00

Total: Personnel Services $244,511.03

Medicare $0.00SUI $4,295.88

Contractual ServicesYouth/Adult Activity $7,412.17Printing $2,738.61

Materials and Supplies $2,141.10

Total: Contractual Services $10,150.78Materials, Supplies and Small Equipment

Office Supplies $352.29

Expenses

Total: Materials, Supplies and Small Equipment $3,328.94

Miscellaneous Equipment $308.26Uniforms and Protective Clothing $0.00

Postage $527.29

Page 145: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Budget ofr Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 30 Culture & RecreationDivision 33 Kids Club & Day Camp

Expenses

435‐20‐00 $1,520.00 $1,520.00$1,520.00 $1,520.00

$296,247.00 $297,924.00Total: Dues, Meetings, Training and Travel $709.76Division Total: Kids Club & Day Camp $258,700.51

Dues, Meetings, Training and TravelTraining and Travel $709.76

Page 146: 2014 2015 Preliminary Budget

 Culture and Recreation ‐ Sports, Fitness & Outdoor Programs 

  Description of Division  This is the tenth  year for this division in the Parks & Recreation Department.  This Division includes:  youth sports, adult sports, outdoor programs, and fitness programs.  

Accomplishments 2013/2014  Offered Pee Wee Sports (ages 4‐7 years) in flag football, soccer, basketball and t‐ball with an average participation of 50 

participants per sport.   

Offered  Youth  Sports  (ages  8‐13  years)  in  flag  football,  soccer  and  basketball  with  an  average  participation  of  40 participants per sport.   

Offered  Start  Smart  Soccer,  Football, T‐Ball and Basketball  for  children ages 3 and 5  years old.   This program has  the support and interaction of parents and staff.  Number of participants has grown significantly. 

Offered Fun Day/Clinics for the following programs: 

Pee Wee and Youth Soccer staffed by Challenger Sports at Sangalang Park  

Pee Wee and Youth Basketball staffed by local firefighters 

Pee Wee and Youth Flag Football staffed by Lathrop Spartans 

Pee Wee T‐Ball staffed by Lathrop Little League 

Continued offering British Soccer Camps staffed by Challenger Sports at Mossdale Park (June 2014) 

Offered open gym Monday—Friday at the Lathrop Community Center during the day for the community. 

Continued Adult Coed Softball League, added  three seasons of Adult Basketball 

Work Plan 2014/2015 

Maintain high program standards for all Parks & Recreation Sports Leagues. 

Increase numbers in Adult Basketball League & Adult Coed Softball participation. 

Offer fundamental basketball camps throughout the year. 

  

Page 147: 2014 2015 Preliminary Budget

 Culture and Recreation ‐ Sports, Fitness & Outdoor Programs 

Work Plan 2014/2015 (continued) 

Offer National Football League (NFL) Punt, Pass and Kick Program and also Pitch, Hit and Run Program. 

Offer Running Classes and begin a Running Club. 

Research offering Hershey Track and Field event 

Research partnering with Manteca Parks and Recreation to participate in the Junior Giants Program 

Capital Requests 

  None  Significant Operating Changes  

Reallocated the Recreation Coordinator position.  Adjusted from 10% to 50%.   

  

Page 148: 2014 2015 Preliminary Budget

 Culture and Recreation ‐ Sports, Fitness & Outdoor Programs 

   Staffing  FY 2014/2015 (in alphabetical order)       Position Summary 

Position:  12/13  13/14  14/15 

Administrative Assistant I/II  0.10  0.00  0.00 

Recreation Leader  0.40  0.47  0.51 

Recreation Supervisor  0.35  0.35  0.40 

Total Full Time Equivalents  0.85  1.32  1.41 

Recreation Coordinator  0.00  0.50  0.45 

Senior Recreation Leader  0.00  0.00  0.05 

Page 149: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $27,667.00 $47,331.00 410‐12‐00 $10,317.00 $10,299.00 410‐13‐00 $225.00 $425.00410‐14‐00 $0.00 $0.00410‐20‐00 $4,346.00 $7,235.00410‐21‐00 $1,245.00 $1,368.00410‐40‐00 $5,091.00 $9,351.00410‐41‐00 $0.00 $609.00410‐42‐00 $69.00 $126.00410‐43‐00 $0.00 $137.00410‐44‐00 $1,684.00 $2,474.00410‐46‐00 $747.00 $229.00410‐46‐01 $0.00 $839.00410‐47‐00 $790.00 $993.00

$52,181.00 $81,416.00

420‐03‐00 $5,820.00 $9,954.00420‐65‐00 $1,410.00 $1,160.00

$7,230.00 $11,114.00

430‐10‐00 $400.00 $400.00430‐11‐00 $180.00 $180.00430‐20‐00 $5,330.00 $5,330.00430‐37‐00 $1,000.00 $1,000.00430‐40‐00 $125.00 $125.00430‐47‐00 $2,040.00 $2,040.00

$9,075.00 $9,075.00

Budget ofr Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 30 Culture & RecreationDivision 36 Sports, Fitness & Outdoor Prgms

Overtime $191.87Vacation/Sick Leave $2,799.28

Personnel ServicesRegular Salaries $21,621.40Part‐time Salaries $8,129.63

Health Insurance $2,931.16Dental Insurance $0.00

Retirement ‐ Employer $3,599.41Retirement ‐ Employee $1,400.31

Workers Compensation Insurance $2,143.05FICA $624.56

Life Insurance $67.19Vision Insurance $0.00

Total: Personnel Services $44,205.93

Medicare $0.00SUI $698.07

Contractual ServicesRecreation $4,058.00Printing $1,065.01

Total: Contractual Services $5,123.01Materials, Supplies and Small Equipment

Office Supplies $68.01

Uniforms and Protective Clothing $0.00

Postage $175.75Materials and Supplies $5,182.08

Expenses

Awards $1,918.63Total: Materials, Supplies and Small Equipment $7,344.47

Miscellaneous Equipment $0.00

Page 150: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Budget ofr Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 30 Culture & RecreationDivision 36 Sports, Fitness & Outdoor Prgms

Expenses

435‐20‐00 $345.00 $345.00$345.00 $345.00

$68,831.00 $101,950.00Division Total: Sports, Fitness & Outdoor Prgms $56,673.41

Dues, Meetings, Training and TravelTraining and Travel $0.00

Total: Dues, Meetings, Training and Travel $0.00

Page 151: 2014 2015 Preliminary Budget

 Culture and Recreation—Library 

  Description of Division  

The Library Division provides staffing and equipment to operate a library branch that is open to the public 25 hours per week.  This li‐brary branch is made possible through a partnership with the Stockton‐San Joaquin County Public Library system.  The branch will be moving to the new location at the Lathrop Generations Center upon the centers completion in June of 2014. 

  

Accomplishments 2013/2014  Lathrop Library Branch has been operating successfully for eight years. 

Lathrop Library Branch offered Preschool Story Time, Puppet Shows, teen programs, arts and crafts programs and guests speakers for all ages. 

The Library Division continued to offer services to Lathrop residents,  including partnership of new programs and no‐cost computer classes. 

Mobile Library site locations include Mossdale Landing Community Park and the Green Park. 

 

Work Plan 2014/2015 

The Library Division will continue to offer services to Lathrop residents such as:  computer access, circulation of materials and programming  to Lathrop residents (which includes partnership of new programs). 

The Stockton‐San Joaquin County Library will continue to be coordinated with for the planning and design of the Lathrop Community Complex which includes a new library component. 

Research the possibility of moving the mobile library site from Mossdale Landing Community Park to Valverde Park location   Capital Requests 

None   

Significant Operating Changes   None 

Page 152: 2014 2015 Preliminary Budget

 Culture and Recreation—Library 

Staffing  FY 2014/2015 (in alphabetical order) 

A Supervising Librarian and a Stockton City‐County employee will provide oversight of  the Lathrop Branch Library  through  the Stockton – San Joaquin County Public Library.   A small portion of a City of Lathrop   Recreation Supervisor’s time  is budgeted to assist with coordination of the division. 

 

 

            

  

Position:  12/13  13/14  14/15 

Recreation Supervisor  0.05  0.05  0.05 

Total Full Time Equivalents  0.05  0.05  0.05 

Page 153: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $3,365.00 $3,422.00410‐13‐00 $25.00 $25.00410‐14‐00 $0.00 $0.00410‐20‐00 $422.00 $460.00410‐21‐00 $119.00 $85.00410‐40‐00 $566.00 $528.00410‐41‐00 $0.00 $38.00410‐42‐00 $8.00 $9.00410‐43‐00 $0.00 $9.00410‐44‐00 $46.00 $53.00410‐46‐00 $48.00 $0.00410‐46‐01 $0.00 $50.00410‐47‐00 $22.00 $22.00

$4,621.00 $4,701.00

420‐03‐00 $900.00 $900.00420‐65‐00 $1,010.00 $960.00

$1,910.00 $1,860.00

430‐10‐00 $125.00 $125.00430‐11‐00 $180.00 $180.00430‐20‐00 $300.00 $300.00430‐37‐00 $200.00 $0.00430‐45‐00 $3,600.00 $5,000.00

$4,405.00 $5,605.00$10,936.00 $12,166.00

Budget for Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Department 30 Culture & RecreationDivision 40 Library

Overtime $24.31Vacation/Sick Leave $357.80

Personnel ServicesRegular Salaries $2,585.77

Health Insurance $489.57Dental Insurance $0.00

Retirement ‐ Employer $354.82Retirement ‐ Employee $136.89

Workers Compensation Insurance $40.80FICA $42.52

Life Insurance $8.31Vision Insurance $0.00

Total: Personnel Services $4,062.49

Medicare $0.00SUI $21.70

Contractual ServicesRecreation $900.00Printing $912.87

$0.00

Total: Contractual Services $1,812.87Materials, Supplies and Small Equipment

Office Supplies $76.12

Expenses

Total: Materials, Supplies and Small Equipment $3,851.87Division Total: Library $9,727.23

Miscellaneous Equipment $0.00Reference Books $3,600.00

Postage $175.75Materials and Supplies

Page 154: 2014 2015 Preliminary Budget

PUBLIC SAFETY 

Page 155: 2014 2015 Preliminary Budget

Chief of Police

Lieutenant

Administrative Sergeant

CIT Deputy (2) Detective

CRO Deputy SRO Deputy (2)

Traffic Deputy

Patrol Sergeant (2)

Sheriff Deputy (12) K9 Deputy (2)

Police Services Manager

Management Analyst II

Administrative Assistant II

City of Lathrop - Police Services

FY 2014-2015

Page 156: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

$514,288.00 $402,983.00$4,529,168.00 $4,725,753.00

($4,014,880.00) ($4,322,770.00)

$60,200.00 $32,000.00$85,181.00 $52,374.00

($24,981.00) ($20,374.00)

$0.00 $0.00$760.00 $97.00

($760.00) ($97.00)

$26,652.00 $118,421.00$30,412.00 $118,421.00($3,760.00) $0.00

$100,000.00 $100,000.00$100,000.00 $100,000.00

$0.00 $0.00

$701,140.00 $653,404.00$4,745,521.00 $4,996,645.00

($4,044,381.00) ($4,343,241.00)

Departmental Staffing1.00 1.00 1.00

Criminal Research Analyst 1.00 1.00 0.00Management Analyst I/II 0.00 1.00 1.00Police Office Supervisor 0.00 1.00 1.00

2.00 4.00 3.00Contractual ServicesChief of Police 1.00 1.00 1.00Deputy Sheriff II for Community Resource Officer 1.00 1.00 1.00

Net Grand Totals: ($4,071,759.31)

Administrative Assistant I/II

Fund Total: State COPS $0.00

Revenue Grand Totals: $392,277.47Expense Grand Totals: $4,464,036.78

Fund Total: Universal Hiring Grant $469.26

Revenue Totals: $100,000.00Expense Totals $100,000.00

Fund Total: Asset Forfeiture ($1,100.26)

Revenue Totals: $10,648.43Expense Totals $10,179.17

Fund Total: Traffic Safety ($8,010.40)

Revenue Totals: $4.16Expense Totals $1,104.42

Fund Total: General Fund ($4,063,117.91)

Revenue Totals: $36,557.48Expense Totals $44,567.88

Expense Totals $4,308,185.31

Public Safety Deparment Budget Summary

Description 2013 Actual AmountRevenue Totals: $245,067.40

Page 157: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Public Safety Deparment Budget Summary

Description 2013 Actual AmountDepartmental Staffing (Continue)

Deputy Sheriff II for School Resource Officer 1.00 1.00 1.00Deputy Sheriff II for Investigations 1.00 1.00 1.00Deputy Sheriff II for Patrol 15.00 15.00 15.00Lieutenant to serve as Supervisor 1.00 1.00 1.00Sergeant to serve as Supervisor 2.00 2.00 2.00

Total Public Safety FTE 22.00 22.00 22.00

Page 158: 2014 2015 Preliminary Budget

Public Safety—Administration 

     Description of Division 

Mission Statement (Why we are here) 

  We, the members of Lathrop Police Services in partnership with our community, will strive to reduce crime, the fear of crime, and improve quality of life by upholding laws, protecting lives and property, and providing a safe and secure environment for every‐one.  

Vision (Where we are headed) 

The vision of Lathrop Police Services, a division of the San Joaquin County Sheriff’s Office, is to be regarded by our community and our profession as the premier law enforcement agency in the State of California.  

Values (How we do our business)  

Safety and security (Our number one priority to all of our citizens living, working or visiting in the City of Lathrop) 

Excellence (The quality of being exceptionally good in our service delivery) 

Respect (Willingness to show consideration, appreciation, concern for all people and staff) 

Vigilance (Careful attention, alert watchfulness of our community) 

Integrity (Honesty and moral soundness) 

Collaboration (To work together/partnerships) 

Ethics (A code of behavior, a set of principles of right conduct we model) 

Goals (Desired outcomes we seek) 

To Reduce Crime 

To Reduce the Fear of Crime 

To Improve the Overall Quality of Life in the Community  

To Build and Maintain Effective Partnerships in the City of Lathrop and with all the City Stakeholders 

Page 159: 2014 2015 Preliminary Budget

 

Public Safety—Administration         Accomplishments 2013/2014 

Reinstated  four  (4)  previously  unfunded  sworn  positions,  including  2  Deputy  Sheriff  positions,  re‐establishing    the Community Impact Team, a second School Resource Officer and Administrative Sergeant. 

Increased School Resource Officer rotating presence at all Lathrop Schools with second SRO. 

Presentation of D.A.R.E. Program to 5th grade students at Lathrop, Widmer, Mossdale Elementary Schools, and the new River Islands Technology Academy, with over 300 students making a pledge to stay drug free. 

Conducted special traffic enforcements and directed patrols targeting specific areas of concern. 

Participated  in National Distracted Driver Campaign  “Phone  in One Hand  / Ticket  in  the Other”,  targeting drivers using hand‐held  phones  while  driving,  sponsored  by  the  National  Highway  Traffic  Safety  Administration  (NHTSA)  and  the California Office of Traffic Safety (OTS). 

Conducted child safety seat inspections and installation training for parents. 

Twenty‐one (21) Neighborhood Watch Groups were active in 2013.  Sixteen (16) community members opened their homes to their neighbors on August 6, 2013 for National Night Out.      

New and existing local business owners were invited to participate in “Business Watch”, a crime deterrent and prevention program for their workplaces.   

Two (2) sessions of the Annual Junior Police Academy Program were held, with 40 cadets participating. 

Annual Citizen's Police Academy  welcomed 11 community members as participants. 

Third  Annual  Bicycle  Helmet  Drive  successfully  produced  enough  donations  to  provide  free  helmets  to  Bicycle  Rodeo participants in need. 

Annual Bicycle Rodeo  ‐ 51  local students participated.   

File of Life for Senior Citizens. 

Community Outreach ‐ Holiday Toy Drives / Canned Food Drives / Clothing Drives.  

CPTED Crime Prevention Through Environmental Design. 

Participated in the Youth Activities Commission. 

Community Crime Prevention Training, specifically Stranger Dangers for children. 

South County Crime Stoppers. 

Page 160: 2014 2015 Preliminary Budget

 Public Safety—Administration 

        Accomplishments 2013/2014 (continued)  

Juvenile  Probation  Partnership  ‐  Lathrop  Police  Services  continues  our  partnership  with  the  Juvenile  Probation Department.  The  full‐time  probation  officer  works  closely  with  our  detectives  and  deputies  to  help  them  in  the identification and apprehension of subjects involved in gang and drug activities. 

Impounded or stored a total of 264 vehicles  in 2013.   Of these vehicles, 33 were driven by a person with a suspended Driver’s license, and 20 of the drivers had prior convictions for Driving Under the Influence. 

Eighty (80) DUI (Driving Under the Influence) arrests were made in 2013. 

Four hundred forty four (444)  criminal arrests were made in calendar year 2013. 

Violent Crimes down by 4% in 2013. 

Received a Grant Award in the amount of $26,500 from the California Office of Traffic Safety. 

Submitted STEP (Selective Traffic Enforcement Program) Grant Application  to OTS in January 2014. 

Lathrop Police  Services was awarded  FIRST Place  in  the 2012 California  Law Enforcement Challenge by  the California Office of Traffic Safety, for the second consecutive year. 

Participated in AVOID the 10  DUI Checkpoints and DUI Special Patrols with other San Joaquin County allied agencies. 

Participated in numerous County‐wide Probation sweeps with local allied agencies. 

Continued  collaboration with City Departments,  including Code Enforcement, Public Works, Animal  Services,  Finance, Parks and Recreation, Community Development and the Lathrop‐Manteca Fire District. 

On‐going  commitment  to  School  Safety  with  all  Lathrop  School  Principals,  including  reviewing  safety  plans  for improvements and collaborating on training drills. 

Participated in Lathrop High School Dances, Football Games and Career Day. 

Lathrop Police Services’ Deputy Sterni honored by M.A.D.D. (Mothers Against Drunk Driving) for DUI Arrests. 

Lathrop Deputies provided instruction to New Visions ROTC Program. 

Implement new Bicycle Patrol Policy and re‐introduce Bicycle Patrols in our neighborhoods and community parks.  

 

 

Page 161: 2014 2015 Preliminary Budget

Public Safety—Administration 

        

Work Plan 2014/15 

  Continue to  improve traffic and pedestrian safety by the use of traffic enforcements and public education by  including 

outreach programs such as; bicycle rodeos and motorcycle safety presentations. 

Continue developing, improving and expanding crime prevention programs within the community. 

 Expand neighborhood watch programs. 

Continue developing the business watch program with local businesses. 

Continue child safety restraint programs for community members, providing free safety seat inspections, proper installa‐

tion assistance, and educational materials on the seatbelt/child safety restraint laws. 

Work  in partnership with other  local Law Enforcement Agencies, conducting special sweeps to check on sex offenders, 

probationers, and parolees to ensure they are in compliance with conditions of parole and probation. 

Analyze potential use of technology in policing. 

Continue OTS Grant funded DUI Enforcements and special operations with allied agencies. 

 

Capital Requests   Two (2) Vehicle Replacements                           $110,000   Significant Operating Changes 

  None 

Page 162: 2014 2015 Preliminary Budget

Public Safety—Administration 

       Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Administrative Assistant I/II  1.00  1.00    1.00  

Criminal Research Analyst   1.00  0.00  0.00 

Police Services Manager  1.00  1.00  1.00 

Total Full Time Equivalents  3.00  3.00  3.00 

Management Analyst  0.00  1.00  1.00 

San Joaquin County Positions:  12/13  13/14  14/15 

Chief of Police  1.00  1.00  1.00 

Deputy Sheriff Investigations  1.00   1.00   1.00 

Deputy Sheriff for Com Resource Officer  0.33  0.33  0.40 

Deputy Sheriff for Patrol  10.00  10.00  10.00 

Deputy Sheriff for School Resource Officer  1.00  1.00  1.00 

Lieutenant to serve as Supervisor  1.00  1.00  1.00 

Sergeant to Serve as Supervisor  2.00  2.00  2.00 

Total San Joaquin County Positions  16.33  16.33  16.40 

Page 163: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

410‐11‐00 $181,879.00 $203,388.00410‐13‐00 $800.00 $800.00410‐14‐00 $0.00 $0.00410‐20‐00 $22,828.00 $27,282.00410‐21‐00 $6,439.00 $5,070.00410‐40‐00 $28,786.00 $24,750.00410‐41‐00 $0.00 $4,810.00410‐42‐00 $451.00 $539.00410‐43‐00 $0.00 $850.00410‐44‐00 $5,320.00 $5,950.00410‐46‐00 $2,637.00 $0.00410‐46‐01 $0.00 $2,983.00410‐47‐00 $1,302.00 $1,302.00 410‐49‐00 $822.00 $1,566.00 

$251,264.00 $279,290.00 

420‐01‐00 $8,900.00 $8,300.00420‐18‐00 $1,704.00 $1,685.00420‐25‐00 $9,392.00 $14,400.00420‐58‐00 $2,142.00 $900.00420‐65‐00 $2,700.00 $300.00420‐70‐00 $8,000.00 $8,000.00420‐72‐00 $2,000.00 $2,000.00420‐75‐00 $3,000.00 $6,750.00

$37,838.00 $42,335.00Other Maintenance & Repair $2,407.20

Total: Contractual Services $27,527.66

Auto/Heavy Equipment Maintenance/Repair $5,646.69Communication Equipment Repair $741.01

Computer Tech Support $1,878.00Printing $157.60

Alarm Service $2,280.00Building & Ground Maintenance $6,026.64

Total: Personnel Services $238,575.98Contractual Services

Professional Services $8,390.52

SDI $800.00

Medicare $0.00SUI $1,302.00

Workers Compensation Insurance $4,853.55FICA $2,527.12

Life Insurance $444.15Vision Insurance $0.00

Health Insurance $26,847.90Dental Insurance $0.00

Retirement ‐ Employer $20,622.53Retirement ‐ Employee $7,890.62

Overtime $65.21Vacation/Sick Leave $16,848.15

Division 10 Police Services

Personnel ServicesRegular Salaries $156,374.75

ExpensesDepartment 40 Public Safety

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 164: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Division 10 Police Services

ExpensesDepartment 40 Public Safety

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

425‐10‐00 $3,586,947.00 $4,187,939.00425‐11‐00 $344,329.00 $0.00425‐14‐00 $23,700.00 $23,670.00

$3,954,976.00 $4,211,609.00

430‐10‐00 $3,800.00 $3,800.00430‐20‐00 $9,000.00 $10,000.00430‐26‐00 $1,400.00 $1,400.00430‐33‐00 $100.00 $100.00430‐37‐00 $500.00 $2,000.00430‐40‐00 $480.00 $200.00430‐45‐00 $365.00 $365.00430‐47‐00 $100.00 $200.00430‐49‐00 $12,800.00 $12,800.00430‐50‐00 $750.00 $750.00430‐60‐00 $1,500.00 $1,800.00

$30,795.00 $33,415.00

435‐10‐00 $300.00 $300.00435‐20‐00 $1,795.00 $600.00

$2,095.00 $900.00

440‐40‐00 $800.00 $1,000.00440‐41‐00 $38,600.00 $38,600.00440‐90‐00 $1,500.00 $3,004.00 

$40,900.00 $42,604.00 Total: Fixed Charges $40,307.66

Rents $38,890.36Compensated Absences $1,417.30

Total: Dues, Meetings, Training and Travel $718.68Fixed Charges

Special Fees $0.00

Dues, Meetings, Training and TravelSubscriptions $115.00Training and Travel $603.68

Contribution M & O $1,410.01Total: Materials, Supplies and Small Equipment $31,318.79

Utilities ‐ Gas and Electric $11,961.69Water $736.25

Reference Books $261.74Awards $100.19

Miscellaneous Equipment $5,378.77Uniforms and Protective Clothing $0.00

Other Maintenance & Repair $603.64Gas/Diesel/Oil/Lubricants $94.77

Materials, Supplies and Small EquipmentOffice Supplies $3,410.71Materials and Supplies $7,361.02

Mossdale Landing ‐ Police $25,000.01Total: Contractual Services (Intergovernmental) $3,931,958.12

Contractual Services (Intergovernmental)Special Contracts $3,560,033.44Gold Rush ‐ Police $346,924.67

Page 165: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

Division 10 Police Services

ExpensesDepartment 40 Public Safety

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

450‐20‐00 $60,700.00 $0.00450‐30‐00 $145,000.00 $110,000.00

$205,700.00 $110,000.00

480‐01‐00 $5,600.00 $5,600.00$5,600.00 $5,600.00

$4,529,168.00 $4,725,753.00Division Total: Police Services $4,308,185.31

Debt ServicePrincipal $5,690.86

Total: Debt Service $5,690.86

Vehicles $32,087.56Total: Fixed Assets $32,087.56

Fixed AssetsMachines and Equipment $0.00

Page 166: 2014 2015 Preliminary Budget

Public Safety– Traffic Safety          Description of Division 

  A portion of  fines collected  for  the violation of certain  traffic misdemeanors are dispersed by  law  to a “Traffic Safety Fund”   established by each City.   These  funds must be used exclusively  for official  traffic  control devices,  the maintenance  thereof,   equipment and supplies  for  traffic  law enforcement and  traffic accident prevention, and  for  the maintenance,  improvements   or construction of public streets, bridges, and culverts within the City.   

        Accomplishments 2013/2014  

Awarded 1st place in the 2012 California Law Enforcement Challenge for Traffic Enforcements, for the second consecu‐tive year. 

  Participated in numerous “AVOID the 10” multi‐agency DUI Enforcements within allied agencies in San Joaquin County. 

  Participated in the California Office of Traffic Safety April Distracted Driver Awareness Campaign, “It’s Not Worth It”. 

     Conducted special patrols in areas for problem speeders, near locals Elementary and High Schools. 

  1 additional Officer trained as a Certified Child Safety Seat Technician, for a total of 2 Department Technicians. 

  1 additional Officer certified as Motorcycle Officer 

         Work Plan 2013/2014    

  Continue increased Traffic Enforcement and Public Education with use of one full‐time Motorcycle Officer.

        Capital Requests  

     Radar‐Lidar Equipment                           $3,500    

        Significant Operating Changes    None 

Page 167: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $1,800.00 $1,800.00420‐65‐00 $1,950.00 $500.00420‐70‐00 $25,725.00 $20,000.00420‐75‐00 $3,000.00 $9,100.00

$32,475.00 $31,400.00

430‐20‐00 $500.00 $1,600.00430‐24‐00 $3,000.00 $3,000.00430‐26‐00 $1,000.00 $1,000.00430‐33‐00 $2,820.00 $2,820.00430‐37‐00 $3,000.00 $3,000.00430‐40‐00 $1,500.00 $1,500.00

$11,820.00 $12,920.00

450‐20‐00 $3,500.00 $3,500.00450‐30‐00 $30,000.00 $0.00

$33,500.00 $3,500.00

990‐90‐10 $7,386.00 $4,554.00$7,386.00 $4,554.00

$85,181.00  $52,374.00 Division Total: Police Services $44,567.88 

Vehicles $0.00Total: Fixed Assets $0.00Transfers

Transfers Out $19,710.00Total: Transfers $19,710.00

Total: Materials, Supplies and Small Equipment $3,686.34Fixed Assets

Machines and Equipment $0.00

Miscellaneous Equipment $615.57Uniforms and Protective Clothing $772.27

Other Maintenance & Repair $0.00Gas/Diesel/Oil/Lubricants $1,338.64

Materials, Supplies and Small EquipmentMaterials and Supplies $0.00Auto/Heavy Equipment Parts $959.86

Other Maintenance & Repair $532.17Total: Contractual Services $21,171.54

Printing $0.00Auto/Heavy Equipment Maintenance/Repair $20,639.37

Division 10 Police Services

Contractual ServicesProfessional Services $0.00

ExpensesDepartment 40 Public Safety

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2070 Traffic Safety

Page 168: 2014 2015 Preliminary Budget

Public Safety—Asset Forfeiture 

Description of Division 

Asset Forfeiture funds that seized as a result of illegal possession, sale or manufacture of illegal drugs or narcotics can be utilized by police departments to purchase police related equipment.  

 Accomplishments 2013/2014  

  There was no activity related to this fund in 2013/2014. 

 

Work Plan 2014/2015  

None 

 

Capital Requests    None 

 

Significant Operating Changes    None  

       

 

   

Page 169: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐38‐00 $760.00 $0.00$760.00 $0.00

990‐90‐10 $0.00 $97.00$0.00 $97.00

$760.00 $97.00 

TransfersTransfers Out $0.00

Total: Transfers $0.00

Total: Contractual Services $1,104.42

Division Total: PS Asset Forefeiture $1,104.42

Division 12 PS Asset Forefeiture

Contractual ServicesCommunity Promotions $1,104.42

ExpensesDepartment 40 Public Safety

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2100 Asset Forfeiture

Page 170: 2014 2015 Preliminary Budget

Public Safety—Universal Hiring Grant 

Description of Division 

Universal Hiring Grant  

Office of Traffic Safety  ‐ Sobriety Checkpoint Mini‐Grant. 

Office of Traffic Safety—Selective Traffic Enforcement Program (STEP) Grant. 

 Accomplishments 2013/2014 

    Received Sobriety Checkpoint Grant Award in the amount of $26,500.       Submitted an application for the Selected Traffic Enforcement Program (STEP) Grant which, if awarded, will begin in Sep‐

tember 2014.   

Work Plan 2014/2015 

Plan and prepare for grant opportunities for the upcoming fiscal year, in anticipation of STEP Grant Award of $118,421.  Capital Requests:   

Total Station—Accident and Crime Scene Reconstruction Equipment   $23,100  MAIT (Major Accident Investigation Team) Vehicle with Scelzi Body     $38,000 

           

Page 171: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

425‐10‐00 $30,402.00 $40,254.00$30,402.00 $40,254.00

430‐37‐00 $0.00 $13,877.00$0.00 $13,877.00

435‐20‐00 $0.00 $3,190.00$0.00 $3,190.00

450‐20‐00 $0.00 $23,100.00450‐30‐00 $0.00 $38,000.00

$0.00 $61,100.00

990‐90‐10 $10.00 $0.00$10.00 $0.00

$30,412.00  $118,421.00Division Total: Police Services $10,179.17 

Vehicles $0.00Total: Fixed Assets $0.00Transfers

Transfers Out $3,389.00Total: Transfers $3,389.00

Total: Dues, Meetings, Training and Travel $0.00Fixed Assets

Machines and Equipment $0.00

Total: Materials, Supplies and Small Equipment $0.00Dues, Meetings, Training and Travel

Training and Travel $0.00

Total: Contractual Services (Intergovernmental) $6,790.17Materials, Supplies and Small Equipment

Miscellaneous Equipment $0.00

Division 10 Police Services

Contractual Services (Intergovernmental)Special Contracts $6,790.17

ExpensesDepartment 40 Public Safety

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2190 Universal Hiring Grant

Page 172: 2014 2015 Preliminary Budget

Public Safety—SLESF  / COPS 

Description of Division 

SLESF (Supplemental Law Enforcement Services Funding)/COPS Funding‐ This fund was established by legislative action to supplement funding to local law enforcement.  The Police Chief will make a  written request to City Council specifying front line law enforcement needs.  Based on the population of the City, we are allocated to receive $100,000   from the State for front line Law Enforcement.  

 

Accomplishments 2013/2014  

  Received funding for the Community Resource Officer Position  in the amount of $100,000 in 4 quarterly   increments of $25,000. 

 

Work Plan 2014/2015  

  Submit request for SLESF / COPS Funding for  FY 14/15  

Capital Requests  

  None  

Significant Operating Changes    None  

Staffing Summary FY 2014‐2015 

        Staffing Summary  

    

   

 

   

San Joaquin County Positions:  12/13  13/14  14/15 

Deputy Sheriff for Com Resource Officer  0.67  0.67  0.60 

Total San Joaquin County Positions  0.67  0.67  0.60 

Page 173: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

425‐10‐00 $100,000.00 $100,000.00$100,000.00 $100,000.00$100,000.00 $100,000.00

Total: Contractual Services (Intergovernmental) $100,000.00Division Total: PS COPS Fund ‐ State AB1913 $100,000.00

Division 16 PS COPS Fund ‐ State AB1913

Contractual Services (Intergovernmental)Special Contracts $100,000.00

ExpensesDepartment 40 Public Safety

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2220 State COPS

Page 174: 2014 2015 Preliminary Budget

PUBLIC WORKS 

Page 175: 2014 2015 Preliminary Budget

Director of Public Works

Administration

Projects & Programs Manager

(Budgeted 50% in PW & 50% in Park &

Rec.)

Sr. Administrative Assistant

Administrative Assistant II –Engineering

Support

Administrative Assistant II - Front

Counter Support (Budgeted 33.5% in

PW & 66.5% in CDD)

Budget / Fiscal Division

Sr. Management Analyst

Engineering Division

Sr. Civil Engineer (2)

Jr. Engineer

Construction Division

Sr. Construction

Inspector

Operations & Maintenance

Superintendent

Maintenance Division

Maintenance Supervisor

Sr. Maintenance Worker (2)

Maintenance Worker I/II (3)

Utilities Operations

Division

Utility Operator

I/II/III (5)

Meter Reader

City of Lathrop - Public Works

FY 2014-2015

Page 176: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended$1,523,079.00 $1,993,329.00$3,247,254.00 $2,601,229.00

($1,724,175.00) ($607,900.00)

$411,000.00 $600,000.00$634,025.00 $661,368.00

($223,025.00) ($61,368.00)

$0.00 $0.00$26,057.00 $26,099.00

($26,057.00) ($26,099.00)

$203,227.00 $10,509.00$718,390.00 $5,000.00

($515,163.00) $5,509.00

$80,753.00 $78,947.00$80,753.00 $78,947.00

$0.00 $0.00

$586,701.00 $569,748.00$637,676.00 $62,350.00($50,975.00) $507,398.00

$121,130.00 $118,420.00$121,130.00 $118,420.00

$0.00 $0.00

$345,520.00 $421,407.00 $355,790.00 $428,161.00 ($10,270.00) ($6,754.00)

$75,000.00 $75,000.00$48,422.00 $53,898.00$26,578.00 $21,102.00Fund Total: Recycling ‐ 3% AB 939 $29,379.09

Revenue Totals: $79,987.20

Revenue Totals: $229,645.60

Expense Totals $50,608.11

Expense Totals $341,094.62 Fund Total: CLSP Services CFD ($111,449.02)

Fund Total: RTIF‐San Joaquin COG ($16,716.71)

Revenue Totals: $63,781.51

Revenue Totals: $297,973.27

Expense Totals $80,498.22

Expense Totals $0.00Fund Total: RTIF‐Lathrop Local West $297,973.27

Fund Total: RTIF‐San Joaquin County 10% ($11,144.63)

Revenue Totals: $42,521.08

Revenue Totals: $19,016.52

Expense Totals $53,665.71

Expense Totals $0.00Fund Total: RTIF‐Lathrop Local East $19,016.52

Expense Totals $2,700.00Fund Total: Public Transit ($7,544.72)

Fund Total: Local Street ($20,269.40)

Revenue Totals: ($4,844.72)

Revenue Totals: $401,745.10Expense Totals $422,014.50

Expense Totals $1,888,413.89 Fund Total: General Fund ($903,638.16)

Public Works Department Budget Summary

Description 2013 Actual AmountRevenue Totals: $984,775.73

Page 177: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Public Works Department Budget Summary

Description 2013 Actual Amount$155,207.00 $127,774.00$182,522.00 $147,529.00($27,315.00) ($19,755.00)

$242,733.00 $238,292.00$258,910.00 $248,741.00($16,177.00) ($10,449.00)

$168,453.00 $173,325.00$219,383.00 $158,739.00($50,930.00) $14,586.00

$63,777.00 $65,934.00$78,246.00 $75,014.00

($14,469.00) ($9,080.00)

$215,066.00 $210,172.00$242,340.00 $210,449.00($27,274.00) ($277.00)

$208,580.00 $206,496.00$419,188.00 $243,452.00

($210,608.00) ($36,956.00)

$2,032,242.00 $2,093,446.00$2,242,020.00 $2,320,999.00($209,778.00) ($227,553.00)

$435,862.00 $432,863.00$452,298.00 $401,948.00($16,436.00) $30,915.00

$31,248.00 $31,608.00$37,032.00 $31,422.00($5,784.00) $186.00

Revenue Totals: $29,626.53Expense Totals $22,022.25Fund Total: Historic Lathrop CFD $7,604.28

Fund Total: Mossdale Landscape & Lighting $99,551.64

Revenue Totals: $432,971.44

Revenue Totals: $2,024,176.69

Expense Totals $333,419.80

Expense Totals $2,112,656.89Fund Total: Mossdale CFD ($88,480.20)

Fund Total: Stonebridge Drain/Lighting $44,844.37

Revenue Totals: $236,568.70

Revenue Totals: $235,332.16

Expense Totals $191,724.33

Expense Totals $173,355.18Fund Total: Stonebridge Landscape $61,976.98

Fund Total: Woodfield Landscape ($5,207.24)

Revenue Totals: $54,827.29

Revenue Totals: $169,005.09

Expense Totals $60,034.53

Expense Totals $120,092.35Fund Total: Street Lighting $48,912.74

Fund Total: Storm Drain City Zone 1 $42,527.31

Revenue Totals: $239,132.90

Revenue Totals: $122,378.52

Expense Totals $196,605.59

Expense Totals $155,384.86Fund Total: Crossroads Storm Drain Zone 1A ($33,006.34)

Page 178: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Public Works Department Budget Summary

Description 2013 Actual Amount$652,430.00 $592,780.00

$2,137,522.00 $2,241,564.00($1,485,092.00) ($1,648,784.00)

$8,443,207.00 $8,259,723.00$8,517,214.00 $8,188,107.00($74,007.00) $71,616.00

$2,910,559.00 $2,970,958.00$3,698,941.00 $2,747,917.00($788,382.00) $223,041.00

$1,186,258.00 $1,193,258.00$1,190,378.00 $1,152,771.00

($4,120.00) $40,487.00

$1,662,396.00 $1,686,108.00$2,215,798.00 $2,030,081.00($553,402.00) ($343,973.00)

$21,754,428.00  $22,150,097.00 $27,761,289.00  $24,234,205.00 ($6,006,861.00) ($2,084,108.00)

Expense Grand Totals: $20,092,655.02 

Expense Totals $1,360,756.49Fund Total: MBR Plant #1 ‐ West Sewer $353,174.40

Revenue Totals: $1,198,807.92

Net Grand Totals: $387,157.22 

Revenue Grand Totals: $20,479,812.24 

Expense Totals $999,031.70 Fund Total: Water Recycling Plant #1 $199,776.22 

Revenue Totals: $1,713,930.89

Fund Total: MWQCF Collection System $269,774.40

Revenue Totals: $2,951,286.99

Revenue Totals: $8,427,745.94

Expense Totals $2,681,512.59

Expense Totals $8,145,673.12 Fund Total: Water $282,072.82 

Fund Total: Mossdale Village CFD 2003‐1 ($172,204.61)

Revenue Totals: $529,419.89Expense Totals $701,624.50

Page 179: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Public Works Department Budget Summary

Description 2013 Actual AmountDepartmental Staffing

1.00 1.33 1.33Budget Analyst I/II 1.00 0.00 0.00City Engineer 0.00 0.50 0.50Construction Inspector I/II 1.00 1.00 1.00Director of Public Works 1.00 1.00 1.00Junior Engineer 1.00 1.00 1.00Maintenance Services Supervisor Parks 1.00 1.00 1.00Maintenance Worker I/II 2.00 3.00 3.00Meter Reader 1.00 1.00 1.00Projects and Programs Manager 0.00 0.00 0.50Public Works Superintendent 1.00 1.00 1.00Senior Administrative Assistant 0.00 1.50 1.50Senior Engineer 2.00 2.00 2.00Senior Maintenance Worker Parks 1.00 1.00 1.00Senior Maintenance Worker 1.00 1.00 1.00Senior Management Analyst 0.00 1.00 1.00Solid Waste & Recycling Coordinator 1.00 0.00 0.00Utility Operator I/II/ III 5.00 5.00 5.00

Total Community Development FTE 20.00 22.33 22.83

Administrative Assistant I/II

Page 180: 2014 2015 Preliminary Budget

Public Works—Administration     

Description of Division 

The Public Works Administration Division consists of the following positions: Public Works Director, Projects and Programs Manager, Senior Management  Analyst,  Senior  Administrative  Assistant,  and  Administrative  Assistant  I/II.  This  Division  provides  management  and administrative support to the other Public Works Divisions, helps administer the Capital Improvement Program (CIP), provides support and customer service to residents, businesses, development project representatives and other outside public and private agencies. 

Accomplishments 2013/2014 

During the 2013/2014 fiscal year, the Division successfully negotiated and administered various contracts related to public works operations and /or capital improvement projects, and administered many Public Works functions and activities including:  

Administration of Capital Improvement Projects related to General Government  & Community Beautification Projects.  Provided assistance to Master Developers with Utility Infrastructure Development and planning  of project expansions .  Assisted with the processing of co‐op reimbursements for state and federal funds for roadway improvements.  Coordinated with Police Services and City Attorney’s office to process auto claims and City property damage claims to recover 

costs  to  repair  damages  to  property  such  as  fire  hydrants,  streetlights,  and  sound  walls  caused  by  vehicle  accidents  or vandalism.   

Adopted the City’s ADA Transition Plan to provide equal access to civic facilities, services, programs, and activities for individuals with disabilities. 

Implemented a new Purchase Order process utilizing the New World software.  Prepared and administered the budget for the Department’s Operating expenditures and the Capital Improvement Program.  Processing of regulatory reporting associated with Domestic and Recycled Water, Wastewater, and Storm Drainage as required 

by State and federal permit requirements.  Updated the City Design and Construction Standards.   Provided management  and  support  to  the  Departments’  other  functional  groups,  such  as:  construction management,  land 

development,  utilities,  surplus  vehicles,  recording  documents  with  County  Recorder,  fire  hydrant  permits,  transportation permits, water system reporting requirements, etc.  

Coordinated with the Bureau of Automotive Repair (BAR) to provide vehicle information to comply with their annual smog check program audit.  

Coordinated bid documents for capital improvement and on‐going maintenance projects.  Reorganized filing systems throughout the department while continuing the Records Retention Management Program. 

 

Page 181: 2014 2015 Preliminary Budget

Public Works—Administration 

Work Plan 2014/2015 

The goal of the Public Works Administration Division is to coordinate and implement the activities in the Public Works 2014 Work Plan while keeping the City Council and Executive Management informed with project status reports on the operation, safety, and financial status of the Public Works Department.  These include the following:  

Ensure all Capital Improvement Projects are implemented on schedule and on budget. 

Continue to provide assistance in utility and infrastructure development to new and existing businesses and developer funded projects. 

Provide  assistance  to  the  Engineering  Division  in  pursue  of  new  FY  grant  funds  from  Local,  State,  and  Federal programs  to assist  in  financing needed  for construction and operation of public  infrastructure  facilities, alternative energy options, and programs to enhance the community. 

Update City’s Capital Facilities Fee (CFF) program. 

Work with the City’s Finance Department to update Public Works Fees in the City’s Fee Schedule.  

Update and  improve Public Works page on City website by updating  information  related  to Solid Waste, Recycling, and Storm Water Pollution information, Sustainable Communities and Street Lighting Outages and Reporting.

Implement new Work Order processing system to  improve communication, execution of work and overall customer service interactions.

Work with the City’s Administrative Services Department to implement training opportunities for Public Works staff. Continue to review contracts and agreements for cost saving measures. 

Continue  implementing Records Management Program, such as developing system of converting mylar drawings  to digital storage systems. 

 Capital Requests 

  None 

Page 182: 2014 2015 Preliminary Budget

 Public Works—Administration 

  

 Significant Operating Changes 

In FY 13/14 , the Budget Analyst I/II was reclassified to a Senior Management Analyst, the Parks & Programs Manager position is split equally with Public Works Administration and Culture and Recreation Administration. 

One half of the Projects & Programs Manager position will be funded in the Public Works Administration fund to assist with project management. 

 

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Administrative Assistant I/II  1.00  1.50  0.83 

Director of Public Works  0.90  1.00  1.00 

Budget Analyst I/II  1.00  0.00  0.00 

Senior Administrative Assistant  0.33  0.33  1.00 

Total Full Time Equivalents  3.73  3.83  4.33 

Senior Management Analyst I/II  0.00  1.00  1.00 

Projects & Programs Manager  0.00  0.00  0.50 

Solid Waste & Resource Conservation Coord.  0.50  0.00  0.00 

Page 183: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $306,116.00 $389,360.00410‐13‐00 $1,250.00 $1,600.00410‐14‐00 $0.00 $0.00410‐20‐00 $37,946.00 $31,868.00410‐21‐00 $11,303.00 $4,015.00410‐40‐00 $48,974.00 $61,881.00410‐41‐00 $0.00 $3,798.00410‐42‐00 $705.00 $1,010.00410‐43‐00 $0.00 $736.00410‐44‐00 $6,075.00 $8,747.00410‐45‐00 $0.00 $2,400.00410‐46‐00 $4,575.00 $0.00410‐46‐01 $0.00 $5,786.00410‐47‐00 $1,662.00 $1,879.00 410‐49‐00 $907.00 $2,992.00 

$419,513.00 $516,072.00 

420‐01‐00 $48,766.00 $10,000.00420‐16‐00 $500.00 $600.00420‐65‐00 $600.00 $600.00420‐75‐00 $100.00 $100.00

$49,966.00 $11,300.00

430‐10‐00 $600.00 $600.00430‐11‐00 $100.00 $100.00430‐40‐00 $450.00 $450.00Uniforms and Protective Clothing $62.38

Materials, Supplies and Small EquipmentOffice Supplies $524.45Postage $18.94

Other Maintenance & Repair $0.00Total: Contractual Services $43,924.37

Contracts ‐ Other $0.00Printing $187.86

Total: Personnel Services $380,932.34Contractual Services

Professional Services $43,736.51

SUI $1,588.05SDI $2,486.22

FICA $3,938.29Medicare $0.00

Workers Compensation Insurance $4,651.24Auto Allowance $1,943.00

Life Insurance $575.40Vision Insurance $0.00

Health Insurance $42,260.39Dental Insurance $0.00

Retirement ‐ Employer $27,381.02Retirement ‐ Employee $9,441.57

Vacation/Sick Leave $23,763.04

Division 01 Public Works Adminstration

Personnel ServicesRegular Salaries $248,004.02

ExpensesDepartment 50 Public Works

Overtime $14,900.10

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 184: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 01 Public Works Adminstration

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐45‐00 $100.00 $100.00430‐47‐00 $0.00 $0.00

$1,250.00 $1,250.00

435‐10‐00 $536.00 $750.00435‐20‐00 $3,100.00 $4,600.00

$3,636.00 $5,350.00

440‐40‐00 $1,420.00 $1,420.00440‐90‐00 $3,016.00 $8,619.00 

$4,436.00 $10,039.00 $478,801.00 $544,011.00Division Total: Public Works Adminstration $433,101.74

Compensated Absences $3,331.15Total: Fixed Charges $4,442.64

Total: Dues, Meetings, Training and Travel $1,759.08Fixed Charges

Special Fees $1,111.49

Dues, Meetings, Training and TravelSubscriptions $148.00Training and Travel $1,611.08

Awards $1,437.54Total: Materials, Supplies and Small Equipment $2,043.31

Reference Books $0.00

Page 185: 2014 2015 Preliminary Budget

Public Works—Construction Management 

Description of Division 

 

This division performs construction  inspection of capital  improvement projects, commercial, residential, and developer off‐site improvements; such as sewer, water, storm drain, curb and gutter, streets, grading, traffic signals, and parks.  The Construction Management Division ensures that the City’s  infrastructure  is built  to  the City’s standards and adheres to approved plans and contract documents.  

Accomplishments 2013/2014  Completed  inspection  services  for a number of private and  commercial developments  including William  Lyon Homes Tract 

3468, Woodside Homes  Tract  3600,  3336,  3338 &  3410,  Legacy Homes  Tract  3446,  California Natural  Products,  In‐N‐Out warehouse expansion, and O’Reilly Auto Parts. 

Inspected  all  Capital  Improvement  Program  (CIP)  projects, which  included  the  City‐Wide  pavement maintenance  projects, Well 7,8 & 9 rehabilitation projects, Lathrop Generations Center,  and various others. 

Completed the storm water inspection certification for the Certified Erosion, Sediment and Storm Water Inspector (CESSWI).   Reviewed and inspected Storm Water Pollution Prevention Plans (SWPPP).  Updated the City Construction Standard and Specifications and Details.  Inspection of Encroachment Permits on City Right‐of‐Ways. 

 Work Plan 2014/2015 

Continue providing  Inspection Services for private development and  improvements within the City’s right‐of‐way to ensure that  the  improvements  meet  the  City  Standards.    Ultimately,  these  improvements  will  become  a  part  of  the  City’s infrastructure.   

Continue  to  provide  inspection  services  for  the  Capital  Improvement  Program  (CIP).    The  CIP  has  identified  numerous projects  including:  Lathrop Road Westerly Grade  Separation, Manthey Bridge Replacement, City‐Wide Road Maintenance and Repairs, Sidewalk Repair Program, etc.  

Continue to oversee construction projects city‐wide to ensure compliance with the new  SWPPP requirements. 

Inspection of City Encroachment Permits. 

Complete Forum workshop on trenching, shoring, and locator training. 

Complete the Qualified SWPPP Developer (QSD Inspector)/Qualified SWPPP Practitioner (QSP) certification.  

Page 186: 2014 2015 Preliminary Budget

Public Works—Construction Management 

 Capital Requests 

None         Significant Operating Changes 

None    

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

Position:  12/13  13/14  14/15 

Senior Construction Inspector   1.00  1.00  1.00 

Total Full Time Equivalents  1.00  1.00  1.00 

Page 187: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $78,040.00 $79,379.00410‐13‐00 $1,500.00 $1,500.00410‐14‐00 $0.00 $0.00410‐20‐00 $9,795.00 $10,648.00410‐21‐00 $2,756.00 $1,974.00410‐40‐00 $17,400.00 $18,336.00410‐41‐00 $0.00 $0.00410‐42‐00 $193.00 $212.00410‐43‐00 $0.00 $0.00410‐44‐00 $3,500.00 $3,850.00410‐46‐00 $1,122.00 $0.00410‐46‐01 $0.00 $1,173.00410‐47‐00 $434.00 $434.00

$114,740.00 $117,506.00

420‐01‐00 $689,606.00 $400,000.00420‐04‐00 $5,000.00 $5,000.00420‐58‐00 $0.00 $0.00420‐65‐00 $400.00 $400.00420‐70‐00 $400.00 $1,000.00420‐75‐00 $100.00 $100.00

$695,506.00 $406,500.00

430‐10‐00 $200.00 $200.00430‐24‐00 $730.00 $730.00430‐33‐00 $4,000.00 $4,000.00

Expenses

Auto/Heavy Equipment Parts $0.00Gas/Diesel/Oil/Lubricants $3,361.25

Total: Contractual Services $316,391.76Materials, Supplies and Small Equipment

Office Supplies $199.13

Auto/Heavy Equipment Maintenance/Repair $839.36Other Maintenance & Repair $23.00

Computer Tech Support $247.50Printing $121.15

Contractual ServicesProfessional Services $311,018.75Personnel $4,142.00

SUI $434.00Total: Personnel Services $112,559.24

FICA $1,081.96Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $3,221.74

Dental Insurance $0.00Life Insurance $191.52

Retirement ‐ Employee $3,445.37Health Insurance $15,948.20

Vacation/Sick Leave $9,028.05Retirement ‐ Employer $9,048.47

Personnel ServicesRegular Salaries $70,159.93Overtime $0.00

Department 50 Public WorksDivision 03 PW Construction Management

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 188: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 50 Public WorksDivision 03 PW Construction Management

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐37‐00 $0.00 $2,400.00430‐40‐00 $650.00 $650.00430‐45‐00 $100.00 $100.00

$5,680.00 $8,080.00

435‐10‐00 $500.00 $400.00435‐20‐00 $500.00 $700.00

$1,000.00 $1,100.00$816,926.00 $533,186.00

Total: Dues, Meetings, Training and Travel $175.69Division Total: PW Construction Management $433,199.07

Dues, Meetings, Training and TravelSubscriptions $175.69Training and Travel $0.00

Reference Books $0.00Total: Materials, Supplies and Small Equipment $4,072.38

Miscellaneous Equipment $0.00Uniforms and Protective Clothing $512.00

Page 189: 2014 2015 Preliminary Budget

Public Works—Land Development Description of Division 

 

The Land Development and Transportation Engineering Division provides engineering review and project management services such as formation of financial districts, project plan review, permit processing, and public assistance. The division provides for the regulation and  control  of  the  design  and  improvement  of  subdivisions,  redevelopment,  and  real  property  services within  the  City.  It  is  also responsible for overseeing Capital Improvements for the Transportation system in the City of Lathrop. Land Development works closely with  the  Community Development Department  and  City  Engineer  to  provide  Public Works  conditions  of  approval  associated with Building and Planning permit applications.  

Accomplishments 2013/2014 Land Development 

Initiated the first steps in making a “finding of adequate progress” toward providing a Urban Level of Flood Protection (ULOP) from  the 200 year  flood  in  the San  Joaquin River as  required by Senate Bill 5.   Consultant PBI was contracted  to provide hydraulic modeling and floodplain mapping. 

Established a Community Facilities District (CFD) for the River Islands development to fund police services and maintenance of  open  space,  roads,  storm  drainage,  and  landscaping,  as  well  as  roadway,  bridge,  water,  sewer,  and  landscaping infrastructure improvements.  

Accepted $12.5M of public improvements in River Islands which included street improvements, interim sewer pipelines and pump stations, Vega Park, water  interconnection, rehabilitation of Stewart, Cohen, and Paradise Roads, and  interim storm drains.  

Approved five final maps for River Islands development (Tracts 3702‐3706) for 239 single family lots and executed subdivision improvement agreements for $6.6M of public improvements.  

Approved encroachment permit for River Islands Arch Gateway Monument sign.   Approved Saybrook CLSP Vesting Tentative Tract Map No. 3789 to subdivide the 94.4 acre site into 430 single family lots.   Continued to implement the Wastewater Interceptor Sewer Unit (ISU) Allocation Policy.   Provided  plan  check  services  for  all  subdivisions  and  other  developments  including  parcel  and  subdivision  maps, 

improvement plans, specific plans, and building permit submittals.   Initiated the Traffic Monitoring Program for the west side of Lathrop and developed preliminary roadway improvements and 

schedule for completion.   Approved agreement for  interconnection to SSJID water supply pipeline at Manthey Road and Stewart Road to serve River 

Islands.   Issued 36 public right‐of‐way Encroachment Permits.   Coordinated with the County Office of Emergency Services to update our Flood Safety Plan in order to gain compliance with 

the California Water Code, Section 9650.   Provided conditions of approval on 7 site plans, 9 use permits and 27 building permits.  

Page 190: 2014 2015 Preliminary Budget

  Public Works—Land Development 

Accomplishments 2013/2014 (continued) Transportation  

Ongoing coordination with Public Agencies to acquire State and Federal grants for Capital Improvement Projects.   Awarded contract and began construction on  the Lathrop Westerly Grade Separation—$21.2M  (Measure K, Prop 1B, CFF, 

STIP, UPRR).  Began preliminary engineering and environmental assessment for the Manthey Road Bridge— $44M (Federal Highway Bridge 

Program, CFF).  Awarded $400K CMAQ funds for the Louise Avenue and McKinley Avenue Signal Improvements.  Awarded contract and completed 2013 Slurry Seal Project.  Awarded contract and completed 2013 Pavement Repair and Rehabilitation Project   Accepted Gordon Trucking off‐site improvements   Implemented the following Traffic Calming Measures:  

Speed cushions installed on Shadywood Drive.   No parking signs installed on McKinley Ave.   No Parking signs installed on Golden Spike Trail.   Pedestrian barricade installed near Mossdale School.  

Completed a Citywide Road Assessment and annual road repair program including restriping of several city streets.   Updated the City’s Speed Survey establishing legal radar‐enforceable speed limits for City streets.  

 

Work Plan 2014/2015   

Develop the engineering design, financing plan, and construction implementation for providing an Urban Level of Flood Protection (ULOP) from the 200 year flood in the San Joaquin River as required by Senate Bill 5.  

Provide quality review and plan checking of all design and improvement of subdivisions and other developments within the  City,  including  River  Islands,  Central  Lathrop,  South  Lathrop, Mossdale  Landing, Historic  Lathrop,  and  Crossroads Industrial Park.  

Complete Preliminary Engineering and Environmental Studies for the Manthey Road Bridge Replacement.   Finalize the City’s Traffic Monitoring Program.   Construct Pavement Rehabilitation Improvements consistent with the City’s Pavement Management Plan.   Construction of Harlan Road Street Improvements—South of Roth Road.   Initiate Project Study Reports (PSR’s) for Lathrop Rd/I‐5, Louise Ave/I‐5, and Yosemite/SR 120 interchanges.   Construction of Lathrop Road Widening from Harlan Road to 5th Street.   Work with SJCOG to identify upgrades to the City’s STAA and non‐STAA Truck Routes as part of a County‐wide effort.   Work with SJCOG to identify upgrades to the County‐wide Bicycle and Pedestrian Master Plan.   Initiation of City wide ADA Transition Plan, including sidewalk improvements addressing trip hazards. 

Page 191: 2014 2015 Preliminary Budget

 Public Works—Land Development 

 Capital Requests  

None  

Significant Operating Changes  

None  

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

   

Position:  12/13  13/14  14/15 

City Engineer  0.30  0.50  0.50 

Junior Engineer  1.00  0.40  0.40 

Senior Engineer  1.00  1.00  1.00 

Total Full Time Equivalents  2.30  1.90  1.90 

Page 192: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $208,699.00 $208,267.00410‐14‐00 $0.00 $0.00410‐20‐00 $17,270.00 $20,853.00410‐21‐00 $6,143.00 $5,163.00410‐40‐00 $29,580.00 $34,838.00410‐41‐00 $0.00 $0.00410‐42‐00 $426.00 $553.00410‐43‐00 $0.00 $0.00410‐44‐00 $4,914.00 $6,195.00410‐46‐00 $2,421.00 $0.00410‐46‐01 $0.00 $3,116.00410‐47‐00 $738.00 $825.00 410‐49‐00 $1,245.00 $1,524.00 

$271,436.00 $281,334.00 

420‐01‐00 $624,672.00 $245,000.00420‐16‐00 $500.00 $500.00420‐58‐00 $0.00 $0.00420‐60‐00 $200.00 $200.00420‐65‐00 $900.00 $900.00420‐69‐00 $1,000.00 $1,000.00420‐75‐00 $24.00 $24.00

$627,296.00 $247,624.00

Expenses

Other Maintenance & Repair $0.00Total: Contractual Services $46,948.30

Printing $658.14Office Equipment & Repair $939.90

Computer Tech Support $201.26Advertising $0.00

Contractual ServicesProfessional Services $45,149.00Contracts ‐ Other $0.00

SDI $1,091.09Total: Personnel Services $155,391.10 

Medicare $0.00SUI $779.00

Workers Compensation Insurance $3,436.10FICA $1,767.51

Life Insurance $264.91Vision Insurance $0.00

Health Insurance $18,669.66Dental Insurance $0.00

Retirement ‐ Employer $11,626.20Retirement ‐ Employee $5,159.73

Personnel ServicesRegular Salaries $112,596.90Vacation/Sick Leave $0.00

Department 50 Public WorksDivision 04 PW Land Development

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 193: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 50 Public WorksDivision 04 PW Land Development

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐10‐00 $476.00 $500.00430‐33‐00 $1,400.00 $1,400.00430‐37‐00 $0.00 $2,400.00430‐40‐00 $425.00 $725.00430‐45‐00 $400.00 $400.00

$2,701.00 $5,425.00

435‐10‐00 $1,165.00 $2,300.00435‐20‐00 $1,000.00 $1,800.00

$2,165.00 $4,100.00

440‐90‐00 $3,410.00 $10,091.00 $3,410.00 $10,091.00 

$907,008.00 $548,574.00Total: Fixed Charges $10,426.84Division Total: PW Land Development $215,090.29 

Total: Dues, Meetings, Training and Travel $854.30Fixed Charges

Compensated Absences $10,426.84

Dues, Meetings, Training and TravelSubscriptions $829.30Training and Travel $25.00

Reference Books $0.00Total: Materials, Supplies and Small Equipment $1,469.75

Miscellaneous Equipment $0.00Uniforms and Protective Clothing $95.06

Materials, Supplies and Small EquipmentOffice Supplies $542.75Gas/Diesel/Oil/Lubricants $831.94

Page 194: 2014 2015 Preliminary Budget

 Public Works—City Hall 

Description of Division 

 The City Hall Division of the Public Works Department provides the operation, maintenance, and janitorial services of the City Hall building. Associated building costs such as utilities are budgeted  in  this division.   City Hall  represents our City and  therefore  is  important that it be well maintained and runs efficiently.      

Accomplishments 2013/2014  HVAC unit replaced.   Replaced recessed lighting, burned out lights, and ballasts.   Serviced and rewired power supply to lobby doors.  Weather stripping replaced at the employees entrance.   Reconfigured cubicles and installed kick plates.  Maintained a safe, clean, and efficient operation of the City Hall building.  Quarterly floor waxing and carpet cleaning   

Work Plan 2014/2015  Continue to maintain a safe, clean, and efficient operation of City Hall.  Continue routine preventative maintenance for the HVAC unit.     Begin  implementing  the  City’s  ADA  Transition  plan  by  prioritizing  ADA‐compliant  improvements  to  City  Hall  and 

budgeting accordingly.  Pursue informal bid for roof repairs for City Hall. 

 Capital Requests    

  Vehicle Replacement    $     4,000   ADA Push Button for Lobby  $     6,000    

Significant Operating Changes  

None    

Page 195: 2014 2015 Preliminary Budget

 Public Works—City Hall 

  

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 

 

 

 

 

 

 

   

 

Position:  12/13  13/14  14/15 

Maintenance Services Supervisor  0.07  0.07  0.07 

Senior Maintenance Worker  0.05  0.05  0.05 

Total Full Time Equivalents  0.12  0.12  0.12 

Page 196: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $7,108.00 $7,230.00410‐13‐00 $120.00 $223.00410‐14‐00 $0.00 $0.00410‐20‐00 $700.00 $736.00410‐21‐00 $252.00 $181.00410‐40‐00 $1,971.00 $2,084.00410‐41‐00 $0.00 $0.00410‐42‐00 $18.00 $20.00410‐43‐00 $0.00 $0.00410‐44‐00 $1,200.00 $1,223.00410‐46‐00 $107.00 $0.00410‐46‐01 $0.00 $108.00410‐47‐00 $52.00 $52.00 410‐49‐00 $47.00 $44.00 

$11,575.00 $11,901.00

420‐01‐00 $11,500.00 $1,000.00420‐16‐00 $4,500.00 $4,500.00420‐18‐00 $8,000.00 $8,000.00420‐25‐00 $43,000.00 $80,500.00420‐27‐00 $1,400.00 $1,450.00420‐60‐00 $100.00 $100.00420‐65‐00 $550.00 $550.00420‐67‐00 $1,000.00 $1,000.00420‐70‐00 $4,100.00 $4,100.00420‐75‐00 $2,550.00 $8,550.00

$76,700.00 $109,750.00

Expenses

Other Maintenance & Repair $0.00Total: Contractual Services $81,076.58

Equipment Rental $0.00Auto/Heavy Equipment Maintenance/Repair $1,024.18

Advertising $0.00Printing $94.08

Building & Ground Maintenance $51,571.78Street Trees & Landscaping $1,200.00

Contracts ‐ Other $3,567.51Alarm Service $13,476.09

Total: Personnel Services $10,682.34Contractual Services

Professional Services $10,142.94

SUI $52.15SDI $45.45

FICA $106.17Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $491.62

Life Insurance $17.52

Retirement ‐ Employee $315.38Health Insurance $1,840.56

Vacation/Sick Leave $633.90Retirement ‐ Employer $658.97

Overtime $185.62

Department 50 Public WorksDivision 05 PW City Hall

Dental Insurance $0.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Personnel ServicesRegular Salaries $6,335.00

Page 197: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 50 Public WorksDivision 05 PW City Hall

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐17‐00 $3,600.00 $3,600.00430‐20‐00 $3,500.00 $3,500.00430‐21‐00 $500.00 $500.00430‐24‐00 $1,000.00 $1,000.00430‐26‐00 $300.00 $300.00430‐33‐00 $2,500.00 $2,500.00430‐40‐00 $50.00 $50.00430‐49‐00 $71,700.00 $71,700.00430‐50‐00 $7,000.00 $7,000.00

$90,150.00 $90,150.00

435‐10‐00 $25.00 $25.00435‐20‐00 $75.00 $75.00

$100.00 $100.00

440‐40‐00 $12,425.00 $12,425.00$12,425.00 $12,425.00

450‐30‐00 $5,000.00 $4,000.00450‐36‐00 $131,000.00 $6,000.00

$136,000.00 $10,000.00$326,950.00 $234,326.00Division Total: PW City Hall $176,588.53

Building $0.00Total: Fixed Assets $0.00

Total: Fixed Charges $11,360.11Fixed Assets

Vehicles $0.00

Total: Dues, Meetings, Training and Travel $45.75Fixed Charges

Special Fees $11,360.11

Dues, Meetings, Training and TravelSubscriptions $37.75Training and Travel $8.00

Water $6,845.52Total: Materials, Supplies and Small Equipment $73,423.75

Uniforms and Protective Clothing $0.00Utilities ‐ Gas and Electric $61,370.63

Other Maintenance & Repair $38.76Gas/Diesel/Oil/Lubricants $1,981.38

Building Maintenance ‐ Materials & Supplies $464.00Auto/Heavy Equipment Parts $14.10

Materials, Supplies and Small EquipmentCustodial Supplies $1,185.34Materials and Supplies $1,524.02

Page 198: 2014 2015 Preliminary Budget

 Public Works—Utility Engineering 

   

Description of Division 

 

The Utility Engineering Division provides the basis for development and implementation of the utility related projects for the City’s Capital Improvement Program (CIP) for water, wastewater, and drainage improvements.  It supports utility infrastructure planning and  compliance  with  permits  administered  by  state  and  federal  regulatory  agencies.    This  division  also  provides  engineering technical support and contract administration for the City’s existing utility systems in conjunction with the Public Works Operations and Maintenance Division.  

Accomplishments 2013/2014  CIP Project Management for the utility related CIP projects for water, wastewater, and drainage improvements: 

Well Modifications (PW 14‐08)  Well 21 Post Construction (PW 08‐09)  Water Meter Improvements (PW 13‐08)  Water Master Plan Update (PW 10‐10)/UWMP 2010 (PW 10‐09)  WRP‐1 MBR Expansion ‐ Phase 1 (WW 10‐15)  Consolidated Treatment Facility Expansion ‐ Phase 2 (WW 14‐14)  Crossroads Wastewater Treatment Facility Expansion (WW 11‐06)  Wastewater Treatment Plant Upgrades (WW 12‐07)  East Side Wastewater Collection System (WW 13‐02)  Wastewater Pump Station Improvements (WW 13‐08) 

  Provided  support  for  regulatory  permit  compliance  for  the  City’s water, wastewater,  and  drainage  systems.   Activities 

included coordination of monitoring and reporting requirements of the permits and ongoing planning and implementation of  the  City’s  Storm Water Management  Plan,  Sewer  System Management  Plan  and  Urban Water Management  Plan associated with regulatory permit compliance.  

 

Utility Planning: Continue technical studies and CIP planning for water, wastewater, recycled water and drainage utilities. Master Plan updates including hydraulic modeling of the utility systems are needed to identify and plan projects. 

  

Page 199: 2014 2015 Preliminary Budget

Public Works—Utility Engineering 

Accomplishments 2013/2014 (continued)  

Provided engineering technical support and contract administration services for the City’s utility systems.  Contracts include services  for wastewater  treatment plant operations, water quality monitoring, wastewater discharge, permit  compliance, SCADA, recycled water farming, and maintenance contracts. 

Coordination  with  the  development  community  to  develop  agreements  to  finance  the  Consolidated  Treatment  Facility Expansion  project  (WW‐10‐15)  to  obtain  additional  sewer  capacity  needed  for  new  development  west  of  I‐5.  Accomplishments  included funding services for project design, permitting, construction, CEQA and a recycled water master plan update.  

 Work Plan FY 2014/2015   The work plan of the Public Works Utility Engineering Division for the upcoming fiscal year includes the following:  

CIP Project Management:  CIP project management for utility related CIP projects planned for fiscal year 2013‐2014:  Well 21 Post Construction  (PW 08‐09)  Water Meter Improvements (PW 13‐08)  Water Master Plan Update (PW 10‐10)/UWMP 2010 (PW 10‐09)  WRP‐1 MBR Expansion (WW 10‐15)  Consolidated Treatment Facility Expansion ‐ Phase 2 (WW 14‐14)  Crossroads Wastewater Treatment Facility Expansion  (WW 11‐06)  Wastewater Treatment Plant Upgrades (WW 12‐07)  East Side Wastewater Collection System (WW 13‐02)  Wastewater Pump Station Improvements (WW 13‐08) 

  Utility Planning: Continue  technical studies and CIP planning  for water, wastewater, recycled water and drainage utilities. 

Master Plan updates including hydraulic modeling of the utility systems are needed to identify and plan projects. 

Page 200: 2014 2015 Preliminary Budget

Public Works—Utility Engineering 

 Work Plan FY 2014/2015 (continued)   

Regulatory  Permit  Compliance:   Ongoing monitoring and  reporting efforts are needed  to maintain  compliance with following state and federal permits for the water, wastewater, recycled water and drainage systems: 

NPDES Phase II MS4, a permit administered by the Regional Water Quality Control Board (RWQCB) to meet Clean Water Act requirements for the City’s drainage system.  

Waste Discharge Requirements permits administered by the RWQCB for the City’s wastewater treatment plants, wastewater  collection  system,  and  recycled water  distribution  systems.    This  includes  reporting  spills  to  the Office of Emergency Services, RWQCB, and San Joaquin County Environmental Health Department or California Department of Public Health (CDPH). 

Water Supply Permit administered by the CDPH.  

Infrastructure  Asset  &  Maintenance  Management:  Develop  and  improve  procedures  for  infrastructure  and maintenance management  through  improved  records and document management  systems.   Provide  support  for ongoing data collection and updates for the GIS and Utility Maps. 

 Capital Requests 

 

None  Significant Operating Changes 

  None 

Page 201: 2014 2015 Preliminary Budget

 

Public Works—Utility Engineering 

Position:  12/13  13/14  14/15 

Principal Engineer  0.00  0.00  0.00 

Public Works Superintendent  0.02  0.02  0.02 

Senior Engineer  1.00  1.00  1.00 

Total Full Time Equivalents  1.62  1.62  1.62 

Junior Engineer  0.60  0.60  0.60 

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

Page 202: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $149,277.00 $151,839.00410‐14‐00 $0.00 $0.00410‐20‐00 $18,736.00 $18,197.00410‐21‐00 $5,264.00 $3,771.00410‐40‐00 $28,188.00 $29,705.00410‐41‐00 $0.00 $0.00410‐42‐00 $369.00 $402.00410‐43‐00 $0.00 $0.00410‐44‐00 $4,116.00 $4,557.00410‐46‐00 $1,994.00 $0.00410‐46‐01 $0.00 $2,405.00410‐47‐00 $703.00 $,703.00410‐49‐00 $985.00 $1,036.00 

$209,632.00 $212,615.00 

420‐01‐00 $10,000.00 $10,000.00420‐16‐00 $500.00 $500.00420‐58‐00 $0.00 $0.00420‐60‐00 $100.00 $100.00420‐65‐00 $1,000.00 $1,000.00420‐69‐00 $500.00 $500.00420‐75‐00 $24.00 $24.00

$12,124.00 $12,124.00

Expenses

Other Maintenance & Repair $0.00Total: Contractual Services $1,445.27

Printing $673.95Office Equipment & Repair $470.08

Computer Tech Support $301.24Advertising $0.00

Contractual ServicesProfessional Services $0.00Contracts ‐ Other $0.00

SDI $1,513.74Total: Personnel Services $292,494.58

Medicare $0.00SUI $1,310.67

Workers Compensation Insurance $7,365.39FICA $3,058.95

Life Insurance $507.58Vision Insurance $0.00

Health Insurance $35,969.38Dental Insurance $0.00

Retirement ‐ Employer $23,527.05Retirement ‐ Employee $9,452.71

Personnel ServicesRegular Salaries $198,143.89Vacation/Sick Leave $11,645.22

Department 50 Public WorksDivision 06 PW Utility Engineering

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Page 203: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 50 Public WorksDivision 06 PW Utility Engineering

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

430‐10‐00 $476.00 $500.00430‐33‐00 $1,400.00 $1,400.00430‐37‐00 $0.00 $2,400.00430‐40‐00 $900.00 $1,025.00430‐45‐00 $200.00 $200.00

$2,976.00 $5,525.00

435‐10‐00 $1,015.00 $1,130.00435‐20‐00 $2,000.00 $1,000.00

$3,015.00 $2,130.00

440‐90‐00 $2,144.00 $16,144.00 $2,144.00 $16,144.00 

$229,891.00 $248,538.00Total: Fixed Charges $18,669.33Division Total: PW Utility Engineering $316,019.31

Total: Dues, Meetings, Training and Travel $2,102.98Fixed Charges

Compensated Absences $18,669.33

Dues, Meetings, Training and TravelSubscriptions $547.98Training and Travel $1,555.00

Reference Books $0.00Total: Materials, Supplies and Small Equipment $1,307.15

Miscellaneous Equipment $0.00Uniforms and Protective Clothing $0.00

Materials, Supplies and Small EquipmentOffice Supplies $475.22Gas/Diesel/Oil/Lubricants $831.93

Page 204: 2014 2015 Preliminary Budget

Public Works—Building Maintenance 

Description of Division 

 

The Building Maintenance Division of the Public Works Department provides the operation, maintenance, and janitorial services for the Senior Center and Community Center buildings. Associated building costs, such as utilities, are budgeted through this division. The Senior Center and Community Center are public facilities where members of the community gather, therefore  it  is  important that both buildings are maintained and run efficiently.  

 

Accomplishments 2013/2014  Supported Parks & Recreation with the set‐up and coordination of the following City events: Memorial Day Celebration, 

Veteran’s Day Celebration, Tree Lighting Ceremony, Volunteer Recognition Dinner,  July 1st Celebration, National Night Out, Lathrop Days Celebration, and the Holiday Parade.   

Provided assistance with the relocation and set‐up of the City’s Library at the Lathrop Generations Center.  Performed Facility Maintenance including: 

Repairs to the Senior Center: lobby light switch, fly fans, curtains, roof leak repair, restroom fan, restroom sink.  Roof repairs at the Community Center.  Veteran’s Memorial American  and  State  flags  replaced  to be  in  compliance with  the National  Flag Pole Code 

requirements and replaced lights and ballasts.  Man‐gate installed at the Corporation Yard.  Coordinated with janitorial services to complete annual carpet cleaning and floor wax at the Community Center 

and Senior Center.  Painted and made necessary repairs to new employee offices or cubes. 

Monitored  building  entrances,  walkways,  parking  lots,  and  landscape  islands  to  eliminate  litter,  graffiti,  and  safety concerns. 

Repainted red curb in parking lot at Valverde Park.  Installed landscape at the Corp Yard entrance.   

Page 205: 2014 2015 Preliminary Budget

Public Works—Building Maintenance 

Work Plan 2014/2015 

 

Implement  the  City’s  ADA  Transition  plan  by  carrying  out  ADA‐compliant  improvements  to  the  Senior  Center  and Community Center. 

Assist other City departments with City events and office maintenance.  

Continue  to monitor building entrances, walkways, parking  lots and  landscape  islands  to eliminate  litter, graffiti, and safety concerns. 

Continue use of SEMS Asset Management program to manage facility maintenance.  

Provide maintenance support for the Lathrop Generations Center.  

Capital Requests Vehicle Replacement     $    9,600 Parks/Facility Scissor Lift  $  22,000 ADA Push Button     $    6,000 

 

Significant Operating Changes None  

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

  Position:  12/13  13/14  14/15 

Maintenance Services Supervisor  0.20  0.20  0.20 

Senior Maintenance Worker   0.20  0.20  0.20 

Total Full Time Equivalents  0.40  0.40  0.40 

Page 206: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $23,544.00 $23,949.00410‐13‐00 $400.00 $812.00410‐14‐00 $0.00 $0.00410‐20‐00 $2,405.00 $2,548.00410‐21‐00 $834.00 $599.00410‐40‐00 $6,625.00 $7,008.00410‐41‐00 $0.00 $0.00410‐42‐00 $58.00 $63.00410‐43‐00 $0.00 $0.00410‐44‐00 $4,000.00 $4,080.00410‐46‐00 $349.00 $0.00410‐46‐01 $0.00 $359.00410‐47‐00 $174.00 $174.00 410‐49‐00 $134.00 $126.00 

$38,523.00 $39,718.00

420‐16‐00 $14,600.00 $14,600.00420‐18‐00 $12,600.00 $14,664.00420‐25‐00 $29,300.00 $55,640.00420‐67‐00 $1,000.00 $1,000.00420‐70‐00 $2,500.00 $2,500.00420‐75‐00 $3,700.00 $4,250.00

$63,700.00 $92,654.00Other Maintenance & Repair $1,297.20

Total: Contractual Services $52,533.86

Equipment Rental $0.00Auto/Heavy Equipment Maintenance/Repair $1,475.59

Alarm Service $9,505.04Building & Ground Maintenance $30,384.65

Total: Personnel Services $35,955.56Contractual Services

Contracts ‐ Other $9,871.38

SUI $173.62SDI $129.97

FICA $348.68Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $1,966.52

Dental Insurance $0.00Life Insurance $58.01

Retirement ‐ Employee $1,044.44Health Insurance $6,207.94

Vacation/Sick Leave $2,163.09Retirement ‐ Employer $2,259.69

Personnel ServicesRegular Salaries $20,919.42Overtime $684.18

Department 50 Public WorksDivision 70 PW Building Maintenance

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpenses

Page 207: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Department 50 Public WorksDivision 70 PW Building Maintenance

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpenses

430‐17‐00 $5,797.00 $5,797.00430‐20‐00 $1,100.00 $1,100.00430‐21‐00 $1,300.00 $1,300.00430‐24‐00 $400.00 $400.00430‐26‐00 $200.00 $200.00430‐33‐00 $3,000.00 $3,000.00430‐35‐00 $200.00 $200.00430‐40‐00 $900.00 $900.00430‐45‐00 $150.00 $150.00430‐49‐00 $42,000.00 $42,000.00430‐50‐00 $8,500.00 $8,500.00

$63,547.00 $63,547.00

435‐10‐00 $100.00 $100.00435‐20‐00 $350.00 $405.00

$450.00 $505.00

440‐40‐00 $2,870.00 $2,870.00$2,870.00 $2,870.00

450‐20‐00 $22,400.00 $22,400.00450‐30‐00 $12,000.00 $9,600.00450‐36‐00 $70,000.00 $6,000.00

$104,400.00 $38,000.00$273,490.00 $237,294.00

Total: Dues, Meetings, Training and Travel $119.99Fixed Charges

Special Fees $2,216.97

Dues, Meetings, Training and TravelSubscriptions $87.99Training and Travel $32.00

Total: Fixed Assets $0.00Division Total: PW Building Maintenance $140,598.28

Vehicles $0.00Building $0.00

Total: Fixed Charges $2,216.97Fixed Assets

Machines and Equipment $0.00

Water $6,933.72Total: Materials, Supplies and Small Equipment $49,771.90

Reference Books $0.00Utilities ‐ Gas and Electric $35,612.80

Shop Tools $95.89Uniforms and Protective Clothing $476.99

Other Maintenance & Repair $230.05Gas/Diesel/Oil/Lubricants $2,786.64

Building Maintenance ‐ Materials & Supplies $156.93Auto/Heavy Equipment Parts $208.16

Materials, Supplies and Small EquipmentCustodial Supplies $2,995.58Materials and Supplies $275.14

Page 208: 2014 2015 Preliminary Budget

Public Works—Park Maintenance  

Description of Division 

 

The Park Maintenance division’s mission is to provide clean and safe parks and recreation facilities that enhance the visual appeal of neighborhoods  and meet  the  recreational  needs  of  Lathrop’s  residents.    The work  includes  regular  scheduled  efforts  as well  as demand driven responses to recreation programming needs, weather, and vandalism; such as, litter removal, restroom maintenance, playground  maintenance,  athletic  field  maintenance,  irrigation  system  maintenance,  tree  maintenance,  and  community  event support. This budget reflects the funds needed to maintain Valverde, Milestone, Libby and Skate Parks and street landscaping. 

Accomplishments 2013/2014    Libby Park Improvements including: 

Replaced playground equipment, tables and benches with ADA compliant play equipment  Installed fencing and signage.   

Performed Preventative Maintenance and Repairs including:  Skate Park repaired.  Basketball nets replaced.    Repaired track lighting at Veterans Memorial. 

Maintained a safe, clean, and efficient operation of landscaping at Cambridge and “N” Street and Valverde, Milestone, Libby and Skate Parks. 

Continuous maintenance of the central  landscape  irrigation control with the Calsense Central  Irrigation Control System at Libby, Milestone, Armstrong, Woodfield, Sangalang, Commons, and Green Parks as well as Thomsen Basin and River Park North.  

Assisted  Parks &  Recreation with  the  set‐up  and  coordination  of  the  following  City  events: Memorial Day  Celebration, Veteran’s  Day  Celebration,  Tree  Lighting  Ceremony,  Volunteer  Recognition  Dinner,  Skate  Park  Competitions,  July  1st Celebration, Lathrop Days Celebration, and the Holiday Parade. 

Participation in Beautification Day:  Replanting at Community Center and compost refurbishment at Valverde park. 

 

Page 209: 2014 2015 Preliminary Budget

Public Works—Park Maintenance  

Work Plan 2014/2015 

 

Continue inspection and preventative maintenance of park playgrounds and athletic fields. Continue to manage contract for rodent control services for Valverde Park. Continue to manage contract for City park maintenance of 13 City parks.  Continue to contract with County Community Corp. workers during the spring and summer to help maintain pond basins, 

right‐of‐way, and landscaping.  It is important to maintain City property in light of the increased weed abatement efforts.  Continue  to maintain  a  safe,  clean,  and  efficient  operation  of  landscaping  at  Cambridge  and  “N”  Street  and Valverde, 

Milestone, Libby and Skate Parks.  Secure restroom facilities each night in an effort to provide a safe and clean environment for public use. 

 Capital Requests 

Park Maintenance Replacement Vehicle    $   12,4000    

Significant Operating Changes  

None     

Page 210: 2014 2015 Preliminary Budget

 Public Works—Park Maintenance 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Maintenance Services Supervisor  0.30  0.30  0.30 

Public Works Superintendent  0.02  0.02  0.02 

Senior Maintenance Worker  0.30  0.30  0.30 

Total Full Time Equivalents  0.62  0.62  0.62 

Page 211: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $37,577.00 $38,223.00410‐13‐00 $600.00 $1,218.00410‐14‐00 $0.00 $0.00410‐20‐00 $3,891.00 $4,130.00410‐21‐00 $1,330.00 $956.00410‐40‐00 $10,285.00 $10,877.00410‐41‐00 $0.00 $0.00410‐42‐00 $93.00 $102.00410‐43‐00 $0.00 $0.00410‐44‐00 $6,070.00 $6,196.00410‐46‐00 $555.00 $0.00410‐46‐01 $0.00 $573.00410‐47‐00 $269.00 $269.00 410‐49‐00 $220.00 $209.00 

$60,890.00 $62,753.00 

420‐04‐00 $4,500.00 $4,500.00420‐16‐00 $2,500.00 $2,500.00420‐18‐00 $2,800.00 $2,800.00420‐27‐00 $10,200.00 $10,300.00420‐32‐00 $36,400.00 $37,360.00420‐60‐00 $100.00 $100.00420‐67‐00 $1,600.00 $1,600.00420‐70‐00 $2,300.00 $2,300.00420‐75‐00 $3,729.00 $31,200.00

$64,129.00 $92,660.00Total: Contractual Services $43,984.90

Auto/Heavy Equipment Maintenance/Repair $2,059.29Other Maintenance & Repair $118.30

Advertising $0.00Equipment Rental $0.00

Street Trees & Landscaping $5,025.00Park Maintenance $31,583.35

Contracts ‐ Other $1,987.60Alarm Service $2,800.00

Total: Personnel Services $57,472.59Contractual Services

Personnel $411.36

SUI $269.08SDI $214.25

FICA $554.13Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $3,014.23

Dental Insurance $0.00Life Insurance $92.33

Retirement ‐ Employee $1,666.10Health Insurance $9,643.98

Vacation/Sick Leave $3,868.97Retirement ‐ Employer $3,651.74

Personnel ServicesRegular Salaries $33,471.54Overtime $1,026.24

Department 50 Public WorksDivision 80 Parks & Landscape Maintenance

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpenses

Page 212: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Department 50 Public WorksDivision 80 Parks & Landscape Maintenance

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General FundExpenses

430‐17‐00 $500.00 $1,000.00430‐20‐00 $2,000.00 $2,000.00430‐21‐00 $1,025.00 $1,000.00430‐24‐00 $400.00 $400.00430‐26‐00 $10,000.00 $12,900.00430‐30‐00 $600.00 $1,000.00430‐33‐00 $3,500.00 $4,000.00430‐35‐00 $1,000.00 $1,000.00430‐40‐00 $700.00 $700.00430‐45‐00 $150.00 $150.00430‐49‐00 $2,500.00 $2,500.00430‐50‐00 $47,600.00 $52,840.00

$69,975.00 $79,490.00

435‐10‐00 $100.00 $100.00435‐20‐00 $200.00 $508.00

$300.00 $608.00

440‐40‐00 $3,350.00 $7,300.00440‐90‐00 $44.00 $89.00 

$3,394.00 $7,389.00 

450‐30‐00 $15,500.00 $12,400.00$15,500.00 $12,400.00

$214,188.00 $255,300.00Division Total: Parks & Landscape Maintenance $173,816.67

Fixed AssetsVehicles $0.00

Total: Fixed Assets $0.00

Dues, Meetings, Training and TravelSubscriptions $121.49Training and Travel $48.00

Compensated Absences $42.08Total: Fixed Charges $1,287.88

Total: Dues, Meetings, Training and Travel $169.49Fixed Charges

Special Fees $1,245.80

Water $51,737.27Total: Materials, Supplies and Small Equipment $70,901.81

Reference Books $0.00Utilities ‐ Gas and Electric $2,231.04

Shop Tools $455.45Uniforms and Protective Clothing $432.06

Chemicals $550.13Gas/Diesel/Oil/Lubricants $3,547.08

Auto/Heavy Equipment Parts $21.93Other Maintenance & Repair $10,454.72

Materials and Supplies $315.18Building Maintenance ‐ Materials & Supplies $1,113.35

Materials, Supplies and Small EquipmentCustodial Supplies $43.60

Page 213: 2014 2015 Preliminary Budget

Public Works—Streets 

Description of Division  

Activities within  the Streets Division  include maintenance,  repair, and  cleaning of City  streets and  rights of way.   The  installation, repair,  and maintenance  of  street  signs,  street  striping,  and  pavement markings  are  also  included  in  this  budget.    This  Division provides maintenance of 82.8 centerline miles of City streets. Work includes pot‐hole patching, seal coating and overlay applications, monthly  street  sweeping,  curbs  and  gutters maintenance,  installation  and maintenance  of  traffic  control  devices  including  traffic signals and control signs, street name signs, right of way mowing and herbicide application, weather response (sanding, catch basin clearing, gravel street work) and community event support. 

Accomplishments 2013/2014  Striping rejuvenation in critical areas of school crossings, bridges and worn areas along heavily travelled roads.  Accepted public improvements, including: 

2013 Slurry Seal Project  2013 Pavement Repair and Rehabilitation Project   Right of Way Acquisitions related to the Lathrop Road Westerly Grade Separation   Started Construction on the Lathrop Road Westerly Grade Separation  

Implemented Traffic Calming Measures:  Speed cushions installed on Shadywood Drive.  No parking signs installed on McKinley Ave.  No Parking signs installed on Golden Spike Trail.  Pedestrian barricade installed near Mossdale School 

Replaced missing street signs and repaired damaged street signs.  Preventative maintenance for heavy equipment and vehicles.  Maintained City streets and roadways with existing staff.

Graffiti removal and weed abatement on city right‐of‐ways.    Contract with Community Corp  to maintain City property,  right‐of‐way, and  landscaping  in  light of  the  increased weed 

abatement efforts.      Patched pot holes throughout the City.  Crack repairs completed in Woodfield area.  Installed signs on Manthey Bridge and right‐of‐ways up to bridge.  Completed Crossroads Streetlights Improvements., CIP PS 12‐18 

Page 214: 2014 2015 Preliminary Budget

Public Works—Streets  

Work Plan 2014/2015  Continue  to  implement  the  Sidewalk  Repair  Program  to  repair  or  remove  and  replace  damaged,  cracked,  and  uneven 

concrete sidewalks as needed.  

Continue to implement the Citywide Traffic Calming Program.  Continue to implement the Pavement Maintenance program throughout the City prioritizing major arterials and collectors.  Renewal of striping in heavily worn areas. 

Continue to utilize community  labor  for right‐of‐way maintenance and trash removal through an agreement with the San Joaquin County Sherriff Community Corps. 

 

Capital Requests  

Battery Back‐up   $   10,000         

Significant Operating Changes    

      An additional Maintenance Worker I position was added in December of 2013 and assigned to street maintenance duties.  

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 Position:  12/13  13/14  14/15 

Maintenance Worker I/II  0.42  1.20  1.20 

Public Works Superintendent  0.05  0.05  0.05 

Senior Maintenance Worker  0.78  0.78  0.78 

Utility Operator I/II/III  0.01  0.01  0.01 

Total Full Time Equivalents  1.26  2.04  2.04 

Page 215: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $100,910.00 $108,153.00410‐12‐00 $0.00 $0.00410‐13‐00 $1,200.00 $4,696.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $41.00410‐20‐00 $8,860.00 $11,397.00410‐21‐00 $2,506.00 $1,642.00410‐40‐00 $17,250.00 $32,421.00410‐41‐00 $0.00 $24.00410‐42‐00 $175.00 $291.00410‐43‐00 $0.00 $4.00410‐44‐00 $12,275.00 $20,487.00410‐46‐00 $987.00 $0.00410‐46‐01 $0.00 $1,638.00410‐47‐00 $547.00 $886.00 410‐49‐00 $48.00 $51.00 

$144,758.00 $181,731.00 

420‐01‐00 $13,000.00 $7,200.00420‐16‐00 $25,033.00 $20,000.00420‐18‐00 $900.00 $900.00420‐29‐00 $18,000.00 $15,616.00420‐30‐00 $1,120.00 $40,000.00420‐31‐00 $48,527.00 $58,840.00420‐33‐00 $55,000.00 $28,500.00420‐58‐00 $1,500.00 $1,500.00420‐60‐00 $100.00 $100.00Advertising $80.04

Street Light Maintenance $543.22Computer Tech Support $1,500.00

Street Stripping $0.00Signal Maintenance $13,464.00

Alarm Service $900.00Street Sweeping Services $11,286.00

Contractual ServicesProfessional Services $5.45Contracts ‐ Other $11,736.17

SDI $48.54Total: Personnel Services $106,680.99

Medicare $0.00SUI $546.79

Workers Compensation Insurance $11,986.42FICA $920.32

Life Insurance $173.19Vision Insurance $0.00

Health Insurance $15,758.40Dental Insurance $0.00

Retirement ‐ Employer $7,681.33Retirement ‐ Employee $2,963.21

Vacation/Sick Leave $8,728.63Standby $30.90

Part‐time Salaries $0.00Overtime $1,794.58

Division 10 PW Streets

Personnel ServicesRegular Salaries $56,048.68

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2080 Local Street

Page 216: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 10 PW Streets

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2080 Local Street

420‐65‐00 $350.00 $350.00420‐67‐00 $500.00 $500.00420‐69‐00 $500.00 $660.00420‐70‐00 $6,000.00 $6,000.00420‐75‐00 $47,780.00 $47,000.00

$218,310.00 $227,166.00

430‐10‐00 $500.00 $500.00430‐17‐00 $200.00 $200.00430‐20‐00 $700.00 $700.00430‐24‐00 $1,600.00 $2,600.00430‐26‐00 $14,575.00 $15,000.00430‐28‐00 $5,640.00 $5,000.00430‐30‐00 $6,000.00 $8,000.00430‐33‐00 $5,600.00 $7,100.00430‐35‐00 $1,000.00 $1,400.00430‐37‐00 $0.00 $800.00430‐40‐00 $900.00 $900.00430‐45‐00 $100.00 $100.00430‐49‐00 $20,860.00 $20,900.00

$57,675.00 $63,200.00

435‐10‐00 $150.00 $200.00435‐20‐00 $870.00 $1,780.00

$1,020.00 $1,980.00Training and Travel $409.00

Total: Dues, Meetings, Training and Travel $474.99

Total: Materials, Supplies and Small Equipment $39,636.36Dues, Meetings, Training and Travel

Subscriptions $65.99

Reference Books $52.05Utilities ‐ Gas and Electric $15,702.82

Miscellaneous Equipment $0.00Uniforms and Protective Clothing $297.43

Gas/Diesel/Oil/Lubricants $6,322.02Shop Tools $951.11

Patching Materials $1,861.16Chemicals $4,535.79

Auto/Heavy Equipment Parts $1,002.44Other Maintenance & Repair $8,528.13

Custodial Supplies $0.00Materials and Supplies $113.95

Total: Contractual Services $106,708.95Materials, Supplies and Small Equipment

Office Supplies $269.46

Auto/Heavy Equipment Maintenance/Repair $5,619.33Other Maintenance & Repair $61,010.58

Equipment Rental $0.00Office Equipment & Repair $470.08

Printing $94.08

Page 217: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 10 PW Streets

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2080 Local Street

440‐40‐00 $38,473.00 $40,468.00440‐90‐00 $110.00 $112.00

$38,583.00 $40,468.00

450‐20‐00 $10,000.00 $10,000.00450‐30‐00 $10,000.00 $0.00

$20,000.00 $10,000.00

990‐90‐10 $120,177.00  $100,719.00 $120,177.00  $100,719.00 $600,523.00  $625,376.00 Division Total: PW Streets $389,579.19 

Vehicles $0.00Total: Fixed Assets $0.00

Total: Fixed Charges $36,857.90Fixed Assets

Machines and Equipment $0.00

TransfersTransfers Out $99,220.00 

Total: Transfers $99,220.00 

Fixed ChargesSpecial Fees $36,752.70Compensated Absences $105.20

Page 218: 2014 2015 Preliminary Budget

Public Works—Street Trees 

Description of Division 

 

The Street Trees &  Landscaping Division provides  for  the planting and maintenance of  street  trees and  for  the development and maintenance of landscaping within the public right‐of‐way.  The Division removes tree branches and brush that may pose a possible hazard to pedestrians and vehicular traffic.  Spraying of street trees for insect infestation and pruning street trees as needed is also provided.

Accomplishments 2013/2014  Replaced 80 street trees at various locations in Mossdale Landing.  Tree Maintenance, including: 

Trees in various locations throughout the City were trimmed to promote health or removed if they posed a public safety hazard. 

Tree pruning on Towne Centre Dr, Easy St, Brookhurst Blvd, Valverde Park, Stonebridge Way, Thomsen Rd, and 5th St.   

Herbicide application to reduce mistletoe growth on trees in Valverde Park & Woodfield Park and olive tree growth on Thomsen Road & 5th Street.   

 

Work Plan 2014/2015 

Continue  to manage and  trim City  trees  located within  the public  right‐of‐way and park  trees with City staff and some contract tree trimming services.  

 

Capital Requests  

None      

Significant Operating Changes  

Future  needs  for  repair  and maintenance  of  intersections,  installing  street  signs  and  street  lights,  and  tree  spraying/pruning  are  signifying  a  need  for  a  bucket  truck.    During  Fiscal  Year  2014/2015,  staff  will  be  evaluating  the  cost effectiveness of purchasing one versus the continued use of various contractors.  This cost would be split among several Public Works divisions.      

An additional Maintenance Worker I position was added in December of 2013 and assigned to street maintenance duties. 

Page 219: 2014 2015 Preliminary Budget

 Public Works—Street Trees 

 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Public Works Superintendent  0.05  0.05  0.05 

Senior Maintenance Worker  0.04  0.04  0.04 

Total Full Time Equivalents  0.09  0.13  0.13 

Maintenance Worker II  0.00  0.04  0.04 

Page 220: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $9,516.00 $9,943.00410‐12‐00 $0.00 $0.00410‐13‐00 $40.00 $208.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $0.00410‐20‐00 $993.00 $1,199.00410‐21‐00 $279.00 $201.00410‐40‐00 $1,334.00 $2,136.00410‐41‐00 $0.00 $0.00410‐42‐00 $20.00 $26.00410‐43‐00 $0.00 $0.00410‐44‐00 $575.00 $1,008.00410‐46‐00 $111.00 $0.00410‐46‐01 $0.00 $149.00410‐47‐00 $39.00 $56.00 410‐49‐00 $48.00 $51.00 

$12,955.00 $14,977.00 

420‐27‐00 $15,000.00 $15,000.00$15,000.00 $15,000.00

440‐90‐00 $110.00 $222.00 $110.00 $222.00 Total: Fixed Charges $105.20

Total: Contractual Services $14,587.00Fixed Charges

Compensated Absences $105.20

Total: Personnel Services $10,850.11Contractual Services

Street Trees & Landscaping $14,587.00

SUI $39.07SDI $48.54

FICA $107.30Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $554.40

Dental Insurance $0.00Life Insurance $19.28

Retirement ‐ Employee $340.58Health Insurance $1,237.52

Standby $0.00Retirement ‐ Employer $891.83

Overtime $80.71Vacation/Sick Leave $581.67

Personnel ServicesRegular Salaries $6,949.21Part‐time Salaries $0.00

Department 50 Public WorksDivision 11 PW Street Trees & Landscaping

Expenses

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2080 Local Street

Page 221: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Department 50 Public WorksDivision 11 PW Street Trees & Landscaping

Expenses

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2080 Local Street

990‐90‐10 $5,437.00  $5,793.00 $5,437.00  $5,793.00 

$33,502.00  $35,992.00 Division Total: PW Street Trees & Landscaping $32,435.31 Total: Transfers $6,893.00 

TransfersTransfers Out $6,893.00 

Page 222: 2014 2015 Preliminary Budget

Public Works—Public Transit 

Description of Division  This Division provides a basic  transportation system serving all age groups with emphasis on elderly and handicapped citizens.  The purpose of the system is to increase the mobility of people by interfacing with neighboring transportation systems wherever possible.  San Joaquin Regional Transit District (SJRTD) has implemented a hopper service which provides faster service to destina‐tions.  Funds from this division are available for contract service to increase bus service if needed. This Division also provides for the maintenance, repair, and upgrade of bus shelters.  Accomplishments 2013/2014 

Maintained and repaired vandalized bus shelters.  Studied unmet transit needs and maintained communication and coordination with SJRTD.  Utilized Local Transportation Funds (LTF) for street maintenance.  Provided information to residents regarding available transit options.  

Work Plan 2014/2015  Continue to study local transit needs and maintain communication and coordination with SJRTD. 

Revise service as needed to match budget. 

Continue to monitor and maintain bus shelters. 

Pending Unmet Transit Needs Study in the Fall of 2014, program the remaining LTF.  Capital Requests  

None         

Significant Operating Changes  None   

Page 223: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

420‐75‐00 $3,000.00 $3,000.00$3,000.00 $3,000.00

425‐10‐00 $15,071.00 $20,692.00$15,071.00 $20,692.00

430‐26‐00 $2,000.00 $2,000.00$2,000.00 $2,000.00

990‐90‐10 $5,986.00 $407.00$5,986.00 $407.00

$26,057.00  $26,099.00 Division Total: PW Public Transit $2,700.00

TransfersTransfers Out $0.00

Total: Transfers $0.00

Materials, Supplies and Small EquipmentOther Maintenance & Repair $0.00

Total: Materials, Supplies and Small Equipment $0.00

Contractual Services (Intergovernmental)Special Contracts $2,700.00

Total: Contractual Services (Intergovernmental) $2,700.00

Contractual ServicesOther Maintenance & Repair $0.00

Total: Contractual Services $0.00

ExpensesDepartment 50 Public WorksDivision 13 PW Public Transit

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2120 Public Transit

Page 224: 2014 2015 Preliminary Budget

 Public Works —RTIF Lathrop Local East 

Description of Division  

The City adopted the Regional Traffic Impact Fee (RTIF) fee on December 20, 2005.  The RTIF was created to help fund regional traffic congestion improvements and related adverse impacts in the County of San Joaquin.  San Joaquin Council of Governments (SJCOG) manages the RTIF program.   SJCOG’s management costs called Third Party Costs, are paid from fees collected and are processed through this budget unit.  

 Accomplishments 2013/2014 

Collected RTIF from new development projects.  

Work Plan 2014/2015 

Continue to collect RTIF from new development. 

 

Significant Operating Changes 

None 

 

Page 225: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

440‐10‐00 $5,000.00 $5,000.00$5,000.00 $5,000.00

990‐90‐10 $713,390.00 $0.00$713,390.00 $0.00$718,390.00  $5,000.00Division Total: PW Streets $0.00

TransfersTransfers Out $0.00

Total: Transfers $0.00

Fixed ChargesFixed Charges $0.00

Total: Fixed Charges $0.00

ExpensesDepartment 50 Public WorksDivision 10 PW Streets

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2340 RTIF‐Lathrop Local East

Page 226: 2014 2015 Preliminary Budget

 Public Works—RTIF San Joaquin County 10% 

Description of Division  The City adopted the Regional Traffic Impact Fee (RTIF) fee on December 20, 2005.  The RTIF was created to help fund regional traffic congestion improvements and related adverse impacts in the County of San Joaquin.  Ten percent (10%) of all RTIF funds collected are transferred to this fund for transfers to the San Joaquin County to mitigate impacts from City projects on County roads. 

 Accomplishments 2013/2014 

None  

Work Plan 2014/2015 

None 

 

Significant Operating Changes 

None 

 

Page 227: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

440‐40‐00 $80,753.00 $78,947.00$80,753.00 $78,947.00$80,753.00 $78,947.00Division Total: PW Streets $53,665.71

Fixed ChargesSpecial Fees $53,665.71

Total: Fixed Charges $53,665.71

ExpensesDepartment 50 Public WorksDivision 10 PW Streets

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2350 RTIF‐San Joaquin County 10%

Page 228: 2014 2015 Preliminary Budget

 Public Works—RTIF Lathrop Local West 

Description of Division  

The City adopted  the Regional Traffic  Impact Fee  (RTIF)  fee on December 20, 2005.   The RTIF was created to help  fund regional traffic congestion improvements and related adverse impacts in the County of San Joaquin.  San Joaquin Council of Governments (SJCOG) manages the RTIF program. SJCOG’s management costs, called Third Party Costs, are paid from this budget. 

 Accomplishments 2013/2014 

Collected RTIF from new development projects.  

Work Plan 2014/2015 

Continue to collect RTIF from new development projects. 

 

Significant Operating Changes 

None 

 

Page 229: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

440‐10‐00 $5,000.00 $5,000.00$5,000.00 $5,000.00

450‐35‐00 $349,676.00 $0.00$349,676.00 $0.00

990‐90‐10 $283,000.00 $57,350.00$283,000.00 $57,350.00$637,676.00  $62,350.00 Division Total: PW Streets $0.00

TransfersTransfers Out $0.00

Total: Transfers $0.00

Fixed AssetsLand / Land Acquisition $0.00

Total: Fixed Assets $0.00

Fixed ChargesFixed Charges $0.00

Total: Fixed Charges $0.00

ExpensesDepartment 50 Public WorksDivision 10 PW Streets

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2360 RTIF‐Lathrop Local West

Page 230: 2014 2015 Preliminary Budget

 Public Works —RTIF SJCOG 15% 

Description of Division  The City adopted the Regional Traffic  Impact Fee (RTIF) fee on December 20, 2005.   The RTIF was created to help fund regional traffic congestion improvements and related adverse impacts in the County of San Joaquin.  Fifteen percent (15%) of all RTIF funds collected are transferred to this fund to transfer to the San Joaquin Council of Governments to mitigate impacts of City projects on the regional transportation system. 

 Accomplishments 2013/2014 

None  

Work Plan 2014/2015 

None 

 

Significant Operating Changes 

None 

 

Page 231: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

440‐40‐00 $121,130.00 $118,420.00$121,130.00 $118,420.00$121,130.00 $118,420.00Division Total: PW Streets $80,498.22

Fixed ChargesSpecial Fees $80,498.22

Total: Fixed Charges $80,498.22

ExpensesDepartment 50 Public WorksDivision 10 PW Streets

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2370 RTIF‐San Joaquin COG

Page 232: 2014 2015 Preliminary Budget

Public Works—CLSP Services CFD 2006‐2 Description of Division 

 

The  Central  Lathrop  Specific  Plan  (CLSP)  Services  CFD  fund was  established  to  fund  the  activities  related  to  providing  public services, public safety, and to maintain public infrastructure as necessary in the Central Lathrop Specific Plan area. 

Accomplishments 2013/2014  Completed construction of the Lathrop Generations Center.  Streetlight quarterly inspections and routine maintenance and repairs to maintain public safety.   Coordinated with Odyssey Landscape services to maintain public improvements on Golden Valley Parkway.   Provided police services to the Central Lathrop Specific Plan area.  Preventative maintenance performed for the  storm water pump.    Contracted rodent control services for River Island Parkway and Lathrop Road.  Coordinated with engineers  and  contractors  for  the design  and  construction of  improvements  for  the CLSP  Interim 

Sewer and Storm Drain pump station and the CLSP Storm Drain basin improvements.  

Work Plan 2014/2015  Maintain a safe, clean, and efficient operation of the storm drain facilities, street lights, and traffic signals. Continue  to  provide  streetlight  and  landscaping  services  on Golden  Valley  Parkway  from  River  Islands  Parkway  to 

Lathrop Road and Lathrop Road from Manthey Road to Land Park Drive. Operate and maintain the CLSP Interim Sewer and Storm Drain pump station and storm drain basin.

 

Capital Requests   None   

 

Significant Operating Changes  This CFD was partially removed from San Joaquin County’s alternative tax payment system (the Teeter Plan) beginning 

in FY 2010/11.  It is unknown when or if the district will be reinstated into the system.  Until reinstatement, the City has curtailed maintenance and operations activities  in an attempt to match expenditures with reduced revenues.   Public safety funding was not affected by the Teeter Plan removal.  

  

Page 233: 2014 2015 Preliminary Budget

 Public Works—CLSP Services CFD 2006‐2 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

  Position:  12/13  13/14  14/15 

Utility Operator I/II/III  0.00  0.00  0.40 

Total Full Time Equivalents  0.04  0.04  0.70 

Special Districts Manager  0.04  0.00  0.00 

Maintenance Services Supervisor  0.00  0.00  0.08 

Maintenance Worker I/II  0.00  0.00  0.14 

Senior Maintenance Worker  0.00  0.00  0.02 

Public Works Superintendent  0.00  0.00  0.06 

Page 234: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $3,620.00 $41,139.00410‐13‐00 $0.00 $1,928.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $1,529.00410‐20‐00 $454.00 $4,688.00410‐21‐00 $128.00 $875.00410‐40‐00 $657.00 $10,916.00410‐41‐00 $0.00 $264.00410‐42‐00 $9.00 $108.00410‐43‐00 $0.00 $46.00410‐44‐00 $140.00 $6,755.00410‐46‐00 $56.00 $0.00410‐46‐01 $0.00 $648.00410‐47‐00 $17.00 $304.00 410‐49‐00 $39.00 $111.00 

$5,120.00 $69,311.00 

420‐01‐00 $5,068.00 $5,068.00420‐04‐00 $0.00 $5,954.00420‐16‐00 $11,590.00 $12,140.00420‐27‐00 $4,800.00 $4,800.00420‐65‐00 $250.00 $250.00420‐70‐00 $1,000.00 $1,000.00420‐75‐00 $28,800.00 $22,900.00

$51,508.00 $52,112.00Total: Contractual Services $34,217.82

Auto/Heavy Equipment Maintenance/Repair $860.45Other Maintenance & Repair $23,502.37

Street Trees & Landscaping $4,800.00Printing $370.55

Personnel $0.00Contracts ‐ Other $780.28

Total: Personnel Services $4,264.56Contractual Services

Professional Services $3,904.17

Workers Compensation Insurance $128.86

Dental Insurance $0.00Life Insurance $8.10

SUI $17.36SDI $39.08

FICA $57.20Medicare $0.00

Retirement ‐ Employee $137.67Health Insurance $519.67

Standby $0.00Retirement ‐ Employer $354.32

Vision Insurance $0.00

Overtime $0.00Vacation/Sick Leave $134.35

Division 66 PW CFD 2006‐2 CLSP Services 

Personnel ServicesRegular Salaries $2,867.95

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2390 CLSP Services CFDExpensesDepartment 50 Public Works

Page 235: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 66 PW CFD 2006‐2 CLSP Services 

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2390 CLSP Services CFDExpensesDepartment 50 Public Works

425‐15‐00 $100,000.00 $100,000.00425‐30‐00 $109,407.00 $121,407.00 

$209,407.00 $221,407.00 

430‐24‐00 $500.00 $500.00430‐26‐00 $500.00 $500.00430‐30‐00 $1,000.00 $1,500.00430‐33‐00 $6,870.00 $5,000.00430‐49‐00 $19,200.00 $21,100.00430‐50‐00 $6,000.00 $5,400.00

$34,070.00 $34,000.00

440‐10‐00 $300.00 $300.00440‐40‐00 $6,530.00 $8,780.00440‐90‐00 $72.00 $134.00

$6,902.00 $9,214.00 

990‐90‐10 $48,783.00 $42,117.00$48,783.00 $42,117.00

$355,790.00  $428,161.00 

Total: Fixed Charges $10,047.10

Division Total: PW CFD 2006‐2 CLSP Services  $341,094.62 

TransfersTransfers Out $77,658.00

Total: Transfers $77,658.00

Special Fees $9,020.34Compensated Absences $780.76

Total: Materials, Supplies and Small Equipment $9,378.49 Fixed Charges

Fixed Charges $246.00

Other Maintenance & Repair $361.13

Utilities ‐ Gas and Electric $0.00Water $5,086.73

Chemicals $800.84Gas/Diesel/Oil/Lubricants $3,129.79

Total: Contractual Services (Intergovernmental) $205,528.65

Contractual Services (Intergovernmental)Central Lathrop ‐ Police $99,131.78

Materials, Supplies and Small EquipmentAuto/Heavy Equipment Parts $0.00

Fire Department $106,396.87

Page 236: 2014 2015 Preliminary Budget

Public Works—Solid Waste AB939      

Description of Division  

The Solid Waste Management Division  is  responsible  for  the collection and disposal of  industrial, commercial, and  residential solid waste.   In addition, administering the City’s Source Reduction and Recycling (SRRE) Program, and providing technical assistance and outreach to increase awareness of waste reduction and recycling.  

In 1989, Assembly Bill 939, Integrated Waste Management Act, was passed to establish a new direction for waste management and the decrease in landfill capacity.  Following  AB 939 came the creation of the CA Integrated Waste Management Board (CIWMB).   The City of Lathrop  is mandated  to meet solid waste diversion goals of 50%, attend monthly planning committees hosted by SJ County Public Works Division, purchase recycled products, and minimize waste.   

Accomplishments 2013/2014  

Negotiated Amendment No. 2 to the Agreement with Allied Waste/Republic Services for a 5 Year Contract Extension.  City secured a grant for Rubberized Asphalt through Cal‐Recycle to promote the use of recycled tires in road maintenance 

work.  Provided cost effective  "bottle‐shaped"  recycling  containers  to Mossdale Elementary, Lathrop Elementary, and Lathrop 

High School designated to increase and promote recycling awareness.   The Division was awarded a $5,000 AB 939 Grant to  implement and continue the beverage container recycling and litter 

reduction programs for the City of Lathrop.   Free  electronics  recycling  event  coordinated with Onsite  Electronics Recycling  for  Lathrop  residents  and businesses  to 

drop off their E‐Waste and Universal Waste. Free mobile shredding service coordinated with Shred‐It  to provide Lathrop  residents with secure personal  information 

destruction and recycling.   Reached an official waste diversion rate of 80% to maintain compliance with AB 939.  Provided a Solid Waste Recycling Kiosk  for questions and concerns  for the City events  listed below.   The Kiosk  included 

free giveaway bags for public outreach that included adult and child educational literature on recycling, composting, and conservation.   Coordination with Allied Waste to provide free compost for Residents of the Community. 

National Night Out  National Public Works Week   MUSD Planet Party Day  Love Lathrop—Beautification Day  Carpenter Company Annual Employee Education Fair

Page 237: 2014 2015 Preliminary Budget

Public Works—Solid Waste AB939  

Work Plan 2014/2015  

Senate Bill 1365, disposal of household Sharps waste, went  into effect September 1, 2008. Further research of grants, funding, and implementation needs to be conducted by staff to assist residents with the cost of FDA approved containers and shipping. 

Provide a list of San Joaquin County available recycling resources. 

Use hands‐on exhibits at city events to educate the public on their essential role in the waste reduction effort. 

Continue to organize and offer residents free e‐waste collection. 

Continue to participate in City organized events and provide a Solid Waste Recycling Kiosk for outreach and education on natural resource conservation educational literature, composting, and recycling.    

Complete  the  required  certification  hours  towards  the  Resource  Management  Professional  Certification  with  the California Resource and Recovery Association (CRRA).   

Organize  various  complimentary  events  for  Lathrop  residents,  such  as:  paper  shredding,  E‐waste  recycling,  and  tire collection. 

Staff  will  continue  to  participate  in  the  San  Joaquin  County  Integrated  Waste  Management  Task  Force  to  obtain additional information on specialized conservation topics (e.g. Go‐Green alternatives) for City of Lathrop residents.  

Research and propose City Recycling Ordinances for City of Lathrop (e.g. Construction & Demolition Ordinance).  

 Capital Requests       

  None  Significant Operating Changes    None 

 

Page 238: 2014 2015 Preliminary Budget

 Public Works—Solid Waste AB939 

Staffing  FY 2014/2015 (in alphabetical order)    Staffing Summary 

Position:  12/13  13/14  14/15 

Solid Waste & Resource Conservation Coord.  0.50  0.00  0.00 

Total Full Time Equivalents  0.50  0.50  0.50 

Administrative Assistant  0.00  0.50  0.50 

Page 239: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $6,521.00 $23,097.00410‐12‐00 $0.00 $0.00410‐13‐00 $250.00 $400.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $0.00410‐20‐00 $3,222.00 $1,444.00410‐21‐00 $911.00 $12.00410‐40‐00 $0.00 $9,168.00410‐41‐00 $0.00 $0.00410‐42‐00 $0.00 $66.00410‐43‐00 $0.00 $0.00410‐44‐00 $455.00 $525.00410‐46‐00 $376.00 $0.00410‐46‐01 $0.00 $341.00410‐47‐00 $217.00 $217.00410‐48‐00 $0.00 $0.00410‐49‐00 $0.00 $0.00

$11,952.00 $35,270.00

420‐01‐00 $25,853.00 $6,700.00420‐60‐00 $200.00 $200.00420‐65‐00 $1,250.00 $1,250.00

$27,303.00 $8,150.00Total: Contractual Services $36,146.09

Advertising $0.00Printing $939.90

Total: Personnel Services $1,098.49Contractual Services

Professional Services $35,206.19

Bilingual Pay $0.00SDI $0.00

Medicare $0.00SUI $34.33

Workers Compensation Insurance $407.95FICA $8.03

Life Insurance $0.00Vision Insurance $0.00

Health Insurance $2.44Dental Insurance $0.00

Retirement ‐ Employer $69.50Retirement ‐ Employee $22.45

Standby $0.00

Part‐time Salaries $0.00Overtime $0.00

Personnel ServicesRegular Salaries $70.20

Vacation/Sick Leave $483.59

ExpensesDepartment 50 Public WorksDivision 40 PW Solid Waste

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2400 Recycling ‐ 3% AB 939

Page 240: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 50 Public WorksDivision 40 PW Solid Waste

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2400 Recycling ‐ 3% AB 939

430‐10‐00 $500.00 $500.00430‐45‐00 $300.00 $300.00

$800.00 $800.00

435‐10‐00 $500.00 $500.00435‐20‐00 $1,600.00 $1,600.00

$2,100.00 $2,100.00

990‐90‐10 $6,267.00 $7,578.00$6,267.00 $7,578.00

$48,422.00  $53,898.00 

Total: Dues, Meetings, Training and Travel $0.00

Division Total: PW Solid Waste $50,608.11 

TransfersTransfers Out $13,216.00

Total: Transfers $13,216.00

Dues, Meetings, Training and TravelSubscriptions $0.00Training and Travel $0.00

Reference Books $0.00Total: Materials, Supplies and Small Equipment $147.53

Materials, Supplies and Small EquipmentOffice Supplies $147.53

Page 241: 2014 2015 Preliminary Budget

Public Works—Crossroads Storm Drain City Zone 1A 

Description of Division 

 

The purpose of the Crossroads Storm Drain Division  is to operate, maintain, and  improve the storm drain system  in the Crossroads Commerce  Center  (CCC),  formerly  known  for  assessment  district  purposes  as  City  Service  Zone  1A.    City  Zone  1A  includes approximately 4.5 miles of pipelines, ponds, pumps, pump station facilities, and catch basins.  Approximately 295 acres of developed property drains into this system.  

Accomplishments 2013/2014  

Operation and maintenance of storm drain infrastructure within the CCC.  On‐going implementation of National Pollutant Discharge Elimination System (NPDES) Storm Water Management Plan   Preventative maintenance of heavy equipment, vehicles, and pump stations. 

 

Work Plan 2014/2015  

Continue operation and maintenance of storm drain infrastructure within the CCC.  Continue implementation of NPDES Storm Water Management Plan.   Continue preventative maintenance of heavy equipment, vehicles, and pump stations.  

  Capital Requests 

  None  

Significant Operating Changes  

  An additional Maintenance Worker I position was added in December of 2013 and assigned to street maintenance duties. 

Page 242: 2014 2015 Preliminary Budget

 Public Works—Crossroads Storm Drain City Zone 1A 

 Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Maintenance Worker I/II  0.13  0.15  0.09 

Public Works Superintendent  0.075  0.08  0.04 

Senior Maintenance Worker  0.02  0.02  0.01 

Special Districts Manager  0.02  0.00  0.00 

Utility Operator I/II/III  0.46  0.46  0.24 

Total Full Time Equivalents  0.705  0.71  0.38 

Page 243: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $41,809.00 $22,211.00410‐12‐00 $0.00 $0.00410‐13‐00 $1,710.00 $1,072.00410‐14‐00 $0.00 $0.00410‐15‐00 $1,609.00 $909.00410‐20‐00 $5,097.00 $2,699.00410‐21‐00 $1,476.00 $490.00410‐40‐00 $10,485.00 $5,665.00410‐41‐00 $0.00 $192.00410‐42‐00 $101.00 $60.00410‐43‐00 $0.00 $34.00410‐44‐00 $6,433.00 $3,616.00410‐46‐00 $611.00 $0.00410‐46‐01 $0.00 $352.00410‐47‐00 $306.00 $164.00 410‐48‐00 $0.00 $0.00410‐49‐00 $92.00 $41.00 

$69,729.00 $37,505.00 

420‐01‐00 $12,019.00 $11,840.00420‐04‐00 $0.00 $2,977.00420‐16‐00 $2,834.00 $2,410.00420‐18‐00 $710.00 $710.00420‐58‐00 $160.00 $160.00420‐60‐00 $100.00 $100.00420‐65‐00 $100.00 $130.00

Advertising $0.00Printing $109.70

Alarm Service $710.00Computer Tech Support $0.00

Personnel $0.00Contracts ‐ Other $3,556.03

Total: Personnel Services $65,374.02Contractual Services

Professional Services $4,790.92

Bilingual Pay $0.00SDI $92.37

Medicare $0.00SUI $305.90

Workers Compensation Insurance $5,528.36FICA $597.67

Life Insurance $99.33Vision Insurance $0.00

Health Insurance $9,252.83Dental Insurance $0.00

Retirement ‐ Employer $4,655.41Retirement ‐ Employee $1,822.37

Vacation/Sick Leave $3,590.37Standby $1,641.19

Part‐time Salaries $0.00Overtime $1,182.76

Division 21 PW Crossroads Storm Drains

Personnel ServicesRegular Salaries $36,605.46

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2500 Crossroads Storm Drain Zone 1A

Page 244: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 21 PW Crossroads Storm Drains

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2500 Crossroads Storm Drain Zone 1A

420‐69‐00 $100.00 $130.00420‐70‐00 $2,600.00 $2,300.00420‐72‐00 $1,000.00 $1,254.00420‐75‐00 $6,800.00 $6,800.00

$26,423.00 $28,811.00

430‐10‐00 $300.00 $300.00430‐17‐00 $100.00 $100.00430‐20‐00 $300.00 $300.00430‐24‐00 $500.00 $500.00430‐26‐00 $1,000.00 $1,000.00430‐30‐00 $300.00 $400.00430‐33‐00 $6,200.00 $6,150.00430‐35‐00 $150.00 $150.00430‐40‐00 $300.00 $300.00430‐45‐00 $200.00 $200.00430‐49‐00 $24,000.00 $24,000.00

$33,350.00 $33,400.00

435‐10‐00 $200.00 $200.00435‐20‐00 $400.00 $555.00

$600.00 $755.00

440‐10‐00 $500.00 $500.00440‐40‐00 $5,200.00 $5,300.00440‐41‐00 $5,120.00 $5,120.00440‐90‐00 $201.00 $89.00 

Rents $0.00Compensated Absences $548.19

Fixed ChargesFixed Charges $459.00Special Fees $4,927.61

Training and Travel $24.84Total: Dues, Meetings, Training and Travel $45.83

Total: Materials, Supplies and Small Equipment $29,108.26Dues, Meetings, Training and Travel

Subscriptions $20.99

Reference Books $0.00Utilities ‐ Gas and Electric $23,932.27

Shop Tools $0.00Uniforms and Protective Clothing $39.06

Chemicals $241.48Gas/Diesel/Oil/Lubricants $4,616.80

Auto/Heavy Equipment Parts $159.56Other Maintenance & Repair $119.09

Custodial Supplies $0.00Materials and Supplies $0.00

Total: Contractual Services $16,864.95Materials, Supplies and Small Equipment

Office Supplies $0.00

Communication Equipment Repair $365.59Other Maintenance & Repair $5,527.49

Office Equipment & Repair $94.08Auto/Heavy Equipment Maintenance/Repair $1,711.14

Page 245: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 21 PW Crossroads Storm Drains

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2500 Crossroads Storm Drain Zone 1A

$11,021.00 $11,009.00 

450‐30‐00 $3,000.00 $0.00$3,000.00 $0.00

990‐90‐10 $38,399.00 $36,049.00$38,399.00 $36,049.00

$182,522.00  $147,529.00 

Total: Fixed Assets $0.00

Division Total: PW Crossroads Storm Drains $155,384.86 

Total: Fixed Charges $5,934.80Fixed Assets

Vehicles $0.00

TransfersTransfers Out $38,057.00

Total: Transfers $38,057.00

Page 246: 2014 2015 Preliminary Budget

  Public Works—Storm Drain City Zone 1 

 Description of Division 

 

The purpose of the Storm Drain Division  is to operate, maintain, and  improve the storm drain system  in the City Zone 1 system area which  encompasses most  of  the  area  bound  by  Louise Avenue  to  the  south,  I‐5  to  the west, UPRR  to  the  east,  and  Stonebridge subdivision  to  the north.   The City  Zone 1  storm drainage  system  includes pipes, ponds, pumps, pump  station  facilities,  and  catch basins.  

Accomplishments 2013/2014  

Operation and maintenance of storm drain infrastructure within Zone 1.  On‐going implementation of National Pollutant Discharge Elimination System (NPDES) Storm Water Management Plan   Preventative maintenance of heavy equipment, vehicles, and pump stations.  New Harlan storm drain station repairs.  New Harlan Pond fence repaired.  Horizon storm drain pump repaired. 

 

Work Plan 2014/2015  

Continue operation and maintenance of Storm Drain infrastructure with Zone 1.  Continue implementation of NPDES Storm Water Management Plan.   Continue preventative maintenance of heavy equipment, vehicles, and pump stations.  

Capital Requests  

None  

Significant Operating Changes  

An additional Maintenance Worker I position was added  in December of 2013 and assigned to street maintenance duties.      

Page 247: 2014 2015 Preliminary Budget

 Public Works—Storm Drain City Zone 1 

 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Maintenance Worker I/II  0.25  0.27  0.27 

Public Works Superintendent  0.075  0.07  0.07 

Senior Maintenance Worker  0.02  0.02  0.02 

Special Districts Manager  0.02  0.00  0.00 

Utility Operator I/II/III  0.49  0.49  0.49 

Total Full Time Equivalents  0.855  0.85  0.85 

Page 248: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $49,155.00 $48,454.00410‐12‐00 $0.00 $0.00410‐13‐00 $1,950.00 $2,374.00410‐14‐00 $0.00 $0.00410‐15‐00 $1,733.00 $1,901.00410‐20‐00 $6,063.00 $5,802.00410‐21‐00 $1,749.00 $1,029.00410‐40‐00 $13,095.00 $13,250.00410‐41‐00 $0.00 $360.00410‐42‐00 $121.00 $128.00410‐43‐00 $0.00 $64.00410‐44‐00 $7,933.00 $8,220.00410‐46‐00 $714.00 $0.00410‐46‐01 $0.00 $767.00410‐47‐00 $371.00 $368.00 410‐48‐00 $0.00 $0.00410‐49‐00 $92.00 $71.00 

$82,976.00 $82,788.00 

420‐01‐00 $13,980.00 $13,862.00420‐04‐00 $0.00 $2,977.00420‐16‐00 $9,285.00 $8,300.00420‐18‐00 $710.00 $710.00420‐27‐00 $2,200.00 $2,200.00420‐32‐00 $6,205.00 $6,203.00420‐58‐00 $250.00 $250.00

Park Maintenance $5,702.40Computer Tech Support $0.00

Alarm Service $710.00Street Trees & Landscaping $1,949.32

Personnel $0.00Contracts ‐ Other $445.17

Total: Personnel Services $78,583.67Contractual Services

Professional Services $6,542.57

Bilingual Pay $0.00SDI $92.37

Medicare $0.00SUI $371.04

Workers Compensation Insurance $7,003.27FICA $700.50

Life Insurance $118.08Vision Insurance $0.00

Health Insurance $11,725.82Dental Insurance $0.00

Retirement ‐ Employer $5,548.49Retirement ‐ Employee $2,163.50

Vacation/Sick Leave $4,662.61Standby $1,753.55

Part‐time Salaries $0.00Overtime $1,404.86

Division 20 PW Storm Drains

Personnel ServicesRegular Salaries $43,039.58

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2510 Storm Drain City Zone 1

Page 249: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 20 PW Storm Drains

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2510 Storm Drain City Zone 1

420‐60‐00 $50.00 $50.00420‐65‐00 $100.00 $130.00420‐67‐00 $700.00 $700.00420‐69‐00 $100.00 $130.00420‐70‐00 $1,900.00 $2,200.00420‐72‐00 $1,600.00 $2,148.00420‐75‐00 $19,797.00 $27,100.00

$56,877.00 $66,960.00

430‐10‐00 $500.00 $300.00430‐17‐00 $200.00 $200.00430‐20‐00 $500.00 $500.00430‐24‐00 $1,000.00 $1,000.00430‐26‐00 $3,000.00 $3,600.00430‐30‐00 $1,200.00 $1,400.00430‐33‐00 $8,000.00 $8,700.00430‐35‐00 $500.00 $500.00430‐40‐00 $350.00 $300.00430‐45‐00 $100.00 $100.00430‐49‐00 $23,678.00 $15,600.00430‐50‐00 $6,650.00 $4,600.00

$45,678.00 $36,800.00

435‐10‐00 $300.00 $200.00435‐20‐00 $1,100.00 $1,050.00

$1,400.00 $1,250.00Fixed Charges

Training and Travel $31.05Total: Dues, Meetings, Training and Travel $52.04

Total: Materials, Supplies and Small Equipment $20,822.38Dues, Meetings, Training and Travel

Subscriptions $20.99

Utilities ‐ Gas and Electric $8,024.74Water $3,688.92

Uniforms and Protective Clothing $78.12Reference Books $0.00

Gas/Diesel/Oil/Lubricants $5,555.47Shop Tools $96.02

Other Maintenance & Repair $1,721.37Chemicals $961.02

Materials and Supplies $368.63Auto/Heavy Equipment Parts $37.89

Materials, Supplies and Small EquipmentOffice Supplies $290.20Custodial Supplies $0.00

Other Maintenance & Repair $8,068.52Total: Contractual Services $24,613.07

Auto/Heavy Equipment Maintenance/Repair $897.48Communication Equipment Repair $56.38

Equipment Rental $53.07Office Equipment & Repair $94.08

Advertising $0.00Printing $94.08

Page 250: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 20 PW Storm Drains

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2510 Storm Drain City Zone 1

440‐10‐00 $2,400.00 $2,400.00440‐40‐00 $16,520.00 $16,620.00440‐90‐00 $201.00 $156.00

$19,121.00 $19,176.00 

450‐30‐00 $3,750.00 $0.00$3,750.00 $0.00

990‐90‐10 $49,108.00 $41,767.00$49,108.00 $41,767.00

$258,910.00  $248,741.00 Division Total: PW Storm Drains $196,605.59 

Fixed AssetsVehicles $0.00

Total: Fixed Assets $0.00Transfers

Transfers Out $53,358.00Total: Transfers $53,358.00

Compensated Absences $548.19Total: Fixed Charges $19,176.43

Fixed Charges $2,388.71Special Fees $16,239.53

Page 251: 2014 2015 Preliminary Budget

Public Works—Residential Street Lighting 

Description of Division 

 

The Residential Street Lighting Division provides street lighting maintenance for the City streets by contract with Pacific,  Gas and Elec‐tric Company.  The Residential Street Lighting District is bounded by Louise Avenue to the south, Interstate 5 to the west, Stonebridge Subdivision  to  the north, and  the City  limits  to  the east.   The Division provides  for  the  installation, maintenance, and operation of streetlights.      

 Accomplishments 2013/2014  

Installed new residential street lighting on 6th St.  Replaced 2 streetlights on Harlan Rd.  Repaired several street lights and replaced burnt out bulbs.   Streetlight quarterly inspections and routine maintenance and repairs to maintain public safety.  Approximately 500 streetlights were operating and maintained. 

 Work Plan 2014/2015  

Install new streetlights as new development occurs.  

Continue to operate and maintain the existing streetlight system. 

Continue to provide streetlight quarterly inspections and routine maintenance services to maintain public safety.   

Contingent upon funding for the energy grant, initiate  replacement of existing fixtures with LED energy efficient fixtures.  Capital Requests  

None       Significant Operating Changes    None        

Page 252: 2014 2015 Preliminary Budget

 Public Works—Residential Street Lighting 

 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

Position:  12/13  13/14  14/15 

Public Works Superintendent  0.01  0.01  0.01 

Special Districts Manager  0.02  0.00  0.00 

Total Full Time Equivalents  0.03  0.01  0.01 

Page 253: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $2,940.00 $1,150.00410‐12‐00 $0.00 $0.00410‐13‐00 $0.00 $0.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $0.00410‐20‐00 $369.00 $154.00410‐21‐00 $104.00 $28.00410‐40‐00 $502.00 $183.00410‐41‐00 $0.00 $0.00410‐42‐00 $7.00 $3.00410‐43‐00 $0.00 $0.00410‐44‐00 $105.00 $39.00410‐46‐00 $44.00 $0.00410‐46‐01 $0.00 $17.00410‐47‐00 $13.00 $4.00 410‐49‐00 $29.00 $10.00 

$4,113.00 $1,588.00 

420‐01‐00 $4,032.00 $7,275.00420‐60‐00 $60.00 $60.00420‐75‐00 $46,720.00 $21,432.00

$50,812.00 $28,767.00

430‐49‐00 $67,000.00 $56,500.00$67,000.00 $56,500.00

Materials, Supplies and Small EquipmentUtilities ‐ Gas and Electric $58,683.19

Total: Materials, Supplies and Small Equipment $58,683.19

Other Maintenance & Repair $1,304.92Total: Contractual Services $4,988.82

Contractual ServicesProfessional Services $3,683.90Advertising $0.00

SDI $29.19Total: Personnel Services $3,651.20

Medicare $0.00SUI $13.05

Workers Compensation Insurance $96.65FICA $44.13

Life Insurance $6.84Vision Insurance $0.00

Health Insurance $425.48Dental Insurance $0.00

Retirement ‐ Employer $308.21Retirement ‐ Employee $118.56

Standby $0.00

Part‐time Salaries $0.00Overtime $0.00

Personnel ServicesRegular Salaries $2,480.04

Vacation/Sick Leave $129.05

ExpensesDepartment 50 Public WorksDivision 12 PW Residential LMD

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2520 Street Lighting

Page 254: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 50 Public WorksDivision 12 PW Residential LMD

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2520 Street Lighting

440‐10‐00 $1,000.00 $1,000.00440‐90‐00 $58.00 $22.00

$1,058.00 $1,022.00 

990‐90‐10 $56,231.00  $12,469.00 $56,231.00  $12,469.00 

$179,214.00  $100,346.00 

Total: Fixed Charges $1,394.48

Division Total: PW Residential LMD $90,104.69 

Fixed ChargesFixed Charges $983.05Compensated Absences $411.43

TransfersTransfers Out $21,387.00 

Total: Transfers $21,387.00 

Page 255: 2014 2015 Preliminary Budget

Public Works—Industrial Street Lighting   Description of Division 

 

The purpose of the  Industrial Street Lighting Division  is to provide street  lighting for City streets by contract with Pacific, Gas and Electric Company for electricity and under contract with Siemens Industry, Inc. for maintenance and repair of the streetlights.  The Industrial Street Lighting District is bound by Louise Avenue to the north, Interstate 5 to the west, and UPRR to the east for Zone A (Crossroads Commerce Center).   Zone B  is bounded by Louise Avenue  to  the north, McKinley Avenue  to  the west, and Yosemite Avenue to the south.  Zone C is bounded by Interstate 5 to the west, Roth Road to the north, the Stonebridge Development to the south, and the UPRR to the east.      

 Accomplishments 2013/2014 

Replaced missing street light wire in the Crossroads Commerce Center and incorporated deterrents to future theft.  Replaced 12  streetlights in the Crossroads Commerce Center.   Application submitted for energy grant to replace existing street  light fixtures with LED energy efficient fixtures allowing 

for reduced maintenance costs.  Provided quarterly inspection for streetlights and signal lights to maintain public safety.   220 Street Lights are maintained in the Industrial Lighting District. 

 Work Plan 2014/2015 

Maintain streetlights and signal lights at an acceptable level. 

Continue to provide streetlight quarterly inspection and routine maintenance services to maintain public safety.   Contingent  upon  funding  for  the  energy  grant,  complete  replacement  of  existing  fixtures  with  LED  energy  efficient 

fixtures.  Capital Requests 

None         Significant Operating Changes 

               None   

Page 256: 2014 2015 Preliminary Budget

 Public Works—Industrial Street Lighting 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

Position:  12/13  13/14  14/15 

Public Works Superintendent  0.01  0.01  0.01 

Special Districts Manager  0.02  0.00  0.00 

Total Full Time Equivalents  0.03  0.01  0.01 

Page 257: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $2,940.00 $1,150.00410‐12‐00 $0.00 $0.00410‐13‐00 $0.00 $0.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $0.00410‐20‐00 $369.00 $154.00410‐21‐00 $104.00 $28.00410‐40‐00 $502.00 $183.00410‐41‐00 $0.00 $0.00410‐42‐00 $7.00 $3.00410‐43‐00 $0.00 $0.00410‐44‐00 $105.00 $39.00410‐46‐00 $44.00 $0.00410‐46‐01 $0.00 $17.00410‐47‐00 $13.00 $4.00 410‐49‐00 $29.00 $10.00 

$4,113.00 $1,588.00 

420‐01‐00 $1,495.00 $4,646.00420‐60‐00 $100.00 $100.00420‐75‐00 $7,700.00 $27,711.00

$9,295.00 $32,457.00

430‐49‐00 $19,000.00 $19,000.00$19,000.00 $19,000.00Total: Materials, Supplies and Small Equipment $15,361.14

Total: Contractual Services $4,481.18Materials, Supplies and Small Equipment

Utilities ‐ Gas and Electric $15,361.14

Advertising $0.00Other Maintenance & Repair $3,121.06

Total: Personnel Services $3,651.20Contractual Services

Professional Services $1,360.12

SUI $13.05SDI $29.19

FICA $44.13Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $96.65

Dental Insurance $0.00Life Insurance $6.84

Retirement ‐ Employee $118.56Health Insurance $425.48

Standby $0.00Retirement ‐ Employer $308.21

Overtime $0.00Vacation/Sick Leave $129.05

Personnel ServicesRegular Salaries $2,480.04Part‐time Salaries $0.00

Department 50 Public WorksDivision 14 PW Industrial LMD

Expenses

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2520 Street Lighting

Page 258: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Department 50 Public WorksDivision 14 PW Industrial LMD

Expenses

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2520 Street Lighting

440‐10‐00 $500.00 $500.00440‐90‐00 $58.00 $22.00

$558.00 $522.00 

990‐90‐10 $7,203.00  $4,826.00 $7,203.00  $4,826.00 

$40,169.00  $58,393.00 Division Total: PW Industrial LMD $29,987.66 

Compensated Absences $411.43Total: Fixed Charges $846.14Transfers

Transfers Out $5,648.00 Total: Transfers $5,648.00 

Fixed ChargesFixed Charges $434.71

Page 259: 2014 2015 Preliminary Budget

  Public Works—Woodfield Park Maintenance 

Description of Division  

Woodfield  Park  is  a  five  acre  neighborhood  park  established  in  a  storm  drain  pond  and  financed  by  assessments  paid  by  the property owners residing  in  the Woodfield Landscape District.   This budget ensures  that  the park  is kept clean, safe, and visually appealing.  Maintenance services are provided by a combination of City personnel and contracted services.     

Accomplishments 2013/2014  Performed Preventative Maintenance and Repairs including: 

Woodfield Park swings replaced and repaired playground grab bar.  Trees pruned.  Irrigation repaired.   

Rodent control maintenance for Woodfield Park.     Installed automated locks at restrooms.  Maintained a safe and clean park including the basketball court and restroom building.   Continuous maintenance of the central landscape irrigation control with the Calsense Central Irrigation Control  System 

at Woodfield.  Preventative maintenance of heavy equipment, vehicles, and pump stations.  Installed lights on outside of restroom building.  Replaced vandalized slide exit on play equipment.  Installed drainage to bottom of pathway heading into park. 

 

Work Plan 2014/2015  Open and close restrooms daily in an effort to prevent vandalism. 

Continue operations to provide the community with a safe and clean recreational area.  

Capital Requests  

Vehicle Replacement  $2,000         

Significant Operating Changes  

None        

Page 260: 2014 2015 Preliminary Budget

 Public Works—Woodfield Park Maintenance 

  

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Maintenance Services Supervisor  0.02  0.02  0.01 

Senior Maintenance Worker  0.03  0.03  0.03 

Special Districts Manager  0.01  0.00  0.00 

Total Full Time Equivalents  0.06  0.05  0.04 

Page 261: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $3,826.00 $2,350.00410‐12‐00 $0.00 $0.00410‐13‐00 $50.00 $102.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $0.00410‐20‐00 $425.00 $282.00410‐21‐00 $135.00 $59.00410‐40‐00 $1,001.00 $715.00410‐41‐00 $0.00 $0.00410‐42‐00 $9.00 $7.00410‐43‐00 $0.00 $0.00410‐44‐00 $535.00 $407.00410‐46‐00 $57.00 $0.00410‐46‐01 $0.00 $35.00410‐47‐00 $26.00 $17.00 410‐49‐00 $23.00 $6.00 

$6,087.00 $3,980.00

420‐01‐00 $1,674.00 $3,334.00420‐16‐00 $3,260.00 $2,360.00420‐32‐00 $13,905.00 $13,912.00420‐60‐00 $60.00 $60.00420‐70‐00 $600.00 $600.00420‐75‐00 $6,300.00 $3,750.00

$25,799.00 $24,016.00Total: Contractual Services $16,544.69

Auto/Heavy Equipment Maintenance/Repair $283.98Other Maintenance & Repair $430.00

Park Maintenance $13,280.91Advertising $0.00

Contractual ServicesProfessional Services $1,556.17Contracts ‐ Other $993.63

SDI $22.77Total: Personnel Services $5,612.89

Medicare $0.00SUI $26.01

Workers Compensation Insurance $327.19FICA $57.03

Life Insurance $9.12Vision Insurance $0.00

Health Insurance $917.62Dental Insurance $0.00

Retirement ‐ Employer $380.34Retirement ‐ Employee $163.78

Vacation/Sick Leave $311.46Standby $0.00

Part‐time Salaries $0.00Overtime $95.31

Division 62 PW Woodfield LMD

Personnel ServicesRegular Salaries $3,302.26

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2530 Woodfield Landscape

Page 262: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 62 PW Woodfield LMD

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2530 Woodfield Landscape

430‐20‐00 $650.00 $650.00430‐21‐00 $500.00 $500.00430‐24‐00 $200.00 $200.00430‐26‐00 $2,500.00 $4,250.00430‐33‐00 $700.00 $1,000.00430‐35‐00 $200.00 $200.00430‐40‐00 $150.00 $150.00430‐45‐00 $50.00 $50.00430‐49‐00 $1,000.00 $1,000.00430‐50‐00 $20,000.00 $22,100.00

$25,950.00 $30,100.00

435‐10‐00 $50.00 $50.00435‐20‐00 $50.00 $71.00

$100.00 $121.00

440‐10‐00 $600.00 $600.00440‐40‐00 $950.00 $960.00440‐90‐00 $18.00 $0.00

$1,568.00 $1,560.00

450‐30‐00 $2,500.00 $2,000.00$2,500.00 $2,000.00Total: Fixed Assets $0.00

Total: Fixed Charges $1,466.71Fixed Assets

Vehicles $0.00

Special Fees $723.88Compensated Absences $195.19

Total: Dues, Meetings, Training and Travel $35.85Fixed Charges

Fixed Charges $547.64

Dues, Meetings, Training and TravelSubscriptions $31.05Training and Travel $4.80

Water $21,486.37Total: Materials, Supplies and Small Equipment $23,949.39

Reference Books $0.00Utilities ‐ Gas and Electric $1,092.39

Shop Tools $0.00Uniforms and Protective Clothing $47.58

Other Maintenance & Repair $488.88Gas/Diesel/Oil/Lubricants $573.16

Building Maintenance ‐ Materials & Supplies $62.45Auto/Heavy Equipment Parts $0.00

Materials, Supplies and Small EquipmentMaterials and Supplies $198.56

Page 263: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 62 PW Woodfield LMD

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2530 Woodfield Landscape

990‐90‐10 $16,242.00 $13,237.00$16,242.00 $13,237.00$78,246.00  $75,014.00 Division Total: PW Woodfield LMD $60,034.53 

TransfersTransfers Out $12,425.00

Total: Transfers $12,425.00

Page 264: 2014 2015 Preliminary Budget

Public Works‐Stonebridge Park & Street Landscaping 

  Description of Division 

 

The purpose of this division is to provide maintenance for the Stonebridge Landscaping District.  Included in the district is Stonebridge Park, a 10‐acre neighborhood park with a restroom building, a basketball court, and approximately 512,000 square feet of street land‐scaping in public rights of way.  The objective is to provide clean, safe, and visually satisfying street and park facilities.

Accomplishments 2013/2014    Sangalang Park Improvements including: 

Solar lighting installed along pathway.  Installed benches, table and garbage cans on pathway.  Installed playground rubberized surfacing  

Performed Preventative Maintenance and Repairs including:  Park irrigation repairs.  Restroom lighting repairs.   Replaced basketball nets.  Swing replacement, playground repairs, and basketball nets replaced. 

Trees pruned on Stonebridge Way.   Maintained park, restroom building, and basketball court in a safe and visually appealing manner.  Maintained a safe, clean operation of the street landscaping.   Continued  to maintain  central  landscape  irrigation  control with  the Calsense Central  Irrigation Control  System  at  San‐

galang.   Preventative maintenance of heavy equipment, vehicles and pump stations.  Coordinated Odyssey Landscape for Park and Street Landscape Maintenance services.  

 

Page 265: 2014 2015 Preliminary Budget

Public Works‐Stonebridge Park & Street Landscaping 

 Work Plan 2014/2015 

 

Maintain a safe, clean and efficient operation of Stonebridge Park, new shade structure and restroom building. 

Provide any needed repairs in a timely manner. 

Open and close restroom building daily. 

Maintain a safe, clean operation of the street landscaping. 

Continue to manage Sangalang Park Landscape Maintenance contract.   

Continue to participate in Beautification Day  Capital Requests  

Vehicle Replacement  $4,000         Significant Operating Changes   

An additional Maintenance Worker I position was added in December of 2013 and assigned to street maintenance duties.     

 

Page 266: 2014 2015 Preliminary Budget

 Public Works‐Stonebridge Park & Street Landscaping 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Public Works Superintendent  0.01  0.01  0.01 

Senior Maintenance Worker  0.02  0.02  0.02 

Special Districts Manager  0.02  0.00  0.00 

Total Full Time Equivalents  0.05  0.05  0.05 

Maintenance Worker I/II  0.00  0.02  0.02 

Page 267: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $4,873.00 $3,248.00410‐12‐00 $0.00 $0.00410‐13‐00 $20.00 $104.00410‐14‐00 $0.00 $22.00410‐15‐00 $0.00 $0.00410‐20‐00 $511.00 $368.00410‐21‐00 $144.00 $58.00410‐40‐00 $734.00 $793.00410‐41‐00 $0.00 $0.00410‐42‐00 $10.00 $9.00410‐43‐00 $0.00 $0.00410‐44‐00 $305.00 $446.00410‐46‐00 $60.00 $0.00410‐46‐01 $0.00 $49.00410‐47‐00 $22.00 $32.00410‐49‐00 $29.00 $0.00

$6,708.00 $5,129.00

420‐01‐00 $2,719.00 $2,719.00420‐04‐00 $0.00 $2,977.00420‐16‐00 $400.00 $300.00420‐27‐00 $60,000.00 $59,900.00420‐32‐00 $16,473.00 $16,470.00420‐60‐00 $100.00 $100.00420‐65‐00 $100.00 $130.00420‐67‐00 $200.00 $200.00

Printing $94.08Equipment Rental $0.00

Park Maintenance $14,424.24Advertising $0.00

Contracts ‐ Other $187.27Street Trees & Landscaping $49,072.39

Contractual ServicesProfessional Services $1,978.43Personnel $0.00

SDI $29.19Total: Personnel Services $5,277.08

Medicare $0.00SUI $21.74

Workers Compensation Insurance $293.29FICA $58.81

Life Insurance $9.65Vision Insurance $0.00

Health Insurance $628.96Dental Insurance $0.00

Retirement ‐ Employer $426.50Retirement ‐ Employee $164.38

Vacation/Sick Leave $264.95Standby $0.00

Part‐time Salaries $0.00Overtime $40.36

Division 60 PW Landscaping Maintenance Dist

Personnel ServicesRegular Salaries $3,339.25

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2550 Stonebridge Landscape

Page 268: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 60 PW Landscaping Maintenance Dist

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2550 Stonebridge Landscape

420‐70‐00 $1,200.00 $1,200.00420‐75‐00 $1,000.00 $4,000.00

$82,192.00 $87,996.00

430‐17‐00 $350.00 $350.00430‐20‐00 $500.00 $500.00430‐21‐00 $500.00 $500.00430‐24‐00 $400.00 $400.00430‐26‐00 $4,000.00 $4,000.00430‐33‐00 $1,600.00 $1,900.00430‐35‐00 $500.00 $500.00430‐40‐00 $250.00 $250.00430‐45‐00 $50.00 $50.00430‐49‐00 $2,650.00 $3,500.00430‐50‐00 $66,100.00 $66,490.00

$76,900.00 $78,440.00

435‐10‐00 $100.00 $87.00435‐20‐00 $120.00 $120.00

$220.00 $207.00

440‐10‐00 $2,400.00 $2,400.00440‐40‐00 $2,460.00 $2,475.00440‐90‐00 $58.00 $0.00

$4,918.00 $4,875.00Compensated Absences $411.43

Total: Fixed Charges $4,490.01

Fixed ChargesFixed Charges $2,311.43Special Fees $1,767.15

Training and Travel $0.00Total: Dues, Meetings, Training and Travel $77.95

Total: Materials, Supplies and Small Equipment $71,338.42Dues, Meetings, Training and Travel

Subscriptions $77.95

Utilities ‐ Gas and Electric $2,791.63Water $65,194.88

Uniforms and Protective Clothing $49.85Reference Books $0.00

Gas/Diesel/Oil/Lubricants $1,288.71Shop Tools $96.02

Auto/Heavy Equipment Parts $21.93Other Maintenance & Repair $1,327.61

Materials and Supplies $109.68Building Maintenance ‐ Materials & Supplies $123.51

Total: Contractual Services $66,549.72Materials, Supplies and Small Equipment

Custodial Supplies $334.60

Auto/Heavy Equipment Maintenance/Repair $793.31Other Maintenance & Repair $0.00

Page 269: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 60 PW Landscaping Maintenance Dist

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2550 Stonebridge Landscape

450‐30‐00 $5,250.00 $4,000.00$5,250.00 $4,000.00

990‐90‐10 $66,152.00 $29,802.00$66,152.00 $29,802.00

$242,340.00  $210,449.00 Division Total: PW Landscaping Maintenance Dist $173,355.18 

Fixed AssetsVehicles $0.00

Total: Fixed Assets $0.00Transfers

Transfers Out $25,622.00Total: Transfers $25,622.00

Page 270: 2014 2015 Preliminary Budget

Public Works—Stonebridge Drainage & Lighting 

 Description of Division 

 

The purpose of the Stonebridge Drainage and Lighting District  is to operate, maintain, and  improve the storm drainage and street lighting within the Stonebridge Subdivision. 

Accomplishments 2013/2014  Operation and maintenance of storm drainage infrastructure and streetlights located within the Stonebridge subdivision.   Ongoing implementation of National Pollutant Discharge Elimination System (NPDES) Storm Water Management Plan.   Preventative maintenance of heavy equipment, vehicles, and pump stations.  Installed solar lights at Sangalang Park. 

 Work Plan 2014/2015 

Continue operation and maintenance of  storm drainage  infrastructure and  streetlights  located within  the Stonebridge subdivision.  

Continue ongoing implementation of NPDES Storm Water Management Plan.   Continue preventative maintenance of heavy equipment, vehicles, and pump stations. 

 Capital Requests  

None         Significant Operating Changes 

  An additional Maintenance Worker I position was added in December of 2013 and assigned to street maintenance duties. 

Page 271: 2014 2015 Preliminary Budget

 Public Works—Stonebridge Drainage & Lighting 

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

Position:  12/13  13/14  14/15 

Maintenance Services Supervisor  0.20  0.20  0.20 

Maintenance Worker I/II  0.40  0.42  0.42 

Public Works Superintendent  0.01  0.01  0.01 

Senior Maintenance Worker  0.19  0.19  0.19 

Special Districts Manager  0.02  0.00  0.00 

Utility Operator I/II/III  0.23  0.23  0.23 

Total Full Time Equivalents  1.05  1.05  1.05 

Page 272: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $57,629.00 $57,342.00410‐13‐00 $1,510.00 $2,244.00410‐14‐00 $0.00 $0.00410‐15‐00 $743.00 $868.00410‐20‐00 $6,615.00 $6,371.00410‐21‐00 $2,051.00 $1,250.00410‐40‐00 $16,382.00 $16,843.00410‐41‐00 $0.00 $360.00410‐42‐00 $141.00 $154.00410‐43‐00 $0.00 $63.00410‐44‐00 $10,305.00 $10,642.00410‐46‐00 $834.00 $0.00410‐46‐01 $0.00 $878.00410‐47‐00 $456.00 $456.00 410‐48‐00 $0.00 $0.00410‐49‐00 $163.00 $136.00 

$96,829.00 $97,607.00 

420‐01‐00 $12,755.00 $12,991.00420‐04‐00 $0.00 $2,977.00420‐16‐00 $2,133.00 $1,640.00420‐18‐00 $710.00 $710.00420‐32‐00 $5,187.00 $5,190.00420‐58‐00 $200.00 $200.00420‐60‐00 $100.00 $100.00420‐65‐00 $100.00 $130.00

Advertising $0.00Printing $94.08

Park Maintenance $2,682.96Computer Tech Support $0.00

Contracts ‐ Other $237.70Alarm Service $710.00

Contractual ServicesProfessional Services $5,277.94Personnel $0.00

SDI $159.16Total: Personnel Services $90,925.60

SUI $455.71Bilingual Pay $0.00

FICA $816.79Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $7,618.29

Dental Insurance $0.00Life Insurance $139.76

Retirement ‐ Employee $2,536.86Health Insurance $15,183.57

Standby $798.27Retirement ‐ Employer $6,081.17

Overtime $1,200.18Vacation/Sick Leave $6,307.73

Division 61 PW Drainage & Lighting BAD

Personnel ServicesRegular Salaries $49,628.11

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2560 Stonebridge Drain/Lighting

Page 273: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 61 PW Drainage & Lighting BAD

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2560 Stonebridge Drain/Lighting

420‐67‐00 $200.00 $200.00420‐69‐00 $300.00 $400.00420‐70‐00 $1,900.00 $1,900.00420‐72‐00 $1,100.00 $2,900.00420‐75‐00 $23,561.00 $24,778.00

$48,246.00 $54,116.00

430‐10‐00 $400.00 $200.00430‐17‐00 $300.00 $300.00430‐20‐00 $400.00 $300.00430‐24‐00 $300.00 $300.00430‐26‐00 $1,000.00 $1,500.00430‐30‐00 $400.00 $600.00430‐33‐00 $2,700.00 $3,000.00430‐35‐00 $200.00 $200.00430‐40‐00 $200.00 $150.00430‐45‐00 $200.00 $200.00430‐49‐00 $36,000.00 $31,000.00430‐50‐00 $2,100.00 $2,100.00

$44,200.00 $39,850.00

435‐10‐00 $300.00 $300.00435‐20‐00 $145.00 $200.00

$445.00 $500.00Training and Travel $33.41

Total: Dues, Meetings, Training and Travel $54.41

Total: Materials, Supplies and Small Equipment $29,998.55Dues, Meetings, Training and Travel

Subscriptions $21.00

Utilities ‐ Gas and Electric $25,492.44Water $1,904.75

Uniforms and Protective Clothing $39.05Reference Books $0.00

Gas/Diesel/Oil/Lubricants $1,124.25Shop Tools $0.00

Other Maintenance & Repair $613.32Chemicals $320.34

Materials and Supplies $0.00Auto/Heavy Equipment Parts $0.00

Materials, Supplies and Small EquipmentOffice Supplies $233.37Custodial Supplies $271.03

Other Maintenance & Repair $4,707.22Total: Contractual Services $15,159.64

Auto/Heavy Equipment Maintenance/Repair $1,122.70Communication Equipment Repair $45.10

Equipment Rental $0.00Office Equipment & Repair $281.94

Page 274: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 61 PW Drainage & Lighting BAD

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2560 Stonebridge Drain/Lighting

440‐10‐00 $2,400.00 $2,400.00440‐40‐00 $3,740.00 $3,720.00440‐90‐00 $58.00 $22.00

$6,198.00 $6,142.00 

450‐30‐00 $2,000.00 $0.00$2,000.00 $0.00

990‐90‐10 $221,270.00 $45,237.00$221,270.00 $45,237.00$419,188.00  $243,452.00 Division Total: PW Drainage & Lighting BAD $191,724.33 

Fixed AssetsVehicles $0.00

Total: Fixed Assets $0.00Transfers

Transfers Out $49,250.00Total: Transfers $49,250.00

Compensated Absences $411.43Total: Fixed Charges $6,336.13

Fixed ChargesFixed Charges $2,311.43Special Fees $3,613.27

Page 275: 2014 2015 Preliminary Budget

 Public Works—Mossdale Services CFD 2004‐1 

 

Description of Division  

The purpose of this division  is to operate and maintain the system  for storm drain  facilities, parks, street  landscaping, signal  lighting, street lighting, police, and animal services within the Mossdale area of the City.  

Accomplishments 2013/2014    Performed Park Preventative Maintenance and Repairs including: 

Restroom repairs.  Irrigation repairs.  Splash pad channel drain repairs.  New ADA compliant bathroom signs installed at Park West.  River Park South gate and irrigation repairs.  Picnic table installed at River Park South.  Crawl tube replaced at the Greens.  Light sensor repaired at the Community Park.  Basketball nets replaced.   

  Performed Preventative Maintenance of heavy equipment and vehicles:  Mossdale Booster Pump serviced.  CVS and M station wet wells cleaned.  Replaced soft start and engine heater at M1.  Transfer switch repaired at M2.   Replaced M6 level transducer.  Replaced M5 UPS.    Serviced generators.  Operation and maintenance of storm drain infrastructure. 

Performed inspections, preventative maintenance, and repairs of streetlights.  Provided animal control staffing at an effective level for the area.  Ongoing implementation of the National Pollutant Discharge Elimination System (NPDES) Storm Water Management Plan.  Provided landscape maintenance services of park and street landscape areas.  Operation and maintenance of park and street landscape area irrigation systems.  Ongoing weed abatement and monthly street sweeping.  Painted over graffiti that was previously removed along asphalt pathway and restroom building.  

 

Page 276: 2014 2015 Preliminary Budget

Public Works—Mossdale Services CFD 2004‐1  

  

Work Plan 2014/2015  Continue preventative maintenance of heavy equipment and vehicles.  Continued operation and maintenance of storm drain infrastructure.    Continue to perform inspections, maintenance and repairs of streetlights.  Continue to provide animal control staffing at an effective level for the area.  Continued implementation of the NPDES Storm Water Management Plan.  Continue to provide landscape maintenance services of park and street landscape areas.  Continued operation and maintenance of park and street landscape area irrigation systems.  Continue to maintain safe and clean parks.   Continue ongoing weed abatement.  Continue monthly street sweeping.  

 Capital Requests  

PW Vehicle Replacement   $   61,000  

Significant Operating Changes  

An additional Maintenance Worker I position was added in December of 2013 and assigned to street maintenance duties. 

Page 277: 2014 2015 Preliminary Budget

 Public Works—Mossdale Services CFD 2004‐1 

  

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

   

Position:  12/13  13/14  14/15 

Animal Services Officer  1.00  1.00  1.00 

Maintenance Services Supervisor  0.15  0.15  0.08 

Maintenance Worker I/II  0.20  0.22  0.14 

Public Works Superintendent  0.05  0.05  0.03 

Senior Maintenance Worker  0.22  0.22  0.21 

Special Districts Manager  0.09  0.00  0.00 

Utility Operator I/II/III  0.40  0.40  0.22 

Total Full Time Equivalents  2.11  2.04  1.68 

San Joaquin County Position:  12/13  13/14  14/15 

Deputy Sheriff for Patrol  5.00  5.00  5.00 

Total San Joaquin County Positions  5.00  5.00  5.00 

Page 278: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $117,564.00 $92,609.00410‐12‐00 $0.00 $0.00410‐13‐00 $2,970.00 $2,774.00410‐14‐00 $0.00 $0.00410‐15‐00 $11,444.00 $10,788.00410‐20‐00 $14,275.00 $11,847.00410‐21‐00 $4,174.00 $2,227.00410‐40‐00 $32,854.00 $29,576.00410‐41‐00 $0.00 $144.00410‐42‐00 $290.00 $245.00410‐43‐00 $0.00 $26.00410‐44‐00 $19,240.00 $16,639.00410‐46‐00 $1,859.00 $0.00410‐46‐01 $0.00 $1,541.00410‐47‐00 $916.00 $730.00 410‐49‐00 $236.00 $80.00 

$205,822.00 $169,226.00 

420‐01‐00 $19,464.00 $19,400.00420‐04‐00 $0.00 $13,397.00420‐16‐00 $18,518.00 $18,340.00420‐18‐00 $0.00 $924.00420‐27‐00 $110,996.00 $111,000.00420‐29‐00 $11,000.00 $11,656.00420‐32‐00 $114,488.00 $114,520.00420‐58‐00 $1,260.00 $1,260.00

Park Maintenance $98,902.48Computer Tech Support $0.00

Street Trees & Landscaping $100,550.85Street Sweeping Services $6,426.75

Contracts ‐ Other $7,207.93Alarm Service $0.00

Contractual ServicesProfessional Services $10,328.46Personnel $0.00

SDI $233.89Total: Personnel Services $191,549.00

Medicare $0.00SUI $915.78

Workers Compensation Insurance $15,819.32FICA $1,778.29

Life Insurance $283.72Vision Insurance $0.00

Health Insurance $28,687.78Dental Insurance $0.00

Retirement ‐ Employer $13,088.68Retirement ‐ Employee $5,173.10

Vacation/Sick Leave $9,622.69Standby $9,635.22

Part‐time Salaries $0.00Overtime $2,033.31

Division 63 PW CFD 2004‐1 Mossdale Services

Personnel ServicesRegular Salaries $104,277.22

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2570 Mossdale CFD

Page 279: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 63 PW CFD 2004‐1 Mossdale Services

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2570 Mossdale CFD

420‐60‐00 $100.00 $100.00420‐65‐00 $200.00 $265.00420‐67‐00 $200.00 $200.00420‐69‐00 $200.00 $265.00420‐70‐00 $9,129.00 $9,500.00420‐72‐00 $2,720.00 $3,250.00420‐75‐00 $13,397.00 $12,132.00

$301,672.00 $316,209.00

425‐12‐00 $14,574.00 $16,254.00425‐14‐00 $1,041,616.00 $1,182,164.00

$1,056,190.00 $1,198,418.00

430‐10‐00 $200.00 $200.00430‐17‐00 $1,100.00 $1,480.00430‐20‐00 $800.00 $800.00430‐24‐00 $1,250.00 $1,250.00430‐26‐00 $10,300.00 $10,900.00430‐30‐00 $400.00 $600.00430‐33‐00 $10,050.00 $10,650.00430‐35‐00 $300.00 $300.00430‐37‐00 $0.00 $0.00430‐40‐00 $2,500.00 $5,000.00430‐45‐00 $400.00 $350.00430‐49‐00 $49,277.00 $51,780.00430‐50‐00 $130,350.00 $149,400.00

$206,927.00 $232,710.00Total: Materials, Supplies and Small Equipment $204,813.36

Utilities ‐ Gas and Electric $39,034.42Water $146,623.50

Uniforms and Protective Clothing $1,164.23Reference Books $42.00

Shop Tools $196.02Miscellaneous Equipment $546.73

Chemicals $320.34Gas/Diesel/Oil/Lubricants $9,511.33

Auto/Heavy Equipment Parts $145.60Other Maintenance & Repair $4,649.74

Custodial Supplies $1,246.18Materials and Supplies $1,243.72

Total: Contractual Services (Intergovernmental) $1,054,615.88Materials, Supplies and Small Equipment

Office Supplies $89.55

Contractual Services (Intergovernmental)Animal Shelter $13,820.04Mossdale Landing ‐ Police $1,040,795.84

Other Maintenance & Repair $21,109.28Total: Contractual Services $252,342.37

Auto/Heavy Equipment Maintenance/Repair $7,188.79Communication Equipment Repair $225.04

Equipment Rental $0.00Office Equipment & Repair $187.86

Advertising $0.00Printing $214.93

Page 280: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 63 PW CFD 2004‐1 Mossdale Services

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2570 Mossdale CFD

435‐10‐00 $500.00 $500.00435‐20‐00 $1,750.00 $2,450.00

$2,250.00 $2,950.00

440‐10‐00 $6,200.00 $6,200.00440‐40‐00 $14,000.00 $16,000.00440‐90‐00 $272.00 $67.00

$20,472.00 $22,267.00 

450‐20‐00 $0.00 $0.00450‐30‐00 $65,500.00 $61,000.00

$65,500.00 $61,000.00

990‐90‐10 $383,187.00 $318,219.00$383,187.00 $318,219.00

$2,242,020.00  $2,320,999.00 

Total: Fixed Assets $5,313.00

Division Total: PW CFD 2004‐1 Mossdale Services $2,112,656.89 

Fixed AssetsMachines and Equipment $5,313.00Vehicles $0.00

TransfersTransfers Out $368,754.00

Total: Transfers $368,754.00

Compensated Absences $1,861.90Total: Fixed Charges $34,541.68

Fixed ChargesFixed Charges $6,189.00Special Fees $26,490.78

Training and Travel $639.60Total: Dues, Meetings, Training and Travel $727.60

Dues, Meetings, Training and TravelSubscriptions $88.00

Page 281: 2014 2015 Preliminary Budget

Public Works‐Mossdale Landscape & Lighting District  Description of Division 

 

The purpose of this division is to maintain street lights, landscaping, park sites, and street trees within the district.  

Accomplishments 2013/2014  Upgrade of SCADA firewall promoting security of City communication systems.  Relocated the old Corp Yard SCADA tower to Stonebridge WWPS to improve the SCADA radio telemetry system.  Irrigation repairs completed on McKee @ Homestead and Stagecoach.    Repaired equipment that was damaged due to vandalism at Armstrong Park.  Trees were trimmed to promote health or removed if they posed a public safety hazard.  Reviewed plans for construction and provided inspections.   Quarterly streetlight inspections, maintenance and repairs required to maintain public safety.  Street light knock down repairs on McKee Blvd., Golden Spike Trail, and Golden Valley Pkwy. due to vehicular accidents.  Replaced missing and damaged street light cast iron split bases.  Coordinated with Odyssey Landscape to provide street landscaping maintenance services.   Maintained safe and clean parks.   Continuous maintenance of the central landscape irrigation control with the Calsense Central Irrigation Control System.  Preventative maintenance for heavy equipment and vehicles.  

Work Plan 2014/2015  Maintain a safe, clean, and efficient operation of street lights and street trees.  Continue to provide quarterly streetlight inspections, maintenance, and repairs required to maintain public safety.  Continue to manage street landscape maintenance contract.   

Continue to manage street sweeping contract.   

Capital Requests  

Vehicle Replacement  $2,000  

Significant Operating Change  

  An additional Maintenance Worker I position was added in December 2013 and assigned to street maintenance duties.  

Page 282: 2014 2015 Preliminary Budget

 Public Works‐Mossdale Landscape & Lighting District 

 

 Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

   

Position:  12/13  13/14  14/15 

Maintenance Services Supervisor  0.05  0.05  0.05 

Maintenance Worker I/II  0.05  0.07  0.07 

Public Works Superintendent  0.05  0.05  0.05 

Senior Maintenance Worker  0.07  0.07  0.07 

Special Districts Manager  0.06  0.00  0.00 

Total Full Time Equivalents  0.28  0.24  0.24 

Page 283: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $20,996.00 $16,085.00410‐13‐00 $170.00 $417.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $0.00410‐20‐00 $2,440.00 $1,765.00410‐21‐00 $726.00 $323.00410‐40‐00 $4,613.00 $4,198.00410‐41‐00 $0.00 $0.00410‐42‐00 $51.00 $43.00410‐43‐00 $0.00 $0.00410‐44‐00 $2,085.00 $2,131.00410‐46‐00 $301.00 $0.00410‐46‐01 $0.00 $241.00410‐47‐00 $122.00 $106.00 410‐48‐00 $0.00 $0.00410‐49‐00 $140.00 $83.00 

$31,644.00 $25,392.00 

420‐01‐00 $5,591.00 $5,591.00420‐04‐00 $0.00 $8,931.00420‐16‐00 $4,344.00 $4,144.00420‐27‐00 $38,800.00 $30,000.00420‐60‐00 $200.00 $100.00420‐65‐00 $200.00 $265.00420‐67‐00 $200.00 $200.00420‐69‐00 $300.00 $400.00

Equipment Rental $0.00Office Equipment & Repair $281.94

Advertising $0.00Printing $225.57

Contracts ‐ Other $3,137.59Street Trees & Landscaping $17,800.61

Contractual ServicesProfessional Services $5,251.21Personnel $0.00

SDI $139.70Total: Personnel Services $28,733.70

SUI $121.50Bilingual Pay $0.00

FICA $299.03Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $1,534.30

Dental Insurance $0.00Life Insurance $49.23

Retirement ‐ Employee $870.08Health Insurance $4,174.24

Standby $0.00Retirement ‐ Employer $2,150.67

Overtime $226.71Vacation/Sick Leave $1,449.27

Division 64 PW Mossdale LLMD

Personnel ServicesRegular Salaries $17,718.97

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2580 Mossdale Landscape & Lighting

Page 284: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 64 PW Mossdale LLMD

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2580 Mossdale Landscape & Lighting

420‐70‐00 $900.00 $920.00420‐72‐00 $100.00 $100.00420‐75‐00 $126,175.00 $78,597.00

$176,810.00 $129,248.00

430‐10‐00 $300.00 $200.00430‐17‐00 $100.00 $100.00430‐20‐00 $100.00 $100.00430‐24‐00 $100.00 $100.00430‐26‐00 $500.00 $500.00430‐30‐00 $150.00 $250.00430‐33‐00 $1,200.00 $1,250.00430‐35‐00 $100.00 $200.00430‐40‐00 $200.00 $200.00430‐45‐00 $50.00 $50.00430‐49‐00 $64,000.00 $78,800.00430‐50‐00 $87,805.00 $101,525.00

$154,605.00 $183,275.00

435‐10‐00 $100.00 $100.00435‐20‐00 $135.00 $100.00

$235.00 $200.00

440‐10‐00 $4,500.00 $4,500.00440‐40‐00 $500.00 $500.00440‐90‐00 $218.00 $112.00

$5,218.00 $5,112.00 Compensated Absences $1,276.34

Total: Fixed Charges $5,604.96

Fixed ChargesFixed Charges $4,328.62Special Fees $0.00

Training and Travel $8.00Total: Dues, Meetings, Training and Travel $45.75

Total: Materials, Supplies and Small Equipment $172,818.12Dues, Meetings, Training and Travel

Subscriptions $37.75

Utilities ‐ Gas and Electric $72,486.45Water $98,662.73

Uniforms and Protective Clothing $41.91Reference Books $0.00

Gas/Diesel/Oil/Lubricants $850.73Shop Tools $0.00

Other Maintenance & Repair $404.54Chemicals $120.12

Materials and Supplies $85.80Auto/Heavy Equipment Parts $0.00

Materials, Supplies and Small EquipmentOffice Supplies $165.84Custodial Supplies $0.00

Other Maintenance & Repair $16,409.34Total: Contractual Services $43,559.27

Auto/Heavy Equipment Maintenance/Repair $387.61Communication Equipment Repair $65.40

Page 285: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 64 PW Mossdale LLMD

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2580 Mossdale Landscape & Lighting

450‐30‐00 $3,000.00 $2,000.00$3,000.00 $2,000.00

990‐90‐10 $80,786.00 $56,721.00$80,786.00 $56,721.00

$452,298.00  $401,948.00 Division Total: PW Mossdale LLMD $333,419.80 

Fixed AssetsVehicles $0.00

Total: Fixed Assets $0.00Transfers

Transfers Out $82,658.00Total: Transfers $82,658.00

Page 286: 2014 2015 Preliminary Budget

Public Works—Historical CFD 2005‐1 

Description of Division 

 

The  purpose  of  this  division  is  to  operate, maintain  and  improve  the  system  for  the  storm  drain  facilities,  parks,  and  street landscaping  within  the  Historical  Community  Facilities  District.    This  District  includes  the  Richmond  American  Homes Developments on  “O” Street and Thompson Street and  the Florsheim Homes on Warren Avenue.   This division  is designed  to annex all new residential and commercial in‐fill developments east of Interstate 5 and function as the primary funding source for the services and systems mentioned above.  

Accomplishments 2013/2014  Maintained the street landscaping, storm drain facilities, and parks in the district to an acceptable standard.  Maintained the central landscape  irrigation control with the Calsense Central Irrigation Control System at Armstrong 

Park.  Coordinated with Odyssey  to  provide  landscape  services  along  “O”  Street,  Thomsen  Street, Warren  Avenue,  and 

Armstrong Park.    

Work Plan 2014/2015  

Maintain a safe, clean and efficient operation of the storm drain facilities, parks, and street landscaping.  Annex commercial properties located along Harlan Road as CFD 2005‐1, Tax Zone 3. 

 

Capital Requests  

None  

Significant Operating Changes  

None  

Page 287: 2014 2015 Preliminary Budget

 Public Works—Historical CFD 2005‐1 

 

 Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

   

Position:  12/13  13/14  14/15 

Maintenance Services Supervisor  0.01  0.01  0.01 

Special Districts Manager  0.01  0.00  0.00 

Total Full Time Equivalents  0.02  0.01  0.01 

Page 288: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $1,516.00 $622.00410‐13‐00 $10.00 $10.00410‐14‐00 $0.00 $0.00410‐20‐00 $163.00 $52.00410‐21‐00 $54.00 $16.00410‐40‐00 $321.00 $170.00410‐41‐00 $0.00 $0.00410‐42‐00 $4.00 $2.00410‐43‐00 $0.00 $0.00410‐44‐00 $135.00 $104.00410‐46‐00 $24.00 $0.00410‐46‐01 $0.00 $10.00410‐47‐00 $9.00 $5.00 410‐49‐00 $16.00 $7.00 

$2,252.00 $998.00

420‐01‐00 $3,717.00 $3,717.00420‐04‐00 $0.00 $1,489.00420‐27‐00 $1,940.00 $1,940.00420‐32‐00 $3,355.00 $3,360.00420‐75‐00 $4,586.00 $300.00

$13,598.00 $10,806.00

425‐30‐00 $1,500.00 $1,500.00$1,500.00 $1,500.00Total: Contractual Services (Intergovernmental) $0.00

Total: Contractual Services $7,450.45Contractual Services (Intergovernmental)

Fire Department $0.00

Park Maintenance $2,896.59Other Maintenance & Repair $0.00

Personnel $0.00Street Trees & Landscaping $1,440.00

Total: Personnel Services $1,911.69Contractual Services

Professional Services $3,113.86

SUI $8.69SDI $16.15

FICA $23.88Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $32.21

Dental Insurance $0.00Life Insurance $3.47

Retirement ‐ Employee $61.37Health Insurance $273.63

Retirement ‐ Employer $135.38Vacation/Sick Leave $80.14

Division 65 PW CFD 2005‐1 Historic Lathrop

Personnel ServicesRegular Salaries $1,269.46

ExpensesDepartment 50 Public Works

Overtime $7.31

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2630 Historic Lathrop CFD

Page 289: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 65 PW CFD 2005‐1 Historic Lathrop

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 2630 Historic Lathrop CFD

430‐20‐00 $200.00 $200.00430‐26‐00 $400.00 $400.00430‐49‐00 $300.00 $300.00430‐50‐00 $7,600.00 $8,200.00

$8,500.00 $9,100.00

435‐20‐00 $50.00 $50.00$50.00 $50.00

440‐10‐00 $300.00 $300.00440‐40‐00 $4,055.00 $4,055.00440‐90‐00 $18.00 $0.00

$4,373.00 $4,355.00

990‐90‐10 $6,759.00 $4,613.00$6,759.00 $4,613.00

$37,032.00  $31,422.00 Division Total: PW CFD 2005‐1 Historic Lathrop $22,022.25 

Compensated Absences $195.19Total: Fixed Charges $778.27Transfers

Transfers Out $4,531.00Total: Transfers $4,531.00

Fixed ChargesFixed Charges $54.00Special Fees $529.08

Dues, Meetings, Training and TravelTraining and Travel $0.00

Total: Dues, Meetings, Training and Travel $0.00

Water $7,109.66Total: Materials, Supplies and Small Equipment $7,350.84

Other Maintenance & Repair $0.00Utilities ‐ Gas and Electric $241.18

Materials, Supplies and Small EquipmentMaterials and Supplies $0.00

Page 290: 2014 2015 Preliminary Budget

Public Works—Mossdale Village CFD 2003‐1 

 Description of Division  

    This fund  is set up to account for the repayment of CFD 2003‐1’s share of the debt service for revenue bonds  issued on July 16, 2003.  The Bond proceeds will be used to fund the City’s share of a water project allotment within the South County Surface Water Supply Project, under an agreement with the South San Joaquin Irrigation District (SSJID). Bond proceeds will also be used for the development and improvement of a water well, water facilities, and appurtenances to provide potable water for the City’s Water System. Most of the properties included in CFD 2003‐1 (Mossdale Village) have been subdivided into single family dwelling unit par‐cels and are all subject to the Special Taxes. 

 Accomplishments 2013/2014  Refinanced Mossdale Village CFD 03‐01 and the Mossdale Village Assessment district 03‐01, Series 2003 for an overall net present value savings of an estimated $1 million or an annual average savings of $49 per residential unit.    

 Work Plan 2014/2015  

None    Capital Requests  

None         

Significant Operating Changes  None   

Page 291: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

420‐01‐00 $31,153.00 $29,453.00$31,153.00 $29,453.00

440‐10‐00 $5,500.00 $5,900.00$5,500.00 $5,900.00

990‐90‐10 $2,100,869.00 $2,206,211.00$2,100,869.00 $2,206,211.00$2,137,522.00  $2,241,564.00 Division Total: PW Water $701,624.50 

TransfersTransfers Out $674,661.16

Total: Transfers $674,661.16

Fixed ChargesFixed Charges $5,424.00

Total: Fixed Charges $5,424.00

Contractual ServicesProfessional Services $21,539.34

Total: Contractual Services $21,539.34

ExpensesDepartment 50 Public WorksDivision 50 PW Water

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 5410 Mossdale Village CFD 2003‐1

Page 292: 2014 2015 Preliminary Budget

 Public Works—Water 

   Description of Division 

 

  The purpose of the Water Division is to provide safe, reliable drinking water to the City’s water utility customers.  The Water Division operates, maintains, and improves the water supply and distribution system.  The City’s water system includes six active wells,  two water  treatment  facilities,  four water storage and associated booster pump stations, approximately 100 miles  of  distribution  piping,  5100 water meters,  and  365  backflow  prevention  devices.  The  system  is  operated  under  a Water Supply Permit administered by the California Department of Public Health. 

Accomplishments 2013/2014  

Operation  and  Maintenance  of  the  City’s  potable  water  system  including  the  Louise  Avenue  and  Well  21  Water Treatment Facilities, City Wells (six), Booster Pump Stations (four), and Water Distribution System. 

Well 21 workplan developed for the removal of Arsenic and Uranium.  Contracts administered for water tank maintenance, water quality testing, and other services related to operations and 

maintenance of the potable water system.  Water Meter Improvements project completed to replace obsolete residential water meters in older neighborhoods.  Waterline and fire hydrant repairs .  Performed preventative maintenance on heavy equipment, vehicles, Booster Stations, and City Wells.  Compliance with the City’s Water Supply Permit and state and federal drinking water regulations including water quality 

monitoring and reporting, cross connection control testing, CDPH annual inspection and response, and preparation and distribution of the annual consumer confidence report. 

Provided safe, reliable drinking water to utility customers.  Provided high quality customer service, including response to customer inquiries about drinking water quality, and the 

water system.  Coordinated operations and surface water deliveries with the SSJID.  Ongoing program implementation of the Urban Water Management Plan .  Water Master Plan Update and UMWP 2010 Update final reports completed.  Reviewed system wide operations and implemented measures to improve efficiency of operations, reducing energy and 

operations costs.  Executed a three‐party water sale agreement amongst Lathrop, Tracy, and SSJID to sell  a portion of Lathrop’s allocated 

SSJID water supply (2 MGD) to the City of Tracy. 

Page 293: 2014 2015 Preliminary Budget

Public Works—Water  

       Work Plan 2014/2015  

Continue working with consultants and regulatory agency to resolve Well 21 arsenic and uranium water quality issues.  Work towards training of operators to the T3 level with the goal of ultimately taking over responsibility to operate the 

LAWTF.  Continue  review  of  system wide  operations  and  implement measures  to  improve  efficiency  of  operations,  reducing 

energy and operations costs.  Continue to provide safe, reliable drinking water to utility customers.  Continue operation and maintenance of the City’s drinking water supply and distribution system.  Continue  tasks  relating  to  compliance  with  the  City’s Water  Supply  Permit,  and  state  and  federal  drinking  water 

regulations.  Continue  to  provide  high  quality  customer  service,  including  response  to  customer  inquiries  about  drinking  water 

quality, and the water system.  Continue  contract  administration  for water  tank maintenance, water  quality  testing,  and  other  services  related  to 

operations and maintenance of the potable water system.  Continue coordination of operations and surface water deliveries to the City with the SSJID.  Continue to work with water utility customers for calibration and/or replacement of water meters.  Complete adoption of City's Urban Water Management Plan and begin program implementation.  Complete CEQA and adoption of City’s Water Master Plan.  Initiate CIP to provide emergency power at Well 10 and electrical service improvements to save energy costs.  

Capital Requests  

Vehicle Replacement ‐  Meter Reader        $   40,000 Radio Towers for water metering and network Equip  $    20,000  

Significant Operating Changes     An additional Accounting Specialist II position was added in December 2013 to assist with increased customer activity . 

Page 294: 2014 2015 Preliminary Budget

 Public Works—Water 

Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 

  Position:  12/13  13/14  14/15 

Accounting Specialist I/II/Technician  1.80  1.80  1.80 

Maintenance Worker I/II  0.15  0.15  0.15 

Meter Reader I/II  1.00  1.00  1.00 

Public Works Superintendent  0.15  0.15  0.15 

Special Districts Manager  0.08  0.00  0.00 

Utility Operator I/II/III  1.27  1.27  1.27 

Total Full Time Equivalents  4.45  4.97  4.97 

Sr. Accounting Technician  0.00  0.60  0.60 

Page 295: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $245,042.00 $276,669.00410‐13‐00 $5,570.00 $6,210.00410‐14‐00 $0.00 $0.00410‐15‐00 $4,001.00 $4,423.00410‐20‐00 $30,215.00 $34,388.00410‐21‐00 $8,696.00 $6,218.00410‐40‐00 $61,605.00 $71,084.00410‐41‐00 $0.00 $2,613.00410‐42‐00 $600.00 $717.00410‐43‐00 $0.00 $498.00410‐44‐00 $26,643.00 $27,780.00410‐46‐00 $3,286.00 $0.00410‐46‐01 $0.00 $4,170.00410‐47‐00 $1,931.00 $2,155.00 410‐49‐00 $222.00 $153.00 

$387,811.00 $437,078.00 

420‐01‐00 $198,581.00 $89,000.00420‐04‐00 $241,327.00 $223,408.00420‐16‐00 $150,944.00 $143,127.00420‐18‐00 $43,810.00 $46,200.00420‐27‐00 $1,700.00 $1,730.00420‐58‐00 $13,820.00 $13,910.00420‐60‐00 $1,000.00 $1,000.00420‐65‐00 $600.00 $600.00420‐67‐00 $850.00 $850.00Equipment Rental $482.87

Printing $35.34

Street Trees & Landscaping $1,479.96Computer Tech Support $3,614.50

Contracts ‐ Other $122,844.82Alarm Service $43,714.00

Professional Services $33,556.24Personnel $241,473.00

SDI $223.85Total: Personnel Services $361,994.33

Advertising $0.00

SUI $1,931.22

FICA $3,170.02Medicare $0.00

Workers Compensation Insurance $21,493.21

Contractual Services

Life Insurance $586.46Vision Insurance $0.00

Health Insurance $58,375.07Dental Insurance $0.00

Retirement ‐ Employer $27,375.69Retirement ‐ Employee $10,631.60

Vacation/Sick Leave $22,376.44Standby $4,127.79

Overtime $2,312.61

Division 50 PW Water

Personnel ServicesRegular Salaries $209,390.37

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 5620 Water

Page 296: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 50 PW Water

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 5620 Water

420‐69‐00 $2,000.00 $2,500.00420‐70‐00 $10,000.00 $10,000.00420‐72‐00 $25,700.00 $31,300.00420‐75‐00 $42,382.00 $41,700.00

$732,714.00 $605,325.00

430‐10‐00 $2,100.00 $2,100.00430‐17‐00 $300.00 $300.00430‐20‐00 $1,750.00 $1,750.00430‐24‐00 $800.00 $1,500.00430‐26‐00 $47,865.00 $46,500.00430‐30‐00 $58,000.00 $60,000.00430‐33‐00 $15,700.00 $16,500.00430‐35‐00 $1,500.00 $1,500.00430‐37‐00 $2,000.00 $37,640.00430‐40‐00 $2,100.00 $2,500.00430‐45‐00 $200.00 $200.00430‐49‐00 $342,500.00 $378,000.00

$474,815.00 $548,490.00

435‐10‐00 $1,000.00 $1,800.00435‐20‐00 $6,300.00 $8,440.00

$7,300.00 $10,240.00

440‐12‐00 $1,600,000.00 $1,465,010.00440‐40‐00 $44,490.00 $57,685.00

Fixed ChargesSCSWSP O&M Costs $1,483,649.84Special Fees $44,797.55

Training and Travel $1,111.90Total: Dues, Meetings, Training and Travel $2,117.33

Total: Materials, Supplies and Small Equipment $449,387.23Dues, Meetings, Training and Travel

Subscriptions $1,005.43

Reference Books $52.05Utilities ‐ Gas and Electric $353,306.03

Miscellaneous Equipment $1,632.19Uniforms and Protective Clothing $966.81

Gas/Diesel/Oil/Lubricants $15,116.77Shop Tools $1,074.38

Other Maintenance & Repair $20,804.18Chemicals $52,866.70

Materials and Supplies $1,313.78Auto/Heavy Equipment Parts $795.68

Materials, Supplies and Small EquipmentOffice Supplies $1,440.66Custodial Supplies $18.00

Other Maintenance & Repair $37,886.25Total: Contractual Services $499,759.13

Auto/Heavy Equipment Maintenance/Repair $10,961.52Communication Equipment Repair $1,924.63

Office Equipment & Repair $1,786.00

Page 297: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Division 50 PW Water

ExpensesDepartment 50 Public Works

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 5620 Water

440‐80‐00 $17,000.00 $17,000.00440‐90‐00 $474.00 $809.00 

$1,661,964.00 $1,540,504.00 

450‐30‐00 $14,000.00 $40,000.00450‐38‐00 $0.00 $20,000.00

$14,000.00 $60,000.00

470‐01‐00 $0.00 $0.00470‐03‐00 $0.00 $0.00

$0.00 $0.00

480‐01‐00 $1,347,349.00 $1,336,268.00480‐02‐00 $1,900,328.00 $1,642,438.00

$3,247,677.00 $2,978,706.00

990‐90‐10 $1,990,933.00 $2,007,764.00$1,990,933.00 $2,007,764.00$8,517,214.00  $8,188,107.00 Division Total: PW Water $8,145,673.12 

Interest $2,168,134.19Total: Debt Service $2,168,134.19)

Total: Depreciation and Amortization $1,108,368.50Debt Service

Principal $0.00

TransfersTransfers Out $2,011,735.14

Total: Transfers $2,011,735.14

Depreciation and AmortizationDepreciation $1,050,158.30Capital Replacement $58,210.20

Improvements ‐ Nonstructure $0.00Total: Fixed Assets $0.00

Total: Fixed Charges $1,544,177.27Fixed Assets

Vehicles $0.00

Bad Debt $13,852.75Compensated Absences $1,877.13

Page 298: 2014 2015 Preliminary Budget

Public Works—MWQCF Wastewater Collection System 

  

 

Description of Division 

 

  The  purpose  of  this  division  is  to  operate, maintain,  and  improve  the  collection  system  for  the  transmission  of  the  City’s wastewater  to  the  Manteca  Water  Quality  Control  Facility  (MWQCF)  for  treatment  and  disposal.    The  MWQCF  provides wastewater  treatment  for  the majority of areas east of  I‐5  in Lathrop, excluding  the Crossroads Commerce Center area.     The MWQCF wastewater collection system consists of gravity sewers, sewer force mains, manholes, and four sewer pump stations. 

  Accomplishments 2013/2014  

Continued implementation of the City’s Sewer System Management Plan as related to the MWQCF wastewater collection system. 

Continuation of Wastewater Pump Station Improvements CIP WW 13‐08.  Performed TV assessment of MWQCF sewer collection system.   Performed Preventative Maintenance of heavy equipment, vehicles, and Pump Stations:  Operation and maintenance services completed on MWQCF collection system.   Provided safe, reliable sewer service to utility customers.  Coordination with the City of Manteca regarding MWQCF operations and regulatory permit compliance.  Customer service, including response to customer inquires and sewer blockages and/or overflows.   Managed allocation, reallocation and/or transfer of Interceptor System Units (ISUs). 

Page 299: 2014 2015 Preliminary Budget

Public Works—MWQCF Wastewater Collection System   

  

Work Plan 2014/2015 

  Continue to provide safe, reliable sewer service to utility customers.  Continued operation and maintenance of the MWQCF wastewater collection system.  Continue coordination with the City of Manteca regarding MWQCF operations and regulatory permit compliance.  Continue to provide customer service, including response to customer inquires and sewer blockages and/or overflows.   Continue ongoing implementation of Sanitary Sewer Management Plan.  Continue ongoing management of allocation, reallocation and/or transfer of Interceptor System Units (ISUs).  Continue ongoing project management of CIP for Wastewater Pump Station Improvements (WW 13‐08)  

Capital Request  

None  

Significant Operating Changes     An additional Maintenance Worker I position was added in December 2013 and assigned to street maintenance duties.   An additional Accounting Specialist II position was added  in December 2013 to assist with increased customer activity . 

Page 300: 2014 2015 Preliminary Budget

Public Works—MWQCF Wastewater Collection System 

  Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

   

Position:  12/13  13/14  14/15 

Accounting Specialist I/II/Technician  0.60  0.60  0.60 

Maintenance Worker I/II  0.30  0.32  0.32 

Public Works Superintendent  0.16  0.16  0.16 

Senior Maintenance Worker  0.02  0.02  0.02 

Utility Operator I/II/III  0.83  0.83  0.83 

Total Full Time Equivalents  1.91  2.13  2.13 

Sr. Accounting Technician  0.00  0.20  0.20 

Page 301: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $108,462.00 $122,757.00410‐12‐00 $0.00 $0.00410‐13‐00 $2,820.00 $3,944.00410‐14‐00 $0.00 $0.00410‐15‐00 $2,393.00 $3,225.00410‐20‐00 $13,156.00 $14,707.00410‐21‐00 $3,851.00 $2,666.00410‐40‐00 $28,494.00 $32,920.00410‐41‐00 $0.00 $890.00410‐42‐00 $267.00 $319.00410‐43‐00 $0.00 $157.00410‐44‐00 $12,606.00 $13,387.00410‐45‐00 $0.00 $0.00410‐46‐00 $1,467.00 $0.00410‐46‐01 $0.00 $1,888.00410‐47‐00 $829.00 $926.00 410‐49‐00 $155.00 $163.00 

$174,500.00 $197,949.00 

420‐01‐00 $99,779.00 $48,900.00420‐16‐00 $6,233.00 $5,200.00420‐18‐00 $800.00 $800.00420‐27‐00 $1,100.00 $1,180.00420‐58‐00 $1,450.00 $1,800.00420‐65‐00 $900.00 $900.00420‐67‐00 $700.00 $700.00Equipment Rental $53.07

Computer Tech Support $0.00Printing $135.15

Alarm Service $800.00Street Trees & Landscaping $930.00

Contractual ServicesProfessional Services $34,687.06Contracts ‐ Other $653.00

SDI $155.45Total: Personnel Services $165,255.15

SUI $828.95

FICA $1,442.01Medicare $0.00

Auto Allowance $0.00

Life Insurance $262.32Vision Insurance $0.00

Health Insurance $26,405.78Dental Insurance $0.00

$10,057.66Standby $2,874.81

Part‐time Salaries $0.00Overtime $2,086.32

Workers Compensation Insurance $10,274.72

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6010 MWQCF Collection System

Division 30 PW Wastewater

Personnel ServicesRegular Salaries $94,081.13

ExpensesDepartment 50 Public Works

Retirement ‐ Employer $12,035.92Retirement ‐ Employee $4,750.08

Vacation/Sick Leave

Page 302: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6010 MWQCF Collection System

Division 30 PW Wastewater

ExpensesDepartment 50 Public Works

420‐69‐00 $500.00 $660.00420‐70‐00 $5,000.00 $5,500.00420‐72‐00 $16,340.00 $17,650.00420‐75‐00 $43,783.00 $40,800.00

$176,585.00 $124,090.00

425‐13‐00 $2,227,608.00 $1,338,195.00$2,227,608.00 $1,338,195.00

430‐10‐00 $1,000.00 $1,000.00430‐17‐00 $350.00 $500.00430‐20‐00 $1,000.00 $1,000.00430‐24‐00 $600.00 $800.00430‐26‐00 $8,700.00 $8,700.00430‐28‐00 $1,400.00 $1,400.00430‐30‐00 $1,100.00 $1,500.00430‐33‐00 $8,000.00 $7,500.00430‐35‐00 $1,000.00 $1,500.00430‐40‐00 $1,300.00 $1,250.00430‐45‐00 $200.00 $200.00430‐49‐00 $39,600.00 $39,600.00430‐50‐00 $3,000.00 $4,500.00

$67,250.00 $69,450.00

435‐10‐00 $600.00 $600.00435‐20‐00 $950.00 $2,382.00

$1,550.00 $2,982.00Total: Dues, Meetings, Training and Travel $372.47

Dues, Meetings, Training and TravelSubscriptions $240.43Training and Travel $132.04

Water $2,392.71Total: Materials, Supplies and Small Equipment $38,158.08

Reference Books $52.05Utilities ‐ Gas and Electric $24,188.15

Shop Tools $746.34Uniforms and Protective Clothing $819.95

Chemicals $880.95Gas/Diesel/Oil/Lubricants $5,239.00

Other Maintenance & Repair $2,462.92Patching Materials $0.00

Materials and Supplies $201.43Auto/Heavy Equipment Parts $466.82

Materials, Supplies and Small EquipmentOffice Supplies $707.76Custodial Supplies $0.00

Contractual Services (Intergovernmental)Sewer Service $823,781.53

Total: Contractual Services (Intergovernmental) $823,781.53

Other Maintenance & Repair $24,856.78Total: Contractual Services $65,311.17

Auto/Heavy Equipment Maintenance/Repair $2,568.18Communication Equipment Repair $157.85

Office Equipment & Repair $470.08

Page 303: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6010 MWQCF Collection System

Division 30 PW Wastewater

ExpensesDepartment 50 Public Works

440‐40‐00 $4,550.00 $5,000.00440‐80‐00 $15,000.00 $15,000.00440‐90‐00 $352.00 $709.00 

$19,902.00 $20,709.00 

450‐20‐00 $0.00 $0.00450‐30‐00 $5,500.00 $0.00

$5,500.00 $0.00

470‐01‐00 $0.00 $0.00$0.00 $0.00

990‐90‐10 $1,026,046.00 $994,542.00$1,026,046.00 $994,542.00$3,698,941.00  $2,747,917.00 Division Total: PW Wastewater $2,681,512.59 

Depreciation and AmortizationDepreciation $540,269.68

Total: Depreciation and Amortization $540,269.68

Total: Transfers $1,031,736.00

Vehicles $0.00Total: Fixed Assets $0.15

Total: Fixed Charges $16,628.36Fixed Assets

Machines and Equipment $0.15

Bad Debt $13,803.35Compensated Absences $336.64

Fixed ChargesSpecial Fees $2,488.37

TransfersTransfers Out $1,031,736.00

Page 304: 2014 2015 Preliminary Budget

Public Works‐Crossroads Wastewater‐Treatment 

 

  Description of Division  

  The purpose of this division is to provide services for operation and maintenance of the wastewater treatment plant serving the Crossroads Commerce Center  area.   The Crossroads wastewater  treatment  facility  is operated under  a  contract with Veolia Water North America  (VWNA).    The plant operations  are  regulated under  a Waste Discharge Requirements order administered by the State Regional Water Quality Control Board. 

Accomplishments 2013/2014  

Provided  services  and  administered  contracts  for  regulatory  permit  compliance,  operations  and maintenance, water quality testing, and groundwater monitoring associated with the Crossroads wastewater treatment plant. 

Project  management  and  contract  administration  services  for  the  Crossroads  Wastewater  Treatment  Plant Improvements CIP WW  11‐06  to provide  additional  sewer  treatment  capacity needed  for  additional development  to occur in the CCC.  

Administered Veolia Water  Industrial Pretreatment Program Contract and management of  the  Industrial Pretreatment Program (IPP).  

Administered  Erler  &  Kalinowski,  Inc.  (EKI)  Contract  services  for  SWISS/Hormel wastewater  permit  requirements  to discharge to the wastewater treatment plant.  

 Work Plan 2014/2015  

Continue to provide project management and contract administration services for the Crossroads Wastewater Treatment Plant Improvements CIP WW 11‐06 to provide additional sewer treatment capacity needed for additional development to occur in the Crossroads Commerce Center.  

Continue to provide services and manage contracts for operations, maintenance, and regulatory permit compliance for the wastewater treatment plant serving the Crossroads Commerce Center. 

Continue  to assist  local and new businesses within Crossroads obtain  sewer capacity needed  for development and/or expansion. 

Page 305: 2014 2015 Preliminary Budget

 Public Works‐Crossroads Recycling Plant #1‐Treatment 

 

 Capital Requests  None 

 Significant Operating Changes 

   None 

 

Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

  Position:  12/13  13/14  14/15 

Public Works Superintendent  0.05  0.05  0.05 

Total Full Time Equivalents  0.05  0.05  0.05 

Page 306: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $5,651.00 $5,748.00410‐14‐00 $0.00 $0.00410‐15‐00 $0.00 $0.00410‐20‐00 $709.00 $771.00410‐21‐00 $199.00 $142.00410‐40‐00 $870.00 $917.00410‐42‐00 $14.00 $15.00410‐43‐00 $0.00 $0.00410‐44‐00 $175.00 $193.00410‐46‐00 $79.00 $0.00410‐46‐01 $0.00 $85.00410‐47‐00 $22.00 $22.00 410‐49‐00 $48.00 $51.00 

$7,767.00 $7,944.00 

420‐01‐00 $608,159.00 $570,110.00420‐18‐00 $0.00 $3,012.00

$608,159.00 $573,122.00

430‐26‐00 $100.00 $100.00430‐33‐00 $0.00 $0.00430‐40‐00 $50.00 $50.00430‐49‐00 $59,000.00 $69,000.00

$59,150.00 $69,150.00Utilities ‐ Gas and Electric $54,203.73

Total: Materials, Supplies and Small Equipment $54,224.98

Gas/Diesel/Oil/Lubricants $8.23Uniforms and Protective Clothing $13.02

Total: Contractual Services $514,086.35Materials, Supplies and Small Equipment

Other Maintenance & Repair $0.00

Contractual ServicesProfessional Services $514,086.35Alarm Service $0.00

SDI $48.54Total: Personnel Services $7,051.52 

Medicare $0.00SUI $21.70

Workers Compensation Insurance $201.87FICA $77.98

Life Insurance $13.73Vision Insurance $0.00

Standby $0.00

Health Insurance $552.68

Retirement ‐ Employer $655.28Retirement ‐ Employee $249.05

Personnel ServicesRegular Salaries $5,230.69Vacation/Sick Leave $0.00

ExpensesDepartment 50 Public WorksDivision 31 PW Wastewater Treatment Plant

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6050 Water Recycling Plant #1

Page 307: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 50 Public WorksDivision 31 PW Wastewater Treatment Plant

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6050 Water Recycling Plant #1

435‐20‐00 $50.00 $50.00$50.00 $50.00

440‐40‐00 $17,275.00 $17,275.00440‐90‐00 $110.00 $222.00 

$17,385.00 $17,497.00 

470‐01‐00 $0.00 $0.00$0.00 $0.00

990‐90‐10 $319,047.00  $313,440.00 $319,047.00  $313,440.00 

$1,011,558.00  $981,203.00 

Total: Depreciation and Amortization $117.92

Division Total: PW Wastewater Treatment Plant $868,314.32 

Total: Fixed Charges $11,640.55Depreciation and Amortization

Depreciation $117.92

TransfersTransfers Out $281,193.00 

Total: Transfers $281,193.00 

Fixed ChargesSpecial Fees $11,535.35Compensated Absences $105.20

Dues, Meetings, Training and TravelTraining and Travel $0.00

Total: Dues, Meetings, Training and Travel $0.00

Page 308: 2014 2015 Preliminary Budget

Public Works‐Crossroads Wastewater‐Collection 

 Description of Division  

This division provides  services  for operation  and maintenance,  and  regulatory permit  compliance  for  the wastewater  collection system, recycled water storage ponds, and recycled water land application areas serving the Crossroads Commerce Center.  

Accomplishments 2013/2014  

Provided services and management of contracts  for operation and maintenance and  regulatory permit compliance  for the wastewater collection system, recycled water storage ponds, and recycled water  land application areas serving the Crossroads Commerce Center. 

Preventative Maintenance for heavy equipment, vehicles, and Pump Stations.  Administered contract with Erler & Kalinowski, Inc. (EKI) for SWISS/Hormel Wastewater permit compliance discharge.  Administered Veolia Water Industrial Pretreatment Program (IPP) Contract and management of the IPP.  Administered contract and coordinated with J&J Farming Services to dispose of recycled water at Land Application Sites 

(LAS) 2 and 3.   

Work Plan 2014/2015  

Continue  to  provide  services  for  operation  and maintenance  and  regulatory  permit  compliance  for  the  wastewater collection  system,  recycled  water  storage  ponds,  and  recycled  water  land  application  areas  serving  the  Crossroads Commerce Center. 

Continue preventative Maintenance for Heavy Equipment, vehicles, and Pump Stations.   Continue to administer contract with EKI for SWISS/Hormel Wastewater permit compliance discharge.  Continue to administer Veolia Water Industrial Pretreatment Program (IPP) Contract and management of the IPP.  Continue to administer contract and coordinate with J&J Farming Services to dispose of recycled water at LAS2 and LAS3.  

Page 309: 2014 2015 Preliminary Budget

 Public Works‐Crossroads Recycling Plant #1‐Collection 

 Capital Requests  

None  

Significant Operating Changes     An additional Maintenance Worker I position was added in December 2013 and assigned to street maintenance duties.   An additional Accounting Specialist II position was added in December 2013 to assist with increased customer activity . 

 Staffing  FY 2014/2015 (in alphabetical order) 

 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

   

Position:  12/13  13/14  14/15 

Accounting Specialist I/II/Technician  0.30  0.30  0.30 

Maintenance Worker I/II  0.10  0.12  0.12 

Public Works Superintendent  0.05  0.05  0.05 

Senior Maintenance Worker  0.02  0.02  0.02 

Utility Operator I/II/III  0.16  0.16  0.16 

Total Full Time Equivalents  0.63  0.75  0.75 

Sr. Accounting Technician  0.00  0.10  0.10 

Page 310: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $36,863.00 $43,492.00410‐13‐00 $650.00 $944.00410‐14‐00 $0.00 $0.00410‐15‐00 $454.00 $580.00410‐20‐00 $4,472.00 $5,173.00410‐21‐00 $1,289.00 $900.00410‐40‐00 $9,719.00 $12,142.00410‐41‐00 $0.00 $240.00410‐42‐00 $89.00 $112.00410‐43‐00 $0.00 $42.00410‐44‐00 $3,248.00 $3,683.00410‐46‐00 $475.00 $0.00410‐46‐01 $0.00 $655.00410‐47‐00 $273.00 $378.00410‐49‐00 $48.00 $0.00

$57,580.00 $68,341.00 

420‐01‐00 $49,583.00 $28,150.00420‐16‐00 $4,244.00 $4,500.00420‐58‐00 $150.00 $800.00420‐69‐00 $100.00 $120.00420‐70‐00 $1,650.00 $1,650.00420‐75‐00 $19,000.00 $16,200.00

$74,727.00 $51,420.00Total: Contractual Services $31,589.56

Auto/Heavy Equipment Maintenance/Repair $672.11Other Maintenance & Repair $3,798.42

Computer Tech Support $0.00Office Equipment & Repair $94.08

Contractual ServicesProfessional Services $23,306.10Contracts ‐ Other $3,718.85

SDI $48.54Total: Personnel Services $54,364.91

SUI $273.47

FICA $460.72Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $2,536.28

Dental Insurance $0.00Life Insurance $88.08

Retirement ‐ Employee $1,576.57Health Insurance $9,506.63

Standby $523.84Retirement ‐ Employer $4,052.35

Overtime $395.54Vacation/Sick Leave $3,990.14

Personnel ServicesRegular Salaries $30,912.75

Department 50 Public WorksDivision 32 PW Xroads WW Collection System

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6050 Water Recycling Plant #1Expenses

Page 311: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Department 50 Public WorksDivision 32 PW Xroads WW Collection System

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6050 Water Recycling Plant #1Expenses

430‐17‐00 $150.00 $150.00430‐24‐00 $600.00 $300.00430‐26‐00 $150.00 $150.00430‐33‐00 $2,000.00 $2,000.00430‐35‐00 $50.00 $50.00430‐40‐00 $300.00 $300.00

$3,250.00 $2,950.00

435‐10‐00 $200.00 $200.00435‐20‐00 $300.00 $1,510.00

$500.00 $1,710.00

440‐40‐00 $11,000.00 $14,500.00440‐90‐00 $110.00 $222.00 

$11,110.00 $14,722.00 

450‐20‐00 $0.00 $0.00450‐30‐00 $1,000.00 $0.00

$1,000.00 $0.00

470‐01‐00 $0.00 $0.00$0.00 $0.00

990‐90‐10 $30,653.00  $32,425.00 $30,653.00  $32,425.00 

$178,820.00  $171,568.00 

Total: Depreciation and Amortization $146.09

Division Total: PW Xroads WW Collection System $130,717.38 

Total: Fixed Assets $0.00Depreciation and Amortization

Depreciation $146.09

TransfersTransfers Out $32,002.00 

Total: Transfers $32,002.00 

Fixed AssetsMachines and Equipment $0.00Vehicles $0.00

Compensated Absences $105.20Total: Fixed Charges $11,218.20

Total: Dues, Meetings, Training and Travel $25.15Fixed Charges

Special Fees $11,113.00

Dues, Meetings, Training and TravelSubscriptions $21.01Training and Travel $4.14

Uniforms and Protective Clothing $39.05Total: Materials, Supplies and Small Equipment $1,371.47

Gas/Diesel/Oil/Lubricants $1,028.73Shop Tools $0.00

Auto/Heavy Equipment Parts $242.98Other Maintenance & Repair $60.71

Materials, Supplies and Small EquipmentCustodial Supplies $0.00

Page 312: 2014 2015 Preliminary Budget

Public Works—MBR Wastewater Treatment Description of Division  

This  division  provides wastewater  collection,  treatment  and  disposal  of  treated  effluent  for  the Mossdale,  River  Islands,  and  CLSP development areas at the Membrane Bioreactor (MBR) wastewater treatment facility located within the Crossroads Commerce Center and its associated wastewater collection and recycled water systems.   The treated water is pumped to recycled water storage basins or agricultural  land application  sites  located  in  the Mossdale, River  Islands and CLSP development areas.   The MBR  facility  is operated under a design‐build‐operate contract with Veolia Water North America (VWNA).  The wastewater collection system consists of gravity sewer pipelines,  sewer  force mains,  and  the Mossdale  sewer  pump  station.    The  recycled water  system  consists of  recycled water distribution  pipelines,  five  recycled  water  basins,  three  recycled water  pump  stations,  and  numerous  urban  and  agricultural  land application areas.      

Accomplishments 2013/2014  Provided ongoing services and management of contracts for operations, maintenance, and regulatory permit compliance for 

the MBR wastewater treatment plant and associated wastewater collection and recycled water systems.  Provided project management and contract administration services for the MBR Wastewater Treatment Plant Improvements 

CIP WW 10‐15  to provide additional sewer  treatment capacity needed  for new development  in  the River  Islands and CLSP development areas.  

Administered Veolia Water IPP Contract renewal and management of the Industrial Pretreatment Program (IPP).  Worked with Veolia to perform asset management assessment and update of the 5 year Capital Replacement budget.  Management of IPP and FOGS program including review of monthly reporting systems.  Preventative Maintenance for Heavy Equipment, Vehicles, and Pump Stations.  Continuation  of  the  City’s  Sewer  System Management  Plan  (SSMP)  as  related  to  the MBR wastewater  treatment  plant’s  

collection system. 

Page 313: 2014 2015 Preliminary Budget

 Public Works—MBR Wastewater Treatment 

 

  Work Plan 2014/2015  Continue to provide ongoing services and management of contracts for operations, maintenance and regulatory permit 

compliance for the MBR wastewater treatment plant and associated wastewater collection and recycled water systems.  Continue  to provide project management  and  contract  administration  services  for  the MBR Wastewater Treatment 

Plant Improvements CIP WW 10‐15 to provide additional sewer treatment capacity needed for new development in the River Islands and CLSP development areas.  

Continue to provide contract administration services for the Veolia Water  IPP Contract and program management of the IPP. 

Continue working with Veolia to perform asset management assessment and update of the 5 year Capital Replacement budget . 

Ongoing preventative Maintenance for Heavy Equipment, Vehicles and Pump Stations.  

Continuation of the City’s Sewer System Management Plan (SSMP) as related to the MBR wastewater treatment plant’s  collection system. 

 Capital Requests    

None   

Significant Operating Changes     An additional Maintenance Worker I position was added in December 2013 and assigned to street maintenance         duties.   An additional Accounting Specialist II position was added in December 2013 to assist with increased customer activity . 

Page 314: 2014 2015 Preliminary Budget

 Public Works—MBR Wastewater Treatment 

 

 Staffing  FY 2014/2015 (in alphabetical order) 

  Staffing Summary 

 

 

 

 

 

 

 

 

 

   

Position:  12/13  13/14  14/15 

Accounting Specialist I/II/Technician  0.30  0.30  0.30 

Public Works Superintendent  0.16  0.16  0.16 

Senior Maintenance Worker  0.02  0.02  0.02 

Special Districts Manager  0.05  0.00  0.00 

Utility Operator I/II/III  1.15  1.15  1.15 

Total Full Time Equivalents  1.68  1.75  1.75 

Maintenance Worker I/II  0.00  0.02  0.02 

Sr. Accounting Technician  0.00  0.10  0.10 

Page 315: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $98,909.00 $102,067.00410‐13‐00 $4,110.00 $2,424.00410‐14‐00 $0.00 $357.00410‐15‐00 $4,125.00 $2,274.00410‐20‐00 $12,022.00 $13,007.00410‐21‐00 $3,475.00 $2,422.00410‐40‐00 $23,494.00 $24,702.00410‐41‐00 $0.00 $483.00410‐42‐00 $243.00 $266.00410‐43‐00 $0.00 $85.00410‐44‐00 $12,708.00 $13,204.00410‐45‐00 $0.00 $0.00410‐46‐00 $1,429.00 $0.00410‐46‐01 $0.00 $1,554.00410‐47‐00 $729.00 $922.00410‐48‐00 $0.00 $0.00410‐49‐00 $203.00 $0.00

$161,447.00 $163,767.00

420‐01‐00 $1,044,959.00 $947,598.00420‐04‐00 $0.00 $7,443.00420‐16‐00 $16,281.00 $16,341.00420‐18‐00 $0.00 $3,024.00420‐27‐00 $6,000.00 $6,000.00420‐58‐00 $5,800.00 $5,800.00420‐65‐00 $500.00 $660.00Printing $470.08

Street Trees & Landscaping $5,640.00Computer Tech Support $0.00

Contracts ‐ Other $7,701.17Alarm Service $0.00

Contractual ServicesProfessional Services $606,212.62Personnel $0.00

SDI $204.36Total: Personnel Services $142,097.63

SUI $729.15Bilingual Pay $0.00

FICA $1,358.42Medicare $0.00

$7,065.93Standby $2,532.00

Overtime $1,977.40

Workers Compensation Insurance $5,892.33Auto Allowance $0.00

Life Insurance $236.33Vision Insurance $0.00

Health Insurance $21,684.92Dental Insurance $0.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6080 MBR Plant #1 ‐ West Sewer

Division 34 PW Wastewater West I‐5 Standby 

Personnel ServicesRegular Salaries $85,129.82

ExpensesDepartment 50 Public Works

Retirement ‐ Employer $10,992.98Retirement ‐ Employee $4,293.99

Vacation/Sick Leave

Page 316: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6080 MBR Plant #1 ‐ West Sewer

Division 34 PW Wastewater West I‐5 Standby 

ExpensesDepartment 50 Public Works

420‐70‐00 $5,350.00 $5,350.00420‐72‐00 $7,300.00 $10,150.00420‐75‐00 $20,934.00 $20,200.00

$1,107,124.00 $1,022,566.00

430‐10‐00 $300.00 $300.00430‐24‐00 $500.00 $500.00430‐26‐00 $5,000.00 $5,000.00430‐30‐00 $300.00 $300.00430‐33‐00 $6,100.00 $6,100.00430‐35‐00 $800.00 $800.00430‐40‐00 $750.00 $600.00430‐45‐00 $300.00 $300.00430‐49‐00 $250,000.00 $235,000.00

$264,050.00 $248,900.00

435‐10‐00 $700.00 $700.00435‐20‐00 $1,500.00 $1,975.00

$2,200.00 $2,675.00

440‐10‐00 $3,737.00 $3,737.00440‐40‐00 $153,940.00 $99,268.00440‐80‐00 $20,000.00 $20,000.00440‐90‐00 $442.00 $442.00

$178,119.00 $123,447.00Total: Fixed Charges $74,529.68

Bad Debt $4,717.74Compensated Absences $1,312.53

Fixed ChargesFixed Charges $1,189.65Special Fees $67,309.76

Training and Travel $146.53Total: Dues, Meetings, Training and Travel $167.55

Total: Materials, Supplies and Small Equipment $180,447.04Dues, Meetings, Training and Travel

Subscriptions $21.02

Reference Books $0.00Utilities ‐ Gas and Electric $173,203.32

Shop Tools $150.93Uniforms and Protective Clothing $130.19

Chemicals $0.00Gas/Diesel/Oil/Lubricants $5,161.51

Auto/Heavy Equipment Parts $919.22Other Maintenance & Repair $716.03

Total: Contractual Services $627,479.32Materials, Supplies and Small Equipment

Office Supplies $165.84

Communication Equipment Repair $539.07Other Maintenance & Repair $4,690.14

Auto/Heavy Equipment Maintenance/Repair $2,226.24

Page 317: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 6080 MBR Plant #1 ‐ West Sewer

Division 34 PW Wastewater West I‐5 Standby 

ExpensesDepartment 50 Public Works

450‐20‐00 $0.00 $0.00450‐30‐00 $7,000.00 $0.00

$7,000.00 $0.00

470‐01‐00 $0.00 $0.00$0.00 $0.00

990‐90‐10 $495,858.00 $468,726.00$495,858.00 $468,726.00

$2,215,798.00  $2,030,081.00 Division Total: PW Wastewater West I‐5 Standby  $1,360,756.49 

Depreciation and AmortizationDepreciation $24,143.08

Total: Depreciation and Amortization $24,143.08

Total: Transfers $311,887.00

Vehicles $0.00Total: Fixed Assets $5.19

Fixed AssetsMachines and Equipment $5.19

TransfersTransfers Out $311,887.00

Page 318: 2014 2015 Preliminary Budget

MEASURE C 

Page 319: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended$2,320,000.00 $2,320,000.00$1,200,000.00 $1,392,000.00$1,120,000.00 $928,000.00

$0.00  $0.00 $925,662.00  $928,000.00

($925,662.00) ($928,000.00)

$2,320,000.00  $2,320,000.00 $2,125,662.00 $2,320,000.00$194,338.00  $0.00 

Departmental Staffing

Office Assistant I/II 0.00 1.00 1.00Facility Supervisor 0.00 1.20 1.20

0.00 2.20 2.20Contractual ServicesDeputy Sheriff II for Community Impact Team 0.00 2.00 2.00Deputy Sheriff II for School Resource Officer 0.00 1.00 1.00Sergeant to serve as Supervisor 0.00 1.00 1.00

0.00 4.00 4.00

Lathrop Manteca Fire DistrictFirefighters/Engineers 0.00 2.00 6.00Battlion Chiefs 0.00 0.00 1.98

Total Measure ‐ C FTE 0.00 2.00 7.98

Revenue Totals: $452,987.12

Revenue Totals: $0.00

Measure ‐ C Department Budget Summary

Description 2013 Actual Amount

Expense Totals $0.00Fund Total: General Fund $452,987.12

Essential City Services

Expense Totals $0.00Fund Total: LMFD Measure C $0.00

Net Grand Totals: $452,987.12

Revenue Grand Totals: $452,987.12Expense Grand Totals: $0.00

Page 320: 2014 2015 Preliminary Budget

 Measure C—Essential City Services 

 

Description of Division 

In  September  2011,  the  City  Council  directed  staff  to  evaluate  a  local  revenue measure  for  the  purpose  of maintaining  and enhancing essential City services, such as police and  fire protection, and youth and senior services within  the City.    In  July 2012, Council approved placing a 1% sales tax measure on the November ballot for voter consideration.  On November 6, 2012, over 77% of the City of Lathrop registered voters passed Measure C (Public Safety/Essential City Services).   On November 19, 2012, the City Council approved an agreement with Lathrop Manteca Fire District allocating 40% of Measure C funds to the District.  The Measure C funds will be used to augment and enhance fire protection activities within the City.  The remaining 60% of Measure C funds will be used by the City to maintain and enhance police and other essential City services.  All Measure C expenditures will be reviewed by the Measure C Community Oversight Committee and recommended to the City Council for approval.  Measure C went into effect on April 1, 2013.  The City began receiving revenue from Measure C in September 2013.  Accomplishments 2013/2014 

 Public Saftety 

Restored four (4) previously unfunded sworn police positions   Two  (2)  Community  Impact  Team  Deputies  to  combat  street‐level  crimes  and  create  a  proactive 

supplement to patrol activities, utilizing an intelligence based reaction team focused on criminal street gangs and drug traffickers. 

One (1) Administrative Sergeant to provide direct supervision to the Resource Officers, Traffic Officers and Investigations Officers, as well as general supervision to the dayshift patrol officers.   This position also assists with administrative functions to allow management to focus on developing a public safety services plan for the anticipated future growth of the City. 

One (1) School Resource Officer to promote a safe environment for school and student success, focusing on prevention, intervention and outreach. 

Page 321: 2014 2015 Preliminary Budget

 

Measure C—Essential City Services Accomplishments 2013/2014 continued 

 Other Essential City Services— Parks & Recreation Positions  

In anticipation of the opening of the Lathrop Generations Center, the Parks & Recreation Department funded two previously unfunded Facility Supervisor positions and funded an Office Assistant position resulting from the re‐classification of the Administrative Assistant to Recreation Coordinator. 

 Work Plan 2014/2015    Public Safety     Continue to fund 4 sworn positions.    Essential City Services 

In addition to funding the staffing of the new Generations Center, Measure C funds will also assist with the funding     of the Maintenance and Operations of the facility.  

 Capital Requests 

 None 

 

Page 322: 2014 2015 Preliminary Budget

 Measure C—Essential City Services 

Staffing FY 2014/2015 (in alphabetical order)    Staffing Summary 

 

 

 

 

 

 

 

 

 

 

 

   

 

Position:  12/13  13/14  14/15 

Facility Supervisor  0.00  1.20  1.20 

Office Assistant I/II  0.00  1.00  1.00 

Total Full Time Equivalents  0.00  2.20  2.20 

San Joaquin County Positions:  12/13  13/14  14/15 

Deputy Sheriff for Com Impact Team  0.00  2.00  2.00 

Deputy Sheriff for School Resource Officer  0.00  1.00  1.00 

Sergeant to Serve as Supervisor  0.00  1.00  1.00 

Total San Joaquin County Positions  0.00  4.00  4.00 

Page 323: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

410‐11‐00 $60,952.00 $85,223.00410‐12‐00 $5,272.00 $0.00410‐14‐00 $0.00 $0.00410‐20‐00 $7,650.00 $8,895.00410‐21‐00 $2,182.00 $1,385.00410‐40‐00 $34,800.00 $27,040.00410‐41‐00 $0.00 $761.00410‐42‐00 $157.00 $258.00410‐43‐00 $0.00 $170.00410‐44‐00 $2,730.00 $3,150.00410‐46‐00 $1,287.00 $320.00410‐46‐01 $0.00 $1,236.00410‐47‐00 $1,255.00 $1,188.00410‐48‐00 $0.00 $0.00410‐49‐00 $0.00 $0.00410‐99‐00 $0.00 $0.00

$116,285.00 $129,626.00

420‐16‐00 $0.00 $12,300.00420‐18‐00 $0.00 $7,420.00420‐25‐00 $0.00 $25,280.00420‐27‐00 $0.00 $6,000.00420‐32‐00 $0.00 $21,700.00420‐67‐00 $0.00 $2,000.00420‐75‐00 $0.00 $11,300.00

$0.00 $86,000.00Total: Contractual Services $0.00

Equipment Rental $0.00Other Maintenance & Repair $0.00

Street Trees & Landscaping $0.00Park Maintenance $0.00

Expense Variance $0.00

SUI $0.00Bilingual Pay $0.00

Alarm Service $0.00Building & Ground Maintenance $0.00

Total: Personnel Services $0.00Contractual Services

Contracts ‐ Other $0.00

FICA $0.00Medicare $0.00

Vision Insurance $0.00Workers Compensation Insurance $0.00

SDI $0.00

Retirement ‐ Employer $0.00

Part‐time Salaries $0.00

Dental Insurance $0.00Life Insurance $0.00

Retirement ‐ Employee $0.00Health Insurance $0.00

Personnel ServicesRegular Salaries $0.00

ExpensesDepartment 19 Measure C 

Vacation/Sick Leave $0.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Division 10 Essential City Services

Page 324: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

ExpensesDepartment 19 Measure C 

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 1010 General Fund

Division 10 Essential City Services

425‐16‐00 $552,761.00 $799,075.00$552,761.00 $799,075.00

430‐17‐00 $0.00 $3,000.00430‐20‐00 $0.00 $1,400.00430‐21‐00 $0.00 $1,300.00430‐26‐00 $0.00 $3,900.00430‐30‐00 $0.00 $600.00430‐49‐00 $0.00 $28,000.00430‐50‐00 $0.00 $38,500.00

$0.00 $76,700.00

440‐40‐00 $0.00 $10,350.00$0.00 $10,350.00

450‐30‐00 $90,000.00 $0.00$90,000.00 $0.00

470‐03‐00 $440,954.00 $290,249.00$440,954.00 $290,249.00

$1,200,000.00 $1,392,000.00Division Total: Essential City Services $0.00

Capital Replacement $0.00

Total: Fixed Charges $0.00Fixed Assets

Vehicles $0.00

Total: Depreciation and Amortization $0.00

Special Fees $0.00

Utilities ‐ Gas and Electric $0.00Water $0.00

Total: Fixed Assets $0.00Depreciation and Amortization

Chemicals $0.00

Materials and Supplies $0.00Building Maintenance ‐ Materials & Supplies $0.00

Total: Materials, Supplies and Small Equipment $0.00Fixed Charges

Materials, Supplies and Small EquipmentCustodial Supplies $0.00

Contractual Services (Intergovernmental)Measure C $0.00

Other Maintenance & Repair $0.00

Total: Contractual Services (Intergovernmental) $0.00

Page 325: 2014 2015 Preliminary Budget

 Measure C—Lathrop Manteca Fire District 

Description of Division  In September 2011, the City Council directed staff to evaluate a local revenue measure for the purpose of maintaining and enhancing essential City services, such as police and fire protection, and youth and senior services within the City.  In July 2012, Council approved placing a 1%  sales  tax measure on  the November ballot  for  voter  consideration.   On November 6, 2012, over 77% of  the City of Lathrop’s registered voters passed Measure C (Public Safety/Essential City Services).   On November 19, 2012, the City Council approved an agreement with Lathrop Manteca Fire District allocating 40% of Measure C funds to the District.  The Measure C funds will be used to augment and enhance fire protection activities within the City.  All Measure C expenditures will be reviewed by the Measure C Community Oversight Committee. Measure C went into effect on April 1, 2013.  The City and the Lathrop Manteca Fire District began receiving revenue from Measure C in September 2013.  Accomplishments 2013/2014 

Funded two  (2) firefighter positions and funded overtime to consistently maintain three  (3)  firefighters on duty at each station on a 24/7 basis. 

Funded Special Operations training.  Funded the City’s portion of the Special Operations Vehicle. 

 Work Plan 2014/2015  

Fund six (6) Firefighter Engineer positions  Fund 66% of three (3) Line Battalion Chiefs positions    This  years  allocation  is  to  maintain  six  Firefighter  Engineers  that  are  no  longer  funded  by  the  Safer  Grant.    These firefighters were hired under the safer grant which ended this year. These firefighters were hired to establish   the staffing levels desired by the City in an effort to increase the number  of  firefighters  closer  to  the  level  required   by NFPA 1710. This  is  required  in order  to enhance  the preservation of  life, property and  the environment within   the City of Lathrop.      The  allocation will  also be utilized  to  fund  the  city portion  (66%) of  three online Battalion Chief positions  to help   maintain  the  span  and  control of  supervisory  responsibilities of  the  large  incidents  that bring  chaos  and unrest  in   our  community.  The  Battalion  Chiefs  will  be  an  integral  part  of  the  administration  assisting  with  community   programs, events and the day to day operations.  

Page 326: 2014 2015 Preliminary Budget

 Measure C—Lathrop Manteca Fire District 

Capital Requests  

None  

Significant Operating Changes  Through the staffing of six (6)  firefighters and 3 Battalion Chiefs, and by utilizing some relief personnel, it will allow us to maintain the staffing levels at six firefighters on duty 24/7 within the City of Lathrop. The Lathrop Manteca Fire District will then be much closer to the staffing  levels within the City of Lathrop that are provided  in neighboring cities,  it also allows us to maintain the enhanced ISO rating that was given to us by the Insurance Services Office in May of 2013.   The staffing levels in the City of Lathrop prior to the Measure C funding would have been at two firefighters per station which  is  significantly below  the national  standards  for City  Fire Departments. The  funding of  the  Special Operations training  allows  for  the  City  to  provide  for  an  increased  service  that will  enhance  the  level  of  public  safety  for  the emergency needs of our community, delivered with care and compassion to all who need our aid.   The  new  apparatus  and  equipment  combine  with  this  continued  training  allows  us  to  respond  to  residents  and businesses within our City that utilize these types of rescue services on a daily basis. The city recognizes that time to have specialized equipment, and  the  training  to utilize  it,  is not when  the emergency occurs, but  in a ready state  for when the emergency arises. 

Page 327: 2014 2015 Preliminary Budget

 

Measure C—Lathrop Manteca Fire District 

 Staffing FY 2014/2015 (in alphabetical order)    Staffing Summary 

 

 

 

 

 

Lathrop Manteca Fire District Positions:  12/13  13/14  14/15 

Firefighters/Engineers  0.00  2.00  6.00 

Battalion Chiefs  0.00  0.00  1.98 

Lathrop Manteca Fire District Positions  0.00  2.00  7.98 

Page 328: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager 

Recommended

425‐16‐00 $925,662.00  $928,000.00$925,662.00  $928,000.00

450‐20‐00 $0.00 $0.00$0.00 $0.00

$925,662.00 $928,000.00Division Total: Lathrop Manteca Fire District  $0.00

Fixed AssetsMachines and Equipment $0.00

Total: Fixed Assets $0.00

Contractual Services (Intergovernmental)Measure C $0.00

Total: Contractual Services (Intergovernmental) $0.00

ExpensesDepartment 19 Measure C Division 20 Lathrop Manteca Fire District 

Fund 2010 LMFD Measure C

Budget For Fiscal Year 2014‐2015

Description 2013 Actual Amount

Page 329: 2014 2015 Preliminary Budget

DEVELOPER PROJECTS 

Page 330: 2014 2015 Preliminary Budget

 

Developer Projects—Saybrook CLSP LLC 

Description of Developer Project 

The project  consists of  approximately 1,525  acres  located north of Mossdale Village on  the west  side of  I‐5.  The property was annexed into the City of Lathrop in 2005.  The project land uses include 468 acres of low‐density residential, 305 acres of medium density residential, and 49 acres of high density residential.  Other uses  include extensive commercial development, a High School site for Lathrop, K‐8 schools, community and neighborhood parks, a site for a future civic center, levees and open space.  A tentative map  is approved  for 1,040 single‐family  lots within 10 villages.   The City also approved a second small  lot  tentative map  for 430 single family lots on the 940acre site adjacent to the Generations Center. 

The City is reviewing a restructuring of CFD 2006‐01 and 02 to help this project begin construction.   

 

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project. 

Professional Services — $100,000 

 

 

General Fund Salaries — $50,000 

 

 

Capital/Projects — $100,000 

 

 

 

Debt Service — $575,528 

Specialized Legal Services  $100,000 

Billable Staff Time for work on Project  $50,000 

2003 Water Supply Bond Payment (94% of Future)  $573,528 

Annual SSJID Fixed O & M  $308.342 

Capital Improvement Projects  $691,658 

Page 331: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $100,000.00 $100,000.00420‐90‐00 $50,000.00 $50,000.00

$150,000.00 $150,000.00

435‐20‐00 $0.00 $472.00$0.00 $472.00

480‐01‐00 $0.00 $175,000.00480‐02‐00 $0.00 $398,528.00

$0.00 $573,528.00

450‐40‐00 $1,699,000.00 $1,000,000.00

$1,699,000.00 $1,000,000.00$1,849,000.00 $1,724,000.00

Total: Capital Projects $533,691.28Division Total: Developer Project $1,152,046.45

Total: Debt Service $547,111.66Capital Projects

Capacity Fee $533,691.28

Debt ServicePrincipal $183,056.66Interest $364,055.00

Dues, Meetings, Training and TravelTraining and Travel $0.00

Total: Dues, Meetings, Training and Travel $0.00

Total: Contractual Services $71,243.51

Division 99 Developer Project

Contractual ServicesProfessional Services $45,785.13

ExpensesDepartment 89 Developer Project

General Fund Salary Changes $25,458.38

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4010 Saybrook CLSP LLC

Page 332: 2014 2015 Preliminary Budget

 

Developer Projects—Gateway Business Park 

Description of Developer Project 

This approved project,  located  in  the City’s Sphere of  Influence,  is south of  the existing city  limits adjoining McKinley Avenue and North of State Route 120. The approved specific plan  includes office, retail and  industrial use on 213.5 acres.   On January 23, 2012 the City Council approved partial Annexation of the specific plan area which was approved by LAFCO on June 1, 2012.  The developer is actively pursuing commercial and industrial builders. 

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project. 

 

Professional Services — $40,000 

  

 

General Fund Salaries — $10,000 

 

 

 

 

Contracts  $40,000 

Billable Staff Time for work on Project  $10,000 

Page 333: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $50,000.00 $40,000.00420‐90‐00 $20,000.00 $10,000.00

$70,000.00 $50,000.00$70,000.00 $50,000.00

General Fund Salary Changes $999.21Total: Contractual Services $999.21

Contractual ServicesProfessional Services $0.00

Division Total: Developer Project $999.21

ExpensesDepartment 89 Developer ProjectDivision 99 Developer Project

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4020 Gateway

Page 334: 2014 2015 Preliminary Budget

 

Developer Projects—Watt (Lathrop Marketplace II) 

Description of Developer Project 

Lathrop Marketplace  II consists of 51 acres commercial property  located at  the northeast corner of Golden Valley Parkway and River  Islands Parkway.  Total building area, when  the  shopping  center  is  completed, will be approximately 702,835  square  feet consisting of nine (9) buildings.  Golden Valley Parkway is completed for commercial access to this property.  Although, there is no commercial development activity at this time,  interest does appear to be picking up.     However, this project is within CLSP and is subject to the liens from CFD 2006‐01.  Restructuring of this CFD is delaying construction on this site. 

 Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project.  

Professional Services — $2,500 

  

General Fund Salaries — $2,500 

  

Capital/Projects — $5,463 

 

 

 

 

 

 

 

Specialized Legal Services  $2,500 

Billable Staff Time for work on Project  $2,500 

Annual SSJID Fixed O & M  $5,463 

Page 335: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $5,000.00 $2,500.00420‐90‐00 $2,500.00 $2,500.00

$7,500.00 $5,000.00$7,500.00 $5,000.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4030 Watt Lathrop IIExpensesDepartment 89 Developer ProjectDivision 99 Developer Project

Contractual ServicesProfessional Services $0.00

Division Total: Developer Project $335.22

General Fund Salary Changes $335.22Total: Contractual Services $335.22

Page 336: 2014 2015 Preliminary Budget

 Developer Projects—South Lathrop Richland 

Description of Developer Project 

This  proposed  project,  located  in  the  City’s  Sphere  of  Influence,  is  south  of  State  Route  120,  connected  to  the  City  by  the undercrossing at Guthmiller. The proposed  specific plan will  include office,  retail and  industrial use on 300 acres.   Richland has submitted a Specific Plan and associated applications for approximately 300 acres. 

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project.  

Professional Services — $20,000 

  

General Fund Salaries — $10,000 

 

 

 

 

 

 

 

 

 

Professional Services  $20,000 

General Fund Salaries  $10,000 

Page 337: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $100,000.00 $20,000.00420‐90‐00 $20,000.00 $10,000.00

$120,000.00 $30,000.00$120,000.00 $30,000.00Division Total: Developer Project $14,850.09

General Fund Salary Changes $6,658.06Total: Contractual Services $14,850.09

Division 99 Developer Project

Contractual ServicesProfessional Services $8,192.03

ExpensesDepartment 89 Developer Project

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4060 South Lathrop Richland

Page 338: 2014 2015 Preliminary Budget

 Developer Projects—Crossroads Richland 

Specialized Legal Services  $5,000 

Billable Staff Time for work on Project  $2,500 

Water CFF Credit Reimbursements  $25,000 

Sewer CFF Credit Reimbursements  $75,000 

Description of Developer Project 

Located on a site south of Louise Avenue between Howland and Harlan Roads, Crossroads is an industrial/commercial area comprised of  450  acres  of  industrial  property,  zoned  Limited  Industrial  (IL)  and  48  acres  of  Highway  Commercial  (HC)  zoned  land.   The commercial area contains the 138,000 square foot Lathrop Business Park.  Adjoining the Lathrop Business Park are several restaurants and a hotel. The Industrial area includes several leading manufacturing and distribution facilities.  A 517,300 s.f. speculation industrial warehouse/distribution building on a 29 acres site at the south end of Harlan Rd. received planning approval.     Building Permit has been submitted to date and is ready to issue.  

In‐n‐Out is nearing completion of its expansion of its processing plant. The City , Richland Planned Communities, and business owners are exploring options for a sewer plant expansion to promote growth.   

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project.  

Professional Services — $5,000 

  

General Fund Salaries — $2,500 

  

Capital/Projects — $100,000 

 

 

 

Page 339: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $5,000.00 $5,000.00420‐90‐00 $2,500.00 $2,500.00

$7,500.00 $7,500.00

450‐41‐00 $1,296,166.00 $100,000.00$1,296,166.00 $100,000.00$1,303,666.00 $107,500.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4080 Xroads RichlandExpensesDepartment 89 Developer Project

General Fund Salary Changes $622.67Total: Contractual Services $622.67

Division 99 Developer Project

Contractual ServicesProfessional Services $0.00

Division Total: Developer Project $5,844.83

Capital ProjectsCapacity Reimbursement $5,222.16

Total: Capital Projects $5,222.16

Page 340: 2014 2015 Preliminary Budget

 Developer Projects—Pacific Union Homes 

Description of Developer Project 

The project is being developed as a mixed‐use master planned development located on the west side of Interstate 5, east of the San Joaquin River, north and  south of River  Islands Parkway. The  site  consists of approximately 316 acres within  the Mossdale Village portion of  the West  Lathrop Specific Plan area.  The property  is  located within  the Mossdale  Landing Urban Design Concept.  The project  land uses  include 929  low‐density  lots, 179 medium density  lots, one K‐8 elementary school site, a 20‐acre community park, four neighborhood parks, bike trails and bike paths, the River Linear Park, and a fire station site.  Vacant padded subdivision lots have been purchased by major developers and construction of new homes is anticipated to continue this year. 

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project. 

 

General Fund Salaries — $1,000 

  Billable Staff Time for work on Project  $1,000 

Page 341: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐90‐00 $10,000.00 $1,000.00$10,000.00 $1,000.00$10,000.00 $1,000.00

Budget Worksheet Report

Description 2013 Actual AmountFund 4100 Pacific Union HomesExpensesDepartment 89 Developer ProjectDivision 99 Developer Project

Contractual ServicesGeneral Fund Salary Changes $362.23

Total: Contractual Services $362.23Division Total: Developer Project $362.23

Page 342: 2014 2015 Preliminary Budget

  Developer Projects—River Islands 

Description of Developer Project 

The River  Islands at  Lathrop project will be developed as a mixed‐use  residential/commercial development on 4,995 acres on Stewart Tract, west of Interstate 5 and the San Joaquin River.  The project includes, among other uses, 11,000 residential units, an approximately  325‐acre  employment  center;  a  45‐acre  town  center;  schools,  various  single‐boat  and multi‐boat  docks;  golf courses; more than 260 acres of parkland; more than 600 acres of lakes, waterways, and canals; over 600 acres of open space; and necessary public facilities and infrastructure to support the project.  A current tentative map of 4,284 units in Phase 1 of the plan is  approved.      Bradshaw  Crossing  Bridge  has  been  completed.    The  Charter  School  opened  in  August  2013.  Three merchant homebuilders have started construction of model homes and production homes. Over 50 building permits have been  issued for single family residences. 

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project.  

Professional Services — $200,000         

 

 

General Fund Salaries — $290,000         

 

 

 

                  Capital/Projects — $1,380,000 

Debt Service — $159,854 

 

 

 

 

 

Billable Staff Time for work on Project    $   50,000 

Billable Police Services    $240,000 

2000 COP Water Bond Payment (32.69%)  $159,854 

Plan Check & Inspections  $650,000 

Pond E  $     6,900 

MBR #1—Wastewater Standby Charge  $153,461 

Annual SSJID Fixed O & M  $507,928 

Contracts  $200,000 

Page 343: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $181,146.00 $200,000.00420‐90‐00 $20,000.00 $50,000.00420‐91‐00 $250,000.00 $240,000.00

$451,146.00 $490,000.00

430‐11‐00 $0.00 $0.00$0.00 $0.00

435‐20‐00 $0.00 $0.00$0.00 $0.00

440‐40‐00 $0.00 $146.00$0.00 $146.00

480‐01‐00 $92,578.00 $92,578.00480‐02‐00 $67,276.00 $67,276.00

$159,854.00 $159,854.00$611,000.00 $650,000.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4150 River IslandsExpensesDepartment 89 Developer Project

General Fund Salary Changes $53,161.89Police Services $346,924.67

Division 99 Developer Project

Contractual ServicesProfessional Services $34,966.42

Total: Contractual Services $435,052.98Materials, Supplies and Small Equipment

Postage $0.00Total: Materials, Supplies and Small Equipment $0.00Dues, Meetings, Training and Travel

Training and Travel $14.65Total: Dues, Meetings, Training and Travel $14.65Fixed Charges

Special Fees $0.00Total: Fixed Charges $0.00Debt Service

Principal $82,639.43

Division Total: Developer Project $594,921.73

Interest $77,214.67Total: Debt Service $159,854.10

Page 344: 2014 2015 Preliminary Budget

 Developer Projects—TCN Properties 

Description of Developer Project 

The Mossdale Landing project site  is  located within the Mossdale Village area of the West Lathrop Specific Plan, bordered on the west by the San Joaquin River and on the south by the southern boundary of the Mossdale Landing Urban Design Concept.  TCN was a Developer previously  involved  in the development of Mossdale Landing. Most of the vacant padded subdivision  lots have been repurchased  by major  developers,  and  construction  of  new model  complexes  have  been  completed  and multiple  phases  have begun.  Staff is reviewing and processing requests for credits and reimbursements. 

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project. 

 

Professional Services — $10,000            

 

 

General Fund Salaries — $5,000 

 

 

Capital/Projects — $16,481 

 

 

 

Specialized Legal Services  $10,000 

Annual SSJID Fixed O & M  $16,481 

Billable Staff Time for work on Project  $5,000 

Page 345: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $20,000.00 $10,000.00420‐90‐00 $10,000.00 $5,000.00

$30,000.00 $15,000.00$30,000.00 $15,000.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4170 TCN PropertiesExpensesDepartment 89 Developer ProjectDivision 99 Developer Project

Contractual ServicesProfessional Services $0.00

Division Total: Developer Project $1,524.32

General Fund Salary Changes $1,524.32Total: Contractual Services $1,524.32

Page 346: 2014 2015 Preliminary Budget

 

Developer Projects—Watt (Lathrop Marketplace I) 

Description of Developer Project 

The Watt‐McKee property  is a portion of  the Mossdale Landing East Project.  Watt‐McKee controls  the 27 acres of Highway Commercial property located at the southwest corner of Louise Avenue/ River Islands Parkway and I‐5.  Lathrop Market Place is anchored  by  Target  and  plans  for  an  additional  anchor  and  several  freestanding  commercial  and  retail  businesses  totaling 300,000  square  feet  are  approved.    No  commercial  development  activity  is  currently  occurring,  although Watt  is  actively pursuing development opportunities.    

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project. 

 

Professional Services — $2,500 

  

General Fund Salaries — $4,000 

 

 

Capital/Projects — $3,000 

 

 

Specialized Legal Services  $2,500 

Annual SSJID Fixed O & M  $3,000 

Billable Staff Time for work on Project  $4,000 

Page 347: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $5,000.00 $2,500.00420‐90‐00 $4,000.00 $4,000.00

$9,000.00 $6,500.00$9,000.00 $6,500.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4180 Watt Lathrop IExpensesDepartment 89 Developer ProjectDivision 99 Developer Project

Contractual ServicesProfessional Services $0.00

Division Total: Developer Project $115.71

General Fund Salary Changes $115.71Total: Contractual Services $115.71

Page 348: 2014 2015 Preliminary Budget

 Developer Projects—Pegasus 

Description of Developer Project 

The Developer is looking at several locations to develop in the Mossdale Village area: 

Tract 3626: Pegasus has submitted a pre‐application for a revision to Tract 3626 proposing a 48 lot subdivision. 

208 Unit Apartments:   Pegasus submitted minor modifications to the previously approved apartment site for review and approval. 

Towne Centre, east of City Hall:  Pegasus is processing a retail/residential mixed use project. 

Sprayfield on Golden Valley Pkwy (GVP) at Towne Centre Drive:   Pegasus  is pursuing a retail use  if they can relocate the sprayfield. 

 

Description of Developer Project Funds 

This fund accounts for revenue and expenditure activities related to the development project. 

 

Professional Services — $7,000 

 

 

General Fund Salaries — $3,000 

 

 

 

 

Contracts  $7,000 

Billable Staff Time for work on Project  $3,000 

Page 349: 2014 2015 Preliminary Budget

Account Number

2014 Amended Budget

2015 City Manager Recommended

420‐01‐00 $5,000.00 $7,000.00420‐90‐00 $5,000.00 $3,000.00

$10,000.00 $10,000.00$10,000.00 $10,000.00

Budget For Fiscal Year 2014‐2015

Description 2013 Actual AmountFund 4200 Pegasus DevelopmentExpensesDepartment 89 Developer ProjectDivision 99 Developer Project

Contractual ServicesProfessional Services $787.50

Division Total: Developer Project $1,546.79

General Fund Salary Changes $759.29Total: Contractual Services $1,546.79

Page 350: 2014 2015 Preliminary Budget

CAPITAL IMPROVEMENT PROGRAM 

Page 351: 2014 2015 Preliminary Budget

Capital Improvement Program

Fiscal Year 2014-15 through 2018-19

Prior &

Current Year

Actuals

Carry Forward

FY 14-15

New Funding

Request

FY 14-15

Planned

FY 2015-16

Planned

FY 2016-17

Planned

FY 2017-18

Planned

FY 2018-19

Total Project

Needs

GG 04-01 Lathrop Generations Center 6,394,882$ 1,933,117$ -$ -$ -$ -$ -$ 8,327,999$

GG 10-17 Retaining Wall and Landscaping

at Towne Centre Dr & Village Ave (Tract 3410) 9,618$ 290,382$ -$ -$ -$ -$ -$ 300,000$

GG 11-09 Financial Management System 537,500$ 63,425$ -$ -$ -$ -$ -$ 600,925$

GG 12-14 Solar Energy Project -$ 12,500$ -$ -$ -$ -$ -$ 12,500$

GG 13-06 Capital Facility Fee Study Update 10,495$ 159,505$ -$ -$ -$ -$ -$ 170,000$

6,952,495$ 2,458,929$ -$ -$ -$ -$ -$ 9,411,424$

PK 03-03 Community Park Expansion 1,687,905$ 27,024$ -$ -$ -$ -$ -$ 1,714,929$

PK 14-03 Soccer Complex -$ 50,000$ -$ 100,000$ -$ -$ -$ 150,000$

PK 14-11 Sangalang Park Improvements 182,615$ 17,385$ -$ -$ -$ -$ -$ 200,000$

1,870,520$ 94,409$ -$ 100,000$ -$ -$ -$ 2,064,929$

PS 97-02 Lathrop Road Westerly Grade Separation 7,585,470$ 11,701,667$ 900,000$ 975,121$ -$ -$ -$ 21,162,257$

PS 02-04 Regional Pedestrian Bikeway 17,980$ 61,035$ -$ -$ -$ -$ -$ 79,015$

PS 02-24 Lathrop Road Widening Rehabilitation 34,912$ 2,161,045$ -$ -$ 475,000$ -$ 4,000,000$ 6,670,957$

PS 06-06 Louise Avenue and I-5 Improvements 1,854,755$ 122,442$ 150,000$ 150,000$ 1,000,000$ -$ -$ 3,277,197$

PS 09-04 River Island Pkwy/Bradshaw Crossing Bridge 1,418,461$ 147,885$ -$ -$ -$ -$ -$ 1,566,346$

PS 11-10 Roth Road/I-5 Interchange Improvements 13,851$ 802,229$ -$ 2,600,000$ -$ -$ -$ 3,416,080$

PS 12-04 Manthey Road Bridge Replacement 40,246$ 1,317,754$ 2,805,900$ 172,050$ 172,050$ 2,265,325$ 37,234,675$ 44,008,000$

PS 12-15 Harlan Road Improvements 131,793$ 201,668$ -$ -$ -$ -$ -$ 333,461$

PS 14-06 Traffic Calming Measures 30,365$ 19,635$ 15,000$ 50,000$ -$ -$ -$ 115,000$

PS 14-12 "O" Street Sidewalk Improvements 5,450$ 114,550$ 80,000$ -$ -$ -$ -$ 200,000$

PS 15-01 City-wide Road Maintenance & Repair Program -$ 488,463$ 485,813$ 490,000$ 490,000$ 90,000$ 90,000$ 2,134,276$

PS 15-04 Sidewalk Repair Program -$ -$ 150,000$ 80,000$ 80,000$ 80,000$ 80,000$ 470,000$

11,133,283$ 17,138,373$ 4,586,713$ 4,517,171$ 2,217,050$ 2,435,325$ 41,404,675$ 83,432,589$

Project Description

General Government and Public Safety

General Government and Public Safety Subtotal:

Parks & Recreation Improvements

Parks & Recreation Subtotal:

Street Improvements

Street Subtotal:

Page 352: 2014 2015 Preliminary Budget

Capital Improvement Program

Fiscal Year 2014-15 through 2018-19

Prior &

Current Year

Actuals

Carry Forward

FY 14-15

New Funding

Request

FY 14-15

Planned

FY 2015-16

Planned

FY 2016-17

Planned

FY 2017-18

Planned

FY 2018-19

Total Project

NeedsProject Description

PW 08-09 Well 21 Post Construction 302,750$ 1,995,319$ -$ -$ -$ -$ -$ 2,298,069$

PW 10-10 Water Master Plan Update 145,769$ 9,231$ -$ -$ -$ -$ 150,000$ 305,000$

PW 12-08 Citywide Water System Repairs 1,440$ 133,560$ -$ -$ -$ -$ -$ 135,000$

PW 13-08 Water Meter Improvements 349,412$ 147,755$ -$ -$ -$ -$ -$ 497,167$

PW 14-08 Modifications for Wells 7, 8 and 9 148,181$ 291,819$ -$ -$ -$ -$ -$ 440,000$

PW 15-05 Well 10 Emergency Power and PG&E Service

Improvements -$ -$ 340,000$ -$ -$ -$ -$ 340,000$

947,552$ 2,577,684$ 340,000$ -$ -$ -$ 150,000$ 4,015,236$

SD 14-13 Flood Protection Hydraulic Modeling & Floodplain

Mapping 9,011$ 52,989$ 50,000$ -$ -$ -$ -$ 112,000$

9,011$ 52,989$ 50,000$ -$ -$ -$ -$ 112,000$

WW 10-15 Lathrop Consolidated Treatment Facility Expansion 1,245,015$ 6,869,625$ -$ -$ -$ -$ -$ 8,114,640$

WW 11-06 Crossroads Wastewater Treatment Plant Improvements 318,277$ 384,723$ 1,050,000$ 1,050,000$ -$ -$ -$ 2,803,000$

WW 12-07 Sewer Plant Upgrades and Maintenance 111,009$ 293,191$ 127,500$ 117,000$ 120,000$ 125,000$ 135,500$ 1,029,200$

WW 13-02 East Side Wastewater Collection System -$ 100,000$ -$ -$ -$ 235,000$ 1,200,000$ 1,535,000$

WW 13-09 Wastewater Pump Station Improvements 15,220$ 259,780$ -$ -$ -$ -$ -$ 275,000$

WW 14-14 Prelim Design LCTF Expansion fr 1.0 mgd to 2.0 mgd -$ 99,000$ 1,725,000$ 18,675,000$ 14,600,000$ -$ -$ 35,099,000$

WW 15-08 Wastewater Master Plan Update -$ -$ 500,000$ -$ -$ -$ -$ 500,000$

1,689,521$ 8,006,319$ 3,402,500$ 19,842,000$ 14,720,000$ 360,000$ 1,335,500$ 49,355,840$

22,602,382$ 30,328,703$ 8,379,213$ 24,459,171$ 16,937,050$ 2,795,325$ 42,890,175$ 148,392,018$

Water Improvements

Water Subtotal:

Drainage Improvements

Drainage Subtotal:

Wastewater Improvements

Wastewater Subtotal:

Grand Total CIP:

Page 353: 2014 2015 Preliminary Budget

Capital Improvement Program

Fiscal Year 2014-15 through 2018-19

Prior &

Current Year

Actuals

Carry Forward

FY 14-15

New Funding

Request

FY 14-15

Planned

FY 2015-16

Planned

FY 2016-17

Planned

FY 2017-18

Planned

FY 2018-19

Total Project

NeedsProject Description

GG 08-05 Animal Shelter -$ -$ -$ -$ -$ -$ 5,055,000$ 5,055,000$

GG 15-10 Historic Center Feasability Study -$ -$ -$ 20,000$ -$ -$ -$ 20,000$

PK 14-01 City Wide Park Master Plan -$ -$ -$ 175,000$ 50,000$ -$ -$ 225,000$

PK 14-05 River Park North Booster Pump -$ -$ -$ 18,000$ -$ -$ -$ 18,000$

PK 15-09 Central Control Irrigation Sys Expansion & Upgrade -$ -$ -$ 25,000$ -$ 18,900$ -$ 43,900$

PS 06-16 Lathrop Road and I-5 Improvements 143,975$ -$ -$ 150,000$ -$ -$ -$ 293,975$

-$ -$ -$ -$ -$ -$ -$ -$

PS 14-04 Harlan Road Precise Plan Line -$ -$ -$ 500,000$ -$ -$ -$ 500,000$

PS 15-02 Louise Avenue & Mckinley Avenue Signal Improvements -$ -$ -$ 250,000$ 450,000$ -$ -$ 700,000$

SD 08-07 Shilling Storm Water Pump Station & Force Main -$ 282,000$ -$ -$ -$ -$ 1,350,000$ 1,632,000$

143,975$ 282,000$ -$ 1,138,000$ 500,000$ 18,900$ 6,405,000$ 8,487,875$

GG 15-07 ADA Transition Plan Implementation -$ -$ 54,000$ 48,000$ 45,000$ 45,000$ 524,200$ 716,200$

PW 10-09 Urban Water Master Plan Update 73,235$ 123,724$ 48,789$ 85,447$ 53,799$ 58,500$ 59,325$ 502,819$

SD 14-10 Storm Water Management Plan -$ -$ 40,000$ 50,000$ 50,000$ 50,000$ 50,000$ 240,000$

WW 11-08 Sewer System Management Plan -$ -$ 56,666$ 56,666$ 56,666$ 56,666$ 56,666$ 283,330$

73,235$ 123,724$ 199,455$ 240,113$ 205,465$ 210,166$ 690,191$ 1,742,349$

Regulatory Compliance Programs

Regulatory Permitting Requirements Total:

Future Capital Improvement Projects

Future Capital Improvement Projects Subtotal:

Page 354: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group - General GovernmentPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

5 Current Projects 9,423,924 6,952,495 2,458,929 - -

1 Future Projects 5,055,000 5,055,000

1 New Projects 20,000 20,000

7 Totals 14,486,424 6,952,495 2,458,929 - 20,000 - - 5,055,000

by Funding Sources

General Fund

GG11-09 487,598 424,173 63,425

487,598 424,173 63,425 - - - - -

Enterprise Funds

GG12-14 12,500 12,500

12,500 - 12,500 - - - - -

GG11-09 56,663 56,663

56,663 56,663 - - - - - -

GG11-09 56,664 56,664

56,664 56,664 - - - - - -

F1010-General

F5600-Water Cap Repl

F5620-Water

F6010-Sewer

Financial Mgmt Sys

Financial Mgmt Sys

Financial Mgmt Sys

Alt Power for City

Subtotal:

Subtotal:

Subtotal:

Subtotal:

Page 355: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group - General GovernmentPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

by Funding Sources Continued

GG04-01 5,000,000 3,698,877 1,301,123

5,000,000 3,698,877 1,301,123 - - - - -

GG04-01 3,327,999 2,696,005 631,994

3,327,999 2,696,005 631,994 - - - - -

GG08-05 5,055,000 5,055,000

5,055,000 - - - - - - 5,055,000

GG13-06 70,000 3,568 66,432

70,000 3,568 66,432 - - - - -

GG10-17 300,000 9,618 290,382

GG13-06 100,000 6,927 93,073

400,000 16,545 383,455 - - - - -

GG12-14 2,500,000 -

GG 15-10 20,000 20,000

2,520,000 - - - 20,000 - - -

14,486,424 6,952,495 2,458,929 - 20,000 - - 5,055,000

F2270-City Services

F2710-Developer Contribution

To be determined

CFF Study Update

Animal Shelter

Historic Center

Alt Power for City

Generations Center

Generations Center

Retaining Wall &

CFF Study Update

F2160-State Grant Prop 84

F2260-Culture & Leisure

Subtotal:

F2290-Administration

Total:

Subtotal:

Subtotal:

Subtotal:

Subtotal:

Subtotal:

Page 356: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group - Parks and RecreationPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

3 Current Projects 2,064,929 1,870,520 94,409 100,000

2 Future Projects 243,000 193,000 50,000

4 New Projects 43,900 - 25,000 18,900

9 Totals 2,351,829 1,870,520 94,409 - 318,000 50,000 18,900 -

by Funding Sources

General Fund

PK03-03 13,500 13,500

PK14-01 225,000 175,000 50,000

PK 15-09 18,900 18,900

257,400 13,500 - - 175,000 50,000 18,900 -

Special Revenue Funds

PK03-03 48,000 48,000

48,000 48,000 - - - - - -

PK03-03 1,586,084 1,559,060 27,024

PK14-03 150,000 50,000 100,000

1,736,084 1,559,060 77,024 - 100,000 - - -

PK03-03 67,345 67,345

67,345 67,345 - - - - - -

Subtotal:

Subtotal:

Subtotal:

Subtotal:

F1010-General Fund

F2260-CFF Culture & Leisure

F3410-Park-In-Lieu

Soccer Complex

CC Expansion

City Wide Master

Central Cntl IR Sys

CC Expansion

CC Expansion

F2150-Federal Grant

CC Expansion

Page 357: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group - Parks and RecreationPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

by Funding Sources Continued

Special Districts

PK 14-11 35,000 35,000

PK 15-09 25,000 25,000

60,000 35,000 - - 25,000 - - -

PK14-11 165,000 147,615 17,385

165,000 147,615 17,385 - - - - -

PK14-05 18,000 18,000

18,000 - - - 18,000 - - -

2,351,829 1,870,520 94,409 - 318,000 50,000 18,900 -

Subtotal:

Total:

Subtotal:

Subtotal:

F2590-Mossdale CFD Capital Replacement

Sangalang Park

F2550-Stonebridge Landscape District

Central Cntl IR Sys

Sangalang Park

River Park No

F2560-Stonebridge Drainage & Lighting District

Page 358: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARYGroup - Street Improvements

Prior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

10 Current Projects 80,828,313 11,133,282 16,649,910 3,950,900 3,947,171 1,647,050 2,265,325 41,234,675

2 Future Projects 793,975 143,975 650,000

3 New Projects 3,304,276 488,463 635,813 820,000 1,020,000 170,000 170,000

15 Totals 84,926,564 11,277,257 17,138,373 4,586,713 5,417,171 2,667,050 2,435,325 41,404,675

by Funding Sources

Special Revenue Funds

PS97-02 5,401,000 1,522,474 3,477,526 401,000

PS02-24 601,342 601,342

PS12-04 8,000 8,000

PS14-06 50,000 5,365 19,635 25,000

PS14-12 120,000 5,450 114,550

PS15-01 22,907 22,907

PS15-04 320,516 50,000 67,629 67,629 67,629 67,629

6,523,765 1,541,289 4,235,960 451,000 92,629 67,629 67,629 67,629

PS97-02 10,855,000 3,162,818 7,692,182 -

PS02-04 64,217 15,615 48,602

10,919,217 3,178,433 7,740,784 - - - - -

Subtotal:

Subtotal:

F2030-Gas Tax

F2110-Measure K

Traffic Calming Meas

"O" St Sidewalk Impr

Sidewalk Repair

Lathrop West Grade

Lathrop Widening Reh

Manthey Bridge Repl

Lathrop West Grade

Pedestrian Bikeway

CityWide Rd Maint

Page 359: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARYGroup - Street Improvements

Prior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

by Funding Sources Continued

PS97-02 200,000 200,000

PS02-04 14,798 2,365 12,433

PS14-06 65,000 25,000 15,000 25,000

PS14-12 80,000 80,000

PS15-01 1,685,813 400,000 485,813 400,000 400,000

PS15-04 149,484 100,000 12,371 12,371 12,372 12,372

2,195,097 227,365 412,433 680,813 437,371 412,371 12,372 12,372

PS97-02 3,232,000 2,700,041 531,959

3,232,000 2,700,041 531,959 - - - - -

PS15-01 65,556 65,556

65,556 - 65,556 - - - - -

PS97-02 136 136

PS02-24 483,645 483,645

483,781 136 483,645 - - - - -

PS97-02 499,000 499,000

PS02-24 1,110,970 34,912 1,076,058

PS12-15 126,195 47,195 79,000

1,736,165 82,107 1,155,058 499,000 - - - -

PS12-15 174,266 51,598 122,668

174,266 51,598 122,668 - - - - -

"O" St Sidewalk Impr

Subtotal:

Subtotal:

Subtotal:

F2140-TDA Funds

F2250-CFF Local Transportation

F2280-CFF Storm Drain

CityWide Rd Maint

Lathrop West Grade

Lathrop Widening Reh

Subtotal:

Subtotal:

Subtotal:

Lathrop West Grade

Lathrop West Grade

Pedestrian Bikeway

Traffic Calming Meas

CityWide Rd Maint

Sidewalk Repair

Lathrop West Grade

F2160-STIP

F2180-Xroads Street Improvements

F2230-CFF-Regional Transportation

Lathrop Widening Reh

Harlan Rd Imprvmnts

Harlan Rd Imprvmnts

Page 360: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARYGroup - Street Improvements

Prior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

by Funding Sources Continued

PS06-06 3,054,489 1,632,047 122,442 150,000 150,000 1,000,000

PS11-10 16,080 13,851 2,229

PS12-04 1,682,267 57,350 57,350 57,350 755,108 755,108

4,752,835 1,645,898 124,671 207,350 207,350 1,057,350 755,108 755,108

PS06-16 29,396 29,396

PS12-04 1,682,267 57,350 57,350 57,350 755,108 755,108

1,711,662 29,396 - 57,350 57,350 57,350 755,108 755,108

PS11-10 283,000 283,000

283,000 - 283,000 - - - - -

PS11-10 517,000 517,000

PS12-04 1,682,267 57,350 57,350 57,350 755,108 755,108

2,199,266 - 517,000 57,350 57,350 57,350 755,108 755,108

PS11-10 500,000 500,000

PS14-04 500,000 500,000

1,000,000 - - - 1,000,000 - - -

PS12-15 33,000 33,000

33,000 33,000 - - - - - -

PS15-01 360,000 90,000 90,000 90,000 90,000

360,000 - - - 90,000 90,000 90,000 90,000

Subtotal:

Subtotal:

Subtotal:

F2360- RTIF Lathrop Local West Transportation

F6030- Sewer CFF

Subtotal:

F2570-Mossdale CFD

F2320- CFF W/C Lathrop Transportation

F2330- WLSP Regional Transportation

Lathrop/I-5 Imprvmnts

Manthey Bridge Repl

Subtotal:

Louise/I-5 Imprvmnts

CityWide Rd Maint

Roth Rd/I-5 Imprvmnts

Manthey Bridge Repl

Roth Rd/I-5 Imprvmnts

Manthey Bridge Repl

Harlan Rd Imprvmnts

Subtotal:

F2420- North Lathrop Impact Fee

Roth Rd/I-5 Imprvmnts

Subtotal:

Harlan Rd Precise Plan

F2340- RTIF Lathrop Local East Transportation

Roth Rd/I-5 Imprvmnts

Page 361: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARYGroup - Street Improvements

Prior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

by Funding Sources Continued

Other Sources

PS06-06 222,708 222,708

PS06-16 264,579 114,579 150,000

PS09-04 1,566,346 1,418,461 147,885

PS15-02 300,000 100,000 200,000

2,353,633 1,755,748 147,885 - 250,000 200,000 - -

PS97-02 975,121 975,121

975,121 - - - 975,121 - - -

PS12-04 38,953,200 32,246 1,317,754 2,633,850 34,969,350

38,953,200 32,246 1,317,754 2,633,850 - - - 34,969,350

PS15-02 400,000 150,000 250,000

400,000 - - - 150,000 250,000 - -

PS11-10 2,100,000 2,100,000

2,100,000 - - - 2,100,000 - - -

PS02-24 4,000,000 475,000 4,000,000

4,475,000 - - - - 475,000 - 4,000,000

84,926,564 11,277,257 17,138,373 4,586,713 5,417,171 2,667,050 2,435,325 41,404,675

Subtotal:

Subtotal:

Subtotal:

Total:

Lathrop West Grade

F2710-Developer Contribution

Railroad

To be determined

F2150-Highway Bridge Program

Lathrop/I-5 Imprvmnts

RI Pkwy Bradshaw Xing

Manthey Bridge Repl

Lathrop Widening Reh

Congestion Mitigation and Air Quality (CMAQ)

Louise/Mckinley Signl

Subtotal:

Roth Rd/I-5 Imprvmnts

Subtotal:

Subtotal:

City of Manteca - Center Point (RTIP)

Louise/Mckinley Signl

Louise/I-5 Imprvmnts

Page 362: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group PW - Water ImprovementsPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

5 Current Projects 4,178,055 1,020,787 2,701,408 48,789 85,447 53,799 58,500 209,325

- Future Projects

1 New Projects 340,000 340,000

6 Totals 4,518,055 1,020,787 2,701,408 388,789 85,447 53,799 58,500 209,325

by Funding Sources

Enterprise Funds

PW10-10 305,000 145,769 9,231 150,000

PW12-08 135,000 1,440 133,560

PW13-08 399,667 251,912 147,755

PW14-08 440,000 148,181 291,819

PW15-05 340,000 340,000

1,619,667 547,302 582,365 340,000 - - - 150,000

PW08-09 171,041 171,041

171,041 171,041 - - - - - -

PW13-08 97,500 97,500 PW10-09 502,819 73,235 123,724 48,789 85,447 53,799 58,500 59,325

600,319 170,735 123,724 48,789 85,447 53,799 58,500 59,325

CFD 2003-1

F562-WaterWater Meter Rep

Subtotal:

Water Sys Repair

Water Meter Rep

Well 7 8 & 9 Mod

Well 21 Post Con

Subtotal:

Subtotal:

Well 10 Power

UWMP - Reg Com

F561-Water Expansion

F560-Water Cap Repl

WMP Update

Page 363: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group PW - Water ImprovementsPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

PW08-09 1,531,471 117,371 1,414,100 -

1,531,471 117,371 1,414,100 - - - - -

PW08-09 14,338 14,338

14,338 14,338 - - - - - -

PW08-09 581,219 581,219

581,219 - 581,219 - - - - -

4,518,055 1,020,787 2,701,408 388,789 85,447 53,799 58,500 209,325Total:

Subtotal:

Subtotal:

F541 - CFD 2003-01

F271-Developer Contribution

Project Buy In Fund 562 & 541

Subtotal:

Well 21 Post Con

Well 21 Post Con

Well 21 Post Con

Page 364: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group - Drainage ImprovementsPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

- Current Projects

1 Future Projects 1,632,000 282,000 1,350,000

1 New Projects 112,000 9,011 52,989 50,000

2 Totals 1,744,000 9,011 334,989 50,000 - - - 1,350,000

by Funding Sources

Special Revenue Funds

SD14-13 50,000 50,000

50,000 - - 50,000 - - - -

SD08-07 1,500,000 150,000 1,350,000

1,500,000 - 150,000 - - - - 1,350,000

SD08-07 132,000 132,000

SD14-13 62,000 9,011 52,989

194,000 9,011 184,989 - - - - -

1,744,000 9,011 334,989 50,000 - - - 1,350,000

F105-Economic Development

ULFP Protection

Subtotal:

F234-CFF Regional Trans

Shilling SWPS

Subtotal:

Total:

Subtotal:

F271-Developer Contribution

Shilling SWPS

ULFP Protection

Page 365: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group - Wastewater ImprovementsPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

6 Current Projects 48,855,840 1,689,521 8,006,319 2,902,500 19,842,000 14,720,000 360,000 1,335,500

- Future Projects

1 New Projects 500,000 500,000

7 Totals 49,355,840 1,689,521 8,006,319 3,402,500 19,842,000 14,720,000 360,000 1,335,500

by Funding Sources

WW11-06 9,192 9,192

9,192 9,192 - - - - - -

WW13-02 1,535,000 100,000 235,000 1,200,000

WW13-09 150,000 8,000 142,000

WW15-08 187,500 187,500

1,872,500 8,000 242,000 187,500 - - 235,000 1,200,000

WW11-06 22,116 22,116

WW12-07 505,200 35,349 98,151 77,500 70,000 100,000 50,000 74,200

WW15-08 44,500 44,500

571,816 57,465 98,151 122,000 70,000 100,000 50,000 74,200

WW10-15 75,000 69,749 5,251

WW12-07 524,000 75,660 195,040 50,000 47,000 20,000 75,000 61,300

WW13-09 125,000 7,220 117,780

WW15-08 268,000 268,000

992,000 152,629 318,071 318,000 47,000 20,000 75,000 61,300 Subtotal:

Subtotal:

Subtotal:

F611-WW Capital Replacement

F607-Crossroads Capital Replacement

Xrds WWTP Expan

Subtotal:

East Side WW Col

WWPS Imprvmnts

WWMP Update

Xrds WWTP Expan

Sewer Plant Upgd

F605-Crossroads

F606-Capital Replacement

WWMP Update

WWMP Update

Sewer Plant Upgd

WWPS Imprvmnts

LCTF Expansion

Page 366: 2014 2015 Preliminary Budget

CITY OF LATHROP

CAPITAL IMPROVEMENT PROGRAM

FIVE YEAR PLAN FY 14-15 THROUGH FY 18-19

CIP SUMMARY

Group - Wastewater ImprovementsPrior & Carry New Funding

Total Est. Current Year Forward Request Planned Planned Planned Planned

by Project Type Cost Actuals FY 14-15 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19

by Funding Sources Continued

WW10-15 7,922,570 1,070,049 6,852,521

WW11-06 2,671,692 286,969 384,723 1,050,000 1,050,000

WW14-14 35,099,000 99,000 1,725,000 18,675,000 14,600,000

45,793,262 1,357,018 7,336,244 2,775,000 19,725,000 14,600,000 - -

WW10-15 117,070 105,217 11,853

117,070 105,217 11,853 - - - - -

49,355,840 1,689,521 8,006,319 3,402,500 19,842,000 14,720,000 360,000 1,335,500

Subtotal:

Total:

Subtotal:

F105-Economic Development

F271-Developer Contribution

Xrds WWTP Expan

LCTF Phase 2

LCTF Expansion

LCTF Expansion

Page 367: 2014 2015 Preliminary Budget

Parks & Recreation

Improvements, $- , 0%

General Government & Public

Safety, $- , 0%

Drainage Improvements,

$50,000 , 1%

CIP by Project Category FY 2014-2015 New Funding Request

Street Improvements,

$4,586,713 , 54%

Water Improvements,

$388,789 , 5%

Wastewater Improvements,

$3,402,500 , 40%

Page 368: 2014 2015 Preliminary Budget

Street Improvements,

$84,926,564 , 54%

Parks & Recreation

Improvements, $2,351,829 ,

2%

General Government & Public

Safety, $14,486,424 , 9%Drainage Improvements,

$1,744,000 , 1%

CIP by Project Category 5-Year Funding Program FYs 2015-2019

Water Improvements,

$4,518,055 , 3%

Wastewater Improvements,

$49,355,840 , 31%

Page 369: 2014 2015 Preliminary Budget

FINANCIAL AND STATISTICAL TABLES 

Page 370: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015

General Fund 1010Information Systems 

Beginning Balance 14/15 348,789$              14/15 Reserves 200,00014/15 Expenses (63,000)

Ending Balance 14/15 485,789$              

Building Beginning Balance 14/15 22,201$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 22,201$                 

Code ComplianceBeginning Balance 14/15 8,906$                   

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 8,906$                   

Police Administration Beginning Balance 14/15 13,583$                 

14/15 Reserves 014/15 Expenses (13,583)

Ending Balance 14/15 ‐$                       

Public Works Administration Beginning Balance 14/15 22,171$                 

14/15 Reserves 014/15 Expenses

Ending Balance 14/15 22,171$                 

Park MaintenanceBeginning Balance 14/15 10,675$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 10,675$                 

EQUIPMENT REPLACEMENT RESERVE BALANCES BY DEPARTMENT

Page 371: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015EQUIPMENT REPLACEMENT RESERVE BALANCES BY DEPARTMENT

General Fund 1010 (CONTINUED)Total General Fund

Beginning Balance 14/15 426,325$              14/15 Reserves 200,00014/15 Expenses (76,583)

Ending Balance 14/15 549,742$              

Traffic Safety 2070Beginning Balance 14/15 28,723$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 28,723$                 

Streets 2080Beginning Balance 14/15 11,028$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 11,028$                 

Crossroads Storm Drain 2500Beginning Balance 14/15 4,535$                   

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 4,535$                   

Storm Drain 2510Beginning Balance 14/15 13,791$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 13,791$                 

Stonebridge Drainage/Lighting District 2560Beginning Balance 14/15 67,994$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 67,994$                 

Page 372: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015EQUIPMENT REPLACEMENT RESERVE BALANCES BY DEPARTMENT

Water 5620Beginning Balance 14/15 25,973$                 

14/15 Reserves 014/15 Expenses (25,973)

Ending Balance 14/15 ‐$                       

Sewer 6010Beginning Balance 14/15 53,591$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 53,591$                 

Sewer West I‐5  6080Beginning Balance 14/15 30,419$                 

14/15 Reserves 014/15 Expenses 0

Ending Balance 14/15 30,419$                 

Grand TotalBeginning Balance 14/15 662,379$              

14/15 Reserves 200,00014/15 Expenses (102,556)

Ending Balance 14/15 759,823$              

Page 373: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

General Fund   101Operating Transfers In

City Services 2270 626,250 626,250 626,250Administration CFF  2290 0 0 0Scholarship Fund 2700 7,500 3,331 6,500Historic CFD 2630 1,500 1,500 1,500Compensated Absences 8010 143,805 91,926 0

Total Operating Transfers In 779,055 723,007 634,250Operating Transfers Out

Measure C LMFD 2010 0 (800,000) (928,000)Public Nuisance 2090 (25,000) (11,766) (25,000)Subsidy Xroad Storm Drain 2500 (8,795) (38,812) (14,379)General Benefit Steet Lights 2520 (16,672) (17,095) (17,566)Subsidy Residential Steet Lights 2520 (7,905) 0 0Subsidy Woodfield Park 2530 0 (9,013) (11,170)General Benefit Stonebridge Landscaping 2550 (3,168) (3,326) (3,492)General Benefit Stonebridge Drain/Lighting 2560 (3,168) (3,326) (3,492)G l CIP 3010 (66 673) 0 0

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

General CIP 3010 (66,673) 0 0Streets CIP 3310 0 0 0

Total Operating Transfers Out (131,381) (883,338) (1,003,099)

Economic Development 1050Operating Transfers Out

Storm Drain CIP Fund 3910 0 0 (50,000)

Measure C LMFD 2010Operating Transfers In

General Fund 1010 0 800,000 928,000

Gas Tax Fund  2030Operating Transfers Out

Streets Fund   2080 (200,000) (200,000) (300,000)Streets & Roads CIP Fund 3310 (606,342) (5,033,000) (3,928,526)

Total Operating Transfers Out (806,342) (5,233,000) (4,228,526)

Page 374: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Streets Fund   20800Operating Transfers In

Gas Tax 2105 Fund   2030 200,000 200,000 300,000Measure "K" Fund   2110 200,000 200,000 300,000

Total Operating Transfers In 400,000 400,000 600,000

Public Nuisance 2090Operating Transfers In

General Fund 1010 25,000 11,766 25,000

Measure "K" Fund   2110Operating Transfers Out

Streets Fund   20800 (200,000) (200,000) (300,000)Streets & Roads CIP Funds   3310 0 (10,909,217) (7,740,784)

Total Operating Transfers Out (200,000) (11,109,217) (8,040,784)

State/Recycling and Recovery Grant Fund   2130O i T f OOperating Transfers Out

Streets & Roads CIP Fund   3310 (37,689) 0 0Total Operating Transfers Out (37,689) 0 0

LTF ‐ Streets & Roads Fund   2140Operating Transfers Out

General CIP Fund  3010 (5,000,000) (29,148) 0Streets & Roads CIP Fund   3310 (1,145,090) (1,448,613) (1,093,246)Storm Drain CIP Fund 3910 0 0 0

Total Operating Transfers Out (1,145,090) (1,477,761) (1,093,246)

Federal Grant    2150Operating Transfers Out

General CIP Fund  3010 (61,954) 0 0Streets & Roads CIP Fund   3310 (2,017,763) (1,250,000) (3,951,604)

STIP Augmentation  2160Operating Transfers Out

General CIP Fund  3010 (5,000,000) (4,394,176) (1,301,123)

Page 375: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

STIP Augmentation  216 (CONTINUED)Streets & Roads CIP Fund 3310 (3,079,677) (1,317,325) (531,959)

Regional Traffic Mitigation Fund 2230Operating Transfers Out

Streets & Roads CIP Fund  3310 0 (3,700) 0

Traffic Mitigation Fund   2250Operating Transfers Out

Streets & Roads CIP Fund   3310 0 0 (499,000)

Culture & Leisure  2260Operating Transfers Out

General CIP Fund  3010 0 (50,000) 0

City Services  2270Operating Transfers Out

G l F d 1010 (626 250) (626 250) (626 250)General Fund 1010 (626,250) (626,250) (626,250)Water Improvement  CIP Fund 569 0 0 0

Total Operating Transfers Out (626,250) (626,250) (626,250)

Administration CFF  2290Operating Transfers Out

General Fund 1010 0 0 0General CIP Fund  3010 (70,000) 0 0

W/C  Lathrop Local  Trans CFF 2320Operating Transfers Out

Streets & Roads CIP Fund   3310 0 0 (207,350)

WLSP Regional Trans CFF 2330Operating Transfers Out

Streets & Roads CIP Fund   3310 0 0 (57,350)

RTIF ‐ Lathrop Local West 2360

Page 376: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Operating Transfers OutStreets & Roads CIP Fund   3310 0 0 (57,350)

Xroad Storm Drain 2500Operating Transfers In

Subsidy General Fund 1010 8,795 38,812 14,379

Street Lights 2520Operating Transfers In

General Benefit & Subsidy 1010 24,577 17,095 17,566Operating Transfers Out

Streets & Roads CIP Fund 331 (100,000) 0 0

Woodfield Park 2530Operating Transfers In

Subsidy General Fund 1010 0 9,013 11,170

Stonebridge Landscaping 2550Operating Transfers In

General Benefit 1010 3,168 3,326 3,492

Stonebridge Drainage/Lighting 2560Operating Transfers In

General Benefit 1010 3,168 3,326 3,492

Mossdale CFD  2570Operating Transfers In

Mossdale CFD Cap Replace 2590 0 4,093 0Operating Transfers Out

Mossdale CFD Cap Replace 2590 (37,422) (5,000) (5,000)Streets & Roads CIP Fund 3310 (90,000) (90,000) 0

Total Operating Transfers Out (127,422) (95,000) (5,000)

Mossdale Landscape & Lighting 2580Operating Transfers In

Mossdale L & L Cap. Replace 2610 0 2,964 0

Page 377: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Mossdale Landscape & Lighting 2580 (Continued)Operating Transfers Out

Mossdale L & L Cap. Replace 2610 (5,000) (5,000) (5,000)

Mossdale CFD Capital Replace  2590Operating Transfers In

Mossdale CFD 2570 37,422 5,000 5,000Operating Transfers Out

Mossdale CFD 2570 0 (4,093) 0

Mossdale L & L Cap. Replace  2610Operating Transfers In

Mossdale Landscape & Lighting 2580 5,000 5,000 5,000Operating Transfers Out

Mossdale Landscape & Lighting 2580 0 (2,964) 0

Historical CFD 2005‐1 2630O i T f OOperating Transfers Out

General Fund 1010 (1,500) (1,500) (1,500)

CDBG 2650Operating Transfers Out

General CIP Fund  3010 (27,541) 0 0

Standby District 2660Operating Transfers Out

MBR Recycled Plant Fund 6080 (571,579) (414,476) (457,963)

Scholarship Fund 2700Operating Transfers Out

General Fund 1010 (7,500) (3,331) (6,500)

Developer Projects Fund 2710Operating Transfers Out

General CIP Fund  3010 0 (100,000) (73,616)Streets & Roads CIP Fund 3310 (2,739,120) (100,000) 0

Page 378: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Developer Projects Fund 2710 (Continued)Storm Drain CIP Fund 3910 0 0 0WasteWater CIP Fund 6090 (560,440) (4,668,781) (3,205,044)

Total Operating Transfers Out (3,299,560) (4,868,781) (3,278,660)

General CIP Fund  3010Operating Transfers In

General Fund 1010 66,673 0 0Gas Tax Fund 2030 5,000 0 0LTF‐Streets & Roads Fund 2140 35,000 29,148 0Federal Grant Fund 2150 61,954 0 0STIP Augmentation Fund 2160 5,000,000 4,394,176 1,301,123Culture & Leisure Fund 2260 0 50,000 0City Services Fund  2270 0 0 0Administration CFF Fund 2290 70,000 0 0CDBG Fund 2650 27,541 0 0Developer Projects Fund 2710 0 100,000 73,616P k I Li F d 3410 55 000 0 0Park‐In‐Lieu Fund 3410 55,000 0 0Water Fund 5620 61,663 0 0Wastewater Fund 6010 59,164 0 0Recycled Water Fund 6080 2,500 0 0

Total Operating Transfers In 5,444,495 4,573,324 1,374,739

Streets & Roads CIP Fund   3310Operating Transfers In

General Fund 1010 0 0 0Gas Tax 2105 Fund 2030 601,342 5,033,000 3,928,526Measure "K" Fund   2110 0 10,909,217 7,740,784State/Recycling and Recovery Fund 2130 37,689 0 0LTF‐Streets & Roads Fund  2140 1,110,090 1,448,613 1,093,246Federal Grant Fund  2150 2,017,763 1,250,000 3,951,604STIP Augmentation Fund 2160 3,079,677 1,317,325 531,959Regional Traffic Impact  Fund   2230 0 3,700 0Traffic Mitigation Fund   2250 0 0 499,000W/C Lathrop Local Trans CFF 2320 0 0 207,350WLSP Regional Trans CFF 2330 0 0 57,350

Page 379: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Streets & Roads CIP Fund   331 (Continued)RTIF ‐ Lathrop Local West 2360 0 0 57,350Industrial Lighting Dist. Fund 2520 100,000 0 0Mossdale CFD 04‐1 Fund 2570 90,000 90,000 0Developer Projects Fund 2710 2,739,120 100,000 0

Total Operating Transfers In 9,775,681 20,151,855 18,067,169

Park‐In‐Lieu Fees 3410Operating Transfers Out

Streets & Roads CIP Fund 3310 (55,000) 0 0

Storm Drain CIP  3910Operating Transfers In

Storm Drain CIP Fund 3910 0 0 50,000Developer Projects Fund 2710 0 0 0

Total Operating Transfers In 0 0 50,000

S f W S l CSLP 5400Surface Water Supply CSLP 5400Operating Transfers Out

Water Fund  5620 (1,220,654) (1,213,945) (576,128)

Mossdale Village CFD 2003‐1 5410Operating Transfers Out

Water Fund 5620 (620,978) (617,478) (789,329)Water CIP Fund   5690 (1,481,077) (1,481,077) (1,414,100)

Total Operating Transfers Out (2,102,055) (2,098,555) (2,203,429)

Water System Capital Replacement   5600Operating Transfers In

Water Fund   5620 324,509 0 390,431Operating Transfers Out

Water Fund   5620 (83,170) (83,170) (85,200)Water CIP Fund   5690 (30,000) (658,000) (340,000)

Water Fund   5620Operating Transfers In

Page 380: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Water Fund   562 (CONTINUED)Surface Water Supply CSLP Fund 5400 1,220,654 1,213,945 576,128Mossdale CFD 2003‐1 Fund 5410 620,978 617,478 789,329Water Capital Replacement Fund  5600 83,170 83,170 85,200Surface Water Supply CFF Fund  5640 0 0 253,435

Total Operating Transfers In 1,924,802 1,914,593 1,704,092Operating Transfers Out

General CIP Fund  3010 (61,663) 0 0Water System Capital Replacement Fund 5600 (324,509) 0 (390,431)SRF Loan Fund 5650 (597,575) 0 0Water CIP Fund 5690 (625,466) (627,682) (630,008)

Total Operating Transfers Out (1,609,213) (627,682) (1,020,439)

Surface Water Supply CFF Fund 5640Operating Transfers Out

Water 5620 0 0 (253,435)

SRF L 5650SRF Loan   5650Operating Transfers In

Water Fund  5620 597,575 0 0Operating Transfers Out

Wastewater CIP Fund   6090 (736,349) 0 0

Water CIP Fund   5690Operating Transfers In

Mossdale Village CFD 2003‐1 Fund  5410 1,481,077 1,481,077 1,414,100Water Capital Replacement Fund  5600 30,000 658,000 340,000Water  Fund  5620 625,466 627,682 630,008SRF Loan Fund  5650 736,349 0 0

Total Operating Transfers In 2,872,892 2,766,759 2,384,108

Wastewater Fund   6010Operating Transfers Out

General CIP Fund  3010 (59,164) 0 0Wastewater Capital Replacement Fund 6060 (390,854) (398,840) (408,066)

Page 381: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Wastewater Connection Fees   6030Operating Transfers Out

Wastewater CIP Fund   6090 0 0 0

Water Recycling Plant #1   6050Operating Transfers Out

Water Recycle Plant #1 Cap Replace Fund 6070 (168,088) (163,976) (163,976)

Wastewater Capital Replacement   6060Operating Transfers In

Wastewater Fund  6010 390,854 398,840 408,066Operating Transfers Out

Wastewater CIP Fund  6090 (25,000) (75,000) (187,500)

Water Recycling Plant #1 Cap Replace   6070Operating Transfers In

Water Recycling Plant #1 Fund   6050 168,088 163,976 163,976O i T f OOperating Transfers Out

Wastewater CIP Fund   6090 (30,000) (73,500) (122,000)

WW Recycled Water 6080Operating Transfers In

Standby District Fund 2660 571,579 414,476 457,963Operating Transfers Out

General CIP Fund  3010 (2,500) 0 0Recycled Water Capital Replacement Fund 6110 0 (108,568) (93,118)

Wastewater CIP Fund   6090Operating Transfers In

Developer Projects Fund  2710 560,440 4,668,781 3,205,044Wastewater Connection Fees Fund   6030 0 0 0Wastewater Capital Replacement Fund 6060 25,000 75,000 187,500Xroad Capital Replacement Fund  6070 30,000 73,500 122,000Wastewater CIP Fund 6100 0 0 0MBR Capital Replacement Fund  6110 30,000 335,700 318,000

Total Operating Transfers In 645,440 5,152,981 3,832,544

Page 382: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2013‐2014

BUDGETED BUDGETED BUDGETEDFY 2012‐2013 FY 2013‐2014 FY 2014‐2015

INTERFUND TRANSACTIONS ‐ OPERATING TRANSFERS

Recycled Water Capital Replacement 6110Operating Transfers In

Recycled Water Fund 6080 0 108,568 93,118Operating Transfers Out

Wastewater CIP Fund   6090 (30,000) (335,700) (318,000)

Compensated Absences Fund   8010Operating Transfers Out

General Fund 1010 (143,805) (91,926) 0

Net Operating Transfers  ‐                                   ‐                               ‐                              

Page 383: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015

BUDGET BUDGET BUDGETFY 2012‐2013 FY 2013‐2014 FY 2014‐20145

General    1010 2,660,689 3,030,438 2,918,731Gas Tax 2105    2030 (786) (1,006) (921)Traffic Safety   2070 (4,710) (7,386) (4,554)Streets   2080 (106,113) (100,074) (106,512)Public Nuisance 2090 (1,106) (1,766) (1,270)Asset Forefeiture 2100 0 0 (97)Measure "K"    2110 (236) 0 (395)Transit 2120 0 (5,986) (407)LTF ‐ Streets & Roads    2140 (804) (562) (762)Universal Hiring Grant 2190 (3,389) (10) 0Historic Lathrop Loan 2240 (193) 0 0Administration C.F.F.   2290 (55) 0 0CLSP 2006‐2 2390 (77,658) (48,783) (42,117)Recycling AB 939   2400 (13,216) (6,267) (7,578)Crossroads Storm Drain     2500 (38,057) (38,399) (36,049)Storm Drain    2510 (53,358) (49,108) (41,767)Street Lighting   2520 (27,035) (20,897) (17,295)Woodfield    2530 (12,425) (16,242) (13,237)Stonebridge Landscaping   2550 (25,622) (31,152) (29,802)Stonebridge Drainage & Lighting   2560 (49,250) (56,270) (45,237)Mossdale CFD 2570 (241,332) (288,187) (313,219)Mossdale Landscape/Lighting 2580 (77,658) (75,786) (51,721)Historical Lathrop CFD   2630 (3,031) (5,259) (3,113)Standy District 2005‐1 2660 (37) (36) (37)Developer Projects 2710 (710) (571) (522)General Government CIP 3010 0 (40,206) (53,000)Streets CIP 3310 0 (4,655) (5,004)Park & Lieu Fees 3410 (710) 0 0Storm Drain CIP 3910 (247) (369) 0Mossdale Village CFD 2003‐1 5410 (1,386) (2,314) (2,782)Water System Capital Replacement   5600 (1,705) (2,041) (2,017)Water Connection Fees   5610 (178) 0 0Water   5620 (882,243) (1,021,161) (987,325)Surface Water Supply CFF   5640 (183) 0 0Water CIP   5690 (2,322) (1,687) (1,792)Wastewater    6010 (577,718) (625,536) (586,476)

FUND NAME

INTERFUND TRANSACTIONS ‐ INDIRECT COST REIMBURSEMENTS

Page 384: 2014 2015 Preliminary Budget

Budget for Fiscal Year 2014‐2015

BUDGET BUDGET BUDGETFY 2012‐2013 FY 2013‐2014 FY 2014‐20145FUND NAME

INTERFUND TRANSACTIONS ‐ INDIRECT COST REIMBURSEMENTS

Wastewater Connection Fees   6030 (596) (972) (532)Water Recycling Plant #1   6050 (145,107) (185,724) (181,889)Wastewater Capital Replacement   6060 (1,971) (2,417) (2,540)Water Recycling Plant #1 Cap Repl    6070 (287) (416) (463)WW Recycled Water   6080 (305,887) (385,816) (375,608)Wastewater CIP 6090 (1,974) (2,161) (1,520)WWTP Expansion   6100 (470) 0 0Recycled Water Cap Replacement   6110 (924) (1,216) (1,171)

NET INDIRECT COST REIMBURSMENTS 0 0 0

All of the City's General Government programs are initially accounted and budgeted for in the General Fund.  However, these support service programs also benefit the City's special revenue and agency funds, and accordingly, transfers are made from these funds to reimburse the General Fund for these services. These transfers are based on a Cost Allocation Plan prepared for this purpose which distributes these shared costs in a uniform consistent manner in with generally accepted accounting principles.  Copies of the most current Cost Allocation Plan are available for review in the Finance Department.  

Page 385: 2014 2015 Preliminary Budget

REFERENCES 

Page 386: 2014 2015 Preliminary Budget

SAMPLE 

 RESOLUTION NO. 14‐_______ 

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LATHROP ADOPTING THE BUDGET FOR FISCAL YEAR 2014‐2015,  AND ALSO ADOPTING THE PROVISIONAL GANN LIMIT, FOR FISCAL YEAR BEGINNING JULY 1, 2014 AND ENDING JUNE 30, 2015. 

  

WHEREAS, the City Council of the City of Lathrop has duly considered the financial needs of the City of Lathrop for fiscal year 

2014‐15; and,  

 WHEREAS, the City Council has caused a budget to be prepared which incorporates those anticipated expenditures, which total 

$__________; and,  

 WHEREAS, the budget document and itemized details are filed with the City Clerk of the City of Lathrop; and,  WHEREAS, the above appropriations are approved as the budget for fiscal year 2014‐15 and that the City Manager is authorized 

to transfer appropriations within the department budgets provided no change is made in the total amount provided for any one 

department; and, 

 WHEREAS, the Provisional Gann Limit has been calculated for fiscal year 2014‐15 to be $______________ (see exhibit “A”).  NOW, THEREFORE, be it resolved that this City Council does hereby approve the appropriations and the provisional Gann Limit 

for 2014‐15 as identified above. 

 

Page 387: 2014 2015 Preliminary Budget

SAMPLE 

PASSED AND ADOPTED by the Council of the City of Lathrop at a regular meeting held on                   , 2014 by the following vote: 

   

AYES: 

NOES: 

ABSENT: 

ABSTAIN: 

APPROVED AS TO FORM:        ATTEST: 

 

   

____________________________      ____________________________ 

City Attorney            City Clerk 

 

Page 388: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

BUDGET PROCESS 

Budget Basis of Accounting   The City’s budget is prepared on a modified accrual basis of accounting for all funds, including proprietary funds.  Capital outlays and debt service principal payments are budgeted as expenditures.  Debt proceeds, capital grants, inter‐fund transfers and inter‐fund loans are budgeted as revenues.  For accounting purposes, however,  these  transactions are reported at year‐end on  the  full accrual basis of accounting  in proprietary  funds  in  the City’s Comprehensive Annual Financial Report (CAFR).  Upon approval of the City Manager, encumbrances may be carried forward to the next fiscal year.  Appropriations are adopted for the general, special revenue and capital project funds.  Annually appropriations are adopted separately for each project as shown in the Capital Improvement Program (CIP) schedules.  Funding sources are shown on the schedules as well.  Budget Level of Control  The budget level of control is at the detail expenditure level.  Once the budget is adopted, the City Council by affirmative vote of a majority of the Council, upon the recommendation of the City Manager, may by resolution make additional or supplementary appropriations from unexpended and unencumbered funds set aside in the reserves in the City budget. The City Manager is authorized to approve transfers of appropriations between expenditure accounts in the operating budget within the same department and within the same fund.  Budget Process  The annual City budget process is as follows:    The City Council approves the budget calendar        December     Departments estimate revenues and expenditures   for FY 2014‐2015 through June 30th        January   

Page 389: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

BUDGET PROCESS 

  Indirect Cost Plan        January     City Manager reviews Non‐218 Assessment District   Budgets        February       Finance prepares beginning estimated fund balances        February     Departments prepare Capital Improvement Program   With funding sources        February     City Council adopts Landscape and Lighting    Non‐218 Assessment District Resolution of Intent         March     City Manager reviews Capital Improvement        March     Departments prepare estimated revenues        March     City Council reviews Capital Improvement   Program        March       Departments prepare estimated appropriations        March   

Page 390: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

BUDGET PROCESS 

   Parks & Recreation Commission reviews        April   Recreation budget               Planning Commission reviews Capital    Improvement Program for conformity   with General Plan        April         City Council holds public hearing for   Non‐218 Assessment Districts        May     Preliminary Budget Delivered to   City Council        May     City Council reviews Preliminary    Budget and Capital Improvement Program        June     City Council adopts Final Budget        June     City Council adopts Final Gann Limit        June 

Page 391: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  General Fund 1010  The general fund accounts for the financial resources not required to be accounted for in another fund.  This fund consists primarily of general government type activities.  SPECIAL REVENUE FUNDS   Special revenue funds account for the financial activity of specific revenues that are legally restricted to expenditure for particular purposes.  Economic Development Fund 1050  To account for revenues and expenditures for the City’s economic development division.   Measure C LMFD Fund 2010  To account for revenues and expenditures for the City’s Measure C LMFD portion.   Gas Tax Fund 2030  To account for revenues apportioned to the City under the Streets and Highway Code, Sections 2105, 2106, 2107, and 2107.5 of the State of California, which are legally restricted for the acquisition, construction, improvement and maintenance of public streets.   Traffic Safety Fund 2070  To account for the fines and forfeitures received under Section 1463 of the Penal Code, which are restricted for the use of official traffic control devices and for some street construction purposes.     

Page 392: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Local Street Fund 2080  To account for revenues and expenditures for the City’s street division.   Public Nuisance Fund 2090  To account for revenues and expenditures for code compliance activities.   Asset Forfeiture Fund 2100  To  account  for  revenues  obtained  from  the  sale  of  forfeited  property  in  drug  related  cases.  These  funds  can  only  be  used  by  the  police department for police‐related equipment.  Measure “K” Fund 2110  To account for revenues generated from a ½ cent sales tax for local street repairs. These funds are restricted for maintenance and construction on street‐related projects.  Public Transit Fund 2120  To account for local transportation funds received for transit purposes from San Joaquin County Council of Governments.  Streets & Roads Local Transportation Funds 2140  To account for the local transportation funds received for street and road purposes from the San Joaquin County Council of Governments.   Federal Grant Fund 2150  To account for federal grant revenues and expenditures. 

Page 393: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  STIP Augmentation Fund 2160  To account for revenues and expenditures for transportation projects included in the State Transportation Improvement Program.  Universal Hiring Grant Fund 2190  To account for the State of California Office of Traffic Safety “Selective Traffic Enforcement Program (STEP)” Grant. State COPS Fund 2220    To account for California State Supplemental Law Enforcement Services Fund (SLESF) grants. Funds received in fiscal year 2012‐13 must be spent by June 30, 2013.  Historic Lathrop Loan Program (HLLP) Fund 2240  To account for loan activity for the Historic Lathrop Loan Program.  Traffic Mitigation Fund 2250  To account for the financial resources collected from traffic mitigation capital facility fees.   Culture & Leisure Fund 2260  To account for the financial resources associated with the capital facility fees for the Library, Cultural Center, Park Improvements to Community Center and Neighborhood Parks.   City Service Fund 2270  To account for the financial resources associated with the capital facility fees for City Hall, Corporate Yard, Animal Services Facility and the Police Station.  

Page 394: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Storm Drain Capital Facility Fee Fund 2280  To account for capital facility fees collected from storm drains.  Administration Fund 2290  To account for a percentage of all capital facility fees collected for the staff to manage/administer capital facility fees.   Environmental Mitigation CFF Fund 2310  To account for capital facility fees collected for the brush rabbit habitat mitigation.   W / C Lathrop Transportation CFF Fund 2320  To account for capital facility fees collected for local and regional road and freeway projects in West Central Lathrop.  WLSP Regional Transportation CFF Fund 2330  To account for capital facility fees collected for regional road and freeway projects in the West Lathrop Specific Plan area.   Regional Transportation Impact Fee (RTIF) Funds 2340‐2370  To account  for  capital  facility  fees  collected  for  regional projects  in  San  Joaquin County. A portion of  the  fees  collected are payable  to  San Joaquin County & San Joaquin County of Governments.  Central Lathrop Specific Plan (CLSP) Services CFD Fund 2390  To account for revenues and expenditures associated with the CLSP Community Facilities District 2006‐2.  

Page 395: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  AB939 Recycling Fund 2400  To account for the financial resources associated with the preparation, implementation and administration of the City’s Integrated Solid Waste Management Plan in accordance with AB939.   North Lathrop Transportation CFF Fund 2420  To account for capital facility fees collected for North Lathrop area.  Stewart Economic Development 80% CFF Fund 2430  To account  for  capital  facility  fees  collected  to  support development both on and off  the Stewart Tract  that will provide  to  the City and  its citizens.   Citywide Economic Development 20% CFF Fund 2430  To account  for  capital  facility  fees  collected  to  support development both on and off  the Stewart Tract  that will provide  to  the City and  its citizens.   Crossroads Storm Drain Capital Replacement Fund 2490  To account for revenues and expenditures related to capital replacement expenditures within the Crossroads Subdivision.  Crossroads Storm Drain Fund 2500  To  account  for  revenues  and  expenditures  related  to  the maintenance  and  operations  of  the  storm  drains  and  improvements within  the Crossroads Subdivision.    

Page 396: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Storm Drain Benefit Assessment District Fund 2510  To account  for  revenues and expenditures associated with  the maintenance and operations of  storm drains  for  residential,  commercial and industrial areas within Historic Lathrop.  Street Light Fund 2520  To account  for  revenues and expenditures associated with  the maintenance and operations of street  lighting  for  residential, commercial and industrial areas within Historic Lathrop.  Woodfield Landscape Maintenance Fund 2530  To account for revenues and expenditures associated with specific park maintenance and operations within the Woodfield Landscape District.   Stonebridge Landscape Maintenance Fund 2550   To account for revenues and expenditures associated with specific park maintenance and operations within the Stonebridge Landscape District.   Stonebridge Drainage and Lighting Fund 2560  To account for revenues and expenditures associated with the storm drainage and lighting  activities within the Stonebridge District.   Mossdale CFD Fund 2570  To account for revenues and expenditures associated with the Mossdale Community Facilities District 04‐1.   Mossdale Landscape and Lighting District Fund 2580  To account for revenues and expenditures associated with the lighting and landscaping activities within the Mossdale District.  

Page 397: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Mossdale CFD Capital Replacement Fund 2590  To account for revenues and expenditures related to capital replacement expenditures within the Mossdale Community Facilities District 04‐1.   Mossdale Landscape & Lighting Capital Replacement Fund 2610  To account for revenues and expenditures related to capital replacement expenditures within the Mossdale Landscape & Lighting District.  Historic Lathrop CFD Fund 2630  To account for revenues and expenditures associated with the Historic Lathrop Community Facilities District 2005‐1.    Community Development Block Grant (CDBG) Fund 2650  To account for the annual federal grant that provides for development of a viable urban community.   Mossdale Standby 2005‐1 Fund 2660  To account for standby charges related to the Operation and Maintenance of the Wastewater Recycling Plant‐1 MBR.  Scholarship Fund 2700  To  account  for  the  revenues  provided  by  businesses/organizations  to  provide  assistance  with  tuition  of  qualified  parks  and  recreation participants.     

Page 398: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  CAPITAL PROJECT FUNDS  Capital project  funds  account  for  the  financial  resources  to be used  for  the  acquisition or  construction of major  facilities other  than  those financed by proprietary funds.   General Fund 3010  To account for the expenditure of funds for projects funded from the General Fund.   Streets and Roads Fund 3310  To account for capital project expenditures related to streets and roads occurring over more than one Fiscal Year.  There is more than one fund used to fund this account.  Park In‐Lieu Fund 3410  To account for revenues and expenditures that can legally be made under the Quimby Act. The revenue is collected from residential developers to offset the impact on parks and can only be used for new park development.  Storm Drain Fund 391  To account for capital project expenditures related to storm drain improvements occurring over more than one Fiscal Year.   DEVELOPER PROJECT FUNDS  Developer project funds account for revenues and expenditures related to capital projects funded by developers.     

Page 399: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Developer Project Fund 2710  To account for the deposits held for multiple developers in accordance with agreements with the City.  Saybrook CLSP Fund 4010  To account for the deposits held for Saybrook CLSP in accordance with agreements with the City.   Gateway Business Park Fund 4020  To account for the deposits held for South Lathrop LLC Gateway Business Park in accordance with agreements with the City.   Watt / Lathrop Marketplace II Fund 4030  To account for the deposits held for Watt / Lathrop Marketplace II in accordance with agreements with the City.   KB Homes Fund 4040  To account for the deposits held for KB Homes in accordance with agreements with the City.   South Lathrop Richland Fund 4050  To account for the deposits held for South Lathrop Richland in accordance with agreements with the City.   Crossroads Richland Fund 4080  To account for the deposits held for Crossroads Richland in accordance with agreements with the City.    

Page 400: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Pacific Union Homes Fund 4100  To account for the deposits held for Pacific Union Homes in accordance with agreements with the City.   Pulte Homes Fund 4130  To account for the deposits held for Pulte Homes in accordance with agreements with the City.   Farmworld Fund 4140  To account for the deposits held for Farmworld in accordance with agreements with the City.   River Islands Fund 4150  To account for the deposits held for River Islands in accordance with agreements with the City.    Robinson Property Fund 4160  To account for the deposits held for Robinson Property in accordance with agreements with the City.  TCN Properties Fund 4170  To account for the deposits held for TCN Properties in accordance with agreements with the City.  Watt / Lathrop Marketplace I (Mossdale) Fund 4180  To account for the deposits held for Watt / Lathrop Marketplace I (Mossdale) in accordance with agreements with the City.   

Page 401: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Pegasus Development Fund 4200  To account for the deposits held for Pegasus Development in accordance with agreements with the City.   ENTERPRISE FUNDS  Enterprise funds account for the financial activity related to services provided to those living within the city limit. The primary source of revenue is collections for the services provided.   Surface Water Supply – CLSP Fund 5400  To account for capital facility fees collected for Central Lathrop’s share of the debt service payment for the 2003 COPs.   Mossdale Village CFD 2003‐1 Fund 5410  To account for the Community Facilities District share of the debt service payment for the 2003 COPs  Water System Capital Replacement Fund 5600  To account for revenues and expenditures for capital replacement improvements to the water system.   Water Connection Fee Fund 5610  To account for capital facility fee revenues and expenditures related to the expansion of the water system.   Water Fund 5620  To account for the activities associated with the production and distribution of potable water by the City to its’ residents and businesses.  

Page 402: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS  Surface Water Supply CFF Fund 5640  To account for capital facility fee revenue and expenditures related to the surface water projects.  Water Capital Improvement Program Fund 5690  To account for capital project expenditures related to water system improvements occurring over more than one fiscal year.   MRWQCF Collection System Fund 6010  To account for the activities associated with operating and maintaining the City’s wastewater collection system, and the treatment and disposal of wastewater at the Manteca Regional Water Quality Control Facility.  Wastewater Connection Fee Fund 6030  To account for capital facility fee revenues and expenditures related to the expansion of the wastewater system.   Crossroads Recycling Plant Fund 6050  To account for the activities associated with operating and maintaining the City’s wastewater collection system, and the treatment and disposal of wastewater at the Water Recycling Plant #1 Schreiber. Wastewater System Capital Fund 6060  To account for revenues and expenditures for capital replacement improvements to the wastewater facilities related to the MRWQCF.   Crossroads Recycling Plant #1 Capital Replacement Fund 6070  To account for revenues and expenditures for capital replacement improvements to the wastewater facilities related to the Water Recyling Plant #1 Schreiber.  

Page 403: 2014 2015 Preliminary Budget

REFERENCE MATERIALS   City of Lathrop    Preliminary Budget   FY 2014‐2015                  

FUND DESCRIPTIONS   MBR #1 – Wastewater Recycling Plant Fund 6080  To account for the activities associated with operating and maintaining the City’s wastewater collection system, and the treatment and disposal of wastewater at the Water Recycling Plant #1 – MBR.  Wastewater Capital Improvement Projects Fund 6090  To account for capital project expenditures related to wastewater system improvements occurring over more than one fiscal year.   Phase III Manteca RWQCF Expansion Fund 6100  To account for proceeds received from the  issuance of bonds for the  installation of a sewer collection system  in the City for Phase III Capacity from the City of Manteca Regional Water Quality Control Facility.   Wastewater Recycling Plant #1‐MBR Capital Replacement Fund 6110 To account  for revenues and expenditures  for capital replacement  improvements to the wastewater  facilities related to the   Water Recycling Plant #1‐MBR.   

Page 404: 2014 2015 Preliminary Budget

THE END