    INSTALLATIONOF PURGE GAS RECOVERY UNIT

    NFL VIJAIPUR

    CONTENTS OF TECHNICAL DOCUMENTS

    PC65/E-1/P-II P

    DOCUMENT NO. REV

    Page 1 of 2

    NFL VIJ AIPUR PGR-J ULY 2013

    PART II

    CONTENTS OF TECHNICAL DOCUMENTS

    FOR

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    NFL, VIJAIPUR

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    2/72

    INSTALLATIONOF PURGE GAS RECOVERY UNIT

    NFL VIJAIPUR

    CONTENTS OF TECHNICAL DOCUMENTS

    PC65/E-1/P-II P

    DOCUMENT NO. REV

    Page 2 of 2

    NFL VIJ AIPUR PGR-J ULY 2013

    LIST OF CONTENTS

    PART-II TECHNICAL DOCUMENTS FOR INSTALLATION OF PURGE GAS RECOVERY

    UNITSECTION DESCRIPTION

    1.0 INTRODUCTION

    2.0 GENERAL DESCRIPTION

    3.0 DESIGN BASIS

    4.0 SCOPE OF WORK

    5.0 GUARANTEES

    6.0 TIME SCHEDULE

    7.0 QUALITY ASSURANCE & CONTROL

    8.0 PROGRESS REPORTING

    9.0 CLARIFICATION OF CONFLICTS

    10.0 DRAWINGS & DOCUMENTS

    11.0 VENDORS LIST

    12.0 SPARES (COMMISSIONING & 2 YEARS OPERATION)

    13.0 ANNEXURE

    ANNEXURE 1 PROCESS BLOCK DIAGRAMANNEXURE 2 P&I DIAGRAMS

    ANNEXURE 3 TIE-IN LIST

    ANNEXURE 4 STATIC EQUIPMENT

    ANNEXURE 4.2 ROTATING EQUIPMENT

    ANNEXURE 5 PIPING

    ANNEXURE 6 ELECTRICAL

    ANNEXURE 7 INSTRUMENTATION

    ANNEXURE 8 CIVIL

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    3/72

    INSTALLATION OF PURGE GAS RECOVERY UNITAT NFL VIJAIPUR

    PLANT: AMMONIA-II

    PC 65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 1 of 13

    0 12.07.13 12.07.13 COMMENT INCORPORATED DSC AV RKV

    P 28.06.13 28.06.13 ISSUED FOR REVIEW DSC AV RKV

    REV REV DATE EFF DATE PURPOSE PREPD REVWD APPD

    INSTALLATION

    OF

    PURGE GAS RECOVERY UNIT

    AMMONIA-II PLANT

    NATIONAL FERTILIZERS LTD (NFL), VIJAIPUR

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    4/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 2 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    CONTENTS

    Section. DESCRIPTION PAGE NO.

    1.0 Introduction 3

    2.0 General 3

    3.0 Design Basis 4-9

    4.0 Scope of work 10

    5.0 Guarantees 10

    6.0 Time Schedule 11

    7.0 Quality Assurance & Control 12

    8.0 Progress Reporting 12

    9.0 Clarification of Conflicts 13

    10.0 Drawings & Documents

    11.0 Vendors List

    12.0 Spares(Commissioning & 2 years Operation)

    13.0 Annexure

    Annexure 1 Process Block Diagram

    Annexure 2 P&I Diagrams

    Annexure 3 Tie-In List

    Annexure 4 Static & Rotating Equipment

    Annexure 5 Piping

    Annexure 6 Electrical

    Annexure 7 Instrumentation

    Annexure 8 Civil

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    5/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 3 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    1.0 INTRODUCTION:

    M/s National Fertilizers Ltd (NFL), Vijaipur is operating two Ammonia Plants each of

    capacity of 1520 MTPD. AMMONIA-I & II Plants were commissioned in 1987 and 1997

    respectively. Both the Plants are based on steam reforming process of M/S HTAS

    Technology. Ammonia-I and Ammonia-II Plants have been revamped in 2012-13 to

    1750MTPD and 1864 MTPD ammonia production capacity respectively.

    In order to maintain loop pressure in synthesis section, a part of gas circulating in the

    synthesis loop has to be pur ged out to the plant fuel system to maintain inerts at anacceptable level. However, this results in loss of Ammonia Production and increases

    specific energy consumption. In order to recover H2 from Purge Gas and increase

    ammonia production, One Purge gas Recovery Unit is installed In Ammonia-I plant. The

    capacity of this PGRU is 15000 NM3/hr and is in operation since 1993.

    NFL intends to install a Purge Gas Recovery (PGR) Unit at Ammonia-II Plant for recovery

    of Hydrogen gas from Synthesis loop purge gas. Installation of PGR unit of 18,000 Nm/h

    capacities will help in saving in energy consumption with associated increase in

    Ammonia production.

    2.0 GENERALDESCRIPTION:

    This specification covers design engineering and supply of complete Purge gas recovery

    unit consisting of

    Gas Pre-treatment.

    Hydrogen Recovery Unit.

    Recovered ammonia purification.

    The complete Hydrogen recovery unit shall be pr eferred as skid mounted for ease of

    installation.

    The purge gas from Ammonia-II plant synthesis loop shall be available at a pressure of

    about 190 kg/cm2g. The purge gas shall be tapped by bidder from the synthesis loop and

    shall be treated to remove ammonia and other impurities to make it suitable for feeding to

    purge gas recovery unit for recovery of hydrogen gas. Bidder can offer PGR unit based

    on any proven technology, which is in satisfactory operation as per Bid Evaluation

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    6/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 4 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    Criteria. The recovered hydrogen shall be fed to ammonia synthesis compressor inlet

    stage depending upon the pressure of the recovered Hydrogen. The operating pressure

    of different stages of Synthesis compressor is 25, 52 and 97 Kg/cm2. The recovered

    ammonia shall be concentrated to 99.5% purity in distillation column and sent to

    Ammonia plant. All process and ut ilities connections with the existing Ammonia-II plant

    shall be installed by bidder by providing required isolation valves and piping.

    Bidders can submit their bid based on any proven technology, which is in satisfactory

    operation as per Bid Evaluation Criteria. The evaluation of the offer shall be based on

    capital cost, operating cost of the unit and other loading criteria defined in the ITB.

    3.0 DESIGN BASIS :

    3.1 The design shall incorporate conventional, reliable & proven features with an ai m to

    minimize the capital cost.

    Consideration shall also be g iven for stability of operation even at reduced loads. The

    vendor should base his design on the OWNERs requirement to operate the entire Unit

    continuously for 24 months without shut down.

    3.2 Process Specif ication

    The Process Specification for PGR is given below in Table 1.

    TABLE-1

    COMPONENT UNIT PURGE GAS RECOVERED H2 TAIL GAS RECOVERED NH3

    H2 Mole % 60 - 68

    N2 Mole % 18 - 25

    Ar Mole % 3 - 6

    CH4 Mole % 6 - 12

    NH3 Mole % 0.4 - 2.5

    H2O Mole % 0

    Flow Normal Nm3/hr 15000

    Flow Rated Nm3/hr 18000

    Pressure Kg/cm2

    (g) 190 30 (Min.) 5 (Min.) 21

    Temperature 0C 15 40 45 40

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    7/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 5 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    H2Recovery

    (Minimum)% 90

    Purity of

    Recovered

    streams

    (Min.)

    % 90 99.5

    3.3 Utilities

    3.3.1 Steam

    Low Pressure Steam:Header Conditions: Normal DesignPressure, Kg/cm2g 3.5 6Temperature, 0C 250 350

    Medium Pressure Steam:Header Conditions: Normal DesignPressure, Kg/cm2g 38 46Temperature, 0C 380 425

    High Pressure Steam:Header Conditions: Normal DesignPressure, Kg/cm2g 107 130Temperature, 0C 525 540

    3.3.2 Demineralised water

    Battery Limit Conditions: Normal DesignPressure, Kg/cm2g 2 5Temperature, 0C 40 60

    Quality in accordance with VGB norms for high Pressure Boilers

    3.3.3 Cooling Water

    Cooling Water SystemBattery Limit Conditions: Supply Return DesignPressure, Kg/cm2g 3.5 2 6Temperature, 0C 33 43 70

    Temperature rise for Design of new coolers, 0C 10

    Pressure drop for design of new coolers, Kg/cm2

    g 0.7

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    8/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 6 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    3.3.4 Instrument air

    Header Conditions: Normal Design

    Pressure, Kg/cm2g 6.5 10Temperature, 0C Ambient 70

    Dew Point at atm pressure, 0C -40Quality Free from dust water drops, oil

    New Instrument lines to be made in SS 304

    3.3.5 Plant Air

    Header Conditions: Normal DesignPressure, Kg/cm2g 4 10Temperature, 0C 40 70

    Quality Free from dust water drops, oil

    3.3.6 Nitrogen

    Header Conditions: Normal DesignPressure, Kg/cm2g 6 10Temperature, 0C 40 70

    Quality Free from dust water drops, oil

    Nitrogen, mole%, min 99.9Oxygen, mole%, max 0.01

    3.3.7 Electric Power

    Power is distributed at the followings levels:

    1. 11 kV 3phase with resistance earthed neutral

    2. 3.3 kV 3 phase with resistance earthed neutral3. 0.415 kV 3 phase with solidly earthed neutral4. 0.24 kV single phase with solidly earthed neutral

    The above voltages have a tolerance of 10% and a 50 Hz frequency with a tolerance of3%.Instrument power will be distributed at 115 V AC with solidly earthed neutral (3 wiresystem)

    Consumer Voltages:

    Power lighting:

    1. Motors above 1000 k 3 x 11 kV2. Motors from 150kV to 1000 k 3 x 3.3 kV

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    9/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 7 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    3. Motors up to 150 k 3 x 0.415 kV4. Electric Heaters acc. To manufactures requirement5. Lighting normal, emergency 240 V AC

    6. Level gauge lighting 240 V AC7. Panic Lighting 10 V AC8. Hand Tools 110 V AC9. Lighting for vessels and furnace 24 V AC

    Controls and instruments for switch gear:

    1. 11 kV switch gear (trip circuit) 110 V DC2. 11 kV switch gear (other circuit) 240 V DC3. 3.3 kV switch gear (trip circuit) 110 V DC4. 3.3 kV switch gear (other circuit) 110 V DC5. 0.415 kV switch gear 240 V AC & 110 V DC

    Instrumentation:

    1. Motorised control valves (4 wire system) 3 x 415 V AC2. Solenid Valves 110 V DC3. \instruments and data logger (through UPS) 115 V AC4. Alarm circuits with lamps and relays 24 V DC5. Illumination of level gauges 240 V AC

    3.4 Climatic Conditions

    3.4.1 Atmospheric Pressure

    Maximum recorded, mbar 967.9Minimum recorded, mbar 936.9Design, mbar 939.0

    3.4.2 Air Temperature

    Jan JulyHighest Temperature recorded, 0C 31.7 41.7Monthly mean daily max. temp., 0C 24.0 31.1Monthly mean temp.at 17:30 , 0C 22.7 26.1Monthly mean temp.at 10:30 , 0C 11.9 25.7Monthly mean daily min. temp., 0C 8.2 24.0Lowest Temperature recorded, 0C -2.2 20.6

    Maximum Temperature recorded, 0C 46.1 (May)Lowest Temperature recorded, 0C -2.2 (January)

    Annual mean temperature recorded, 0C 22.3

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    10/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 8 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    3.4.3 Design Air / humidity

    Temperature 35 0C

    Relative Humidity 100

    3.4.4 Rainfall

    Mean annual Rainfall, mm 1219.8Heaviest in a day, mm 290.5Design (1 hour), mm 120.0

    3.4.5 HumidityJan July

    Monthly mean relative humidity at 10:30, % 61 84Monthly mean relative humidity at 17:30, % 37 71

    3.4.6 Wind

    The recorded mean wind speeds are as follows:

    January 1.4 Km/hrFebruary 5.1 Km/hrMarch 5.9 Km/hr

    April 7.4 Km/hrMay 10.4 Km/hrJune 13.0 Km/hrJuly 12.0 Km/hrAugust 10.0 Km/hrSeptember 7.4 Km/hrOctober 5.9 Km/hrNovember 2.9 Km/hrDecember 3.3 Km/hr

    Prevailing direction is W to E from February to June, SW to NE from June to October and

    NE to SW from October to Fabruary.

    Design Wind Speed. Km/hr 160

    Design Wind load for design against wind forces and wind load shall be increased by 30% to cater for the effect on piping systems, platform, ladders etc.

    3.4.7 Ambience

    Due to the location within an industrial complex, the air may contain particles of send &Urea. The air may accidentally contain Ammonia vapour, and for this reason no part in

    direct contact with the atmosphere may be constructed from copper or copper alloys.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    11/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 9 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    3.4.8 Load bearing capacity

    Nature of terrain Flat and Graded

    Land characteristics Clay, Sand & Fractured rock

    All major foundations may be placed at a depth of 1.5 - 2.0 meters below ground levelwith net sage bearing capacity of 300 450 KN/m2. Ordinary foundations may be placedat depth of 1.0 1.5 meters below ground level with a net safe bearing capacity of 150 200 KN/m2.

    3.4.9 Seismic conditions

    The design must be executed as per code IS 1893 (1975). The actual site at Vijaipur isdefined as being situated in zone one (I).

    3.5 General Requirements

    3.5.1 Required minimum hydrogen purity is 90.00%. High methane and argon rejection rates

    are required. Vendor to confirm/ furnish improved rejection rates.

    3.5.2 Required minimum recovered Liquid NH3purity is 99.50 %.

    3.5.3 Hydrogen recovery to be guaranteed as 90%.

    3.5.4 Vendor to provide/ confirm steam and other utilities requirement.3.5.5 Max. Ammonia concentration is 200 ppmv for reject gas.

    3.5.6 Adequate provisions shall be m ade for isolation of equipment without causing a

    shutdown, so that maintenance or repair work can be carried out on such items (e.g.

    block valves on rotating equipment standby units, block valves and bypass on control

    valves, etc.). All control valves on hazardous fluid shall be provided with double block

    & bleed system. All isolation valves for various sections of the plants, process/steam

    vents, drains, etc. as may be required during start-up/shut-down and during PLANT

    upsets shall be provided

    3.5.7 No deviations from the project specification and this specification are permitted unless

    approved in writing by Owner/consultant.

    3.5.8 Approval of owner for P&I diagrams, process flow sheets, specifications of equipments

    and rotating machineries is required. P&I and all other drawings are to be computer

    based.

    3.5.9 Vendor other than given in vendor list for all equipments, machineries, package plants,

    packing etc. are to be approved by owner.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    12/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 10 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    3.5.10 Sizes of various Piping indicated in the Tie-in list & P&IDs of PGR(PC65-1000-0021)

    is tentative and final sizes shall be as per designing & recommendation of vendor.

    However, Sizes of existing lines where Tie-in is to be taken are actual.

    4.0 SCOPE OF WORK:

    Bidders scope of work shall include design, HAZOP study, engineering of equipment &

    accessories, procurement and s upply of complete material & bought-out items for

    mechanical, electrical and I nstruments of Hydrogen purge gas recovery unit including

    fabrication at shop, Testing and Inspection, Packing, Loading &Transportation, Unloading

    at site, Erection, Construction, Testing & Commissioning &Guaranteed test run for

    complete PGR unit as per specification given in NIT.

    4.1 Scope of Supply:

    Scope of supply shall include but not limited to following items:

    4.1.1 Purge gas pre-treatment unit.

    4.1.2 Purge Gas Recovery unit.

    4.1.3 Ammonia concentration unit

    4.1.4 Interconnecting Piping valves as per Annexure 3.

    4.1.5 Instrumentation and controls

    4.1.6 Complete electrical system

    4.1.7 Any other item required as per vendor

    4.1.8 Demolition / obstruction, if any, of the equipments/structures related to

    changes in the sections to be retained, shall be in the scope of the vendor.

    5.0 GUARANTEES:

    Vendor shall furnish following guarantees for the PGR system.

    5.1 Performance Guarantees:

    5.1.1 Vendor to guarantee plant operation at Rated, Normal and 50% of normal purge gas flow

    rate.

    5.1.2 Vendor to guarantee minimum Hydrogen recovery of 90.0 mol% at all above condition as

    per 5.1.1.

    5.1.2 Vendor to guarantee minimum Ammonia purity of 99.5 mol%.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    13/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 11 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    5.1.3 Vendor shall guarantee purity of Hydrogen as minimum 90.00 %.

    5.1.4 Vendor to guarantee max ammonia concentration 200 ppmv for the reject gas.

    5.2 Guarantee for utili ty consumpt ion:

    Vendor to guarantee specific consumption of following utilities per NM3of Hydrogen

    recovered at normal operating capacity.

    a) MP Steam (MT)

    b) LP Steam (MT)

    c) Cooling water (M3)

    d) DM water (M3

    )f) Power (KWH)

    5.3 Guaranteed life of Membrane/packings/any other adsorbent media

    5.4 Guaranteed start-up time for PGR unit

    6.0 TIME SCHEDULE

    The preferred completion period of PGR Unit shall be 8 months. In case of higher

    completion period, necessary loading as per loading criteria shall be done.

    6.1 Bidder shall furnish activity schedule in form of master network in PrimaVera identifying

    major activities in various areas like design, engineering, procurement of materials and

    bought out items, manufacture of equipment, delivery activities.

    The schedule should confirm to the time period mentioned.

    6.2 Master network shall be discussed and agreed upon. Engineering drawings and data

    submission schedule shall also be discussed and finalized before issue of letter of intent.6.3 After award of contract, the bidder shall plan sequence of work of manufacture and

    erection to meet the commissioning dates given above and shall ensure that all

    work/manufacture, shop testing and shipment of equipment is in accordance with

    construction/execution sequence.

    6.4 Within fifteen days after award of letter of intent bidder shall submit for review and

    approval of detailed network schedules based on master network as mutually agreed

    upon, showing logic and duration of activities in following major areas: Detailed

    engineering, procurement, manufacture, shop, inspection, testing despatch/shipment

    and receipt at site.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    14/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 12 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    6.5 Bidder shall, within fifteen days of award of letter of intent, submit the scheme for

    calculation of percentage progress for schedule and actual, for review and approval of

    the client.

    7.0 QUALITY ASSURANCE AND CONTROL:

    7.1 Quality Assurance (QA) shall mean the organisational set up, procedures as well as test

    methods and facilities developed by bidder in order to assure that all equipments leaving

    bidders shop are of the highest possible quality that is either equal to or better than the

    requirement specified.

    7.2 Quality control(QC), shall mean all the tests, measurement , checks and calibration whichare to be carried out in bidders shop in order to compare the actual characteristics of the

    equipment/ unit /system with the specified ones, along with furnishing of the relevant

    documentation (certificates/records) containing the data or result of these activities.

    7.3 Bidder shall submit a c omprehensive description (manual) of QA/QC measures

    contemplated by him for implementation with regard to this specification. It is contractual

    obligation of the bidder to develop and implement adequate QA/QC systems.

    7.4 QA/QC system shall cover all products and services of the contract i.e. documentationmaterial, shop and site fabrication, transportation and site works, including job sub

    contracted by the bidder.

    8.0 PROGRESS REPORTING:

    Bidder shall prepare monthly progress report under the following broad heads, indicating

    schedule and actual status of individual items.

    i. Basic Engineering

    ii. Detailed Engineering

    iii. Procurement (Ordering)

    iv. Manufacture

    v. Delivery

    vi. Erection & Commissioning

    It should contain

    i. Executive summary

    ii. SCurve indicating schedule & actual percentage progress.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    15/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT AT NFL VIJAIPURPLANT: AMMONIA-II

    PC65/E-01/P-II 0

    DOCUMENT NO REV

    SHEET 13 of 13

    FORM NO: 02-0000-0021F2 REV1 All rights reserved

    9.0 CLARIFICATION OF CONFLICTS:

    If there is any conflict between the related specifications, codes and s tandards, the

    Contractor shall immediately consult with the Purchaser in writing for clarification. Failure

    of Contractor to seek, in writing, clarification of conflicting requirements prior to

    acceptance of the Purchase Order shall constitute obligation of Contractor to comply with

    all of the conflicting requirements at no additional cost, even to the extent that rework

    and/or retesting may be required.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    16/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 1 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    TECHNICAL

    SECTION 10.0 DRAWINGS & DOCUMENT

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    17/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 2 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    TABLE OF CONTENTS

    SL. NO. DESCRIPTION SHEET NUMBER

    1.0 DRAWINGS & DOCUMENTS 3

    2.0 CATEGORY OF DOCUMENTS 5

    3.0 PROCEDURE 7

    4.0 LIST OF DRAWINGS & DOCUMENTS 8

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    18/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 3 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    1.0 DRAWINGS & DOCUMENTS

    This chapter details out various drawings and documents to be generated at various stages

    during the course of execution of the Project by the LSTK Bidder for different project activities.

    Categorization of the documents/ drawings for review/ information/ records of PMC and the

    review/ approval requirements of the Owner/ PMC along with routing of the documents/

    drawings will be conveyed separately as a philosophy.

    The efficient handling of drawings and documents to be prepared by the LSTK Bidder under the

    contract is the key to the timely completion of the plants. The LSTK Bidder undertakes to

    ensure that all drawings and documents to be submitted by him to the Owner/ PMC shall be ofprofessional quality and conforming to the contractual requirements. The LSTK Bidder also

    undertakes to institute a formal drawing control system which will be documented and

    submitted to the Owner/PMC for review or approval.

    Compliance of this chapter on drawings and documents is mandatory and is non-negotiable.

    The drawings / documents are to be generated by the LSTK Bidder at various stages of the

    project covering different activities. The drawings / documents generated will be in the category

    of Approval/ Review/ Information. The list of drawings and documents required is enclosed;

    however, the categorisation for the drawings/ documents will be informed separately. However,

    this will in no way relieve the LSTK Bidder of responsibility to conform to drawings, standards,

    specification, codes and contractual requirements / obligations.

    The LSTK Bidder shall prepare the drawing numbering procedure and submit to Owner/ PMC

    for approval. Each Drawing submitted by the LSTK Bidder shall be clearly marked with the

    name of the Owner, PMC with revision number & date. It should contain the minimum following

    details:

    a.Size of Drawing.

    b.Discipline of Engineering for which the drawing is issued.

    c.Discipline wise segregation of numbering sequence for example:

    LSTK Bidder to note that the number corresponds to Ammonia- I & II plants and shall be

    prefixed to all related documents/deliverables which shall be indicated to successful bidder.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    19/72

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    20/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 5 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    Sequence of submission of drawing is essential for proper review of documents and timely

    completion of the project is to be adhered. In case sequence is not maintained, the documents

    submitted will not be reviewed by Owner/ PMC and responsibility of timely execution of plant

    shall be to the LSTK Bidder's account.

    2.0 CATEGORY OF DOCUMENTS

    Category Description Action by Owner/ PMC

    1 Records/ Information

    LSTK Bidder can continue to progress with the work. This

    drawings or documents will be retained with Owner/PMC

    for information only. Owner/ PMC reserves the right to

    advise the LSTK Bidder of any comments (deviations

    from the contract) at any time and the LSTK Bidder is

    liable to respond to satisfy that the work being done is in

    accordance with the contract; deviations, if any will be

    bidder's risk and cost.

    2 Review

    Owner/PMC will review and advise the LSTK Bidder of

    any Comments on Bidders Drawings / documents within

    specified schedule (ie 2 weeks), from date of receipt in

    PMC office of LSTK Bidder's drawings/documents. The

    review period is defined as date of receipt of documents

    by PMC, to date of issue of comments by PMC. This

    review period shall be valid only if submission of drawings

    is done by LSTK Bidder in accordance with approved

    drawings / documents schedule as indicated in ITB. In

    case of any non-conformity to the above by LSTK Bidder

    due to which the period of review extends beyond 2weeks by the PMC, schedule delay, if any will have to be

    absorbed by the Bidder.

    The documents falling under Review category will be returned with comments within specified

    time schedules subject to fulfilling other conditions enumerated. The information category

    document will be retained for information only but however Owner/PMC reserves the right to

    comment at any stage of the Project, but not later than two weeks of receipt.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    21/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 6 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    Where clearance of Owner/ PMC is required for ordering of equipment materials, enquiry

    documents and one technically selected offer is to be submitted for review. The unpriced

    copies of purchase orders detailing both technical and commercial aspects for all items shall be

    submitted to PMC/ Owner within 15 days of issue of the same.

    Each purchase order forwarded should contain complete technical documents. It is obligatory

    for the LSTK Bidder to obtain acceptance on all the technical documents and accepted copy

    only to be forwarded to Owner / PMC. Any inaccuracies /omissions/inconsistencies noticed and

    brought to the notice of the LSTK Bidder at any stage of the project will be rectified/ replaced by

    LSTK Bidder without any cost & time implication to the Owner/ PMC.

    Detailed manufacturing schedules of fabricated/ manufactured items shall be submitted withinone month of ordering, Status report for all the items in detail, will be submitted once in a

    month.

    Documents to Boiler Regulation authorities shall be submitted and getting the documents

    reviewed by PMC/Owner. To any other agencies, documents shall be submitted under

    intimation to PMC/Owner.

    As built drawings and documents will be generated within one month of completion of activities

    on respective items of work.

    As Built Drawings:

    LSTK Bidder will furnish reproducible and electronic files of all the drawings under their scope

    to Owner / PMC, certified as As-Built Issue by Third Party Inspection Agency (TPIA) for

    Vendor Items coming under Third Party Inspection / LSTK Bidder for all other drawings.

    Upon completion of identifiable units or components of the fabrication, construction and

    installation phase of the project the Bidder will complete all the related plans to the "as built'

    stage including all Vendor drawings and furnish Owner/PMC with the following:

    a. One complete set of all original tracings copies.

    b. One complete set of reduced size (A3-297x420 mm) copies of all drawings.

    c. One set of CD for all documents/drawings/data

    d. All the as built drawings duly certified should be scanned and converted into electronic

    files made on magnetic/discs/optical long storage.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    22/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 7 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    e. All other project documents such as operating and maintenance manuals,

    manufacturers' Catalogues etc. shall also be scanned on magnetic/optical discs for safe

    storage and retrievals by the Owner when needed.

    f. 8 complete sets of full size prints of the drawings and 4 sets of reduced size prints.

    g. 8 complete bound sets of Manufacturer's specifications including design calculations.

    h. 8 complete sets in hard binders of the Manufacturers data book including certified prints

    and data for all items including test reports. Data Books shall be complete with index as

    tag numbers associated with Manufacturer's data shown. Equipment data shall include

    as a minimum requirement the principal and description of operation, drawings and

    dimensions, spare parts lists and unpriced purchase orders and bill of material.

    i. 8 bound copies each of the Spare Parts data books and the Lubricants inventory

    Schedule.

    j. 8 complete sets of field records shall be signed by both the Bidder's and Owner's

    Representative at the site.

    k. Original approvals and related drawings and documents from the statutory authority.

    l. Copies of correspondence with the statutory authorities.

    3.0 PROCEDURE

    The procedure for compilation of final as-built documents / drawings shall be informed later.

    However the Procedure for routing the final / as built documents/ drawings to PMC / Owner

    shall be informed during the execution stage.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    23/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 8 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    4.0 LIST OF DRAWINGS & DOCUMENTS

    4.1 PROCESS

    Sl.No DescriptionWithBid(Y/N)

    ForReview/Approval

    ForInformation

    Final/Approved/ As-built

    1.0 Design Basis Y Y Y

    2.0 Process Description Y Y Y

    3.0 Process Flow Diagrams Y Y Y

    4.0 P&I Diagrams Y Y Y

    5.0 Tie-in Point Diagram Y Y Y

    6.0Data sheet of all equipment andmachinery

    Y Y Y

    7.0 Guaranteed Consumption of utilities Y Y Y

    8.0 Life of Membrane/ other media

    Y Y Y

    9.0 Start up requirement of PGR unit Y Y Y

    4.2 STATIC EQUIPMENTS

    Sr.No

    Name of Document

    WithBid

    Y/N

    ForReview/

    Approv

    al

    Forinformatio

    n

    Final /approved

    / As-built

    1.0 Filled in Data Sheets of pressure equipment along withoutline sketches showing thickness of main parts, weight(erection & operating) and anchorage details

    Y - - -

    2.0 General arrangement for package items showing plan,elevation & end view

    Y Y - Y

    3.0 Recommended spares for commissioning & 2 yearsoperation

    Y Y - -

    4.0 Details of internals including demister, i.e. make andmodel No., free volume, wire dia, surface area, and

    density of material and separation efficiency.

    Y - - -

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    24/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 9 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    5.0 Civil load data including details of foundation/anchor bolts N - Y Y

    6.0 Drawing list N Y - Y

    7.0 Thermal, Mechanical & Structural Design calculations,Hydrodynamic calculation for Internals includingfabrication drgs. Of main equipment & Internalscomplying with the specifications and codes.

    N Y - Y

    8.0 Skin temperature vs. Metal tube length curve for superheaters, economizer & Air Preheater etc.

    N - - Y

    9.0 Specifications for Acid/Alkali cleaning N - - Y

    10.0 Welding procedure and performance records approvedby inspecting authority ( ** )

    N Y - Y

    11.0 Operating/Maintenance manual for mechanical itemswherever required N - - Y

    12.0 Transportation drawing showing overall dimension, C.G.weight and handling instructions duly approved byappropriate authority

    N - Y Y

    13.0 Procedure for hydraulic test and heat treatment (** ) N Y - Y

    14.0 Procedure for tube to tubesheet joint (**) N Y - Y

    15.0 Procedure for repair of damaged tubes (**) N Y - Y

    16.0 Procedure for site jobs like assembly, heat treatment,

    testing ,application of painting & insulation etc. ( ** )

    N Y - Y

    17.0 Records of NDT tests e.g. Radiography, UltrasonicTesting(UT), Magnetic Particle / Penetrant Testing(MP/PT), hardness etc. ( ** )

    N - - Y

    18.0 Records of vacuum box test plumbness, roundness,peaking, banding etc. (**)

    N - - Y

    19.0 Materials test certificates duly stamped by inspectingauthority ( ** )

    N - - Y

    20.0 PWHT Charts (**) N - - Y

    21.0 Mock-up test for Tube To Tube sheet joint (**) N - - Y

    22.0 Test on production test coupons ( ** ) N - - Y

    23.0 Corrosion test reports including C, Cr, Ni, Mo and ferritecontents report of raw materials, weldments, HAZ etc. ( **)

    N - - Y

    24.0 Hydraulic/pneumatic/Hydro-Pneumatic test reports ( ** ) N - - Y

    25.0 Strain gauge measurement ( ** ) N - - Y

    26.0 Foundation settlement check record(**) N - - Y

    27.0 Calibration report (**) N - - Y

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    25/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 10 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    4.3 Rotating Equipment

    PUMPS WithBid

    (Y/N)

    For

    Review/Approv

    al

    For

    Informatio

    n

    Final/Approved/ As-builtSl.No Description

    1.0

    List of drawings / documents including drawing

    number, revision number, description and

    approval status

    N Y - Y

    2.0Detailed manufacturing programme (Time bar

    chart )Y Y - Y

    3.0 Certified dimensional outline drawing Y Y - Y

    4.0 Cross sectional drawing and bill of material Y Y - Y

    5.0 Shaft seal drawing and bill of material N Y - Y

    6.0

    Shaft coupling assembly drawing and bill of

    materials including allowable misalignment

    clearances, shaft bores & key ways dimensions

    with tolerances and the style of coupling guard

    N Y - Y

    7.0

    Primary & auxiliary sealing schematic and bill of

    materials including seal fluid, fluid flows,

    pressure pipe and valve sizes, instrumentation,orifice sizes, and piping arrangement drawings

    N Y - Y

    8.0

    Cooling or heating schematic and bill of

    materials including cooling & heating media,

    fluid flows, pressure, pipe and valve sizes,

    instrumentation, orifice sizes and piping

    arrangement drawings

    N Y - Y

    9.0 Lube oil schematic and bill of materials Y Y - Y

    10.0

    Lube oil system arrangement drawing including

    sizes, rating and location of all customerconnections N Y - Y

    28.0 All final As- built shop drgs. & design calculations dulycertified by Third Party inspecting authority ( ** )

    N - - Y

    29.0 Records/ drawings, charts duly approved, signed andstamped by Statutory Authorities ( ** )

    N - - Y

    30.0 All Radiography films ( ** ) N - - Y

    31.0 Mechanical Guarantee Certificate ( ** ) N - - Y

    32.0 Inspectors final certificate ( ** ) N - - Y

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    26/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 11 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    11.0 Lube oil component drawings data N Y - Y

    12.0Electrical and instrumentation schematics,

    wiring diagrams and bill of materials N Y - Y

    13.0Electrical and instrumentation arrangement

    drawing and list of componentsN Y - Y

    14.0 Performance curves Y Y - Y

    15.0Pump specification sheet with complete details

    in proforma enclosed with enquiry / orderY Y - Y

    16.0

    Certified foundation assembly drawing of pump

    with driver & all accessories mounted on baseplate with load diagram for foundation design

    (In case of motor being procured by purchaser,

    motor frame details will be supplied to vendor

    within 4 weeks.)

    Y Y - Y

    17.0

    Engineering flow diagram showing:

    - Lubrication & sealing lines

    - Flushing / washing lines

    - Cooling / steam lines

    N Y - Y

    18.0

    Reference list for pumps supplied in past for

    similar duty conditions. Reference list shallcontain complete address of user, users

    purchase order number, brief specifications

    and date of commissioning

    Y - - Y

    19.0 Lube oil schedule N - - Y

    20.0Automatic recirculation valve assembly drawing,

    sectional drawing with bill of materialY Y - Y

    21.0 Quality Assurance Plan. Y Y - -

    22.0

    Material test certificates and Inspection &performance test report along with

    dispatch clearance certificates from

    inspector

    N - - Y

    23.0Instruction manuals describing installation,

    operation and maintenance proceduresN - - Y

    24.0 Spare parts recommendations and price list Y - - Y

    25.0Parts catalogue complete with reference

    drawing nos. and sketches etc.Y - - Y

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    27/72

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    28/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 13 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    4.5 CIVIL & STRUCTURALS

    Sl. No. DescriptionWith Bid

    (Y/N)

    ForReview/

    Approval

    For

    Information

    Final/Approved/ As-built

    1.0 Engineering specifications Y

    2.0 Design basis Y

    3.0 Overall foundation layout drawings Y Y Y

    4.0 Drawings & design calculations Equipmentfoundations

    Y Y

    5.0 Drawings & design calculations forSteel/RCC structures foundations

    Y Y

    6.0 Drawings & design calculations forSteel/RCC structures

    Y Y

    7.0Drawings & design calculations for majorSteel/RCC structures/foundations viz.compressors & machine foundations etc.

    Y Y

    8.0Structural layout drawings:Showing key plan wise StructuralSectional drawings, platforms, Ladders,Walkways & Staircases

    Y Y

    9.0 Fabrication & construction drawings forstructures

    Y Y

    10.0 Standards for steel structures Y

    11.0 Standards for concrete construction Y

    12.0 Standards for general civil Y

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    29/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 14 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    4.6 ELECTRICAL

    Sr.No. Name of Document

    Documents Required (Y / N)

    With

    Bid

    For

    Approval

    / Review

    For

    Informatio

    n

    Final /

    Approve

    d/ As-

    Built

    1. Load List indicating rated and absorbed

    power of loads and duty type (Continuous

    / Standby / Intermittent) at different

    voltages including emergency loads

    Y

    To be

    submitte

    d as and

    when

    revised-

    Y Y

    2. Construction power requirement:-

    1.0 Peak load in KVA

    2.0 Estimated KWH in KWH

    3.0 Duration:- in days

    Y - Y Y

    3. Single line distribution diagram (LV,

    lighting,) including protection and

    metering details

    Y Y - Y

    4. Specification of all Electrical Equipment - Y - Y

    5. Filled in Specification Sheets and Technical

    Particulars of all equipment- Y - Y

    6. General arrangement and foundation

    drawings of all equipment N - Y Y

    7. Equipment layout in Sub Station, MCC

    room, and plant area showing location of

    all electrical equipment N

    Y( Before

    releasing

    for civil

    construct

    ion)

    - Y

    8. Cable schedule N - Y Y

    9. Cable rack / trench / pipe layout N - Y Y

    10. Power Layout N - Y Y

    11. Schematic diagram for all control panel &

    switch boards

    N Y

    Y

    (Before

    order

    placement

    to sub

    vendor)

    Y

    12. Feeder Details of all LV switch boards /

    PanelsN Y

    Same as

    above-Y

    13. Interconnection & Terminal connection

    diagramN - Y Y

    14. List of controls, interlocks, indication &

    metering at various locations for all drives. N - Y Y

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    30/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 15 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    Sr.No. Name of Document

    Documents Required (Y / N)

    With

    Bid

    For

    Approval

    / Review

    For

    Informatio

    n

    Final /

    Approve

    d/ As-

    Built

    15. Characteristic curves for motor N - Y Y

    17. Earthing Layout

    N -

    Y

    (1 month

    before

    commence

    ment of

    work)

    Y

    18. Lighting layout

    N -

    Y( 2months

    before

    commence

    ment of

    actual

    work)

    Y

    19. Catalogues for all bought out items

    Y -

    Y( Before

    erection of

    equipment

    )

    -

    20. Bill of Materials covering all electrical

    equipment and installation materials

    - -

    As and

    when PO is

    released to

    sub

    vendors

    Y

    21. Installation operation and maintenance

    (Manual)N - Y -

    23. Spare Parts list Y - Y Y

    24. Test Certificates N ** - Y

    25. Guarantee Certificates N ** - Y

    26. Quality Assurance Plan & Formats N ** Y - Y

    28. Erection Drawings & Details N Y - Y

    29. Construction & Commissioning

    specification and procedure for all

    equipment

    - - Y Y

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    31/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 16 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    4.7 Instrumentation

    Sl.No Description WithBid(Y/N)

    For Review/Approval

    ForInformation

    Final/

    Approved/ As-

    built

    1 Drawing & document schedule Y Y

    2 Instrument Index Y

    3Instrument sizing calculations (controlvalves, safety valves & flow elements)

    Y

    4 Utility requirements Y

    5 Level sketches Y

    6 Material Requisition Y Y

    7 Purchase Requisition Y

    8 Vendor Drawings Y

    9 Functional Schematic Y

    10 Logic Diagrams as per ISA 75.2 Y

    11 Instrument loop drawings Y

    12 Control room layout Y Y

    13 Layout of equipment inside control room Y Y

    14 Power supply distribution Y Y

    15 Wiring diagram for panels Y

    16 Configuration diagram Y Y

    17 I/O assignment Y Y

    18DCS graphics, report/log formats & otherDCS docs.

    Y Y

    19 Instrument duct / tray layout Y

    20 Instrument cable schedule Y

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    32/72

    INSTALLATION OF PURGE GAS RECOVERY UNIT

    PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPURPC65/E-1/ P-II/10.0 0

    DOCUMENT REV

    Page 17 of 17

    _________________________________________________________________________________________________________________FORM NO: 02-0000-0021 F2REV2 All rights reserved

    Sl.No DescriptionWithBid

    (Y/N)

    For Review/Approval

    ForInformation

    Final/Approved/ As-

    built

    21 Instrument location plans Y

    22 Instrument installation drawings Y

    23 Bill of material for installation items Y

    24 Spare part list for :

    a. Mandatory Spares Y

    b. Start up & commissioning Y

    25 Inspection & test procedures Y

    26Complete catalogues with part list for allvendor supplied instruments, control etc.

    Y

    27Installation, operation & maintenancemanuals

    Y

    28 As Built Drawings Y

    Notes:

    1.Final documentations including approved documentation from statutory design verifying

    authority shall be supplied in hard copies (6 sets) as well as soft copies in CD formats.

    Applicable software is MS Office 2000, Word, Access, Excel and PDF.

    2.Document marked as (**) are to be approved by authorized Inspection Agency and

    Statutory Authorities as applicable.

    3.Bidder shall submit document in required number of sets as stated elsewhere in

    commercial part.

    4.This list indicates the minimum drawings and documents requirements. However vendor

    shall submit complete list of document & drawing schedule listing all drawings and

    documents to be submitted by them during the course of execution of the job. The

    schedule shall list all drawings and documents along with their number and expected

    date of submission.

    LEGEND: Y - Yes, N - No

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    33/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 1 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    TECHNICAL

    SECTION - 11.0

    VENDOR LIST

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    34/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 2 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    TABLE OF CONTENTS

    SL. NO. DESCRIPTION SHEET NUMBER

    1.02.0

    2.1

    2.2

    3.0

    4.0

    5.0

    Package Vendor - PGRMechanical

    Static Equipments

    Rotating Equipments

    Piping

    Electrical

    Instrumentation

    33

    3

    3

    4

    13

    15

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    35/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 3 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    Sl.No Vendor s Name Country

    1.0 PURGE GAS RECOVERY UNIT

    1 Liquid Air Engineering India2 BHPV India

    3 Air Product Belgium

    4 Air Liquide France

    5 Linde Engineering Germany

    6 Chart Energy USA

    7 UOP USA

    8 Membrane Technology & Research, Inc. Newark, CA USA

    2.0 Mechanical - Static Equipments

    2.1 COLUMNS

    1 ARTSON ENGINEERING LIMITED India

    2 BHPV India

    3 Godrej & Boyce Mfg. Co. Ltd India

    4 GR Engineering Private Ltd India

    5 Grasim Industries India

    6 India Tube Mills & Metal Industries LTD. India

    7 Kaveri Engg. Industries Ltd. India

    8 Larsen & Toubro Ltd India

    9 Lloyds Steel Industries Limited India

    10 Novatech Projects India (P) Ltd. (CS &SS only) India

    11 Patel Air Temp india limited (CS & SS only) India

    12 Precision Equipments (Chennai) PVt. Ltd. India

    13 Tata Chemicals Ltd. India

    14 The Anup Engineering Limited India

    15 The Indian Sugar & General Engg. Corpn. , Dahej ( CS/SS/AS) India16 The Indian Sugar & General Engg. Corpn. (ISGEC). Yamuna Nagar India

    17 Hyosung Corporation Korea

    18 Apparatebau Schweisstechnik Gmbh Austria

    19 Schoeller-Bleckmann Nitec GMBH Austria

    20 ATB Acciaieria E Tubificio Di Brescia SP Italy

    21 Belleli S.P.A. Italy

    22 GE Power (Nuovo Pignone SPA) Italy

    23 Rolle S.P.A Italy

    24 Hitachi Zosen Japan

    25 Kawasaki Heavy Industries Ltd. Japan

    26 Mitsui & Company Ltd. Japan

    27 Doosan Mecatec Co. Ltd. Korea28 Hanjan DCM Co. Ltd. Korea

    29 Hundai Heavy Industries Ltd. Korea

    30 Korea heavy industries & constn . Co. Ltd Korea

    31 Sembawang Engg. (PTE) ltd Singapore

    32 Mechanical DE LA Pena S.A Spain

    2.2 Mechanical - Rotating Equipments

    Pumps (Centrif ugal)

    1 A.R Wilfley India Pvt. Ltd India

    2 Beacon Weir Ltd India

    3 Bharat pumps and Compressors Ltd India4 ITT Corporation India Ltd. (Formerly Gould Pumps Inc.) India

    5 Kirloskar Brothers Ltd. India

    6 Kirloskar Ebara pumps Ltd India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    36/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 4 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    7 Kishore pumps Pvt. Ltd India

    8 KSB Pumps Ltd India

    9 Sulzer pumps India Ltd. (single stage only) India

    10 Pumpen Fabrik Ernst Vogel Austria

    11 Ensival S.A Belgium

    12 GE Power (Nuovo Pignone Spa) Italy

    13 Weir Gabbioneta SRL Italy

    14 Arai pump Mfg. Co. Ltd Japan

    15 Sanwa Hydrotech Corporation Japan

    16 Flowserve (IDP) U.K

    17 Labour pump Co. Ltd U.K

    Pumps (Reciprocating)

    1 Bharat pumps and compressors Ltd India

    2 V.K Pumps Industries Pvt. Ltd India3 UT Pumps & system Pvt. Ltd India

    4 Swelore Engineering Pvt. Ltd India

    5 Lewa Herbertott Gmbh & Co Germany

    6 Uraca Pumpenfabrik Gmbh & Co Germany

    7 Dosapro Millton Roy Italy

    8 Peroni Pompe Spa Italy

    9 Nigata Worthington pumps Japan

    10 Nikkiso Co. Ltd. Japan

    11 Bran & Luebbe Ltd. U.K

    3.0 PIPING

    CS Welded Pipes To API 5L Spiral Long. Welded (SAW/EFSW)

    1. HEAVY METAL PIPE CENTRE (Upto 24" (Upto SCHXXS) India

    2 Jindal Pipes Ltd. India

    3 JOTINDRA STEEL & TUBES LTD. (" to 14") India

    4 KALPESH TUBE(INDIA), (TRADER) India

    5 Lalit Profiles & Steel Inds. Ltd. India

    6. Mann Industries India

    7. Mukat Pipes Tarapur India

    8 PRATIBHA INDUSTRIES NB LTD.,(16" to 24" NB, Wall Thickness:6 mm to 20 mm) India

    9. P.K.Forge & Fitting Industries India

    10. Ratnamani Metals & Tubes Ltd. India11 SAIL India

    12 SAGAR STEEL CORPORATION (TRADER India

    13 Saw Pipes India

    14 Surinder Engg. Co. Pvt. Ltd India

    15. Surya Roshini Ltd India

    16 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India

    17 Welspun Gujarat Stahl Rohren Limited (For Anjar and Dahej Plants) India

    18 Phoceenne France

    19 ETS Trouvay & Cauvin France

    20 Mannesmann Handel AG Germany

    21 Thyssen-Krupp Stahlunion GmbH Germany

    22 Dalmine SPA Italy

    23 Raccortubi SRL Italy

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    37/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 5 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    24 Kosei Sangyo Ltd Japan

    25 Marubeni Itochu Steel Japan

    26 Mitsubishi Corporation Japan

    27 Nippon Kokan Japan

    28 Nippon Steel Corporation Japan

    29 Nishitani & Co. Ltd. Japan

    30 Nissho Iwai Corporation Japan

    31 Okura & Co. Ltd. Japan

    32 Sojitz Corporation Japan

    33 Sumitomo Metal Industries Ltd. Japan

    34 Hyundai Corporation Korea

    35 British Steel Corporation U.K.

    36 Corus Tubes Limited U.K.

    37 SAW pipes USA, Inc U.S.ACS/AS LT Seamless Pipes

    1 BHEL India

    2 Indian Tube Co. India

    3 ISMT Limited India

    4 Jay Lakshmi steel & engineering co. India

    5 Jindal Saw Ltd. India

    6 Maharashtra Seamless Ltd. India

    7 P.K.Forge & Fitting Industries India

    8 Phoceenne France

    9 ETS Trouvay & Cauvin France

    10 Mannesmann Handel AG Germany

    11 Horst Kurvers GmbH Germany

    12 Dalmine SPA Italy

    13 Gam Raccordi S.P.A Italy

    14 IBF Seamless Pipes SPA Italy

    15 Raccortubi SRL Italy

    16 Marubeni Itochu Steel Japan

    17 Mitsubishi Corporation Japan

    18 Nippon Steel Corporation Japan

    19 Nishitani & Co. LTD. Japan

    20 Nissho Iwai Corporation Japan21 Okura & Co. Ltd. Japan

    22 Sojitz Corporation Japan

    23 Sumitomo Metal Industries Ltd. Japan

    24 Hyundai Corporation Korea

    25 AB Sandvik Steel Sweden

    26 Vomal International Limited U.K.

    27 Corus Tubes Limited U.K.

    28 British Steel Corporation U.K.

    SS Seamless / Welded Pipes

    1. Anil Metal Corporation India

    2 Apex Tubes India

    3 BHANDARI FOILS & TUBES LIMITED(Seamless Upto 4"(Sch. 80)&Welded Upto 20"(Thk.

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    38/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 6 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    4 Choksi Tube Company Ltd. India

    5 HEAVY METAL & TUBES (Upto 8" (thickness upto 18.26 mm)) India

    6 HEAVY METAL PIPE CENTRE (Upto 8" ( Upto SCH80S) (PDIL approved

    Manufacturer's Make only))

    India

    7 Jaylakshmi Steel & Engg. Co India

    8 Jindal Saw Ltd. India

    9 KRYSTAL STEEL MANUFACTURING PVT. LTD. (Upto 2" (Material uptoGrade SS 321))

    India

    10 Mardale Pipes Plus Ltd India

    11 MODERN TUBE INDUSTRIES LIMITED (Upto 2" (Upto SS Grade 321)) India

    12 Nuclear Fuel Complex India

    13 P.K.Forge & Fitting Industries India

    14 Prakash Steelage Limited(0.5 to 20 welded & 0.25 to 8 smls (upto sch 40s)) India

    15 QUALITY STAINLESS PVT. LTD. ( Seamless: Upto 6" (SCH40S ), Welded:

    Upto 20" (SCH40S)

    India

    16 Rajendra Mechanical Industries Ltd. India

    17 Ratnamani Metals & Tubes Ltd. India

    18 SANDVIK ASIA PVT. LTD. (" to 2" (Thk: upto 8.74 mm)) India

    19 SANGHVI METALS (TRADER) India

    20 SCORODITE STAINLESS (INDIA) PVT. LTD. (Upto 2" (Upto SS Grade 321)) India

    21 Shubhlaxmi Metals & Tubes Pvt. Ltd India

    22 Suraj Stainless Limited India

    23 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India

    24 ETS Trouvay & Cauvin France

    25 Phoceenne France

    26 H. BUTTING GmbH & CO. (Seamless : Upto 30" (upto 16mm thk) & Welded: Upto72" (upto 64mm )

    Germany

    27 Horst Kurvers GmbH Germany

    28 Mannesmann Handel AG Germany

    29 Thyssen-Krupp Stahlunion GmbH Germany

    30 Dalmine SPA Italy

    31 Gam Raccordi S.P.A Italy

    32 IBF Seamless Pipes SPA Italy

    33 Raccortubi SRL Italy

    34 Marubeni Itochu Steel Japan

    35 Mitsubishi Corporation Japan

    36 Nippon Steel Corporation Japan

    37 Nishitani & CO. LTD. Japan

    38 Nissho Iwai Corporation Japan

    39 Okura & Co. LTD. Japan

    40 Sojitz Corporation Japan

    41 Sumitomo Metal Industries LTD. Japan

    42 Ab Sandvik Steel Sweden

    43 T.T.I. Tubacex Tubos Inoxidables, S.A. Spain

    44 SOSTA BV (Upto 72" ( thickness upto 25.4 mm)) Netherland

    45 Vomal International Limited U.K.

    46 Corus Tubes Limited U.K.47 British Steel Corporation U.K.

    48 Hyundai Corporation Korea

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    39/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 7 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    SS Seamless Tubes

    1. Anil Metal Corporation India

    2 APEX TUBES PVT. LIMITED (Upto 50.8 mm OD (Thickness Upto 4.00 mm)) India

    3 BHANDARI FOILS & TUBES LIMITED (Upto 50 mm OD) India

    4 HEAVY METAL & TUBES (Upto 8" (thickness upto 18.26 mm)) India

    5 KRYSTAL STEEL MANUFACTURING PVT. LTD. (Upto 50.8 OD (Material uptoGrade SS 321))

    India

    6. MODERN TUBE INDUSTRIES LIMITED (Upto 50.80 OD (Upto SS Grade 321)) India

    7. India

    8 Prakash Steelage Limited (0.25" to 4" (upto 5mm thickness)) India

    9. Ratnamani Metals & Tubes Ltd. India

    10. SANDVIK ASIA PVT. LTD. (OD upto 60.33 (Thk: upto 8.74 mm)) India

    11 SCORODITE STAINLESS (INDIA) PVT.LTD. (Upto 50.80 OD (Upto SS Grade321))

    India

    12 Suraj Stainless Limited India

    13 T.T.I.-Tubacex Tubos Inoxidables, S.A.(OD 15.8 mm to 250.0 mm, wall thk.1.0mm)

    Spain

    Fittings: CS/AS/SS Seamless & Forged

    1. Amforge Industries India

    2 Anil Metal Corporation India

    3 COMMERCIAL SUPPLYING AGENCY

    4 CSA FITTINGS (Forged: " to 2" (Upto 9000#) & Seamless: 2" to 8" (Upto SCHXXS))

    5 EBY Fasteners India

    6. EBY Industries India

    7. FIT-TECH INDUSTRIES (CS (Forged) Elbow and Tee " NB to 1 " NB, Rating3000#, 6000#, 9000#

    India

    8 Flash Forge(P) Ltd. India

    9. Gujarat Infrapipes Pvt. Ltd. India

    10. IISCO Ltd. India

    11 Jay Lakshmi Steel & Engineering Co. India

    12 KALPESH TUBE(INDIA),(TRADER) (upto a max order value Rs.25.0 lakh) India

    13 M.S Fittings Manufacturing Co. Pvt Ltd. India

    14 Mardale Pipes Plus Ltd India

    15. National Org Chemical India Ltd India

    16 Navkar Forgings & Fittings Pvt. Ltd India

    17 NL HAZRA India

    18 P.K Forge & Fitting industries India

    19 Parmar Techno Forge India

    20 Perfect Marketing (P) Ltd, India

    21 PETROCHEM INDUSTRIES (Seamless: upto 16" (all Fittings) & upto 36" (OnlyCaps) Sch : XXS /

    India

    22 RAJENDRA FORGE INDUSTRIES (CS: Upto 12" Sch 40 & SS: 6" Sch 40S) India

    23 SAGAR STEEL CORPORATION (TRADER) India

    24 SANGHVI METALS (TRADER) India

    25 Sawan Engineers India

    26 Shivananda Pipe Fittings Ltd., India

    27 Surya Roshni Ltd India

    28 S & G Engineers (P) Ltd. India

    29 STEWARTS AND LLOYDS OF INDIA LIMITED India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    40/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 8 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    30 Teekay Tubes Private Limited India

    31 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India

    32 Topaz Piping Industries India

    33 Tube Bend India

    34 Tube Products Incorporate(CS fitting Only) India

    35 Visvesaraya iron & steel Ltd. India

    36 Zoloto Industries India

    37 BHDT GMBH Austria

    37 BHDT GMBH Austria

    38 Phoceenne France

    39 ETS Trouvay & Cauvin France

    40 Vallourec France

    41 Seikmann Anlagen-Technik GMBH. Germany

    42 TPS-Technitube Rohrenwerke GMBH Germany43 Mannesmann Handel AG Germany

    44 Horst Kurvers GmbH Germany

    45 Dalmine SPA Italy

    46 Gam Raccordi S.P.A Italy

    47 IBF Seamless Pipes SPA Italy

    48 IND Meccanica Bassi Luigi & C. SPA Italy

    49 Mantovani SpA Italy

    50 Raccortubi Srl Italy

    51 Techno Forge SPA Italy

    52 Marubeni Itochu Steel Japan

    53 Nippon Kokan Japan

    54 Nishitani & co. Ltd. Japan

    55 Nissho Iwai Corporation Japan

    56 Okura & co. Ltd. Japan

    57 Sojitz Corporation Japan

    58 Sumitomo Metal Industries Ltd. Japan

    59 Avesta Candvite Tube AD Sweden

    60 Helens Energy Sweden

    61 Haitima Corporation Sweden

    62 Corus Tubes Limited U.K.

    63 British Steel Corporation U.K.64 Eurotube Limited U.K.

    65 Vomal International Limited U.K.

    66 Bonney Forge U.S.A.

    Forged Flanges

    1. Ajay Forging Pvt. Ltd India

    2 Amforge Industries India

    3 Anandmayee Forgings PVT. LTD. India

    4 C D Engineering India

    5 Chaudhary Hammer Works (P) LTD. India

    6. Echjay Industries Ltd India

    7. Ferrous Alloys Forging Pvt. Ltd India

    8 Golden Iron & Steel Works India

    9. GOOD LUCK ENGINEERING CO. ("-12" (Upto 2500#), 14"-16" (Upto 900#), India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    41/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 9 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    18"-32" (Upto 600#),

    10. J.K Forgings India

    11 Kunj Forgings Pvt. Ltd.(Material CS/SS/AS) India

    12 MAHESH INDUSTRIES (Upto 8" (150#, Material: ASTM A105 only)) India

    13 Perfect Marketing (P) Ltd India

    14 Punjab Steel India

    15. RAJENDRA FORGE INDUSTRIES (CS & SS : Upto 12", 300#) India

    16 R D Forge (A Unit Of R D Chemicals Pvt Ltd) India

    17 Sanghvi Forgings & Engineering Ltd India

    18 Sawan Engineers India

    19 S & G ENGINEERS (P) LTD. India

    20 TECHNO FORGE LTD. (Upto 42" (upto 300#), upto 24" (600#), upto 20" (900#),upto 16" (1500#),

    India

    21 Tube Bend (Calcutta) Pvt Ltd India

    22 Viraj, Tarapur India

    23 Phoceenne France

    24 ETS Trouvay & Cauvin France

    25 Horst Kurvers GmbH Germany

    26 I.S. International Italy

    27 Mantovani spa Italy

    28 Officine Nicola Galperti & Figlio S.P.A Italy

    29 Raccortubi Srl Italy

    30 Nichinan Sangyo CO. Ltd., Japan

    31 Nishitani & CO. Ltd. Japan

    32 Sojitz Corporation Japan33 Vomal International Limited U.K.

    Gate/ Globe/ Check Valves CS/SS/AS > =900 Lbs

    1 Audco India Limited (L&T Valves Divn.) India

    2 BHEL (Valves Division) India

    3 BDK Engineering Industries Ltd. (upto 2500#) India

    4 FLOVEL VALVES PVT. LTD. (Dual Plate Check Valves only: Upto 24" (900#)) India

    5 KSB Pumps Limited (Valves Divn) India

    6 Larsen & Toubro Limited (1/2" to 2") India

    7 Leader Valves Limited (1500 & 2500# upto 12",forging upto 2" 2500#) India

    8 NSSL Limited India

    9 Oswal Industries Ltd. (1500 & 2500, 1/2" to 2" size) India

    10 Sempell Valves Pvt Limited India

    11 Tyco valves & Controls India Pvt Ltd, India

    12 Hoerbiger Ventilwerke,(For Plate Type Check Valves only) India

    13 Babcock Borsig Espana, S.A. Berlin

    14 Velan Inc. Canada

    15 FRIULCO SPA (Upto 32" (900#); 24" (1500#); 14" (2500#)) Italy

    16 Valvitalia SPA Italy

    17 BFE Bonney Forge Valve Licensee Italy

    18 Cesare Bonetti Italy

    19 Fasani S.P.A. Italy20 GTC Italia, S.R.L. Italy

    21 OMB S.P.A. Italy

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    42/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 10 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    22 Petrol Valves S.R.L Italy

    23 Matsura H. P Machine Works Co.Ltd. Japan

    24 NishitanI & Co. Ltd. Japan

    25 POYAM VALVES, (AMPO S. COOP.) (Size upto 30" (Rating upto 2500#)) Spain

    26 Sufa Limited U.A.E.

    27 BEL Valves U.K.

    Ball valves (Metal Seated)

    1 Larsen & Toubro Limited India

    2 NSSL Limited (2" NB to 12" NB, Ratings:150# & 300# (Material: Cast CS/AS/SS)) India

    3 OSWAL INDUSTRIES LTD. (Upto 24" (150#, 300#, & 600#)) India

    4 VIRGO ENGINEERS LTD. (Upto16" (Upto 600#)) India

    5 WEIR BDK VALVES (A UNIT OF WEIR INDIA PVT. LTD.) (Cast: Upto 30" (150# & 300#);20" NB

    India

    6 VELAN INC. (Size upto 16" (Rating upto 600#)) canada

    7 Alfa Valvole SRL Italy

    8 CESARE BONETTI SPA (Upto 24" (150#) & 4" (Upto 1500#) Trunnion Mounted only) Italy

    9 GE power (Nuovo Pignone SPA) Italy

    10 GTC Italia, S.R.L. Italy

    11 Petrol Valves S.R.L Italy

    12 Valvitalia Spa Italy

    13 PERRIN GmbH (Size upto 24" (Rating upto 2500#)) Germany

    14 Red point alloys Bv Netherland

    15 FRIULCO SPA (Upto 48" (150# & 300#); 20" (Upto 1500#); 12" (2500#)) Italy

    16 POYAM VALVES, (AMPO S. COOP.) (Size upto 42" (Rating Upto 2500#)) Spain

    17 Metso Automation Singapore18 Orbit Valves PLC Singapore

    Butterfly Valves

    1. Advance Valves (rubber lined and metal seated) India

    2 Audco India Limited (L&T Valves Divn.) India

    3 BDK Process Control Pvt Ltd. (upto 1600mm) India

    4 Crawley & Ray (F&E) Pvt. Ltd. (40mm - 1000mm) India

    5 Delval Flow Controls Private Limited (2" NB to 24" NB; for Classes: 150#,300#,)

    India

    6 Fisher-Xomox Sanmar Ltd. India

    7 Flocon systems pvt. Ltd. (CS upto 12" 150#) India

    8 Fouress Engineering (I) Ltd. India9 Hawa valves india pvt. Ltd. India

    10 Hawa Engineers, Ahmedabad

    11 Hi-tech butterfly valves India Pvt. Ltd (

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    43/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 11 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    21 Griss Sapag Industrail Valves France

    22 Adams Armaturen Germany

    23 GTC Italia, S.R.L. Italy

    24 Haitima Corporation Taiwan

    25 Weir valves & controls division. U.K

    26 Leeds Valve Ltd U.K

    27 Curtis Wright Flow Control Corpoaration (COPES-VULCAN LTD) U.S.A.

    28 Lear siegler meas. Ctrls. Corp U.S.A.

    29 Tyco International INC.,U.S.A. U.S.A.

    30 Emerson Process Mgt U.S.A.

    31 Spx Valves & Controls U.S.A.

    32 XOMOS (Crane Co) U.S.A.

    Plug Valves (Non Lubricated)

    1. A V VALVES LIMITED (Upto 20" (150#) (CS & SS) India2 Audco India Ltd (L&T Valves Divn.) India

    3 AZ ARMATUREN GMBH (" NB to 20" NB, 150#, 300#, 600# (Matl. CS, SS & AS)) India

    4 BDK Process Control Pvt Ltd. India

    5. Crawley & Ray (Founders & Engineers) Pvt. Ltd (DN 200) India

    6 L&T Ltd ( 1/2" to 24") India

    7. WEIR BDK VALVES (A UNIT OF WEIR INDIA PVT. LTD.) (Upto 16"(150#), 12"(300#), 3" (600#))

    India

    8. Xomox Sanmar Limited (Fisher Xomox) India

    9. O.M.S. Saleri Di Saleri P & Figli S.M.C. Italy

    10. POYAM VALVES, (AMPO S. COOP.) (Upto 30" (Upto 900#) for Lift Plug valves only.) Spain

    Spirally Wound Gaskets1. Gaskets (India) Pvt. Ltd India

    2 Goodrich gasket Pvt. Ltd. India

    3 IGP Engineers Limited India

    4 Madras Industrial Products India

    5 Packings & Jointings Pvt. Ltd India

    6. Perfect marketing (P) Ltd, India

    7. Prashant Engg Stores India

    8 Spiraseal gaskets pvt. Ltd. India

    9. Starflex sealing india pvt. Ltd. India

    10. Uniklinger Gaskets, Pune India

    11 Garlock Sealing systems Ltd., Pune India

    12 TEADIT gaskets, Mumbai India

    13 THE BENGAL MILL STORES SUPPLY CO.(TRADER) India

    14 UNIQUE INDUSTRIAL PACKINGS PVT.LTD. (Upto 42"(600#) & Upto 24" (2500#))

    Expansion Joints & Bellows

    1. Cori Engineers PVT. Ltd. India

    2 D.Wren & Co. India

    3 Flexatherm Expanllow Pvt. Ltd India

    4 Flexican Bellows & Hoses Pvt. Ltd India

    5 Fluidyne Engg. (I) Pvt. Ltd India

    6. Keld Ellentoft India Pvt. Ltd India7. Lonestar Industries India

    8 Metallic Bellows (India) Pvt. Ltd India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    44/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 12 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    9. Prashant Engg Stores India

    10. Standard Precision Bellows India

    11 Tuboflex Germany

    12 FLEXIDER S.P.A. Italy

    13 Ke-Burgmann India Pvt. Ltd., India

    STRAINERS (PERMANENT INCLUDING Y-TYPE)

    1 FLAIR STRAINERS & FILTERS (Size upto 42" (Rating upto 1500#)) India

    2 GRAND PRIX ENGINEERING PVT. LTD. (upto 60" pipeline, upto ANSI 1500#) India

    3 GREAVES LIMITED India

    4 GUJARAT OTOFILT India

    5 KWIKFLO FILTERS PVT. LTD. India

    6. LEADER VALVES LIMITED (upto 300# & upto 12"size) India

    7. MOD FABRICATORS India

    8 MULTITEX FILTERATION ENGINEERS LTD India9. ZOLOTO INDUSTRIES (15mm to 100mm) India

    10. BOTELI VALVE GROUP CO. LTD. (Y - Type only: 14" (150#) & 3" (300# & 600#)) China

    STEAM TRAPS

    1 Spirax Marshall Ltd., Pune

    2 YARWAY CORPORATION India

    3 GESTRA AG Germany

    4 ARMSTRONG INTERNATIONAL INC. U.S.A

    5 OGONTZ CORPORATION U.S.A

    6 TYCO INTERNATIONAL INC.,U.S.A. U.S.A

    7 TLV Co. Ltd., Japan, Japan

    SPRING SUPPORTS

    1. MYRICS PIPING SYSTEM PVT.LTD. India

    2 PIPE SUPPORTS INDIA PVT. LTD. India

    3 PIPING & ENERGY PRODUCTS (P) LTD. India

    4 SARATHI ENGG. ENTERPRISES PVT. LTD. India

    5 SPRING SUPPORTS MFG. CO. India

    6. FLEXIDER S.P.A. Italy

    FASTENERS

    1 AEP COMPANY India

    2CAPITAL INDUSTRIES

    India

    3 CONSOLE ENGG. & FASTNERS INDUSTRIES India

    4 EBY FASTNERS India

    5 FIT TIGHT NUTS & BOLTS LTD. India

    6 FIX FIT FASTENERS MFG. PVT. LTD. India

    7 INDUSTRIAL ENGINEERING CORPORATION (Size upto 4" (M100)) India

    8 MEGA ENGINEERING PRIVATE LIMITED (" to 3" Material: CS/AS/SS) India

    9 METRO MECHANICAL PVT.LTD. India

    10 NAGBHUSHANAM INDUSTRIES India

    11 NIREKA ENGG. CO. PVT. LTD. India

    12 PACIFIC FORGING & FASTENERS PVT. LTD. (M 10 to M125) India

    13 PERFECT MARKETING (P) LTD, India14

    PIONEER NUTS & BOLTS PVT. LTD.India

    15 PRECISION AUTO ENGINEERS India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    45/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 13 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    16 PRECISION ENGINEERING INDUSTRIES India

    17 PTD FASTNERS PVT. LTD. India

    18 SANGHVI METALS (TRADER) India

    19 SUNDARAM FASTENERS LIMITED India

    20 UDHERA FASTENERS India

    4.0 ELECTRICAL

    Induction Motors LV (415 V) (Safe Area)

    1 Ansaldo Robicon Italy

    2 Siemens AG Germany

    3 BHEL (Electrical Machines Divn.) India

    4 Asea Brown Boveri Ltd. India

    5 Siemens Ltd. India

    6 Toshiba Corporation Japan7 Fuji Electric Systems Co. Ltd. Japan

    8 Crompton Greaves Ltd. India

    9 Kirloskar Electric Company Ltd. India

    10 Bharat Bijlee Ltd. India

    Induction Motors LV (415 V) (For Hazardous Area)

    1. Asea Brown Boveri Ltd. India/Sweden

    2. Crompton Greaves Ltd. India

    3. Bharat Bijlee Ltd. India

    4. Siemens AG Germany

    5. Kirloskar Electric Company Ltd. India6. Mitsubishi Corporation Japan

    7. Toshiba Corporation Japan

    8. General Electric Co. USA

    9. Fuji Electric Systems Co. Ltd. Japan

    LT (1.1 KV) Power Cables

    1 Cable Corporation of India Ltd. India

    2 Ravin Cables Limited India

    3 RPG Cables Limited India

    4 Finolex Cables Ltd. India

    5 KEI Industries Ltd. India

    6 Torrent Cables Limited India

    7 Industrial Cables (I) Limited India

    8 NICCO Corporation Limited India

    9 Universal Cables Ltd. India

    10 KEC International ltd.(Formerly RPG Cables Limited) India

    11 Gemscab industries Limited India

    12 Special Cable Pvt. Limited India

    13 Friends Cables Industries India

    14 Polycab Wires Pvt. Limited India

    LT (1.1 KV) Control Cables

    1 Cable Corporation of India Ltd. India2 RPG Cables Limited India

    3 Finolex Cables Ltd. India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    46/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 14 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    4 KEI Industries Ltd. India

    5 Cords Cable Industries Ltd. India

    6 NICCO Corporation Limited India

    7 Universal Cables Ltd. India

    8 KEC International ltd.(Formerly RPG Cables Limited) India

    9 Gemscab industries Limited India

    10 Special Cable Pvt. Limited India

    11 Friends Cables Industries India

    12 Polycab Wires Pvt. Limited India

    Switchboards LV (415 V) (MCC/PCC/PMCC)

    1. Larsen & Toubro Ltd. India

    2. GE Power Controls India Pvt. Ltd. India

    3. Siemens Ltd. India

    Control & Relay Panel

    1. AREVA India

    2. Asea Brown Boveri Ltd. India

    3. Controls & Switchgear Co. Ltd. India

    4. Elecmech Corporation India

    5. Larsen & Toubro Ltd. (El. Products Divn) India

    6. Siemens Ltd. India

    7. Lotus Powergear Pvt. Ltd. India

    Flameproof Local Control Station, Junction Box, Lighting Fitting, Plug, Socket, Hand Lamp,

    Accessories L ight ing, Dist ribu tion Board & Contro l Panel

    1. FCG Flameproof Control Gears Pvt. Ltd. India

    2. Baliga Lighting Equipments Ltd. India

    3. Sudhir Switchgears Pvt. Ltd. India

    4. Flameproof Equipments Pvt. Ltd. India

    5. Flexpro Electricals Pvt. Ltd. India

    6. R. Stahl India/Germany

    7. Siemens A.G. Germany

    8. Legrand S.A. France

    9. FCG Power Industries Pvt. Ltd. India

    10. SCG Ex D Tech Pvt. Ltd. IndiaCable Trays

    1 Globe Electrical Industries India India

    2 Metalite Industries India India

    3 Stealite Engineering Co. India India

    4 Indiana Cable trays corporation India India

    5 Sadhana Engineering Corporation India India

    6 ATP Engineering Works India

    7. MEK Engineer & construction India

    8 Slotco steel products Pvt. Ltd. India

    Earthing & Lightning Protection Material (Al/GI) Wire/Strip

    1 .Anand Electric Trading Co. India

    2 Bharti Exports India India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    47/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 15 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    3 Controls & Switchgear Co. Ltd. India

    4 Jayant Metal Mfg. Co. India

    5

    Metalite Industries India

    India6 Premier Power Products (Calcutta) Pvt. Ltd. India

    7 Control & switchgear Ltd. India

    8 Jamna Metal Co. India India

    Protective Relays (other than BMR)

    1 AREVA (HV & MV switchboard) India

    2 ABB Limited India

    5.0 INSTRUMENTATION

    Gas Analysers (IR, Thermal Conductivi ty, Paramagnetic)

    1 ChemtrolsEnginnering Limited (Maihak Make) India

    2 Emerson Process Management (I) Pvt. Ltd India3 Siemens AG Germany

    4 Emerson Process Management Singapore Ltd Singapore

    5 M.S.A International U.S.ApH, conductivi ty & ORP Analyser

    1 Emerson Process Management (I) Pvt. Ltd India

    2 Forbes PolymetronPvt. Ltd India

    3 Zellweger SA France

    4 Yokogawa Electric Corporation Japan

    5 Emerson Process Management Singapore Ltd Singapore

    6 Foxbaro Far East Pte Ltd Singapore

    7 Hach company U.S.A

    Trace Analyser/ Ion Selective1 Forbes PolymetronPvt. Ltd India

    2 Zellweger SA France

    3 Bran &Luebbe Ltd U.K

    4 Hach company U.S.ASOX/ NOXAnalyser

    1 Emerson Process Management (I) Pvt. Ltd India

    2 Sick AG Germany

    3 Siemens AG Germany

    4 Horiba Ltd. Japan

    5 Yokogawa Electric Corporation Japan

    6 Emerson Process Management Singapore Ltd Singapore

    7 Lear Siegler Meas. Controls Corp. U.S.A

    8 M.S.A International U.S.A9 Thermo Environment Instruments Inc U.S.A

    Mass Spectrometer

    1 VG Gas Analysis Systems U.K

    2 Orbital Science Corporation U.S.A

    3 Thermofisher U.K / India

    Gas Chromatograph

    1 Applied Automation Inc Singapore

    2 Foxbaro Far East Pte Ltd SingaporeFlue Gas Analyser (ZrO2type)

    1 Emerson Process Management (I) Pvt. Ltd India

    2 AmetekInc U.S.A

    3 GE Panametrics IrelandH2S/ Total Sulphur Analysers

    1 Barton Instrument Systems Limited U.K

    2 Thermofisher U.K/ India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    48/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 16 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    3 Teledyne India

    System House Analysers

    1 ChemtrolsEnginnering Limited India

    2 Emerson Process Management (I) Pvt. Ltd India3 Intech Italy

    Density Analysers

    1 Emerson Process Management (I) Pvt. Ltd (coriolis type) India

    2 Bopp & Reuther MesstechnikGmbh (coriolis type) Germany

    3 SolartronMobrey U.K

    4 Chemtrolls for Sarasota (thermo electron corporation) India

    5 Sarasota (thermo electron corporation) USA

    Moisture Analysers

    1 GE Panametrics Italy

    2 AmetekInc U.S.AGas & Fire Detection System

    1 Andrew Yule & Company Ltd. (Fire) India

    2 Honeywell Automation India Limited (Gas) India

    3 J B Boda And Brothers Pvt. Ltd. (Gas Make-International Sensor Technology) India

    4 Pollution Protection System Mumbai Pvt Ltd (Gas) India

    5 Teledyne Fluid Systems (Gas) Thailand

    6 General Monitors (Gas) U.KFlow Element: Orifice/ Venturi/ Flow Nozzle

    1 Baliga Lighting Equipments Limited (Only Orifice) India

    2 General Instruments Consortium (Only Orifice) India

    3 Instrumentation Ltd, Palakkad India

    4 Micro Precision Products Private Ltd. India

    5 Eureca Industrial Eqipments Pvt Ltd. India

    6 Bopp & Reuther MesstechnikGmbh Germany

    7 Technomatic Spa Italy8 ISA Controls Limited U.K

    9 Daniel Measurement & Control U.S.APitot Tube/ Annubar

    1 Control Engineers India

    2 Emerson Process Management (I) Pvt. Ltd. India

    3 Micro Precision Products Private Ltd. India

    4 Technomatic Spa Italy

    5 ISA Controls Limited U.K

    6 Daniel Measurement & Control U.S.ARotameters

    1 Instrumentation Engineers Pvt. Ltd. India

    2 Krohne Marshall Pvt. Ltd. India3 Placka Instruments & Controls Pvt. Ltd. (Purge Rotameter Only) India

    4 Rota Instrumentation India

    5 Eureca Industrial Eqipments Pvt Ltd. India

    6 Krohne Germany

    7 Rota Yokogawa Gmbh& Co. Kg Germany

    8 Tokyo Keiso Co. Ltd. Japan

    9 Yamatake Corporation Japan

    10 Emerson Process Mgt U.S.AMass Flow Meter (Coriol is Type)

    1 Emerson Process Management (I) Pvt. Ltd. India

    2 Bopp & Reuther MesstechnikGmbh Germany

    3 Endress + Hauser Gmbh& Co. Germany

    4 Krohne Germany5 Schlumberger Resource Management Ltd. U.S.A

    6 Yokogawa Electric Corporation, Japan (M/s Yokogawa India Limited) India

    7 FmcSanmar Ltd. India

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    49/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 17 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    8 Bopp & Reuther MesstechnikGmbh Germany

    9 Instromet International N.V Holland

    10 Itochu Corporation (Rep.KubotaCorpn.) Japan

    11 Yamatake Corporation Japan12 Oval Asea Pacific Pte Ltd Singapore

    13 Barton Instrument Systems Limited U.K

    14 Emerson Process Mgt U.K

    15 Emerson Process Mgt U.S.A

    16 Rockwell International Corpn. U.S.AVortex meter

    1 Krohne Marshall Pvt. Ltd. India

    2 Yokogawa Limited India

    3 Bopp & Reuther MesstechnikGmbh Germany

    4 Endress + Hauser Gmbh& Co., Germany

    5 Krohne Germany

    6 Itochu Corporation (Rep.KubotaCorpn.) Japan

    7 Schlumberger Resource Management Ltd. U.S.APD Meter

    1 Rockwin Flow Meters (I) Pvt. Ltd. India

    2 Bopp & Reuther MesstechnikGmbh Germany

    3 Oval Asea Pacific Pte Ltd Singapore

    4 Emerson Process Mgt U.S.A

    5 Schlumberger Resource Management Ltd. U.S.A

    Magnetic Flow meter

    1 Emerson Process Management (I) Pvt. Ltd. India

    2 Krohne Marshall Pvt. Ltd. India

    3 Bopp & Reuther MesstechnikGmbh Germany

    4 Krohne Germany

    5 Yamatake Corporation Japan6 Yokogawa Electric Corporation, Japan (M/s Yokogawa India Limited) India

    Pressure Gauges

    1 A N Instruments Pvt. Ltd. India

    2 General Instruments Consortium, India

    3 H.Guru Industries India

    4 Manometer (India) Pvt. Ltd India

    5 PeejeeEngg. Works India

    6 Precision Industries Ltd. (standard normal type) India

    7 Premium Inst. & Controls Ltd. India

    8 Waaree Instruments Ltd. India

    9 Walchandnagar Industries Ltd. India

    10 Ashcroft India(P) Ltd. (standard normal type) India11 Dresser Europe S.A Germany

    12 WikaAlexenderWiegardGmbh& Co. Germany

    13 Spriano Spa Italy

    14 Nagano Keiki Seisakusho Japan

    15 Rueger SA Switzerland

    16 Budenberg Gauge Co. Ltd U.KVol. Seal Pr. Gauges

    1 A N Instruments Pvt. Ltd. (=

  • 8/13/2019 20130826154746_2 of 25 - NIT for PGR at NFL Vijaipur - Tech NIT

    50/72

    INSTALLATION OF PURGE GAS RECOVERY

    UNIT PACKAGE IN AMMONIA-II

    AT NFL, VIJAIPUR

    PC65/E-1/ P-II/11.00

    DOCUMENT NO REV

    Page 18 of 26

    FORM NO: 02-0000-0021 F2REV2 All rights reserved

    2 Barton Instrument Systems Limited U.K

    3 Delta Controls Ltd. U.K

    Pressure & D/P Transmitters

    1 Emerson Process Management (I) Pvt. Ltd. India2 Honeywell Automation India Limited India

    3 Yokogawa Limited India

    4 Siemens Ag, Germany Germany

    5 Yamatake Corporation Japan

    6 Yokogawa Electric Corporation Japan

    7 Emerson Process Mgt Singapore Ltd Singapore

    8 SmarSingaporePte. Ltd. Singapore

    9 Honeywell Inc. U.S.A

    10 Moore Products Company U.S.A

    11 M/s Fuji Electric Co JapanTemperature Transmitters

    1 Emerson Process Management (I) Pvt. Ltd. India

    2 Honeywell Automation India Limited India

    3 Yokogawa Limited India

    4 Siemens Ag, Germany Germany

    5 F