2013工程中心简介10141 ch-en

Embed Size (px)

Citation preview

  • 7/27/2019 2013 10141 ch-en

    1/73

    1 .......................................................................................................1

    2 The Establishment of the National Engineering Research

    Center for Offshore Windpower.....................................................................................4

    a) Positioning of the National Engineering Research Center for

    Offshore Windpower.................................................................................................4

    b) Team building of the National Engineering Research Center

    for Offshore Windpower............................................................................................6

    3

    .....................................................................................101 ...............................................................10

    1.1 Organization..........................................................................10

    1.2 Construction of Bases....................................................................13

    1.3 Construction of Testing Platform..........................................14

    b) .....................................................15

    2.2 The research and development projects

    undertook by Engineering center.............................................................................17

    c) ................................................................................20

    3.1 .......................................................................................20

    3.2 Personnel training....................................................................................21d) .....................................24

    4.1 Radiation and diffusion capability of

    technology achievements.........................................................................................24

    4.3 ...................................................................................27

    Figure 3-2 Name of applied basic technical achievements transformation.........31

    4.4 ...........................................32

    e) ................................................................................35

    5.1 Open Services................................................................................35

    5.2 Personnel training....................................................................................36

    5.3 Academic communication.............................................................36

    f) ............................................................37

    6.1 Organizational structure............................................37

    6.2 .............................................................................................................46

    6.3 operation system..................................................................................48

    4 3 ...................................................................50

    1 ............................................................................50

    1.1 ...............................................................50

    1.2 Strengthen applied research market

    adaptability..............................................................................................................51

  • 7/27/2019 2013 10141 ch-en

    2/73

    1.3 To further strengthen international exchanges......52

    b) three-year development plan for the future....................52

    2.1 3 next three years construction and

    development planning.............................................................................................52

    2.2 3 The next three years of technical development path.................................................................................................................................55

    5.......................................................................................................................59

    6 ...................................................................................60

  • 7/27/2019 2013 10141 ch-en

    3/73

    1

    ( )

    ( )

    9 2004 4 9

    2006 6 28

    National R&D Center for Offshore Wind Power was established based on CSIC

    (Chongqing) Haizhuang Windpower Equipment Co., Ltd. Haizhuang is a CSIC

    company doing strong in wind power equipment R&D, fomerly Chongqing

    Haizhuang Technology Development Corp. By the end of 2012, Haizhuang's totalasset reached 6 billion RMB level.

    850KW2MW2.5MW

    5MW

    By introducing and innovating European technology, Haizhuang currently has a

    product serie contains 850KW, 2MW, 2.5MW and 5MW with different type which

    could satisfy different climate and geographic conditions. Off-grid and micro-grid

    system are also Haizhuang's products.

    Being the largest shipbuilding group in China, CSIC's national-level labs for

    offshore engineering has enable Haizhuang with unique advantages in key offshore

    wind related technology as currency analysis, typhoon alerting and forcasting,

    offshore installation, etc.Strong intergration of CSIC offshore forces is significantly

    supporting Haizhuang with the strongest capability in offshore wind in China.

    95%

    1

  • 7/27/2019 2013 10141 ch-en

    4/73

    ( )

    Many of worldwide mainstream turbine manufacturer were formerlyWind doingshipbuilding as turbines' core structure is similar to vessels. In this perspective, CSIC

    has excellent advantages of turbine supply chain. Currently, CSIC could manufactur

    the turbine components by 95% inside the group. As the leading wind company in

    CSIC, Haizhuang has the key technology of turbine components.

    --

    2012

    9 2MW

    2.0MW

    Haizhuang has estsablished solid strategic partnership with all the TOP 10 wind

    developer in China. With the high standard quality control protocol, Haizhuang is astable company doing sustainable business. In the year of 2012, Haizhuang has been

    ranked NO.9 in China in annual newly installation and NO.1 in 2MW sector (double-

    fed). In Guodian's Jiangsu tecting wind far where different turbines are installed,

    Haizhuang has 2 sets of 2MW turbines ranking No.1 and No.3 in single turbine

    annual yield which could be strong proof of turbine quality.

    2011 10 2 2MW 2012 3

    In the tear of 2011, 2 sets of Haizhuang 2MW turbines were exported to the USA

    and got COD in March, 2012. The good performance has gained Haizhuang's imange

    in the States.

    98%

    With the high standard quality assurance system, Haizhuang turbine get annual

    availablity at 98%+ level, Haizhuang got good reptutation from wind farms located in

    2

  • 7/27/2019 2013 10141 ch-en

    5/73

    different provinces.

    Haizhuang is growing towards a group level with a national R&D center, 5

    manufacturing bases and a investment company established. Outside Chongqing,

    Haizhuang has bases in Inner Mongolia, Xinjiang, Yunnan, Jiangsu, and Gansu

    provinces pointing at all the reginal market in China. Haizhuang (Beijing) New

    Energy Investment Corp is doing active wind power development and investment in

    China.

    With decades' development and CSIC resources, Haizhuang is performing a

    stable strategy in technology R&D, advanced turbine manufacturing and investment,

    Haizhuang has the conditions and capabilities to develop the National Offshore Wind

    Enigeering Center..

    3

  • 7/27/2019 2013 10141 ch-en

    6/73

    2 The Establishment of the

    National Engineering Research Center for

    Offshore Windpower

    a) Positioning of the National EngineeringResearch Center for Offshore Windpower

    The National Engineering Research Center for Offshore Windpower was

    established in conjunction with Haizhuang Windpower Equipment Co., Ltd. Operated

    under Core competence and Cooperation mode the research center has designed as

    a national leading and global competitive institute, which fully utilzed the synergestic

    scientific resources inside CSIC Group, and competible with the offshore technology

    development of China. The Centers mission is R&D of general technology in the

    emerging offshore wind power industry and consistend develop and provide a stable

    public service platform, and the Center engaged itself in buiding of a offshore wind

    power scientific base which combined technologcal innovation, transfer of theresearch archivments, exchange the information and technolog and human resource

    training together. Following the Chinas development strategy of offshore wind

    energy and based on the R&D of offshore wind power geration system, a innovation

    platform of offshore turbine development and offshore wind farm construction of our

    own would be built, and it will accelerate the update of Chinese offshore technology,

    improve the mangagment of construction and operation for offshore wind project, and

    realize the nations target for the development of renewable energy.

    4

  • 7/27/2019 2013 10141 ch-en

    7/73

    The overall objective of the Center is to establish a fundamental base for design

    of offshore wind turbine, system integration, test and verification. The Center serves

    Chinese wind turbine manufacturing industry in the R&D for the critical and general

    technology such as design of offshore wind power system, integrated manufacturing,

    ocean environment, and provide comprehensive solution for offshore wind power

    equipment manufacturing and project construction, build a innovation platform of the

    independent design, make and integration of the offshore wind turbine that is fully

    compatible for Chinas climate, wind condition and geological characteristics, take the

    overall innovation ability of Chinese wind power industry to a new level.

    Haizhuang Windpower is a manufacturer of wind turbine generator. Thecompany is responsible for the solution of bottlenecks in manufacture and operation

    of offshore wind power equipments as follows:

    1

    2

    3

    4

    5

    (1) Simulation and research of testing technique for Impact of ocean wind, wave,

    current and tide on WTG, tower and foundation.

    (2) Design of offshore WTG based on ocean wind resource and environment

    (3) Research of high reliability and serviceability based on ocean environment

    (4) Research and application of erosion protection technology for offshore WTG

    (5) Construction of foundation and erection of offshore WTG

    5

  • 7/27/2019 2013 10141 ch-en

    8/73

    b) Team building of the NationalEngineering Research Center for Offshore

    Windpower

    3

    29

    Since its foundation, the member list of the Reporting Committee of the

    Feasibility has contained the representative from the direct official, Haizhuang

    Windpower, CSIC and other relevant companies and institutes. Meanwhile an

    Academic Committee has been established also. The Academic Committee included 3

    Academicians from CNERI and 29 domestic and foreign top specialists of offshore

    wind power. The Director is responsible for the Center, and is directed and supervised

    by the Administration Committee. Under the Center there will be subsections as the

    R&D Center Denmark, the Department of Technology, Haizhuang R&D Center,

    Administration Office of Engineering Center, Lab Resources of CSIC, Technology

    Resource of Supply Chain.

    153 129

    24

    31 44 78

    The Center is operating in compliance with the regulations of CSIC(Chongqing)

    Haizhuang Windpower Equipment CO., Ltd. CSIC Group and under the principal of

    modern enterprise. It has utilized its synergistic advantages of the current technology

    economy and human resources, and has provided multilateral R&D, technical

    consultant and service, technological communication, promotion of new technology

    and education. The Center continuously enhance its team by introducing of talent with

    advanced technology, either full time or part time, by employment or guest invitation.

    6

  • 7/27/2019 2013 10141 ch-en

    9/73

    The Center has 153 staffs, 129 employees and 24 guest researchers and postdoctors.

    The elite researcher team of 31 senior engineers, 44 intermediate engineers and 78

    junior engineers bring out outstanding ability of research and innovation.

    2.5MW

    60Hz H102-2.0MW

    During the period of establishment, the Center has opened series of research for

    the critical and general technologies, which covers system design, integrated

    manufacturing, ocean engineering and erosion protection, expansion of the

    environment compatibility of WTG, optimization of the control strategy for wind

    power, energy management platform and cutting edge technologies of wind power.

    Such researches can reduce the costs and improve the efficiency of design and

    manufacturing of offshore wind power equipment and construction of offshore wind

    projects. Meanwhile the R&D for 2.5MW WTG, the WTG compatible with 60Hz

    grids in North America, the H102-2.0 MW WTG with extra long blades and the

    plateau type and inter-tidal type WTG has also been finished.

    5.0MW 127m 151m IECI

    IECIIIB+ GL IEC

    5MW

    5MW 5MW

    In the same period, the development of 5.0 MW offshore WTG has been

    finished, which has used standard and modularized design, equipped with blade

    length of 127m and 151m, is compatible for IEC wind zone class I and III B+

    respectively, which has expanded the available scope of utility. The turbine is fully

    compliance with the design standards of IEC and Germanischer Llody. The 2 turbines

    of this model has been installed in Longyuan Rudong Intertidal Demonstration Wind

    Park, Jiang Su province, which is operated by Longyuan Wind Power CO., Ltd. its

    the first 5MW offshore model installed with tripod foundation and erected by offshore

    wind turbine installation ship in China. The 2 turbines are currently running und good

    and stable condition, and have already archived full load generation. The domestic

    leading and global outstanding performance shows the strong research ability of the

    7

  • 7/27/2019 2013 10141 ch-en

    10/73

    Center.

    The load simulation and calculations platform for the offshore wind power and

    the analysis and test platform for the system control of the offshore wind power have

    been setup by the Center. At the same time the Center has utilized domestic advantage

    in offshore equipment, offshore engineering, resistance technology in extreme

    environments and resources inside CSIC Group, co-founded with 3 research institutes

    the Laboratory for the Research of Ocean Dynamic, the Laboratory for the Research

    of the Offshore Wind Turbine Generator Testing and the Laboratory for the Research

    of Erosion Protection of Offshore Wind Power Equipments. With said facilities the

    Center has won the ability in research and test of critical technology for the offshore

    wind power, and accomplished its set objectives.

    10

    4 17 4

    6 10 89 20 15

    2

    During the establishment, the Center has undertaken 10 offshore wind power

    relevant research projects from local and state government, including 4 national

    projects, 17 patents have been applied, under which 4 for inventions, 6 applications

    are been accepted, 10 have be certificated, 89 papers are published, 20 technological

    achievements with own intellectual property are gained. The Center has also

    participated in formulating of 15 standards, has formulated 2 standards alone, that has

    greatly improved and regulated offshore wind power industry.

    709 MECALKK 10

    The Center has very close contact with domestic engineering companies, design

    institutes, universities, scientific institutes and manufacturing enterprises, who have

    already strong performance in offshore wind power. 10 cooperation projects have

    been carried out with Chongqing University, North China Electric Power Unnivercity,

    8

  • 7/27/2019 2013 10141 ch-en

    11/73

    Chongqing Institute of Industrial Automation and Instrumention, Chongqing

    Academy of Science and Technology, CSIC(Wuhan) Lingjiu Electric CO., LTD.

    MECAL, kk-electronic in period of establishment. Such objective oriented projects of

    offshore wind power technology has guaranteed the transfer of research achievements

    into productions.

    24

    3

    100

    37

    21

    Today, the Center has cultivated 24 Masters and 3 Doctors/Postdoctors in the

    area of offshore wind power and trained over 100 professions in the area of

    engineering, management, sales related to offshore wind power. The Center has ever

    sent 37 person-time abroad for technological cooperation, training and education, 21

    person-time for business visit. As an exchange platform, the Center has hold 3 times

    high level, large scale international forums of offshore wind power technology, and

    has been evaluated as important milestones of the development of the offshore windpower in China.

    9

  • 7/27/2019 2013 10141 ch-en

    12/73

    3

    Operating Performance of the National Engineering Research Center for

    Offshore Windpower

    1 Fundamental construction of the Center

    1.1 Organization

    -1

    The Center has rearranged its existing and new scientific resources in

    categories of the Research of Application Foundation, the Research of CriticalTechnology, the Research of Application in the Engineering, the Research of

    Technology Promotion, Figure III-1 shows the scientific units of the Center and their

    research assignments.

    10

  • 7/27/2019 2013 10141 ch-en

    13/73

    5MW

    2MW

    850k

    w

    2. 5M

    W

    -1

    11

  • 7/27/2019 2013 10141 ch-en

    14/73

    the National Engineering Research

    Center for Offshore Windpower

    Research Categories

    the Research of

    Application Foundation

    the Research of

    Critical Technology

    the Research of Application

    in the Engineering

    the Resea rc h o f

    Technology Promotion

    Research Subjects

    Erosi

    on

    protection

    technique

    Testi

    ng

    technique

    of

    offshore

    wind

    Rem

    ote

    control

    and

    monitorin

    g of

    offshore

    wind

    Grid-

    friendly

    connection

    technique

    of

    offshore

    wind

    power

    Offs

    hore

    installatio

    n

    technique

    Deve

    lopment

    of 5MW

    offshore

    wind

    turbine

    Rese

    arch of

    cutting

    edge

    technolog

    ies

    Deve

    lopment

    of 2.5MW

    offshore

    wind

    turbine

    Impr

    ovement

    and

    optimizati

    on of

    2MW and

    850kW

    wind

    Influ

    ence of

    ocean

    Dynamics

    to

    offshore

    wind

    Win

    d turbine

    control

    Load

    analysis

    of wind

    turbine

    Research facilities

    Platform

    for Load

    Simulation and

    Calculation

    Platform

    for Analysis

    and Testing of

    System Control

    Laborator

    y of Ocean

    Dynamic

    Laborator

    y of Erosion

    Protection

    Laborator

    y of Wind

    Turbine

    Testing

    Technique

    Software

    Design Studio

    of Engineering

    Center and

    R&D Center

    Research

    Lab for Grid

    Connection of

    Engineering

    Center and

    R&D Center

    Research

    Lab for

    offshore wind

    turbine

    installation

    Mechanic

    al Lab of the

    Dep. of Techn.

    R&D

    Center

    Research

    Lab for System

    Design

    Engineeri

    ng Center

    Figure III-1 Organization of the National Engineering Research Center for Offshore

    Windpower

    12

  • 7/27/2019 2013 10141 ch-en

    15/73

    1.2 Construction of Bases

    2MW

    The industrial base of the center is combined within the production project of

    2MW Various Speed Constant Frequency Wind Turbine Generator of Haizhuang

    Windpower, and the manufacturing base of Haizhuang Windpower Jiangsu for

    offshore wind turbine and components.

    2MW

    2008 2010 3 2MW

    50

    The 2MW Various Speed Constant Frequency Wind Turbine Generator of

    CSIC(Chongqing) Haizhuang Windpower Equipment Co., Ltd. has been launched in

    2008, and accomplished in March 2010. The launch of the production has achieved a

    advanced, high efficient and logistically smooth capacity of 500,000 kW/a with fully

    own intellectual property. The production facility includes erection equipments,

    assembly, measurements and testing equipments, commission platform, warehouse

    and logistic facility.

    2MW

    the National Engineering Research Center for Offshore Windpower is located on

    the 2nd and 3rd floor by Haizhuang Windpower. The establish of the industrial base

    has greatly improved the hardware for the R&D of offshore wind turbine, and

    provided a possibility of mass production.

    5MW

    2013 2014 50

    The production base of Haizhuang Windpower Jiangsu serves the production of

    5MW and other offshore wind turbines. The facility of offshore turbine and

    components manufacturing is under ready-to-operate stage, and is been planed to be

    put into operation in 2013, and be expected to reach the annual capacity of production

    13

  • 7/27/2019 2013 10141 ch-en

    16/73

    of 500.000kW in 2014.

    1.3 Construction of Testing Platform 5

    5

    Testing platform is the basic condition of technological R&D. In the past 3 years

    the Center has established 5 labs and simulation platform capable for fundamental

    research by itself or in cooperation with relevant research institutes inside CSIC

    Groups. With the establishment of such labs the R&D condition is been efficiently

    improved and enhanced.

    -1

    Table III-1 Labs and Testing platform of the Center

    No.

    Name

    Established by

    1

    Platform for Load Simulation and Calculation

    of Offshore Wind Power

    Self established

    2

    Platform for Analysis and Testing of

    System Control for Offshore Wind Power

    Equipment

    Self established

    3

    the National Engineering Research Center

    for Offshore Windpower

    Laboratory of Ocean Dynamic

    702

    Cooperation with CSIC

    Research Institute No.702

    4

    the National Engineering Research Center

    725

    Cooperation with CSIC

    Research Institute No. 725

    14

  • 7/27/2019 2013 10141 ch-en

    17/73

    for Offshore Windpower

    Lab of Erosion Protection for Offshore Wind

    Power Equipments

    5

    the National Engineering Research Center

    for Offshore Windpower

    Laboratory of Offshore Wind Turbine

    Testing Technique

    712 Cooperation with CSIC

    Research Institute No. 712

    b) The R&D abilities of engineering and technology and the Transfer of the

    achievements

    2.1 The R&D abilities and achievements of the

    Center

    6

    4 1 2 1

    1

    During the 3 years of the establishing 6 research subjects have been awarded

    including 4 awards of the Outstanding and Important New Products Chong Qing, 1

    first prize, 2 second prizes and 1 third prize for the Progress in Science and

    Technology of CSIC Group, 1 Achievements Prize for the Progress in Science and

    Technology of Shipbuilding Industry Company Chon Qing.

    17 4 13

    6 10

    17 Patents have been applied, including 4 new inventions, 13 utility models, 6

    applications have been accepted, 10 have been granted.

    13

    10 IntertekCE 1 2

    8

    15

  • 7/27/2019 2013 10141 ch-en

    18/73

    13 Design Certificates of the new products developed by the Center have been

    given, including 10 Certificates by CCS(China Classification Society), CE Certificate

    by Intertek, 2 Certificate by China General Certification Center. 8 Tests including

    LVRT(Low Voltage Ride Through) and Assessment of Grid Adaptability by China

    Electric Power Research Institute have been passed.

    89 52

    Applied Mechanics and Material Advanced Materials

    ResearchRenewable Energy

    9

    89 papers have been written in the past 3 years, from which 52 papers have been

    published on top domestic and foreign academic journals such asApplied Mechanics andMaterialAdvanced Materials ResearchRenewable Energy,Acta Energiae Solaris Sinica,

    Journal of Vibration and Shock. 9Bulletins of the National Engineering Research Center

    for Offshore Windpowerhave been released, on which the activities of wind power industry

    and of the Center in last 3 years would be fully recorded.

    17

    ISO

    9 2

    /

    6

    ISO/TC8/WG3

    2011 10 2013 9

    Ports and Marine OperationsCommunication and Emergency

    ManagementEntry-level QualificationTechnical EquipmentLogistics-

    Supply Chain Information FlowWork and Living Condition OffshorePersonnel

    Transfer Systems 7 ISO

    The Center has formulate alone or participated in totally 17 industry standards,

    including 9 national and industrial standards by the National Technical Committee for

    Standardization of Wind Machinery, China Electric Power Research Institute, China

    Machinery Association Branch Association for Wind Power and ISO, 2 standards of

    Administration of Quality and Technology Supervision Chong Qing. The Center has

    participated in formulation of 6 national standards: Technical Specifications for

    Electric Pitch Control System of Wind Turbine Generator Units, Doubly fed variable

    speed constant frequency wind turbine, Measurement and assessment of Power

    16

  • 7/27/2019 2013 10141 ch-en

    19/73

    quality characteristics of Wind turbine generator system, Communications for

    monitoring and control of wind power plants. Overall description of principles and

    models, Acoustic noise measurement techniques of wind turbine generators systems,

    Design requirements for offshore wind turbines. And the Center has also been invited

    as formulator of ISO for offshore wind power standards to participate the formulationand discussion meetings of ISO work group TC8/WG3 for offshore wind power

    standards, who is only institute be invited for the formulating works of international

    standards for offshore wind power. From October 2011 to September 2013 the Center

    has participated formulation and discussion of 7 ISO Standards for the offshore wind

    power, such as Ports and Marine Operations Communication and Emergency

    ManagementEntry-level Qualification Technical EquipmentLogistics- Supply

    Chain Information FlowWork and Living Condition Offshore Personnel Transfer

    Systems. By this means the Center has introduced the experiences of European

    offshore wind technology and project practices of offshore engineering and facilitated

    the progress and development of offshore wind industry of China.

    2.2 The research and development projects undertookby Engineering center

    10

    4 6

    Engineering center established for three years, and undertake the main

    technical difficulties of offshore wind and also took many research projects from

    national, provincial and the company, which has 10 science and technology

    projects above the provincial level, and 4 national projects, 6 the provincial

    project.

    National research projects

    15.0MW

    Design, Integration and Demonstration of 5.0MW offshore wind

    turbines with doubly-fed constant frequency generation.Ministry of

    Science and Technology

    2 5.0MW

    The key technology research of 5.0MW offshore wind turbines.

    Ministry of Science and Technology

    3

    17

  • 7/27/2019 2013 10141 ch-en

    20/73

    The key technology research of offshore wind turbines design.

    Ministry of Science and Technology

    45.0MW

    Development and industrialization of 5.0MW offshore wind turbines.(National Energy Administration)

    Provincial research projects

    1H872MW

    Development and industrialization of H872MW wind turbines.

    (Chongqing Economic and Information Commission)

    2

    Mixing tower and Improve the capacity of wind farm. (Chongqing

    Economic and Information Commission)

    3H100-2.0MW

    Development and industrialization of H100-2.0MW wind turbines.

    (Chongqing Economic and Information Commission)

    4 The key technology research of ocean currents. (Chongqing Technology

    Committee)

    5

    National cooperation base construction. (Chongqing Technology

    Committee)

    6 Demonstration application of distributed access to wind power in China.

    3

    5MW

    5MW

    5MW

    2

    18

  • 7/27/2019 2013 10141 ch-en

    21/73

    5MW

    SCADA

    -2

    Figure 3Organizational relations ofthe major projects and key technical points

    During these 3 years of the construction, engineering center with the help of

    HZ windpower company to make technology accumulation, and get the support

    from CSIC Group in marine equipment and engineering technical advantages. The

    center make the development of the 5 mw offshore wind turbine, key projects

    around the project application and wind turbines on engineering application. And

    the center applied the technical achievements of 5 MW offshore to the onshore

    wind turbines optimization and upgrading which promote the technological

    popularizing and radiation. The major projects and key technical points center

    undertake as shown in figure 3 to 2.

    2.3 The centers technology transformation

    efficiency

    3

    H102-2.0MW

    H60-2.0MW H87-2.0MW H93-2.0MW

    H102-2.0MW H93-

    2.0MW

    19

  • 7/27/2019 2013 10141 ch-en

    22/73

    Transformation of the centers technological achievements is carry out by the

    HZ windpower. After 3 years, the technical accumulation and transformation has

    been made outstanding achievements. Through the transformation, there has

    formed a sequence of wind turbines products cover a variety of natural

    environment and wind area, and developed a number of national and provincialkey products, such as H102-2.0 MW wind turbine which won the award of the

    national ministry of science and technology. Besides this, wind turbine of H60-2.0

    MW, the H87-2.0 MW, H93-2.0 MW and H102-2.0 MW also won the award of the

    Chongqing key new product, and H93-2.0 MW wind turbine for Chongqings

    excellent key new product.

    2011-2012

    2013 1-6

    154%

    At the same time, the centers technology conversion efficiency is also

    reflected in HZ windpower' s performance. With the increasing of technical ability

    and the strength of technical accumulation, the company's performance has a

    larger breakthrough. In 2011-2012, the period of adjustment in wind powerindustry, the company's annual installed capacity maintain a certain growth rate.

    According to Statistics fromthe Chinese wind energy association published in June

    1, 2013, the companys newly installed capacity grew by 154%, which is the

    fastest growing in the domestic wind power equipment manufacturing industry.

    Respectively, the official Xinhua news agency and People's Daily separately

    published feature articles called " the mystery of the haizhuang windpower s

    bucking up" and why the haizhuang windpower can be risen during the

    contrarian. Both of them are pay tribute to The center and companys steady

    development strategy.

    c) The team construction and training of the talents

    3.1 The team construction performance of the talents

    20

  • 7/27/2019 2013 10141 ch-en

    23/73

    3 2009 62 153

    129 24

    During these 3 years, the center has built a high level of high quality talent

    team. Now, it has 153 engineers which nearly three times compare with 62

    engineers in 2009, including 129 fixed staff, research and postdoctoral visiting

    personnel 24 people. All of them have rich experience in project management and

    teaching.

    20 2010 2012

    16.1% 20.2%

    24.2% 26.1%

    In addition to hire permanent staff , , the center also hired technology

    backbone and management personnel from the CSIC Group during the forming

    period, and the other relevant institutions and enterprises of the CSIC also sent

    their engineering and technical personnel more than 20 people to the centre to

    work. The data of comparison between the early 2010 of and the end of 2012, the

    senior title personnel proportion increased from 16.1% to 16.1%, and theproportion of Dr. Master's personnel also increased from 24.2% to 24.2%, which is

    show the center played a huge role of supporting the form of attract and cultivate

    high-level talents

    3.2 Personnel training

    The center make full use of its own advantage of wind power equipment

    system integration and engineering construction, closely linked with the wind

    power enterprises, They combining with the university, adopt various forms to

    train specialized technical and management personnel in offshore wind power.

    2012 24

    3

    100

    21

  • 7/27/2019 2013 10141 ch-en

    24/73

    By the end of 2012, the center has trained 24 people of postgraduate of

    offshore wind power, 3 post-doctoral in offshore wind power and all kinds of

    specialized personnel more than 100 person in engineering , management and

    marketing.

    2000 21

    50 / , ,

    The center has trained specialized personnel more than 2000 people in

    engineering technology, management, and organized the 21 groups of 50

    m/academic backbone to abroad for engineering technology exchange and short-

    term technical training, which improve the their international vision, and also

    increase the international influence of the engineering center and its

    technological achievements during these three years.

    3

    2010 12 28 2010

    24

    During these three years, the center has held international industry BBS in

    academic exchanges 3 times. Mainly including:

    December 28, 2010, the first academic conference of the national engineering

    research center for offshore wind power in 2010 held in Beijing. The Academician

    Wu Yousheng from CAE was been hired as honorary director of the academic

    committee, The Academician Jin Donghan as director, and Other 24 experts

    formed academic Committee. The CSIC Groups deputy general manager Li Guoan

    attended the meeting and made a speech. The groups chief engineer, director of

    the ministry of equipment Sun Jianke, the president of HZ windpower Yang Benxin

    and other relevant departments of the leadership, experts and heads of the

    relevant departments from group headquarters also attended the meeting.

    2011 10 26

    100

    MECAL Anton de Roest 14

    2011

    22

  • 7/27/2019 2013 10141 ch-en

    25/73

    October 26, 2011, "the second annual meeting of academic committee of

    national offshore wind power engineering technology research center and high-level technical BBS offshore wind" was held in Chongqing. The Academician Jin

    Donghan, Dr. Sun Honghang and Yang Benxin, director of the national engineering

    research center for offshore wind power, attended the meeting. As well as more

    than 100 experts and scholars from the main global wind power equipment

    research and development institutions also attended the meeting.

    Some experts including Academician Jin Donghan, deputy director Li Junfeng

    from he national development and reform commission of the energy research

    institute, Dutch MECAL company general manager Anton DE Roest and so on,

    made academic reports. The reports content including offshore wind power

    technology development at home and abroad, development trend of wind power

    industry standard, as well as the related special technology, and other aspects.

    This annual meeting and technical BBS is an item activity of international well-

    known research institutions Chongqing Action in 2011, gathering some industrial

    personages, and provided a high-level communication platform for offshore wind

    power technology research and development in our country. It also deepen the

    mutual trust in the offshore wind field at home and abroad, enhance the

    confidence to participate in international cutting-edge technology and ability.

    2012 2013 1 12

    80

    5MW

    2MW

    23

  • 7/27/2019 2013 10141 ch-en

    26/73

    January 12, 2013, "The third high-level annual meeting of national offshore

    wind power engineering technology research center academic committee and

    wind power generation technology BBS" held in Rudong. Jiangsu province. More

    than 80 people attended the meeting, theConference Name List including

    Director of National ministry of science and technology planning departmentWang Junli, honorary director of the academic committee Academician Wu

    Yousheng, director of academic committee of Jin Donghan, Yang Benxin, director

    of the center, and some well-known experts and scholars in the wind power

    industry at home and abroad, leaders, the media. The meeting discussed "the

    future prospects of the development of wind power in China's, development

    status of offshore wind power and risk response, China classification society for

    the development of the offshore wind power". Experts, scholars and engineers

    make the reports about "macro guidance, technical progress, and cutting-edge

    technology". Among them, the center also make a introduction of developing of

    5MW offshore wind turbines and improving of 2MW onshore wind turbines through

    independent innovation of technology breakthrough.

    d) Radiation and diffusion capability of technology achievements,

    influence on the development of the industry

    4.1 Radiation and diffusion capability of technologyachievements

    The center always adhere to: the combination of science and technology with

    economy, science and technology combined with production, research

    combination with learning. According to the national economy, social

    development and market needs, the center special for industries and fields to

    research independently and develop scientific and technological achievements in

    cooperation with the upstream development way, as well as adhere to

    continuously apply the technology achievements systematically.

    24

  • 7/27/2019 2013 10141 ch-en

    27/73

    At the same time, the center through cooperation transformation, technology

    transfer, technical service and other ways to realize the transformation of

    scientific and technological achievements into productivity.

    LM

    KK

    During these three years, the center makes full use of its own technology and

    industrial chain integration advantages, through joint research and development

    to make the upstream companies get the benefit from technical results, such as

    the LM wind power blade co., Chongqing heavy wind power gear box (wuhan) co.,

    LTD., CSIC LingJiu electric co., LTD., Denmark KK electronics company. Also

    through the technology training, complete equipment and engineering services to

    support the development of other downstream enterprises, such as Longyuan

    Power, Huaneng Group, CGNPC, CLP and Yunnan Energy Investments.

    Through the EPC, production base construction, equipment supply, the

    centers technological achievements to spread to most wind energy resource-rich

    provinces in China, including Inner Mongolia, Xinjiang, Jiangsu, Liaoning, Hebei,

    Shandong, Shanxi, Gansu, Yunnan, Guangdong, Zhejiang, Jiangxi and so on. At the

    same time, through equipment supply, joint research and development, the

    center realized the technological radiation to North America and Denmark. In the

    future, technology from the engineering center could also radiate to Brazil,

    Romania, Ukraine, Germany and other countries or regions.

    4.2 Technical cooperation and collaboration

    25

  • 7/27/2019 2013 10141 ch-en

    28/73

    The center and engineering companies in offshore wind field both at home

    and abroad, design institutes, universities, research institutes and production

    enterprises to maintain close contact, targeted to carry out research andengineering technology research in the field of offshore wind, ensure smooth

    bridge between research and industrialization of production, to drive the

    technological innovation, mechanism innovation to promote the healthy and rapid

    development of offshore wind power industry. In the process, engineering center

    core played a leading role, reflect the engineering center in offshore wind field of

    cohesion and coordination ability.

    5.0MW

    5MW // 5MW

    200KW

    5MW

    2MW

    The center carried out the evaluation index and the wind turbine blade

    matching sex research, and studies of 5.0 MW offshore wind power unit simulationtechnology, the dynamic analysis of 5 MW wind turbine transmission chain With

    Chongqing university; With north China electric power university, they carried out

    the island wind/wood/micro grid storage system research and development "and"

    5 MW offshore wind turbine gear box and generator system integrated

    optimization design; Automatic control technology and shenyang university of

    technology institute conducted 200 kw wind turbine technology transfer; With

    chongqing jiaotong university opened under the wave loading with offshore wind

    turbines based research on dynamic response of the single pile; With chongqing

    institute of science and technology research to 5 mw offshore wind power unit

    reliability design. Cooperating with xinjiang university is highly effective and

    reliable wind power generation system research on key technology of cooperation;

    In cooperation with the China electric power research institute to carry out the

    national energy application technology research and engineering demonstration

    project ". With huazhong university of science and technology, China motor, pater

    electric and other institutions and enterprises to carry out the "2 mw brushless

    doubly-fed generator and converter industrialization" projects, etc.

    5MW MECAL

    5MW LM KK 5MW

    26

  • 7/27/2019 2013 10141 ch-en

    29/73

    Lehnhoff GL

    5MW

    5MW

    In the 5MW offshore wind turbines developed, engineering center design

    company MECAL a partnership with the Netherlands, as a 5 mw project overseas

    consulting units. At the same time, engineering center and LM blade company, KK

    electronics, such as foreign enterprises to achieve cooperation, jointly completed

    5 mw for the development of some parts. In addition, engineering center, also

    with the German Lehnhoff consultancy, Germany GL classification society and

    other overseas research institutions set up a partnership, and established the r&d

    center in Denmark. Thus, in the process of research and development of 5 mw

    offshore wind turbines, ideas, take the long, advantages of science and

    technology at home and abroad and technical force, has realized the

    technological achievements to the domestic and overseas radiation, ultimately to

    ensure that the 5MW offshore wind turbines has reached the international

    advanced level.

    4.3 Technical achievements transformation and extension

    The one of important mission of national engineering technology research

    center is to transform scientific and technological achievements into engineering

    practice, the basic research results into applicable technology innovation, so as to

    realize the conversion technology to productivity. Among them, the technological

    achievements include two parts, one is from the basis of colleges and universities,

    research institutes and other research institutions of scientific research results,

    the second is applied basic technological achievements obtained by engineering

    center itself.

    4.3.1 The transformation of the basic scientific research

    27

  • 7/27/2019 2013 10141 ch-en

    30/73

    Basic scientific research need long time of accumulation of data, the results

    have significant scientific value, but the industry is worth not, significantly, this

    kind of research is usually carried out in professional research institutes or

    universities. National engineering technology research center, one of the most

    important task is to research results into such basic scientific problem hassignificant engineering products of industrial value.

    The national engineering research center for offshore wind power through the

    form of joint construction of laboratory and research institutes, the basic scientific

    research ability, can fully grasp of relevant scientific research institutes of

    technology, and use the engineering center of industrial design, engineering and

    manufacturing ability, the results into the engineering application. Concrete

    results include:

    1 725

    725

    5MW

    (1) The anticorrosion technology transformation. Engineering center and the

    Chinese heavy industry 725 research institute jointly established the national

    engineering research center for offshore wind power, Marine wind power

    equipment anticorrosion research laboratory. 725 Marine anticorrosive technology

    has a long-term accumulation of data, can provide Marine steel structure

    anticorrosion technology and a number of data required.

    The national engineering research center for offshore wind power - sea wind

    power equipment anticorrosion research laboratory, on the basis of the existing

    technology accumulation, anti-corrosion technology of offshore wind turbines are

    studied, and through the engineering center will technology into engineering

    practice. Under water anodic protection technology, different height of the steel

    structure anticorrosion technology, etc., have been applied to the engineering

    center of 5 mw offshore wind turbines jacket and tower anticorrosive.

    2 702

    702

    28

  • 7/27/2019 2013 10141 ch-en

    31/73

    2011

    5MW

    6 2011 5MW

    (2)Transformation of Marine hydrodynamics research achievements.

    Engineering center and the Chinese heavy industry 702 to build the national

    engineering research center for offshore wind power, Marine power research

    laboratory, with 702 of ocean dynamics data accumulation and research strength,

    mastered the hydrological characteristics of China's coastal waters and kinetic

    characteristics of the seabed, on the basis of the offshore wind turbine parts of

    sediment impact characteristics were studied. In 2011, the national engineering

    research center for offshore wind power to east China survey design institute

    designed for 5 mw offshore wind power unit 6 pile jacket, and in the second half of

    2011, the success of the installation to ensure the smooth lifting of the 5 mw

    offshore wind turbines.

    3 712

    712

    5MW

    884

    5MW

    (3) The transformation of wind generator detection technology. Engineeringcenter and the Chinese heavy industry 712 jointly formed by Marine wind power

    unit testing research laboratory, using 712 testing technology in the power

    system to accumulate, the establishment of a wind turbine power system test

    platform. 5 mw offshore wind turbines are engineering center developed on the

    use of the high-speed permanent magnet synchronous generator is generator

    manufacturers the Chinese heavy industry 884 factory testing, the test results will

    be used to guide the 5 mw offshore wind power unit of the system design and

    control parameters optimization.

    4

    5MW

    (4) Military technology transfer. Marine machinery and equipment of whole

    sealing and heat dissipation structure is originally applied Yu Junpin technology.

    Development of 5 mw offshore wind turbines in the center of the engineering

    application of the technology, and realized the transformation of the military

    technology to civilian goods.

    29

  • 7/27/2019 2013 10141 ch-en

    32/73

    4.3.2 Applied basic technical achievements transformation

    850kW2MW2.5MW5MW

    The national engineering research center for offshore wind power depends on

    the sea with wind power company research and development center and the

    department of scientific research strength, the multiple application of offshore

    and onshore wind turbines based key technologies are studied, including the

    system design of wind turbine technology, reliability, improve technology, on-line

    condition monitoring, remote monitoring, wind power increases, optimization

    control technology, etc., have been at the 850 kw of installed wind power

    company, 2 MW, 2.5 MW, 5 MW power levels of applied in wind turbines. The

    specific name of the transformation of technological achievements such as shown

    below. With a supporting institution sea wind power company's engineering and

    construction conditions, national engineering research center for offshore wind

    power has the ability to turn research fully and promote to the industry,

    implementation technology value-added.

    -2

    1 5MW

    2 2.0MW

    3 H102-2.0MW

    4 H100-2.0MW

    5 H103-2.5MW

    7 H52-850kW

    8 H60-850kW

    9 2.0MW

    10 2.0MW

    11 2.0MW60HZ

    30

  • 7/27/2019 2013 10141 ch-en

    33/73

    12

    13

    14 2.0MW

    15

    16

    17 70m/80m

    Figure 3-2 Name of applied basic technical achievements transformation

    No Result Way of

    tansformation

    1 5MW wind turbine research anddevelopment

    self-transformatio

    n

    2 the second generation of 2.0MW wind

    turbine research and development

    self-transformatio

    n

    3 H102-2.0MW wind turbine research and

    development

    self-transformatio

    n

    4 H100-2.0MW wind turbine research and

    development

    self-transformatio

    n

    5 H103-2.5MW wind turbine research anddevelopment

    self-transformatio

    n

    7 H52-850kW wind turbine research and

    development

    self-transformatio

    n

    8 H60-850kW wind turbine research and

    development

    self-transformatio

    n

    9 The typhoon type of 2.0MW wind turbine

    research and development

    self-transformatio

    n

    10 2.0MW wind turbine for intertidal zonedresearch and development

    self-transformatio

    n

    11 2.0MW 60HZ wind turbine research and

    development

    self-transformatio

    n

    12 Distributed wind power generation self-transformatio

    n

    13 An island of micro grid self-transformatio

    n

    14 Cost reducing for 2.0MW wind turbine self-transformatio

    n

    31

  • 7/27/2019 2013 10141 ch-en

    34/73

    15 Development of control system self-transformatio

    n

    16 Development of Remote Monitor System self-transformatio

    n

    17 Mountain transportation for tower of

    70m/80m

    self-transformatio

    n

    4.4 Impact on industry technology progress and the function of the industry

    competition

    5MW

    3

    9

    2MW

    2MW 111

    Engineering center of national science and technology support plan the

    successful design of the 5 mw offshore wind power unit and connected to the grid,

    is engineering center to carry out the innovative technology of the landmark

    result of the research and development. The wind generator with completely

    independent intellectual property rights, after 3 years of technical research,

    successively in transmission system, control system, key technology such as

    Marine corrosion has achieved a major breakthrough in the field, with the nine

    national patent technology, the unit of similar models in the current

    implementation "three of the most", namely, the "largest rotor diameter and the

    nose the lightest weight, generating the highest", which greatly improved the

    world competitiveness of China's offshore wind turbine. At the same time for 2

    mw wind turbine key technology research and engineering design, through

    technology optimization, quality improvement, improve efficiency and load for

    wind turbines, which can improve the utilization rate and capacity, the failure rate

    greatly reduced, and successfully developed the 2 mw rotor diameter is 111

    meters is suitable for the low wind speed area of wind turbines, for enhancing the

    power performance and improve the competitiveness of wind power industry has

    great role in promoting.

    32

  • 7/27/2019 2013 10141 ch-en

    35/73

    2011 6

    2013 12

    2 2012

    2013 18 259

    Engineering center initiated by participating in state and local government

    departments concerned about industry long-term planning, upstream and

    downstream industry chain of offshore wind power radiation, diffusion effect, thus

    promoting the development of industry technology. Such as engineering center is

    involved in launched by the Chinese academy of engineering of the strategic

    emerging industry training and development of strategic consulting projects, in

    which the wind power industry consulting for renewable energy group. The project

    time is in June 2011 to December 2013, the purpose is to provide policy reference

    for the national "much starker choices-and graver consequences-in planning and

    the suggestion. The consulting projects include the wind power industry as well asthe offshore wind development present situation at home and abroad to

    summarize, the development trend of the industry and the key technology and

    the anticipation of disruptive technologies or breakthrough technology, pointed

    out that the development of industry roadmap, and focus on research and

    development direction of industry policy advice. This project has for two years, at

    the end of 2012 project results summary for the white paper China's strategic

    emerging industry development report 2013, published by science press, Beijing,

    China academy of engineering.

    --

    - -

    --

    Engineering Center assume that the contents of the White Paper on Chapter 18, "

    wind power industry " ( Page 259 ). Engineering Center chaired by the Chongqing

    municipal government launched the " Twelve Five" Chongqing strategic emergingindustries of wind power industry cluster building program project, which includes

    33

  • 7/27/2019 2013 10141 ch-en

    36/73

    the right of Chongqing wind power equipment industry status quo and the main

    summary of the problems presented in Chongqing wind power industry cluster

    building ideas and building goals and industry chain cluster configuration and

    construction layout suggestions, and industry chain cluster construction of key

    projects and safeguards provided advice .

    5MW

    200kW

    Engineering Center vigorously carry out the wind, waves, currents, tides and

    other environmental factors on the wind turbine, tower and foundation interaction and

    impact simulation and experimental research, completed for wave loads - foundation -

    tower Coupling Dynamics Simulation Technology. Carried out wave loads - Wind

    load - wind turbine coupled dynamics simulation. Conducted a marine corrosion

    failure mechanism and infrastructure of the extent of damage. For wave loads -

    foundation - miniature tower flume experiment, with the wind, waves, currents, tides

    and other environmental factors on the wind turbine, tower and foundation interaction

    and impact simulation and test the ability to provide public services for the sector

    platform.

    34

  • 7/27/2019 2013 10141 ch-en

    37/73

    e) Capacity and effectiveness of external development services

    5.1 Open Services 702 712 725

    18

    9

    Through the establishment of open issues form, engineering center attracted

    domestic Institute,such as CSIC 702 Institute, 712 Institute, 725 Institute, Chongqing

    Institute of Science and Technology, Chongqing University, North China Electric

    Power University and other research institutes and universities to participate in

    significant research and development engineering centers of 18 cooperation projects,

    in addition, the initiative to undertake domestic engineering center also commissioned

    a major wind power companies transverse research and development topics for

    research and development of the domestic wind power enterprises to provide

    technical services, 3 years to undertake research and development 9 topics.

    Through the innovation model, engineering centers and research cooperation

    made a lot of scientific and technological achievements, to domestic and foreign wind

    power companies through publicity, marketing, not only in the field of wind power

    industry domestic and overseas show the scientific and technological achievements

    with independent intellectual property rights, but also supports a large number of

    domestic and overseas project development and implementation process of the project

    successfully achieved technological achievements transformation, transfer and

    diffusion of radiation, promote wind power equipment manufacturing, control and

    other areas of technological progress.

    850kW/2MW/2.5MW/5MW

    20

    35

  • 7/27/2019 2013 10141 ch-en

    38/73

    In 3-year period, the engineering center homegrown 850kW/2

    MW/2.5MW/5MW key wind turbine technology innovation results in a large number

    of more than 20 major projects successfully achieved industrialization and foreign

    service, and create a good economic.

    5.2 Personnel training

    98

    2000

    Engineering Center established three-year period, the Haizhuang Windpowercompany attach great importance to R & D personnel and engineering and technical

    personnel training, the intensity of technical exchanges and cooperation with foreign

    countries has been greatly improved, inviting Chinese Academy of Engineering and

    other experts and scholars carried out with a variety of training 98 times, training all

    kinds of engineering and technical personnel and research and development staff of

    more than 2,000 people.

    21 50

    Engineering Center trips were organized 21 batches 50 preson-time academic

    backbone abroad for engineering and technical exchanges and short-term technical

    training in 3-year, to enhance technical and R & D staff of international perspective,

    but also increased technological achievements Engineering Center's international

    influence.

    5.3 Academic communication

    31

    615

    Engineering Center established three-year, a number of research institutions

    domestic and overseas, enterprises and universities to carry out academic exchange

    activities, invited Chinese Academy of Engineering, and many other experts carried

    out with various academic exchange activities 31 times, to participate in academic

    exchange activities reached 615 person-time.

    36

  • 7/27/2019 2013 10141 ch-en

    39/73

    f) Organizational structure, system build and operation mechanism innovation

    6.1 Organizational structure

    Engineering Center relying on CSIC (Chongqing) Haizhuang Windpower

    Equipment Co., Ltd. to established. Engineering Center. Director is responsible for the

    implementation of the system, meanwhile accepting the Management Committee

    operational guidance and supervision. Establis the Danish research center, technology

    dept., research and development centers, engineering centers office, the machine room

    is under the technical department, offshore wind turbine installation laboratory andoffshore wind turbine grid access research, under the R & D Center, establis Software

    design Laboratory, System design Laboratory and Applied basic Laboratory, under the

    Engineering Center Office, establis the technology exchange service center and

    central office. In addition , institutional settings including CSIC laboratory resources

    and Supply chain technology resources, whereCSIC laboratory resources jurisdiction

    National Offshore Wind Engineering Research Center - Ocean Power Research

    Laboratory, National offshore Wind Engineering Research Center - marine wind

    turbine testing research laboratory, National offshore Wind Engineering Research

    Center - ocean wind power equipment corrosion research laboratory.

    -3

    37

  • 7/27/2019 2013 10141 ch-en

    40/73

    -3

    Figure 3- 3 Engineering Center Organization

    38

  • 7/27/2019 2013 10141 ch-en

    41/73

    39

  • 7/27/2019 2013 10141 ch-en

    42/73

    1 Management Committee

    Management

    Committee

    Dire

    ctor/Vice

    Director

    Scient

    ific

    committee

    Inter

    nal public

    resources

    Denma

    rk R&DCenter

    Technology Dept. R&DCenter

    Engine

    ering CenterOffice

    CSIC

    LaboratoryResource

    Supply

    chain

    technologyresources

    Machi

    ne room

    Offshore

    wind turbinesinstalled laboratory

    Grid

    access

    laboratory

    Software design

    Laboratory

    Systemdesign

    Laboratory

    Applied basicLaboratory

    Technicalcommunication

    service center

    Management Office

    Offshorepower research

    laboratory

    Offshore

    wind turbines

    detection research

    laboratory

    Marine wind

    power equipment

    anticorrosion researchlaboratory

    40

  • 7/27/2019 2013 10141 ch-en

    43/73

    Main Responsibilities: responsible for Engineering Center development strategy,

    development strategy formulation, supervision and review of the financial budgetreport and its implementation, coordination between the relevant cooperation units.

    -3

    -3

    Table 3-3 The name list of the Management Committee

    41

  • 7/27/2019 2013 10141 ch-en

    44/73

    Title Name Basic information

    Direct

    or

    Yang

    Benxin

    General manager assistant of China Shipbuilding

    Industry Corporation

    President of CSIC (Chongqing) Haizhuang

    Windpower Co., Ltd

    Vice

    Director

    Cao

    Yuzhong

    Section chief ofNational ministry of science

    and technology development planning department

    platform base

    Zheng

    Fangneng

    Section chief of National ministry of science and

    technology department of energy, high and new

    technology

    Xu

    Qing

    Vice Director of Chongqing Science And

    Technology Commission

    Luo

    Jiyan

    Director of CSIC of Science and Technology

    Dept.

    Yu

    Shqoing

    General manager of CSIC (Chongqing)

    Haizhuang Windpower Co., Ltd

    Comm

    ittee

    member

    Wang

    Junli

    Section chief ofNational ministry of science

    and technology development planning department

    research

    Tao

    Youchuan

    Vice general manager of CSIC (Chongqing)

    Haizhuang Windpower Co., Ltd, head of the professor

    Comm

    ittee

    member

    Weng

    Zhenping

    Director of China Ship Scientific Research

    Center

    Chen

    Jun

    Section chief of Chongqing science and

    technology commission planning department

    Xiao

    Feng

    Section chief of Chongqing science and

    technology commission high&new department

    2

    3

    29

    Engineering Center Scientific Committee brought together 3 Chinese Academy

    of Engineering, domestic and overseas wind power technology experts 29 preson.

    42

  • 7/27/2019 2013 10141 ch-en

    45/73

    Main responsibilities: regular meetings of the Scientific Committee meeting to

    study and discuss domestic and overseas technological developments, development,planning engineering center direction of the work; responsible for the engineering

    centers commitment or ongoing project evaluation and inspection, project director of

    the center for the daily management advice; engineering center regularly technical

    characteristics, quality of personnel, hardware and software basis for evaluation of

    major projects, tasks, organization and implementation of the development and

    engineering centers are suggested.

    -4

    -4

    Name

    /

    Title

    Area

    Organisation

    Wu

    Yousheng

    /

    Honorary

    Chairman

    /Academician of China

    Engineering Academy

    Ship

    Engineering

    702

    China Ship Reserching Center

    (CSIC 702)

    Jin Donghan

    /

    Chief of Scientific

    Commitee/Academician

    of China Engineering

    Academy

    Marine

    Engineering

    711

    CSIC 711

    Gu Xinyi

    /

    Deputy Chief of

    Scientific Commitee/

    Academician of China

    Engineering Academy

    Oil Machine

    Shengli Petroleum Administrative

    Bureau

    Yang

    /

    Energetics

    North China Electric Electric

    43

  • 7/27/2019 2013 10141 ch-en

    46/73

    Name

    /

    Title

    Area

    Organisation

    Yongping Deputy Chief of

    Scientific Commitee/Professor, docotoral

    supervisor

    University

    He Yulin

    /

    Deputy Chief of

    Scientific Commitee/

    Professor, docotoral

    supervisor

    Mechanics

    University of Chongqing

    Fang Shujia

    Researcher

    Electronics

    CSIC and China Shipbuilding

    Engineering Commitee

    Sun

    Dezhuang

    Researcher

    Ship and

    Ocean

    engineering

    CSIC Dalian Institute

    Sun

    Mingxian

    Researcher

    Corrosion

    and

    protection

    725

    CSIC 725

    Qi Hesheng

    Senior Professor

    Engineer

    Wind power

    China Agriculture Machinery

    Association

    Li Junfeng

    Researcher

    Energy

    Policy

    Natioanl Climate Change researching

    and international cooperation center

    Li Weijia

    /

    Professor, docotoral

    supervisor

    Vessel

    Electronics

    Huazhong University of Science and

    Technology

    44

  • 7/27/2019 2013 10141 ch-en

    47/73

    Name

    /

    Title

    Area

    Organisation

    ChenYingqiu

    /

    Docotoral supervisor,Researcher

    Ship and

    Ocean

    engineering

    CCS

    Zhu

    Junsheng

    /

    Deputy Director-

    General/ Senior

    Engineer

    Renewables

    IREC

    Zhang Liang

    /

    Professor, docotoral

    supervisor

    Ship and

    Ocean

    engineering

    Harbin Engineering University

    Yang

    Xiaosheng

    Researcher

    Wind

    development

    Guodian Longyuan Group

    He Dexin

    Researcher

    Wind

    Technology

    IREC

    Shi Pengfei

    Professor level Senior

    Engineer

    Mechanics

    IREC

    China Hydro

    Zhao

    Shengxiao

    Professor level Senior

    Engineer

    Wind Power

    China Hydro Hua Dong Institute

    Jia Limin

    /

    Professor, docotoral

    supervisor

    Smart

    Control and

    Automation

    North Jiaotong University

    Qin Haiyan

    Researcher

    Certification

    GC Certification

    45

  • 7/27/2019 2013 10141 ch-en

    48/73

    Name

    /

    Title

    Area

    Organisation

    and Testing

    Guan

    Xiaohong

    /

    Professor, docotoral

    supervisor

    Control

    Engineering

    Xi'an Jiaotong University

    Dai Huizhu

    /

    Researcher, docotoral

    supervisor

    Renewables

    and

    Interconnecti

    on

    China EPRI

    Norbert

    Hennchen

    PH.D Grid

    Integration

    FREQCON

    FREQCON

    Frank

    Nielsen

    PH.D Project

    Management

    LM

    LM Blade

    HenrikSimo

    nsen

    PH.D Electrical

    Engineering

    KK

    KK Electronics

    Yang

    Benxin

    Researcher

    HZ windpower

    Yu Shaoqing

    Researcher

    Mechanics

    HZ windpower

    Researcher&scholar

    Electromech

    anical

    HZ windpower

    Tang

    Wenbing

    Researcher

    Mecha

    nics

    HZ windpower

    6.2

    46

  • 7/27/2019 2013 10141 ch-en

    49/73

    Engineering Center fully relies on the support which comes from CSIC (Chongqing)HZ windpower Equipment Company and China Shipbuilding Industry Corporation. Based

    on the policy of modern management, it conducts the daily management and operation in

    the full use of the comprehensive advantages of relying on scientific research,

    management, talent and basic conditions, to carry out joint technology research,

    technical consulting, technology services, foreign exchange, promotion of achievements

    and personnel training etc.. At the same time, it actively introduces high-tech talent,

    insisting on the combination of full-time and part-time, fixed and visiting combination

    employing mechanism.

    Engineering Center introduces competition and talent-oriented mechanism, market

    demand-oriented policy, scientific and technological achievements of engineering,

    industrialization basic tasks, while the implementing of diversification mechanism to

    science, industry, trade, industry, academia, research organically as a whole. Engineering

    Center makes the allocation, reward, discipline and team building efforts to create a

    relaxed environment. Truly conducive to scientific and technological achievements of

    engineering, is conducive to the stability of high-level personnel and training. Engineering

    Center implementation projects incentives for commitment to national and provincial key

    projects of R & D project team for project awards, project leaders, project members

    according to their contribution to the project to give the corresponding reward.

    Meanwhile, in order to motivate employees, employees of the acquired knowledge of the

    results to be winning, actively encourage employees declare the results, the formation of

    papers and patents, or as a working initial results are summarized in the "Engineering

    Center Briefing" published, so that each employee I can feel its associated knowledge

    management, thus the rise of a knowledge innovation, knowledge sharing and

    application of knowledge, good atmosphere.

    47

  • 7/27/2019 2013 10141 ch-en

    50/73

  • 7/27/2019 2013 10141 ch-en

    51/73

    research outcome will be in the promotion, transformation, and pilot by HZs priority.

    (3)

    Engineering Center achieved economic benefits, mainly for their own

    development; Engineering Center main economic sources of CSIC and Sea

    Windpower technology development and investment company fees, national and

    Chongqing research funding and transfer of results technical service fees.

    (4)

    20

    5MW

    Engineering Center implements an open, flowing full appointment. With in the period

    of buiding Engineering Center, in addition to the employment of staff, many hired

    CSIC member units of technicians and management personnel to the engineering

    center office. In strong support of CSIC, CSIC subordinates related institutes and

    enterprises to send people to Engineering Center office or sending a senior

    engineering and technical staff of nearly 20 people, major innovative projectengineering center - 5MW offshore wind turbine development work and other

    research work smoothly. Achieve openness and fluidity.

    49

  • 7/27/2019 2013 10141 ch-en

    52/73

    4 3

    work to improve and future three-year development plan

    1 the development process can be improved working

    1.1 industry technology can further enhance the scope of radiation

    National Offshore Wind Engineering Research Center, during the planning

    process, has achieved good results in the field of offshore wind power technology

    and is the leading domestic level position .

    Engineering center for offshore wind technology breakthroughs have a positive

    influence on the onshore wind, with the support of HZ. But from the entire industry,

    the influence is still less enough. This problem is due to a primary center construction

    project support unit of the enterprise, with universities or research institutes exists

    major differences: the enterprise profitable demand, the need to expand its market

    share, it is bound with other companies to form the same type of competition. It

    results unit of the enterprise as the main support center for technical engineering

    services industry radiated power is not enough.

    50

  • 7/27/2019 2013 10141 ch-en

    53/73

  • 7/27/2019 2013 10141 ch-en

    54/73

    authorized engineering technology research center industry much-needed training

    professional and technical class talent, build degree awarded points for the whole

    industry to provide adequate human resources. If they can take these policies and

    measures, is expected to play an engineering center in the offshore wind industry

    leading position and further lead the industry technical standards and promoteprogress.

    1.3 To further strengthen international exchanges

    National Offshore Wind Engineering Research Center, during the planning

    process, the number and frequency of foreign exchange is not too high. I hope after

    the completion of the engineering centers, the National confer greater international

    exchange of space. It will provide more support for experts participating in

    international conferences, international cooperation, sending personnel to study

    abroad, exchanging with other experts.

    b) three-year development plan for thefuture

    2.1 3 next three years construction and developmentplanning

    China's offshore wind power industry is in a period of rapid development to

    solve the energy shortage, promote energy conservation and improve the living

    environment. Industry is expected to scale and broad development prospects, the

    National Offshore Wind Engineering Research Center shoulder heavy responsibilities.

    52

  • 7/27/2019 2013 10141 ch-en

    55/73

    Engineering Center, once completed, will focus on the development of offshore

    wind power industry, the overall situation, with the technical results obtained during

    the preparation, and further improve the center's technical strength, promote

    technology to the industrial transformation, opening up new areas of research, and to

    strengthen the public service platform and industrial innovation platform construction.Concrete will contain the following:

    2.1.1 3

    4~5 10~15

    3~5

    The next three years, in the current basis, continue to increase offshore windpower technology research and development input. Follow the national offshore wind

    power development in the strategic plan, and actively carry out forward-looking

    offshore wind power technology research and development, and strive to undertake

    national key scientific research projects 4 ~ 5, 10 provincial and ministerial research

    15, R & D expenditure of 3 to 5 billion.

    30 10

    100

    Strive to achieve greater breakthroughs in scientific research, more than 30

    patent applications, of which more than 10 patents and published more than 100

    academic papers. Offshore wind power base in scientific issues, engineering design,

    optimization and application of computing technology breakthroughs in key areas, a

    deeper grasp the core technology of offshore wind power.

    2.1.2 Strengthen offshore wind innovation platformconstruction

    5 3

    Preparation period has completed five laboratory and simulation test platform for

    the construction work. In the next three years, will further strengthen the innovation

    platform construction, the new micro-grid ocean island platform and a number of new

    experimental research platforms, and enhance research capabilities.

    53

  • 7/27/2019 2013 10141 ch-en

    56/73

    Improve the existing platform social service functions, through laboratory open

    to joint research and development, papers, monographs and published in the form, so

    that R & D platform engineering centers and technological achievements to serve the

    society and industry.

    2.1.3 Enhance the depth and breadth of radiationtechnology

    3~5

    Engineering Center, once completed, will further deepen a cooperative

    relationship with the current universities, research institutes, enterprises and foreign

    well-known research institutions of cooperation, more research on the establishment

    of cooperation. Further play a unifying role engineering center, with more universities

    and research institutes to establish relations of cooperation, and strive to add three to

    five cooperative units, which integrate the advantages of technical resources within

    and outside the industry together for the offshore wind industry to provide technical

    support and security.

    Strengthen the upstream and downstream industry technical radiation capacity,

    improve offshore wind power components manufacturing and procurement standards,

    provide technical support to parts enterprises, enhance the upstream radiation;

    increase downstream enterprises total package, complete sets of equipment, training

    of personnel the number and activity level, and enhance the industry downstream of

    radiation.

    3

    It should expandthe geographical scope of radiation technology and increased

    technological achievements coverage. Through product sales, self-built wind farms,

    joint research projects with local governments and other forms of demonstration

    54

  • 7/27/2019 2013 10141 ch-en

    57/73

    projects, to achieve technological achievements to the provinces, municipalities and

    autonomous regions of radiation. In the next three years, and strive not currently

    covered by provinces, municipalities and autonomous regions to form a breakthrough,

    expand coverage. Unit while enhancing exports and cooperation with foreign research

    institutions, to increase funding for research and development centers in Denmark,personnel and project investment, strengthen scientific research to overseas radiation.

    2.1.4 Establish a higher level of talent 3 3

    3

    300 250

    40% 35%

    Engineering center in three years construction period, personnel has been greatly

    expanded. In the next three years, it will continue to introduce, recruitment,

    secondment and other forms, to further expand personnel. Engineering center in three

    years and strive to personnel number doubled to more than 300 people, of which less

    than 250 permanent staff person including senior titles talent to increase the

    percentage to 40%, and increase the percentage of doctors and masters to 35 percent,

    and by strengthening personnel training and other means to enhance professionalism.

    3

    3 3

    Continue to strengthen international and domestic trade exchanges. Has held

    three sessions in international trade on the basis of academic exchange forum in the

    next three years, continues to grow at an annual forum held three sessions way.

    Actively participate in academic exchanges both inside and outside the industry,

    expanding Engineering Center's academic influence, grasp the industry advancedtechnology and offshore wind industry trends, leading the forefront of technology.

    While participating actively in the national strategic consulting projects, it will

    provide industry trends, forecasts and industry policy advice to the project to make the

    center of social responsibility.

    2.2 3 The next three years of technical development path

    55

  • 7/27/2019 2013 10141 ch-en

    58/73

    The next three years, engineering technology development center will mainly

    focus on offshore wind power basic theoretical research, offshore wind power

    equipment product development and optimization, and offshore wind power key

    technology ecosystem.

    2.2.1 The basic theory of offshore wind power research

    According to China from the Bohai Sea to the South China Sea resources tocollect and collate data, China's coastal areas have a certain geographical and

    hydrological characteristics in common. Offshore Wind Engineering Research Center

    for Chinese coastal waters have done to be characterized, to carry out offshore wind

    power base bias applied research projects. Such as marine power for offshore wind

    turbine load effects on marine wind conditions for wind turbine optimal control,

    offshore wind corrosion, marine micro-siting of offshore wind power foundation

    design and construction, marine environment crew protection, offshore wind on the

    marine environment the impact.

    2.2.2 Continuous updating of wind turbine products1 5MW

    5MW

    5MW

    5MW units stereotypes and small batch production

    National Offshore Wind Engineering Research Center at the planning stage, the

    development of a 5MW offshore wind turbines now in Jiangsurudong installed and

    functioning electricity. Engineering Center established, will be available, based on

    stereotypes 5MW offshore wind turbines, and continuing to make technical

    improvements to reach the international advanced level. Enhance the reliability of the

    unit, automation and intelligence, to improve power generation capacity.

    5MW

    Through technical updates, from prototype to achieve 5MW units into small

    56

  • 7/27/2019 2013 10141 ch-en

    59/73

    batch production, spread to the market. By quickly bringing new technology and new

    equipment design into business value and achieve the transformation of the industrial

    technology research and development, to engineering center construction purposes.

    2 2013 2MW 2MW